Railway tunnel construction shot hole accurate positioning system and device

Through the integration of manual assistance and intelligent navigation technology, drilling parameters and processes are optimized, drilling paths and anti-slip drilling control are corrected, and the over-excavation problem caused by rock drilling trolleys during railway tunnel construction is solved, and accurate positioning and efficient construction are achieved.

CN119041891APending Publication Date: 2024-11-29CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410701953.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In railway tunnel construction, the rock drilling trolley structure makes it easy to cause large over-excavation during the drilling process, which increases costs and reduces construction quality.

Method used

Using a combination of manual auxiliary units and intelligent navigation units, the drilling parameter optimization unit, process adjustment unit, drilling precision control unit and anti-slip drilling control unit, combined with tooling precision positioning unit, the precision positioning unit of rock drilling trolley is realized. Calibrate, reduce over-excavation and improve construction efficiency.

Benefits of technology

It significantly improves drilling accuracy and construction efficiency, reduces the bend deformation and over-excavation of drill rods, ensures the flatness of the palm surface, improves construction safety and positioning accuracy, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041891A_ABST
    Figure CN119041891A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of railway tunnel construction, in particular to a railway tunnel construction shot hole accurate positioning system and device.The railway tunnel construction shot hole accurate positioning system comprises a manual assistance unit, a drilling jumbo navigation error correcting unit and a hole opening precision improving unit; the intelligent navigation unit is combined with an artificial auxiliary system to realize accurate positioning in a three-dimensional plane; a drilling parameter optimization unit; a process adjustment unit; comprising a process planner used for adjusting the construction process, a free face enlarging device used for enlarging a free face of a tunnel face, and an external insertion angle adjuster used for effectively reducing an external insertion angle. The drilling precision control unit is used for correcting a drilling path; the device further comprises an anti-skid drill control unit and a tool precise positioning unit. By integrating a human assistance unit, an intelligent navigation unit, a drilling parameter optimization unit, a process adjustment unit, a drilling precision control unit, an anti-skid drilling control unit and a tool precision positioning unit, the drilling precision is remarkably improved, and the construction efficiency is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of railway tunnel construction, and in particular to a railway tunnel construction blasthole precise positioning system and device. Background Art

[0002] In railway tunnel construction, the use of drilling rigs has greatly improved the construction speed and the ability to overcome complex geological conditions. However, due to the characteristics of the drilling rig structure itself, large over-excavation is prone to occur during the drilling process, resulting in increased costs and reduced construction quality. Summary of the invention

[0003] In view of the problem in the above or prior art that due to the characteristics of the rock drilling rig structure itself, large over-excavation is easily generated during the drilling process, resulting in increased costs and reduced construction quality, the present invention is proposed.

[0004] Therefore, the object of the present invention is to provide a system and device for accurately positioning blastholes in railway tunnel construction.

[0005] To solve the above technical problems, the present invention provides the following technical solutions: including, a manual assistance unit, used to correct the navigation error of the drilling rig and improve the hole opening accuracy; an intelligent navigation unit, combined with the manual assistance system, to achieve precise positioning in a three-dimensional plane; a drilling parameter optimization unit; a process adjustment unit; including a process planner, used to adjust the construction process, an open face enlarger, used to increase the open face of the face, and an external insertion angle adjuster, used to effectively reduce the external insertion angle; a drilling precision control unit, used to correct the drilling path; and an anti-slip drill control unit and a tooling precision positioning unit.

[0006] As a preferred solution of the railway tunnel construction blasthole precise positioning system of the present invention, the drilling parameter optimization unit includes a drilling path corrector for correcting the drilling path, a pressure water canceller for canceling the influence of pressure water, and a joint and fissure influence eliminator for eliminating the influence of joints and fissures on drilling; the drilling parameter optimization unit can be used to adjust the rotation pressure, thrust pressure, and impact pressure according to the surrounding rock strength and drill rod type to control the drilling speed and reduce the bending deformation of the drill rod.

[0007] As a preferred solution of the railway tunnel construction blasthole precise positioning system of the present invention, the process adjustment unit is used to adjust the traditional construction process, increase the free surface of the heading face, effectively reduce the external insertion angle, and reduce the over-excavation amount.

[0008] As a preferred solution of the railway tunnel construction blasthole precise positioning system of the present invention, the drilling precision control unit can be used to correct the drilling path and offset the influence of pressure water and joints and fissures.

[0009] As a preferred solution of the precise positioning system for blastholes in railway tunnel construction of the present invention, the anti-slip drill control unit includes a bottom leveling function module for ensuring that the face is on a plane; a drilling position trimmer for trimming the drilling position to prevent the drill from slipping; the anti-slip drill control unit can prevent the drill from slipping due to an uneven face through the bottom leveling function and drilling position trimming function of the equipment system.

[0010] As an optimal solution of the railway tunnel construction blasthole precise positioning system and device of the present invention, wherein: the tooling precise positioning unit includes a locking foot anchor locator for precisely positioning the locking foot anchor; a pipe shed locator for precisely positioning the pipe shed; a system anchor locator for precisely positioning the system anchor. The tooling precise positioning unit is used to precisely position the locking foot anchor, pipe shed and system anchor using relevant tooling in combination with on-site operation requirements.

[0011] As a preferred solution of the railway tunnel construction blasthole precise positioning system and device of the present invention, it also includes: a construction method for the above-mentioned system, which includes: using a manual assistance system and an intelligent navigation system to accurately position the rock drilling trolley; adjusting the drilling parameters through a drilling parameter optimization unit; adjusting the construction process through a process adjustment unit; correcting the drilling path through a drilling precision control system; preventing the drill from slipping through an anti-slip drill control unit; and using relevant tooling precision positioning units to accurately position locking foot anchors, pipe racks, and system anchors.

[0012] As a preferred solution of the device for accurately positioning blastholes in railway tunnel construction of the present invention, it includes: the above-mentioned system for accurately positioning blastholes in railway tunnel construction, and a drilling trolley equipped with an interface for receiving signals from a manual assistance unit and an intelligent navigation unit; a control system connected to the drilling trolley, for receiving and processing signals from each unit, and controlling the drilling trolley to perform corresponding operations.

[0013] As a preferred solution of the railway tunnel construction blasthole precise positioning system device of the present invention, it also includes: a sensor array connected to the control system for monitoring the position and direction of the drilling trolley and various parameters during the drilling process.

[0014] As a preferred solution of the railway tunnel construction blasthole precise positioning system and device of the present invention, it also includes: an actuator connected to the control system, which is used to perform specific physical operations according to the instructions of the control system, such as adjusting pressure, propulsion, rotation, etc.

[0015] The beneficial effects of the railway tunnel construction blasthole precise positioning system and device of the present invention are as follows: by integrating the manual assistance unit, the intelligent navigation unit, the drilling parameter optimization unit, the process adjustment unit, the drilling precision control unit, the anti-slip drill control unit and the tooling precise positioning unit, the drilling accuracy is significantly improved and the construction efficiency is optimized; the system can automatically adjust the rotation pressure, the thrust pressure and the impact pressure, control the drilling speed according to the surrounding rock strength and the drill rod type, reduce the bending deformation of the drill rod, and reduce the over-excavation through process adjustment. The correction function of the drilling path effectively offsets the influence of pressure water and joints and fissures, while the anti-slip drill control unit ensures the flatness of the face, prevents the problem of slipping drill, and improves the construction safety; in addition, the tooling precise positioning unit further improves the positioning accuracy of the locking foot anchor rod, the pipe shed, and the system anchor rod; the application of the comprehensive construction method integrates the functions of each unit to form a complete set of construction processes, reduce construction costs, improve construction efficiency and environmental adaptability, and promote the progress of tunnel construction technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0017] Figure 1 A schematic diagram comparing manual drilling and mechanical drilling for the precise blasthole positioning system and device for railway tunnel construction.

[0018] Figure 2 This is a schematic diagram of the relationship between the 20cm drill rod deflection and drilling speed change for the blasthole precision positioning system and device for railway tunnel construction.

[0019] Figure 3 This is a schematic diagram of the relationship between the change in drill rod deflection and drilling speed during normal advancement of the blasthole precision positioning system and device for railway tunnel construction.

[0020] Figure 4 Schematic diagram of the correspondence between the navigation map of the drilling trolley and the actual contour line of the precise blasthole positioning system and device for railway tunnel construction.

[0021] Figure 5 Schematic diagram of the navigation diagram of the drilling rig for the precise blasthole positioning system and equipment for railway tunnel construction. DETAILED DESCRIPTION

[0022] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0023] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0024] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0025] Example 1, reference Figures 1 to 3 , which is the first embodiment of the present invention, and this embodiment provides a railway tunnel construction blasthole precise positioning system and device, including, a manual assistance unit, used to correct the navigation error of the rock drilling trolley and improve the hole opening accuracy; an intelligent navigation unit, combined with the manual assistance system, to achieve precise positioning in a three-dimensional plane; a drilling parameter optimization unit; a process adjustment unit; including a process planner, used to adjust the construction process, an empty face increaser, used to increase the empty face of the heading face, and an external insertion angle adjuster, used to effectively reduce the external insertion angle; a drilling precision control unit, used to correct the drilling path; and an anti-slip drill control unit and a tooling precision positioning unit.

[0026] Furthermore, the drilling parameter optimization unit includes a drilling path corrector for correcting the drilling path, a pressure water compensator for offsetting the influence of pressure water, and a joint and fissure influence eliminator for eliminating the influence of joints and fissures on drilling; the drilling parameter optimization unit can be used to adjust the rotation pressure, thrust pressure, and impact pressure according to the surrounding rock strength and drill pipe type to control the drilling speed and reduce the bending deformation of the drill pipe.

[0027] Specifically, the tooling precise positioning unit includes a locking foot anchor locator, which is used to accurately locate the locking foot anchor; a pipe roof locator, which is used to accurately locate the pipe roof; a system anchor locator, which is used to accurately locate the system anchor; the tooling precise positioning unit is used to accurately locate the locking foot anchor, pipe roof, and system anchor in combination with on-site operation requirements using relevant tooling.

[0028] It should be noted that the process adjustment unit is used to adjust the traditional construction process, increase the free surface of the heading face, effectively reduce the external insertion angle, and reduce the over-excavation amount.

[0029] Furthermore, the drilling precision control unit can be used to correct the drilling path and offset the influence of pressurized water and joints and fissures. The anti-slip drill control unit includes a bottom leveling function module for ensuring that the face is on a plane; a drilling position trimmer for trimming the drilling position to prevent slipping drill; the anti-slip drill control unit can prevent slipping drill caused by uneven face through the bottom leveling function and drilling position trimming function of the equipment system. The reason for setting it here is that through summarizing a large number of drilling processes, the reasons for the poor drilling accuracy include navigation errors of the drilling rig, initial support thickness affecting the propulsion beam to reach the designed position, joints and fissures causing drill rod deviation, excessive propulsion rate causing drill rod pressure change, and uneven face causing the drill to slip at the start-up position.

[0030] When in use, the system is first started. The operator starts the control system on the drilling rig, activates the manual assistance unit and the intelligent navigation unit, and then designs the data input. The operator enters the tunnel design parameters into the manual assistance unit, including the tunnel contour, blasthole position and angle, etc. The second is to perform initial positioning. The design data is received through the intelligent navigation unit, and the initial positioning deviation is calculated in combination with the current position of the drilling rig, and then navigation correction is performed. During the positioning of the drilling rig, the face is designed according to the surrounding eye spacing mark contour, so as to correct the navigation deviation and improve the hole opening accuracy; the second is to mark the external insertion angle control point at the initial support position, which is generally marked at the side wall position. By adjusting the three holes of the single arm, the law of the deviation of this cycle is found, and the external insertion angle deviation is effectively controlled. According to the calculation results, the intelligent navigation unit automatically adjusts the position of the drilling rig, and fine-tunes it manually after preliminary positioning correction. The operator fine-tunes it according to the feedback of the navigation unit to ensure that the drilling rig is accurately aligned with the predetermined blasthole position. During the drilling process, the external insertion angle is within 15 cm, and the design drawing cannot fully display the drilling direction on the display, so it is difficult for the operator to control the external angle. When drawing the drilling and blasting design drawing for importing into the rock drilling rig, if the external insertion angle is within 15cm, add 15cm when drawing it, and manually input the external insertion angle during operation to improve the reference value of drilling and give full play to the role of the intelligent navigation system of the rock drilling rig.

[0031] In summary, in this embodiment, the railway tunnel construction blasthole precision positioning system realizes highly automated and intelligent construction operations by integrating multiple functional units. The manual assistance unit and the intelligent navigation unit work together to ensure that the drilling trolley is accurately positioned according to the design contour. The drilling parameter optimization unit automatically adjusts the rotation pressure, thrust pressure and impact pressure to adapt to different geological conditions and control the drilling speed to reduce the bending deformation of the drill rod. The process adjustment unit reduces over-excavation and improves construction efficiency by optimizing the construction process. The drilling precision control unit and the anti-slip drill control unit work together to ensure the accuracy of the drilling path and the safety of construction. The tooling precision positioning unit uses the locking foot anchor locator, pipe roof locator and system anchor locator to achieve precise positioning.

[0032] Example 2, reference Figures 1 to 3 , which is the second embodiment of the present invention. Different from the previous embodiment, it includes a construction method for the above-mentioned system, which includes: using a manual assistance system and an intelligent navigation system to accurately position the rock drilling trolley; adjusting the drilling parameters through a drilling parameter optimization unit; adjusting the construction process through a process adjustment unit; correcting the drilling path through a drilling precision control system; preventing sliding drill through an anti-slip drill control unit; and accurately positioning the locking foot anchor rod, pipe rack, and system anchor rod using a related tooling precision positioning unit. To solve the problem of sliding drill, first, make full use of the bottom leveling function of the equipment system, and ensure that the face can be on the same plane through adjustment during blasting, especially the peripheral eyes. Second, during the drilling process, fully trim the drilling position, and if there is a wedge-shaped protrusion, the drill rod is leveled at a low speed by observation so that it can have a stable entry platform.

[0033] The rest of the structure is the same as that of Example 1.

[0034] When in use, the parameters are set first. Before drilling, the drilling parameter optimization unit sets the initial drilling parameters according to the geological exploration report, including rotation speed, thrust force, etc., and then the drilling is started. The operator issues a drilling command, and the control system activates the drilling machine to start the drilling operation. At the same time, real-time monitoring and adjustment are carried out. The sensor array monitors the drilling status in real time, such as the force on the drill rod, the drilling depth and the reaction of the surrounding rock. The drilling parameter optimization unit dynamically adjusts the drilling parameters according to the monitoring data, and performs drilling path correction at the same time. The drilling precision control unit automatically corrects the drilling path according to the sensor feedback to ensure the drilling accuracy. Finally, the process adjustment is carried out. After the drilling is completed, the process adjustment unit guides the operator to carry out the next construction process, such as blasting, slag removal, etc.

[0035] The traditional tunnel construction process is: drilling → blasting → slag removal → support. When drilling holes in the peripheral holes, the size of the external insertion angle is often determined by the empty face, affected by the thickness of the initial support in the previous cycle and the structure of the advancing beam itself. However, the owner's document requires that the distance between the heading and the empty face is not allowed to be greater than the spacing of one arch frame, resulting in high external insertion angles in the peripheral holes. The external insertion angle is often reduced by adding short holes, but at the same time the drilling workload is increased, the polishing effect is not good, and there is an obvious misalignment. The construction process is adjusted to: drilling → blasting → slag discharge → drilling → support, which increases the free surface of the face and can effectively reduce the external insertion angle. The over-excavation caused by the external insertion angle of the previous cycle perfectly accommodates the top plate of the drilling rig. The theoretical maximum over-excavation at the bottom of the hole is the initial support thickness, and the average over-excavation can be basically controlled within 10cm. Among them, in order to ensure the normal advancement of the drilling, it is necessary to open a hole at a low speed of 20cm to provide the drilling direction and then accelerate the advancement. The rotation pressure, impact pressure, and propulsion pressure jointly determine the drilling speed. Taking the surrounding rock strength of 100mpa as an example, the drilling speed is best controlled at 10cm / min~15cm / min under the premise of ensuring the optimal drilling time. Figure 2 The relationship between the drill rod deflection and the drilling speed when the surrounding rock strength is 100 MPa, the drill rod type is Baochangnian alloy steel (5.525 m long), and the hole opening is 20 cm. Under the same conditions, the normal advancement rate is 1.5 m / min to 2 m / min, which is the best. Figure 3 Normal advancement is the relationship between the change of drill pipe deflection and drilling speed. The development of joints and fissures on the face seriously affects the accuracy of the hole body, which is often manifested as a curved hole, especially in the water-rich surrounding rock. The excessive pressure water in the hole overlaps with the pressure water in the drill pipe, resulting in excessive negative pressure, which affects the penetration rate, thereby affecting the drilling path, causing the borehole to deviate. The drilling path is corrected using the drilling precision control system of the drilling rig. The drilling situation is judged by the drilling rate, water discharge in the hole, and water pressure displayed on the instrument panel. Specifically, the drilling rate decreases, the water discharge in the hole increases, and the water pressure increases. The advancement speed and advancement pressure are gradually adjusted to the normal drilling rate through manual control to offset the influence of pressure water and joints and fissures. The dual guarantee of intelligent adjustment + manual control is formed to improve the drilling accuracy.

[0036] In summary, this embodiment focuses on the application of the railway tunnel construction blasthole precision positioning system in actual construction and the effects it brings. The construction method includes using manual assistance and intelligent navigation to accurately position the rock drilling trolley, adjusting the drilling parameters through the drilling parameter optimization unit, optimizing the construction process through the process adjustment unit, correcting the drilling path through the drilling precision control system, preventing the slipping drill control unit from preventing the drill from slipping, and accurately positioning the tooling precision positioning unit to accurately position the locking foot anchor rod, pipe shed, and system anchor rod. These steps work together to achieve a significant improvement in drilling accuracy, reduce the problem of over-excavation during construction, and improve construction efficiency and safety.

[0037] Example 3, reference Figures 1 to 3 , which is the third embodiment of the present invention, is different from the previous embodiment in that it includes the above-mentioned railway tunnel construction blasthole precise positioning system, and a drilling rig equipped with an interface for receiving signals from a manual assistance unit and an intelligent navigation unit; a control system connected to the drilling rig, for receiving and processing signals from each unit, and controlling the drilling rig to perform corresponding operations.

[0038] Specifically, it also includes a sensor array connected to the control system for monitoring the position and direction of the drilling rig and various parameters during the drilling process.

[0039] Furthermore, it also includes an actuator connected to the control system, which is used to perform specific physical operations according to the instructions of the control system, such as adjusting pressure, propulsion, rotation, etc.

[0040] The rest of the structure is the same as that of Example 2.

[0041] When in use, first carry out an equipment inspection. Before construction, the operator checks the status of equipment such as the drilling rig, control system, sensor array and actuator to ensure that the control system integrates all units, ensures smooth data transmission, and that each unit works together to monitor the construction. During the construction process, the operator can monitor the entire construction process through the control system, including drilling, support and tooling positioning, and on this basis ensure safety control. The anti-slip drill control unit monitors the state of the face in real time to prevent slipping drills to ensure construction safety and achieve precise positioning. The tooling precise positioning unit can accurately position the locking foot anchor rods, pipe sheds and system anchor rods when necessary to improve construction quality and finally record and analyze data. During the construction process, the control system records all operation data and sensor data for subsequent analysis and optimization of construction plans.

[0042] In summary, in this embodiment, the precise positioning device for blastholes in railway tunnel construction consists of a drilling trolley, a control system, a sensor array, and an actuator. The drilling trolley is equipped with an interface for receiving signals from a manual auxiliary unit and an intelligent navigation unit. The control system is connected to the drilling trolley, responsible for receiving and processing signals from each unit, and controlling the drilling trolley to perform corresponding operations. The sensor array monitors the position, direction, and various parameters of the drilling trolley during the drilling process. The actuator performs specific physical operations according to the instructions of the control system, such as adjusting pressure, propulsion, rotation, etc. The integration and operation of this device demonstrates the automation and intelligence level of precise positioning of blastholes in railway tunnel construction.

[0043] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values ​​(e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to several modifications still falling within the scope of the appended claims.

[0044] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.

[0045] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.

[0046] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A railway tunnel construction blasthole precise positioning system, characterized by: include, Manual assistance unit, used to correct drilling rig navigation errors and improve drilling accuracy; Intelligent navigation unit, combined with the manual assistance system, to achieve precise positioning in the three-dimensional plane; Drilling parameter optimization unit; Process adjustment unit; including a process planner for adjusting the construction process, an open face enlarger for increasing the open face of the tunnel face, and an external insertion angle adjuster for effectively reducing the external insertion angle; A drilling precision control unit for correcting the drilling path; and, Anti-slip drill control unit and tooling precision positioning unit.

2. The railway tunnel construction blasthole precise positioning system according to claim 1, characterized in that: The drilling parameter optimization unit includes a drilling path corrector for correcting the drilling path, a pressure water offsetter for offsetting the influence of pressure water, and a joint and fissure influence eliminator for eliminating the influence of joints and fissures on the drilling; The drilling parameter optimization unit can be used to adjust the rotation pressure, thrust pressure, and impact pressure according to the surrounding rock strength and drill pipe type to control the drilling speed and reduce the bending deformation of the drill pipe.

3. The railway tunnel construction blasthole precise positioning system according to claim 1 or 2, characterized in that: The process adjustment unit is used to adjust the traditional construction process, increase the free surface of the tunnel face, effectively reduce the external insertion angle, and reduce the over-excavation amount.

4. The railway tunnel construction blasthole precise positioning system as claimed in claim 3, characterized in that: The drilling precision control unit can be used to correct the drilling path and offset the influence of pressure water and joints and fissures.

5. The railway tunnel construction blasthole precise positioning system as claimed in claim 4, characterized in that: The anti-slip drill control unit includes a bottom leveling function module for ensuring that the face of the tunnel is on a plane; a drilling position trimmer for trimming the drilling position to prevent the drill from slipping; The anti-slip drill control unit can prevent the slipping drill problem caused by uneven face of the tunnel through the bottom leveling function of the equipment system and the trimming of the drilling position.

6. The railway tunnel construction blasthole precise positioning system according to claim 4 or 5, characterized in that: The tooling precise positioning unit includes a locking foot anchor rod positioner for precisely positioning the locking foot anchor rod; a pipe shed positioner for precisely positioning the pipe shed; System anchor locator, used to accurately locate system anchors; The tooling precise positioning unit is used to precisely position the locking foot anchor rods, pipe sheds, and system anchor rods using relevant tooling in combination with on-site operation requirements.

7. The railway tunnel construction blasthole precise positioning system according to claim 6, characterized in that: Also included is a construction method for the above system, comprising: Use manual assistance system and intelligent navigation system to accurately position the drilling rig; Adjust drilling parameters through drilling parameter optimization unit; Adjust the construction process through the process adjustment unit; Correct the drilling path using the drilling precision control system; Prevent drill slipping by anti-slip drill control unit; Use relevant tooling precision positioning units to accurately position locking anchors, pipe racks, and system anchors.

8. A precise positioning device for blastholes in railway tunnel construction, characterized in that: The invention comprises a railway tunnel construction blasthole precise positioning system as claimed in any one of claims 1 to 7, and A drilling rig equipped with an interface for receiving signals from a manual assistance unit and an intelligent navigation unit; The control system is connected to the drilling rig and is used to receive and process signals from each unit and control the drilling rig to perform corresponding operations.

9. The railway tunnel construction blasthole precise positioning device according to claim 8, characterized in that: Also included is a sensor array connected to the control system for monitoring the position and orientation of the drilling rig, as well as various parameters during the drilling process.

10. The railway tunnel construction blasthole precise positioning device according to claim 8 or 9, characterized in that: It also includes an actuator, which is connected to the control system and is used to perform specific physical operations according to the instructions of the control system, such as adjusting pressure, propulsion, rotation, etc.