Method for extracting terrestrial heat through solid waste cementing function filling body arrangement pipeline

By laying and pouring solid waste cementing function filling paste in the mine branch and tunnel, combined with the segmented layout of geothermal extraction pipelines, the technical problems of mine solid waste disposal and geothermal development are solved, and the effective utilization of solid waste and geothermal heat are realized. Efficient development improves work efficiency and prevents surface subsidence.

CN119042824AActive Publication Date: 2024-11-29CHINA UNIV OF MINING & TECH
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410958346.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-29
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

In the process of green coal mining and renewable geothermal energy development, effective mining solid waste disposal and mining geothermal development technical methods are lacking.

Method used

The method of laying the pipes of solid waste cementing function filler is adopted. By laying the main filling pipes and the end filling pipes in the mine branch tunnel, digging the chute along the length of the branch tunnel and installing the isolation retaining wall, pouring the solid waste cementing function filler paste, and Connect it to the geothermal extraction pipeline to form a segmented geothermal extraction system.

Benefits of technology

The green disposal of solid waste and the development of geothermal heat have been achieved, the work efficiency has been improved, the surface subsidence has been prevented, and a unified goaf filling and geothermal heat extraction system has been formed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119042824A_ABST
    Figure CN119042824A_ABST
Patent Text Reader

Abstract

The invention discloses a method for extracting terrestrial heat by arranging a pipeline for a solid waste cementing functional filling body, which comprises the following steps of: in the coal mining process of continuous mining and continuous filling, paving a terrestrial heat extraction pipeline while filling paste in a goaf branch roadway; and then the geothermal extraction pipelines in the multiple parallel branch roadways are connected through heat extraction branch pipes laid in the air return gate road and the transportation gate road, the geothermal extraction pipelines of all the branch roadways are connected with heat extraction main pipes laid in the air return gate road and the transportation gate road, and an underground heat extraction system is formed. According to the method, continuous sectional type filling and laying are adopted, the adopted filling main pipeline, the tail end filling pipeline and the terrestrial heat extraction pipeline are all sectional type, the operation of the next section of pipeline, the isolation retaining wall and the clamping groove can not be hindered during sectional grouting filling, and the operation efficiency can be greatly improved. Meanwhile, the solid waste under the mine serves as a filling body, the waste can be effectively utilized, and the filling cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine solid waste disposal and mine geothermal development, and in particular to a method for extracting geothermal energy by arranging pipelines for solid waste cemented functional filling bodies. Background Art

[0002] Driven by green coal mining and renewable geothermal energy development, the realization of mine solid waste disposal and mine geothermal development has become a general trend. Using mine solid waste filling to achieve mine geothermal development is an effective way to achieve the above goals, but there is currently a lack of relevant technical methods. Summary of the invention

[0003] In order to achieve the above-mentioned purpose, the present invention provides a method for extracting geothermal energy by arranging pipelines for solid waste-cemented functional filling bodies, which can realize green disposal of solid waste and develop geothermal energy at the same time.

[0004] The technical solution adopted by the present invention is: a method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies, comprising the following steps:

[0005] Step S1, demarcate the continuous segmented filling space of the mined branch lanes on the working face, and lay the main filling pipeline along the bottom plate of the branch lanes;

[0006] Step S2: excavating slots on the top plate of the branch tunnel and the bottom plate thereunder, excavating another set of slots along the length direction of the branch tunnel, and then installing isolation retaining walls on the two sets of slots respectively to construct the first section of filling space;

[0007] Step S3, connecting the terminal filling pipe to the main filling pipe, with the other end passing through the isolation retaining wall and extending into the first filling space, and the geothermal extraction pipe passing through the two isolation retaining walls, with both ends located outside the two isolation retaining walls;

[0008] Step S4, pouring the solid waste cementing functional filling paste into the first filling space through the main filling pipe and the terminal filling pipe;

[0009] Step S5, excavating the slot backward to construct the next section of filling space, and then installing the geothermal extraction pipeline and connecting it to the geothermal extraction pipeline in the first section of filling space;

[0010] Step S6: After the first section of the filling space is poured, the filling pump is turned off, part of the main filling pipe is disassembled, and the end filling pipe is moved so that its outlet is located in the next section of the filling space;

[0011] Step S7, repeat step S3-step S6 until the functional buried pipe filling of a single branch tunnel is completed; step S8, repeat step S1 to step S6, complete the buried pipe filling of each parallel branch tunnel, and then connect the two ends of the geothermal extraction pipe of each branch tunnel to the heat extraction branch pipe in the return air chute and the transport chute, and then connect all the heat extraction branch pipes to the heat extraction main pipe, thereby forming a buried pipe heat exchange system.

[0012] As a further improvement of the present invention, the main filling pipeline is a stainless steel pipe, which is installed in sections, and the length of each section is 3-5 meters.

[0013] As a further improvement of the present invention, the slots are respectively located in the top plate and bottom plate of the branch tunnel, four on the top and four on the bottom. The depth of a single slot is 1 / 10 of the height of the branch tunnel, the width is 1 / 10 of the width of the branch tunnel, and the thickness is 1 / 3 of the isolation retaining wall.

[0014] As a further improvement of the present invention, the isolation retaining wall is an arched structure assembled from four prefabricated modules, and through holes for installing the end filling pipe and the geothermal extraction pipe are reserved on the retaining wall.

[0015] As a further improvement of the present invention, the geothermal extraction pipeline is made of high thermal conductivity stainless steel pipe, and the length of each segment is 3-5m.

[0016] As a further improvement of the present invention, the end filling pipe is composed of a vertical section and a horizontal section, one end of the horizontal section is supported and fixed by a reserved through hole of the isolation retaining wall, and the other end is supported and fixed by a spiral telescopic support rod.

[0017] As a further improvement of the present invention, the solid waste cementing functional filling paste is composed of porous volcanic rock coarse aggregate adsorbed with paraffin, gangue coarse aggregate, gangue fine aggregate, fly ash, cement and treated mine water, and the specific proportion parameters are: slurry concentration 80%, volcanic rock coarse aggregate replacement rate 50%, sand rate 40%, bone-cement ratio 2:1, and fly ash output 0.2.

[0018] As a further improvement of the present invention, the excavation of the slots in the rear filling space, the layout of the isolation retaining wall and the installation of the rear geothermal extraction pipeline are completed simultaneously with the pouring of the solid waste bonding functional filling paste in the first filling space.

[0019] As a further improvement of the present invention, the heat extraction branch pipe and the heat extraction main pipe are both thermal insulation stainless steel pipes.

[0020] The beneficial effects of the present invention are:

[0021] (1) The present invention can unify the filling of the goaf and geothermal heat extraction in the continuous mining and filling coal mining mode, which can fully utilize the solid waste and prevent the ground subsidence, and form a geothermal heat extraction system for geothermal development;

[0022] (2) The paste filling work is carried out simultaneously with the laying of geothermal pipes, which can improve the work efficiency of the entire project;

[0023] (3) Since the buried pipe filling in each branch tunnel is completed in sections, the main filling pipeline and the terminal filling pipeline are installed in sections, and the isolation retaining wall is installed in a spliced ​​manner. Therefore, when grouting is performed in the front filling space, the subsequent opening and installation of the isolation retaining wall and the slot can be carried out simultaneously to improve the laying efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0025] Figure 1 It is a schematic diagram of the functional buried pipe filling of the segmented branch tunnel of the working face in the embodiment of the present invention;

[0026] Figure 2 This is a schematic diagram of a branch lane slot in an embodiment of the present invention;

[0027] Figure 3 It is a front view and a side view of the isolation retaining wall in the embodiment of the present invention;

[0028] Figure 4 This is a schematic diagram of fixing the support rod of the end filling pipe in an embodiment of the present invention;

[0029] Figure 5 This is a functional buried pipe filling effect diagram of the goaf area of ​​the working face in an embodiment of the present invention;

[0030] In the figure, 1 is the main filling pipeline; 2 is the card slot; 3 is the isolation retaining wall; 4 is the geothermal extraction pipeline; 5 is the terminal filling pipeline; 6 is the solid waste bonding functional filling paste; 7 is the heat extraction branch pipe; 8 is the heat extraction main pipe; 9 is the spiral telescopic support rod. DETAILED DESCRIPTION

[0031] Figure 1 For the continuous segmented pipe laying process diagram, please refer to Figure 1 The present invention provides a method for extracting geothermal heat by arranging pipelines for solid waste cementing functional filling bodies, comprising the following steps:

[0032] Step S1, first define the continuous segmented filling space of the branch tunnels that have been mined on the working face, and lay the main filling pipeline 1 along the bottom plate of the branch tunnel. The main filling pipeline 1 is laid in a continuous segmented manner, made of stainless steel pipe, with a segment length of 3 to 5m, an inner diameter of 18 to 22cm, and a wall thickness of 1 to 1.5cm.

[0033] Step S2: excavate a slot 2 on the top plate of the branch tunnel and the bottom plate below it, excavate another set of slots 2 along the length direction of the branch tunnel, and then install an isolation retaining wall 3 on the slots 2 to construct the first section of the filling space. Figure 2 As shown, the slots 2 are located in the top and bottom plates of the branch tunnels, four on each side, and are used to install and fix the isolation retaining wall 3. The depth of a single slot 2 is 1 / 10 of the height of the branch tunnel, the width is 1 / 10 of the width of the branch tunnel, and the thickness is 1 / 3 of the isolation retaining wall 3. Figure 3 The figure shows the side view and the front view of the isolation retaining wall 3. The isolation retaining wall 3 is an arched structure assembled from four prefabricated modules, and a through hole is reserved in the middle for installing the end filling pipe 5 and the geothermal extraction pipe 4. The thickness of the module is 20-25 cm, the width is 1 / 2 of the width of the branch tunnel, the full-size height is 6 / 5 of the height of the branch tunnel, and the arch height is 1 / 10 of the height of the branch tunnel; the thickness of the concave / convex matching part of the module is 1 / 2 of the thickness of the module, the width is equal to the width of the module, and the depth is 1 / 10 of the height of the branch tunnel; the size of the external fixing block of the module matches the card slot 2.

[0034] Step S3, connect the end filling pipe 5 to the main filling pipe 1, and the other end thereof passes through the isolation retaining wall 2 and extends into the first filling space, and the geothermal extraction pipe 4 passes through the two isolation retaining walls 3, and the two ends are located outside the two isolation retaining walls 3. The end filling pipe 5 is composed of a vertical section and a horizontal section, and the horizontal section is connected in sections. One end of the horizontal section is fixed by a reserved through hole of the isolation retaining wall 3, and the other end is fixed by a spiral telescopic support rod 9, as shown in FIG. Figure 4 As shown. The two ends of the spiral telescopic support rod 9 are fixed on both sides of the branch tunnel, which can fix the horizontal section of the end filling pipe 5 to prevent it from tilting to both sides. Both ends of the geothermal extraction pipe 4 are fixed by the reserved through holes of the isolation retaining wall 3. The material is a high thermal conductivity stainless steel pipe with an inner diameter of 20 to 25 cm and a wall thickness of 0.8 to 1 cm. The segment length is 3 to 5 m.

[0035] Step S4, pouring solid waste cementing functional filling paste 6 into the first filling space through the main filling pipe 1 and the terminal filling pipe 5. The solid waste cementing functional filling paste 6 is composed of porous volcanic rock coarse aggregate adsorbed with paraffin, gangue coarse aggregate, gangue fine aggregate, fly ash, cement and treated mine water. Its specific proportion parameters are: slurry concentration 80%, gangue replacement rate of volcanic rock coarse aggregate 50%, sand rate 40%, bone-cement ratio 2:1, fly ash output 0.2. Among them, the gradation of volcanic rock coarse aggregate is the same as that of gangue coarse aggregate, both of which are natural gradation and the maximum particle size is 12mm, cement is PO 42.5 ordinary Portland cement, and fly ash is secondary fly ash.

[0036] Step S5, excavate the slot 2 backward, construct the next filling space, and then install the geothermal extraction pipeline 4 and connect it with the geothermal extraction pipeline 4 in the first filling space. The excavation of the slot 2 in the rear filling space, the layout of the isolation retaining wall 3, and the installation of the rear geothermal extraction pipeline 4 are completed at the same time as the solid waste cementing functional filling paste 6 is poured into the first filling space, so the filling and pipeline installation efficiency can be greatly improved.

[0037] Step S6, after the pouring of the first section of the filling space is completed, the filling pump is turned off, part of the main filling pipe 1 is disassembled, and the terminal filling pipe 5 is moved so that its outlet is located in the next section of the filling space.

[0038] Step S7, repeating steps S3 to S6 until the functional buried pipe filling of the entire branch tunnel is completed. After completion, the branch tunnel is filled with the filling body, and the geothermal extraction pipeline 4 is buried inside. The length of the connected geothermal extraction pipeline 4 is the length of a single branch tunnel. Moreover, the geothermal extraction pipeline 4 is composed of two layers, upper and lower, and can also be arranged in a multi-layer array according to requirements.

[0039] Step S8, please refer to Figure 5 Repeat steps S1 to S6 to complete the filling of buried pipes in all parallel branch lanes, and then connect the two ends of the geothermal extraction pipe 4 of each branch lane to the heat extraction branch pipe 7 in the return air chute and the transport chute, and then connect all the heat extraction branch pipes 7 to the heat extraction main pipe 8, so as to form a buried pipe heat exchange system. The heat extraction branch pipe 7 and the heat extraction main pipe 8 are both insulated stainless steel pipes, wherein the heat extraction branch pipe 7 has an inner diameter of 30-35 cm and a wall thickness of 1-1.5 cm, and the heat extraction main pipe 8 has an inner diameter of 40-45 cm and a wall thickness of 2-3 cm.

[0040] Please refer to Figure 5 The coal mining method of the present invention is continuous mining and continuous filling mining. A piece of coal field is mined from left to right, and each mining unit is a branch tunnel. When this piece of coal field is continuously mined to the right, it leaves behind a plurality of mined branch tunnels. The local heat extraction pipeline 4 is arranged in each branch tunnel along the length direction of the branch tunnel, and its two ends are connected by the heat extraction branch pipe 7. The extraction branch pipes 7 of all branch tunnels are then connected to the heat extraction main pipe 8, and a heat extraction system is laid out. When extracting heat, water is filled into the geothermal extraction pipeline 4 to circulate and absorb the heat of the underground rock mass, and geothermal development can be completed.

[0041] The present invention has the following advantages: First, the goaf filling and the pipe extraction system are constructed simultaneously, and the construction efficiency is improved by coordinating the construction; second, the goaf filling uses the gangue and mine water in the mine, and is completed underground, so the waste materials can be reused to prevent surface subsidence; third, during the segmented grouting, the subsequent slot excavation and the installation of the isolation retaining wall can be carried out at the same time, which can greatly improve the work efficiency; fourth, the main filling pipe 1 and the terminal filling pipe 5 used in the present method are both segmented structures, which is convenient for the segmented filling work, and the isolation retaining wall 3 is a spliced ​​structure, so as not to hinder the disassembly of the horizontal section of the terminal filling pipe 5, and to facilitate the simultaneous installation of the rear section isolation retaining wall 3.

[0042] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto. Various changes that can be made within the knowledge scope of technicians in the relevant technical field without departing from the spirit of the present invention are all within the protection scope of the claims of the present invention.

Claims

1. A method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies, characterized in that: The following steps are involved: Step S1, demarcate the continuous segmented filling space of the mined branch tunnels on the working face, and lay the main filling pipeline along the bottom plate of the branch tunnel (1); Step S2, cutting grooves (2) on the top plate of the branch tunnel and the bottom plate thereunder, cutting another group of grooves (2) along the length direction of the branch tunnel, and then installing isolation retaining walls (3) on the two groups of grooves (2) respectively, so as to construct the first section of filling space; Step S3, connecting the terminal filling pipeline (5) to the main filling pipeline (1), with the other end of the terminal filling pipeline passing through the isolation retaining wall (3) and extending into the first-stage filling space, and the geothermal extraction pipeline (4) passing through the two isolation retaining walls (3), with the two ends of the pipeline located outside the two isolation retaining walls (3); Step S4, pouring the solid waste cementing functional filling paste (6) into the first filling space through the main filling pipe (1) and the terminal filling pipe (5); Step S5, excavating the card slot (2) in a backward manner to construct the next section of filling space, and then installing the geothermal extraction pipeline (4) and connecting it to the geothermal extraction pipeline (4) in the first section of filling space; Step S6: After the pouring of the first filling space is completed, the filling pump is turned off, part of the main filling pipe (1) is disassembled, and the end filling pipe (5) is moved so that its outlet is located in the next filling space; Step S7, repeating steps S3 to S6 until the functional buried pipe filling of a single branch tunnel is completed; Step S8, repeating steps S1 to S6, filling all the parallel branch tunnels with buried pipes, and then connecting the two ends of the geothermal extraction pipe (4) of each branch tunnel to the heat extraction branch pipe (7) in the return air chute and the transport chute, and then connecting all the heat extraction branch pipes (7) to the heat extraction main pipe (8), thereby forming a buried pipe heat exchange system.

2. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The main filling pipeline (1) is a stainless steel pipe and is installed in sections, with each section being 3-5 meters long.

3. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The slots (2) are respectively located in the top plate and the bottom plate of the branch tunnel, four in each of the upper and lower plates; the depth of a single slot (2) is 1 / 10 of the height of the branch tunnel, the width is 1 / 10 of the width of the branch tunnel, and the thickness is 1 / 3 of the isolation retaining wall (3).

4. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The isolation retaining wall (3) is an arched structure assembled from four prefabricated modules, and through holes for installing the end filling pipe (5) and the geothermal extraction pipe (4) are reserved on the retaining wall.

5. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The geothermal extraction pipeline (4) is made of high thermal conductivity stainless steel pipe, and the length of each segment is 3-5m.

6. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The end filling pipe (5) is composed of a vertical section and a horizontal section. One end of the horizontal section is supported and fixed by a reserved through hole of the isolation retaining wall (3), and the other end is supported and fixed by a spiral telescopic support rod (9).

7. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The solid waste cementing functional filling paste (6) is composed of porous volcanic rock coarse aggregate adsorbed with paraffin, gangue coarse aggregate, gangue fine aggregate, fly ash, cement and treated mine water, and the specific proportion parameters are: slurry concentration 80%, volcanic rock coarse aggregate replacement rate 50%, sand rate 40%, bone-cement ratio 2:1, and fly ash output 0.

2.

8. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1 is characterized in that: The excavation of the slot (2) of the rear filling space, the layout of the isolation retaining wall (3) and the installation of the rear geothermal extraction pipeline (4) are completed simultaneously with the pouring of the solid waste bonding functional filling paste (6) of the first filling space.

9. The method for extracting geothermal heat by arranging pipelines for solid waste cemented functional filling bodies according to claim 1, characterized in that: The heat extraction branch pipe (7) and the heat extraction main pipe (8) are both heat-insulating stainless steel pipes.

Citation Information

Patent Citations

  • Underground diaphragm wall prefabricating method for built-in capillary tube heat exchanger

    CN111827263A

  • Roadway type cemented filling mining method of nearly flat seam

    CN112253115A

  • Sectionless coal pillar mining and solid waste filling method for coal mine

    CN114233293A

  • Detachable filling retaining wall and construction method thereof

    CN116537872A

  • Paste filling method with parallel mining and filling

    CN117432463A