Municipal rain and sewage pipe network exploration method
Through drone terrain surveying, RTK surveying and pipeline robot inspection, the structure and function problems of municipal rainwater and sewage pipeline networks have been solved, detailed inspection reports and repair suggestions are provided, inspection efficiency and accuracy are improved, and cost and implementation difficulty are reduced. .
Patent Information
- Application Number
- CN202411350826.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-29
AI Technical Summary
The existing municipal rainwater and sewage pipelines generally have structural damage, corrosion, and blockage, resulting in operational problems such as direct discharge of sewage, counter-irrigation of rivers and lakes, infiltration of foreign water, overflow, and lack of effective detection and maintenance methods.
UAV topographic surveying technology, RTK surveying equipment and pipeline robots are used to conduct rainwater and sewage pipeline network surveys, and through topographic mapping, coordinate measurement, and internal image detection of pipelines, analyze defect types and levels, evaluate the structure and functional characteristics of the pipe section, and provide detection results. and repair suggestions.
It realizes rapid and accurate detection of the conditions of the rain and sewage pipeline network, provides a basis for pipeline network repair and transformation, reduces implementation difficulty, construction period and cost, and improves detection efficiency and accuracy.
Smart Images

Figure CN119044208A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical fields of environmental protection, municipal engineering and sewage treatment, and in particular to a municipal rainwater and sewage pipe network survey method. Background Art
[0002] Municipal rainwater and sewage pipe network systems collect and transport domestic sewage, industrial wastewater and rainwater. They are an important part of urban infrastructure. The quality of drainage facilities directly determines the level of urban development and affects the urban landscape and sanitary environment. However, in recent years, there is a general phenomenon of "focusing on construction, neglecting management and maintenance" in urban drainage pipe networks. Problems such as structural damage, corrosion, and blockage of existing sewage pipes are becoming increasingly prominent, causing many operational problems such as direct discharge of sewage, backflow of river and lake water, infiltration of external water, and overflow. Summary of the invention
[0003] In order to solve the problems existing in the prior art, the present invention provides a method for surveying a municipal rainwater and sewage pipe network.
[0004] To this end, the technical solution of the present invention is a method for investigating municipal rainwater and sewage pipe networks, which is characterized by being applied to investigating municipal rainwater and sewage pipe networks, and comprising the following steps: S1: Use UAV terrain mapping technology to map the area to be inspected and establish a topographic map; S2: Use RTK surveying equipment to measure the coordinates and elevation of the rainwater and sewage wells in the area to be inspected, and reflect the data on the topographic map; then conduct on-site surveys and measurements to obtain the current status of the rainwater and sewage wells and the pipe diameters; S3: Analyze the elevation information of the rainwater and sewage wells to draw the current rainwater and sewage pipe network, clarify the starting point, end point, trunk and branch pipes of the pipe network system, and plan the pipeline inspection path; S4: Use pipeline inspection robots to record images of the inside of pipelines and determine defect types and levels; S5: Analyze the data, count the number of defects, and evaluate the structure and functional properties of the pipe section to obtain the test results; Preferably, S1 includes the following steps: S1.1: Determine the service scope of the rainwater and sewage pipe network and the scope of topographic survey; S1.2: Use UAV mapping equipment to map terrain data on site; S1.3: Use surveying and mapping data to create topographic maps of the service area.
[0005] Preferably, S2 comprises the following steps: S2.1: On-site investigation of the current status, direction, starting point and intersection of the rainwater and sewage pipe network within the service area; S2.2: Use RTK surveying equipment to measure the coordinate positioning and elevation information data of all rainwater and sewage inspection wells, where the elevation information data includes the elevation of the top center point of the inspection well, the elevation of the bottom of the inspection well, and the buried depth of the inlet and outlet pipes. In addition, the diameter of the inlet and outlet pipes of the target well and the pipe material data need to be measured; S2.3: Feed the rainwater and sewage inspection well data obtained by mapping back to the topographic map obtained in S1.3; Preferably, S2.2 comprises the following steps: S2.2.1: In addition to the information in S2.2, the site survey should also include the landforms, topography, and traffic conditions in the surrounding environment of the pipeline area to be inspected; S2.2.2: In addition to the information described in S2.2, the on-site investigation should also collect existing rainwater and sewage pipeline maps, historical pipeline inspection data, other pipeline data in the pipeline area to be inspected, and engineering geology and hydrogeology data in the pipeline area to be inspected.
[0006] Preferably, S3 comprises the following steps: S3.1: Comprehensively analyze the relevant information obtained in S2 and draw a complete map of the current rainwater and sewage pipe network; S3.2: Analyze the current rainwater and sewage pipe network drawings obtained in step S3.1, and mark the starting point of the pipe network and the direction of water flow; S3.3: Plan the pipe sections that need to be inspected, calculate the inspection workload in advance, and prepare the inspection plan.
[0007] Preferably, S3.3 includes the following contents: The contents of the inspection plan include: the inspection tasks, purpose, and duration; the overview of the pipeline to be inspected, the inspection method and process control, possible problems and countermeasures, personnel, equipment and material plans, the results data to be submitted, and safety measures.
[0008] Preferably, S4 comprises the following steps: S4.1: Use pipeline robot inspection equipment to enter the target pipe section and record video data, mainly to detect functional and structural defects of the pipeline; when the functional defects are not serious and meet the conditions for continued inspection, structural defect inspection should be carried out at the same time; when the functional defects are serious, such as pipeline blockage or obstacles in the pipeline, it is impossible to continue the inspection, and records should be kept; S4.2: For the pipe sections recorded in S4.1 that cannot be inspected for structural defects due to functional defects, take pipeline dredging measures to remove blockages and obstacles to meet the conditions for continued inspection; S4.3: Continue to conduct structural defect detection on the pipe sections that meet the detection conditions in S4.2; S4.4: Interpret imaging data to determine the type and severity of functional and structural defects in the pipeline.
[0009] Preferably, S4.4 comprises the following steps: S4.4.1: Determine the defect type. Functional defects include: sedimentation, scaling, obstacles, residual walls, tree roots, and scum. Structural defects include: cracks, deformation, corrosion, misalignment, undulation, disconnection, detachment of interface materials, concealed connection of branch pipes, penetration of foreign objects, and leakage.
[0010] S4.4.2: Determine the defect level: The defect level is divided into four levels: 1, 2, 3, and 4, corresponding to the four severity levels: slight defect, medium defect, serious defect, and major defect; S4.4.3: Determine the circumferential position of the defect: The circumferential position of the pipeline defect shall be indicated by the clock method. The defect description shall be expressed by four Arabic numerals in clockwise direction to indicate the starting and ending positions. The first two digits shall indicate the starting position of the defect, and the last two digits shall indicate the ending position of the defect. For example, when the defect is located at a certain point, the first two digits shall be expressed as 00, and the last two digits shall indicate the defect point. S4.4.4: Determine the longitudinal position of the defect: The longitudinal starting point of the pipeline defect position should be the pipeline opening of the starting well, and the longitudinal positioning error of the defect position should be less than 0.5m.
[0011] Preferably, S5 comprises the following steps: S5.1: Evaluation of pipe segment structural properties. Based on the pipe segment structural defect data obtained in S4, the pipe segment structural defect evaluation and repair index calculation are performed; S5.2: Pipe segment functional property assessment: Based on the pipe segment structural defect data obtained in S4, perform pipe segment functional defect assessment and calculate maintenance index; S5.3: Draw a test results map and prepare a test report; the test results map should mark the starting number, pipeline specifications, problem description, problem type, location and level, and repair suggestions for the problem pipe section.
[0012] Beneficial effects: Compared with the prior art, the drone surveying and mapping technology used in the present invention can quickly construct a topographic map of the target area, providing a basis for subsequent investigation and design. This method has the advantages of low implementation difficulty, short construction period and low cost. The RTK surveying and mapping technology can obtain the precise coordinates and elevation information of the existing inspection wells, thereby providing targeted information for pipeline investigation and design. The pipeline robot investigation technology is used. The key to this step is that it can detect the internal information of underground rainwater and sewage pipes, and can intuitively obtain the function and structural characteristics of the pipes, thereby providing a basis for subsequent pipe network repair and transformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a flow chart of the present invention.
[0014] Figure 2 yes Figure 1 Flowchart of S1 in FIG.
[0015] Figure 3 yes Figure 1 Flowchart of S2 in FIG.
[0016] Figure 4 yes Figure 1 Flowchart of S3 in Fig.
[0017] Figure 5 yes Figure 1 Flowchart in S4.
[0018] Figure 6 yes Figure 1 Flowchart of S5 in FIG. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings, but this embodiment should not be understood as limiting the present invention.
[0020] The present invention Figures 1 to 6 As shown: A municipal rainwater and sewage pipe network survey method is applied to the municipal rainwater and sewage pipe network survey, comprising the following steps: S1: Use UAV terrain mapping technology to map the area to be inspected and establish a topographic map; S2: Use RTK surveying equipment to measure the coordinates and elevation of the rainwater and sewage wells in the area to be inspected, and reflect the data on the topographic map; then conduct on-site surveys and measurements to obtain the current status of the rainwater and sewage wells and the pipe diameters; S3: Analyze the elevation information of the rainwater and sewage wells to draw the current rainwater and sewage pipe network, clarify the starting point, end point, trunk and branch pipes of the pipe network system, and plan the pipeline inspection path; S4: Use pipeline inspection robots to record images of the inside of pipelines and determine defect types and levels; S5: Analyze the data, count the number of defects, and evaluate the structure and functional properties of the pipe section to obtain the test results; In this embodiment, S1 includes the following steps: S1.1: Determine the service scope of the rainwater and sewage pipe network and the scope of topographic survey; S1.2: Use UAV mapping equipment to map terrain data on site; S1.3: Use surveying and mapping data to create topographic maps of the service area.
[0021] In this embodiment, S2 includes the following steps: S2.1: On-site investigation of the current status, direction, starting point and intersection of the rainwater and sewage pipe network within the service area; S2.2: Use RTK surveying equipment to measure the coordinate positioning and elevation information data of all rainwater and sewage inspection wells, where the elevation information data includes the elevation of the top center point of the inspection well, the elevation of the bottom of the inspection well, and the buried depth of the inlet and outlet pipes. In addition, the diameter of the inlet and outlet pipes of the target well and the pipe material data need to be measured; S2.3: Feed the rainwater and sewage inspection well data obtained by mapping back to the topographic map obtained in S1.3; Among them, S2.2 includes the following steps: S2.2.1: In addition to the information in S2.2, the site survey should also include the landforms, topography, and traffic conditions in the surrounding environment of the pipeline area to be inspected; S2.2.2: In addition to the information described in S2.2, the on-site investigation should also collect existing rainwater and sewage pipeline maps, historical pipeline inspection data, other pipeline data in the pipeline area to be inspected, and engineering geology and hydrogeology data in the pipeline area to be inspected.
[0022] In this embodiment, S3 includes the following steps: S3.1: Comprehensively analyze the relevant information obtained in S2 and draw a complete map of the current rainwater and sewage pipe network; S3.2: Analyze the current rainwater and sewage pipe network drawings obtained in step S3.1, and mark the starting point of the pipe network and the direction of water flow; S3.3: Plan the pipe sections that need to be inspected, calculate the inspection workload in advance, and prepare the inspection plan; Among them, S3.3 includes the following: The contents of the inspection plan include: the inspection tasks, purpose, and duration; the overview of the pipeline to be inspected, the inspection method and process control, possible problems and countermeasures, personnel, equipment and material plans, the results data to be submitted, and safety measures.
[0023] In this embodiment, S4 includes the following steps: S4.1: Use pipeline robot inspection equipment to enter the target pipe section and record video data, mainly to detect functional and structural defects of the pipeline; when the functional defects are not serious and meet the conditions for continued inspection, structural defect inspection should be carried out at the same time; when the functional defects are serious, such as pipeline blockage or obstacles in the pipeline, it is impossible to continue the inspection, and records should be kept; S4.2: For the pipe sections recorded in S4.1 that cannot be inspected for structural defects due to functional defects, take pipeline dredging measures to remove blockages and obstacles to meet the conditions for continued inspection; S4.3: Continue to conduct structural defect detection on the pipe sections that meet the detection conditions in S4.2; S4.4: Interpret imaging data to determine the type and severity of functional and structural defects in the pipeline; Among them, S4.4 includes the following steps: S4.4.1: Determine the defect type. Functional defects include: sedimentation, scaling, obstacles, residual walls, tree roots, and scum. Structural defects include: cracks, deformation, corrosion, misalignment, undulation, disconnection, detachment of interface materials, concealed connection of branch pipes, penetration of foreign objects, and leakage.
[0024] S4.4.2: Determine the defect level: The defect level is divided into four levels: 1, 2, 3, and 4, corresponding to the four severity levels: slight defect, medium defect, serious defect, and major defect; S4.4.3: Determine the circumferential position of the defect: The circumferential position of the pipeline defect shall be indicated by the clock method. The defect description shall be expressed by four Arabic numerals in clockwise direction to indicate the starting and ending positions. The first two digits shall indicate the starting position of the defect, and the last two digits shall indicate the ending position of the defect. For example, when the defect is located at a certain point, the first two digits shall be expressed as 00, and the last two digits shall indicate the defect point. S4.4.4: Determine the longitudinal position of the defect: The longitudinal starting point of the pipeline defect position should be the pipeline opening of the starting well, and the longitudinal positioning error of the defect position should be less than 0.5m.
[0025] In this embodiment, S5 includes the following steps: S5.1: Structural property assessment of pipe sections. Based on the structural defect data of pipe sections obtained in S4, refer to the relevant contents in Chapter 8 of the Technical Regulations for Inspection and Assessment of Urban Drainage Pipelines to conduct structural defect assessment of pipe sections and calculate the repair index. S5.2: Evaluation of pipe segment functional properties: Based on the pipe segment structural defect data obtained in S4, refer to Chapter 8 of the Technical Regulations for Inspection and Evaluation of Urban Drainage Pipelines to evaluate the pipe segment functional defects and calculate the maintenance index; S5.3: Draw a test results map and prepare a test report; the test results map should mark the starting number, pipeline specifications, problem description, problem type, location and level, and repair suggestions for the problem pipe section.
[0026] Working principle of the present invention: First, drone mapping technology is used to construct a topographic map of the target area to provide a mapping work surface for subsequent work; Then, RTK measurement technology is used to accurately locate the coordinates and elevations of the inspection wells and pipelines, providing a basis for pipeline network analysis; Then use the pipeline inspection robot to conduct video inspection on the inside of the pipeline to obtain an assessment report on the structure and function status of the pipeline; Finally, the repair and maintenance value index of the pipeline network is obtained through statistical calculation methods.
[0027] Parts not described in detail in this specification are well-known technologies in the art.
[0028] Through the description of the above exploration method, technicians in the relevant technical field should understand that the present invention is not limited to the above-mentioned specific implementation methods. Improvements and substitutions based on the present invention using the well-known technology in the field all fall within the protection scope of the present invention and should be defined by the claims.
Claims
1. A method for investigating a municipal rainwater and sewage pipe network, characterized in that: Applied to municipal rainwater and sewage pipe network survey, including the following steps: S1: Use UAV terrain mapping technology to map the area to be inspected and establish a topographic map; S2: Use RTK surveying equipment to measure the coordinates and elevation of the rainwater and sewage wells in the area to be inspected, and reflect the data on the topographic map; then conduct on-site surveys and measurements to obtain the current status of the rainwater and sewage wells and the pipe diameters; S3: Analyze the elevation information of the rainwater and sewage wells to draw the current rainwater and sewage pipe network, clarify the starting point, end point, trunk and branch pipes of the pipe network system, and plan the pipeline inspection path; S4: Use pipeline inspection robots to record images of the inside of pipelines and determine defect types and levels; S5: Analyze the data, count the number of defects, and evaluate the structure and functional properties of the pipe section to obtain the test results.
2. A municipal rainwater and sewage pipe network survey method according to claim 1, characterized in that: The S1 includes the following steps: S1.1: Determine the service scope of the rainwater and sewage pipe network and the scope of topographic survey; S1.2: Use UAV mapping equipment to map terrain data on site; S1.3: Use surveying and mapping data to create topographic maps of the service area.
3. A municipal rainwater and sewage pipe network survey method according to claim 2, characterized in that: The S2 comprises the following steps: S2.1: On-site investigation of the current status, direction, starting point and intersection of the rainwater and sewage pipe network within the service area; S2.2: Use RTK surveying equipment to measure the coordinate positioning and elevation information data of all rainwater and sewage inspection wells, where the elevation information data includes the elevation of the top center point of the inspection well, the elevation of the bottom of the inspection well, and the buried depth of the inlet and outlet pipes. In addition, the diameter of the inlet and outlet pipes of the target well and the pipe material data need to be measured; S2.3: Feed the rainwater and sewage inspection well data obtained from the surveying to the topographic map obtained in S1.
3.
4. A municipal rainwater and sewage pipe network survey method according to claim 3, characterized in that: The S2.2 comprises the following steps: S2.2.1: In addition to the information in S2.2, the site survey should also include the landforms, topography, and traffic conditions in the surrounding environment of the pipeline area to be inspected; S2.2.2: In addition to the information described in S2.2, the on-site investigation should also collect existing rainwater and sewage pipeline maps, historical pipeline inspection data, other pipeline data in the pipeline area to be inspected, and engineering geology and hydrogeology data in the pipeline area to be inspected.
5. A municipal rainwater and sewage pipe network survey method according to claim 4, characterized in that: The S3 comprises the following steps: S3.1: Comprehensively analyze the relevant information obtained in S2 and draw a complete map of the current rainwater and sewage pipe network; S3.2: Analyze the current rainwater and sewage pipe network drawings obtained in step S3.1, and mark the starting point of the pipe network and the direction of water flow; S3.3: Plan the pipe sections that need to be inspected, calculate the inspection workload in advance, and prepare the inspection plan.
6. A municipal rainwater and sewage pipe network survey method according to claim 5, characterized in that: The S3.3 includes the following: The content of the testing plan includes: the task, purpose and duration of the testing; Overview of the pipeline to be inspected, inspection methods and process control, possible problems and countermeasures, personnel, equipment and material plans, results and information to be submitted, and safety measures.
7. The municipal rainwater and sewage pipe network survey method according to claim 6 is characterized by: The S4 comprises the following steps: S4.1: Use pipeline robot inspection equipment to enter the target pipe section and record video data, mainly to detect functional and structural defects of the pipeline; when the functional defects are not serious and meet the conditions for continued inspection, structural defect inspection should be carried out at the same time; when the functional defects are serious, such as pipeline blockage or obstacles in the pipeline, it is impossible to continue the inspection, and records should be kept; S4.2: For the pipe sections recorded in S4.1 that cannot be inspected for structural defects due to functional defects, take pipeline dredging measures to remove blockages and obstacles to meet the conditions for continued inspection; S4.3: Continue to conduct structural defect detection on the pipe sections that meet the detection conditions in S4.2; S4.4: Interpret imaging data to determine the type and severity of functional and structural defects in the pipeline.
8. A municipal rainwater and sewage pipe network survey method according to claim 7, characterized in that: The S4.4 comprises the following steps: S4.4.1: Determine the defect type. Functional defects include: sedimentation, scaling, obstacles, residual walls, tree roots, and scum; structural defects include: rupture, deformation, corrosion, misalignment, undulation, disconnection, interface material shedding, branch pipe concealed connection, foreign matter penetration, and leakage; S4.4.2: Determine the defect level: The defect level is divided into four levels: 1, 2, 3, and 4, corresponding to the four severity levels: slight defect, medium defect, serious defect, and major defect; S4.4.3: Determine the circumferential position of the defect: The circumferential position of the pipeline defect shall be indicated by the clock method. The defect description shall be expressed by four Arabic numerals in clockwise direction to indicate the starting and ending positions. The first two digits shall indicate the starting position of the defect, and the last two digits shall indicate the ending position of the defect. For example, when the defect is located at a certain point, the first two digits shall be expressed as 00, and the last two digits shall indicate the defect point. S4.4.4: Determine the longitudinal position of the defect: The longitudinal starting point of the pipeline defect position should be the pipeline opening of the starting well, and the longitudinal positioning error of the defect position should be less than 0.5m.
9. A municipal rainwater and sewage pipe network survey method according to claim 8, characterized in that: The S5 comprises the following steps: S5.1: Evaluation of pipe segment structural properties. Based on the pipe segment structural defect data obtained in S4, the pipe segment structural defect evaluation and repair index calculation are performed; S5.2: Pipe segment functional property assessment: Based on the pipe segment structural defect data obtained in S4, perform pipe segment functional defect assessment and calculate maintenance index; S5.3: Draw a test results map and prepare a test report; the test results map should mark the starting number, pipeline specifications, problem description, problem type, location and level, and repair suggestions for the problem pipe section.
Citation Information
Cited By
Underground pipe network detecting and positioning method and device
CN121214446A