Statistical method, system and equipment for abnormity of power transmission and transformation equipment of station and medium
By identifying and counting abnormal situations of power transmission and transformation equipment, the problems of data filling errors and monthly indicator assessment in the existing technology have been solved, and rapid data diagnosis and accuracy have been improved.
Patent Information
- Application Number
- CN202411093435.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-29
AI Technical Summary
The existing technology cannot effectively identify and count abnormal situations in power transmission and transformation equipment, resulting in data filling errors and unqualified monthly indicator assessments.
By obtaining unplanned power transmission and transformation data of each device at the station, we can determine whether the recovery time of the device is greater than or equal to the statistical time, and judge the fault type based on the status of the collector wire, including offline all the field, tripping one main transformer and sending out the main transformer from the main transformer from the outgoing line, Trip, quickly diagnose data and fill in complaints.
Quickly help on-site data diagnosis, reduce calculation errors, accelerate the process of filling out complaints, ensure the accuracy and completeness of the data, and improve the monthly indicator assessment pass rate.
Smart Images

Figure CN119046833A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power transmission and transformation equipment, and relates to a statistical method, system, equipment and medium for abnormality of power transmission and transformation equipment at a station. Background Art
[0002] The power transmission and transformation equipment is a vital component of the power generation system, and its operating status directly affects the power generation efficiency and stability of the entire power field. At present, the group has developed a production reporting system to supervise various regions and stations. In the new energy production reporting system, on-site duty personnel are required to confirm and report the data pushed by the system every day, and file complaints. Among them, the unplanned shutdown of power transmission and transformation is an indispensable part of the system. The abnormality of the collector pushed by the system is an important factor affecting the data. Failure to confirm on site in time can easily cause great errors in the data.
[0003] The group issues a monthly indicator plan, among which the indicators related to power transmission and transformation include offline rate, disconnection rate, and power loss. In addition, the on-duty personnel need to count and verify the pushed data before 3 a.m., so that the operation and maintenance center can report the daily production report to the group every morning. Therefore, it is urgent to identify and count the abnormal data pushed by the power transmission and transformation outage, which is convenient for on-site reporting and complaints, and also speeds up the review of the business department to ensure the normal assessment of the monthly indicators. However, no relevant technology is currently available. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a statistical method, system, device and medium for abnormalities of power transmission and transformation equipment at a station. The method, system, device and medium can identify and count abnormalities of power transmission and transformation equipment at a station.
[0005] In order to achieve the above object, the present invention adopts the following technical scheme:
[0006] In one aspect, the present invention provides a statistical method for judging abnormal conditions of power transmission and transformation equipment at a station, comprising:
[0007] Obtain the non-planned data of power transmission and transformation of each equipment under the station;
[0008] According to the unplanned data of power transmission and transformation of each equipment under the station, determine whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state;
[0009] When the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state, the fault type of the equipment in the station is determined based on the status of all collectors under the station.
[0010] The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to the present invention is further improved in that:
[0011] The fault types of equipment in the station include the whole station offline, primary main transformer tripping and outgoing line and main transformer tripping.
[0012] Assume that circuit_break_type=1 indicates an abnormality, circuit_break_type=2 indicates a fault, subtyep=1 indicates that the collector abnormality is an offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype.
[0013] When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in=1 to collectors with sub_type in=4 is 1, and when sub_type=1, more than 80% of the collectors are abnormal, the entire site is judged to be offline.
[0014] When the installed capacity of the station is greater than 90MW, more than 50% of the collectors are in the collector disconnection state or the collector abnormality under this subtype is a fault abnormality, it is judged as a main transformer trip.
[0015] When circuit_break_type=1, subtyep=2 and subtyep=4, the abnormal collector line accounts for 100%, and it is determined that the outgoing line and the main transformer are tripped.
[0016] In a second aspect of the present invention, the present invention provides a statistical system for judging abnormal conditions of power transmission and transformation equipment at a station, comprising:
[0017] The acquisition module is used to obtain the non-planned data of power transmission and transformation of each equipment in the station;
[0018] The first judgment module is used to judge whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state according to the unplanned data of power transmission and transformation of each device under the station;
[0019] The second judgment module is used to judge the fault type of the equipment in the station according to the status of all collectors under the station when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state.
[0020] The statistical system for judging abnormal conditions of power transmission and transformation equipment at a station according to the present invention is further improved in that:
[0021] Assume that circuit_break_type=1 indicates an abnormality, circuit_break_type=2 indicates a fault, subtyep=1 indicates that the collector abnormality is an offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype;
[0022] When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in = 1 to collectors with sub_type in = 4 is 1, and when sub_type = 1, more than 80% of the collectors are abnormal, then the entire site is considered offline;
[0023] When the installed capacity of the station is > 90MW, more than 50% of the collectors are in the collector disconnection state or the collector abnormality under this subtype is a fault abnormality, it is judged as a primary main transformer trip;
[0024] When circuit_break_type=1, subtyep=2 and subtyep=4, the abnormal collector line accounts for 100%, and it is determined that the outgoing line and the main transformer are tripped.
[0025] In a third aspect of the present invention, the present invention provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment at a site when executing the computer program.
[0026] In a fourth aspect of the present invention, the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment at a site are implemented.
[0027] The present invention has the following beneficial effects:
[0028] During specific operation of the statistical method, system, equipment and medium for abnormalities of power transmission and transformation equipment in a station described in the present invention, when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state, the fault type of the equipment in the station is judged according to the status of all collector lines under the station, which can quickly help to diagnose data on site, analyze the causes, speed up the time for filing complaints, and facilitate the review of the business department, thereby ensuring the accuracy and completeness of the data and reducing calculation errors. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0030] Figure 1 The present invention is a flow chart of the method. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only an embodiment of a part of the present invention, not all embodiments, and is not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concepts disclosed in the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.
[0032] The accompanying drawings show schematic diagrams of structures according to embodiments disclosed in the present invention. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0033] Embodiment 1
[0034] refer to Figure 1 The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to the present invention comprises the following steps:
[0035] 1) Obtain the non-planned data of power transmission and transformation of each equipment under the station;
[0036] 2) During the statistical period, the recovery time is greater than the statistical time or is in an unrecovered state, and the data is not converted into a power transmission and transformation plan;
[0037] 3) When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in=1 to collectors with sub_type in=4 is 1, and when more than 80% of the collectors are abnormal under sub_type=1, the entire site is judged to be offline.
[0038] Wherein, circuit_break_type=1 indicates abnormality, circuit_break_type=2 indicates fault, subtyep=1 indicates that the collector abnormality is offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; the initial fault cause is the cause corresponding to the first data, and the latest treatment measures refer to the latest measures and progress reported when the system is restored or not restored;
[0039] When the installed capacity of the station is greater than 90MW, and more than 50% (accounting for 0.5<=x<1) of the collectors are in a collector break (i.e., circuit_break_type=1) or the collectors under this subtype are abnormal (faulty) (i.e., subtyep=2), it is judged as a primary main transformer trip;
[0040] When the collector line is in the collector line break state (i.e. circuit_break_type=1), collector line abnormality (fault) (i.e. subtyep=2), collector line abnormality (other) (i.e. subtyep=4), and the abnormal collector line accounts for 100%, it is judged that the sending line and the main transformer are tripped;
[0041] Among them, a primary main transformer trip will take precedence over the outgoing line and main transformer trip. Therefore, for the same station, when the start time is the same, the outgoing line and main transformer trip will be discarded and classified as a primary main transformer trip.
[0042] 4) The on-site duty personnel fill in the form for confirmation, the business department appeals, and finally calculates and statistics the total power loss (loss power) and total installed capacity (capacity) of all offline equipment in the field, and records the earliest min (start time of shutdown) and latest max (resumption time) of the equipment offline. If it has not been restored, it will be displayed as empty, and the initial cause of the equipment failure and the latest treatment measures and progress will be obtained; the detailed data of the site will be retained for data verification and a report will be issued.
[0043] To solve the problem that the group issues monthly target plans, including indicators such as offline rate, disconnection rate, and power loss related to power transmission and transformation, the power transmission and transformation data pushed by the system are not confirmed in time on site one by one, and manual confirmation distinguishes the types of outages, and the reporting and appeals are slow. Because they are completed before 3 a.m. every day, they are prone to time delays, resulting in large data errors and failures in monthly target assessments. The present invention distinguishes the types into full-site offline, primary main transformer tripping, and transmission line main transformer tripping, etc., which can quickly help the site to diagnose data, analyze the causes, speed up the time for reporting appeals, and facilitate the review of the business department, thereby ensuring the accuracy and completeness of the data, reducing calculation errors, and improving the pass rate of monthly target assessments.
[0044] Embodiment 2
[0045] The statistical system for judging abnormal conditions of power transmission and transformation equipment at a station according to the present invention comprises:
[0046] The acquisition module is used to obtain the non-planned data of power transmission and transformation of each equipment in the station;
[0047] The first judgment module is used to judge whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state according to the unplanned data of power transmission and transformation of each device under the station;
[0048] The second judgment module is used to judge the fault type of the equipment in the station according to the status of all collectors under the station when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state.
[0049] As an implementation mode of the present invention, circuit_break_type=1 indicates an abnormality, circuit_break_type=2 indicates a fault, subtyep=1 indicates that the collector abnormality is an offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype;
[0050] When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in = 1 to collectors with sub_type in = 4 is 1, and when sub_type = 1, more than 80% of the collectors are abnormal, then the entire site is considered offline;
[0051] When the installed capacity of the station is > 90MW, more than 50% of the collectors are in the collector disconnection state or the collector abnormality under this subtype is a fault abnormality, it is judged as a primary main transformer trip;
[0052] When circuit_break_type=1, subtyep=2 and subtyep=4, the abnormal collector line accounts for 100%, and it is determined that the outgoing line and the main transformer are tripped.
[0053] The division of modules in the embodiments of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional module in each embodiment of the present application may be integrated into a processor, or may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of software functional modules.
[0054] Embodiment 3
[0055] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment in a station are implemented, for example, comprising: obtaining unplanned power transmission and transformation data of each device in the station; judging whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state according to the unplanned power transmission and transformation data of each device in the station; when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state, judging the fault type of the equipment in the station according to the state of all collectors in the station; setting circuit_break_type=1 to indicate abnormality, circuit_break_type=2 to indicate fault, subtyep=1 to indicate that the collector abnormality is an offline abnormality; subtyep=4 to indicate that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype; when all collectors in the statistical station are in the collector abnormal state, the collector with sub_type in=1 and sub_type When the ratio of the collector lines with in=4 is 1 and the proportion of collector lines exceeding 80% is abnormal when sub_type=1, the whole site is judged to be offline; when the installed capacity of the site is capacity>90MW, more than 50% of the collector lines are in the collector line disconnection state or the collector line abnormality under this subtype is a fault abnormality, it is judged to be a main transformer tripping; when circuit_break_type=1, subtyep=2 and subtyep=4, the proportion of abnormal collector lines is 100%, it is judged to be the sending line and main transformer tripping.
[0056] In addition, the computer device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that the above are examples of computer devices and do not constitute a limitation on computer devices. The computer device may include more components than the above, or a combination of certain components, or different components. For example, the computer device may also include input and output devices, network access devices, buses, etc. The memory may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. The memory may be used to store the computer programs and / or modules, and the processor implements various functions of the computer device by running or executing the computer programs and / or modules stored in the memory and calling the data stored in the memory.
[0057] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the computer device, and uses various interfaces and lines to connect various parts of the entire computer.
[0058] Embodiment 4
[0059] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment in a station are implemented, for example, including: obtaining unplanned power transmission and transformation data of each device in the station; judging whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state based on the unplanned power transmission and transformation data of each device in the station; when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state, judging the fault type of the equipment in the station based on the status of all collectors in the station; setting circuit_break_type=1 to indicate abnormality, circuit_break_type=2 to indicate fault, subtyep=1 to indicate that the collector abnormality is an offline abnormality; subtyep=4 to indicate that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype; when all collectors in the statistical station are in the collector abnormality state, the collector with sub_type in=1 and sub_type When the ratio of the collector line of in=4 is 1, and when the collector lines that account for more than 80% are abnormal in the case of sub_type=1, it is judged that the whole site is offline; when the installed capacity of the site is capacity>90MW, more than 50% of the collector lines are in the collector line disconnection or the collector line abnormality under this subtype is a fault abnormality, it is judged as a main transformer trip; when circuit_break_type=1, subtyep=2 and subtyep=4, the abnormal collector line accounts for 100%, it is judged as the transmission line and the main transformer trip. Specifically, the computer-readable storage medium includes, but is not limited to, for example, volatile memory and / or non-volatile memory. The volatile memory may include random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include read-only memory (ROM), hard disk, flash memory, optical disk, magnetic disk, etc.
[0060] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0061] Based on this understanding, the present invention implements all or part of the processes in the above-mentioned method for automatically detecting task status and start and stop, and can also be completed by instructing related hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and when the computer program is executed by the processor, the steps of the above-mentioned statistical method for judging abnormal conditions of station power transmission and transformation equipment can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or preset intermediate form, etc.
[0062] It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electrical carrier signals and telecommunication signals.
[0063] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0064] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0065] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A statistical method for judging abnormal conditions of power transmission and transformation equipment at a station, characterized in that: include: Obtain the non-planned data of power transmission and transformation of each equipment under the station; According to the unplanned data of power transmission and transformation of each equipment under the station, determine whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state; When the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state, the fault type of the equipment in the station is determined based on the status of all collectors under the station.
2. The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 1 is characterized in that: The fault types of equipment in the station include the whole station offline, primary main transformer tripping and outgoing line and main transformer tripping.
3. The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 1 is characterized in that: circuit_break_type=1 indicates an abnormality, circuit_break_type=2 indicates a fault, subtyep=1 indicates that the collector abnormality is an offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype.
4. The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 3 is characterized in that: When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in=1 to collectors with sub_type in=4 is 1, and when sub_type=1, more than 80% of the collectors are abnormal, the entire site is judged to be offline.
5. The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 3 is characterized in that: When the installed capacity of the station is greater than 90MW, more than 50% of the collectors are in the collector disconnection state or the collector abnormality under this subtype is a fault abnormality, it is judged as a main transformer trip.
6. The statistical method for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 3 is characterized in that: When circuit_break_type=1, subtyep=2 and subtyep=4, and the proportion of the constant collector line is 100%, it is judged that the sending line and the main transformer are tripped.
7. A statistical system for judging abnormal conditions of power transmission and transformation equipment at a station, characterized in that: include: The acquisition module is used to obtain the non-planned data of power transmission and transformation of each equipment in the station; The first judgment module is used to judge whether the recovery time of the equipment in the station is greater than or equal to the statistical time and whether the station is in an unrecovered state according to the unplanned data of power transmission and transformation of each device under the station; The second judgment module is used to judge the fault type of the equipment in the station according to the status of all collectors under the station when the recovery time of the equipment in the station is greater than or equal to the statistical time or the station is in an unrecovered state.
8. The statistical system for judging abnormal conditions of power transmission and transformation equipment at a station according to claim 7 is characterized in that: circuit_break_type=1 indicates an abnormality, circuit_break_type=2 indicates a fault, subtyep=1 indicates that the collector abnormality is an offline abnormality; subtyep=4 indicates that the collector abnormality is other faults; circuit_break_type indicates all states of the collector; sub_type indicates all states under the collector subtype; When all collectors under the statistical site are in an abnormal state, the ratio of collectors with sub_type in = 1 to collectors with sub_type in = 4 is 1, and when sub_type = 1, more than 80% of the collectors are abnormal, then the entire site is considered offline; When the installed capacity of the station is > 90MW, more than 50% of the collectors are in the collector disconnection state or the collector abnormality under this subtype is a fault abnormality, it is judged as a primary main transformer trip; When circuit_break_type=1, subtyep=2 and subtyep=4, and the proportion of the constant collector line is 100%, it is judged that the sending line and the main transformer are tripped.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment at a site as described in any one of claims 1 to 6 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, the steps of the statistical method for determining abnormal conditions of power transmission and transformation equipment at a station as described in any one of claims 1 to 6 are implemented.