Tunnel water accumulation amount calculation method and device, equipment and storage medium
Through segmented calculation of tunnel design information and slope information, the rapid and accurate calculation of tunnel water accumulation is solved, and the calculation of tunnel water accumulation with low cost and low resource requirements is realized. It is suitable for pre-feasibility research and emergency response of tunnel projects Disaster relief.
Patent Information
- Application Number
- CN202410929543.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-07-11
AI Technical Summary
The existing technology has the problem that it cannot be calculated quickly and accurately in the calculation of tunnel water accumulation, and it is economical and difficult to implement, requiring hardware equipment and three-dimensional geometric modeling, the calculation process is slow and resource consumption is high.
By dividing the interval based on the design information of the target tunnel, combining the slope information for segmented calculations, and using calculation models for volume calculations to determine the tunnel water accumulation volume, achieving fast and accurate calculation of the tunnel water accumulation volume without hardware equipment and three-dimensional modeling .
It realizes rapid and accurate calculation of the amount of water accumulated in tunnels, reduces resource demand, has a wide range of application and low economic costs, and is suitable for pre-feasibility research and emergency disaster relief calculations of tunnel projects.
Smart Images

Figure CN119047022A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel engineering technology, and in particular to a method, device, equipment and storage medium for calculating water accumulation in a tunnel. Background Art
[0002] At present, the calculation of tunnel water accumulation relies on hardware equipment to detect water levels. At the same time, detailed three-dimensional geometric information of buildings and tunnels is required. First, a tunnel model between subway stations is established, and then the water accumulation model is reproduced. The existing technology monitors the water level through hardware equipment, so sensors need to be arranged in advance during the construction phase of the tunnel project, and existing tunnel projects need to be reconstructed. In addition, this technology requires the establishment of tunnel and building geometric modeling for volume calculation, which is slow and requires high computer hardware equipment. Therefore, the economic cost of the existing technology is high and the implementation is difficult.
[0003] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention
[0004] The main purpose of this application is to provide a method, device, equipment and storage medium for calculating the amount of water accumulated in a tunnel, aiming to solve the technical problem in the prior art that it is impossible to quickly and accurately calculate the amount of water accumulated in a tunnel.
[0005] To achieve the above purpose, the present application proposes a method for calculating the amount of water accumulation in a tunnel, the method comprising:
[0006] Dividing the target tunnel into sections according to design information of the target tunnel to obtain a plurality of waterlogged sections corresponding to the target tunnel;
[0007] Segmenting each flooded interval according to the interval waterlogging information of each flooded interval and the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each flooded interval and segmented waterlogging information of each waterlogging segment;
[0008] Perform volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment;
[0009] The tunnel water accumulation amount of the target tunnel is determined according to the water accumulation volume of each water accumulation segment.
[0010] In one embodiment, dividing the target tunnel into sections according to the design information of the target tunnel to obtain a plurality of waterlogged sections corresponding to the target tunnel includes:
[0011] Determine a plurality of first target point mileages and a plurality of second target point mileages of the target tunnel according to design information of the target tunnel;
[0012] The target tunnel is divided into sections according to the mileages of each first target point and each second target point, so as to obtain a plurality of waterlogged sections corresponding to the target tunnel.
[0013] In one embodiment, segmenting each flooded interval according to the interval waterlogging information of each flooded interval and the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each flooded interval and segmented waterlogging information of each waterlogging segment includes:
[0014] Perform range calculation based on the waterlogging information of each waterlogging interval to determine the waterlogging coverage interval of each waterlogging interval;
[0015] Segmenting the waterlogging coverage intervals of each waterlogging interval according to the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each waterlogging interval;
[0016] Parameter calculation is performed according to the slope information of the target tunnel and the interval waterlogging information of each waterlogging interval to determine the segmented water depth of each waterlogging segment and the water surface mileage difference of each waterlogging segment;
[0017] The segmented water accumulation information of each water accumulation segment is obtained according to the segmented water depth, water surface mileage difference and segmented slope of each water accumulation segment.
[0018] In one embodiment, before performing volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment, the method further includes:
[0019] Determine the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0020] According to the cone type of each water accumulation segment and the water accumulation volume calculation model corresponding to each cone type, the target calculation model corresponding to each water accumulation segment is determined.
[0021] In one embodiment, determining the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment includes:
[0022] Determine the segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0023] When the segmented water depth of each water accumulation segment is greater than the tunnel height of each water accumulation segment, the cone type of each water accumulation segment is determined to be a large cone type;
[0024] When the segmented water depth of each waterlogging segment is less than or equal to the tunnel height of each waterlogging segment, the water surface mileage difference of each waterlogging segment is determined according to the segmented waterlogging information of each waterlogging segment, and the cone type of each waterlogging segment is determined according to the segmented mileage difference, water surface mileage difference and segmented slope of each waterlogging segment.
[0025] In one embodiment, determining the cone type of each water accumulation segment according to the water surface mileage difference and segment slope of each water accumulation segment includes:
[0026] Parameters are calculated based on the water surface mileage difference and segment slope of each waterlogged segment to determine the target comparison parameters of each waterlogged segment;
[0027] When the target comparison parameter of each water accumulation segment is greater than or equal to the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a small cone type;
[0028] When the target comparison parameter of each water accumulation segment is less than the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a medium cone type.
[0029] In one embodiment, the step of performing volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment includes:
[0030] When the cone type of each water accumulation segment is a small cone type, a cylindrical bottom surface is constructed according to the center line of the target tunnel, and a plurality of oblique cones corresponding to each water accumulation segment and a cone diameter of each oblique cone are obtained according to the construction result;
[0031] Determine the water surface mileage difference and segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0032] The volume of each oblique cone is determined by performing volume calculation based on the cone diameter of each oblique cone, the water surface mileage difference of each water accumulation segment, the segment water depth of each water accumulation segment, and the segment slope of each water accumulation segment;
[0033] The volumes of each oblique cone are calculated and summarized to obtain the volume of water in each water accumulation segment.
[0034] In addition, to achieve the above-mentioned purpose, the present application also proposes a tunnel water accumulation calculation device, the tunnel water accumulation calculation device comprising: a division module, used to divide the target tunnel into sections according to the design information of the target tunnel, and obtain multiple water accumulation sections corresponding to the target tunnel;
[0035] A segmentation module, used to segment each waterlogged interval according to the interval waterlogging information of each waterlogged interval and the slope information of the target tunnel, to obtain a plurality of waterlogging segments corresponding to each waterlogged interval and segmented waterlogging information of each waterlogging segment;
[0036] A calculation module, used to perform volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment, so as to determine the water accumulation volume of each water accumulation segment;
[0037] The processing module is used to determine the tunnel water accumulation amount of the target tunnel according to the water accumulation volume of each water accumulation segment.
[0038] In addition, to achieve the above-mentioned purpose, the present application also proposes a tunnel water accumulation calculation device, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, and the computer program is configured to implement the steps of the tunnel water accumulation calculation method as described above.
[0039] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by the processor, the steps of the tunnel water accumulation calculation method as described above are implemented.
[0040] The present application provides a method for calculating the amount of water accumulation in a tunnel. The present application divides a target tunnel into sections according to design information of the target tunnel to obtain a plurality of water accumulation sections corresponding to the target tunnel; segments each water accumulation section according to the section water accumulation information of each water accumulation section and the slope information of the target tunnel to obtain a plurality of water accumulation sections corresponding to each water accumulation section and the section water accumulation information of each water accumulation section; performs volume calculation according to the section water accumulation information of each water accumulation section and a target calculation model corresponding to each water accumulation section to determine the water accumulation volume of each water accumulation section; and determines the amount of water accumulation in the tunnel of the target tunnel according to the water accumulation volume of each water accumulation section. Through the above method, each waterlogging interval is segmented based on the interval waterlogging information and slope information of each waterlogging interval, and the waterlogging volume of each waterlogging segment can be obtained based on the segmented waterlogging information of each waterlogging segment and the target calculation model corresponding to each waterlogging segment. The waterlogging volume of each waterlogging segment is summarized to obtain the tunnel waterlogging volume of the target tunnel, realizing the rapid calculation of the tunnel waterlogging volume, and subsequently, the water surface mileage and water depth can be calculated from the waterlogging volume according to the tunnel waterlogging volume calculation method. The accuracy of the calculation is guaranteed, and at the same time, the application range is wide and the resource demand is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0042] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0043] Figure 1 A schematic diagram of a flow chart provided for the first embodiment of the method for calculating the amount of water accumulated in a tunnel of the present application;
[0044] Figure 2 A schematic diagram of the interval division of the method for calculating the amount of water accumulation in a tunnel provided in Example 1 of the present application;
[0045] Figure 3 A schematic diagram of volume calculation of a method for calculating water accumulation in a tunnel provided in Example 1 of the present application;
[0046] Figure 4 A schematic diagram of a cone type for the method for calculating the amount of water accumulation in a tunnel provided in Example 1 of the present application;
[0047] Figure 5 A schematic diagram of a fitting curve for the method for calculating the amount of water accumulation in a tunnel provided in Example 1 of the present application;
[0048] Figure 6 A schematic diagram of a brief flow chart of parameter back calculation of a method for calculating water accumulation in a tunnel provided in Example 1 of the present application;
[0049] Figure 7 A schematic diagram of a flow chart provided for the second embodiment of the method for calculating the amount of water accumulation in a tunnel of the present application;
[0050] Figure 8 A schematic diagram of the overall simplified process of the method for calculating the amount of water accumulated in a tunnel provided in the second embodiment of the present application;
[0051] Fig. 9 This is a schematic diagram of the module structure of the tunnel water accumulation calculation device according to an embodiment of the present application;
[0052] Fig.10 Schematic diagram of the equipment structure of the hardware operating environment involved in the method for calculating the amount of water accumulation in a tunnel in an embodiment of the present application.
[0053] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0054] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.
[0055] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.
[0056] The main solution of the embodiment of the present application is: divide the target tunnel into intervals according to the design information of the target tunnel to obtain multiple waterlogging intervals corresponding to the target tunnel; segment each waterlogging interval according to the interval waterlogging information of each waterlogging interval and the slope information of the target tunnel to obtain multiple waterlogging segments corresponding to each waterlogging interval and segmented waterlogging information of each waterlogging segment; perform volume calculation according to the segmented waterlogging information of each waterlogging segment and the target calculation model corresponding to each waterlogging segment to determine the waterlogging volume of each waterlogging segment; determine the tunnel waterlogging amount of the target tunnel according to the waterlogging volume of each waterlogging segment.
[0057] At present, the calculation of tunnel water accumulation relies on hardware equipment to detect water levels. At the same time, detailed three-dimensional geometric information of buildings and tunnels is required. First, a tunnel model between subway stations is established, and then the water accumulation model is reproduced. The existing technology monitors the water level through hardware equipment, so sensors need to be arranged in advance during the construction phase of the tunnel project, and existing tunnel projects need to be reconstructed. In addition, this technology requires the establishment of tunnel and building geometric modeling for volume calculation, which is slow and requires high computer hardware equipment. Therefore, the economic cost of the existing technology is high and the implementation is difficult.
[0058] Many existing 3D modeling software have similar modeling and volume statistics functions, but have not been able to extract a relatively simple formula for calculating the volume of tunnel water accumulation. The water level calculation process cannot be traced or verified, and it is difficult to develop a more in-depth calculation program based on the calculation results. The calculation process is difficult to express with a formula, and is only applicable to forward calculations, that is, 3D modeling is performed to calculate the volume after the tunnel water depth and water surface range are known. It is impossible to reversely calculate the starting and ending range of the water surface and the water depth based on the estimated volume. Therefore, the application scope of the existing technology is small and the application effect is low.
[0059] The method for calculating the amount of water accumulated in a tunnel mentioned in the present application only needs to be based on the slope data of the longitudinal section of the tunnel. It does not require hardware foundations such as sensors, nor does it require the establishment of a tunnel model, and the computer resource consumption is low. The present invention can be used to design and demonstrate drainage schemes in the early pre-feasibility study stage of tunnel engineering, or to perform emergency rescue calculations on tunnels that are already in operation. It has a wide range of applications and low economic costs. The tunnel is divided into small sections with different slopes. By summarizing the calculation methods for the amount of water accumulated in the tunnel under different water depths, the amount of water accumulated in the tunnel can be calculated without modeling the tunnel, and a calculation book with traceable calculation formulas can be output. The calculation process is accurate, fast, and has low resource requirements. Based on this calculation principle, the interval water accumulation and water depth / water surface mileage curve can be output, and the water surface mileage and water depth can be quickly calculated based on the volume of water accumulation, providing a basis for the design of tunnel drainage systems, deep tunnel regulation and storage, and other engineering projects.
[0060] The present application divides each waterlogging interval into segments based on the interval waterlogging information and slope information of each waterlogging interval, and obtains the waterlogging volume of each waterlogging segment based on the segmented waterlogging information of each waterlogging segment and the target calculation model corresponding to each waterlogging segment. The waterlogging volumes of each waterlogging segment are summarized to obtain the tunnel waterlogging volume of the target tunnel, thereby realizing rapid calculation of the tunnel waterlogging volume. Subsequently, the water surface mileage and water depth can be reversely calculated from the waterlogging volume according to the tunnel waterlogging volume calculation method, thereby ensuring the accuracy of the calculation, while having a wide range of adaptability and low resource requirements.
[0061] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a tunnel water accumulation amount calculation device, etc. The following takes the tunnel water accumulation amount calculation device as an example to illustrate this embodiment and the following embodiments.
[0062] Based on this, the present application embodiment provides a method for calculating the amount of water accumulation in a tunnel, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the method for calculating the amount of water accumulation in a tunnel according to the present application.
[0063] In this embodiment, the method includes steps S10 to S40:
[0064] Step S10, dividing the target tunnel into sections according to the design information of the target tunnel, and obtaining a plurality of waterlogged sections corresponding to the target tunnel;
[0065] It should be noted that the design information includes but is not limited to the mileages corresponding to multiple highest points and the mileages corresponding to multiple lowest points of the target tunnel, and the target tunnel refers to the tunnel for which water accumulation calculation is required.
[0066] It is understandable that the cross-section of most tunnels in shield tunneling, mining and other construction methods is approximately circular. Therefore, when calculating the amount of water accumulated in a tunnel, the tunnel can be appropriately simplified into an inclined cylinder in the longitudinal section, and the volume calculation can be performed based on this simplified model. The curvature of the tunnel's running curve on the plane is small, and the volume error can be simplified using the calculation coefficient. The longitudinal section model of a typical tunnel is as follows: Figure 2 As shown in the figure, the accumulated water gathers at both ends of the lowest point under the action of gravity, and the accumulated water on both sides of the highest point can be divided into two parts. Therefore, the tunnel can be divided into multiple water accumulation sections according to the mileage of the lowest point and the highest point.
[0067] In a feasible implementation manner, step S10 may further include steps A11 to A12:
[0068] Step A11, determining a plurality of first target point mileages and a plurality of second target point mileages of the target tunnel according to design information of the target tunnel;
[0069] It should be noted that the first target point mileage refers to the mileage of the highest point in the target tunnel, and the second target point mileage refers to the mileage of the lowest point in the target tunnel.
[0070] Step A12, dividing the target tunnel into sections according to the mileages of each first target point and each second target point, to obtain a plurality of waterlogged sections corresponding to the target tunnel.
[0071] It should be noted that, because the accumulated water gathers at both ends of the lowest point under the action of gravity, the accumulated water on both sides of the highest point can be divided into two parts. Therefore, the target tunnel can be divided into multiple water accumulation intervals according to the mileage of each first target point and the mileage of each second target point.
[0072] In this embodiment, multiple first target point mileages and multiple second target point mileages of the target tunnel are determined according to the design information of the target tunnel; the target tunnel is divided into sections according to each first target point mileage and each second target point mileage, and multiple waterlogging sections corresponding to the target tunnel are obtained. In this way, the accuracy of subsequent waterlogging calculation can be guaranteed.
[0073] Step S20, segmenting each flooded interval according to the interval waterlogging information of each flooded interval and the slope information of the target tunnel, to obtain a plurality of waterlogging segments corresponding to each flooded interval and segmented waterlogging information of each waterlogging segment;
[0074] It should be noted that the interval waterlogging information of each waterlogging interval can be the starting mileage of the waterlogging surface in each waterlogging interval, or the ending mileage of the waterlogging surface in each waterlogging interval, or the water depth of each waterlogging interval; because in a single waterlogging interval, due to the different tunnel slopes of different mileage sections, the water depth and water surface mileage ranges of each slope section are different, and it is difficult to calculate after combining them. In this embodiment, each waterlogging interval is segmented according to the slope to obtain multiple waterlogging segments, and the segmented calculation of the volume in the interval is performed. The waterlogging volume in the same slope section follows a similar calculation method.
[0075] It can be understood that the segmented water accumulation information of each water accumulation segment includes but is not limited to the segmented water depth, water surface mileage difference and segmented slope of each water accumulation segment. The water surface mileage difference can reflect the length of the water surface of each water accumulation segment.
[0076] In a feasible implementation manner, step S20 may further include steps B11 to B14:
[0077] Step B11, performing range calculation according to the waterlogging information of each waterlogging interval to determine the waterlogging coverage area of each waterlogging interval;
[0078] It should be noted that, for each waterlogged interval, after obtaining the interval waterlogging information corresponding to each waterlogged interval, the range of waterlogging coverage in the waterlogged interval can be calculated based on the interval waterlogging information. In this embodiment, the range of waterlogging coverage in the waterlogged interval is the waterlogging coverage interval of the waterlogged interval. The interval waterlogging information can be collected by sensors in the target tunnel or manually. This embodiment does not limit the method for obtaining the interval waterlogging information.
[0079] Step B12, segmenting the waterlogging coverage interval of each waterlogging interval according to the slope information of the target tunnel, and obtaining a plurality of waterlogging segments corresponding to each waterlogging interval;
[0080] It should be noted that, according to the slope information of the target tunnel, the range covered by water in each flooded section is segmented, and continuous positions with the same slope are taken as a water segment, thereby obtaining multiple water segments corresponding to each water segment.
[0081] Step B13, performing parameter calculation according to the slope information of the target tunnel and the interval waterlogging information of each waterlogging interval, and determining the segmented water depth of each waterlogging segment and the water surface mileage difference of each waterlogging segment;
[0082] Step B14, obtaining the segmented waterlogging information of each waterlogging segment according to the segmented water depth, water surface mileage difference and segmented slope of each waterlogging segment.
[0083] It should be noted that the segmented water depth, water surface starting mileage, and water surface starting mileage of each water-logged segment can be calculated through the slope information of the target tunnel and the interval waterlogging information of each waterlogged segment. The water surface starting mileage and water surface starting mileage of each waterlogged segment can further determine the water surface mileage difference of each waterlogged segment. The segmented water depth, water surface mileage difference, and segmented slope of each waterlogged segment are summarized to obtain the segmented waterlogging information of each waterlogged segment.
[0084] In this embodiment, the water coverage interval of each waterlogged interval is determined by performing range calculation based on the interval waterlogging information of each waterlogged interval; the water coverage interval of each waterlogged interval is segmented according to the slope information of the target tunnel to obtain multiple waterlogging segments corresponding to each waterlogged interval; parameter calculation is performed based on the slope information of the target tunnel and the interval waterlogging information of each waterlogged interval to determine the segmented water depth of each waterlogged segment and the water surface mileage difference of each waterlogged segment; the segmented waterlogging information of each waterlogged segment is obtained based on the segmented water depth, water surface mileage difference and segmented slope of each waterlogged segment. Through the above method, accurate segmentation of the waterlogged interval can be achieved, laying a foundation for the subsequent rapid calculation of the amount of waterlogging.
[0085] Step S30, performing volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment;
[0086] It should be noted that the shape of the water accumulation in the target tunnel can be regarded as a part of an inclined cylinder, e.g. Figure 3 As shown, for the oblique truncated cylinder, the volume calculation formula is: On the XOY plane, for the cylindrical surface, x 2 +y 2 =R 2 , can be obtained On the YOZ plane, according to the principle of similar triangles, Available The volume of the oblique truncated cylinder can be Figure 3 The volume is calculated by integrating the cross section parallel to the XOZ plane along the Y axis.
[0087]
[0088] It is understandable that within a single water-logged segment, since the tunnel has an inclined slope, the tunnel cross-section at the starting and ending points of the segment is elliptical and not perpendicular to the centerline of the tunnel. The interval waterlogging model cannot directly use the truncated cylinder calculation formula and requires further processing. Therefore, according to the different segmented water depths of each water-logged segment, each water-logged segment can be divided into different cone types, and different cone types correspond to different calculation methods. According to the segmented waterlogging information of each water-logged segment, the cone type of each water-logged segment is first determined, and then according to the calculation method corresponding to each cone type, the target calculation model corresponding to each water-logged segment is determined. In this embodiment, the cone types include but are not limited to small inclined cones, medium inclined cones, and large inclined cones, etc. Figure 4 shown.
[0089] In a specific implementation, the water volume of each water accumulation segment is calculated by inputting the segmentation technical parameters of each water accumulation segment into the target calculation model corresponding to each water accumulation segment.
[0090] In a feasible implementation manner, step S30 may further include steps C11 to C14:
[0091] Step C11, when the cone type of each water accumulation segment is a small cone type, a cylindrical bottom surface is constructed according to the center line of the target tunnel, and a plurality of oblique cones corresponding to each water accumulation segment and a cone diameter of each oblique cone are obtained according to the construction result;
[0092] It should be noted that before calculating the water volume of each integral segment, it is necessary to construct the bottom surface of the cylinder perpendicular to the center line of the tunnel, such as Figure 4 As shown by the dotted line in the middle, after the construction is completed, each water accumulation segment can obtain multiple standard truncated cylinders.
[0093] Step C12, determining the water surface mileage difference and the segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0094] Step C13, performing volume calculation according to the cone diameter of each inclined cone, the water surface mileage difference of each water accumulation segment, the segment water depth of each water accumulation segment, and the segment slope of each water accumulation segment, to determine the volume of each inclined cone;
[0095] It should be noted that the angle and axial height of the truncated cylinder are calculated by calculating the cone diameter of each inclined cone, the difference in water surface mileage of each water accumulation segment, the segmented water depth of each water accumulation segment and the segmented slope of each water accumulation segment, and the volume calculation formula of the truncated cylinder is used to calculate, so as to obtain the volume of multiple truncated cylinders.
[0096] Step C14, calculating and summarizing the volumes of the oblique cones to obtain the water volume of each water accumulation segment.
[0097] It should be noted that when the cone type of each water accumulation segment is a small cone type, the calculation method of splitting and adding is adopted. Figure 4 The surface where the dotted line of the vertical tunnel outline is located is taken as the bottom surface, which is perpendicular to the center line of the tunnel, so two oblique truncated cylinders can be obtained. According to the parameters such as the cone diameter of each segment, the water surface mileage difference of each water accumulation segment, the segment water depth of each water accumulation segment, and the segment slope of each water accumulation segment, the angle, length and other parameters in the oblique truncated cylinder formula are calculated, and then the volume of the two oblique truncated cylinders is calculated. After adding them, the water volume of each water accumulation segment can be obtained.
[0098] It can be understood that when the cone type of each water accumulation segment is a medium cone type, the calculation method of subtraction after completion is adopted. Figure 4 As shown by the middle dotted line, each water accumulation segment is completed into a larger small oblique cone. After calculating the volume of the two small oblique cones according to the above calculation method, the two parts are subtracted to obtain the water volume of each water accumulation segment.
[0099] In the specific implementation, when the cone type of each water accumulation segment is a large cone type, the calculation method of subtraction after completion is also adopted. Figure 4 As shown by the middle dotted line, the large oblique cone is completed into a complete oblique cylinder, the volume of the oblique cylinder is calculated, and the volume of the small oblique cone on the top is subtracted to obtain the volume of water in each water accumulation segment.
[0100] It should be noted that when the water surface in each water accumulation segment is not above the highest point of the segment and the water accumulation completely fills the tunnel, the water accumulation volume of each water accumulation segment is calculated as a complete oblique cylinder. In this embodiment, when each water accumulation segment is a small oblique cone, it means that the cone type of the water accumulation segment is a small cone type; when each water accumulation segment is a medium oblique cone, it means that the cone type of the water accumulation segment is a medium cone type; when each water accumulation segment is a large oblique cone, it means that the cone type of the water accumulation segment is a large cone type.
[0101] In this embodiment, when the cone type of each water accumulation segment is a small cone type, a cylindrical bottom surface is constructed according to the center line of the target tunnel, and multiple inclined cones corresponding to each water accumulation segment and the cone diameter of each inclined cone are obtained according to the construction result; the water surface mileage difference and segmented water depth of each water accumulation segment are determined according to the segmented water accumulation information of each water accumulation segment; the volume of each inclined cone is determined according to the cone diameter of each inclined cone, the water surface mileage difference of each water accumulation segment, the segmented water depth of each water accumulation segment and the segmented slope of each water accumulation segment; the volume of each inclined cone is calculated and summarized to obtain the water accumulation volume of each water accumulation segment. In the above manner, the volume of each water accumulation segment can be accurately calculated.
[0102] Step S40: determining the tunnel water accumulation amount of the target tunnel according to the water accumulation volume of each water accumulation segment.
[0103] It should be noted that by summing up the water volume of each water accumulation segment, the water volume of each water accumulation interval can be obtained, and by further summing up the water volume of each water accumulation interval, the tunnel water volume in the target tunnel can be obtained.
[0104] It can be understood that, based on the present embodiment, multiple water depths or water surface mileage values can be input, and the calculation model type under each input value can be determined in batches. The volume can be quickly calculated by bringing it into the calculation formula, and a scatter plot of the relationship between the interval volume and the water depth or water surface mileage can be obtained. Since the slopes of the interval water accumulation calculation segments are different, as the water depth / water surface mileage increases, the corresponding water accumulation calculation model and the formula used are also changing, and the water accumulation volume curve is difficult to draw directly. However, when the number of water depths or water surface mileages calculated by the software is large and the intervals are small, an approximate fitting curve of the interval water accumulation and the water depth / water surface mileage can be obtained, for example Figure 5 This curve can be used to check and calculate flood emergency response, post-disaster drainage, tunnel storage and other systems during the design phase.
[0105] In a specific implementation, based on this embodiment, the water depth and water surface range of the water accumulation interval can be reversely calculated by inputting the water accumulation volume, such as Figure 6 Before the calculation begins, the maximum volume V of the interval must be calculated. max , determine the input volume V0≤V max, and then perform the back calculation after the conditions are met. Specifically, two calculation methods are supported: 1. Fitting curve calculation: Based on the fitting curve of water volume and water depth / water surface mileage generated above, find the water depth and water surface mileage corresponding to the input volume through curve interpolation, and then use the above method to calculate the volume, and output the calculation sheet of the required water volume. 2. Binary iterative calculation: Since the water volume increases monotonically with the increase of water depth, the water depth can be calculated by binary iterative calculation. Take the maximum water depth H max As the upper limit of water depth, 0 as the lower limit of water depth, calculate water depth H = (upper limit of water depth + lower limit of water depth) / 2, and according to the calculation method described above, the current water volume V can be calculated. Judge the calculation result, if V>V0, then use H as the new upper limit of water depth, otherwise use H as the new lower limit of water depth, until the relative error between the calculated V and the input value V0 is iterated to within the set value δ, and finally output the calculation report.
[0106] The present embodiment provides a method for calculating the amount of water accumulation in a tunnel. The method of the present embodiment divides the target tunnel into sections according to the design information of the target tunnel to obtain a plurality of water accumulation sections corresponding to the target tunnel; segments each water accumulation section according to the interval water accumulation information of each water accumulation section and the slope information of the target tunnel to obtain a plurality of water accumulation sections corresponding to each water accumulation section and the segmented water accumulation information of each water accumulation section; performs volume calculation according to the segmented water accumulation information of each water accumulation section and the target calculation model corresponding to each water accumulation section to determine the water accumulation volume of each water accumulation section; and determines the amount of water accumulation in the tunnel of the target tunnel according to the water accumulation volume of each water accumulation section. Through the above method, each waterlogging interval is segmented based on the interval waterlogging information and slope information of each waterlogging interval, and the waterlogging volume of each waterlogging segment can be obtained based on the segmented waterlogging information of each waterlogging segment and the target calculation model corresponding to each waterlogging segment. The waterlogging volume of each waterlogging segment is summarized to obtain the tunnel waterlogging volume of the target tunnel, thereby realizing the rapid calculation of the tunnel waterlogging volume, and according to the tunnel waterlogging volume calculation method, the water surface mileage and water depth can be reversely calculated from the waterlogging volume, thereby ensuring the accuracy of the calculation, while having a wide range of adaptability and low resource requirements.
[0107] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 7 , step S30, the tunnel water volume calculation method further includes steps S31-S32:
[0108] Step S31, determining the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0109] It should be noted that, according to the segmented water accumulation information of each water accumulation segment, combined with the type judgment condition, the cone type of each water accumulation segment can be determined. In this embodiment, the cone type includes but is not limited to a small cone type, a medium cone type, and a large cone type.
[0110] In a feasible implementation manner, step S31 may further include steps D11 to D13:
[0111] Step D11, determining the segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment;
[0112] Step D12, when the segmented water depth of each water accumulation segment is greater than the tunnel height of each water accumulation segment, determining the cone type of each water accumulation segment to be a large cone type;
[0113] It should be noted that when the segmented water depth of each water-filled segment is greater than the tunnel height of each water-filled segment, it means that the water-filled segment is a large inclined cone. At this time, the cone type of the water-filled segment is a large cone type.
[0114] Step D13, when the segmented water depth of each water-logged segment is less than or equal to the tunnel height of each water-logged segment, the water surface mileage difference of each water-logged segment is determined according to the segmented waterlogging information of each water-logged segment, and the cone type of each water-logged segment is determined according to the segmented mileage difference, water surface mileage difference and segmented slope of each water-logged segment.
[0115] It should be noted that when the segmented water depth of each water-logged segment is less than or equal to the tunnel height of each water-logged segment, the water surface mileage difference of each water-logged segment needs to be determined based on the segmented waterlogging information of each water-logged segment. The cone type of each water-logged segment is further determined by the segmented mileage difference, water surface mileage difference and segmented slope of each water-logged segment combined with the type judgment condition.
[0116] In this embodiment, the segmented water depth of each water accumulation segment is determined according to the segmented water accumulation information of each water accumulation segment; when the segmented water depth of each water accumulation segment is greater than the tunnel height of each water accumulation segment, the cone type of each water accumulation segment is determined to be a large cone type; when the segmented water depth of each water accumulation segment is less than or equal to the tunnel height of each water accumulation segment, the water surface mileage difference of each water accumulation segment is determined according to the segmented water accumulation information of each water accumulation segment, and the cone type of each water accumulation segment is determined according to the segmented mileage difference of each water accumulation segment, the water surface mileage difference and the segmented slope. Through the above method, accurate identification of the cone type of each water accumulation segment is achieved.
[0117] In a feasible implementation manner, step D13 may further include steps E11 to E13:
[0118] Step E11, performing parameter calculation according to the water surface mileage difference and segment slope of each water accumulation segment, and determining the target comparison parameter of each water accumulation segment;
[0119] It should be noted that when the segmented water depth of each water accumulation segment is less than or equal to the tunnel height of each water accumulation segment, the water surface mileage difference of each water accumulation segment and the segmented slope of each water accumulation segment are multiplied, and the obtained value is the target comparison parameter of each water accumulation segment.
[0120] Step E12, when the target comparison parameter of each water accumulation segment is greater than or equal to the segmented water depth of each water accumulation segment, determining the cone type of each water accumulation segment to be a small cone type;
[0121] Step E13, when the target comparison parameter of each water accumulation segment is less than the segmented water depth of each water accumulation segment, determine that the cone type of each water accumulation segment is a medium cone type.
[0122] It should be noted that, when the segmented water depth of each water accumulation segment is less than or equal to the tunnel height of each water accumulation segment, and the target comparison parameter of each water accumulation segment is greater than or equal to the segmented water depth of each water accumulation segment, it means that the water accumulation segment is a small inclined cone, and the cone type of the water accumulation segment is a small cone type at this time; when the segmented water depth of each water accumulation segment is less than or equal to the tunnel height of each water accumulation segment, and the target comparison parameter of each water accumulation segment is less than the segmented water depth of each water accumulation segment, it means that the water accumulation segment is a medium inclined cone, and the cone type of the water accumulation segment is a medium cone type at this time.
[0123] In this embodiment, the target comparison parameter of each water accumulation segment is determined by calculating the parameter according to the water surface mileage difference and the segment slope of each water accumulation segment; when the target comparison parameter of each water accumulation segment is greater than or equal to the segment water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a small cone type; when the target comparison parameter of each water accumulation segment is less than the segment water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a medium cone type. In the above manner, accurate identification of the cone type of each water accumulation segment is achieved.
[0124] Step S32, determining a target calculation model corresponding to each water accumulation segment according to the cone type of each water accumulation segment and the water accumulation volume calculation model corresponding to each cone type.
[0125] It should be noted that different cone types correspond to different calculation methods, and the target calculation model corresponding to each water accumulation segment is determined according to the calculation method corresponding to each cone type.
[0126] This embodiment provides a method for calculating the amount of water accumulation in a tunnel. This embodiment determines the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment; and determines the target calculation model corresponding to each water accumulation segment according to the cone type of each water accumulation segment and the water accumulation amount calculation model corresponding to each cone type. In this way, the target calculation model corresponding to each water accumulation segment can be accurately selected, laying a foundation for the subsequent accurate calculation of the amount of water accumulation.
[0127] For example, in order to help understand the implementation process of the tunnel water volume calculation method obtained by combining this embodiment with the above-mentioned embodiment 1, please refer to Figure 8 , Figure 8 A brief flow chart of a method for calculating the amount of water accumulated in a tunnel is provided. Specifically:
[0128] The specific process of the method for calculating the amount of water accumulation in a tunnel of this embodiment is as follows: the tunnel is divided into multiple water accumulation intervals according to the mileage of the lowest and highest points of the tunnel. By inputting the water depth or water surface mileage range of each water accumulation interval, combined with the diameter, slope and other information of the tunnel, the volume of the water accumulation interval is calculated respectively. In a single water accumulation interval, due to the different tunnel slopes of different mileage sections, the water depth and water surface mileage range of each slope section are different, and it is difficult to calculate after combining them together. In this embodiment, the water accumulation interval is calculated in sections according to the slope, and the volume of water accumulation in the same slope section follows a similar formula. The shape of the water accumulation in the tunnel can be regarded as part of an inclined cylinder. In this embodiment, according to the different water depths of each section in the water accumulation interval, the interval water accumulation model is divided into three types. In the calculation section of a single slope, the tunnel has an inclined slope, and the tunnel cross section at the starting and ending points of the section is elliptical and not perpendicular to the center line of the tunnel. The interval water accumulation model cannot directly use the volume calculation formula of the oblique truncated cylinder and needs further processing. Before applying the truncated cylinder formula, it is necessary to first construct a cylindrical bottom surface perpendicular to the tunnel centerline. For different situations where the water depth in the tunnel ranges from low to high, the following methods are used for calculation: (1) For small oblique cones, the calculation method of splitting and adding is used. The surface where the dotted line of the vertical tunnel contour is located is used as the bottom surface. This surface is perpendicular to the tunnel centerline, so two standard oblique cylinders can be obtained. According to the water surface mileage, water depth, slope, diameter and other parameters, the angle, length and other parameters in the oblique cylinder formula are calculated. Then the volume of the two oblique cylinders is calculated. After adding them, the water volume of the small oblique cone can be obtained. (2) For medium oblique cones, the calculation method of completing and subtracting is used. The medium oblique cone is completed into a larger small oblique cone. After calculating the volume of the two small oblique cones according to the above calculation method, the two parts are subtracted to obtain the water volume of the medium oblique cone. (3) For large inclined cones, the calculation method of completion and subtraction is also used. The large inclined cone is completed into a complete inclined cylinder, the volume of the inclined cylinder is calculated, and the volume of the small inclined cone at the top is subtracted to obtain the water volume of the large inclined cone. (4) When the water surface in the segmented tunnel is above the highest point of the segment and the water completely fills the tunnel, the segment volume is calculated as a complete inclined cylinder.
[0129] Through the method of this embodiment, the volume calculation of each section of water accumulation is realized according to different types of inclined cones, and the water accumulation curve is output. The calculation is fast and the result is accurate, and the calculation process is traceable.
[0130] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the method for calculating the amount of water accumulation in a tunnel of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.
[0131] This application also provides a tunnel water volume calculation device, please refer to Fig. 9 , the tunnel water accumulation calculation device comprises:
[0132] A division module 10 is used to divide the target tunnel into sections according to the design information of the target tunnel, so as to obtain a plurality of waterlogged sections corresponding to the target tunnel;
[0133] The segmentation module 20 is used to segment each waterlogged interval according to the interval waterlogging information of each waterlogged interval and the slope information of the target tunnel, and obtain a plurality of waterlogging segments corresponding to each waterlogged interval and segmented waterlogging information of each waterlogging segment;
[0134] A calculation module 30, configured to perform volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment, and determine the water accumulation volume of each water accumulation segment;
[0135] The processing module 40 is used to determine the tunnel water accumulation amount of the target tunnel according to the water accumulation volume of each water accumulation segment.
[0136] Optionally, the division module 10 is further used for:
[0137] According to the design information of the target tunnel, a plurality of first target point mileages and a plurality of second target point mileages of the target tunnel are determined; the target tunnel is divided into sections according to the first target point mileages and the second target point mileages to obtain a plurality of waterlogged sections corresponding to the target tunnel.
[0138] Optionally, the segmentation module 20 is further used for:
[0139] Perform range calculation based on the interval waterlogging information of each waterlogging interval to determine the waterlogging coverage interval of each waterlogging interval; segment the waterlogging coverage interval of each waterlogging interval according to the slope information of the target tunnel to obtain multiple waterlogging segments corresponding to each waterlogging interval; perform parameter calculation based on the slope information of the target tunnel and the interval waterlogging information of each waterlogging interval to determine the segmented water depth of each waterlogging segment and the water surface mileage difference of each waterlogging segment; obtain the segmented waterlogging information of each waterlogging segment based on the segmented water depth, water surface mileage difference and segmented slope of each waterlogging segment.
[0140] Optionally, the calculation module 30 is further used for:
[0141] The cone type of each water accumulation segment is determined according to the segmented water accumulation information of each water accumulation segment; the target calculation model corresponding to each water accumulation segment is determined according to the cone type of each water accumulation segment and the water accumulation volume calculation model corresponding to each cone type.
[0142] Optionally, the calculation module 30 is further used for:
[0143] The segmented water depth of each water accumulation segment is determined according to the segmented water accumulation information of each water accumulation segment; when the segmented water depth of each water accumulation segment is greater than the tunnel height of each water accumulation segment, the cone type of each water accumulation segment is determined to be a large cone type; when the segmented water depth of each water accumulation segment is less than or equal to the tunnel height of each water accumulation segment, the water surface mileage difference of each water accumulation segment is determined according to the segmented water accumulation information of each water accumulation segment, and the cone type of each water accumulation segment is determined according to the segmented mileage difference of each water accumulation segment, the water surface mileage difference and the segmented slope.
[0144] Optionally, the calculation module 30 is further used for:
[0145] Parameters are calculated based on the water surface mileage difference and segmented slope of each water accumulation segment to determine the target comparison parameter of each water accumulation segment; when the target comparison parameter of each water accumulation segment is greater than or equal to the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a small cone type; when the target comparison parameter of each water accumulation segment is less than the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a medium cone type.
[0146] Optionally, the calculation module 30 is further used for:
[0147] When the cone type of each water accumulation segment is a small cone type, a cylindrical bottom surface is constructed according to the center line of the target tunnel, and a plurality of inclined cones corresponding to each water accumulation segment and a cone diameter of each inclined cone are obtained according to the construction result; the water surface mileage difference and the segmented water depth of each water accumulation segment are determined according to the segmented water accumulation information of each water accumulation segment; the volume of each inclined cone is determined according to the cone diameter of each inclined cone, the water surface mileage difference of each water accumulation segment, the segmented water depth of each water accumulation segment and the segmented slope of each water accumulation segment; the volume of each inclined cone is calculated and summarized to obtain the water accumulation volume of each water accumulation segment.
[0148] The tunnel water accumulation amount calculation device provided by the present application adopts the tunnel water accumulation amount calculation method in the above embodiment, which can solve the technical problem that the prior art cannot quickly and accurately calculate the tunnel water accumulation amount. Compared with the prior art, the beneficial effects of the tunnel water accumulation amount calculation device provided by the present application are the same as the beneficial effects of the tunnel water accumulation amount calculation method provided by the above embodiment, and the other technical features of the tunnel water accumulation amount calculation device are the same as the features disclosed in the above embodiment method, which will not be repeated here.
[0149] The present application provides a tunnel water accumulation amount calculation device, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the tunnel water accumulation amount calculation method in the above-mentioned embodiment one.
[0150] Reference below Fig.10 , which shows a schematic diagram of the structure of a tunnel water accumulation amount calculation device suitable for implementing the embodiment of the present application. The tunnel water accumulation amount calculation device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Fig.10 The tunnel water accumulation calculation device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0151] like Fig.10 As shown, the tunnel water accumulation amount calculation device may include a processing device 1001 (such as a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the tunnel water accumulation amount calculation device are also stored. The processing device 1001, ROM1002 and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the tunnel water volume calculation device to communicate wirelessly or wired with other devices to exchange data. Although the figure shows a tunnel water volume calculation device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.
[0152] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.
[0153] The tunnel water accumulation amount calculation device provided by the present application adopts the tunnel water accumulation amount calculation method in the above embodiment, which can solve the technical problem that the prior art cannot quickly and accurately calculate the tunnel water accumulation amount. Compared with the prior art, the beneficial effects of the tunnel water accumulation amount calculation device provided by the present application are the same as the beneficial effects of the tunnel water accumulation amount calculation method provided by the above embodiment, and the other technical features in the tunnel water accumulation amount calculation device are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.
[0154] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.
[0155] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0156] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the method for calculating the amount of water accumulated in a tunnel in the above-mentioned embodiment.
[0157] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.
[0158] The above-mentioned computer-readable storage medium may be included in the tunnel water accumulation amount calculation device; or it may exist independently without being assembled into the tunnel water accumulation amount calculation device.
[0159] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the tunnel water accumulation amount calculation device, the tunnel water accumulation amount calculation device is enabled to calculate the tunnel water accumulation amount.
[0160] Computer program code for performing the operations of the present application may be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0161] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0162] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.
[0163] The readable storage medium provided by the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned method for calculating the amount of water accumulated in a tunnel, and can solve the technical problem that the amount of water accumulated in a tunnel cannot be calculated quickly and accurately in the prior art. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided by the present application are the same as the beneficial effects of the method for calculating the amount of water accumulated in a tunnel provided by the above-mentioned embodiment, and will not be elaborated here.
[0164] The present application also provides a computer program product, including a computer program, which implements the steps of the tunnel water accumulation calculation method as described above when executed by a processor.
[0165] The computer program product provided by this application can solve the technical problem that the prior art cannot quickly and accurately calculate the amount of water accumulated in a tunnel. Compared with the prior art, the beneficial effects of the computer program product provided by this application are the same as the beneficial effects of the method for calculating the amount of water accumulated in a tunnel provided by the above embodiment, and will not be elaborated here.
[0166] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.
Claims
1. A method for calculating the amount of water accumulated in a tunnel, characterized in that: The method for calculating the amount of water accumulation in a tunnel comprises: Dividing the target tunnel into sections according to design information of the target tunnel to obtain a plurality of waterlogged sections corresponding to the target tunnel; Segmenting each flooded interval according to the interval waterlogging information of each flooded interval and the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each flooded interval and segmented waterlogging information of each waterlogging segment; Perform volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment; The tunnel water accumulation amount of the target tunnel is determined according to the water accumulation volume of each water accumulation segment.
2. The method according to claim 1, characterized in that The step of dividing the target tunnel into sections according to the design information of the target tunnel to obtain a plurality of waterlogged sections corresponding to the target tunnel includes: Determine a plurality of first target point mileages and a plurality of second target point mileages of the target tunnel according to design information of the target tunnel; The target tunnel is divided into sections according to the mileages of each first target point and each second target point, so as to obtain a plurality of waterlogged sections corresponding to the target tunnel.
3. The method according to claim 1, characterized in that The step of segmenting each flooded interval according to the interval waterlogging information of each flooded interval and the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each flooded interval and segmented waterlogging information of each waterlogging segment includes: Perform range calculation based on the waterlogging information of each waterlogging interval to determine the waterlogging coverage interval of each waterlogging interval; Segmenting the waterlogging coverage intervals of each waterlogging interval according to the slope information of the target tunnel to obtain a plurality of waterlogging segments corresponding to each waterlogging interval; Parameter calculation is performed according to the slope information of the target tunnel and the interval waterlogging information of each waterlogging interval to determine the segmented water depth of each waterlogging segment and the water surface mileage difference of each waterlogging segment; The segmented water accumulation information of each water accumulation segment is obtained according to the segmented water depth, water surface mileage difference and segmented slope of each water accumulation segment.
4. The method according to claim 1, characterized in that Before performing volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment, the method further includes: Determine the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment; According to the cone type of each water accumulation segment and the water accumulation volume calculation model corresponding to each cone type, the target calculation model corresponding to each water accumulation segment is determined.
5. The method according to claim 4, characterized in that The step of determining the cone type of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment includes: Determine the segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment; When the segmented water depth of each water accumulation section is greater than the tunnel height of each water accumulation section, the cone type of each water accumulation section is determined to be a large cone type; When the segmented water depth of each waterlogging segment is less than or equal to the tunnel height of each waterlogging segment, the water surface mileage difference of each waterlogging segment is determined according to the segmented waterlogging information of each waterlogging segment, and the cone type of each waterlogging segment is determined according to the segmented mileage difference, water surface mileage difference and segmented slope of each waterlogging segment.
6. The method according to claim 5, characterized in that Determining the cone type of each water accumulation segment according to the water surface mileage difference and segment slope of each water accumulation segment includes: Parameters are calculated based on the water surface mileage difference and segment slope of each waterlogged segment to determine the target comparison parameters of each waterlogged segment; When the target comparison parameter of each water accumulation segment is greater than or equal to the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a small cone type; When the target comparison parameter of each water accumulation segment is less than the segmented water depth of each water accumulation segment, the cone type of each water accumulation segment is determined to be a medium cone type.
7. The method according to claim 1, characterized in that The step of performing volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment to determine the water accumulation volume of each water accumulation segment includes: When the cone type of each water accumulation segment is a small cone type, a cylindrical bottom surface is constructed according to the center line of the target tunnel, and a plurality of oblique cones corresponding to each water accumulation segment and a cone diameter of each oblique cone are obtained according to the construction result; Determine the water surface mileage difference and segmented water depth of each water accumulation segment according to the segmented water accumulation information of each water accumulation segment; The volume of each oblique cone is determined by performing volume calculation based on the cone diameter of each oblique cone, the water surface mileage difference of each water accumulation segment, the segment water depth of each water accumulation segment, and the segment slope of each water accumulation segment; The volumes of each oblique cone are calculated and summarized to obtain the volume of water in each water accumulation segment.
8. A device for calculating the amount of water accumulated in a tunnel, characterized in that: The tunnel water accumulation calculation device comprises: A division module, used for dividing the target tunnel into sections according to the design information of the target tunnel, and obtaining a plurality of waterlogged sections corresponding to the target tunnel; A segmentation module, used to segment each waterlogged interval according to the interval waterlogging information of each waterlogged interval and the slope information of the target tunnel, to obtain a plurality of waterlogging segments corresponding to each waterlogged interval and segmented waterlogging information of each waterlogging segment; A calculation module, used to perform volume calculation according to the segmented water accumulation information of each water accumulation segment and the target calculation model corresponding to each water accumulation segment, so as to determine the water accumulation volume of each water accumulation segment; The processing module is used to determine the tunnel water accumulation amount of the target tunnel according to the water accumulation volume of each water accumulation segment.
9. A tunnel water accumulation calculation device, characterized in that: The tunnel water accumulation amount calculation device includes: a memory, a processor, and a tunnel water accumulation amount calculation program stored in the memory and executable on the processor, wherein the tunnel water accumulation amount calculation program is configured to implement the tunnel water accumulation amount calculation method according to any one of claims 1 to 7.
10. A storage medium, characterized in that: The storage medium stores a tunnel water accumulation amount calculation program, and when the tunnel water accumulation amount calculation program is executed by the processor, the tunnel water accumulation amount calculation method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Subway tunnel and pipe gallery water level automatic early warning system and early warning method thereof
CN114235093A
Accumulated water depth detection method and device, electronic equipment and storage medium
CN115371583A
Underpass tunnel ponding early warning method, device and equipment and storage medium
CN118035741A
Subway tunnel interval inflow analysis method and system based on digital twinning and medium
CN118094737A