Power monitoring system asset risk assessment method and device, terminal equipment and storage medium
By analyzing the network topology and operation data of the power monitoring system, building an asset exposure database and combining the vulnerability database for vulnerability scanning and risk assessment, it solves the system failures and low frequency caused by frequent vulnerability scanning in the power monitoring system and is difficult to understand in real time. The problem of risk has achieved dynamic risk assessment and adjustment of protection strategies.
Patent Information
- Application Number
- CN202411238920.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-05
AI Technical Summary
The frequent use of vulnerability databases in power monitoring systems to conduct vulnerability scanning will affect equipment operation and business continuity, increasing the probability of system failure, while too low frequency will be difficult to understand real-time risk conditions and cannot meet the needs of dynamic changes.
By obtaining network topology data and system operation data of the power monitoring system, conducting communication protocol analysis, building an asset exposure database, combining preset vulnerability databases for vulnerability scanning and risk assessment, monitoring asset exposure changes in real time, and dynamically adjusting protection strategies.
It realizes vulnerability scanning and risk assessment within preset time intervals, reduces the difficulty of risk assessment of power monitoring systems, ensures comprehensive assessment of asset exposure and vulnerability situations, avoids the risk of system failure caused by frequent scanning, and adapts to Dynamically changing security threats.
Smart Images

Figure CN119047836A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information technology, and in particular to a method, device, terminal equipment and storage medium for assessing asset risk in an electric power monitoring system. Background Art
[0002] Power monitoring system assets refer to all physical and non-physical assets used to monitor and control the power production and supply process. Power monitoring systems are usually composed of multiple systems. These subsystems may come from equipment from different manufacturers. Different manufacturers' equipment uses different technologies and communication protocols, which leads to the monitoring equipment usually having strong uniqueness. It is impossible to use a common vulnerability library and risk quantification standards, which increases the difficulty of risk assessment. At the same time, because the power monitoring system has high requirements for business continuity, any operation that may cause system interruption, including vulnerability scanning, needs to be carried out with caution. Frequent use of vulnerability libraries to carry out risk assessment operations such as vulnerability scanning will have an impact on equipment operation and business continuity, and the probability of triggering system failures during the scanning process will increase, creating additional safety hazards. However, if the frequency of risk assessment of power monitoring system assets is too low, it is difficult to gain insight into its real-time risk status and meet the needs of dynamic changes in asset risks of the power monitoring system. Summary of the invention
[0003] The embodiment of the present invention provides a method, device, terminal device and storage medium for asset risk assessment of a power monitoring system, which can effectively solve the problem that the prior art frequently uses vulnerability libraries to conduct risk assessment operations such as vulnerability scanning, which will affect equipment operation and business continuity, increase the probability of triggering system failures during the scanning process, and create additional safety hazards. However, if the frequency of asset risk assessment of the power monitoring system is too low, it is difficult to gain insight into its real-time risk status and meet the needs of dynamic changes in asset risks of the power monitoring system.
[0004] An embodiment of the present invention provides a method for assessing asset risk of a power monitoring system, comprising:
[0005] Obtain network topology data and system operation data of the power monitoring system to be evaluated;
[0006] Performing communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data to obtain assets of the monitoring system to be evaluated;
[0007] According to the assets of the power monitoring system to be evaluated, situation awareness of the assets is performed within a preset time interval to build an asset exposure database of the power monitoring system to be evaluated;
[0008] Perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure database and the preset vulnerability database to obtain vulnerability information of the asset;
[0009] A risk assessment is performed on the power monitoring system to be assessed according to the asset exposure database, the vulnerability information and the loophole database to obtain an asset risk assessment result of the power monitoring system to be assessed.
[0010] Further, based on the network topology data and the system operation data, a communication protocol analysis is performed on the power monitoring system to be evaluated to obtain the assets of the monitoring system to be evaluated, including:
[0011] Determine the node attribute information of each node in the power monitoring system to be evaluated according to the network topology data; the node attribute information includes: node IP address, node port number and node service type;
[0012] According to the system proprietary protocol in the system operation data, the communication protocol of the system proprietary protocol is analyzed by using the protocol reverse method and the data packet analysis method to obtain the proprietary protocol characteristics of the power monitoring system to be evaluated;
[0013] According to the node attribute information, the proprietary protocol characteristics and a preset proprietary protocol characteristic model library, determining whether there is a system proprietary protocol response port in the power monitoring system to be evaluated;
[0014] If yes, then obtain a response message from the system proprietary protocol response port, and identify the assets of the monitoring system to be evaluated according to the response message;
[0015] If not, an asset discovery engine is constructed according to the proprietary protocol characteristics, and the ports of the power monitoring system to be evaluated are scanned according to the asset discovery engine to obtain the assets of the power monitoring system to be evaluated.
[0016] Furthermore, according to the assets of the power monitoring system to be evaluated, situation awareness of the assets is performed within a preset time interval to build an asset exposure surface database of the power monitoring system to be evaluated, including:
[0017] According to the assets of the power monitoring system to be evaluated, determine the network behavior characteristics, communication mode characteristics and service status characteristics of the assets;
[0018] Clustering assets within a preset time interval according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics to obtain an asset group;
[0019] Analyze the network communication relationship between different assets according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics, and construct an asset association topology diagram between the assets;
[0020] An asset exposure surface database of the power monitoring system to be evaluated is constructed based on the asset group and the asset association topology map.
[0021] Furthermore, the construction of the preset vulnerability database includes:
[0022] Obtaining historical vulnerability event information of the power monitoring system and historical vulnerability information corresponding to the historical vulnerability event information; the historical vulnerability information includes vulnerability description, vulnerability affected version and vulnerability risk level;
[0023] Perform semantic extraction based on the historical vulnerability event information to obtain vulnerability attack methods and attack device types;
[0024] Perform semantic extraction according to the vulnerability description to obtain the vulnerability type;
[0025] Build a vulnerability database based on vulnerability attack methods, attack device types, vulnerability types, vulnerability-affected versions, and vulnerability risk levels.
[0026] Furthermore, a vulnerability scan is performed on the power monitoring system to be evaluated according to the asset exposure database and the preset vulnerability database to obtain the vulnerability information of the asset, including:
[0027] Determine basic attributes of the asset according to the asset exposure database; the basic attributes include operating system version, middleware version and open port type;
[0028] Determine the vulnerability type corresponding to the basic attribute according to the vulnerability impact version corresponding to the basic attribute in a preset vulnerability database;
[0029] Perform vulnerability scanning on the assets of the power monitoring system to be assessed according to the vulnerability types corresponding to the basic attributes, and generate a preliminary vulnerability list; the preliminary vulnerability list includes: potential vulnerabilities, preliminary risk levels of potential vulnerabilities, and existing vulnerabilities;
[0030] Conduct code audits on potential vulnerabilities based on the preliminary vulnerability list to obtain vulnerability information of assets.
[0031] Further, based on the asset exposure database, the vulnerability information and the vulnerability database, a risk assessment is performed on the power monitoring system to be assessed to obtain an asset risk assessment result of the power monitoring system to be assessed, including:
[0032] Associating the vulnerability information with the vulnerability database, and calculating a first score for indicating the degree of vulnerability damage;
[0033] Determining, based on the asset exposure database, a second score for indicating the importance of the asset;
[0034] Calculate a comprehensive risk score of the power monitoring system to be evaluated based on the first score and the second score;
[0035] According to the comprehensive risk score and the preset risk threshold, the magnitude relationship between the comprehensive risk score and the preset risk threshold is determined to obtain an asset risk assessment result of the power monitoring system to be assessed.
[0036] Furthermore, it also includes:
[0037] Monitor the asset exposure database of the power monitoring system to be evaluated in real time. When the asset exposure database changes, calculate the database similarity between the asset exposure database after the change and the asset exposure database before the change.
[0038] When the database similarity is less than a preset similarity threshold, the changed asset exposure database and the vulnerability database are associated to obtain the latest vulnerability associated with the asset exposure of the power monitoring system to be evaluated;
[0039] Determine the protection level corresponding to the vulnerability risk level based on the vulnerability risk level corresponding to the latest vulnerability;
[0040] According to the protection level, the firewall and IPS protection strategy corresponding to the protection level are started; and according to the firewall and IPS protection strategy, the power monitoring system to be evaluated is protected.
[0041] As an improvement of the above solution, another embodiment of the present invention provides a power monitoring system asset risk assessment device, including:
[0042] A system data acquisition module is used to obtain network topology data and system operation data of the power monitoring system to be evaluated;
[0043] A system asset discovery module, used to perform communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data, and obtain the assets of the monitoring system to be evaluated;
[0044] An asset database construction module is used to perform situation awareness on the assets of the power monitoring system to be evaluated within a preset time interval and to construct an asset exposure surface database of the power monitoring system to be evaluated;
[0045] A vulnerability scanning module, used to perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure surface database and a preset vulnerability database to obtain vulnerability information of the asset;
[0046] The risk assessment module is used to perform risk assessment on the power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database, and obtain an asset risk assessment result of the power monitoring system to be assessed.
[0047] Another embodiment of the present invention provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements an asset risk assessment method for an electric power monitoring system as described in the above embodiment.
[0048] Another embodiment of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute an asset risk assessment method for a power monitoring system described in the above embodiment.
[0049] By implementing the present invention, at least the following beneficial effects are achieved:
[0050] The present invention provides a method, device, terminal equipment and storage medium for asset risk assessment of an electric power monitoring system. The method can obtain network topology data and system operation data of an electric power monitoring system to be assessed; perform communication protocol analysis on the electric power monitoring system to be assessed based on the network topology data and the system operation data to obtain the assets of the monitoring system to be assessed; perform situation awareness on the assets within a preset time interval based on the assets of the electric power monitoring system to be assessed, and construct an asset exposure database for the electric power monitoring system to be assessed; perform vulnerability scanning on the electric power monitoring system to be assessed based on the asset exposure database and a preset vulnerability database to obtain vulnerability information of the assets; perform risk assessment on the electric power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database to obtain an asset risk assessment result of the electric power monitoring system to be assessed. By analyzing the network topology data and system operation data of the power monitoring system to be evaluated, the assets of the monitoring system to be evaluated can be identified, and then the situation awareness of the assets can be carried out within the preset time interval, and the asset exposure database of the power monitoring system to be evaluated can be constructed, so as to perform vulnerability scanning, so as to realize the vulnerability scanning and evaluation work within the preset time interval, which neither uses vulnerability scanning frequently nor has a frequency of vulnerability scanning too low; at the same time, according to the asset exposure database, vulnerability information and vulnerability database, the risk assessment of the power monitoring system to be evaluated is carried out, and the asset risk assessment result of the power monitoring system to be evaluated is obtained, which can comprehensively assess the asset exposure and vulnerability situation of the power monitoring system. Even if there are devices from different manufacturers in the system's assets, quantitative analysis can be carried out based on the constructed asset exposure database and asset vulnerability information, thereby reducing the difficulty of risk assessment of the power monitoring system. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a flowchart of a method for assessing asset risk in a power monitoring system provided by one embodiment of the present invention;
[0052] Figure 2 It is a structural diagram of an asset risk assessment device for a power monitoring system provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] See also Figure 1 , is a flow chart of a method for risk assessment of power monitoring system assets provided by an embodiment of the present invention, comprising:
[0055] S1. Obtain network topology data and system operation data of the power monitoring system to be evaluated;
[0056] S2. Perform communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data to obtain the assets of the monitoring system to be evaluated;
[0057] S3. Based on the assets of the power monitoring system to be evaluated, situation awareness is performed on the assets within a preset time interval to build an asset exposure database of the power monitoring system to be evaluated;
[0058] S4. Perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure database and the preset vulnerability database to obtain vulnerability information of the asset;
[0059] S5. Perform risk assessment on the power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database to obtain an asset risk assessment result of the power monitoring system to be assessed.
[0060] Specifically, the network topology data of the power monitoring system to be evaluated includes system nodes and the topological relationship of system nodes. By using network scanning, the network topology structure can be obtained to obtain network topology data, and then the node attribute information of each node in the power monitoring system to be evaluated is determined; the node attribute information includes: node IP address, node port number and node service type. System operation data includes system deployment environment, such as system proprietary protocol, IEC60870-5-104, DNP3 and Modbus, etc. The assets of the monitoring system to be evaluated refer to the equipment, software, data and other resources that play various functions and roles in the monitoring system. The asset exposure database refers to the database of asset information of the power monitoring system to be evaluated exposed to external attackers in the cyberspace. The preset vulnerability database is a database that stores and classifies various known security vulnerabilities. The vulnerability information of the asset refers to the weak links in the asset or asset group that may be exploited by threats to cause damage. These weak links may exist in various aspects such as configuration, hardware, software and information. The asset risk assessment result includes the asset risk assessment score of the power monitoring system to be evaluated.
[0061] In a preferred embodiment of the present invention, the network topology data and the system operation data of the power monitoring system to be evaluated are first obtained; then, based on the network topology data and the system operation data, the communication protocol analysis is performed on the power monitoring system to be evaluated to obtain the assets of the monitoring system to be evaluated; then, based on the assets of the power monitoring system to be evaluated, situation awareness is performed on the assets within a preset time interval to construct an asset exposure database for the power monitoring system to be evaluated; then, based on the asset exposure database and a preset vulnerability database, a vulnerability scan is performed on the power monitoring system to be evaluated to obtain the vulnerability information of the assets; finally, based on the asset exposure database, the vulnerability information and the vulnerability database, a risk assessment is performed on the power monitoring system to be evaluated to obtain an asset risk assessment result of the power monitoring system to be evaluated.
[0062] Preferably, according to the network topology data and the system operation data, a communication protocol analysis is performed on the power monitoring system to be evaluated to obtain the assets of the monitoring system to be evaluated, including:
[0063] Determine the node attribute information of each node in the power monitoring system to be evaluated according to the network topology data; the node attribute information includes: node IP address, node port number and node service type;
[0064] According to the system proprietary protocol in the system operation data, the communication protocol of the system proprietary protocol is analyzed by using the protocol reverse method and the data packet analysis method to obtain the proprietary protocol characteristics of the power monitoring system to be evaluated;
[0065] According to the node attribute information, the proprietary protocol characteristics and a preset proprietary protocol characteristic model library, determining whether there is a system proprietary protocol response port in the power monitoring system to be evaluated;
[0066] If yes, then obtain a response message from the system proprietary protocol response port, and identify the assets of the monitoring system to be evaluated according to the response message;
[0067] If not, an asset discovery engine is constructed according to the proprietary protocol characteristics, and the ports of the power monitoring system to be evaluated are scanned according to the asset discovery engine to obtain the assets of the power monitoring system to be evaluated.
[0068] Specifically, protocol reverse engineering and data packet analysis are existing technologies. The preset proprietary protocol feature model library includes protocol message formats, key fields, and protocol features of all proprietary protocols extracted from the state machine. Protocol features include grammatical features and semantic features. For example, IEC60870-5-104, DNP3, Modbus, etc., make full use of the public specifications and features of these protocols, extract key fields and protocol message formats, and build a special proprietary protocol feature model library.
[0069] In a preferred embodiment of the present invention, the node attribute information of each node in the power monitoring system to be evaluated is determined according to the network topology data; the node attribute information includes: node IP address, node port number and node service type. A network topology diagram of the power monitoring system can be constructed according to the node attribute information, and the obtained network topology diagram and the heterogeneity of different systems provide basic information and reference basis for the identification of proprietary protocols. For the deployment environment of the system, the operating system type, version number and middleware type of different subsystems are identified through system fingerprint recognition, and the heterogeneity of the system is judged. The network topology diagram reveals the distribution and communication relationship of each node in the system, and the heterogeneity analysis helps to understand the operating system and middleware that may be used by different subsystems, thereby inferring the proprietary protocol that may be adopted. Combined with this information, traffic capture and analysis can be performed more effectively, and the specific proprietary protocol type and version can be identified using the proprietary protocol feature model library, so as to achieve a comprehensive understanding and monitoring of the internal communication of the power control system.
[0070] Specifically, without affecting the normal operation of the system, the internal communication traffic of the system is captured by passively acquiring data such as traffic mirroring. The captured traffic data is parsed and feature extracted by using the built proprietary protocol feature model library to identify the proprietary protocol type, version and other proprietary protocol features used in the system. Alternatively, protocol reversal and data packet parsing are used to extract the protocol features of the proprietary protocol from the format, field and state machine of the protocol message. Then, according to the node attribute information, by simulating the protocol communication process information, the network interface, service port and dedicated interface in the power monitoring system are detected to determine whether there is a system proprietary protocol response port in the power monitoring system to be evaluated, that is, to determine whether there is a proprietary protocol response on the port; if there is a proprietary protocol port, the response message of the system proprietary protocol response port is obtained, and according to the content of the port response message, the content in the proprietary protocol feature model library is used to identify the assets of the monitoring system to be evaluated, and the type, version and configuration of the assets are obtained; if not, an asset discovery engine is constructed according to the proprietary protocol features, and the port of the power monitoring system to be evaluated is scanned according to the asset discovery engine to obtain the assets of the power monitoring system to be evaluated.
[0071] In principle, the assets of the power monitoring system to be evaluated include: Equipment type: Identify the types of different equipment in the power monitoring system, such as PLC (Programmable Logic Controller), RTU (Remote Terminal Unit), SCADA system (Supervisory Control and Data Acquisition System), smart meter, etc.; Equipment version: Determine the version information of the software or firmware running in each device or system, which is crucial for understanding the update status and potential vulnerabilities of the system; Equipment configuration: Obtain the configuration information of the device, including the configuration of the network interface, the setting of the service port, the enabled protocol and its parameters, etc. These configuration data can help further understand the operation mode of the device and the potential security risks; Network interface: Identify the network interface of each device in the power monitoring system and obtain relevant key information such as IP address and MAC address; Service port: Discover and record the service ports opened by the devices in the system, understand the service types and protocols carried by these ports, and determine their specific uses; Special interface: Identify the special interfaces that may exist in the system. These interfaces may be used for specific proprietary protocol communications and are an important way for devices to communicate with other systems or devices.
[0072] Schematically, determining whether there is a system proprietary protocol response port in the power monitoring system to be evaluated includes: (1) constructing communication messages that conform to a specific proprietary protocol based on a preset proprietary protocol feature model library. These messages simulate the actual communication process and contain appropriate formats, contents, and sequences to ensure that they can trigger the response of the device. And design an adaptive protocol communication framework so that the messages can be dynamically adjusted according to the characteristics of different protocols to adapt to the subtle differences of various protocols. (2) Using the constructed communication messages, the network interfaces, service ports, and dedicated interfaces in the power monitoring system are detected through different detection technologies (such as TCPSYN scanning, UDP detection, ARP scanning, etc.). Send the constructed protocol message to the target port to simulate a communication request. (3) Capture the response message returned by the target port through a network scanning tool or a traffic capture tool (such as Wi reshark, Tcpdump, etc.). (4) Compare the captured response message with the content in the proprietary protocol feature model library to determine whether the response message conforms to the known proprietary protocol characteristics. (5) If the format, field, status and other features of the response message match a proprietary protocol feature in the proprietary protocol feature model library, it can be determined that the port uses the proprietary protocol. (6) At the same time, the identified port is associated with the asset information to generate a mapping relationship between the port and the asset, and it is recorded in the asset library.
[0073] Specifically, through in-depth analysis of the proprietary protocol of the power monitoring system, a protocol reverse analysis environment is first built, including tools such as traffic mirroring, packet capture, and protocol decoding. With Wi reshark, Tcpdump, etc. as representatives, typical proprietary protocol packet samples are selected, and Wi reshark and other tools are used to decode and analyze them, and the format, field, length and other characteristics of the protocol message are observed, and compared with general application layer protocols such as HTTP and FTP, and the particularity of the proprietary protocol is summarized. Then, reverse engineering tools such as IDAPro and Ollydbg are used to disassemble and debug the key communication programs or modules of the proprietary protocol, analyze the internal implementation logic of the protocol state machine, data structure, encoding and decoding, and abstract and refine the results of the reverse analysis to extract a complete set of proprietary protocol feature model libraries. Based on the extracted proprietary protocol features, an asset discovery engine is created, and the particularity of the proprietary protocol is fully considered. A set of adaptive protocol communication frameworks are designed, which can dynamically adjust the format, content, sequence and other parameters of the communication message according to the characteristics of different protocols. Based on the proprietary protocol feature model library, an asset discovery engine is created. The engine implements a variety of detection technologies, such as TCPSYN scanning, UDP detection, ARP scanning, etc. By constructing different protocol messages, it detects open IP addresses, port numbers, MAC addresses and other information in the system. Through port fingerprint recognition technology, it matches the rules in the proprietary protocol feature model library, identifies the device type, version, service and other information behind the port, and generates a mapping relationship between the port and the asset. The engine also has the ability to automatically scan and conduct regular inspections, and dynamically updates the content of the asset library through continuous network scanning and asset inventory.
[0074] Preferably, according to the assets of the power monitoring system to be evaluated, situation awareness is performed on the assets within a preset time interval to build an asset exposure surface database of the power monitoring system to be evaluated, including:
[0075] According to the assets of the power monitoring system to be evaluated, determine the network behavior characteristics, communication mode characteristics and service status characteristics of the assets;
[0076] Clustering assets within a preset time interval according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics to obtain an asset group;
[0077] Analyze the network communication relationship between different assets according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics, and construct an asset association topology diagram between the assets;
[0078] An asset exposure surface database of the power monitoring system to be evaluated is constructed based on the asset group and the asset association topology map.
[0079] In a preferred embodiment of the present invention, according to the assets of the power monitoring system to be evaluated, passive traffic monitoring and active detection are used to obtain the network communication data, service port status and application information of the assets; through data cleaning and feature extraction, the network behavior characteristics, communication mode characteristics and service status characteristics of the assets are obtained. According to the network behavior characteristics, the communication mode characteristics and the service status characteristics, the assets are clustered using a machine learning algorithm within a preset time interval to obtain an asset group; then, data association analysis is used to determine the network communication relationship, service call relationship and data transmission relationship between different assets, and the network communication relationship between different assets is analyzed according to the network behavior characteristics, the communication mode characteristics and the service status characteristics, and an asset association topology diagram between the assets is constructed. For the assets in each asset group, a deep learning algorithm is used to construct a feature model of the corresponding asset network behavior and communication mode; the network behavior characteristics, the communication mode characteristics and the service status characteristics are input into the corresponding feature model to obtain the feature vector representation of the asset under the feature model; through feature vector comparison and similarity calculation, the similarity between the new assets and the existing assets is judged, and the category of the asset in the asset classification system is determined; the asset's feature vector, asset association topology map and classification information are stored in the database to build a fine-grained asset exposure database.
[0080] In another preferred embodiment of the present invention, through passive traffic monitoring and active detection, it is obtained that a certain asset communicates with 5 different IP addresses within 1 hour, opens 3 service ports such as 80, 443, and 3306, and uses 3 applications such as Ngi nx, Tomcat, and MySQL. After data cleaning and feature extraction, it is obtained that the average number of packets received per minute by the asset is 1000, the average number of packets sent is 800, the number of concurrent connections processed by port 80 per second is up to 50, the connection success rate of port 443 is 98%, and the average response time of port 3306 is 10 milliseconds. Using data association analysis, it is found that there is network communication between the asset and the other 3 assets, of which 2 assets call the service of the asset, and the other asset receives the data transmitted by the asset, thereby constructing an asset association topology map between assets. Using the K-means clustering algorithm, 1000 assets are divided into 5 asset groups according to network behavior characteristics, communication mode characteristics, and service status characteristics. For each asset in each asset group, a long short-term memory neural network is used to build a feature model with 10 hidden layers and 100 neurons in each layer. The feature vector of the asset is input into the trained feature model to obtain a 200-dimensional feature vector representation. The Euclidean distance between the vector and all asset vectors in the asset library is calculated, and it is found that the distance to a certain asset is the smallest, which is only 1. Based on this, it is judged that the newly added asset belongs to the category to which the asset belongs. The 200-dimensional feature vector of the newly added asset, the asset association topology containing 5 nodes and 10 edges, and the category information are stored in the asset exposure database. At this point, the asset has been included in the scope of fine-grained management.
[0081] Specifically, the construction of the preset vulnerability database includes:
[0082] Obtaining historical vulnerability event information of the power monitoring system and historical vulnerability information corresponding to the historical vulnerability event information; the historical vulnerability information includes vulnerability description, vulnerability affected version and vulnerability risk level;
[0083] Perform semantic extraction based on the historical vulnerability event information to obtain vulnerability attack methods and attack device types;
[0084] Perform semantic extraction according to the vulnerability description to obtain the vulnerability type;
[0085] Build a vulnerability database based on vulnerability attack methods, attack device types, vulnerability types, vulnerability-affected versions, and vulnerability risk levels.
[0086] In a preferred embodiment of the present invention, historical vulnerability event information of the power monitoring system and historical vulnerability information corresponding to the historical vulnerability event information are obtained; the historical vulnerability information includes vulnerability description, vulnerability impact version and vulnerability risk level; natural language processing is used to perform semantic extraction on the historical vulnerability event information to obtain vulnerability attack methods and attack device types; and semantic extraction is performed based on the vulnerability description to obtain vulnerability types. Then, the characteristics and vulnerabilities of the power monitoring equipment can be extracted to obtain security risk factors, and the vulnerability database can be optimized again. The security risk factors include default passwords, hard-coded credentials, and debugging interfaces. Finally, a vulnerability database is constructed based on vulnerability attack methods, attack device types, vulnerability types, vulnerability impact versions, and vulnerability risk levels.
[0087] Preferably, a vulnerability scan is performed on the power monitoring system to be evaluated according to the asset exposure database and a preset vulnerability database to obtain the vulnerability information of the asset, including:
[0088] Determine basic attributes of the asset according to the asset exposure database; the basic attributes include operating system version, middleware version and open port type;
[0089] Determine the vulnerability type corresponding to the basic attribute according to the vulnerability impact version corresponding to the basic attribute in a preset vulnerability database;
[0090] Perform vulnerability scanning on the assets of the power monitoring system to be assessed according to the vulnerability types corresponding to the basic attributes, and generate a preliminary vulnerability list; the preliminary vulnerability list includes: potential vulnerabilities, preliminary risk levels of potential vulnerabilities, and existing vulnerabilities;
[0091] Conduct code audits on potential vulnerabilities based on the preliminary vulnerability list to obtain vulnerability information of assets.
[0092] In a preferred embodiment of the present invention, the vulnerability information of the asset refers to the defects or weaknesses in the design, implementation, and configuration of the asset, which may be exploited by threats to cause damage to the asset. According to the asset exposure database, the basic attributes of the asset are determined; the basic attributes include the operating system version, the middleware version, and the open port type; by analyzing the basic attributes, the vulnerability impact version corresponding to the basic attributes is searched in the preset vulnerability database to determine the vulnerability type corresponding to the basic attributes. According to the vulnerability type corresponding to the basic attribute, the assets of the power monitoring system to be evaluated are scanned for vulnerabilities to generate a preliminary vulnerability list. If the preliminary vulnerability list is not empty, the code audit technology is used according to the vulnerability risk level in the vulnerability database to perform code audit on the potential vulnerabilities in the preliminary vulnerability list, confirm the vulnerabilities existing in the asset, and determine the existing vulnerabilities in the asset and the preliminary risk level of the potential vulnerabilities. According to the potential vulnerabilities and existing vulnerabilities, a security vulnerability list is formed, and a penetration test is used according to the security vulnerability list to simulate attacks on the assets to determine whether the security vulnerabilities can be remotely exploited. During the test, the exploitability and actual harm of the vulnerabilities are verified by constructing specific attack scenarios. If the security vulnerability can be exploited remotely, the conditions for exploitation and the degree of harm of the security vulnerability can be determined by dynamically tracking and debugging the scanning process. Through dynamic tracking and debugging, the conditions for exploitation of the vulnerability (such as whether specific permissions and access conditions are required) and the degree of harm (such as the scope of data leakage, damage to system integrity, etc.) can be further determined, and finally the vulnerability information of the asset can be obtained.
[0093] Preferably, a risk assessment is performed on the power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database to obtain an asset risk assessment result of the power monitoring system to be assessed, including:
[0094] Associating the vulnerability information with the vulnerability database, and calculating a first score for indicating the degree of vulnerability damage;
[0095] Determining, based on the asset exposure database, a second score for indicating the importance of the asset;
[0096] Calculate a comprehensive risk score of the power monitoring system to be evaluated based on the first score and the second score;
[0097] According to the comprehensive risk score and the preset risk threshold, the magnitude relationship between the comprehensive risk score and the preset risk threshold is determined to obtain an asset risk assessment result of the power monitoring system to be assessed.
[0098] In a preferred embodiment of the present invention, the vulnerability information and the vulnerability database are associated, and the first score used to represent the vulnerability hazard level is calculated according to the hazard level in the vulnerability information and the vulnerability risk level in the vulnerability database; then, according to the asset exposure database and the vulnerability information, the importance of the connection relationship of each node in the asset and the asset group classification relationship is determined according to the asset association topology in the asset exposure database, and then the importance of the utilization conditions and the asset group classification relationship in the vulnerability information is determined. The second score used to represent the importance of the asset is determined; then, according to the first score and the second score, the comprehensive risk score of the power monitoring system to be evaluated is calculated. Finally, according to the comprehensive risk score and the preset risk threshold, the size relationship between the comprehensive risk score and the preset risk threshold is judged to obtain the asset risk assessment result of the power monitoring system to be evaluated. For example, the preset risk threshold is divided into high risk 8-10 points, medium risk 6-8 points, and low risk below 6 points. If the comprehensive risk score is 8 points, the asset risk assessment result of the power monitoring system to be evaluated is high risk; if the comprehensive risk score is 6 points, the asset risk assessment result of the power monitoring system to be evaluated is medium risk; if the comprehensive risk score is 5 points, the asset risk assessment result of the power monitoring system to be evaluated is low risk.
[0099] In a preferred embodiment of the present invention, 100 power monitoring equipment vulnerabilities are semantically analyzed and extracted, and the vulnerabilities with a vulnerability description similarity greater than 80% are classified into one category, and finally the vulnerability database contains 75 typical vulnerabilities. When optimizing the vulnerability database, for example, 50 incident cases were analyzed, of which 30 incidents involved vulnerabilities in the vulnerability database, and 20% of the vulnerability information in the vulnerability database was updated through association analysis. When parsing the device function, for example, 1,000 power monitoring devices were analyzed, and it was found that 400 of them had default password risks, 300 had debugging interface risks, and 100 had hard-coded credential risks, and the vulnerability database was optimized accordingly. When assessing the vulnerability risk, for example, a certain power monitoring device has a serious vulnerability, and its hazard level is scored as 4 points, and its difficulty of use is scored as 2 points. Then the comprehensive risk score of the vulnerability is 4×2=8 points, which belongs to the high risk level. When forming an equipment risk assessment report, for example, a risk assessment is conducted on 1,000 power monitoring devices, and it is ultimately assessed that there are 100 high-risk devices, 300 medium-risk devices, and 600 low-risk devices.
[0100] In another preferred embodiment of the present invention, it is found that a certain asset uses the Windows Server 2012 operating system, the middleware is Apache Tomcat 5, and the open ports are 80, 443, 3389, etc. Analysis shows that the operating system and middleware versions of the asset are relatively old, and its related vulnerability library contains 3 high-risk vulnerabilities and 5 medium-risk vulnerabilities. It is determined that the vulnerability types such as SQL injection and file upload need to be detected. Vulnerability scanning is used to detect the asset, and 6 preliminary vulnerabilities such as 1 SQL injection and 2 weak passwords are found. According to the vulnerability risk level, code audit technology is used to focus on auditing 2 high-risk SQL injection vulnerabilities, and finally confirm that the asset has 1 SQL injection vulnerability. Through penetration testing, it is found that the SQL injection vulnerability can be exploited remotely, and the attacker can obtain sensitive information in the database by constructing malicious SQL statements. After tracking and debugging, it is determined that the exploitation condition of the vulnerability requires an unauthorized database connection, and the degree of harm is that 90% of the sensitive data in the database can be obtained. In the risk assessment module, the risk score of the asset is calculated to be 8.5 points, out of a total of 10 points, which is high risk. The asset security risks are analyzed, such as a high-risk SQL injection vulnerability in the Web application, multiple security risks in the older middleware version, and the server is not patched in time, etc., to form an asset security risk assessment report, and it is recommended to fix the vulnerability as soon as possible, upgrade the software version, and strengthen security protection.
[0101] Indicatively, it also includes:
[0102] Monitor the asset exposure database of the power monitoring system to be evaluated in real time. When the asset exposure database changes, calculate the database similarity between the asset exposure database after the change and the asset exposure database before the change.
[0103] When the database similarity is less than a preset similarity threshold, the changed asset exposure database and the vulnerability database are associated to obtain the latest vulnerability associated with the asset exposure of the power monitoring system to be evaluated;
[0104] Determine the protection level corresponding to the vulnerability risk level based on the vulnerability risk level corresponding to the latest vulnerability;
[0105] According to the protection level, the firewall and IPS protection strategy corresponding to the protection level are started; and according to the firewall and IPS protection strategy, the power monitoring system to be evaluated is protected.
[0106] In a preferred embodiment of the present invention, the asset exposure database of the power monitoring system to be evaluated is monitored in real time. When the asset exposure database changes, the database similarity of the asset exposure database after the change and the asset exposure database before the change is calculated to determine whether the power monitoring system has suffered a new attack, causing the network topology data and system operation data of the system to change, thereby causing the asset exposure database to change. Then, when the database similarity is less than the preset similarity threshold, it means that the network topology data and system operation data of the system have changed due to a new attack. The changed asset exposure database and the vulnerability database are associated to obtain the latest vulnerability associated with the asset exposure of the power monitoring system to be evaluated; according to the vulnerability risk level corresponding to the latest vulnerability in the vulnerability database, the protection level corresponding to the vulnerability risk level is determined. If there is no vulnerability of this type recorded in the vulnerability database, the latest vulnerability response is the highest risk level and stored in the vulnerability database to determine that the corresponding protection level is the highest level. Finally, according to the protection level, the firewall and IPS protection strategy corresponding to the protection level is started; and according to the firewall and IPS protection strategy, the power monitoring system to be evaluated is protected.
[0107] In another preferred embodiment of the present invention, based on the exposure data of the asset, through asset fingerprint recognition, the technical stack characteristics of each asset are extracted to construct an asset portrait; the vulnerability information is standardized and integrated to eliminate redundancy and noise, and a panoramic view of the vulnerability of the asset is formed; the risk assessment results are associated with the asset portrait and the panoramic view of the vulnerability, and the asset security knowledge map is constructed using a graph database; based on the asset security knowledge map, a random forest is used to construct a risk prediction model, and the threat events and risk levels suffered by the asset are predicted based on the threat situation information and vulnerability information currently faced by the asset; if the predicted risk level exceeds the preset risk threshold, a risk alarm is triggered and risk alarm information is generated, and the alarm information includes risk description, risk level, and affected assets; based on the predicted threat events and risk levels, combined with the importance information and vulnerability information of the asset, a corresponding security protection strategy is generated, and the security protection strategy includes access control, data encryption, and security monitoring measures. Specifically, by using web crawler technology, such as the Scrapy framework, the exposure data of the asset can be obtained efficiently. Using asset fingerprinting technology, such as the Nmap tool, we extract the characteristics of the asset's operating system, web server, database and other technology stacks to build a multi-dimensional asset portrait. The collected vulnerability information is normalized using the CVE standard, and the vulnerabilities are clustered and fused through similarity algorithms such as cosine similarity to remove redundant and noisy data, ultimately forming a panoramic view of the asset's vulnerability. Using the graph database Neo4j, we associate asset portraits, vulnerability panoramas with risk assessment results to build an asset security knowledge graph. On this basis, we select the random forest algorithm to train the risk prediction model. The input features of the model include the threat situation faced by the asset, such as the number of malicious IP accesses and the severity of the vulnerability, and output the probability and risk level of the asset being threatened. When the predicted risk level exceeds the preset threshold, such as 7, a risk alarm is triggered, and an alarm message containing risk description, risk level, and affected assets is generated. Furthermore, combined with the asset importance score and vulnerability severity, a security protection strategy is automatically generated. For example, for high-risk assets, access control measures are deployed, sensitive data is encrypted with AES, and security monitoring is strengthened, and abnormal behavior detection rules are set. By implementing this embodiment, automatic discovery, early warning and protection of asset security risks can be achieved, greatly improving security operation efficiency. Through the risk prediction model, potential threats can be proactively identified, warning information and protection strategies can be generated, and emergency response speed can be improved; comprehensive consideration of asset exposure, known vulnerabilities and historical event cases can be used to conduct customized risk assessments and generate targeted security protection strategies.The dynamic and adaptive nature of this process ensures the effectiveness and timeliness of protective measures; through continuous monitoring of asset exposure and difference analysis, the asset exposure database and vulnerability database are constantly updated to achieve dynamic adjustment of risk assessment and protection strategies, and achieve self-adaptation and continuous optimization of the closed-loop security protection system; the above-mentioned technical means are integrated into the entire life cycle management of assets, from the introduction of assets to retirement, covering the entire process of security risk assessment and protection, ensuring that newly added assets can also be quickly integrated into the overall security framework, reducing security blind spots and risks caused by asset changes.
[0108] In another preferred embodiment of the present invention, asset exposure change information is obtained according to the asset exposure monitoring system, and historical data in the asset exposure database is compared by a difference analysis algorithm to determine the newly added or changed exposure data; the exposure data is updated to the asset exposure database to realize the dynamic update of the asset exposure database; the updated asset exposure database is dynamically associated with the vulnerability database by using data association analysis to determine the vulnerability associated with the newly added or changed exposure; according to the result of the vulnerability association analysis, the risk indicator corresponding to the vulnerability is obtained from the risk knowledge base; the newly added or changed exposure, vulnerability and risk indicator are comprehensively analyzed. The system conducts comprehensive assessment to determine the latest risk score and risk level of the asset; if the latest risk score or risk level exceeds the preset risk threshold, the security protection strategy update mechanism is triggered; according to the latest risk score and risk level, the security protection strategy is determined, and the protection strategy configuration is matched according to the security protection strategy; through the protection strategy configuration delivery interface, the updated security protection strategy is automatically delivered to the relevant security protection devices, including firewalls and IPS, to dynamically adjust the security protection strategy; continuously monitor the asset exposure change information and protection effect information, and provide real-time feedback on the asset exposure change information and protection effect information to form a dynamic closed-loop continuous protection mechanism. Specifically, the asset exposure monitoring system obtains asset exposure change information every 5 minutes, and compares the historical data in the asset exposure database through the difference analysis algorithm to determine the newly added or changed exposure data. The difference analysis algorithm adopts a similarity-based comparison method, and sets the similarity threshold to 8. Data above the threshold is considered unchanged, and data below the threshold is considered newly added or changed data. The newly added or changed exposure data obtained by the difference analysis is updated to the asset exposure database to realize the dynamic update of the asset exposure database, and the update frequency is once an hour. Data association analysis is adopted, and natural language processing technology is used to extract keywords from the updated asset exposure surface library and vulnerability library. Through word vector similarity calculation, the exposure surfaces and vulnerabilities with similarity greater than 9 are associated, and the vulnerabilities associated with the newly added or changed exposure surfaces are determined. According to the results of vulnerability association analysis, risk indicators corresponding to the vulnerabilities are obtained from the risk knowledge base, including vulnerability hazard level, vulnerability exploitation difficulty, etc. A comprehensive assessment is conducted on the newly added or changed exposure surfaces, associated vulnerabilities and risk indicators. A rule-based risk assessment model is adopted to set the weights of different risk factors, and the latest risk score of the asset is calculated. The risk level is divided according to the score range. If the latest risk score exceeds 8 points or the risk level is high risk, the update mechanism of the security protection strategy is triggered. According to the latest risk score and risk level, the corresponding protection measures are matched from the security protection strategy knowledge base. The knowledge base presets firewall rules and IPS rule templates corresponding to different risk levels, and generates targeted protection strategy configurations according to the risk situation.Through the security configuration delivery interface, the SSH protocol is used to automatically deliver the updated protection strategy to the firewall and IPS devices. The delivery process takes no more than 1 minute, and the protection strategy is adjusted dynamically. The asset exposure change information and protection effect information are continuously monitored. The monitoring cycle is 10 minutes, and the asset exposure change information and protection effect information are fed back in real time. If the protection strategy fails or the asset exposure continues to deteriorate, the above process is automatically triggered to form a dynamic closed-loop continuous protection mechanism to achieve real-time perception and rapid response to asset security risks.
[0109] In another preferred embodiment of the present invention, based on the discovery of assets in the power monitoring system, key information of the assets is obtained; the security risk level of the assets is determined by analyzing the key information, and a list of high-risk assets is determined. If the asset is a high-risk asset, the security protection measures are matched according to the security protection strategy to form an asset security reinforcement plan; the asset security reinforcement plan is applied to the asset by using an automated configuration management tool to complete asset security protection; the logs and monitoring data during the operation of the asset are obtained, and the asset security status and risk changes are determined through security analysis, and suspicious behaviors are identified; if an asset security incident or risk change is found, the asset security response process is triggered and disposed of according to the preset disposal plan; if the asset changes, the asset information is re-acquired, and the asset risk prediction and protection process is entered to achieve continuous management and control of the entire life cycle of the asset. Specifically, the power monitoring system network is automatically scanned by the asset discovery tool to obtain key information such as the IP address, operating system, port, service, etc. of the asset, and the asset fingerprint recognition technology is used to achieve a recognition rate of more than 95%. Risk prediction models are used to comprehensively evaluate factors such as asset vulnerabilities, configurations, and permissions. The security risk scores of assets are calculated through fuzzy comprehensive evaluation methods. The risk levels are divided into three levels: low, medium, and high. Assets with scores greater than 8 points are classified as high-risk assets. For high-risk assets, corresponding security protection measures are matched, such as closing non-essential ports, fixing vulnerabilities, and strengthening identity authentication, to form asset security reinforcement plans. Through automated configuration management tools such as Ansible, the reinforcement plan is applied to assets to achieve batch and rapid security protection. The system logs, network traffic and other data of assets are continuously monitored, and machine learning algorithms are used for security analysis. The security status of assets is judged through anomaly detection models to identify suspicious behaviors. When security incidents are discovered, the affected assets are quickly isolated through the preset automated response process to block the spread of attacks. When assets change, such as adding new equipment or upgrading software, the asset security assessment process is re-triggered to dynamically update the risk status and protection measures of assets. Through the asset management platform, information such as asset security risks, protection status, and security incidents is centrally displayed to form an intuitive asset security visualization view. By utilizing asset security big data and optimizing risk prediction models through machine learning algorithms, the accuracy of risk identification can be improved. At the same time, security protection strategies can be dynamically adjusted to achieve intelligent and adaptive asset security management and control.
[0110] By implementing this embodiment, the network topology data and system operation data of the power monitoring system to be evaluated are analyzed, the assets of the monitoring system to be evaluated can be identified, and then the situation awareness of the assets is performed within a preset time interval, and an asset exposure database of the power monitoring system to be evaluated is constructed, so as to perform vulnerability scanning, and realize vulnerability scanning within a preset time interval to carry out evaluation work, so that vulnerability scanning is not used frequently and the frequency of vulnerability scanning is not too low; at the same time, based on the asset exposure database, vulnerability information and vulnerability database, a risk assessment of the power monitoring system to be evaluated is performed, and an asset risk assessment result of the power monitoring system to be evaluated is obtained, which can comprehensively evaluate the asset exposure and vulnerability conditions in the power monitoring system. Even if there are devices from different manufacturers in the system's assets, quantitative analysis can be performed based on the constructed asset exposure database and asset vulnerability information, thereby reducing the difficulty of risk assessment of the power monitoring system.
[0111] See also Figure 2 , is a schematic diagram of a structure of an asset risk assessment device for a power monitoring system provided by an embodiment of the present invention, comprising:
[0112] A system data acquisition module is used to obtain network topology data and system operation data of the power monitoring system to be evaluated;
[0113] A system asset discovery module, used to perform communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data, and obtain the assets of the monitoring system to be evaluated;
[0114] An asset database construction module is used to perform situation awareness on the assets of the power monitoring system to be evaluated within a preset time interval and to construct an asset exposure surface database of the power monitoring system to be evaluated;
[0115] A vulnerability scanning module, used to perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure surface database and a preset vulnerability database to obtain vulnerability information of the asset;
[0116] The risk assessment module is used to perform risk assessment on the power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database, and obtain an asset risk assessment result of the power monitoring system to be assessed.
[0117] The present invention provides an asset risk assessment device for an electric power monitoring system. The device acquires network topology data and system operation data of an electric power monitoring system to be assessed according to a system data acquisition module. Then, in a system asset discovery module, communication protocol analysis is performed on the electric power monitoring system to be assessed according to the network topology data and the system operation data to obtain the assets of the monitoring system to be assessed. Then, in an asset database construction module, situation awareness is performed on the assets within a preset time interval according to the assets of the electric power monitoring system to be assessed, and an asset exposure database of the electric power monitoring system to be assessed is constructed. Then, in a vulnerability scanning module, vulnerability scanning is performed on the electric power monitoring system to be assessed according to the asset exposure database and a preset vulnerability database to obtain vulnerability information of the assets. Finally, in a risk assessment module, risk assessment is performed on the electric power monitoring system to be assessed according to the asset exposure database, the vulnerability information and the vulnerability database to obtain an asset risk assessment result of the electric power monitoring system to be assessed. By analyzing the network topology data and system operation data of the power monitoring system to be evaluated, the assets of the monitoring system to be evaluated can be identified, and then the situation awareness of the assets can be carried out within the preset time interval, and the asset exposure database of the power monitoring system to be evaluated can be constructed, so as to perform vulnerability scanning, so as to realize the vulnerability scanning and evaluation work within the preset time interval, which neither uses vulnerability scanning frequently nor has a frequency of vulnerability scanning too low; at the same time, according to the asset exposure database, vulnerability information and vulnerability database, the risk assessment of the power monitoring system to be evaluated is carried out, and the asset risk assessment result of the power monitoring system to be evaluated is obtained, which can comprehensively assess the asset exposure and vulnerability situation of the power monitoring system. Even if there are devices from different manufacturers in the system's assets, quantitative analysis can be carried out based on the constructed asset exposure database and asset vulnerability information, thereby reducing the difficulty of risk assessment of the power monitoring system.
[0118] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.
[0119] Those skilled in the art can clearly understand that, for the sake of convenience and brevity, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0120] Another embodiment of the present invention further provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements a method for assessing asset risk of a power monitoring system as described in the above embodiment when executing the computer program. The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The terminal device may include, but is not limited to, a processor and a memory.
[0121] The processor may be a central processing unit (CPU), or other general-purpose processors, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and various interfaces and lines are used to connect various parts of the entire terminal device.
[0122] The memory can be used to store the computer program, and the processor realizes various functions of the terminal device by running or executing the computer program stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile phone, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Med ia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device or other volatile solid-state storage device.
[0123] Another embodiment of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute an asset risk assessment method for a power monitoring system described in the above embodiment.
[0124] The storage medium is a computer-readable storage medium, and the computer program is stored in the computer-readable storage medium. When the computer program is executed by the processor, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium.
[0125] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A method for assessing asset risk of a power monitoring system, characterized in that: include: Obtain network topology data and system operation data of the power monitoring system to be evaluated; Performing communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data to obtain assets of the monitoring system to be evaluated; According to the assets of the power monitoring system to be evaluated, situation awareness of the assets is performed within a preset time interval to build an asset exposure database of the power monitoring system to be evaluated; Perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure database and the preset vulnerability database to obtain vulnerability information of the asset; A risk assessment is performed on the power monitoring system to be assessed according to the asset exposure database, the vulnerability information and the loophole database to obtain an asset risk assessment result of the power monitoring system to be assessed.
2. A method for assessing asset risk of a power monitoring system according to claim 1, characterized in that: According to the network topology data and the system operation data, a communication protocol analysis is performed on the power monitoring system to be evaluated to obtain the assets of the monitoring system to be evaluated, including: Determine the node attribute information of each node in the power monitoring system to be evaluated according to the network topology data; the node attribute information includes: node IP address, node port number and node service type; According to the system proprietary protocol in the system operation data, the communication protocol of the system proprietary protocol is analyzed by using the protocol reverse method and the data packet analysis method to obtain the proprietary protocol characteristics of the power monitoring system to be evaluated; According to the node attribute information, the proprietary protocol characteristics and a preset proprietary protocol characteristic model library, determining whether there is a system proprietary protocol response port in the power monitoring system to be evaluated; If yes, then obtain a response message from the system proprietary protocol response port, and identify the assets of the monitoring system to be evaluated according to the response message; If not, an asset discovery engine is constructed according to the proprietary protocol characteristics, and the ports of the power monitoring system to be evaluated are scanned according to the asset discovery engine to obtain the assets of the power monitoring system to be evaluated.
3. The method for assessing asset risk of a power monitoring system according to claim 1, characterized in that: According to the assets of the power monitoring system to be evaluated, situation awareness of the assets is performed within a preset time interval to build an asset exposure database of the power monitoring system to be evaluated, including: According to the assets of the power monitoring system to be evaluated, determine the network behavior characteristics, communication mode characteristics and service status characteristics of the assets; Clustering assets within a preset time interval according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics to obtain an asset group; Analyze the network communication relationship between different assets according to the network behavior characteristics, the communication mode characteristics, and the service status characteristics, and construct an asset association topology diagram between the assets; An asset exposure surface database of the power monitoring system to be evaluated is constructed based on the asset group and the asset association topology map.
4. The method for assessing asset risk of a power monitoring system according to claim 1, characterized in that: The construction of the preset vulnerability database includes: Obtaining historical vulnerability event information of the power monitoring system and historical vulnerability information corresponding to the historical vulnerability event information; the historical vulnerability information includes vulnerability description, vulnerability affected version and vulnerability risk level; Perform semantic extraction based on the historical vulnerability event information to obtain vulnerability attack methods and attack device types; Perform semantic extraction according to the vulnerability description to obtain the vulnerability type; Build a vulnerability database based on vulnerability attack methods, attack device types, vulnerability types, vulnerability-affected versions, and vulnerability risk levels.
5. A method for assessing asset risk of a power monitoring system according to claim 4, characterized in that: A vulnerability scan is performed on the power monitoring system to be evaluated based on the asset exposure database and the preset vulnerability database to obtain the vulnerability information of the asset, including: Determine basic attributes of the asset according to the asset exposure database; the basic attributes include operating system version, middleware version and open port type; Determine the vulnerability type corresponding to the basic attribute according to the vulnerability impact version corresponding to the basic attribute in a preset vulnerability database; Perform vulnerability scanning on the assets of the power monitoring system to be assessed according to the vulnerability types corresponding to the basic attributes, and generate a preliminary vulnerability list; the preliminary vulnerability list includes: potential vulnerabilities, preliminary risk levels of potential vulnerabilities, and existing vulnerabilities; Conduct code audits on potential vulnerabilities based on the preliminary vulnerability list to obtain vulnerability information of assets.
6. A method for assessing asset risk of a power monitoring system as claimed in claim 1, characterized in that: According to the asset exposure database, the vulnerability information and the vulnerability database, a risk assessment is performed on the power monitoring system to be assessed to obtain an asset risk assessment result of the power monitoring system to be assessed, including: Associating the vulnerability information with the vulnerability database, and calculating a first score for indicating the degree of vulnerability damage; Determining a second score for indicating the importance of an asset based on the asset exposure database and the vulnerability information; Calculate a comprehensive risk score of the power monitoring system to be evaluated based on the first score and the second score; According to the comprehensive risk score and the preset risk threshold, the magnitude relationship between the comprehensive risk score and the preset risk threshold is determined to obtain an asset risk assessment result of the power monitoring system to be assessed.
7. A method for assessing asset risk of a power monitoring system according to claim 4, characterized in that: Also includes: Monitor the asset exposure database of the power monitoring system to be evaluated in real time. When the asset exposure database changes, calculate the database similarity between the asset exposure database after the change and the asset exposure database before the change. When the database similarity is less than a preset similarity threshold, the changed asset exposure database and the vulnerability database are associated to obtain the latest vulnerability associated with the asset exposure of the power monitoring system to be evaluated; Determine the protection level corresponding to the vulnerability risk level based on the vulnerability risk level corresponding to the latest vulnerability; According to the protection level, the firewall and IPS protection strategy corresponding to the protection level are started; and according to the firewall and IPS protection strategy, the power monitoring system to be evaluated is protected.
8. An asset risk assessment device for a power monitoring system, characterized in that: include: A system data acquisition module is used to obtain network topology data and system operation data of the power monitoring system to be evaluated; A system asset discovery module, used to perform communication protocol analysis on the power monitoring system to be evaluated based on the network topology data and the system operation data, and obtain the assets of the monitoring system to be evaluated; An asset database construction module is used to perform situation awareness on the assets of the power monitoring system to be evaluated within a preset time interval and to construct an asset exposure surface database of the power monitoring system to be evaluated; A vulnerability scanning module, used to perform vulnerability scanning on the power monitoring system to be evaluated according to the asset exposure database and a preset vulnerability database to obtain vulnerability information of the asset; The risk assessment module is used to perform risk assessment on the power monitoring system to be assessed based on the asset exposure database, the vulnerability information and the vulnerability database, and obtain an asset risk assessment result of the power monitoring system to be assessed.
9. A terminal device, characterized in that: It includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements an asset risk assessment method for an electric power monitoring system as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute an asset risk assessment method for a power monitoring system as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Configurable automatic asset risk assessment method and device and medium
CN117857162A
Cited By
Power equipment safety detection method and device and terminal equipment
CN119415915A
Data protection method and system for safe operation platform
CN120257315A
A data protection method and system of a layered architecture security operation platform
CN120257315B
Intelligent data security exposure surface risk assessment method, system, equipment and medium
CN120750654A
Internet-of-things security early warning linkage decision-making method
CN121792227A
