Operation system and method based on renewable resource front-end collection, transportation and disposal

Through big data analysis, the operation system for the front-end collection, transportation and office of renewable resources has been built, which has solved the problem of poor supervision of renewable resources operation, achieved balanced and timely material allocation, and reduced costs.

CN119047889AInactive Publication Date: 2024-11-29NANJING ZAISHENGYUN TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411525910.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-30
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

At this stage, the operation and supervision of renewable resources is poor, and there are many types of materials and serious clusters, resulting in unbalanced allocation, low timeliness and economicality, and a lack of integrated operation systems and methods.

Method used

Based on big data analysis, a front-end collection, transportation and operation system for renewable resources is built, including front-end recycling management module, vehicle scheduling management module, early warning module and management application platform. Through constraints and solutions, the optimal solution for material scheduling is obtained, and the processing is generated. to improve processing efficiency and reduce costs.

Benefits of technology

It improves the efficiency of front-end processing of regenerative resources and reduces costs, and achieves the balance and timeliness of material allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047889A_ABST
    Figure CN119047889A_ABST
Patent Text Reader

Abstract

The invention discloses an operation system and method based on renewable resource front-end collection, transportation and disposal, and relates to the technical field of renewable resource processing, and the operation system comprises a front-end recovery management module, a vehicle scheduling management and control module, an early warning module, an administrator authority work module and a management application platform. In order to solve the problems of unbalanced allocation and low timeliness and economical efficiency of renewable resources caused by various types, serious gathering and unreasonable allocation of renewable resource materials at the present stage, the operation system for front-end receiving, transporting and processing of renewable resources provided by the invention constructs a benefit function for front-end receiving, transporting and processing of renewable resources, so as to improve the efficiency of the renewable resources. The optimal solution of front-end receiving, transportation and handling for material scheduling is obtained through constraint and solution, and a front-end handling scheme is generated, so that the front-end processing efficiency of renewable resources is improved, the cost is reduced, and good balance and timeliness are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of renewable resource processing, and in particular to an operating system and method based on the front-end collection, transportation and disposal of renewable resources. Background Art

[0002] The processing of renewable resources includes the whole process management from resource collection, transportation to final processing. At present, digital platforms are usually used for data processing to realize the functions of renewable resource supervision and traceability. However, the current operation and supervision effect of renewable resources on digital platforms is generally average, which is mainly reflected in the fact that in the process of renewable resource operation and disposal, there are many types of renewable resource materials, serious crowding, and unreasonable distribution, which leads to unbalanced allocation of renewable resources and low timeliness and economy. In addition, there is still a lack of an integrated operation system and method for the front-end collection, transportation and disposal of renewable resources. For this reason, we propose an operation system and method for the front-end collection, transportation and disposal of renewable resources based on big data. Summary of the invention

[0003] The present invention is proposed in view of the above-mentioned problems existing in the existing renewable resource control processing.

[0004] Therefore, one of the objects of the present invention is to provide an operation system and method based on the collection, transportation and disposal of renewable resources front end, which is based on big data analysis, and in order to meet the cost and efficiency of the collection, transportation and disposal departments at all levels of the renewable resources front end, constructs a benefit function for the collection, transportation and disposal of renewable resources front end, obtains the optimal solution for material scheduling of the front end collection, transportation and disposal through constraints and solutions, and generates a disposal plan for the front end, which improves the efficiency of the front end processing of renewable resources and reduces the cost, and has good balance and timeliness.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] On the one hand, the present invention provides an operation system and method based on the front-end collection, transportation and disposal of renewable resources, including:

[0007] A front-end recycling management module, with which users connect through WeChat applet mounting. The front-end recycling management module is used for placing orders for renewable resources, making appointments for door-to-door visits, and processing order settlement services after users log in to the system. The module includes a renewable resource operation analysis submodule, which is used to obtain photos uploaded by users and information filled in, and identify detailed information on renewable resources after analysis and processing;

[0008] The vehicle dispatching and control module is used to obtain the detailed information of the renewable resources ordered by the user of the front-end recycling management module, and then accept the order in the system, and perform task planning and task dispatching after analyzing the renewable resource operation, and at the same time perform route planning and in-transit control of the operating vehicles. After the operating vehicles complete the freight loading, they complete the material delivery and recycling. The vehicle dispatching and control module includes a vehicle dispatching submodule, a task planning and analysis submodule, a task dispatching submodule, and a route planning submodule;

[0009] The early warning module is used to warn of abnormal conditions during the recycling, transportation and disposal of renewable resources, including a vehicle status warning submodule, a driver supervision warning submodule, a vehicle gathering and parking warning submodule, a vehicle without order warning submodule, and a driving abnormality warning submodule;

[0010] The management application platform is used to access the processing data of the vehicle dispatching and control module, generate business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visualize the business data in the form of data charts.

[0011] As a preferred solution of the present invention, it also includes an administrator authority working module connected to the vehicle scheduling and control module, and the administrator authority working module is used for the administrator to implement manual dynamic adjustment strategies based on the location area information and material category information of the user's order, combined with the operating vehicles and driver resources.

[0012] As a preferred solution of the present invention, the vehicle scheduling submodule is used to obtain the running track information of the operating vehicle according to the positioning device by setting the operating vehicle information, and to identify and obtain the location distribution information of the operating vehicle on the map;

[0013] The task planning analysis submodule is used to generate renewable resource front-end planning information through analysis based on the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule;

[0014] The task dispatching submodule is used to, after receiving the renewable resource front-end planning information, convert the renewable resource planning information into task event information and dispatch it to the corresponding front-end operating vehicle;

[0015] The route planning submodule is used to plan the routes of the front-end operating vehicles that receive the mission event information and generate the optimal operating route information on the map.

[0016] As a preferred solution of the present invention, the task planning analysis submodule generates renewable resource front-end planning information by analyzing the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule, as follows:

[0017] Determine the demand constraints for recycled materials at the front end of renewable resources;

[0018] The benefit model of the renewable resources front end is established, and the benefit maximization model of renewable resources is expressed as follows:

[0019] ;

[0020] in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources, For the Total number of items in the order;

[0021] The constraints on the renewable resource front end are expressed as follows:

[0022] ;

[0023] in, It is the upper limit of recycling at the front end of renewable resources;

[0024] Establish cost model for renewable resource front end;

[0025] ;

[0026] ;

[0027] in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; The unit consumption cost of the renewable resources front end is is the differential symbol;

[0028] For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The unit time operating cost of an order;

[0029] Construct the mission planning analysis submodule for the operation cost model and solve it. The expression for minimizing the operation cost of the mission planning analysis submodule is as follows:

[0030] ;

[0031] in, is the minimum operating cost, For the renewable resources front end The weight of an order.

[0032] As a preferred solution of the present invention, the operation cost model is solved by the task planning analysis submodule to generate a solution result. According to the solution result and in combination with dynamic planning to match the operation vehicle information, the corresponding front-end operation vehicle is determined and defined as the scheduling operation vehicle to perform current task planning, task event information and route planning, and then the optimal operation route information is generated on the map for scheduling operation.

[0033] As a preferred solution of the present invention, the vehicle status alarm submodule is used to count the real-time status of the operating vehicle and issue an early warning; its real-time status includes driving, engine off, no network, terminal disassembled, and summarizes the early warnings of vehicle failure, low battery voltage, entering and exiting the fence, going out without a mission, vehicle collision, etc.;

[0034] The driver supervision warning submodule monitors the driver's behavior status in real time and issues warnings based on the driver monitoring DSM; it combines high-precision cameras, infrared sensors, image processing algorithms, deep learning models and other technologies to observe and analyze the driver's eyelid opening and closing frequency, nodding movements, driver's line of sight, concentration, smoking, making phone calls and other behaviors in real time to issue warnings;

[0035] The vehicle gathering and parking alarm submodule is based on intelligent video analysis IVA, which monitors the vehicle gathering and parking status in real time and issues warnings; it integrates multiple technical means such as video monitoring, image analysis, and artificial intelligence algorithms to monitor the number of vehicles on the road in real time, and analyze the behavior of vehicles in the monitoring area in real time. When a large number of vehicles gather or congestion occurs in a certain area in a short period of time, the system will automatically identify and trigger an alarm;

[0036] The no-order vehicle use alarm submodule is based on GPS and geo-fencing technology, and combines the vehicle monitoring system and the Internet of Things technology to monitor the use of vehicles without valid orders and issue an early warning; it collects data and uploads it to the backend management system, and uses the Internet of Vehicles technology to match the system order system. If the system detects that the vehicle is being used without a valid order, it will immediately alarm;

[0037] The driving abnormality warning submodule uses the ADAS driving warning system to monitor the vehicle's route and status in real time and issue warnings. It can quickly identify problems such as abnormal vehicle position, illegal parking, speeding, etc., and quickly inform the driver through the remote monitoring platform, thereby effectively supervising and reducing potential risks.

[0038] As a preferred solution of the present invention, the early warning module also includes a risk level control submodule, which sets at least three risk levels to be matched according to a preset threshold, and generates corresponding risk occurrence events and level information according to the data matching obtained by the early warning module, and presents it visually.

[0039] As a preferred solution of the present invention, the detailed information of renewable resources includes material category, quantity, loading service, and information on entering the underground garage;

[0040] The renewable resource operation analysis submodule is used to intelligently classify and process the renewable resource three-dimensional scanning data based on a preset deep residual network model to generate renewable resource classification data.

[0041] On the one hand, the present invention provides a method for operating a system based on front-end collection, transportation and disposal of renewable resources, comprising the following steps:

[0042] Step S1, the user establishes a connection with the front-end recycling management module through the WeChat applet. The front-end recycling management module is used for placing orders for renewable resources, making appointments for door-to-door services, and processing order settlement services after the user logs into the system. It includes a renewable resource operation analysis submodule, which is used to obtain photos uploaded by users and information filled in, and identify detailed information on renewable resources after analysis and processing;

[0043] Step S2, after obtaining the detailed information of the renewable resources ordered by the user of the front-end recycling management module, the system accepts the order, and distributes the task after task planning through the renewable resource operation analysis submodule, and at the same time, the route planning and in-transit control of the operating vehicle are carried out, and the operating vehicle completes the material delivery and recycling after completing the freight loading; at the same time, during the recycling, transportation and disposal of renewable resources, abnormal conditions are monitored and early warnings are issued;

[0044] The specific steps include:

[0045] Step S201, determining the recycling material demand constraints of the renewable resource front end;

[0046] Step S202, establish a benefit model for the renewable resource front end, and the benefit maximization model for renewable resources is expressed as follows:

[0047] ;

[0048] in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources;

[0049] The constraints on the renewable resource front end are expressed as follows:

[0050] ;

[0051] in, It is the upper limit of recycling at the front end of renewable resources;

[0052] At the same time, a cost model for the renewable resource front end is established;

[0053] ;

[0054] ;

[0055] in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; It is the unit consumption cost of the renewable resources front end;

[0056] For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The unit time operating cost of an order;

[0057] Step S203, constructing and solving the operation cost model of the task planning analysis submodule. The expression for minimizing the operation cost of the task planning analysis submodule is as follows:

[0058] ;

[0059] in, is the minimum operating cost, For the renewable resources front end The weight of an order;

[0060] Step S3, by accessing the processing data of the vehicle dispatching and control module, generating business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visually presenting the business data in the form of data charts.

[0061] The beneficial effects of the present invention are as follows: Based on big data analysis, the present invention constructs a benefit function for the collection, transportation and disposal of the front-end of renewable resources in order to meet the cost and efficiency of the collection, transportation and disposal departments at all levels at the front-end of renewable resources. The optimal solution for material scheduling of the collection, transportation and disposal of the front-end is obtained through constraints and solutions, and a disposal plan for the front-end is generated, which improves the efficiency of the front-end processing of renewable resources and reduces the cost, and has good balance and timeliness. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0063] Figure 1 It is a schematic diagram of the modular structure of the system of the present invention;

[0064] Figure 2 It is an application scenario and a flow chart of the system of the present invention;

[0065] Figure 3 It is a schematic diagram of the system operation process of the present invention;

[0066] Figure 4 It is a schematic diagram of the system architecture of the present invention;

[0067] Figure 5 It is a schematic diagram of the process of the present invention.

[0068] Numbers in the figure: 10, front-end recycling management module; 20, vehicle dispatching and control module; 30, early warning module; 40, administrator authority work module. DETAILED DESCRIPTION

[0069] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0070] Reference Figure 1-Figure 4 As shown, it is an embodiment of the present invention, which provides an operation system and method based on the front-end collection, transportation and disposal of renewable resources, including: a front-end recycling management module 10, a vehicle scheduling control module 20, an early warning module 30, an administrator authority work module 40 and a management application platform; wherein the operation system for the front-end collection, transportation and disposal of renewable resources constructs a benefit function for the front-end collection, transportation and disposal of renewable resources, obtains the optimal solution for material scheduling of the front-end collection, transportation and disposal through constraints and solutions, and generates a disposal plan for the front end, thereby improving the efficiency of the front-end processing of renewable resources and reducing costs, and has good balance and timeliness, as shown below:

[0071] The front-end recycling management module 10 of this embodiment is connected to the front-end recycling management module 10 by the user through the WeChat applet mounting. The front-end recycling management module 10 is used for placing orders for renewable resources, making appointments for door-to-door visits and processing order settlement services after the user logs into the system. It includes a renewable resource operation analysis submodule. The renewable resource operation analysis submodule is used to obtain photos uploaded by users and information filled in, and identify detailed information of renewable resources after analysis and processing; specifically, in this embodiment, the detailed information of renewable resources includes material category, quantity, loading service, and information on entering the underground garage; further explained, the renewable resource operation analysis submodule is used to perform intelligent classification processing on renewable resource three-dimensional scanning data based on a preset deep residual network model to generate renewable resource classification data.

[0072] The vehicle dispatching and control module 20 of this embodiment is used to obtain the detailed information of the renewable resources ordered by the user of the front-end recycling management module 10, and then accept the order in the system, and perform task planning and task dispatching after analyzing the operation of renewable resources, and at the same time perform route planning and in-transit control of the operating vehicles. After the operating vehicles complete the freight loading, they complete the material delivery and recycling. The vehicle dispatching and control module 20 includes a vehicle dispatching submodule, a task planning and analysis submodule, a task dispatching submodule, and a route planning submodule; it should be emphasized that the vehicle dispatching submodule in the preferred scheme of this embodiment is used to obtain the operation track information of the operating vehicles according to the positioning device by setting the operating vehicle information, and identify and obtain the location distribution information of the operating vehicles on the map;

[0073] The task planning and analysis submodule is used to generate renewable resource front-end planning information through analysis based on the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule;

[0074] The task dispatching submodule is used to receive the renewable resource front-end planning information, convert the renewable resource planning information into task event information and dispatch it to the corresponding front-end operating vehicle;

[0075] The route planning submodule is used to plan the routes of the front-end operating vehicles that receive the mission event information and generate the optimal operating route information on the map.

[0076] It should be emphasized that the task planning analysis submodule generates renewable resource front-end planning information through analysis based on the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule, as follows:

[0077] Determine the demand constraints for recycled materials at the front end of renewable resources;

[0078] The benefit model of the renewable resources front end is established, and the benefit maximization model of renewable resources is expressed as follows:

[0079] ;

[0080] in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources;

[0081] The constraints on the renewable resource front end are expressed as follows:

[0082] ;

[0083] in, It is the upper limit of recycling at the front end of renewable resources;

[0084] Establish cost model for renewable resource front end;

[0085] ;

[0086] ;

[0087] in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; It is the unit consumption cost of the renewable resources front end;

[0088] For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The unit time operating cost of an order;

[0089] Construct the mission planning analysis submodule for the operation cost model and solve it. The expression for minimizing the operation cost of the mission planning analysis submodule is as follows:

[0090] ;

[0091] in, is the minimum operating cost, For the renewable resources front end The weight of an order.

[0092] The early warning module 30 of this embodiment is used for early warning of abnormal conditions during the recycling, transportation and disposal of renewable resources, and includes a vehicle status warning submodule, a driver supervision warning submodule, a vehicle gathering and parking warning submodule, a no-order vehicle warning submodule, and a driving abnormality warning submodule;

[0093] The management application platform of this embodiment is used to access the processing data of the vehicle dispatching and control module 20, generate business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visualize the business data in the form of data charts.

[0094] Preferably, this embodiment also includes an administrator authority working module 40 connected to the vehicle dispatching and control module 20. The administrator authority working module 40 is used for the administrator to implement manual dynamic adjustment strategies based on the location area information and material category information of the user's order, combined with the operating vehicles and driver resources.

[0095] In addition, the task planning analysis sub-module solves the operating cost model and generates the solution results. According to the solution results and combined with dynamic planning to match the operating vehicle information, the corresponding front-end operating vehicle is determined and defined as the scheduling operating vehicle to carry out current task planning, task event information and route planning, and then the optimal operating route information is generated on the map for scheduling operations.

[0096] At the same time, the vehicle status alarm submodule is used to count the real-time status of operating vehicles and issue warnings; its real-time status includes driving, engine off, no network, terminal disassembled, and summarizes warnings such as vehicle failure, low battery voltage, entering and exiting the fence, no mission out, and vehicle collision;

[0097] The driver supervision warning submodule is based on the driver monitoring DSM, which monitors the driver's behavior status in real time and issues warnings. It combines high-precision cameras, infrared sensors, image processing algorithms, deep learning models and other technologies to observe and analyze the driver's eyelid opening and closing frequency, nodding movements, driver's line of sight, concentration, smoking, making phone calls and other behaviors in real time to issue warnings.

[0098] The vehicle gathering and parking alarm submodule is based on intelligent video analysis (IVA), which monitors the vehicle gathering and parking status in real time and issues warnings. It integrates multiple technical means such as video monitoring, image analysis, and artificial intelligence algorithms to monitor the number of vehicles on the road in real time and analyze the behavior of vehicles in the monitoring area in real time. When a large number of vehicles gather or congestion occurs in a certain area in a short period of time, the system will automatically identify and trigger an alarm.

[0099] The no-order vehicle use alarm submodule is based on GPS and geo-fencing and combines vehicle monitoring and IoT technology to monitor and warn when a vehicle is used without a valid order. It collects data and uploads it to the backend management system, using the Internet of Vehicles technology to match the system order system. If the system detects that a vehicle is used without a valid order, it will immediately alarm.

[0100] The driving abnormality warning submodule uses the ADAS driving warning system to monitor the vehicle's route and status in real time and issue warnings. It can quickly identify problems such as abnormal vehicle position, illegal parking, speeding, etc., and quickly inform the driver through the remote monitoring platform, thereby effectively supervising and reducing potential risks.

[0101] To further illustrate, the early warning module 30 also includes a risk level control submodule, which sets at least three risk levels to be matched according to a preset threshold, and generates corresponding risk occurrence events and level information according to the data matching obtained by the early warning module 30, and presents it visually.

[0102] The advantages of this embodiment are: 1. Using big data to conduct in-depth analysis of the types, quantities, recycling frequency, value, operating vehicles, routes, etc. of renewable resources to optimize recycling costs and processing procedures;

[0103] 2. Through accurate data analysis, predict and control the costs of recycling, transportation and processing to maximize cost-effectiveness;

[0104] 3. Construct a benefit function to schedule the collection, classification, storage and transportation of materials to achieve the optimal logistics solution;

[0105] 4. Generate specific disposal plans based on the optimization model to guide the final treatment of renewable resources, such as reuse, remanufacturing or safe disposal, to ensure the timeliness of renewable resource treatment and the balanced distribution of processing capacity, and to avoid resource backlogs or processing bottlenecks.

[0106] A method of operating a system based on front-end collection, transportation and disposal of renewable resources in this embodiment includes the following steps:

[0107] Step S1, the user connects to the front-end recycling management module 10 through the WeChat applet. The front-end recycling management module 10 is used for placing orders for renewable resources, making appointments for door-to-door visits, and processing order settlement services after the user logs into the system. It includes a renewable resource operation analysis submodule, which is used to obtain photos uploaded by users and information filled in, and identify detailed information on renewable resources after analysis and processing;

[0108] Step S2, after obtaining the detailed information of the renewable resources ordered by the user of the front-end recycling management module 10, the system accepts the order, and distributes the task after task planning through renewable resource operation analysis, and at the same time performs route planning and in-transit control of the operating vehicle, and completes the material delivery and recycling after the operating vehicle completes the freight loading; at the same time, the abnormal state warning is issued during the recycling, transportation and disposal of renewable resources;

[0109] The specific steps include:

[0110] Step S201, determining the recycling material demand constraints of the renewable resource front end;

[0111] Step S202, establish a benefit model for the renewable resource front end, and the benefit maximization model for renewable resources is expressed as follows:

[0112] ;

[0113] in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources, For the Total number of items in the order;

[0114] The constraints on the renewable resource front end are expressed as follows:

[0115] ;

[0116] in, It is the upper limit of recycling at the front end of renewable resources;

[0117] At the same time, a cost model for the renewable resource front end is established;

[0118] ;

[0119] ;

[0120] in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; The unit consumption cost of the renewable resources front end is is the differential symbol;

[0121] For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The operating cost per unit time of an order;

[0122] Step S203, constructing and solving the operation cost model of the task planning analysis submodule. The expression for minimizing the operation cost of the task planning analysis submodule is as follows:

[0123] ;

[0124] in, is the minimum operating cost, For the renewable resources front end The weight of an order;

[0125] Step S3, by accessing the processing data of the vehicle dispatching and control module 20, generating business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visually presenting the business data in the form of data charts.

[0126] Based on the above, it can be known that the present invention is based on big data analysis. In order to meet the cost and efficiency of the collection, transportation and disposal departments at all levels at the front end of renewable resources, a benefit function of the collection, transportation and disposal of renewable resources is constructed. Through constraints and solutions, the optimal solution for material scheduling of the front-end collection, transportation and disposal is obtained and the front-end disposal plan is generated, which improves the efficiency of the front-end processing of renewable resources and reduces the cost, and has good balance and timeliness.

[0127] In addition, the present invention may also consider how to innovate the recycling method of renewable resources through the "Internet +" model, improve the recycling rate, reduce the recycling cost, and improve the industry transparency and regulatory efficiency through digital means. Through this comprehensive solution, the modernization and sustainable development of the renewable resource recycling industry can be effectively promoted.

[0128] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function according to the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium.

[0129] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0130] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0131] Any process or method description in the flow chart or otherwise described herein can be understood to represent a module, fragment or portion of a code including one or more executable instructions for implementing the steps of a specific logical function or process. And the scope of the preferred embodiment of the present application includes other implementations, in which the functions may not be performed in the order shown or discussed, including in a substantially simultaneous manner or in a reverse order according to the functions involved.

[0132] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, which can be embodied in any computer-readable medium for use by an instruction execution system, apparatus or device such as a computer-based system, a system including a processor or other system that can fetch instructions from an instruction execution system, apparatus or device and execute instructions, or used in conjunction with these instruction execution systems, apparatuses or devices.

[0133] It should be understood that the various parts of the present application can be implemented with hardware, software, firmware or a combination thereof. In the above embodiments, multiple steps or methods can be implemented with software or firmware stored in a memory and executed by a suitable instruction execution system. All or part of the steps of the above embodiment method can be completed by instructing the relevant hardware through a program, which can be stored in a computer-readable storage medium, and when the program is executed, it includes one of the steps of the method embodiment or a combination thereof.

[0134] In addition, each functional unit in each embodiment of the present application can be integrated into a processing module, or each unit can exist physically separately, or two or more units can be integrated into one module. The above-mentioned integrated module can be implemented in the form of hardware or in the form of a software functional module. If the above-mentioned integrated module is implemented in the form of a software functional module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. The storage medium can be a read-only memory, a disk or an optical disk, etc.

[0135] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An operating system based on the front-end collection, transportation and disposal of renewable resources, characterized in that: include: A front-end recycling management module (10), wherein the user connects to the front-end recycling management module (10) via a WeChat applet, wherein the front-end recycling management module (10) is used for placing an order for renewable resources, making an appointment for door-to-door service, and processing order settlement services after the user logs into the system, and comprises a renewable resource operation analysis submodule, wherein the renewable resource operation analysis submodule is used for obtaining photos uploaded by the user and information filled in by the user, and identifying the detailed information of the renewable resources after analysis and processing; The vehicle dispatching and control module (20) is used to obtain detailed information of the renewable resources ordered by the user of the front-end recycling management module (10), then accept the order in the system, and perform task planning and task dispatching through the renewable resource operation analysis submodule, and at the same time perform route planning and in-transit control of the operating vehicles, and complete the material delivery and recycling after the operating vehicles complete the freight loading, the vehicle dispatching and control module (20) comprising a vehicle dispatching submodule, a task planning and analysis submodule, a task dispatching submodule, and a route planning submodule; An early warning module (30) is used for early warning of abnormal conditions during the recycling, transportation and disposal of renewable resources, and comprises a vehicle status warning submodule, a driver supervision warning submodule, a vehicle gathering and parking warning submodule, a vehicle without order warning submodule, and a driving abnormality warning submodule; A management application platform is used to access the processing data of the vehicle dispatching control module (20), generate business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visualize the business data in the form of data charts.

2. An operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 1, characterized in that: It also includes an administrator authority working module (40) connected to the vehicle dispatching and control module (20), wherein the administrator authority working module (40) is used for the administrator to implement a manual dynamic adjustment strategy based on the location area information and material category information of the user's order, combined with the operating vehicles and driver resources.

3. The operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 1, characterized in that: The vehicle dispatch submodule is used to obtain the running track information of the operating vehicles according to the positioning device by setting the operating vehicle information, and to identify and obtain the location distribution information of the operating vehicles on the map; The task planning analysis submodule is used to generate renewable resource front-end planning information through analysis based on the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule; The task dispatching submodule is used to, after receiving the renewable resource front-end planning information, convert the renewable resource planning information into task event information and dispatch it to the corresponding front-end operating vehicle; The route planning submodule is used to plan the routes of the front-end operating vehicles that receive the mission event information and generate the optimal operating route information on the map.

4. The operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 3, characterized in that: The task planning analysis submodule generates renewable resource front-end planning information through analysis based on the current renewable resource detailed information and the operating vehicle information identified by the vehicle scheduling submodule, as follows: Determine the demand constraints for recycled materials at the front end of renewable resources; The benefit model of the renewable resources front end is established, and the benefit maximization model of renewable resources is expressed as follows: ; in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources, For the Total number of items in the order; The constraints on the renewable resource front end are expressed as follows: ; in, It is the upper limit of recycling at the front end of renewable resources; Establish cost model for renewable resource front end; ; ; in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; The unit consumption cost of the renewable resources front end is is the differential symbol; For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The operating cost per unit time of an order; The operating cost model of the mission planning and analysis submodule is constructed and solved. The expression for minimizing the operating cost of the mission planning and analysis submodule is as follows: ; in, is the minimum operating cost, For the renewable resources front end The weight of an order.

5. The operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 4, characterized in that: The task planning analysis submodule is used to solve the operation cost model and generate a solution result. According to the solution result and combined with dynamic planning to match the operation vehicle information, the corresponding front-end operation vehicle is determined and defined as the scheduling operation vehicle for current task planning, task event information and route planning. Then, the optimal operation route information is generated on the map for scheduling operation.

6. The operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 1, characterized in that: The vehicle status alarm submodule is used to count the real-time status of operating vehicles and issue early warnings; The driver supervision warning submodule monitors the driver's behavior status in real time and issues warnings based on the driver monitoring DSM; The vehicle gathering and stopping alarm submodule monitors the vehicle gathering and stopping status in real time and issues an early warning based on intelligent video analysis (IVA); The no-order vehicle use warning submodule is based on GPS and geo-fencing technology, and combines the vehicle monitoring system and the Internet of Things technology to monitor the use of vehicles without valid orders and issue an early warning; The abnormal driving warning submodule monitors the vehicle's driving route and status in real time through the ADAS driving warning system and issues a warning.

7. An operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 6, characterized in that: The early warning module (30) further comprises a risk level control submodule, which sets at least three risk levels to be matched according to a preset threshold value, and generates corresponding risk occurrence events and level information according to data matching acquired by the early warning module (30), and presents them visually.

8. The operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 1, characterized in that: The detailed information of the renewable resources includes the material category, quantity, loading service, and information on entering the underground garage; The renewable resource operation analysis submodule also includes a method for performing intelligent classification processing on the renewable resource three-dimensional scanning data based on a preset deep residual network model to generate renewable resource classification data.

9. A method applied to the operating system based on the front-end collection, transportation and disposal of renewable resources as claimed in claim 1, characterized in that: The following steps are involved: Step S1, the user establishes a connection with the front-end recycling management module (10) through the WeChat applet, the front-end recycling management module (10) is used for placing an order for renewable resources, making an appointment for door-to-door service and processing order settlement services after the user logs into the system, and comprises a renewable resource operation analysis submodule, the renewable resource operation analysis submodule is used for obtaining photos uploaded by the user and information filled in, and identifying the detailed information of the renewable resources after analysis and processing; Step S2, after obtaining the detailed information of the renewable resources ordered by the user of the front-end recycling management module (10), the system accepts the order, and after planning the task through the renewable resource operation analysis submodule, the task is dispatched, and the route planning and in-transit control of the operating vehicle are carried out at the same time. After the operating vehicle completes the freight loading, the material delivery and recycling are completed; at the same time, during the recycling, transportation and disposal of the renewable resources, abnormal conditions are monitored and early warnings are issued; Step S3, by accessing the processing data of the vehicle dispatching and control module (20), generating business data of various dimensions in the recycling, transportation and disposal of renewable resources according to the processing data, and visually presenting the business data in the form of data charts.

10. The method of operating a system based on front-end collection, transportation and disposal of renewable resources as claimed in claim 9, characterized in that: In step S2, task planning is performed through renewable resource operation analysis and then task distribution is performed, which specifically includes the following steps: Step S201, determining the recycling material demand constraints of the renewable resource front end; Step S202, establish a benefit model for the renewable resource front end, and the benefit maximization model for renewable resources is expressed as follows: ; in, For the renewable resources front end The recycling unit price of each category, For the renewable resources front end The number of returns per order, To maximize the recycling value of renewable resources; The constraints on the renewable resource front end are expressed as follows: ; in, It is the upper limit of recycling at the front end of renewable resources; At the same time, a cost model for the renewable resource front end is established; ; ; in, For the The consumption cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The consumption of recycled resources collected, transported and disposed of at the front end for each order; The total cost of collecting, transporting and disposing of renewable resources at the front end; For the The unit cost of collecting, transporting and disposing of recycled resources at the front end of each order; For the The proportion of consumption of an order in total consumption; The total cost of front-end consumption for renewable resources; It is the unit consumption cost of the renewable resources front end; For the renewable resources front end The cumulative cost of an order increases with the operating time, For the renewable resources front end The vehicle cost of the order operation route, For the renewable resources front end The operating cost per unit time of an order; Step S203, constructing and solving the operation cost model of the task planning analysis submodule. The expression for minimizing the operation cost of the task planning analysis submodule is as follows: ; in, is the minimum operating cost, For the renewable resources front end The weight of an order.

Citation Information

Patent Citations

  • Integrated big data management system for urban renewable resources

    CN109063866A

  • Intelligent renewable resource recovery system

    CN111583507A

  • Renewable resource recovery method and device and computer readable storage medium

    CN112990491A