Material frame scheduling method and device, computer equipment and readable storage medium
Simulated grasping and scheduling of material frames at a virtual station address inefficiencies in steel plate cutting, improving production efficiency and reducing wait times.
Patent Information
- Application Number
- CN202411096381.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-12
AI Technical Summary
Current material frame scheduling methods in steel plate cutting processes are inefficient, leading to suboptimal production efficiency and increased costs.
A method involving simulated grasping at a virtual station to determine target material placement frames, followed by sending scheduling messages to control the transfer of material frames, reducing waiting times and improving efficiency.
Simulated grasping and scheduling significantly reduce material frame scheduling wait times, enhancing production efficiency and utilization rates.
Smart Images

Figure CN119059256A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of manufacturing industry, and in particular to a material frame scheduling method, device, computer equipment, computer-readable storage medium and computer program product. Background Art
[0002] In the manufacturing industry, especially in heavy industries involving steel plate cutting, material frame scheduling is an extremely critical link in production logistics, which directly affects the production efficiency and cost of steel plates.
[0003] At present, taking the steel plate unloading process as an example, the material frame scheduling is usually carried out in the following ways: (1) Manual scheduling by the production planner or site supervisor based on the production demand of the parts and the status of the material frame to ensure the timely supply of parts to the material frame on the production line; (2) Automation system support: using Internet of Things technology and sensors, combined with automation equipment to realize automatic identification, positioning and transfer of the material frame; (3) After the workstation grabbing is completed, the material frame information provided by the workstation is used to determine whether it needs to be transferred.
[0004] However, the current material frame scheduling method still cannot provide efficient production efficiency. Summary of the invention
[0005] Based on this, it is necessary to provide a material frame scheduling method, device, computer equipment, computer readable storage medium and computer program product that provide efficient part processing efficiency in response to the above technical problems.
[0006] In a first aspect, the present application provides a material frame scheduling method, the method comprising:
[0007] When the part to be grasped arrives at the simulated grasping station, the part to be grasped is grasped in a simulated manner, and a target material placing frame for placing the part to be grasped and a material placing frame to be transferred are determined. The simulated grasping station is set before the actual grasping station;
[0008] Based on the target unloading frame of the parts to be grasped, determine the unloading frame to be transferred out;
[0009] Based on the material discharging frame to be transferred out and the material discharging frame to be transferred in, a first material frame scheduling message is sent to the material frame scheduling end, and the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material discharging frame to be transferred out and the transfer in of the material discharging frame to be transferred in.
[0010] In one embodiment, simulating grasping of the part to be grasped includes:
[0011] Obtain part information of the part to be grasped;
[0012] Based on the part information, determine the grasping position information of the part to be grasped;
[0013] Based on the grasping position information, simulate the grasping of the parts to be grasped.
[0014] In one embodiment, determining a target placing frame for placing the parts to be grasped includes:
[0015] Obtain part information of the part to be grasped;
[0016] Based on the part information, a target placing frame matching the part information in the placing frame placement area is determined.
[0017] In one embodiment, determining the material discharging frame to be transferred to includes:
[0018] Obtain part information of the part to be grasped;
[0019] In the case that there is a non-empty material placing frame matching the part information in the candidate material placing frame placement area, the material placing frame to be transferred to is determined based on the non-empty material placing frame, wherein the non-empty material placing frame contains a part matching the part information of the part to be grabbed;
[0020] When there is no non-empty material placing frame matching the part information in the candidate material placing frame placement area, a material placing frame to be transferred into that matches the part information is determined based on the free material placing frames in the candidate material placing frame placement area.
[0021] In one embodiment, based on the material placing frame to be transferred out and the material placing frame to be transferred in, sending a first material placing frame scheduling message to the material placing frame scheduling end includes:
[0022] Obtain the number of the material discharging frame to be transferred out and the number of the material discharging frame to be transferred in;
[0023] Based on the number of the outgoing material placing frame and the number of the incoming material placing frame, a first material placing frame scheduling message is sent to the material placing frame scheduling end.
[0024] In one embodiment, the method further comprises:
[0025] Before the part to be grasped arrives at the actual grasping station, the material discharging frame to be transferred out and the material discharging frame to be transferred in of the target station are determined, and the target station includes the actual grasping station, the station between the actual grasping station and the simulated grasping station, and the simulated grasping station;
[0026] Generate a target outgoing material discharging frame queue based on the intersection of the outgoing material discharging frames of the target workstation;
[0027] Based on the union of the second material placing frames of the target workstation, a target transfer material placing frame queue is generated;
[0028] Based on the target outgoing material frame queue and the target incoming material frame queue, a second material frame scheduling message is sent to the material frame scheduling end, and the second material frame scheduling message is used to instruct the material frame scheduling end to control the outgoing of the target outgoing material frame queue and the incoming of the target incoming material frame queue.
[0029] In one embodiment, based on the target outgoing material frame queue and the target incoming material frame queue, sending the second material frame scheduling message to the material frame scheduling end includes:
[0030] Obtain the number N of material-discharging frames to be transferred out in the target material-discharging-out frame queue and the number M of material-discharging frames to be transferred in the target material-discharging-in frame queue;
[0031] When N is less than or equal to M, N target transfer-in placing frames are selected from the target transfer-in placing frame queue according to the priority of the second placing frame in the target transfer-in placing frame queue;
[0032] Based on the N targets entering the discharge frame and the N targets exiting the discharge frame, a second frame scheduling message is sent to the frame scheduling end, and the second frame scheduling message is used to instruct the frame scheduling end to control the entry of the N targets entering the discharge frame and the exit of the N targets exiting the discharge frame.
[0033] In a second aspect, the present application further provides a material frame scheduling device, the device comprising:
[0034] The simulation grabbing module is used to simulate grabbing of the parts to be grabbed when the parts to be grabbed arrive at the simulation grabbing station, determine the target material placing frame for placing the parts to be grabbed, and the material placing frame to be transferred into, and the simulation grabbing station is set before the actual grabbing station;
[0035] A determination module, used for determining a material discharging frame to be transferred out based on a target material discharging frame of the parts to be grasped;
[0036] The scheduling module is used to send a first material frame scheduling message to the material frame scheduling end based on the material frame to be transferred out and the material frame to be transferred in. The material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material frame to be transferred out and the transfer in of the material frame to be transferred in.
[0037] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0038] When the part to be grasped arrives at the simulated grasping station, the part to be grasped is grasped in a simulated manner, and a target material placing frame for placing the part to be grasped and a material placing frame to be transferred are determined. The simulated grasping station is set before the actual grasping station;
[0039] Based on the target unloading frame of the parts to be grasped, determine the unloading frame to be transferred out;
[0040] Based on the material discharging frame to be transferred out and the material discharging frame to be transferred in, a first material frame scheduling message is sent to the material frame scheduling end, and the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material discharging frame to be transferred out and the transfer in of the material discharging frame to be transferred in.
[0041] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the following steps are implemented:
[0042] When the part to be grasped arrives at the simulated grasping station, the part to be grasped is grasped in a simulated manner, and a target material placing frame for placing the part to be grasped and a material placing frame to be transferred are determined. The simulated grasping station is set before the actual grasping station;
[0043] Based on the target unloading frame of the parts to be grasped, determine the unloading frame to be transferred out;
[0044] Based on the material discharging frame to be transferred out and the material discharging frame to be transferred in, a first material frame scheduling message is sent to the material frame scheduling end, and the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material discharging frame to be transferred out and the transfer in of the material discharging frame to be transferred in.
[0045] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0046] When the part to be grasped arrives at the simulated grasping station, the part to be grasped is grasped in a simulated manner, and a target material placing frame for placing the part to be grasped and a material placing frame to be transferred are determined. The simulated grasping station is set before the actual grasping station;
[0047] Based on the target unloading frame of the parts to be grasped, determine the unloading frame to be transferred out;
[0048] Based on the material discharging frame to be transferred out and the material discharging frame to be transferred in, a first material frame scheduling message is sent to the material frame scheduling end, and the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material discharging frame to be transferred out and the transfer in of the material discharging frame to be transferred in.
[0049] The above-mentioned material frame scheduling method, device, computer equipment, computer-readable storage medium and computer program product, when the part to be grasped arrives at the simulated grasping station, simulates grasping of the part to be grasped in advance to determine the target material placement frame for placing the part to be grasped and the material placement frame to be transferred in, and determines the material placement frame to be transferred out based on the target material placement frame of the part to be grasped, and sends a first material frame scheduling message to the material frame scheduling end in advance based on the material placement frame to be transferred out and the material placement frame to be transferred in, so as to instruct the material frame scheduling end to control the transfer out of the material placement frame to be transferred out and the transfer in of the material placement frame to be transferred in. In the whole process, simulated grasping is performed at the simulated grasping station before the actual grasping station, and then the material frame scheduling is performed in advance, which greatly reduces the waiting time for material frame scheduling during actual grasping and improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0051] FIG1 is an application environment diagram of a material frame scheduling method in one embodiment;
[0052] Figure 2 Schematic diagram of a flow chart of a material frame scheduling method in one embodiment;
[0053] Figure 3 A schematic diagram of a structure simulating a truss in one embodiment;
[0054] Figure 4 It is a schematic diagram of a nesting diagram when cutting a steel plate according to an embodiment;
[0055] Figure 5 It is a flowchart of a material frame scheduling method in another embodiment;
[0056] Figure 6 is a structural block diagram of a material frame scheduling device in one embodiment;
[0057] Figure 7 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0058] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0059] The material frame scheduling method provided in the embodiment of the present application can be applied in the application environment shown in Figure 1. The control terminal 102 communicates with the material frame scheduling terminal 104 through a network.
[0060] When the control terminal 102 monitors that the parts to be grasped arrive at the simulated grasping station, the control terminal 102 simulates the grasping of the parts to be grasped, determines the target material placement frame for placing the parts to be grasped, and the material placement frame to be transferred in, and the simulated grasping station is set before the actual grasping station; based on the target material placement frame of the parts to be grasped, determines the material placement frame to be transferred out; based on the material placement frame to be transferred out and the material placement frame to be transferred in, sends a first material frame scheduling message to the material frame scheduling terminal 104, and the material frame scheduling message is used to instruct the material frame scheduling terminal 104 to control the transfer out of the material placement frame to be transferred out and the transfer in of the material placement frame to be transferred in.
[0061] The control terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, IoT devices, and portable wearable devices. IoT devices may be smart speakers, smart TVs, smart air conditioners, smart vehicle-mounted devices, projection devices, etc. Portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. Head-mounted devices may be virtual reality (VR) devices, augmented reality (AR) devices, smart glasses, etc.
[0062] In an exemplary embodiment, Figure 2 As shown, a material frame scheduling method is provided, and the method is applied to the control terminal 102 in FIG. 1 as an example for explanation, wherein:
[0063] S200, when the part to be grasped arrives at the simulated grasping station, simulate grasping is performed on the part to be grasped, and a target material placing frame for placing the part to be grasped and a material placing frame to be transferred are determined.
[0064] Among them, the simulated grasping station is a station for simulating the grasping of the parts to be grasped. The simulated grasping station is arranged before the actual grasping station. The actual grasping station is the station for actually grasping the parts to be grasped. The simulated grasping station includes several stations arranged before the actual grasping station. For example, the simulated grasping station can be two stations arranged before the actual grasping station, or three stations arranged before the actual grasping station. The parts to be grasped are the parts to be grasped at the actual grasping station. The number of parts to be grasped can be one or more. The material placement frame is a device for storing parts. The parts to be grasped in the present application may not be limited to parts, but may be other equipment.
[0065] Specifically, when the control terminal detects that the part to be grasped arrives at the simulated grasping station, the control terminal simulates grasping the part to be grasped. Specifically, the simulated grasping of the part to be grasped is performed by a simulated robot or simulated truss program in the control terminal.
[0066] There is also a material placement frame area next to the workstation, which includes several material placement frames. Since the simulated grasping is to grasp the parts to be grasped and place them in the material placement frame, after the simulated grasping process is completed, the usage of each material placement frame in the material placement frame area can be determined, that is, the target material placement frame for placing the parts to be grasped can be determined. In addition, since several material placement frames in the material placement frame area may not necessarily meet the placement requirements of some parts to be grasped, that is, some parts to be grasped cannot be placed in the existing material placement frame area, it is necessary to determine the material placement frame to be transferred from the cache area, that is, the candidate material placement frame area, so as to transfer the material placement frame to be transferred into the existing material placement frame area to achieve the placement of the parts to be grasped.
[0067] In an exemplary embodiment, the actual grasping is performed by grasping with an actual truss, and the simulated grasping is performed by using a simulated truss that simulates the configuration of the actual truss. Figure 3 As shown, when using the simulation truss program, the offline mode can be used to simulate the movement of the actual truss, and when simulating the grabbing, the speed of the simulated truss operation can be adjusted. Therefore, the speed of the simulated truss operation can be increased to speed up the process of simulated grabbing.
[0068] In an exemplary embodiment, in order to ensure that the material placing frames used for material placing frame scheduling analysis are the latest material placing frame data, the distance between the simulated grabbing station and the actual grabbing station should not be too large to ensure that the simulation is a real scene.
[0069] S400, determining a material discharging frame to be transferred out based on a target material discharging frame of the parts to be grasped.
[0070] Specifically, the target material placing frame is a material placing frame used to place the parts to be grasped, and the material placing frame to be transferred out is a material placing frame that is not needed to be used in the material placing frame area.
[0071] More specifically, after all the material placing frames in the material placing frame area are determined, the material placing frames in the material placing frame area are removed from the target material placing frame, which is the material placing frame to be transferred out. For example, there are A, B, C, and D parts to be picked up, and the material placing frames in the material placing frame area include material placing frames a, b, c, d, and e. The target material placing frame for placing the part A to be picked up is determined to be material placing frame b, the target material placing frame for placing the part A to be picked up is determined to be material placing frame d, the target material placing frame for placing the part B to be picked up is determined to be material placing frame e, and the target material placing frame for placing the part C to be picked up is determined to be the material placing frame f to be transferred into in the candidate material placing frame area. At this time, the material placing frames that do not need to be used among material placing frames a, b, c, d, and e are material placing frames a and c, and material placing frames a and c are determined to be material placing frames to be transferred out.
[0072] S600: Send a first material frame scheduling message to a material frame scheduling end based on a material frame to be transferred out and a material frame to be transferred in.
[0073] The material frame scheduling message is used to instruct the material frame scheduling end to control the outgoing material frame to be outgoing and the incoming material frame to be in. The material frame scheduling end can be an AGC (Automatic Generation Control) robot or other equipment for grabbing parts.
[0074] Specifically, based on the material frame to be transferred out and the material frame to be transferred in, a first material frame scheduling message is generated, and the first material frame scheduling message is sent to the material frame scheduling end, and the material frame to be transferred out and the material frame to be transferred in in the first material frame scheduling message are extracted by the material frame scheduling end to transfer the material frame to be transferred in to the material frame placement area, and transfer out the material frame to be transferred out.
[0075] Furthermore, since the space of the material placing frame area is limited, that is, the number of material placing frames in the material placing frame area is limited, the number of material placing frames in the material placing frame area is less than or equal to the maximum number threshold. Therefore, when the number of material placing frames in the material placing frame area is the maximum number threshold, a first material frame scheduling message is generated based on the material placing frames to be transferred out and the material placing frames to be transferred in, including: only when the material placing frames to be transferred out exist, the first material frame scheduling message is generated based on the material placing frames to be transferred out and the material placing frames to be transferred in, and when the material placing frames to be transferred out do not exist, the material placing frames cannot be scheduled. In other words, when the number of material placing frames in the material placing frame area is the maximum number threshold, only when the material placing frames to be transferred out are transferred out first, can the material placing frames to be transferred in be accepted.
[0076] In the above-mentioned material frame scheduling method, when the part to be grasped arrives at the simulated grasping station, the part to be grasped is simulated grasped in advance to determine the target material placement frame for placing the part to be grasped and the material placement frame to be transferred in, and based on the target material placement frame of the part to be grasped, the material placement frame to be transferred out is determined, and based on the material placement frame to be transferred out and the material placement frame to be transferred in, the first material frame scheduling message is sent to the material frame scheduling end in advance to instruct the material frame scheduling end to control the transfer out of the material placement frame to be transferred out and the transfer in of the material placement frame to be transferred in. In the whole process, the material frame scheduling is performed in advance by simulating grasping at the simulated grasping station before the actual grasping station, which greatly reduces the waiting time for material frame scheduling during actual grasping and improves production efficiency.
[0077] In an exemplary embodiment, simulating grasping of a part to be grasped includes:
[0078] Obtain part information of the part to be grasped; determine grasping position information of the part to be grasped based on the part information; and simulate grasping of the part to be grasped based on the grasping position information.
[0079] The part information includes length, width, thickness, next process sequence, order, etc. The next process sequence refers to the next process to be performed. The grasping position information refers to the position information of the simulated grasping of the grasped part.
[0080] Specifically, when the parts to be grasped arrive at the simulated grasping station, the part information of all the parts to be grasped and their relative positions to the steel plate can be uploaded to the control terminal, and the control terminal determines the grasping position information of the parts to be grasped based on the part information of all the parts to be grasped and their relative positions to the steel plate. The grasping position information includes the grasping position. Based on the grasping position, the parts to be grasped are simulated grasped.
[0081] In an exemplary embodiment, there are two scenarios for material frame scheduling: one is to sort large pieces and directly stack them; the other is to sort large pieces and lay them flat on the plate chain line first, then stack large pieces and then stack the parts. Stacking actually means placing.
[0082] 1. Direct stacking of large pieces for sorting: When large pieces are sorted, they are parts cut from a steel plate and are grabbed using a truss. The truss range is the truss coordinate system. The steel plate cutting is based on Figure 4 The nesting diagram shown in the figure. Nesting means using as much material as possible on a limited material area for production. The nesting diagram refers to the reasonable sorting of various parts on limited materials to maximize the utilization rate of steel plates. The nesting diagram is information provided by the upstream. Figure 4In the nesting diagram, different frames can be regarded as different parts. By sorting different parts in the nesting diagram, each part on the steel plate can be cut. Each part to be grabbed has a corresponding pixel coordinate on the nesting diagram, which is in a fixed ratio with the actual steel plate, and the length and width of the steel plate are known. In general, the docking position of the steel plate is fixed for large-piece sorting. Therefore, the approximate position of the part in the actual coordinate system can be inferred based on the coordinates of the docking position of the steel plate, that is, the grabbing position information of the part to be grabbed.
[0083] 2. First, large pieces are sorted and laid flat on the plate chain line, and then large pieces are stacked and the parts are stacked: In the case of large pieces stacking, large pieces are sorted to lay the parts on the steel plate flat on the plate chain line, and after sanding, calibration and other processes, they are placed in the stacking frame for large pieces stacking. Large piece sorting can provide the coordinates for laying parts flat. Since the plate chain line is segmented and the distance of each segment is the same, the relative position of the laid parts will not change much when they arrive at the large piece stacking station, and the position of the parts in this batch is basically the same, so the grasping position information of the parts to be grasped can also be inferred through the method in point 1, so as to simulate grasping.
[0084] In an exemplary embodiment, there are multiple parts to be grasped, and the grasping order when simulating grasping of the multiple parts to be grasped is generally set according to the needs of the staff or the user. Generally, simulating grasping of the multiple parts to be grasped includes: grasping in one direction according to the position of the parts, grasping from both ends to the middle by two truss arms, or grasping from large to small according to the size of the parts.
[0085] In the above embodiment, based on the part information of the part to be grasped, the grasping position information of the part to be grasped can be accurately determined, thereby realizing accurate simulated grasping of the part to be grasped based on the grasping position information. Furthermore, by simulating the grasping process of the actual grasping station, the real grasping sequence and stacking sequence are simulated, which greatly improves the correctness of the pre-planning and better meets the material frame scheduling requirements of the actual use scenario.
[0086] In an exemplary embodiment, determining a target placing frame for placing the parts to be grasped includes:
[0087] The part information of the part to be grasped is obtained; based on the part information, a target placing frame in the placing area of the placing frame that matches the part information is determined.
[0088] Specifically, the part information such as the length, width, thickness, next process sequence, and order of the part to be grasped is obtained, and based on the part information such as the length, width, thickness, next process sequence, and order of the part to be grasped, a target material frame that matches the part information of the part to be grasped is selected from several material frames in the material frame placement area. For example, a target material frame that matches the size of the part to be grasped is selected from several material frames in the material frame placement area, that is, a target material frame that matches the length, width, and thickness of the part to be grasped is selected; for another example, a target material frame that matches the order information of the part to be grasped is selected from several material frames in the material frame placement area. In actual applications, the order information includes order type information. At this time, selecting a target material frame that matches the order information of the part to be grasped means selecting a target material frame that matches the order type information of the part to be grasped.
[0089] In an exemplary embodiment, after determining the target material placement frame, the point information of the part to be grasped in the target material placement frame can also be determined. The specific steps include: converting the target material placement frame into a plane image, and matching the target material placement frame in the plane image form with the plane image of the part to be grasped, and the empty area of the target material placement frame in the plane image form can be used to place the part to be grasped.
[0090] In the above embodiment, by determining a target material placing frame that matches the part information in the material placing frame placement area, parts to be grasped that match the part information can be placed through the target material placing frame without material frame scheduling.
[0091] In an exemplary embodiment, determining a material placing frame to be transferred to includes:
[0092] Obtain the part information of the part to be grabbed; if there is a non-empty material frame matching the part information in the candidate material frame placement area, determine the material frame to be transferred to based on the non-empty material frame; if there is no non-empty material frame matching the part information in the candidate material frame placement area, determine the material frame to be transferred to that matches the part information based on the free material frames in the candidate material frame placement area.
[0093] Among them, the non-empty material placing frame contains parts that match the part information of the part to be grabbed but do not meet its internal storage space. Generally, the non-empty material placing frame refers to a half-frame material placing frame. The candidate material placing frame placement area is different from the material placing frame placement area. The material placing frame placement area is the existing material placing frame placement area next to the workstation, while the candidate material placing frame placement area is the material placing frame placement area in other places, such as the material placing frame placement area in the buffer area or the vertical storage area.
[0094] Specifically, when determining the material frame to be transferred in the candidate material frame placement area, there is a screening priority for the material frame to be transferred. In the present application, when determining the material frame to be transferred, the non-empty material frames in the candidate material frame placement area are screened first, and then the free material frames in the candidate material frame placement area are screened, so that the used material frames can be reused again to improve the utilization rate.
[0095] Furthermore, the basic condition for determining the material placement frame to be transferred into is that the material placement frame to be transferred into matches the part information of the part to be grabbed. In other words, whether the material placement frame to be transferred into is a non-empty material placement frame or an idle material placement frame, it needs to match the part information of the part to be grabbed. For example, the part information of the non-empty material placement frame and the part to be grabbed can be matched, which can be the size information of the non-empty material placement frame and the part to be grabbed, or the part already placed in the non-empty material placement frame can be matched with the type of the part to be grabbed; for another example, the part information of the idle material placement frame and the part to be grabbed can be matched, which can be the size information of the idle material placement frame and the part to be grabbed, etc.
[0096] In an exemplary embodiment, the execution order of determining the placement frame that matches the part information and determining the non-empty placement frame or the free placement frame is not limited. For example, the placement frame that matches the part information may be determined in the candidate placement frame placement area first, and then the non-empty placement frame may be determined from the placement frame that matches the part information. If there is no non-empty placement frame, the free placement frame may be determined from the placement frame that matches the part information. For another example, the non-empty placement frame may be determined in the candidate placement frame placement area first, and then the non-empty placement frame that matches the part information may be determined from the non-empty placement frame. If it does not exist, the free placement frame may be determined in the candidate placement frame placement area, and then the free placement frame that matches the part information may be determined from the free placement frame.
[0097] In the above embodiment, when determining the material placing frame to be transferred, the non-empty material placing frames matching the part information in the candidate material placing frame placement area are first screened, and then the free material placing frames matching the part information in the candidate material placing frame placement area are screened, so as to realize the reuse of the material placing frames that have been used and improve the utilization rate of the material placing frames that have been used.
[0098] In an exemplary embodiment, based on the material frame to be transferred out and the material frame to be transferred in, sending a first material frame scheduling message to the material frame scheduling end includes:
[0099] The outgoing material discharging frame number of the material discharging frame to be transferred out and the incoming material discharging frame number of the material discharging frame to be transferred in are obtained; based on the outgoing material discharging frame number and the incoming material discharging frame number, a first material frame scheduling message is sent to the material frame scheduling end.
[0100] Specifically, since the material frame scheduling end identifies the material discharge frame number, after determining the material discharge frame to be transferred out and the material discharge frame to be transferred in, it is necessary to obtain the material discharge frame number of the material discharge frame to be transferred out and the material discharge frame number of the material discharge frame to be transferred in, and then generate the first material frame scheduling message based on the material discharge frame number and the material discharge frame number, and send the first material frame scheduling message to the material frame scheduling end.
[0101] The material frame scheduling end determines the material frame to be transferred out corresponding to the number of the transferred out material frame and the material frame to be transferred in corresponding to the number of the transferred in material frame through the number of the transferred out material frame, and then schedules the material frame to be transferred out and the material frame to be transferred in to realize the transfer of the material frame to be transferred out and the transfer of the material frame to be transferred in.
[0102] In the above embodiment, by obtaining the number of the material-exiting frame to be transferred out and the number of the material-inputting frame to be transferred in, the material frame scheduling end can accurately transfer out the material-exiting frame and transfer in the material-inputting frame based on the number of the material-exiting frame and the number of the material-inputting frame.
[0103] In an exemplary embodiment, Figure 5 As shown, the method also includes:
[0104] S720, before the part to be grasped arrives at the actual grasping station, determine the material discharging frame to be transferred out and the material discharging frame to be transferred in of the target station.
[0105] The target stations include the actual grabbing station, the station between the actual grabbing station and the simulated grabbing station, and the simulated grabbing station.
[0106] Specifically, when simulating the grasping operation of the actual grasping station, it is assumed that the part to be grasped has arrived at the actual grasping station. At this time, the stations between the actual grasping station and the simulated grasping station and the simulated grasping station may also have parts that need to be grasped.
[0107] Therefore, the actual grabbing station, the station between the actual grabbing station and the simulated grabbing station, and the respective unloading frames to be transferred out and unloading frames to be transferred in of the simulated grabbing station can be determined. The determination method is consistent with the material frame scheduling method for determining the unloading frame of the actual grabbing station in advance when the part to be grabbed arrives at the simulated grabbing station.
[0108] For example, there are work stations 3, 4, and 5. If the actual grasping station is station 5 and the simulated grasping station is station 3, then at this time, simulation calculations can be performed in sequence according to the station sequence 5-4-3 to obtain the material discharging frames to be transferred out and the material discharging frames to be transferred in of stations 3, 4, and 5 respectively.
[0109] S740, generating a target transfer-out material placing frame queue based on the intersection of the to-be-transferred-out material placing frames of the target workstation.
[0110] Specifically, the material discharging frames to be turned out of the actual grabbing station are taken as a set, the material discharging frames to be turned out of each station between the actual grabbing station and the simulated grabbing station are taken as a set, and the material discharging frames to be turned out of the simulated grabbing station are taken as a set.
[0111] The intersection of all sets is determined, and based on all the unloading frames to be transferred out in the intersection, a target unloading frame queue is generated. That is, from the unloading frames to be transferred out of the actual grabbing station, the station between the actual grabbing station and the simulated grabbing station, and the simulated grabbing station, the same unloading frames that need to be transferred out of each station are determined as the unloading frames to be transferred out in the target unloading frame queue.
[0112] In an exemplary embodiment, if there is no intersection in the to-be-turned-out material frames of the target station, the union of the to-be-turned-out material frames of the target station is obtained, and a target turn-out material frame queue is generated based on the union of the to-be-turned-out material frames of the target station. In the target turn-out material frame queue at this time, the order of the to-be-turned-out material frames is in priority order, and the higher the priority order, the earlier the time of being turned out. Specifically, the priority of the to-be-turned-out material frame of the actual gripping station>the priority of the to-be-turned-out material frame of the station between the actual gripping station and the simulated gripping station>the priority of the to-be-turned-out material frame of the simulated gripping station. Furthermore, since each workstation may have multiple material discharging frames to be transferred out, when each workstation has multiple material discharging frames to be transferred out, there is also a priority order within the material discharging frames to be transferred out of the same priority level. For example, the internal priority order of at least one material discharging frame to be transferred out of each workstation can be determined based on the frequency used in history, and the frequency used in history is inversely proportional to the internal priority order.
[0113] S760, generating a target transfer-in material placing frame queue based on the union of the material placing frames to be transferred-in of the target workstation.
[0114] Specifically, the collections are constructed based on the material placing frame to be transferred into of the actual grasping station, the material placing frame to be transferred into of each station between the actual grasping station and the simulated grasping station, and the material placing frame to be transferred into of the simulated grasping station.
[0115] The union of all sets is determined, and based on all the to-be-transferred material placing frames in the union, a target transfer-in material placing frame queue is generated. That is, from the actual grabbing station, the station between the actual grabbing station and the simulated grabbing station, and the respective to-be-transferred material placing frames of the simulated grabbing station, each material placing frame that needs to be transferred is determined as the to-be-transferred material placing frame in the target transfer-in material placing frame queue.
[0116] In an exemplary embodiment, in the queue of the target transfer-in material frame, the order of the target transfer-in material frame is in priority order, and the higher the priority order, the earlier the time of transfer. Specifically, the priority of the material frame to be transferred into the actual grasping station> the priority of the material frame to be transferred into the station between the actual grasping station and the simulated grasping station> the priority of the material frame to be transferred into the simulated grasping station. Furthermore, since there may be multiple material frames to be transferred into each station, when there are multiple material frames to be transferred into each station, there is also a priority order inside the material frames to be transferred into with the same priority. For example, the internal priority order of at least one material frame to be transferred into each station can be determined based on the frequency used in history, and the frequency used in history is proportional to the internal priority order; for another example, the importance of the material frame to be transferred into each station can also be used to determine the internal priority order of at least one material frame to be transferred into each station.
[0117] For example, the material placing frames to be transferred into of the actual grasping station include a and b, the material placing frames to be transferred into of the station between the actual grasping station and the simulated grasping station include c, and the material placing frames to be transferred into of the simulated grasping station include d. For the material placing frames to be transferred into of the actual grasping station, the material placing frame to be transferred into a is used to place the parts A, B, and C to be grasped, and the material placing frame to be transferred into b is used to place the part D to be grasped. It can be seen that the importance of the material placing frame to be transferred into a is greater than that of the material placing frame to be transferred into b. Therefore, the order of the target material placing frame queue finally generated is {a, b, c, d}.
[0118] S780: Send a second material frame scheduling message to the material frame scheduling end based on the target outgoing material frame queue and the target incoming material frame queue.
[0119] The second material frame scheduling message is used to instruct the material frame scheduling end to control the target outgoing material frame queue and the target incoming material frame queue.
[0120] Specifically, based on the target outgoing material frame queue and the target incoming material frame queue, a second material frame scheduling message is generated, that is, based on the material frame number of each material frame to be outgoing material frame in the target outgoing material frame queue and the material frame number of each material frame to be incoming material frame in the target incoming material frame queue, a second material frame scheduling message is generated. The second material frame scheduling message is sent to the material frame scheduling end, and the material frame scheduling end controls the outgoing of the target outgoing material frame queue and the incoming of the target incoming material frame queue.
[0121] In the above embodiment, by determining the actual grasping station, the station between the actual grasping station and the simulated grasping station, and the respective material placing frames to be transferred out and the material placing frames to be transferred in of the simulated grasping station, it is possible to reduce the occurrence of accidents caused by lack of material placing frames at other stations during the period when the parts to be grasped arrive at the actual grasping station from the simulated grasping station, thereby improving the accuracy of material frame scheduling.
[0122] In an exemplary embodiment, based on the target outgoing material frame queue and the target incoming material frame queue, sending the second material frame scheduling message to the material frame scheduling end includes:
[0123] Obtain the number N of the frames to be transferred out in the target transfer-out material frame queue and the number M of the frames to be transferred in the target transfer-in material frame queue; when N is less than or equal to M, select N target transfer-in material frames from the target transfer-in material frame queue according to the priority of the frames to be transferred in the target transfer-in material frame queue; based on the N target transfer-in material frames and the N target transfer-out material frames, send a second material frame scheduling message to the material frame scheduling end.
[0124] Wherein, N and M are integers greater than 0. The second material frame scheduling message is used to instruct the material frame scheduling end to control the transfer of N targets into the material frame and the transfer of N targets out of the material frame.
[0125] Specifically, the number of material frames in the target outgoing material frame queue is N, and the number of material frames in the target incoming material frame queue is M. Since the material frame placement area has limited space, the number of material frames stored in the material frame placement area is limited.
[0126] That is to say, when the number of material frames stored in the material frame placement area is already the maximum, if the number N is less than or equal to M, the number of material frames transferred out cannot meet the number requirements of the material frames transferred in, that is, the material frames to be transferred in the target transferred-in material frame queue cannot all be transferred in. At this time, only according to the priority of the material frames to be transferred in the target transferred-in material frame queue, N material frames to be transferred in can be screened out from the target transferred-in material frame queue. Then, the N material frames to be transferred out in the target transferred-out material frame queue are determined as the N target transferred-in material frames, and based on the N target transferred-in material frames and the N target transferred-out material frames, a second material frame scheduling message is generated and sent to the material frame scheduling end. If the number N is greater than M, it means that the number of material frames transferred out at this time is sufficient to meet the number requirements of the material frames transferred in, and the material frames to be transferred in the target transferred-in material frame queue can all be transferred in.
[0127] When the number of material frames stored in the material frame placement area is not the maximum number, the specific material frame scheduling process can be determined according to pre-set rules based on the relationship between the number N of material frames to be transferred out in the target transfer-out material frame queue and the number M of material frames to be transferred in the target transfer-in material frame queue.
[0128] For example, when the number of material frames stored in the material frame placement area differs from the maximum number by K:
[0129] If M>K, then according to the priority of the unloading frame to be unloaded in the target unloading frame queue, determine MK target unloading frames in the target unloading frame queue. If there is no priority for the unloading frame to be unloaded in the target unloading frame queue, that is, the unloading frame to be unloaded exists in all target workstations, then randomly select MK target unloading frames to be unloaded from the target unloading frame queue.
[0130] If M>K, and the target out-putting frame to be turned out in the put-out frame queue is not to be turned out, then K target in-putting frames in the target in-putting frame queue can be determined according to the priority of the in-putting frames to be turned in in the put-in frame queue.
[0131] If M<K, all targets are directly transferred into the M pending transfer frames in the material placement frame queue.
[0132] In the above embodiment, when the number of material frames stored in the material frame placement area is already the maximum and the number N of material frames to be transferred out in the target transferred-out material frame queue is less than or equal to the number M of material frames to be transferred in the target transferred-in material frame queue, N target transferred-in material frames are screened out from the target transferred-in material frame queue according to the priority of the material frames to be transferred in the target transferred-in material frame queue, so as to avoid the transferred-in material frames exceeding the preset number threshold, thereby improving the efficiency of material frame scheduling.
[0133] In one embodiment, manual scheduling may be limited by human errors and subjective judgments, resulting in supply chain delays or errors on the production line. However, this application basically does not require human intervention, saving labor costs and also avoiding errors caused by human subjectivity during manual scheduling.
[0134] In a specific application embodiment, the parts to be grasped include A, B, C, D, and E, and the working stations include station 3, station 4, and station 5. Station 3 is a simulated grasping station, and station 5 is an actual grasping station. The material frame placement area includes material frames a, b, c, and d, and the maximum number of material frames that can be stored in the material frame placement area is 4. The candidate material frame placement area includes material frames f, g, and h. Material frame f is a non-empty material frame. Several parts D are stored in material frame f, and the internal storage space is not full. Material frames g and h are idle material frames. The material frame scheduling method includes:
[0135] The master control sends the prediction task signal to the control terminal.
[0136] When the part to be grasped arrives at station 3, the control terminal simulates grasping the part to be grasped that is assumed to arrive at station 5. In the process of simulated grasping, the part information of each part to be grasped is obtained, and the grasping position information of the part to be grasped is determined based on the part information, and the grasping of the part to be grasped is simulated based on the grasping position information.
[0137] Further, the target material placing frame a for placing the part A to be picked up and the target material placing frame b for placing the parts B and C to be picked up in the material placing area are determined. However, the material placing frames c and d do not match the part information of the part to be picked up. Therefore, the material placing frames c and d are determined as the material placing frames to be transferred out.
[0138] From the candidate material placing area, select the non-empty material placing frame f with the part D to be picked up, and the idle material placing frame g that matches the part information such as the size, next sequence, and order of the part E to be picked up. The non-empty material placing frame f and the idle material placing frame g are determined as the material placing frames to be transferred in.
[0139] According to the above method, simulate grabbing is performed on the parts to be grabbed at stations 3 and 4 in turn, and the material frames to be transferred out and in are obtained for stations 3 and 4. For example, the material frames to be transferred out of station 3 are c and d, the material frames to be transferred out of station 4 are c and d, the material frame to be transferred in of station 3 is the idle material frame h, and the material frame to be transferred in of station 4 is the idle material frame g.
[0140] Based on the overlapping outgoing material frames c and d in the outgoing material frames of workstation 3, workstation 4 and workstation 5, a target outgoing material frame queue {c, d} is generated; based on the incoming material frames of workstation 3, workstation 4 and workstation 5, a target incoming material frame queue {f, g, h} is generated.
[0141] The number of frames to be transferred out in the target transfer-out frame queue is 2, and the number of frames to be transferred in the target transfer-in frame queue is 3. Therefore, even if all the frames to be transferred out in the target transfer-out frame queue are transferred out, only 2 target transfer-in frames can be transferred in from the target transfer-in frame queue. At this time, the target transfer-out frames are c and d; the target transfer-in frames are f and g.
[0142] Based on the material frame number of the target outgoing material discharge frame and the material frame number of the target incoming material discharge frame, a second material frame scheduling message is generated according to the format agreed with the master control, and the second material frame scheduling message is uploaded to the master control.
[0143] The master control pushes the second material frame scheduling message to the material frame scheduling end, and the material frame scheduling end transfers the target out of the material discharge frames c and d, and transfers the target into the material discharge frames f and g.
[0144] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0145] Based on the same inventive concept, the embodiment of the present application also provides a material frame scheduling device for implementing the material frame scheduling method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more material frame scheduling device embodiments provided below can refer to the limitations of the material frame scheduling method above, and will not be repeated here.
[0146] In an exemplary embodiment, Figure 6 As shown, a material frame scheduling device is provided, including: a simulation grabbing module 200, a determination module 400 and a scheduling module 600, wherein:
[0147] The simulated grasping module 200 is used to simulate the grasping of the parts to be grasped when the parts to be grasped arrive at the simulated grasping station, determine the target material placement frame for placing the parts to be grasped, and the material placement frame to be transferred to. The simulated grasping station is set before the actual grasping station.
[0148] The determination module 400 is used to determine the material placement frame to be transferred out based on the target material placement frame of the parts to be grasped.
[0149] The scheduling module 600 is used to send a first material frame scheduling message to the material frame scheduling end based on the material frame to be transferred out and the material frame to be transferred in. The material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material frame to be transferred out and the transfer in of the material frame to be transferred in.
[0150] In one embodiment, the simulated grasping module 200 is further used to obtain part information of the part to be grasped; based on the part information, determine the grasping position information of the part to be grasped; based on the grasping position information, simulate grasping of the part to be grasped.
[0151] In one embodiment, the simulated grasping module 200 is further used to obtain part information of the part to be grasped; based on the part information, determine a target material placement frame in the material placement area that matches the part information.
[0152] In one of the embodiments, the simulation grasping module 200 is also used to obtain part information of the part to be grasped; when there is a non-empty material frame matching the part information in the candidate material frame placement area, the material frame to be transferred into is determined based on the non-empty material frame, wherein the non-empty material frame contains a part matching the part information of the part to be grasped; when there is no non-empty material frame matching the part information in the candidate material frame placement area, the material frame to be transferred into that matches the part information is determined based on the idle material frames in the candidate material frame placement area.
[0153] In one embodiment, the scheduling module 600 is further used to obtain the number of the outgoing material frame to be transferred out and the incoming material frame number of the incoming material frame to be transferred in; based on the outgoing material frame number and the incoming material frame number, send a first material frame scheduling message to the material frame scheduling end.
[0154] In one of the embodiments, the material frame scheduling device also includes a multi-station processing module, which is used to determine the to-be-turned-out material frame and the to-be-turned-in material frame of the target station before the parts to be grasped arrive at the actual grasping station, the target station including the actual grasping station, the station between the actual grasping station and the simulated grasping station, and the simulated grasping station; based on the intersection of the to-be-turned-out material frames of the target stations, a target turn-out material frame queue is generated; based on the union of the to-be-turned-in material frames of the target stations, a target turn-in material frame queue is generated; based on the target turn-out material frame queue and the target turn-in material frame queue, a second material frame scheduling message is sent to the material frame scheduling end, and the second material frame scheduling message is used to instruct the material frame scheduling end to control the turning out of the target turn-out material frame queue and the turning in of the target turn-in material frame queue.
[0155] In one of the embodiments, the multi-station processing module is also used to obtain the number N of material frames to be transferred out in the target transfer-out material frame queue, and the number M of material frames to be transferred in the target transfer-in material frame queue; when N is less than or equal to M, according to the priority of the material frames to be transferred in the target transfer-in material frame queue, N target transfer-in material frames are screened out from the target transfer-in material frame queue; based on the N target transfer-in material frames and the N target transfer-out material frames, a second material frame scheduling message is sent to the material frame scheduling end.
[0156] Each module in the above-mentioned material frame scheduling device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0157] In an exemplary embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as shown in FIG. Figure 7 As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, near field communication (NFC) or other technologies. When the computer program is executed by the processor, a material frame scheduling method is implemented. The display unit of the computer device is used to form a visually visible picture, which can be a display screen, a projection device or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.
[0158] Those skilled in the art will understand that Figure 7 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0159] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0160] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0161] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0162] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0163] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0164] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A material frame scheduling method, It is characterized in that The method comprises: When the part to be grasped arrives at the simulated grasping station, the part to be grasped is simulated grasped to determine the target material placing frame for placing the part to be grasped and the material placing frame to be transferred, and the simulated grasping station is set before the actual grasping station; Determine a discharge frame to be transferred out based on the target discharge frame of the parts to be grasped; Based on the material frame to be transferred out and the material frame to be transferred in, a first material frame scheduling message is sent to the material frame scheduling end, wherein the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material frame to be transferred out and the transfer in of the material frame to be transferred in.
2. The method according to claim 1, It is characterized in that The simulated grasping of the part to be grasped comprises: Obtaining part information of the part to be grasped; Based on the part information, determine the grasping position information of the part to be grasped; Based on the grasping position information, simulated grasping is performed on the part to be grasped.
3. The method according to claim 1, It is characterized in that The step of determining a target placing frame for placing the part to be grasped includes: Obtaining part information of the part to be grasped; Based on the part information, a target material placing frame in a material placing frame placement area that matches the part information is determined.
4. The method according to claim 1, It is characterized in that Determining the material discharging frame to be transferred to comprises: Obtaining part information of the part to be grasped; In the case that there is a non-empty material placing frame matching the part information in the candidate material placing frame placement area, a material placing frame to be transferred to is determined based on the non-empty material placing frame, wherein a part matching the part information of the part to be grabbed is placed in the non-empty material placing frame; When there is no non-empty material placing frame matching the part information in the candidate material placing frame placement area, a material placing frame to be transferred into that matches the part information is determined based on the free material placing frames in the candidate material placing frame placement area.
5. The method according to claim 1, It is characterized in that The sending a first material frame scheduling message to the material frame scheduling end based on the material frame to be transferred out and the material frame to be transferred in includes: Obtaining the material discharging frame number of the material discharging frame to be discharging out and the material discharging frame number of the material discharging frame to be discharging in; Based on the outgoing material placing frame number and the incoming material placing frame number, a first material placing frame scheduling message is sent to the material placing frame scheduling end.
6. The method according to any one of claims 1 to 5, It is characterized in that The method further comprises: Before the part to be grasped arrives at the actual grasping station, determine the material discharging frame to be transferred out and the material discharging frame to be transferred in of the target station, wherein the target station includes the actual grasping station, the station between the actual grasping station and the simulated grasping station, and the simulated grasping station; Generate a target outgoing material discharging frame queue based on the intersection of the to-be-outgoing material discharging frames of the target workstation; Generate a target transfer-in material placing frame queue based on the union of the to-be-transferred material placing frames of the target workstation; Based on the target outgoing material frame queue and the target incoming material frame queue, a second material frame scheduling message is sent to the material frame scheduling end, wherein the second material frame scheduling message is used to instruct the material frame scheduling end to control the outgoing of the target outgoing material frame queue and the incoming of the target incoming material frame queue.
7. The method according to claim 6, It is characterized in that The sending a second material frame scheduling message to the material frame scheduling end based on the target outgoing material frame queue and the target incoming material frame queue includes: Obtain the number N of material-dispensing frames to be transferred out in the target material-dispensing-out frame queue and the number M of material-dispensing frames to be transferred in the target material-dispensing-in frame queue; When N is less than or equal to M, N target transfer-in placing frames are selected from the target transfer-in placing frame queue according to the priorities of the frames to be transferred-in placing frames in the target transfer-in placing frame queue; Based on the N target entry release frames and the N target exit release frames, a second frame scheduling message is sent to the frame scheduling end, and the second frame scheduling message is used to instruct the frame scheduling end to control the entry of the N target entry release frames and the exit of the N target exit release frames.
8. A material frame scheduling device, It is characterized in that The device comprises: A simulated grasping module is used to simulate grasping of the part to be grasped when the part to be grasped arrives at the simulated grasping station, determine a target material placing frame for placing the part to be grasped, and a material placing frame to be transferred into, and the simulated grasping station is arranged before the actual grasping station; A determination module, used for determining a material discharging frame to be transferred out based on a target material discharging frame of the parts to be grasped; The scheduling module is used to send a first material frame scheduling message to the material frame scheduling end based on the material frame to be transferred out and the material frame to be transferred in, wherein the material frame scheduling message is used to instruct the material frame scheduling end to control the transfer out of the material frame to be transferred out and the transfer in of the material frame to be transferred in.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Distribution scheduling method and device, storage medium and electronic equipment
CN112907011A
Automatic charging basket switching equipment and method
CN115285710A
Control method for grabbing parts from material frame under visual guidance of robot
CN116061183A
Material circulation system for automatically feeding and taking materials
CN118358932A
Logistics area management method, logistics area management system, and non-transitory computer-readable storage medium
US20230289677A1