Prefabricated bridge deck system structure of high-speed maglev track beam

Through the prefabricated assembled bridge deck system structure of high-speed maglev track beams, the prefabricated assembly method is used to improve construction accuracy and efficiency, solving the problems of high accuracy and cost in traditional bridge deck construction, and meeting the accuracy and comfort requirements of high-speed maglev traffic.

CN119061790APending Publication Date: 2024-12-03HIWING TECH ACAD OF CASIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310646549.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The construction of traditional railway bridge deck systems is difficult to meet the accuracy requirements of vehicle magnets and track beams in high-speed maglev traffic, resulting in unstable magnetic levitation force and uncomfortable vehicle driving, and low construction accuracy and high cost.

Method used

Adopt a prefabricated bridge deck system structure of high-speed magnetic levitation track beam, including module installation substrate, module auxiliary support table, slide rail, sensor laying bracket, connector and grouting sleeve, and improve construction accuracy and efficiency through prefabricated assembly to meet the needs of The accuracy and comfort requirements of high-speed electric maglev trains.

Benefits of technology

It improves the quality and construction efficiency of bridge deck casting, reduces costs, meets the accuracy and comfort requirements of vehicles in high-speed maglev traffic, and solves the problems of quality control difficulties and finished product quality defects in traditional construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061790A_ABST
    Figure CN119061790A_ABST
Patent Text Reader

Abstract

The invention discloses a high-speed magnetic levitation track beam prefabricated assembly type bridge deck system structure which comprises a module installation base plate, a module auxiliary supporting table, a sliding rail, a sensor laying support, a first connecting piece, a grouting sleeve, a second connecting piece and a third connecting piece. The module mounting base plates are sequentially fixed to the side wall of a track beam through first connecting pieces in the direction of the track beam and used for mounting a ground module, the module auxiliary supporting tables are sequentially arranged at the position, close to the side wall, of the bottom of the track beam in the direction of the track beam and used for supporting the ground module, and the sliding rail is arranged at the bottom of the track beam. The sensor laying support is fixed to the inner side wall of the sliding rail through the second connecting piece, grouting sleeves are embedded in the module auxiliary supporting table and the sliding rail and provided with grouting holes and grout outlet holes, and the third connecting piece is arranged in the track beam and matched with the grouting sleeves to achieve fixation of the module auxiliary supporting table, the sliding rail and the track beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of high-speed maglev transportation, and in particular to a prefabricated assembled bridge deck system structure of a high-speed maglev track beam. Background Art

[0002] Most of the traditional railway bridge deck construction adopts the technology of on-site formwork casting on beams. The cast-in-place construction technology requires a large amount of formwork and template materials and has a low turnover rate. At the same time, it has high technical requirements for construction operators and is difficult to meet higher precision requirements.

[0003] In the field of high-speed maglev transportation, the distance between the vehicle magnet and the magnet on the track beam directly affects the change of magnetic buoyancy force. In order to ensure the smooth development of lift and resistance of the vehicle when it takes off and lands, and at the same time ensure the riding comfort of the vehicle in the middle section of the line, very strict requirements are placed on the construction accuracy of the entire bridge deck system.

[0004] However, it is difficult to meet the above precision requirements by cast-in-place construction of bridge decks, and the cost of subsequent rectification is very huge. Summary of the invention

[0005] The invention provides a high-speed maglev track beam prefabricated assembled bridge deck system structure, which can solve the technical problems in the prior art.

[0006] The present invention provides a prefabricated and assembled bridge deck structure of a high-speed maglev track beam, wherein the bridge deck structure includes: a module installation base plate, a module auxiliary support platform, a slide rail, a sensor laying bracket, a first connecting piece, a grouting sleeve, a second connecting piece and a third connecting piece. The module installation base plate is fixed to the side wall of the track beam in sequence along the direction of the track beam through the first connecting piece for installing a ground module. The module auxiliary support platform is sequentially arranged at a position close to the side wall at the bottom of the track beam along the direction of the track beam for supporting the ground module. The slide rail is arranged at the bottom of the track beam. The sensor laying bracket is fixed to the inner side wall of the slide rail through the second connecting piece. The module auxiliary support platform and the slide rail are pre-embedded with the grouting sleeve, and the grouting sleeve is provided with a grouting hole and a grouting outlet hole. The third connecting piece is arranged in the track beam and cooperates with the grouting sleeve to realize the fixation of the module auxiliary support platform and the slide rail to the track beam.

[0007] Preferably, the first connecting member includes a first sleeve and a first bolt, the first sleeve is embedded in the track beam, and the first bolt passes through the module mounting base plate and cooperates with the first sleeve to fix the module mounting base plate.

[0008] Preferably, the first connecting member further includes a first gasket disposed between the head of the first bolt and the module mounting base plate.

[0009] Preferably, the second connecting member includes a second sleeve and a second bolt, the second sleeve is pre-buried in the slide rail, and the second bolt passes through the sensor installation bracket and cooperates with the second sleeve to fix the sensor installation bracket.

[0010] Preferably, the second connecting member further includes a second gasket disposed between the head of the second bolt and the sensor mounting bracket.

[0011] Preferably, the third connecting member is a steel bar.

[0012] Preferably, the bridge deck structure further includes a leveling layer, which is arranged between the track beam and the track.

[0013] Preferably, the bridge deck structure further includes a sealing ring, which is arranged between the grouting sleeve and the leveling layer.

[0014] The above technical solution solves the problems of difficult quality control, many quality defects of finished products and long construction period in the traditional bridge deck casting process, improves the quality of bridge deck casting and work efficiency, reduces costs, and can meet the precision and comfort requirements of high-speed electric maglev trains. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The included drawings are used to provide a further understanding of the embodiments of the present invention, which constitute a part of the specification, are used to illustrate the embodiments of the present invention, and together with the text description, explain the principles of the present invention. Obviously, the drawings in the following description are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0016] Figure 1 A schematic diagram of a prefabricated and assembled bridge deck system structure of a high-speed maglev track beam according to an embodiment of the present invention is shown;

[0017] Figure 2 A schematic diagram of a bridge deck connection part according to an embodiment of the present invention is shown;

[0018] Figure 3 A schematic diagram of connecting a module mounting substrate according to an embodiment of the present invention is shown;

[0019] Figure 4 A schematic diagram showing the connection between a slide rail and an auxiliary support platform according to an embodiment of the present invention is shown;

[0020] Figure 5 A schematic diagram of sensor installation support connection according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0021] It should be noted that, in the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0023] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, numerical expressions and numerical values ​​do not limit the scope of the present invention. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.

[0024] like Figure 1-5As shown, an embodiment of the present invention provides a prefabricated assembled bridge deck structure of a high-speed maglev track beam, wherein the bridge deck structure includes: a module mounting base plate 1, a module auxiliary support platform 2, a slide rail 3, a sensor laying bracket 4, a first connecting member, a grouting sleeve 8, a second connecting member and a third connecting member 11, wherein the module mounting base plate 1 is fixed to the side wall of the track beam in sequence along the direction of the track beam through the first connecting member for installing a ground module, the module auxiliary support platform 2 is sequentially arranged at a position close to the side wall at the bottom of the track beam along the direction of the track beam for supporting the ground module, the slide rail 3 is arranged at the bottom of the track beam, the sensor laying bracket 4 is fixed to the inner wall of the slide rail 3 through the second connecting member, the module auxiliary support platform 2 and the slide rail 3 are pre-embedded with the grouting sleeve 8, the grouting sleeve 8 is provided with a grouting hole and a grouting outlet hole, and the third connecting member 11 is arranged in the track beam and cooperates with the grouting sleeve 8 to realize the fixation of the module auxiliary support platform 2 and the slide rail 3 to the track beam.

[0025] The above technical solution solves the problems of difficult quality control, many quality defects of finished products and long construction period in the traditional bridge deck casting process, improves the quality of bridge deck casting and work efficiency, reduces costs, and can meet the precision and comfort requirements of high-speed electric maglev trains.

[0026] In the present invention, the module installation base plate 1 can be installed by workshop prefabrication-on-site assembly. For example, the module installation base plate 1 can be prefabricated in two lengths of 3m and 6m to meet the installation requirements of 9m, 24m, and 30m track beams.

[0027] According to one embodiment of the present invention, the first connecting member includes a first sleeve 5 and a first bolt 6, the first sleeve 5 is embedded in the track beam, and the first bolt 6 passes through the module mounting base plate 1 and cooperates with the first sleeve 5 to fix the module mounting base plate 1.

[0028] The first sleeve 5 can be pre-buried at a predetermined position during the prefabrication of the track beam. The diameter of the bolt hole on the module mounting base plate 1 is slightly larger than the diameter of the first bolt 6 to facilitate secondary fine adjustment.

[0029] That is, the reserved hole diameter on the module mounting base plate is slightly larger than the bolt diameter, and the range of secondary fine adjustment is determined by the margin.

[0030] According to an embodiment of the present invention, the first connecting member further comprises a first gasket 7 disposed between the head of the first bolt 6 and the module mounting base plate 1 .

[0031] Thereby, the module mounting substrate can be better fixed.

[0032] According to one embodiment of the present invention, the second connecting member includes a second sleeve 12 and a second bolt 13, the second sleeve 12 is pre-embedded in the slide rail 3, and the second bolt 13 passes through the sensor laying bracket 4 and cooperates with the second sleeve 12 to fix the sensor laying bracket 4.

[0033] By installing the sensor laying bracket through the sleeve, the installation accuracy and installation speed can be increased.

[0034] According to an embodiment of the present invention, the second connecting member further includes a second gasket, which is disposed between the head of the second bolt 13 and the sensor installation bracket 4 .

[0035] In this way, the sensor mounting bracket can be better fixed.

[0036] According to an embodiment of the present invention, the third connecting member 11 is a steel bar.

[0037] According to one embodiment of the present invention, the bridge deck structure further includes a leveling layer 10 disposed between the track beam and the track 3 .

[0038] Therefore, temporary sealing is performed between the side wall of the slide rail and the leveling layer before grouting, which can ensure that the track beam-leveling layer-slide rail form a whole after the grouting is completed.

[0039] According to an embodiment of the present invention, the bridge deck structure further includes a sealing ring 9 disposed between the grouting sleeve 8 and the leveling layer 10 .

[0040] In the present invention, the module auxiliary support platform 2 can be made of a prefabricated reinforced concrete block, in which a grouting sleeve 8 is pre-buried, and a grouting hole and a grouting hole are reserved on the side close to the center line of the line. During the prefabrication of the track beam, steel bars (vertical connecting steel bars) can be reserved at the corresponding positions of the module auxiliary support platform 2, and the installation is carried out by grouting connection (for example, grouting is carried out from the grouting hole, and grouting is stopped after grouting from the grouting hole, and the hole is sealed).

[0041] The module auxiliary support platform is used for auxiliary force bearing. The main force bearing mode is that the top surface is subjected to the pressure of the motor module. By ensuring the flatness of the top surface when prefabricating the blocks, the top surface elevation can be ensured to meet the design requirements during assembly.

[0042] For example, the slide rail 3 can be made of a reinforced concrete rectangular cross-section, which can meet the rigidity requirements and provide sufficient top surface driving space. The slide rail 3 can be made into components of three lengths of 3m, 6m, 10m, and 12m by means of segmented prefabrication to meet the installation requirements of 9m, 24m, and 30m track beams, while facilitating lifting and transportation. The grouting sleeve 8 is embedded in the prefabricated reinforced concrete component, and the grouting hole and the grouting hole are reserved. The second sleeve is reserved at the position of the slide rail where the sensor laying bracket needs to be installed. During installation, the leveling layer between the beam body and the slide rail is first constructed, and then the prefabricated part is adjusted to the designed position, and then grouting is carried out from the grouting hole. After the grouting hole is discharged, the grouting is stopped and the hole is sealed.

[0043] That is, when the track beam is prefabricated, the bolt sleeves required for mounting the module installation base plate, the auxiliary support platform and the vertical steel bars required for connecting the slide rails are pre-embedded. At the same time, when the slide rails are prefabricated, the bolt sleeves required for installing the sensor bracket are pre-embedded.

[0044] It can be seen from the above embodiments that the high-speed maglev track beam prefabricated assembled bridge deck system structure described in the present invention has at least the following advantages compared with the prior art:

[0045] 1. The bridge deck structure is prefabricated and assembled as a whole, which can significantly improve the construction quality and shorten the construction period, and has excellent engineering application prospects;

[0046] 2. The module installation base plate of the assembled bridge deck system can be fine-tuned to provide greater redundancy for module installation, increase construction accuracy, and facilitate maintenance;

[0047] 3. The slide rails and support platforms of the prefabricated bridge deck are installed by connecting the leveling layer + grouting method, which increases the adjustability of the elevation and solves the disadvantage of the formwork cast-in-place method that the elevation of the slide rails and support platforms is difficult to control due to the uneven beam surface;

[0048] 4. The assembled bridge deck sensor laying bracket is installed through a reserved sleeve to increase installation accuracy and speed;

[0049] 5. The precast concrete parts are processed on site to meet the flatness requirements of the module installation base plate and the top surface of the slide rail, ensuring the smooth development of lift and resistance when the vehicle floats and lands, and the driving comfort of the vehicles in the middle section of the line.

[0050] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention. The directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.

[0051] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.

[0052] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of the present invention.

[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A high-speed maglev track beam prefabricated assembly bridge deck structure, characterized in that: The bridge deck system structure comprises: a module installation base plate (1), a module auxiliary support platform (2), a slide rail (3), a sensor installation bracket (4), a first connecting piece, a grouting sleeve (8), a second connecting piece and a third connecting piece (11); the module installation base plate (1) is fixed to the side wall of the track beam in sequence along the direction of the track beam through the first connecting piece for installing the ground module; the module auxiliary support platform (2) is arranged in sequence along the direction of the track beam at a position close to the side wall at the bottom of the track beam for supporting the ground module; the slide rail (3) is arranged at the bottom of the track beam; the sensor installation bracket (4) is fixed to the inner side wall of the slide rail (3) through the second connecting piece; the module auxiliary support platform (2) and the slide rail (3) are pre-buried with the grouting sleeve (8); the grouting sleeve (8) is provided with a grouting hole and a grouting outlet hole; the third connecting piece (11) is arranged in the track beam and cooperates with the grouting sleeve (8) to achieve the fixing of the module auxiliary support platform (2) and the slide rail (3) to the track beam.

2. The bridge deck structure according to claim 1, characterized in that: The first connecting member comprises a first sleeve (5) and a first bolt (6); the first sleeve (5) is pre-buried in the track beam; the first bolt (6) passes through the module mounting base plate (1) and cooperates with the first sleeve (5) to achieve fixation of the module mounting base plate (1).

3. The bridge deck structure according to claim 2, characterized in that: The first connecting member also includes a first gasket (7) which is arranged between the head of the first bolt (6) and the module mounting base plate (1).

4. The bridge deck structure according to claim 1, characterized in that: The second connecting member comprises a second sleeve (12) and a second bolt (13); the second sleeve (12) is pre-buried in the slide rail (3); the second bolt (13) passes through the sensor installation bracket (4) and cooperates with the second sleeve (12) to fix the sensor installation bracket (4).

5. The bridge deck structure according to claim 4, characterized in that: The second connecting member also includes a second gasket, which is arranged between the head of the second bolt (13) and the sensor installation bracket (4).

6. The bridge deck structure according to any one of claims 1 to 5, characterized in that: The third connecting member (11) is a steel bar.

7. The bridge deck structure according to claim 6, characterized in that: The bridge deck structure also includes a leveling layer (10) arranged between the track beam and the track (3).

8. The bridge deck structure according to claim 7, characterized in that: The bridge deck structure also includes a sealing ring (9) which is arranged between the grouting sleeve (8) and the leveling layer (10).