Double-row steel sheet pile enclosure structure

By using a detachable pull rod device to adjust the spacing between steel sheet pile walls in the double-row steel sheet pile pile enclosure structure, the problems of falling off steel connections and unrecyclable concrete beam connections in the prior art are solved, and flexible adjustment of steel sheet pile enclosure structure and Efficient support effect.

CN119061876AActive Publication Date: 2024-12-03POWERCHINA HUADONG ENG CORP LTD

Patent Information

Application Number
CN202411388872.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-12-03
Estimated Expiration
2044-10-08

AI Technical Summary

Technical Problem

In the actual working state of the existing double-row steel sheet pile enclosure structure, the steel connections are prone to falling off and offset, resulting in inconsistent deformation and difficult to recycle concrete beam connections, which limits its application scope.

Method used

A flexible disassembleable tie rod device is adopted to adjust the axial force of the tie rod by adjusting the components, adjust the spacing between the steel sheet pile walls, and form an I-shaped connection structure to ensure the coordinated deformation and overall stiffness of the front and rear steel sheet piles.

Benefits of technology

The flexible adjustment and efficient support of the double-row steel sheet pile enclosure structure are realized, which improves the safety and stability of the structure, and avoids the unrecyclable problem of steel sheet piles and expands the application scope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061876A_ABST
    Figure CN119061876A_ABST
Patent Text Reader

Abstract

The double-row steel sheet pile enclosure structure comprises a first steel sheet pile wall and a second steel sheet pile wall which are arranged in parallel, a first reinforcing device is arranged on the first steel sheet pile wall, a second reinforcing device is arranged on the second steel sheet pile wall, and a pull rod device is arranged between the first steel sheet pile wall and the second steel sheet pile wall. The first reinforcing device and the second reinforcing device are fixedly connected with the pull rod device to form the I-shaped double-row steel sheet pile enclosure structure, and the pull rod device comprises a pull rod and an adjusting assembly assembled with the pull rod. The pull rod device adjusts the axial force of the pull rod through an adjusting assembly so as to adjust the distance between the first steel sheet pile wall and the second steel sheet pile wall. The front-row steel sheet pile walls and the rear-row steel sheet pile walls are connected through the reinforcing devices and the pull rod devices, it is ensured that the steel sheet pile walls jointly resist lateral soil pressure, the overall rigidity of the structure is enhanced, the distance between the front-row steel sheet pile walls and the rear-row steel sheet pile walls is accurately adjusted by adjusting pull rod axial force, synchronism of the double-row steel sheet pile walls is improved, and the overall supporting effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of foundation pit engineering, and in particular to a double-row steel sheet pile retaining structure. Background Art

[0002] As a common retaining structure, double-row steel sheet piles are widely used in many fields, such as river bank protection, wharf breakwaters, bridge foundation cofferdams and temporary support of foundation pits. They have been recognized by the engineering community for their excellent support effects, efficient and convenient construction, and green and pollution-free nature. They have considerable application prospects and practical value.

[0003] The connection structure of the conventional double-row steel sheet pile enclosure structure requires welding of steel sections or pouring of concrete beams to give the double-row steel sheet pile wall good strength and integrity. However, in actual working conditions, the double-row steel sheet piles will fall off and deviate when connected with steel sections, which will weaken the steel section connection effect, and then make the deformation of the front and rear rows of piles uncoordinated, the deformation displacement of the front row of piles is too large, and the rear row of piles cannot fully exert their support performance, which greatly reduces the safety and stability of the overall structure; and the use of concrete beams for connection can easily lead to the inability to recycle steel sheet piles, which is not conducive to economic and environmental protection, and limits the application scope of double-row steel sheet piles.

[0004] Based on this, it is urgent to propose a double-row steel sheet pile retaining structure to solve the limitations of the existing technology. Summary of the invention

[0005] The purpose of the present application is to provide a double-row steel sheet pile enclosure structure which can be flexibly disassembled and can accurately adjust the distance between the front and rear rows of steel sheet pile walls.

[0006] To achieve the above-mentioned objectives, the present application is implemented through the following technical solutions: a double-row steel sheet pile enclosure structure, comprising a first steel sheet pile wall and a second steel sheet pile wall arranged in parallel, a first reinforcement device is arranged on the first steel sheet pile wall, a second reinforcement device is arranged on the second steel sheet pile wall, a tie rod device is arranged between the first steel sheet pile wall and the second steel sheet pile wall, the first reinforcement device and the second reinforcement device are respectively fixedly connected to the tie rod device to form an I-shaped double-row steel sheet pile enclosure structure, the tie rod device comprises a tie rod and an adjustment component assembled with the tie rod, and the tie rod device adjusts the axial force of the tie rod through the adjustment component to adjust the distance between the first steel sheet pile wall and the second steel sheet pile wall.

[0007] Further, the adjustment component is a detachably assembled adjustment sleeve, and the pull rod device includes a first pull rod, an adjustment sleeve and a second pull rod that are detachably connected in sequence; the first end of the first pull rod is assembled and connected to the first reinforcement device, and the second end of the first pull rod is provided with a first external thread to be adapted for assembly with the adjustment sleeve; the first end of the second pull rod is assembled and connected to the second reinforcement device, and the second end of the second pull rod is provided with a second external thread to be adapted for assembly with the adjustment sleeve.

[0008] Furthermore, the adjusting sleeve includes a rotating sleeve and a fixed sleeve, the fixed sleeve is provided with an axial force gauge, the fixed sleeve and the rotating sleeve are detachably connected via a screw arranged in the fixed sleeve, and the inner wall of the rotating sleeve is provided with a first internal thread adapted to the first external thread and a second internal thread adapted to the screw.

[0009] Furthermore, at least two rotating rods are provided on the outer wall surface of the rotating sleeve and / or the fixed sleeve.

[0010] Furthermore, the axial force meter is fixed in the fixed sleeve by bolts, and the wire of the axial force meter passes through an opening on the fixed sleeve and extends out of the fixed sleeve.

[0011] Further, the first reinforcement device is composed of a number of first purlins connected end to end, the adjacent first purlins are connected and fixed by first connecting channels inserted and overlapped therein through first bolts, a first assembly hole is provided on the flange of the part of the first purlin away from the first connecting channel steel, and the first tie rod passes through the first assembly hole to be assembled with the first reinforcement device; the second reinforcement device is composed of a number of second purlins connected end to end, the adjacent second purlins are connected and fixed by second connecting channels inserted and overlapped therein through second bolts, a second assembly hole is provided on the flange of the part of the second purlin away from the second connecting channel steel, and the second tie rod passes through the second assembly hole to be assembled with the second reinforcement device; the center points of the first assembly hole and the second assembly hole are located on the same straight line.

[0012] Furthermore, a plurality of first corbels are arranged on the surface of the web of the first steel sheet pile wall to support the first reinforcement device, a plurality of second corbels are arranged on the surface of the web of the second steel sheet pile wall to support the second reinforcement device, and a plurality of purlin support plates are arranged at the first / second purlin gaps of the first reinforcement device and / or the second reinforcement device.

[0013] Furthermore, the distance between the first connecting channel steel of the first reinforcement device and / or the second connecting channel steel of the second reinforcement device and the nearest tie rod is 1 / 4 to 1 / 3 of the distance between the adjacent tie rods located on both sides thereof.

[0014] Furthermore, the first pull rod passes through the first assembly hole and is assembled and fixed to the first reinforcement device by a first nut, and a first pad is provided between the first nut and the first assembly hole; the second pull rod passes through the second assembly hole and is assembled and fixed to the second reinforcement device by a second nut, and a second pad is provided between the second nut and the second assembly hole.

[0015] Furthermore, a first through hole for the first tie rod to pass through is provided at a position of the first steel sheet pile corresponding to the first assembly hole, and / or a second through hole for the second tie rod to pass through is provided at a position of the second steel sheet pile corresponding to the second assembly hole.

[0016] The invention application has the following beneficial technical effects: the double-row steel sheet pile wall and the reinforcement device are connected as a whole through a tie rod device, and the tie rod device adjusts the spacing between the double-row steel sheet pile walls by adjusting the axial force of the tie rod, and the structure is simple and the support is reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0018] Figure 1 A top view of an exemplary double-row pile enclosure structure of the present application; Figure 2 for Figure 1 A side view of the double row pile enclosure structure shown; Figure 3 for Figure 1 A front view of the assembly of the first steel sheet pile wall and the first reinforcement device is shown; Figure 4 for Figure 1 A front view of the assembly of the second steel sheet pile wall and the second reinforcement device shown; Figure 5 is a side view of an exemplary first perimeter purlin and a first connecting channel steel / a second perimeter purlin and a second connecting channel steel; Figure 6 A top view of an exemplary adjustment sleeve of the present application; Figure 7 A side view of an exemplary adjustment sleeve of the present application; Figure 8 A top view of another exemplary double-row pile enclosure structure of the present application; Fig. 9 A top view of another exemplary double-row pile enclosure structure of the present application.

[0019] Figure Number: 100. Double-row steel sheet pile enclosure structure 1. First steel sheet pile wall 10, first steel sheet pile 11, first through hole 2. First reinforcement device 20, first nut 21, first pad 22. First external thread of first pull rod 220 23. First purlin 231, first bolt 233, first fastening bolt 234, first purlin support plate 235, first corbel 24. First connecting channel steel 25. First assembly hole 3. Second steel sheet pile wall 30, second steel sheet pile 31, second through hole 4. Second reinforcement device 40, second nut 41, second pad 42. second pull rod 420. second external thread 43, second purlin 430, second connecting channel steel 431, second bolt 432, second assembly hole 433, second fastening bolt 434, second purlin support plate 435, second corbel 436, locking screw 44, adjusting sleeve 440, rotating sleeve 441 first rotating rod 442, fixed sleeve 443, second rotating rod 444, screw 445 axial force gauge 4451, bolt 4452, wire DETAILED DESCRIPTION

[0020] Here, exemplary embodiments will be described in detail, and examples thereof are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The implementation methods described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are only examples of devices and methods consistent with some aspects of the present application.

[0021] The terms used in this application are only for the purpose of describing specific embodiments and are not intended to limit this application. Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which the invention belongs. Similar words such as "one" or "one" used in the specification and claims of this application do not indicate a quantitative limitation, but rather indicate the existence of at least one. Similar words such as "include" or "comprise" mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. Similar words such as "connect" or "connected" are not limited to physical or mechanical connections, and may include electrical connections, whether direct or indirect.

[0022] The singular forms "a", "said" and "the" used in this specification and the appended claims are also intended to include the plural forms, unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more of the associated listed items.

[0023] See also Figures 1 to 9 As shown, a double-row steel sheet pile enclosure structure 100 includes a first steel sheet pile wall 1 and a second steel sheet pile wall 3 arranged in parallel, a first reinforcement device 2 is arranged on the first steel sheet pile wall 1, a second reinforcement device 4 is arranged on the second steel sheet pile wall 3, and a tie rod device is arranged between the first steel sheet pile wall 1 and the second steel sheet pile wall 3. The first reinforcement device 2 and the second reinforcement device 4 are respectively fixedly connected with the tie rod device to form an I-shaped double-row steel sheet pile enclosure structure 100. The tie rod device includes a tie rod and an adjustment component assembled with the tie rod, and the tie rod device adjusts the axial force of the tie rod through the adjustment component to adjust the distance between the first steel sheet pile wall 1 and the second steel sheet pile wall 3. In this way, the first steel sheet pile wall 1, the second steel sheet pile wall 3 and the soil between the piles form a portal frame type enclosure structure with greater overall rigidity, which effectively resists lateral soil pressure and improves the support effect. The first steel sheet pile wall 1 of the present application is formed by assembling a plurality of first steel sheet piles 10 that are engaged end to end, and the second steel sheet pile wall 3 is formed by assembling a plurality of second steel sheet piles 30 that are engaged end to end. In the embodiment of the present application, the steel sheet piles used in the same steel sheet pile wall are made of a single integrally formed Larsen steel sheet pile.

[0024] Please refer to Figure 1 and Figure 8 As shown, specifically, the first reinforcement device 2 is fixed to the web surface of the first steel sheet pile 10 by a plurality of groups of two first fastening bolts 233. The second reinforcement device 4 is fixed to the web surface of the second steel sheet pile by a plurality of groups of two second fastening bolts 433. When the first reinforcement device and the second reinforcement device are located on the inner side of the first steel sheet pile wall and the second steel sheet pile wall, the corresponding steel sheet pile at the outermost end is connected to the purlin by fastening bolts, and a locking screw 436 is further provided to lock the two, thereby enhancing the overall support effect of the first reinforcement device and the second reinforcement device.

[0025] The adjustment assembly is a detachably assembled adjustment sleeve 44. The pull rod device includes a first pull rod 22, an adjustment sleeve 44 and a second pull rod 42 which are detachably connected in sequence; the first end of the first pull rod 22 is assembled and connected with the first reinforcement device 2. The second end of the first pull rod 22 is provided with a first external thread 220 which is adapted to be assembled with the adjustment sleeve 44; the first end of the second pull rod 42 is assembled and connected with the second reinforcement device 4, and the second end of the second pull rod 42 is provided with a second external thread 420 which is adapted to be assembled with the adjustment sleeve 44.

[0026] The adjusting sleeve 44 includes a rotating sleeve 440 and a fixed sleeve 442, and an axial force gauge 445 is provided in the fixed sleeve 442. The fixed sleeve 442 and the rotating sleeve 440 are detachably connected through a screw 444 provided in the fixed sleeve 442, and the screw 444 is provided with a thread. The inner wall of the rotating sleeve 440 is provided with a first internal thread adapted to the first external thread 220 and a second internal thread adapted to the screw 444.

[0027] At least two rotating rods are provided on the outer wall surface of the rotating sleeve 440 and / or the fixed sleeve 442. The axial force gauge 445 is fixed in the fixed sleeve 442 by a bolt 4451, and the wire 4452 of the axial force gauge passes through the opening on the fixed sleeve and extends out of the fixed sleeve to communicate with the outside world. Specifically, the axial force gauge 445 is arranged inside the fixed sleeve 442 at one end close to the second external thread 420. In an exemplary embodiment of the present application, four first rotating rods 441 are arranged at equal intervals on the outer wall surface of the rotating sleeve 440, and four second rotating rods 443 are arranged at equal intervals on the outer wall surface of the fixed sleeve 442. The fixed sleeve 442 is tightened with the second pull rod 42 by sleeve-fitting the rod member on the second rotating rod 443, thereby ensuring that the end of the second external thread 420 of the second pull rod is in close contact with the axial force gauge 445. By rotating the rotating sleeve 440 by sleeve-connecting the rod on the first rotating rod 441, the distance between the fixed sleeve 442 and the first tie rod 22 can be adjusted. In this way, on the basis of flexibly adjusting the distance between the front and rear rows of piles by rotating the sleeve, the axial force of the tie rod can be measured in real time by using the axial force meter, so as to more accurately and quantitatively adjust the force degree of the tie rod, so that the tie rod is tightened to connect the first and second steel sheet piles, transfer the load and effectively control the deformation displacement of the first and second steel sheet piles; at the same time, the adjusting sleeve first fixes the end of the tie rod of the second steel sheet pile by tightening the fixed sleeve, so in actual construction, it is only necessary to directly rotate the rotating sleeve to connect with the tie rod of the first steel sheet pile, and adjust the distance between the front and rear rows of piles on the basis of ensuring the reliability of the tie rod connection, which is conducive to flexible and simple construction and improves construction efficiency. As a routine, the first steel sheet pile is located in the front row and the second steel sheet pile is located in the back row.

[0028] The first reinforcement device 2 is composed of a plurality of first purlins 23 connected end to end, and the adjacent first purlins 23 are connected and fixed by first connecting channel steels 24 inserted and overlapped therein through first bolts 231, and a first assembly hole 25 is provided on the flange of the part of the first purlin 23 away from the first connecting channel steel 24, and the first tie rod 22 passes through the first assembly hole 25 to be assembled with the first reinforcement device 2; the second reinforcement device 4 is composed of a plurality of second purlins 43 connected end to end, and the adjacent second purlins 43 are connected and fixed by second connecting channel steels 430 inserted and overlapped therein through second bolts 431, and a second assembly hole 432 is provided on the flange of the part of the second purlin 43 away from the second connecting channel steel 430, and the second tie rod 42 passes through the second assembly hole 432 to be assembled with the second reinforcement device 4; the center of the first assembly hole 25 and the second assembly hole 432 are located on the same straight line. As mentioned above, the plurality of tie rod devices of the double-row steel sheet pile enclosure structure 100 of the present application are arranged at intervals and parallel to each other along the direction of the first steel sheet pile wall 1 and the second steel sheet pile wall 3. In this way, it can be ensured that the load of the steel sheet pile wall can be effectively transmitted to the tie rod through the surrounding purlin, avoiding the tie rod directly connected to the steel sheet pile, resulting in local stress concentration and damage to the steel sheet pile.

[0029] Specifically, the first purlin and the first connecting channel steel used in the first reinforcement device and the second reinforcement device are channel steels of different specifications, and the cross-sectional size of the channel steel used in the first purlin is larger than the cross-sectional size of the channel steel of the first connecting channel steel. Each connecting channel steel of the first reinforcement device 2 is fixed to the web surface of the end of the adjacent first purlin 23 channel steel by a first bolt 231, thereby connecting two adjacent first purlins. The number of the first bolts used is adjusted according to different construction requirements. In this way, a purlin with a strong connection and high stability is formed, which can more effectively transfer the load on the steel sheet pile wall. In the embodiment of the present application, the second reinforcement device has the same assembly method and structure as the first reinforcement, which will not be repeated here.

[0030] A plurality of first corbels 235 are arranged on the surface of the web of the first steel sheet pile to support the first reinforcement device 2, and a plurality of first purlin support plates 234 are arranged at the gap of the first purlin 23 of the first reinforcement device 2. The first purlin support plates 234 can bear part of the deadweight of the first reinforcement device 2 to prevent the channel steel from crushing the tie rod. By arranging the first corbels 235, when the first tie rod 22 is forced to squeeze the first purlin 23 channel steel, the first purlin 23 channel steel can be limited to a certain extent by means of connecting bolts to reduce the stability of the purlin; and the first reinforcement device 2 makes the first steel sheet piles that are interlocked and connected to each other firmly locked into a whole, further improving the integrity of the first steel sheet pile wall 1, and effectively coordinates the deformation displacement of the first steel sheet piles when the first steel sheet pile wall 1 is subjected to lateral soil pressure, so as to keep the first steel sheet piles under stress in the same straight line.

[0031] A plurality of second corbels 435 are provided on the web surface of the second steel sheet pile 30 to support the second reinforcement device 4, and a plurality of second purlin 43 support plates are provided in the gaps of the second purlin 43 of the second reinforcement device 4. By providing the second corbels 435 and the second purlin 43 support plates, part of the deadweight of the second reinforcement device 4 can be borne, and the second tie rod 42 can be prevented from being crushed by the channel steel. When the second steel sheet pile wall 3 is subjected to lateral soil pressure and loads transmitted by the tie rods, the deformation displacement of the second steel sheet pile 30 is effectively coordinated, and the second steel sheet pile 30 is kept in the same straight line to be jointly stressed, thereby improving the support performance; at the same time, the additional fastening bolts can ensure that there is no separation between the purlin and the steel sheet pile wall, and ensure that the load can be completely transmitted to the steel sheet pile wall through the purlin, thereby enhancing the integrity of the double-row steel sheet pile enclosure structure.

[0032] The distance between the first connecting channel steel of the first reinforcement device and / or the second connecting channel steel of the second reinforcement device and the nearest tie rod is 1 / 4 to 1 / 3 of the distance between the adjacent tie rods on both sides thereof. The first / second connecting channel steel is arranged at the position closest to the minimum bending moment of the purlin to ensure the safety and stability of its splicing and fixing of the adjacent purlin channel steels.

[0033] The first tie rod 22 passes through the first assembly hole 25 and is assembled and fixed with the first reinforcement device 2 by the first nut 20, and a first pad 21 is provided between the first nut 20 and the first assembly hole 25; the second tie rod 42 passes through the second assembly hole 432 and is assembled and fixed with the second reinforcement device 4 by the second nut 40, and a second pad 41 is provided between the second nut 40 and the second assembly hole 432. By providing the first pad and the second pad, there is no need to provide additional fixing bolts at the contact point between the purlin and the steel sheet pile, ensuring that the load of the steel sheet pile wall can be effectively transmitted to the tie rod through the purlin, which can reduce the damage caused by the fixing bolts and the steel sheet pile openings, and can also avoid the local stress concentration and damage of the steel sheet pile caused by the direct connection of the tie rod with the steel sheet pile.

[0034] In an exemplary embodiment, if Fig. 9 As shown, the first steel sheet pile 10 is provided with a first through hole 11 for the first tie rod 22 to pass through at a position corresponding to the first assembly hole 25, and / or the second steel sheet pile 30 is provided with a second through hole 31 for the second tie rod 42 to pass through at a position corresponding to the second assembly hole 432. In actual construction applications, the first reinforcement device 2 and the second reinforcement device 4 will be arranged on different sides of the first steel sheet pile wall 1 and the second steel sheet pile wall 3 to form different support structures.

[0035] See also Figure 8As shown, as an exemplary embodiment, the double-row steel sheet pile enclosure structure 100 includes a first steel sheet pile wall 1, a first reinforcement device 2 assembled with the first steel sheet pile wall 1, a second steel sheet pile wall 3, and a second reinforcement device 4 assembled with the second steel sheet pile wall 3. Specifically, the first reinforcement device is arranged at the rear side of the first steel sheet pile wall, that is, between the first steel sheet pile wall and the second steel sheet pile wall; the second reinforcement device is arranged in front of the second steel sheet pile wall. In this way, the construction space of the first reinforcement device and the second reinforcement device are both located between the steel sheet pile walls, and the loading and unloading of the reinforcement device can be completed by excavating part of the soil between the piles, which does not occupy the construction space inside the foundation pit, and is conducive to protecting the first reinforcement device and avoiding structural damage caused by the construction inside the foundation pit.

[0036] See also Fig. 9 As shown, as an exemplary embodiment, the first steel sheet pile wall 1, the first reinforcement device 2, the second steel sheet pile wall 3 and the second reinforcement device 4 in this embodiment have the same structural settings as the previous embodiment, which will not be repeated here. The difference in this embodiment is that the first reinforcement device 2 is arranged in front of the first steel sheet pile wall 1, and the second reinforcement device 4 is arranged behind the second steel sheet pile wall 3. In this way, when the first steel sheet pile resists the lateral soil pressure and transfers the load to the second steel sheet pile through the first tie rod, the second reinforcement device is in a state of being squeezed by the second nut, the second pad and the second tie rod. Therefore, there is no need to set fixing bolts at the contact point between the second reinforcement device and the second steel sheet pile wall, which can reduce the opening loss of the steel sheet pile and improve the economy.

[0037] The present application is described through several specific embodiments, and those skilled in the art should understand that various changes and equivalent substitutions can be made to the present application without departing from the scope of the present application. In addition, various modifications can be made to the present application for specific circumstances or specific situations without departing from the scope of the present application. Therefore, the present application is not limited to the specific embodiments disclosed, but should include all implementation methods falling within the scope of the claims of the present application.

Claims

1. A double-row steel sheet pile enclosure structure, comprising a first steel sheet pile wall and a second steel sheet pile wall arranged in parallel, characterized in that: A first reinforcement device is arranged on the first steel sheet pile wall, a second reinforcement device is arranged on the second steel sheet pile wall, a tie rod device is arranged between the first steel sheet pile wall and the second steel sheet pile wall, the first reinforcement device and the second reinforcement device are respectively fixedly connected to the tie rod device to form an I-shaped double-row steel sheet pile enclosure structure, the tie rod device includes a tie rod and an adjustment component assembled with the tie rod, and the tie rod device adjusts the axial force of the tie rod through the adjustment component to adjust the distance between the first steel sheet pile wall and the second steel sheet pile wall.

2. The double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: The adjustment assembly is a detachably assembled adjustment sleeve, and the pull rod device includes a first pull rod, an adjustment sleeve and a second pull rod that are detachably connected in sequence; the first end of the first pull rod is assembled and connected to the first reinforcement device, and the second end of the first pull rod is provided with a first external thread that is adapted to be assembled with the adjustment sleeve; the first end of the second pull rod is assembled and connected to the second reinforcement device, and the second end of the second pull rod is provided with a second external thread that is adapted to be assembled with the adjustment sleeve.

3. The double-row steel sheet pile enclosure structure according to claim 2 is characterized in that: The adjusting sleeve includes a rotating sleeve and a fixed sleeve. The fixed sleeve is provided with an axial force gauge. The fixed sleeve and the rotating sleeve are detachably connected via a screw rod provided in the fixed sleeve. The inner wall of the rotating sleeve is provided with a first internal thread matched with the first external thread and a second internal thread matched with the screw rod.

4. The double-row steel sheet pile enclosure structure according to claim 3 is characterized in that: At least two rotating rods are arranged on the outer wall surface of the rotating sleeve and / or the fixed sleeve.

5. The double-row steel sheet pile enclosure structure according to claim 4 is characterized in that: The axial force meter is fixed in the fixing sleeve by bolts, and the wire of the axial force meter passes through the opening on the fixing sleeve and extends out of the fixing sleeve.

6. The double-row steel sheet pile enclosure structure according to any one of claims 2 to 5, characterized in that: The first reinforcement device is composed of a plurality of first purlins connected end to end, and the adjacent first purlins are connected and fixed by first connecting channels that are inserted and overlapped therein through first bolts, and a first assembly hole is provided on the flange of the part of the first purlin away from the first connecting channel steel, and the first tie rod passes through the first assembly hole to be assembled with the first reinforcement device; the second reinforcement device is composed of a plurality of second purlins connected end to end, and the adjacent second purlins are connected and fixed by second connecting channels that are inserted and overlapped therein through second bolts, and a second assembly hole is provided on the flange of the part of the second purlin away from the second connecting channel steel, and the second tie rod passes through the second assembly hole to be assembled with the second reinforcement device; the hole centers of the first assembly hole and the second assembly hole are located on the same straight line.

7. The double-row steel sheet pile enclosure structure according to claim 6 is characterized in that: A plurality of first corbels are arranged on the surface of the web of the first steel sheet pile wall to support the first reinforcement device, a plurality of second corbels are arranged on the surface of the web of the second steel sheet pile wall to support the second reinforcement device, and a plurality of purlin support plates are arranged at the first / second purlin gaps of the first reinforcement device and / or the second reinforcement device.

8. The double-row steel sheet pile enclosure structure according to claim 7 is characterized in that: The distance between the first connecting channel steel of the first reinforcement device and / or the second connecting channel steel of the second reinforcement device and the nearest tie rod is 1 / 4 to 1 / 3 of the spacing between the adjacent tie rods located on both sides thereof.

9. The double-row steel sheet pile enclosure structure according to claim 7 is characterized in that: The first pull rod passes through the first assembly hole and is assembled and fixed to the first reinforcement device by a first nut, and a first pad is provided between the first nut and the first assembly hole; the second pull rod passes through the second assembly hole and is assembled and fixed to the second reinforcement device by a second nut, and a second pad is provided between the second nut and the second assembly hole.

10. The double-row steel sheet pile enclosure structure according to any one of claims 7 to 9, characterized in that: A first through hole for the first tie rod to pass through is provided at a position of the first steel sheet pile corresponding to the first assembly hole, and / or a second through hole for the second tie rod to pass through is provided at a position of the second steel sheet pile corresponding to the second assembly hole.

Citation Information

Patent Citations

  • Foundation pit steel support axial force meter convenient to disassemble

    CN214843750U

  • Fixing pull rod for cofferdam construction

    CN217460639U

  • Back-filling spacer and earth retaining method using back-filling spacer

    JP2012202046A

  • soldier beam installed according to axial force inexcavating work