Roller pile for eliminating negative friction resistance and construction method thereof

By using roller piles and their construction methods on pile foundations, the negative friction resistance between piles and soil is reduced by using the chute and roller structure, the problem of decreasing pile foundation bearing capacity in the wet loess area is solved, and the further development is achieved Efficient construction and lower pollution risk.

CN119061885APending Publication Date: 2024-12-03LANZHOU UNIVERSITY OF TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411338110.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

When building pile foundations in wet loess areas, the pile foundation bearing capacity decreases due to negative friction resistance. The traditional treatment method is costly, complex in construction and easy to contaminate groundwater.

Method used

Roller piles and construction methods are adopted, by setting chutes and rollers on the surface of the upper pile body, the sliding structure of the steel sleeve reduces the negative friction resistance between the pile body and the soil under physical and mechanical means, and reduces the pile foundation structure Direct contact area to improve load-bearing capacity.

Benefits of technology

Effectively eliminate negative friction resistance, avoid the decline in pile foundation bearing capacity, improve the overall bearing capacity, and reduce construction complexity and pollution risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061885A_ABST
    Figure CN119061885A_ABST
Patent Text Reader

Abstract

The invention is used for the technical field of pile foundation engineering, and particularly discloses a roller pile for eliminating negative friction resistance and a construction method thereof.The roller pile comprises a lower pile body, the main body of the lower pile body is cylindrical, the lower end of the lower pile body is of a conical structure, and the upper surface of the lower pile body is fixedly connected with a connecting pile body; an upper pile body is fixedly connected to the upper surface of the connecting pile body, and the lower pile body, the upper pile body and the connecting pile body form a complete pile body structure. According to the roller pile capable of eliminating the negative friction resistance and the construction method thereof, the eight sliding grooves are annularly formed in the outer surface of the upper pile body, the rollers are arranged in the sliding grooves and arranged on the outer surface of the steel bar iron ring in a sleeving mode through the bearings, and through cooperation of the rollers and the sliding grooves, when soil around the pile is settled and the outer surface of the steel sleeve is subjected to downward pulling force, namely the negative friction resistance, the negative friction resistance is eliminated; the steel sleeve can slide downwards, negative friction is effectively eliminated, reduction of the bearing capacity of the pile foundation is avoided, and the bearing capacity of the pile foundation is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation engineering, in particular to a roller pile for eliminating negative friction resistance and a construction method thereof. Background Art

[0002] A pile foundation refers to a deep foundation consisting of a pile and a pile cap connected to the top of the pile, or a single pile foundation connected by a column and a pile foundation. It is usually used for the foundation support of a building. The function of the pile foundation is to transfer the building load to a soil layer with good bearing performance deeper underground to meet the requirements of bearing capacity and settlement. The pile foundation has a high bearing capacity and can withstand vertical loads, horizontal loads, uplift loads and vibration loads. It is the most widely used form of deep foundation. Therefore, the pile foundation is a very important link in the construction process of a building. The design of the pile foundation must take into account the size of the load it bears and the mechanical properties of the soil to ensure that the pile foundation can withstand the load stably. On the other hand, the pile foundation interacts with the surrounding soil. During construction, the stress state of the soil will change during the process of the pile body entering the soil, which may cause deformation of the pile foundation or soil settlement.

[0003] When pile foundation is constructed in collapsible loess areas and soft soil areas, the pile foundation often faces the problem of negative friction. Negative friction means that the settlement of the soil on the side of the pile is greater than the settlement of the pile body, resulting in a decrease in the bearing capacity of the pile foundation, affecting the safety and stability of the building. Traditional methods for dealing with negative friction include the use of isolation materials, such as the casing method and the coating method. The casing method uses a casing that is adapted to the design size of the pile, and uses the vibration during pipe pulling to compact the concrete to form the required cast-in-place pile. The materials used in the coating method contain harmful chemicals, which can cause serious pollution to the groundwater quality. Therefore, these methods have the disadvantages of high cost, complex construction, limited effect, and easy contamination of groundwater. Summary of the invention

[0004] The object of the present invention is to provide a roller pile and a construction method thereof for eliminating negative friction, so as to solve the problem of decreased pile foundation bearing capacity due to negative friction during pile foundation construction in collapsible loess areas mentioned in the background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a roller pile for eliminating negative friction resistance and a construction method thereof, comprising a lower pile body, wherein the main body of the lower pile body is cylindrical, and the lower end of the lower pile body is a conical structure, a connecting pile body is arranged above the lower pile body, and an upper pile body is arranged above the connecting pile body, the lower pile body, the upper pile body and the connecting pile body constitute a complete pile foundation structure, and the lower pile body, the upper pile body and the connecting pile body are an integrated structure, the upper pile body is a cylindrical structure, and the diameter of the upper pile body is smaller than the diameter of the lower pile body, the connecting pile body is a truncated cone structure, the bottom surface diameter of the truncated cone connecting pile body is smaller than the diameter of the pile body, and the top surface diameter of the truncated cone connecting pile body is equal to the diameter of the upper pile body;

[0006] Preferably, a sliding structure is provided on the surface of the upper pile body, and the sliding structure is provided with a slide groove and a roller to drive the steel sleeve to move, thereby reducing the negative friction resistance between the pile body and the soil on the pile side by physical and mechanical means.

[0007] By adopting the above technical solution, the negative friction resistance between the pile body and the soil at the side of the pile can be reduced by using the slide grooves and rollers arranged on the surface of the upper pile body.

[0008] Preferably, the sliding structure comprises a slide groove, which is a rectangular parallelepiped structure and is vertically opened on the outer surface of the upper pile body, and 8 slide grooves are equidistantly opened on the outer surface of the upper pile body.

[0009] By adopting the above technical solution, the roller of the sliding structure can be accommodated and installed by utilizing the sliding groove on the outer surface of the upper pile body.

[0010] Preferably, a roller is provided on the inner wall of the slide, and the roller is in contact with the inner wall of the slide, a cylindrical roller bearing is provided on the inner surface of the roller, 8 rollers are arranged in a ring shape, and the 8 rollers are respectively installed inside each slide, and the roller is sleeved on the outer surface of the steel bar iron ring through a bearing, and the diameter of the steel bar iron ring is the same as the inner diameter of the roller, the steel bar iron ring is a circular ring structure, and the 8 rollers are sleeved on the outer surface of the same steel bar iron ring to form a rolling structure.

[0011] By adopting the above technical solution, multiple rollers connected by steel bar iron rings can evenly transmit negative friction force to the steel sleeve on the outer surface of the upper pile body.

[0012] Preferably, multiple layers of rolling structures are arranged in parallel on the outer surface of the upper pile body, and fixing parts are arranged between adjacent rolling structures. The fixing parts are steel bars, and one end of the fixing parts is fixedly connected to the surface of the steel bar iron ring of the upper layer, and the other end of the fixing parts is fixedly connected to the surface of the steel bar iron ring of the lower layer. The multiple layers of the steel bar iron rings and the rollers are connected by fixing parts to form an annular grid structure.

[0013] By adopting the above technical solution, the negative friction of the pile foundation structure is reduced by using multiple layers of steel bars and rollers.

[0014] Preferably, a steel sleeve is sleeved on the outer surface of the upper pile body, and the steel sleeve is a circular cylinder structure penetrating from top to bottom. A slideway is provided on the inner surface of the steel sleeve, and the slideway is a rectangular structure, and the slideway is vertically distributed on the inner surface of the steel sleeve. There are 8 slideways evenly distributed on the inner surface of the steel sleeve, and the 8 slideways are aligned with the rollers one by one.

[0015] By adopting the above technical solution, the negative friction resistance on the pile foundation can be reduced by utilizing the movement of the steel sleeve on the outer surface of the upper pile body.

[0016] Preferably, the investigation step includes the following sub-steps:

[0017] Before construction, conduct a geological survey of the area where the building is located to obtain the geological conditions of the construction area, including soil type, thickness, bearing capacity, etc., to facilitate subsequent construction;

[0018] Determine the foundation design plan, and determine the foundation bearing capacity requirements based on the structure of the building and the geological conditions of the construction area;

[0019] According to the geological conditions of the construction area and the design plan, calculate and determine the size of the roller, the depth and width of the slideway, and the thickness and strength of the steel sleeve;

[0020] Prefabricate and assemble the piles according to the calculated dimensions.

[0021] The construction steps include the following sub-steps:

[0022] Level the construction site, ensure the flatness and levelness of the foundation, avoid deviations during the construction process, determine the pile position according to the design requirements, and drill holes;

[0023] Start the pile driver and use it to sink the pile into the foundation soil;

[0024] Repeat the piling process until all piles are constructed.

[0025] By adopting the above technical solution and investigating the geological conditions and design scheme before construction, the most suitable dimensions of structures such as rollers on the pile foundation surface can be calculated according to different geological environments to ensure the construction quality and use effect of the roller pile foundation.

[0026] Compared with the prior art, the beneficial effects of the present invention are: the roller pile for eliminating negative friction and the construction method thereof:

[0027] 1. In the present invention, 8 slide grooves are arranged in an annular manner on the outer surface of the upper pile body, rollers are arranged in the slide grooves, and the depth of the slide grooves is the difference between the inner and outer diameters of the rollers. The rollers are sleeved on the outer surface of the steel iron ring through bearings. The rollers and the steel iron rings form an annular grid structure on the outer surface of the upper pile body. A steel sleeve is sleeved on the outer surface of the upper pile body. A slideway is arranged on the inner wall of the steel sleeve to contact the rollers. The steel sleeve has the same outer diameter as the lower pile body. Through the cooperation of the rollers and the slide grooves, the pile body can slide downward under the action of negative friction resistance, effectively eliminating the negative friction resistance and avoiding the decrease in the bearing capacity of the pile foundation. At the same time, by reducing the direct contact area between the pile structure and the soil, it is helpful to maintain the positive friction resistance and improve the overall bearing capacity and of the pile foundation structure;

[0028] 2. In the present invention, a complete pile body structure is formed by a lower pile body, an upper pile body and a connecting pile body, and the diameter of the upper pile body is smaller than that of the lower pile body. A linear transition is formed between the upper pile body and the lower pile body through a truncated cone-shaped connecting pile body, so that the pile body structure can adapt to changes in soil bearing capacity at different depths, and structures such as the slide groove, roller, and steel sleeve on the surface of the upper pile body can be prefabricated according to geological conditions and building design, and the pile foundation driving process is carried out after being assembled with the pile body to ensure the construction quality and use effect of the roller pile foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a front view structural schematic diagram of the present invention;

[0030] Figure 2 It is a schematic diagram of the connection structure between the upper pile body and the steel bar iron ring of the present invention;

[0031] Figure 3 It is a schematic diagram of the top view of the upper pile body of the present invention;

[0032] Figure 4 It is a schematic diagram of the structure of the steel bar iron ring and the fixing member of the present invention;

[0033] Figure 5 It is a schematic diagram of the steel bar iron ring and roller structure of the present invention;

[0034] Figure 6 It is a schematic diagram of the roller structure of the present invention;

[0035] Figure 7 It is a schematic diagram of the top view structure of the steel sleeve of the present invention.

[0036] In the figure: 1. lower pile body; 2. upper pile body; 3. connecting pile body; 4. slideway; 5. roller; 6. steel bar iron ring; 7. fixing part; 8. steel sleeve; 9. slideway. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] See also Figure 1-7 The present invention provides a technical solution: a roller pile for eliminating negative friction and a construction method thereof, comprising a lower pile body 1, an upper pile body 2, a connecting pile body 3, a slide 4, a roller 5, a steel iron ring 6, a fixing part 7, a steel sleeve 8, and a slideway 9.

[0039] The investigation step includes the following sub-steps: before construction, survey the geological conditions of the area where the building is located to obtain the geological conditions of the construction area, including soil type, thickness, bearing capacity, etc., to facilitate subsequent construction; determine the foundation design plan, and determine the foundation bearing capacity requirements based on the structure of the building and the geological conditions of the construction area; calculate the bearing capacity requirements of the pile body and determine the number of pile bodies based on the geological conditions of the construction area and the design plan; calculate and determine the size of the roller 5, the depth and width of the slide 4, and the thickness and strength of the steel sleeve 8 based on the pile bearing capacity requirements; prefabricate and assemble the pile body according to the calculated size;

[0040] Before construction, a survey is conducted on the construction area. The survey content includes the geological conditions of the construction area, the type, thickness and bearing capacity of the soil in the construction area, and the maximum bearing capacity required by the building is determined according to the building design plan. The geological conditions and the bearing capacity requirements of the building are comprehensively considered to determine the bearing capacity requirements of the building foundation, thereby calculating the bearing capacity requirements of the pile body and determining the number of piles required for the foundation. The sizes of the roller 5, the slide 4 and the steel sleeve 8 are calculated according to the bearing capacity requirements of the pile body, and they are assembled with the pile body after processing, and subsequent construction is carried out after assembly.

[0041] The construction process includes the following sub-steps: leveling the construction site, ensuring the flatness and levelness of the foundation to avoid deviations during the construction process, determining the pile position according to the design requirements, and drilling holes; starting the pile driver and using the pile driver to sink the pile into the foundation soil; repeating the piling process until all piles are completed;

[0042] During the construction process, according to the characteristics of the construction site, the construction ground is leveled and compacted as a construction platform to determine the pile position and ground elevation. After the pile foundation is laid out, guard piles are set in front, behind, left and right of the pile foundation to allow the pile foundation center and elevation to be checked at any time. After the position of the pile foundation is determined, the pile body is sunk into the foundation soil using a pile driver. The construction process is repeated until all piles are installed.

[0043] The main body of the lower pile body 1 is cylindrical, and the lower end of the lower pile body 1 is a conical structure. A connecting pile body 3 is arranged above the lower pile body 1, and an upper pile body 2 is arranged above the connecting pile body 3. The lower pile body 1, the upper pile body 2 and the connecting pile body 3 constitute a complete pile foundation structure, and the lower pile body 1, the upper pile body 2 and the connecting pile body 3 are an integrated structure. The upper pile body 2 is a cylindrical structure, and the diameter of the upper pile body 2 is smaller than the diameter of the lower pile body 1. The connecting pile body 3 is a truncated cone structure, and the bottom diameter of the truncated cone connecting pile body 3 is smaller than the diameter of the pile body 1. The top surface diameter of the body 3 is equal to the diameter of the upper pile body 2. A sliding structure is arranged on the surface of the upper pile body 2. The sliding structure is provided with a slide groove 4 and a roller 5 to drive the steel sleeve 8 to move, thereby reducing the negative friction between the pile body and the soil on the pile side by a physical and mechanical method. The sliding structure includes a slide groove 4, which is a rectangular parallelepiped structure, and the slide groove 4 is vertically opened on the outer surface of the upper pile body 2. Eight slide grooves 4 are evenly spaced on the outer surface of the upper pile body 2. The inner wall of the slide groove 4 is provided with a roller 5, and the roller 5 is in contact with the inner wall of the slide groove 4. The inner surface of the roller 5 is provided with a roller 5. The bearing has a cylindrical roller, and the rollers 5 are arranged in an annular manner with 8 pieces. The 8 rollers 5 are respectively installed in the interior of each slide 4. The rollers 5 are sleeved on the outer surface of the steel iron ring 6 through the bearing sleeve, and the diameter of the steel iron ring 6 is the same as the inner diameter of the roller 5. The steel iron ring 6 is a circular ring structure. The 8 rollers 5 are sleeved on the outer surface of the same steel iron ring 6 to form a layer of rolling structure. The outer surface of the upper pile body 2 is parallel to the multi-layer rolling structure. A fixing member 7 is arranged between adjacent rolling structures. The fixing member 7 is a steel bar, and one end of the fixing member 7 is connected to the upper layer. The surface of the steel bar iron ring 6 is fixedly connected, the other end of the fixing member 7 is fixedly connected to the surface of the steel bar iron ring 6 of the lower layer, and the multi-layer steel bar iron ring 6 and the roller 5 are connected by the fixing member 7 to form an annular grid structure, and the outer surface of the upper pile body 2 is sleeved with a steel sleeve 8, and the steel sleeve 8 is a circular cylinder structure that passes through from top to bottom, and the inner surface of the steel sleeve 8 is provided with a slideway 9, which is a rectangular parallelepiped structure, and the slideways 9 are vertically distributed on the inner surface of the steel sleeve 8, and there are 8 slideways 9 equidistantly distributed on the inner surface of the steel sleeve 8, and the 8 slideways 9 are aligned one by one with the rollers 5 respectively;

[0044] like Figure 1-Figure 7As shown, the lower pile body 1, the upper pile body 2 and the connecting pile body 3 in the present invention are partially immersed in the foundation soil. At this time, the surface of the lower pile body 1 is in contact with the soil on the pile side, and the upper pile body 2 is isolated from the soil on the pile side by the steel sleeve 8. The diameter of the lower pile body 1 is larger than the diameter of the upper pile body 2. The lower pile body 1 and the upper pile body 2 are connected by a truncated cone-shaped connecting pile body 3. The connecting pile body 3 forms a conical structure between the lower pile body 1 and the upper pile body 2, so that the lower pile body 1 and the upper pile body 2 can adapt to the bearing capacity changes of soils at different depths, and the applicability is wider. When the steel sleeve 8 contacts the soil on the pile side, when the soil on the pile side settles, due to the negative friction between the soil on the pile side and the pile foundation, the settlement height of the pile foundation structure composed of the pile body 1, the upper pile body 2 and the connecting pile body 3 is usually greater than the settlement height of the soil on the pile side, thereby resulting in The bearing capacity of the pile foundation structure for the building is reduced. In the present invention, the negative friction resistance of the soil on the pile side is transmitted to the steel sleeve 8 on the outer surface of the upper pile body 2. The steel sleeve 8 slides downward under the action of the negative friction force. The slideway 9 on the inner wall of the steel sleeve 8 contacts the roller 5 on the surface of the upper pile body 2 to ensure the smooth sliding of the roller 5. The roller 5 transforms the sliding process of the steel sleeve 8 on the surface of the upper pile body 2 from sliding friction to rolling friction. The steel sleeve 8 slides downward, so that the negative friction force applied by the soil on the pile side to the pile foundation structure is transmitted from the surface of the upper pile body 2 and the lower pile body 1 to the surface of the steel sleeve 8, thereby utilizing the settlement of the steel sleeve 8 to replace the settlement of the upper pile body 2 and the lower pile body 1, thereby avoiding the reduction of the bearing capacity of the pile foundation structure. By connecting the prefabricated accessories with the upper pile body 2, the pile foundation does not require additional accessories during construction, thereby reducing the difficulty of construction.

[0045] Working principle: In the present invention, in the pile body structure, the diameter of the lower pile body 1 is larger than the diameter of the upper pile body 2, and the lower pile body 1 and the upper pile body 2 are transitionally connected by the connecting pile body 3 to form a conical structure, so as to adapt to the changes in soil bearing capacity at different depths, and eight vertical slide grooves 4 are distributed on the outer surface of the upper pile body 2, and rollers 5 are arranged in the slide grooves 4, and the rollers 5 are arranged on the outer surface of the steel iron ring 6 through bearing sleeves to form a circular ring structure, which is connected up and down by fixing parts 7 to form a circular ring grating structure, so that the rollers 5 are in contact with the slideway 9 of the inner wall of the steel sleeve 8 outside the upper pile body 2. When the pile foundation is subjected to the negative friction resistance of the soil on the pile side, the steel sleeve 8 can slide downward along the rollers 5 in the slide grooves 4 to transfer the negative friction force of the soil on the pile side to the surface of the steel sleeve 8, thereby eliminating or reducing the negative friction resistance.

[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A roller pile for eliminating negative friction resistance, comprising a lower pile body (1), the main body of the lower pile body (1) is cylindrical, and the lower end of the lower pile body (1) is a conical structure, a connecting pile body (3) is arranged above the lower pile body (1), an upper pile body (2) is arranged above the connecting pile body (3), the lower pile body (1), the upper pile body (2) and the connecting pile body (3) constitute a complete pile foundation structure, and the lower pile body (1), the upper pile body (2) and the connecting pile body (3) are an integrated structure, characterized in that: The upper pile body (2) is a cylindrical structure, and the diameter of the upper pile body (2) is smaller than the diameter of the lower pile body (1); the connecting pile body (3) is a truncated cone structure, the bottom surface diameter of the truncated cone connecting pile body (3) is smaller than the diameter of the pile body (1), and the top surface diameter of the truncated cone connecting pile body (3) is equal to the diameter of the upper pile body (2).

2. The roller pile for eliminating negative friction according to claim 1, characterized in that: The surface of the upper pile body (2) is provided with a sliding structure, and the sliding structure is provided with a sliding groove (4) and a roller (5) to drive the steel sleeve (8) to move, thereby reducing the negative friction resistance between the pile body and the soil body on the pile side by a physical and mechanical method.

3. The roller pile for eliminating negative friction according to claim 2, characterized in that: The sliding structure comprises a slide groove (4), the slide groove (4) is a rectangular parallelepiped structure, and the slide groove (4) is vertically opened on the outer surface of the upper pile body (2), and 8 slide grooves (4) are evenly spaced on the outer surface of the upper pile body (2).

4. The roller pile for eliminating negative friction according to claim 3, characterized in that: The inner wall of the slide groove (4) is provided with a roller (5), and the roller (5) is in contact with the inner wall of the slide groove (4). The inner surface of the roller (5) is provided with a cylindrical roller bearing. Eight rollers (5) are arranged in an annular shape. The eight rollers (5) are respectively installed inside each slide groove (4). The roller (5) is sleeved on the outer surface of the steel bar iron ring (6) through a bearing. The diameter of the steel bar iron ring (6) is the same as the inner diameter of the roller (5). The steel bar iron ring (6) is a circular ring structure. The eight rollers (5) are sleeved on the outer surface of the same steel bar iron ring (6) to form a layer of rolling structure.

5. The roller pile for eliminating negative friction according to claim 1, characterized in that: The outer surface of the upper pile body (2) is provided with multiple layers of rolling structures in parallel, and a fixing member (7) is provided between adjacent rolling structures. The fixing member (7) is a steel bar, and one end of the fixing member (7) is fixedly connected to the surface of the steel bar iron ring (6) of the upper layer, and the other end of the fixing member (7) is fixedly connected to the surface of the steel bar iron ring (6) of the lower layer. The multiple layers of the steel bar iron ring (6) and the roller (5) are connected by the fixing member (7) to form an annular grid structure.

6. The roller pile for eliminating negative friction according to claim 5, characterized in that: The outer surface of the upper pile body (2) is sleeved with a steel sleeve (8), and the steel sleeve (8) is a circular cylinder structure that passes through from top to bottom. The inner surface of the steel sleeve (8) is provided with a slideway (9), and the slideway (9) is a rectangular parallelepiped structure. The slideways (9) are vertically distributed on the inner surface of the steel sleeve (8). There are 8 slideways (9) evenly distributed on the inner surface of the steel sleeve (8), and the 8 slideways (9) are aligned one by one with the rollers (5).

7. A construction method for roller piles to eliminate negative friction, comprising a research step and a construction step, characterized in that: The research step includes the following sub-steps: Before construction, conduct a geological survey of the area where the building is located to obtain the geological conditions of the construction area, including soil type, thickness, bearing capacity, etc., to facilitate subsequent construction; Determine the foundation design plan, and determine the foundation bearing capacity requirements based on the structure of the building and the geological conditions of the construction area; According to the geological conditions of the construction area and the design plan, the size of the roller (5), the depth and width of the chute (4), and the thickness and strength of the steel sleeve (8) are calculated and determined; Prefabricate and assemble the piles according to the calculated dimensions. The construction steps include the following sub-steps: Level the construction site, ensure the flatness and levelness of the foundation, avoid deviations during the construction process, determine the pile position according to the design requirements, and drill holes; Start the pile driver and use it to sink the pile into the foundation soil; Repeat the piling process until all piles are constructed.