Sectional type granary and mounting method thereof

Through segmented design and lifting, the problems of difficult and poor quality of existing barn funnel welding are solved, and the slope uniformity and structural strength are improved, and the construction difficulty and labor intensity are reduced.

CN119062174APending Publication Date: 2024-12-03GUANGZHOU MECHANICAL & ELECTRICAL INSTALLATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411402232.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The construction of existing barn funnels is difficult, the labor intensity is high, and the construction quality is difficult to ensure, which can easily cause uneven slopes on all sides.

Method used

The funnel is divided into two parts: the upper cone and the lower cone, and is connected by bolts and is modularly installed in combination with hoisting. Only one welding process is required to ensure slope uniformity and structural strength.

Benefits of technology

It improves the construction quality, reduces the difficulty and labor intensity of welding, avoids grain stagnation and uneven slopes on all sides, and enhances the structural strength of the funnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062174A_ABST
    Figure CN119062174A_ABST
Patent Text Reader

Abstract

The sectional type granary comprises an upper cone, a lower cone and a main granary body, the main granary body comprises a granary body top cross beam and a granary body bottom cross beam, the lower end of the upper cone is provided with a first flange edge, the upper end of the lower cone is provided with a second flange edge, the first flange edge is provided with a first bolt hole for a bolt to penetrate through, and the second flange edge is provided with a second bolt hole for a bolt to penetrate through. The first flange edge is provided with a first bolt hole, the second flange edge is provided with a second bolt hole matched with the first bolt hole, the first flange edge and the second flange edge are connected through a bolt, and reinforcing ribs are arranged on the outer side of the cone body of the upper cone. According to the installation method of the sectional type granary, modular installation is carried out in a hoisting mode, only one welding process is needed in the hoisting process, the problem that the gradients of the four faces of a funnel are not uniform is solved, the welding difficulty is small, and therefore the construction difficulty can be lowered, and the labor intensity is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of barn hoppers, and in particular relates to a sectional barn and an installation method thereof. Background Art

[0002] The granary on the drying line of the grain drying plant is a container for storing grains. It is welded from steel beams and steel plates. A conical grain unloading steel funnel is set at the bottom of the granary. The steel funnel at the bottom of the granary is assembled and welded by steel plates. Due to the large size and weight of the funnel and the limited operating space at the bottom of the granary, the construction is difficult. Therefore, the existing construction method is to directly weld the steel plates to the bottom of the granary in blocks and then assemble them into a steel funnel. This method has great difficulty in welding construction, high labor intensity, and difficult to guarantee construction quality. It is also easy to cause problems such as uneven slopes on all sides of the steel funnel. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a sectional barn and an installation method thereof, which can effectively solve the problems of the prior art in that the funnel welding construction is difficult, the labor intensity is high, and the construction quality is difficult to ensure.

[0004] In order to solve the above technical problems, the technical solution adopted in one aspect of the present invention is as follows:

[0005] A sectional barn comprises an upper cone, a lower cone and a main bin body, wherein the main bin body comprises a bin body top beam and a bin body bottom beam, the lower end of the upper cone is provided with a first flange edge, the upper end of the lower cone is provided with a second flange edge, the first flange edge is provided with a first bolt hole for bolts to pass through, the second flange edge is provided with a second bolt hole matching the first bolt hole, the first flange edge and the second flange edge are connected by bolts, and reinforcing ribs are provided on the outer side of the vertebral body of the upper cone.

[0006] As a preferred solution of the present invention, the upper end of the upper cone is provided with a flange, and chamfered edges are provided around the flange.

[0007] As a preferred solution of the present invention, chamfered edges are provided at four corners of the first flange edge and the second flange edge.

[0008] As a preferred solution of the present invention, the material of the upper cone and the lower cone are both set to steel.

[0009] The technical solution adopted in one aspect of the present invention is as follows:

[0010] A method for installing a sectional barn comprises the following steps:

[0011] Step 1: a temporary lifting point is set on the top beam of the warehouse body, and a plurality of temporary lifting rings are set on the inner side of the upper end of the upper cone;

[0012] Step 2: Use a hoisting rope to hoist the upper cone upward from below the bottom crossbeam of the warehouse body into the interior of the main warehouse body until the upper end of the upper cone reaches the bottom crossbeam of the warehouse body;

[0013] Step 3: Welding the upper cone and the bottom crossbeam of the warehouse body;

[0014] Step 4: Remove the lifting rope and set a plurality of temporary lifting rings on the inner side of the upper end of the lower cone;

[0015] Step 5: Use a hoisting rope to hoist the lower cone upward from below the bottom crossbeam of the warehouse into the main warehouse until the upper end of the lower cone reaches the lower end of the upper cone;

[0016] Step 6: Connect the first flange edge of the upper cone and the second flange edge of the lower cone by bolts;

[0017] Step 7: Remove the lifting rope to complete the installation.

[0018] The sectional barn and the installation method thereof provided by the present invention have the following beneficial effects compared with the prior art:

[0019] By adopting the present invention, the funnel is prefabricated into an upper cone and a lower cone, which ensures that the slope of the funnel is uniform, improves the construction quality, and avoids the phenomenon of grain jamming during use; and because the outer sides of the vertebral bodies of the upper cone and the lower cone are provided with reinforcing ribs, the structural strength of the entire funnel can be improved; in addition, the present invention adopts a hoisting method for modular installation, and only one welding process is required during the hoisting process, which avoids the problem of uneven slopes on the four sides of the funnel, and the welding difficulty is small, thereby reducing the construction difficulty and reducing the labor intensity. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.

[0021] Figure 1 is a top view of the upper cone;

[0022] Figure 2 It is a bottom view of the upper cone;

[0023] Figure 3 is a side view of the upper cone;

[0024] Figure 4 is a top view of the lower cone;

[0025] Figure 5 It is a bottom view of the lower cone;

[0026] Figure 6is a side view of the lower cone;

[0027] Figure 7 It is a structural schematic diagram of the hoisting process of the upper cone;

[0028] Figure 8 This is a schematic diagram of the structure of the upper cone after the lifting is completed;

[0029] Fig. 9 It is a structural schematic diagram of the hoisting process of the lower cone;

[0030] Fig.10 This is a schematic diagram of the structure of the lower cone after the lifting is completed;

[0031] Fig.11 It is a schematic diagram of the structure after the final lifting is completed.

[0032] Markings in the figure:

[0033] Upper cone 1; lower cone 2; first flange edge 3; second flange edge 4; reinforcing rib 5; flange 6; chamfered edge 7; first bolt hole 8; second bolt hole 9; main bin body 10; bin body top crossbeam 101; bin body bottom crossbeam 102. DETAILED DESCRIPTION

[0034] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0035] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. It should be understood that the terms "first", "second", etc. are used in the present invention to describe various information, but such information should not be limited to these terms, which are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, "first" information may also be referred to as "second" information, and similarly, "second" information may also be referred to as "first" information.

[0036] like Figures 1 to 6As shown, a preferred embodiment of the present invention provides a segmented barn, which includes an upper cone 1, a lower cone 2 and a main bin body 10, wherein the main bin body 10 includes a bin body top beam 101 and a bin body bottom beam 102, a first flange edge 3 is provided at the lower end of the upper cone 1, a second flange edge 4 is provided at the upper end of the lower cone 2, the first flange edge 3 is provided with a first bolt hole 8 for bolts to pass through, the second flange edge 4 is provided with a second bolt hole 9 matching the first bolt hole 8, the first flange edge 3 and the second flange edge 4 are connected by bolts, and a reinforcing rib 5 is provided on the outer side of the vertebral body of the upper cone 1.

[0037] Exemplarily, the upper end of the upper cone 1 is provided with a flange 6, and the flange 6 is provided with chamfered edges 7 around the edges, and the four corners of the first flange 3 and the second flange 4 are all provided with chamfered edges 7. The chamfered edges 7 can facilitate the grinding of the weld and can avoid grain jamming.

[0038] Exemplarily, the upper cone 1 and the lower cone 2 are both made of steel.

[0039] like Figures 7 to 11 The preferred embodiment of the present invention provides a method for installing a sectional barn, which also includes a main barn body 10, wherein the main barn body 10 includes a barn body top crossbeam 101 and a barn body bottom crossbeam 102, and includes the following steps:

[0040] Step 1: a temporary lifting point is set on the top crossbeam 101 of the warehouse body, and a plurality of temporary lifting rings are set on the inner side of the upper end of the upper cone 1;

[0041] Step 2: Use a hoisting rope to hoist the upper cone 1 upward from below the cross beam 102 at the bottom of the warehouse into the interior of the main warehouse 10 until the upper end of the upper cone 1 reaches the cross beam 102 at the bottom of the warehouse;

[0042] Step 3: Welding the upper cone 1 and the bottom crossbeam 102 of the warehouse body;

[0043] Step 4: Remove the lifting rope and set a plurality of temporary lifting rings on the inner side of the upper end of the lower cone 2;

[0044] Step 5: Use a hoisting rope to hoist the lower cone 2 upward from below the bottom crossbeam 102 of the warehouse into the main warehouse 10 until the upper end of the lower cone 2 reaches the lower end of the upper cone 1;

[0045] Step 6: Connect the first flange edge 3 of the upper cone 1 and the second flange edge 4 of the lower cone 2 by bolts;

[0046] Step 7: Remove the lifting rope to complete the installation.

[0047] By adopting the present invention, the funnel is prefabricated into an upper cone 1 and a lower cone 2, which ensures that the slope of the funnel is uniform, improves the construction quality, and avoids the phenomenon of grain jamming during use; and because the outer sides of the upper cone 1 and the lower cone are provided with reinforcing ribs 5, the structural strength of the entire funnel can be improved; in addition, the present invention adopts a hoisting method for modular installation, and only one welding process is required during the hoisting process, which avoids the problem of uneven slopes on the four sides of the funnel, and the welding difficulty is small, thereby reducing the construction difficulty and reducing the labor intensity.

[0048] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0049] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A sectional barn, characterized in that: It includes an upper cone, a lower cone and a main bin body, the main bin body includes a bin top beam and a bin bottom beam, the lower end of the upper cone is provided with a first flange edge, the upper end of the lower cone is provided with a second flange edge, the first flange edge is provided with a first bolt hole for bolts to pass through, the second flange edge is provided with a second bolt hole matching the first bolt hole, the first flange edge and the second flange edge are connected by bolts, and reinforcing ribs are provided on the outer side of the vertebral body of the upper cone.

2. A sectional barn according to claim 1, characterized in that: The upper end of the upper cone is provided with a flange, and chamfered edges are provided around the flange.

3. A sectional barn according to claim 1, characterized in that: Chamfered edges are provided at four corners of the first flange edge and the second flange edge.

4. A sectional barn according to claim 1, characterized in that: The material of the upper cone and the lower cone is both set to steel.

5. A method for installing a segmented grain bin bottom hopper according to any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: a temporary lifting point is set at the top crossbeam of the warehouse body, and a plurality of temporary lifting rings are set on the inner side of the upper end of the upper cone; Step 2: Use a hoisting rope to hoist the upper cone upward from below the bottom crossbeam of the warehouse body into the interior of the main warehouse body until the upper end of the upper cone reaches the bottom crossbeam of the warehouse body; Step 3: Welding the upper cone and the bottom crossbeam of the warehouse body; Step 4: Remove the lifting rope and set a plurality of temporary lifting rings on the inner side of the upper end of the lower cone; Step 5: Use a hoisting rope to hoist the lower cone upward from below the bottom crossbeam of the warehouse into the main warehouse until the upper end of the lower cone reaches the lower end of the upper cone; Step 6: Connect the first flange edge of the upper cone and the second flange edge of the lower cone by bolts; Step 7: Remove the lifting rope to complete the installation.