Permanent and temporary combined fabricated enclosing wall and construction process thereof
Through the prefabricated fence design combined with Yonglin, the slot connection structure of columns and wall panels is used to solve the problems of complex assembly of existing prefabricated fences and low structural stability, and the rapid, economical and environmentally friendly construction and use of the fences is achieved. , suitable for a variety of places.
Patent Information
- Application Number
- CN202411190282.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-03
AI Technical Summary
The existing precast concrete prefabricated fences are complex in assembly, have low structural stability, long construction cycle, high labor costs, serious environmental pollution, and are greatly affected by the climate in the northern region, making maintenance inconvenient.
Adopt the prefabricated fence design combined with Yonglin, including multiple columns, wall panels and fences. The side walls of the columns are equipped with upper and lower clamping slots. The wall panels and fences are connected by clamping slots. The lower end of the column is fixed to the solid foundation of the earth or On the concrete cushion layer, a modular, standardized and standardized construction process is realized.
It has achieved rapid construction of fences, shortened construction cycles, reduced labor costs and environmental pollution, improved structural stability, and is suitable for communities, factories and other places. It is used as temporary fences and formal fences, reducing construction periods and maintenance costs. .
Smart Images

Figure CN119062182A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to building construction, and in particular to a permanent and temporary assembled enclosure and a construction process thereof. Background Art
[0002] In the current construction drawing design process, the fence is generally built on site. On-site masonry fences generally take a long time to build, have high requirements for the construction site, cause severe environmental pollution, and are inconvenient to construct and maintain, especially in the northern region, which is greatly affected by the climate and requires regular maintenance after construction. The core technology of industrialized prefabricated concrete assembled fences is that the wind-resistant columns, wall panels, and tops of the fences are all prefabricated in the factory and then transported to the site for assembly, which can shorten the construction period to the maximum extent and has significant technical and economic benefits. However, the existing prefabricated fences are complicated to assemble and have low structural stability. Summary of the invention
[0003] In order to solve one or more of the technical problems existing in the prior art, the present invention provides a permanent and temporary combined assembled fence and a construction process thereof.
[0004] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: a permanent and temporary assembled fence, comprising multiple columns, multiple wall panels and multiple fences, the multiple columns are arranged in sequence at intervals, the lower ends of the multiple columns are fixed in a rammed earth foundation or fixed on a concrete cushion layer on the upper surface of the rammed earth foundation, wall panels and fences are provided between two adjacent columns, and the fences are arranged above the wall panels; the side walls of the columns are provided with vertically penetrating grooves, the two ends of the wall panels are respectively clamped in the grooves corresponding to the two adjacent columns, the fences are placed on the upper surface of the wall panels, and the two ends of the fences are respectively fixedly connected to the two adjacent columns.
[0005] The beneficial effects of the present invention are as follows: the prefabricated fence of the present invention realizes the modularization, standardization, normalization and diversification of the fence, making the construction of the fence faster and solving the problems of long fence construction period, high labor cost, complex construction site, and serious environmental pollution caused by wet operation. The prefabricated fence is more economical, green, low-carbon and environmentally friendly, and has been effectively used in various communities, factories, service areas and other places. The prefabricated fence of the present invention, as a temporary fence during the construction process, not only plays a role in safety protection, but also can effectively isolate the construction site from the outside world, prevent non-staff from entering the construction site, and reduce the occurrence of safety accidents. After completion, the Yonglin combined prefabricated fence will be put into use as a formal fence, avoiding the cost expenditure and construction period incurred in setting up and dismantling temporary fences during the construction process.
[0006] Based on the above technical solution, the present invention can also be improved as follows.
[0007] Furthermore, the upper end of the column is higher than the upper end of the fence.
[0008] Furthermore, a column cap is provided at the upper end of the column, and the end surface of the upper end of the column is coated with cement mortar, and the column cap is fixed to the upper end of the column through the cement mortar.
[0009] Furthermore, the column is a rectangular column, and two opposite side walls of the column are respectively provided with slots.
[0010] Furthermore, the cross section of the wall panel is in a T-shaped structure, and clamping blocks are respectively provided at both ends of the wall panel, and the clamping blocks are adapted to be clamped in the clamping grooves.
[0011] Furthermore, a connecting piece is pre-buried in the slot of the column, and both ends of the fence are respectively connected and fixed to the corresponding connecting piece.
[0012] Furthermore, the connecting member is a metal member, and welding plates are respectively provided at both ends of the fence, and the welding plates are fixed to the metal member by welding or by bolt connection.
[0013] Furthermore, two connecting pieces arranged up and down are pre-buried in the slot of the column.
[0014] Furthermore, a pre-buried concrete pier is provided at the lower end of the column, the pre-buried concrete pier is coaxially and integrally connected to the column, the lower end of the wall panel is placed on the pre-buried concrete pier, and the circumference of the pre-buried concrete pier is greater than the circumference of the column.
[0015] A construction process of a permanent and temporary assembled enclosure wall as described above comprises the following steps:
[0016] S1, determine the column installation point, excavate the foundation pit at the column installation point, lift the column with a crane and place it in the foundation pit, adjust the verticality and position of the column, ensure the column spacing and verticality, and use C30 concrete to cast the foundation pit; or, S1', determine the column installation point, set a concrete cushion layer at the column installation point, lift the column with a crane and place it on the concrete cushion layer, adjust the verticality and position of the column, ensure the column spacing and verticality;
[0017] S2, use a lifting device to clamp the center of the wall panel to ensure balance. After confirming that there are no obstacles around and in the air, lift the wall panel and insert it into the corresponding slots of the adjacent columns. Adjust the verticality and flatness of the wall panel and install the wall panels one by one so that the wall panels are placed on the rammed soil foundation or on the pre-buried concrete piers;
[0018] S3, pre-embed the connecting piece in the slot of the column, install the fence piece by piece between two adjacent columns, and place it above the wall panel so that the fence is connected and fixed with the connecting piece;
[0019] S4, applying cement mortar on the top of the column, and then installing the column cap on the top of the column to ensure that the column cap is level;
[0020] S5, perform surface treatment on the defects on the surface of the prefabricated fence and then spray paint.
[0021] The beneficial effect of the present invention is that after the columns, wall panels and fences are processed and manufactured in the factory, they are assembled and installed on site, which conforms to the concept of low carbon and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The cross-sectional structure of the permanent and temporary assembled enclosure of Example 1 is shown in FIG. Figure 1 ;
[0023] Figure 2 The cross-sectional structure of the permanent and temporary assembled enclosure of Example 1 is shown in FIG. Figure 2 ;
[0024] Figure 3 The cross-sectional structure of the permanent and temporary assembled enclosure of Example 1 is shown in FIG. Figure 3 ;
[0025] Figure 4 It is a schematic cross-sectional structure diagram of a column of Example 1;
[0026] Figure 5 It is a schematic cross-sectional structure diagram of the wall panel of Example 1;
[0027] Figure 6 The cross-sectional structure of the permanent and temporary assembled fence of Example 2 is shown in FIG. Figure 1 ;
[0028] Figure 7 The cross-sectional structure of the permanent and temporary assembled fence of Example 2 is shown in FIG. Figure 2 ;
[0029] Figure 8 The cross-sectional structure of the permanent and temporary assembled fence of Example 2 is shown in FIG. Figure 3 .
[0030] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0031] 1. Column; 11. Slot; 2. Wall panel; 3. Fence; 4. Column cap; 5. Embedded concrete pier; 6. Rammed earth foundation; 7. Foundation pit; 8. Concrete cushion. DETAILED DESCRIPTION
[0032] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0033] Example 1
[0034] like Figure 1 to Figure 5 As shown, a permanent and temporary assembled fence of the present embodiment comprises a plurality of columns 1, a plurality of wall panels 2 and a plurality of fences 3. The plurality of columns 1 are arranged in sequence at intervals, and the lower ends of the plurality of columns 1 are fixed in a rammed earth foundation 6. A wall panel 2 and a fence 3 are provided between two adjacent columns 1, and the fence 3 is arranged above the wall panel 2. A slot 11 which passes through from top to bottom is provided on the side wall of the column 1, and the two ends of the wall panel 2 are respectively clamped in the slots 11 corresponding to the two adjacent columns 1, and the fence 3 is placed on the upper surface of the wall panel 2, and the two ends of the fence 3 are respectively fixedly connected to the two adjacent columns 1.
[0035] like Figure 1 As shown, the upper end of the column 1 in this embodiment is higher than the upper end of the fence 3.
[0036] like Figure 1 As shown, in this embodiment, a column cap 4 is further provided at the upper end of the column 1 , and the upper end surface of the column 1 is coated with cement mortar, and the column cap 4 is fixed to the upper end of the column 1 through the cement mortar.
[0037] like Figure 4 As shown, the column 1 of this embodiment is a rectangular column, and slots 11 are respectively provided on two opposite side walls of the column 1.
[0038] like Figure 5 As shown, the cross section of the wall panel 2 of this embodiment is a T-shaped structure, and clamping blocks are respectively provided at both ends of the wall panel 2, and the clamping blocks are adapted to be clamped in the clamping slots 11.
[0039] Specifically, a connecting piece is pre-buried in the slot 11 of the column 1 of this embodiment, and both ends of the fence 3 are respectively connected and fixed to the corresponding connecting piece.
[0040] Preferably, the connecting member is a metal member (which may be sheet-shaped or rod-shaped, etc.), and welding plates are respectively provided at both ends of the fence 3, and the welding plates are fixed to the metal member by welding or by bolt connection.
[0041] Preferably, two connecting members arranged up and down are pre-buried in the slot 11 of the column 1 .
[0042] The concrete structures such as the columns 1 and the wall panels 2 of this embodiment are all prefabricated with reinforced concrete to improve the structural stability. The fence is made of 1.4 mm stainless steel pipes welded together.
[0043] The prefabricated fence of this embodiment realizes the modularization, standardization, regularization and diversification of the fence, making the construction of the fence faster and solving the problems of long fence construction period, high labor cost, complex construction site, and serious environmental pollution caused by wet operation. The prefabricated fence has been effectively used in various communities, factories, service areas and other places with its characteristics of being more economical, green, low-carbon and environmentally friendly. The prefabricated fence of this embodiment, as a temporary fence during the construction process, not only plays a role in safety protection, but also can effectively isolate the construction site from the outside world, prevent non-staff from entering the construction site, and reduce the occurrence of safety accidents. After completion, the Yonglin combined prefabricated fence will be put into use as a formal fence, avoiding the cost expenditure and construction period incurred in setting up and dismantling temporary fences during the construction process.
[0044] This embodiment also provides a construction process of the permanent and temporary assembled fence as described above, comprising the following steps:
[0045] S1, lay out the lines, determine the installation point of column 1, excavate foundation pit 7 at the installation point of column 1, and lift column 1 with a crane and place it in foundation pit 7, adjust the verticality and position of column 1, ensure the spacing and verticality of column 1, and use C30 concrete to cast the foundation pit; specifically, use 150 excavator to excavate the foundation pit, the foundation pit size is 500 square and the depth is 0.6 meters.
[0046] S2, use a lifting device to clamp the center of the wall panel 2 to ensure balance. After confirming that there are no obstacles around and in the air, lift the wall panel 2 and insert it into the corresponding slot 11 of the adjacent column 1, adjust the verticality and flatness of the wall panel 2, and install the wall panels 2 one by one so that the wall panels are placed on the rammed soil foundation 6;
[0047] S3, pre-embed the connecting piece in the slot 11 of the column 1, install the fence 3 piece by piece between two adjacent columns 1, and place it above the wall panel 2, so that the fence 3 is connected and fixed with the connecting piece;
[0048] S4, applying cement mortar on the top of the column 1, and then installing the column cap 4 on the top of the column 1 to ensure that the column cap 4 is level;
[0049] S5, perform surface treatment on the surface defects of the assembled fence, and then spray paint. After the spray painting is completed, the company's decorative promotional pictures can be installed. After the temporary construction is completed, when it is used as a permanent fence, the promotional pictures can be removed.
[0050] After the columns of this embodiment are installed, secondary grouting with cast-in-place concrete is used.
[0051] The construction process of this embodiment has a short construction period and a fast construction speed. The modular assembly method can greatly shorten the construction period and improve construction efficiency. The wall of this embodiment has high construction quality. Due to the pre-processing and standardized production of materials, the consistency and accuracy of the construction quality can be guaranteed. The wall of this embodiment also has the characteristics of energy saving and environmental protection. The assembled wall is prefabricated in the factory, which reduces the on-site manufacturing process, reduces energy consumption and material waste, and is more environmentally friendly. The wall of this embodiment is easy to maintain and manage. The assembled wall is easy to clean and maintain, which can extend the service life and reduce maintenance costs.
[0052] Example 2
[0053] like Figure 6 to Figure 8 As shown, a permanent and temporary assembled fence of the present embodiment comprises a plurality of columns 1, a plurality of wall panels 2 and a plurality of fences 3. The plurality of columns 1 are arranged in sequence at intervals, and the lower ends of the plurality of columns 1 are fixed on a concrete cushion layer 8 on the upper surface of a rammed earth foundation 6. A wall panel 2 and a fence 3 are provided between two adjacent columns 1, and the fence 3 is arranged above the wall panel 2. A slot 11 which passes through the column 1 from top to bottom is provided on the side wall of the column 1, and the two ends of the wall panel 2 are respectively clamped in the slots 11 corresponding to the two adjacent columns 1, and the fence 3 is placed on the upper surface of the wall panel 2, and the two ends of the fence 3 are respectively fixedly connected to the two adjacent columns 1.
[0054] like Figure 6 As shown, the upper end of the column 1 in this embodiment is higher than the upper end of the fence 3.
[0055] like Figure 6 As shown, in this embodiment, a column cap 4 is further provided at the upper end of the column 1 , and the upper end surface of the column 1 is coated with cement mortar, and the column cap 4 is fixed to the upper end of the column 1 through the cement mortar.
[0056] refer to Figure 4 The column 1 of this embodiment is a rectangular column, and slots 11 are respectively provided on the opposite side walls of the column 1.
[0057] refer to Figure 4 The cross section of the wall panel 2 of this embodiment is a T-shaped structure, and a clamping block is respectively provided at both ends of the wall panel 2, and the clamping block is adapted to be clamped in the clamping slot 11.
[0058] Specifically, a connecting piece is pre-buried in the slot of the column of this embodiment, and both ends of the fence are respectively connected and fixed to the corresponding connecting piece.
[0059] Preferably, the connecting member is a metal member, and welding plates are respectively provided at both ends of the fence 3, and the welding plates are fixed to the metal member by welding or by bolt connection.
[0060] Preferably, two connecting members arranged up and down are pre-buried in the slot 11 of the column 1 .
[0061] like Figure 6 to Figure 8 As shown, the lower end of the column 1 of this embodiment is provided with a pre-embedded concrete pier 5, the pre-embedded concrete pier 5 is coaxially connected to the column 1, the lower end of the wall panel 2 is placed on the pre-embedded concrete pier 5, and the perimeter of the pre-embedded concrete pier 5 is greater than the perimeter of the column 1. The pre-embedded concrete pier 5 adopts a rectangular structure, and the side length of the pre-embedded concrete pier 5 corresponds to the side length of the column 1 and is arranged in parallel. The pre-embedded concrete pier 5 is placed and fixed on the concrete cushion 8 with cement slurry, so that the column has higher stability.
[0062] The concrete structures of the column 1, wall panel 2, embedded concrete pier 5 and the like in this embodiment are all prefabricated with reinforced concrete to improve the structural stability. The fence is made of 1.4 mm stainless steel pipes welded together.
[0063] The prefabricated fence of this embodiment realizes the modularization, standardization, regularization and diversification of the fence, making the construction of the fence faster and solving the problems of long fence construction period, high labor cost, complex construction site, and serious environmental pollution caused by wet operation. The prefabricated fence has been effectively used in various communities, factories, service areas and other places with its characteristics of being more economical, green, low-carbon and environmentally friendly. The prefabricated fence of this embodiment, as a temporary fence during the construction process, not only plays a role in safety protection, but also can effectively isolate the construction site from the outside world, prevent non-staff from entering the construction site, and reduce the occurrence of safety accidents. After completion, the Yonglin combined prefabricated fence will be put into use as a formal fence, avoiding the cost expenditure and construction period incurred in setting up and dismantling temporary fences during the construction process.
[0064] This embodiment also provides a construction process of the permanent and temporary assembled fence as described above, comprising the following steps:
[0065] S1, determine the column installation point, set a concrete cushion layer 8 at the column installation point, and lift the column with a crane and place it on the concrete cushion layer, adjust the verticality and position of the column, and ensure the column spacing and verticality;
[0066] S2, use a lifting device to clamp the center of the wall panel 2 to ensure balance. After confirming that there are no obstacles around and in the air, lift the wall panel 2 and insert it into the corresponding slot 11 of the adjacent column 1, adjust the verticality and flatness of the wall panel 2, and install the wall panels 2 one by one; place the wall panel 2 on the embedded concrete pier 5;
[0067] S3, pre-embed the connecting piece in the slot 11 of the column 1, install the fence 3 piece by piece between two adjacent columns 1, and place it above the wall panel 2, so that the fence 3 is connected and fixed with the connecting piece;
[0068] S4, applying cement mortar on the top of the column 1, and then installing the column cap 4 on the top of the column 1 to ensure that the column cap 4 is level;
[0069] S5, perform surface treatment on the surface defects of the assembled fence, and then spray paint. After the spray painting is completed, the company's decorative promotional pictures can be installed. After the temporary construction is completed, when it is used as a permanent fence, the promotional pictures can be removed.
[0070] After the columns of this embodiment are installed, secondary grouting with cast-in-place concrete is used.
[0071] The construction process of this embodiment has a short construction period and a fast construction speed. The modular assembly method can greatly shorten the construction period and improve construction efficiency. The wall of this embodiment has high construction quality. Due to the pre-processing and standardized production of materials, the consistency and accuracy of the construction quality can be guaranteed. The wall of this embodiment also has the characteristics of energy saving and environmental protection. The assembled wall is prefabricated in the factory, which reduces the on-site manufacturing process, reduces energy consumption and material waste, and is more environmentally friendly. The wall of this embodiment is easy to maintain and manage. The assembled wall is easy to clean and maintain, which can extend the service life and reduce maintenance costs.
[0072] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0073] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0074] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0075] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0076] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0077] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A permanent and temporary assembled fence, characterized in that: It includes multiple columns, multiple wall panels and multiple fences. The multiple columns are arranged in sequence at intervals. The lower ends of the multiple columns are fixed in a rammed earth foundation or on a concrete cushion layer on the upper surface of the rammed earth foundation. Wall panels and fences are provided between two adjacent columns, and the fences are arranged above the wall panels. The side walls of the columns are provided with vertically penetrating grooves, and the two ends of the wall panels are respectively clamped in the corresponding grooves of the two adjacent columns. The fence is placed on the upper surface of the wall panels, and the two ends of the fence are respectively fixedly connected to the two adjacent columns.
2. According to claim 1, a permanent and temporary assembled fence, characterized in that: The upper end of the column is higher than the upper end of the fence.
3. According to claim 1, a permanent and temporary assembled fence, characterized in that: The upper end of the column is also provided with a column cap, the end surface of the upper end of the column is coated with cement mortar, and the column cap is fixed to the upper end of the column through the cement mortar.
4. The permanent and temporary assembled fence according to claim 1, characterized in that: The column is a rectangular column, and two opposite side walls of the column are respectively provided with clamping grooves.
5. The permanent and temporary assembled fence according to claim 1, characterized in that: The cross section of the wall panel is in a T-shaped structure. Both ends of the wall panel are respectively provided with clamping blocks, and the clamping blocks are adapted to be clamped in the clamping grooves.
6. The permanent and temporary assembled fence according to claim 1, characterized in that: Connecting pieces are pre-buried in the slots of the upright posts, and both ends of the fence are respectively connected and fixed to corresponding connecting pieces.
7. The permanent and temporary assembled fence according to claim 6, characterized in that: The connecting piece is a metal piece, and welding plates are respectively provided at both ends of the fence. The welding plates are fixed to the metal piece by welding or by bolt connection.
8. The permanent and temporary assembled fence according to claim 6, characterized in that: Two connecting pieces arranged up and down are pre-buried in the slot of the column.
9. The permanent and temporary assembled fence according to claim 1, characterized in that: A pre-buried concrete pier is provided at the lower end of the column, the pre-buried concrete pier is coaxially and integrally connected with the column, the lower end of the wall panel is placed on the pre-buried concrete pier, and the circumference of the pre-buried concrete pier is greater than the circumference of the column.
10. A construction process for a permanent and temporary assembled fence according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, determine the column installation point, excavate the foundation pit at the column installation point, lift the column with a crane and place it in the foundation pit, adjust the verticality and position of the column, ensure the column spacing and verticality, and use C30 concrete to cast the foundation pit; or, S1', determine the column installation point, set a concrete cushion layer at the column installation point, lift the column with a crane and place it on the concrete cushion layer, adjust the verticality and position of the column, ensure the column spacing and verticality; S2, use a lifting device to clamp the center of the wall panel to ensure balance. After confirming that there are no obstacles around and in the air, lift the wall panel and insert it into the corresponding slots of the adjacent columns. Adjust the verticality and flatness of the wall panel and install the wall panels one by one so that the wall panels are placed on the rammed soil foundation or on the embedded concrete piers; S3, pre-embed the connecting piece in the slot of the column, install the fence piece by piece between two adjacent columns, and place it above the wall panel so that the fence is connected and fixed with the connecting piece; S4, applying cement mortar on the top of the column, and then installing the column cap on the top of the column to ensure that the column cap is level; S5, perform surface treatment on the defects on the surface of the prefabricated fence and then spray paint.