Pressure filtrate energy recovery equipment of sludge dewatering workshop and operation method of pressure filtrate energy recovery equipment
The filtrate energy recovery device in sludge dewatering workshops recycles sewage energy into electricity, addressing resource waste and improving energy efficiency and environmental performance.
Patent Information
- Application Number
- CN202310645932.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-01
- Publication Date
- 2024-12-03
AI Technical Summary
The direct discharge of wastewater from sludge dewatering workshops results in resource waste and low energy efficiency, necessitating a solution to recycle the potential energy in sewage and improve environmental and economic performance.
A filtrate energy recovery device is implemented, comprising a collecting device, water collecting pipes, a sewage buffer tank, power generation device, and power storage system, which collects sewage from drum concentrators and plate and frame filters to generate electricity, utilizing a mixed flow generator and power storage system to stabilize and distribute power.
The device recycles sewage energy to power workshop loads, stabilizes power generation, and reduces energy costs by storing excess power, enhancing energy efficiency and environmental protection.
Smart Images

Figure CN119062501A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of sludge dewatering treatment, and in particular to a filter press liquid energy recovery device in a sludge dewatering workshop and an operation method thereof. Background Art
[0002] In daily production and life, a large amount of sewage is generated, and a large amount of sludge is generated in the treatment of sewage. If these sludges are not handled properly, they will cause serious pollution. Therefore, it is necessary to separate the water from the sludge. The sludge dehydration workshop generally adopts a low-temperature vacuum dehydration and drying integrated process, using a drum concentrator and a plate and frame filter press to separate the water from the sludge. The sludge treatment process is: biological pool-skimming pool-drum concentrator-plate and frame filter press. The water content of the sludge after treatment in the skimming pool is 99.2%, and the water content after treatment in the drum concentrator and the plate and frame filter press is about 40%. Therefore, there will be a large amount of sewage after treatment in the drum concentrator and the plate and frame filter press. Due to the requirements of the low-temperature vacuum dehydration and drying integrated process, the working site of the drum concentrator and the plate and frame filter press is required to be a certain height from the ground, and the height in many workshops is even more than ten meters. In the existing sludge dewatering workshop, the wastewater after the drum thickener and the plate and frame filter press is directly discharged into the sewage pipe network. With the increasing requirements for environmental protection and energy conservation, the amount of wastewater generated by the sludge dewatering workshop is increasing. The direct discharge of wastewater has the problem of waste of resources and low economic benefits. Therefore, how to solve the sewage problem generated by the sludge dewatering workshop and improve the energy-saving and environmental protection performance of the sludge dewatering workshop is an issue that needs to be considered urgently. Summary of the invention
[0003] In view of the shortcomings of the prior art mentioned above, the technical problem to be solved by the present invention is to provide a filtrate energy recovery device for a sludge dewatering workshop and an operation method thereof, which can utilize the sewage treatment of the drum concentrator and the plate and frame filter press in the sludge dewatering workshop to generate electricity for use in the workshop, recycle the potential energy in the sewage, improve the energy-saving and environmental protection performance of the workshop, and save costs.
[0004] To achieve the above-mentioned purpose, the present invention provides a filtrate energy recovery device for a sludge dewatering workshop, which is used for treating and utilizing the sewage of a drum concentrator and a plate and frame filter press in the sludge dewatering workshop, and comprises a collecting device, a first water collecting pipe, a second water collecting pipe, a sewage buffer tank, a power generation water supply pipe, a power generation device, a power generation control cabinet, a power storage device and a distribution box. The sewage buffer tank is arranged below the plate and frame filter press, and the collecting device is arranged below the water outlet of the plate and frame filter press and can collect the sewage dropped from the plate and frame filter press. The first water collecting pipe connects the collecting device and the sewage buffer tank, and the water inlet port of the second water collecting pipe is connected to the drain outlet of the drum concentrator, and the water outlet port is connected to the sewage buffer tank, and The water outlet port is lower than the water inlet port, the power generation device is arranged below the sewage buffer tank, the power generation water supply pipe connects the power generation device and the sewage buffer tank, the generator in the power generation device is electrically connected to the power generation control cabinet, the output line of the power generation control cabinet is connected to the distribution box, and a power transmission switch is provided on the output line of the power generation control cabinet, the power generation control cabinet can stabilize the voltage and frequency of the power generated by the power generation device and transmit it out, the power storage device includes a battery pack and a battery circuit, the battery pack is respectively connected to the output line of the power generation control cabinet and the distribution box through the battery circuit, the battery circuit is provided with an AC / DC converter and a battery switch, and the distribution box is used to connect to the power load.
[0005] Furthermore, the power generation device is a mixed flow power generation device.
[0006] Furthermore, the impeller in the power generation device is arranged horizontally, and a section of the power generation water supply pipe connected to the power generation device is horizontal.
[0007] Furthermore, an electric valve is provided on the power generation water supply pipe.
[0008] Furthermore, the collecting device includes a water collecting funnel, and the bottom of the water collecting funnel is connected to the first water collecting pipe.
[0009] Furthermore, it also includes a sewage collection tank and a drainage pipe. The sewage collection tank is arranged below the power generation device to receive water dropped from the power generation device. One end of the drainage pipe is connected to the sewage collection tank, and the other end is used to connect to the workshop sewage network.
[0010] Furthermore, it also includes an intermediate AC bus, and the power generation control cabinet, battery circuit and distribution box are all connected to the intermediate AC bus.
[0011] Furthermore, the power storage device also includes an intelligent controller and a battery management system. The battery management system can monitor the power level of the battery pack and can switch the power storage device between charging and discharging modes. The intelligent controller is connected to the battery management system. The intelligent controller is respectively connected to the power generation device and the distribution box, and can detect the power generation status of the power generation device and the load status of the distribution box. The intelligent controller is also respectively connected to the power transmission switch and the battery switch control.
[0012] The present invention also provides an operating method of the above-mentioned filtrate energy recovery device, including the following working modes:
[0013] M1. Charging mode: When the intelligent controller detects that the generator is generating electricity and the power generation situation meets the requirements, the power transmission switch is closed, and the generator control cabinet transmits electricity to the distribution box. When it is detected that the output power of the generator is greater than the load of the distribution box, the battery switch is closed, and the battery management system switches to charging mode, supplying power to the load while charging the battery pack;
[0014] M2, independent discharge mode: when the intelligent controller detects that the power generation device is generating electricity but cannot meet the requirements, the power generation device stops generating electricity, controls the power transmission switch to be disconnected, the battery switch to be closed, the battery management system switches to the discharge mode, and the battery pack supplies power to the load;
[0015] M3, auxiliary discharge mode: When the intelligent controller detects that the power generation device is generating electricity and meets the requirements, but the output power of the power generation device cannot meet the load of the distribution box, it controls the power supply switch to close, the battery switch to close, the battery management system switches to discharge mode, and the battery pack provides power to the load.
[0016] Furthermore, the energy storage device is also connected to an external mains power supply, and is provided with an external power switch for controlling the connection and disconnection with the external mains power supply. The external power switch is disconnected in the charging mode, independent discharge mode and auxiliary discharge mode. The operation method also includes M4, a grid-connected charging mode: the external power switch is closed, the power generation device does not generate electricity, the power transmission switch is disconnected, and when the capacity of the battery pack is insufficient, the battery switch is closed, and the battery management system is switched to the charging mode to charge the battery pack through the external mains power.
[0017] As described above, the filtrate energy recovery device and the operation method thereof according to the present invention have the following beneficial effects:
[0018] By arranging a collecting device, a first water collecting pipe, a second water collecting pipe, a sewage buffer pool, a power generation water supply pipe, a power generation device, a power generation electric control cabinet, a power storage device and a distribution box, the sewage generated by the plate and frame filter press and the drum thickener can be collected into the sewage buffer pool for buffering by utilizing the height difference, and sent to the power generation device below for power generation, and the generated electricity can be used to supply power to various loads in the workshop, and by arranging a power storage device, it can be stored when the power generation device generates too much electricity, supplement the electricity when the power generation device generates insufficient electricity, and independently supply electricity when the power generation device does not generate electricity, so as to fully utilize the generated electricity. The filtrate energy recovery equipment and its operation method of the present invention can process and utilize the sewage of the drum thickener and the plate and frame filter press in the sludge dewatering workshop, generate electricity for use in the workshop, recycle the potential energy in the sewage, improve the energy-saving and environmental protection performance of the workshop, and save costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The figure is a schematic diagram of the layout of the filtrate energy recovery equipment of the present invention in a workshop.
[0020] Figure 2 It is a schematic structural diagram of the filtrate press energy recovery device of the present invention.
[0021] Figure 3 It is a schematic structural diagram of the power generation device of the present invention.
[0022] Figure 4 It is a schematic structural diagram of the collecting funnel of the present invention.
[0023] Figure 5 This is a schematic diagram of the line connections in the filtrate energy recovery equipment.
[0024] Description of Figure Numbers
[0025] 1 Plate and frame filter press
[0026] 2 Drum Thickener
[0027] 3 Collection device
[0028] 4. First water collection pipe
[0029] 5 Second water collection pipe
[0030] 6 Sewage Buffer Pool
[0031] 7 Power generation and water supply pipe
[0032] 8 Power generation device
[0033] 81 Generator
[0034] 82 Water inlet pipe
[0035] 83 Snail
[0036] 84 Drain pipe
[0037] 9 Power generation control cabinet
[0038] 10 Electric valve
[0039] 11 Sewage collection tank
[0040] 12 Drain pipe
[0041] 13 Battery pack
[0042] 14 AC / DC converter
[0043] 15 Battery switch
[0044] 16 Power switch
[0045] 17 Distribution Box
[0046] 18 Intermediate AC bus
[0047] 19 External mains
[0048] 20 External power switch DETAILED DESCRIPTION
[0049] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0050] It should be noted that the structures, proportions, sizes, etc. drawn in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and so on quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0051] See also Figures 1 to 5The present invention provides a filtrate energy recovery device for a sludge dewatering workshop, which is used for treating and utilizing the sewage of a plate and frame filter press 2 and a rotary drum thickener 1 in the sludge dewatering workshop, and comprises a collecting device 3, a first water collecting pipe 4, a second water collecting pipe 5, a sewage buffer pool 6, a power generation water supply pipe 7, a power generation device 8, a power generation electric control cabinet 9, a power storage device and a distribution box 17, wherein the sewage buffer pool 6 is arranged below the rotary drum thickener 1, the collecting device 3 is arranged below the water outlet of the rotary drum thickener 1 and can collect the sewage falling from the rotary drum thickener 1, the first water collecting pipe 4 connects the collecting device 3 and the sewage buffer pool 6, the water inlet port of the second water collecting pipe 5 is connected to the drain port of the plate and frame filter press 2, the water outlet port is connected to the sewage buffer pool 6, and the water outlet port thereof is lower than the water inlet port, so that the sewage of the plate and frame filter press 2 can automatically flow into the sewage buffer pool 6 through the second water collecting pipe 5, and the power generation device 8 is arranged below the sewage buffer pool 6, preferably it can be located on the ground as much as possible so that the height difference between it and the sewage buffer pool 6 is as large as possible. The power generation water supply pipe 7 connects the power generation device 8 and the sewage buffer tank 6. The generator 81 in the power generation device 8 is electrically connected to the power generation control cabinet 9. The output line of the power generation control cabinet 9 is connected to the distribution box 17, and a power transmission switch 16 is provided on the output line of the power generation control cabinet 9, which is used to control the on and off of the circuit between the power generation control cabinet 9 and the distribution box 17. The power generation control cabinet 9 can stabilize the voltage and frequency of the power generated by the power generation device 8 and transmit it out. The power storage device includes a battery pack 13 and a battery circuit. The battery pack 13 is connected to the output line of the power generation control cabinet 9 and the distribution box 17 through the battery circuit. An AC / DC converter 14 and a battery switch 15 are provided in the battery circuit. The distribution box 17 is used to connect to the power load.
[0052] The main working principle of the filtrate energy recovery device involved in the present invention is as follows: during operation, the rotary drum concentrator 1 will drop sewage, which is collected by the collecting device 3 and automatically sent to the sewage buffer pool 6 through the first water collecting pipe 4 due to the height difference. The sewage generated by the plate and frame filter press 2 is discharged from its drainage port and automatically sent to the sewage buffer pool 6 through the second water collecting pipe 5. The sewage buffer pool 6 has a large height difference with the power generation device 8. The sewage flows downward to the power generation device 8 through the power generation water supply pipe 7. When reaching the power generation device 8, it has a sufficient flow rate. The sewage drives the impeller of the generator 81 in the power generation device 8 to rotate, thereby generating electricity. Since the sewage of the rotary drum concentrator 1 and the plate and frame filter press 2 may not always be available, and the amount of sewage may be different, it is first cached through the sewage buffer pool 6 to ensure that the water flow that can flow into the power generation device 8 is stable. The electricity generated by the power generation device 8 is adjusted by the power generation control cabinet 9. After the voltage and frequency are stable, it is transported to the distribution box 17. The distribution box 17 is used to connect with the common electrical loads (including lighting, air conditioners, sockets, etc.) in the workshop to supply power to the load. Furthermore, when the generated power is higher than the load, the power storage device can be charged. Specifically, the battery pack 13 is charged through the battery line, and the battery switch 15 is closed. At this time, the AC / DC converter 14 is used to convert the alternating current into direct current to charge the battery pack 13. When the power generated by the power generation device 8 is not enough for the load, or when no power is generated, the battery pack 13 can be used to supplement the power supply or supply power alone. Specifically, the battery switch 15 is closed. At this time, the AC / DC converter 14 is used to convert the direct current output by the battery pack 13 into alternating current to supply power to the load.
[0053] In this embodiment, see Figure 1 and Figure 2 In the sludge dewatering workshop, the height of the drum thickener 1 is generally higher than that of the plate and frame filter press 2, wherein the sewage buffer tank 6 can be set at a height similar to that of the plate and frame filter press 2, and ensure that the outlet port of the second water collecting pipe 5 is lower than the water inlet port, so that the sewage from the plate and frame filter press 2 automatically flows into the sewage buffer tank 6 due to the height difference.
[0054] In this embodiment, see Figure 2 and Figure 3As a preferred design, the power generation device 8 is a mixed flow generator 81. The mixed flow generator is an existing structure, also known as a Francis turbine, which is a type of reaction turbine. It specifically includes a generator 81, a volute 83, a water inlet pipe 82 and other structures. The impeller of the generator 81 is located in the volute 83. The water inlet pipe 82 is connected to the volute 83 and is connected to the power generation water supply pipe 7. The sewage enters the volute 83 from the water inlet pipe 82 and can flow along the volute 83, continuously driving the impeller of the generator 81 to rotate, and the contact time with the impeller is long, and the power generation efficiency is high. Then the sewage in the volute 83 is discharged through the drain pipe 84 at the bottom. Preferably, the impeller in the power generation device 8 is horizontally arranged, that is, its axis is vertically arranged, and the section of the power generation water supply pipe 7 connected to the mixed flow generator 81 is horizontal, that is, the water inlet pipe 82 is horizontal, thereby further improving the power generation efficiency.
[0055] In this embodiment, see Figure 1 and Figure 2 As a preferred design, an electric valve 10 is also provided on the power generation water supply pipe 7, which can be a butterfly valve. The electric valve 10 can be close to the power generation device 8 or the sewage buffer tank 6. When the amount of sewage in the sewage buffer tank 6 is insufficient, the power generation of the power generation device 8 will be unstable. At this time, the electric valve 10 can be closed to stop the power generation work, and the electric valve 10 can be opened to generate electricity after the amount of sewage in the sewage buffer tank 6 increases to the corresponding water volume.
[0056] In this embodiment, see Figure 2 and Figure 4 As a preferred design, the collecting device 3 includes a water collecting funnel, and the bottom of the water collecting funnel is connected to the first water collecting pipe 4. The water collecting funnel can be made of stainless steel, with a simple structure and low cost, and can well collect the falling sewage.
[0057] In this embodiment, see Figure 1 and Figure 2 As a preferred design, it also includes a sewage collection tank 11 and a drainage pipe 12. The sewage collection tank 11 is arranged below the power generation device 8 to receive the water falling from the power generation device 8. One end of the drainage pipe 12 is connected to the sewage collection tank and the other end is used to connect to the workshop sewage network, so as to finally treat the sewage in a unified manner.
[0058] In this embodiment, see Figure 5 As a preferred design, an intermediate AC bus 18 is also provided. The intermediate AC bus 18 is respectively connected to the power generation control cabinet 9, the battery line and the distribution box 17 to facilitate line connection. The power generation control cabinet 9 and the power storage device can both supply power to the distribution box 17 through the intermediate AC bus 18. At the same time, the power generation control cabinet 9 can charge the power storage device through the intermediate AC bus 18.
[0059] In this embodiment, the power generation and control cabinet 9 may adopt an existing brushless intelligent integrated cabinet, which includes a balancing instrument that can adjust and stabilize the frequency and voltage generated by the generator 81 and then transmit it out.
[0060] In this embodiment, preferably, the power storage device also includes an intelligent controller and a battery management system. The battery management system can monitor the power of the battery pack 13 and can switch the power storage device to a charging or discharging mode. The intelligent controller is connected to the battery management system, and the battery management system can feed back the power of the battery pack 13 to the intelligent controller, and the intelligent controller can control the battery management system to switch the charging and discharging modes. The intelligent controller is connected to the power generation device 8 and the distribution box 17 respectively, and can detect the power generation status (including power, voltage, frequency, stability, etc.) of the power generation device 8 and the load status of the distribution box 17. The intelligent controller is also connected to the power transmission switch 16 and the battery switch 15 respectively, and can control the on and off of the power transmission switch 16 and the battery switch 15. In this embodiment, the battery pack 13 preferably adopts a high-capacity density lithium iron phosphate battery, and uses liquid cooling technology. The power storage device can store, convert and release electric energy under grid-connected conditions, has load adjustment capability, and can automatically adjust the output according to the load to ensure safe and reliable operation of the system.
[0061] The present invention also provides an operating method of the above-mentioned filtrate energy recovery device, including the following working modes:
[0062] M1. Charging mode: When the intelligent controller detects that the power generation device 8 is generating electricity and the power generation situation meets the requirements, the power transmission switch 16 is closed, and the electricity is transmitted to the distribution box 17 through the power generation control cabinet 9 to supply power to the load, and when it is detected that the output power of the power generation device 8 is greater than the load of the distribution box 17, the battery switch 15 is closed, and the battery management system is switched to the charging mode, supplying power to the load while charging the battery pack 13.
[0063] M2, independent discharge mode: when the intelligent controller detects that the power generation device 8 generates electricity but fails to meet the requirements, the power generation device 8 stops generating electricity, controls the power supply switch 16 to be disconnected, the battery switch 15 to be closed, and the battery management system switches to the discharge mode, and the battery pack 13 supplies power to the load. Specifically, when the amount of sewage flowing into the power generation device 8 is insufficient, the power generation of the power generation device 8 is insufficient, the frequency and voltage are unstable, and the requirements are not met, in order to protect the circuit, the power generation device 8 stops working. Preferably, the intelligent controller can be connected to the electric valve 10 to control the electric valve 10 to automatically close, and the power generation device 8 automatically stops generating electricity. After the power generation device 8 stops generating electricity, it is independently powered by the power storage device, so the battery management system is controlled to switch to the discharge mode, and the battery pack 13 converts direct current into alternating current through the AC / DC converter 14, and transmits it to the distribution box 17 to supply power to the load.
[0064] M3, auxiliary discharge mode: when the intelligent controller detects that the power generation device 8 is generating electricity and meets the requirements, but the output power of the power generation device 8 cannot meet the load of the distribution box 17, it controls the power transmission switch 16 to close, the battery switch 15 to close, and the battery management system switches to the discharge mode. The battery pack 13 converts direct current into alternating current through the AC / DC converter 14 to provide power for the load to maintain energy balance. In this mode, the battery pack 13 plays a supplementary role to ensure the continuity and stability of the entire system.
[0065] In this embodiment, preferably, the power storage device is also connected to an external mains 19 (i.e., an external public power grid). Specifically, the external mains 19 is connected to an intermediate AC bus 18, and is connected to the battery circuit of the power storage device through the intermediate AC bus 18, and is provided with an external power switch 20 for controlling the on-off connection with the external mains 19. The connection to the external mains 19 is mainly used to charge the battery pack 13 of the power storage device. When this method is adopted, the external power switch 20 is disconnected in the above-mentioned charging mode, independent discharge mode, and auxiliary discharge mode, and this moment is called the off-grid operation mode. When the external power switch 20 is closed, it is the grid-connected operation mode, and the operation method also includes:
[0066] M4, grid-connected charging mode: when the external power switch 20 is closed, the power generation device 8 does not generate electricity, the power transmission switch 16 is disconnected, and the capacity of the battery pack 13 is insufficient, the battery switch 15 is closed, and the battery management system is switched to the charging mode, and the battery pack 13 is charged by the external AC power 19, so as to provide energy reserve for the filtrate energy recovery equipment in the off-grid operation mode.
[0067] As can be seen from the above, the filtrate energy recovery device and operation method of the sludge dewatering workshop of the present invention have the following beneficial effects:
[0068] 1. It can collect the sewage discharged from the plate and frame filter press 2 and the drum thickener 1 in the sludge dewatering workshop and use it to generate electricity, making full use of the potential energy of the sewage at a high altitude, recycling the potential energy and converting it into electrical energy to power the lighting, air conditioning and other loads in the workshop, saving energy and protecting the environment.
[0069] 2. At the same time, the power storage device can store the power when the power generation device 8 generates too much electricity, supplement the power when the power generation device 8 generates insufficient electricity, and independently supply power when the power generation device 8 does not generate electricity, thereby making full use of the generated electricity.
[0070] 3. It can effectively reduce the electricity consumption cost of the sludge dewatering workshop and has high economic benefits.
[0071] In summary, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.
[0072] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A filter press liquid energy recovery device for a sludge dewatering workshop, used for treating and utilizing wastewater from a plate and frame filter press (2) and a drum thickener (1) in the sludge dewatering workshop, characterized in that: The invention comprises a collecting device (3), a first water collecting pipe (4), a second water collecting pipe (5), a sewage buffer pool (6), a power generation water supply pipe (7), a power generation device (8), a power generation electric control cabinet (9), a power storage device and a distribution box (17), wherein the sewage buffer pool (6) is arranged below a rotary drum concentrator (1), the collecting device (3) is arranged below the water outlet of the rotary drum concentrator (1) and is capable of collecting sewage dropped from the rotary drum concentrator (1), the first water collecting pipe (4) connects the collecting device (3) and the sewage buffer pool (6), the water inlet port of the second water collecting pipe (5) is connected to the drain outlet of a plate and frame filter press (2), the water outlet port is connected to the sewage buffer pool (6), and the water outlet port is lower than the water inlet port, the power generation device (8) is arranged below the sewage buffer pool (6), and the power generation water supply pipe (7) is connected to the second water collecting pipe (5). The water pipe (7) connects the power generation device (8) and the sewage buffer tank (6); the generator (81) in the power generation device (8) is electrically connected to the power generation control cabinet (9); the output line of the power generation control cabinet (9) is connected to the distribution box (17); and a power transmission switch (16) is provided on the output line of the power generation control cabinet (9); the power generation control cabinet (9) can stabilize the voltage and frequency of the power generated by the power generation device (8) and transmit it out; the power storage device includes a battery pack (13) and a battery circuit; the battery pack (13) is respectively connected to the output line of the power generation control cabinet (9) and the distribution box (17) through the battery circuit; an AC / DC converter (14) and a battery switch (15) are provided in the battery circuit; and the distribution box (17) is used to be connected to an electrical load.
2. The filtrate press energy recovery device according to claim 1, characterized in that: The power generation device (8) comprises a mixed flow generator set.
3. The filtrate press energy recovery device according to claim 2, characterized in that: The impeller in the power generation device (8) is arranged horizontally, and a section of the power generation water supply pipe (7) connected to the power generation device (8) is horizontal.
4. The filtrate press energy recovery device according to claim 1, characterized in that: The power generation water supply pipe (7) is also provided with an electric valve (10).
5. The filtrate press energy recovery device according to claim 1, characterized in that: The collecting device (3) comprises a water collecting funnel, and the bottom of the water collecting funnel is connected to the first water collecting pipe (4).
6. The filtrate press energy recovery device according to claim 1, characterized in that: It also includes a sewage collection tank (11) and a drainage pipe (12), wherein the sewage collection tank (11) is arranged below the power generation device (8) and is used to receive water dropped from the power generation device (8), and one end of the drainage pipe (12) is connected to the sewage collection tank (11) and the other end is used to connect to the workshop sewage network.
7. The filtrate press energy recovery device according to claim 1, characterized in that: It also includes an intermediate AC busbar (18), and the power generation control cabinet (9), battery circuit and distribution box (17) are all connected to the intermediate AC busbar (18).
8. The filtrate press energy recovery device according to claim 1, characterized in that: The power storage device further comprises an intelligent controller and a battery management system. The battery management system is capable of monitoring the power level of the battery pack (13) and switching the power storage device between a charging mode and a discharging mode. The intelligent controller is connected to the battery management system. The intelligent controller is respectively connected to the power generation device (8) and the distribution box (17) and is capable of detecting the power generation status of the power generation device (8) and the load status of the distribution box (17). The intelligent controller is also respectively connected to the power transmission switch (16) and the battery switch (15).
9. A method for operating the filtrate energy recovery device according to claim 8, characterized in that: Includes the following working modes: M1, charging mode: when the intelligent controller detects that the power generation device (8) is generating electricity and the power generation condition meets the requirements, the power transmission switch (16) is closed, and the power generation control cabinet (9) transmits electricity to the distribution box (17); and when it is detected that the output power of the power generation device (8) is greater than the load of the distribution box (17), the battery switch (15) is closed, and the battery management system switches to the charging mode, supplying power to the load while charging the storage battery pack (13); M2. Independent discharge mode: When the intelligent controller detects that the power generation device (8) generates electricity but fails to meet the requirements, the power generation device (8) stops generating electricity, controls the power supply switch (16) to be disconnected, and the battery switch (15) to be closed, and the battery management system switches to the discharge mode, and the storage battery pack (13) supplies power to the load. M3, auxiliary discharge mode: when the intelligent controller detects that the power generation device (8) is generating electricity and meets the requirements, but the output power of the power generation device (8) cannot meet the load of the distribution box (17), it controls the power supply switch (16) to close, the battery switch (15) to close, and the battery management system switches to the discharge mode, and the battery pack provides power to the load.
10. The operating method of the filtrate press energy recovery device according to claim 9, characterized in that: The power storage device is also connected to an external mains power (19) and is provided with an external power switch (20) for controlling the connection with the external mains power (19). The external power switch (20) is disconnected in the charging mode, independent discharge mode and auxiliary discharge mode. The operation method further comprises M4, a grid-connected charging mode: the external power switch (20) is closed, the power generation device (8) does not generate power, the power transmission switch (16) is disconnected, and when the capacity of the storage battery pack (13) is insufficient, the battery switch (15) is closed, and the battery management system is switched to a charging mode to charge the storage battery pack (13) through the external mains power (19).