Pressure pipeline under-pressure leaking stoppage method and under-pressure leaking stoppage clamp

By designing a pressure-blocking jig and stress elimination device, the problem of unbalanced filling pressure and stress concentration of sealant in pressure pipelines is solved, and long-term effective sealing without sealant is achieved, ensuring material safety and equipment stability.

CN119062852APending Publication Date: 2024-12-03MAOMING GAOLI LEAK STOPPING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411250259.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing pressure-load sealing methods of pressure pipelines have problems such as leaks, sealant contamination materials, stress concentration and secondary leakage, and harmful ions infiltration of sealant lead to metal embrittlement.

Method used

Design a method and fixture with pressure plugging, obtain appropriate materials and shapes through measurement, prepare a pressure equalization chamber, sealing groove, sealing mechanism and adjustment mechanism, fix it at the leakage point, realize sealing without sealant, adopt stress relief device and Axial fixing mechanism ensures long-term effective sealing.

Benefits of technology

The sealant-free leak plugging of pressure pipes is achieved, which avoids material pollution and stress concentration, extends the sealing effect, reduces maintenance frequency, and improves safety and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062852A_ABST
    Figure CN119062852A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pressure pipeline pressure leaking stoppage, and particularly provides a pressure pipeline pressure leaking stoppage method and a pressure leaking stoppage clamp, and the pressure pipeline pressure leaking stoppage method comprises the following steps: obtaining a preparation material of the pressure leaking stoppage clamp according to the material type, the design temperature and the design pressure in a to-be-repaired pressure pipeline; obtaining a first clamp body and a second clamp body from the preparation material according to the measured shape and size of the to-be-repaired pressure pipeline; the first clamp body and the second clamp body are machined according to the shape and the size, obtained through measurement, of the leakage point of the to-be-repaired pressure pipeline; the first clamp body and the second clamp body are fixed to the leakage point of the pressure pipeline through the body connecting mechanism, so that the pressure equalizing cavity is communicated with the interior of the pressure pipeline, and pressure leaking stoppage of the pressure pipeline is completed. And finally, the under-pressure leaking stoppage clamp can seal a leakage point of a pressure pipeline without using a sealant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pressure pipeline under-pressure plugging, and in particular to a pressure pipeline under-pressure plugging method and a pressure plugging clamp. Background Art

[0002] Pressure equipment is usually equipped with pressure pipelines, which are generally used to transport materials under pressure. During the production process, pressure pipelines often leak materials locally due to material corrosion and other reasons, resulting in material leakage, economic losses, environmental pollution or personal injury accidents. At present, there are two main ways to deal with pressure pipeline leakage. One is to suspend production and replace damaged equipment; the second is to continue production without suspending production and adopt online pressure sealing methods to continue production. From the perspective of production needs, the online pressure sealing method is more in line with production needs.

[0003] However, for the online pressure sealing method, the existing technology is to fix a clamp on the leakage point, set a sealing cavity in the clamp, and then fill the sealing cavity with sealant. Since the pressure pipeline runs under pressure, the filling pressure of the sealant needs to be balanced with the operating pressure in the pressure pipeline. If the pressure is too small, it cannot be filled. If the pressure is too large, it will enter the pressure pipeline and contaminate the materials in the pressure pipeline, causing subsequent equipment damage and affecting product quality. In addition, during subsequent use, the sealant often needs to be replenished multiple times as it is used, otherwise the leakage problem will occur again. However, multiple replenishments can easily cause stress concentration at the leakage point, and ultimately secondary leakage occurs. At the same time, harmful ions or atoms in the sealant penetrate into the metal surface, causing embrittlement of the metal structure. If it is not discovered in time, it will undergo qualitative changes and break.

[0004] Therefore, the prior art has defects and shortcomings and needs further improvement and development. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present application aims to provide a pressure pipeline under pressure plugging method and a pressure plugging clamp, aiming to solve the problem of the need to inject sealant when plugging a pressure pipeline under pressure.

[0006] The technical solution adopted by the present application to solve the technical problem is as follows: a pressure pipeline under pressure plugging method, comprising:

[0007] According to the material type, design temperature and design pressure in the pressure pipeline to be repaired, the preparation materials of the pressurized plugging fixture are obtained;

[0008] According to the measured shape and size of the pressure pipe to be repaired, a first clamp body and a second clamp body are obtained from the prepared material;

[0009] According to the shape and size of the leakage point of the pressure pipeline to be repaired obtained by measurement, a pressure equalizing cavity, an end hole, a sealing groove, a sealing mechanism, a sealing adjustment mechanism and a body connection mechanism are prepared on the first clamp body and the second clamp body, wherein the sealing groove is located at the periphery of the pressure equalizing cavity and extends into the end hole, and the sealing mechanism is located in the sealing groove and is used to seal the pressure equalizing cavity;

[0010] The first clamp body and the second clamp body are fixed at the leakage point of the pressure pipeline through the body connection mechanism, so that the pressure equalization chamber is connected with the interior of the pressure pipeline to complete the pressure plugging of the pressure pipeline.

[0011] Optionally, the first clamp body and the second clamp body are fixed at the leakage point of the pipeline by the body connection mechanism to complete the pressure pipe under pressure plugging, and then further comprising:

[0012] Detecting whether the pressurized leak plugging fixture has leakage;

[0013] If so, the sealing pressure of the sealing mechanism is adjusted by the sealing adjustment mechanism to seal the pressure equalizing chamber again.

[0014] Optionally, the first clamp body and the second clamp body are obtained from the prepared material according to the measured shape and size of the pressure pipe to be repaired, and then the following steps are further included:

[0015] Perform nondestructive testing on the first fixture body and the second fixture body.

[0016] Optionally, the pressure pipeline under pressure plugging method further includes:

[0017] According to the measured shape and size of the pressure pipeline to be repaired, a stress relief device for relieving the bending stress of the pipeline is prepared, and the stress relief device includes a supporting mechanism or a hanging mechanism.

[0018] Optionally, after fixing the first clamp body and the second clamp body at the leakage point of the pressure pipeline by the body connection mechanism so that the pressure equalization chamber is connected with the interior of the pressure pipeline, the method further comprises:

[0019] Determine a first stress relief fixing point on the pressure plugging fixture and a second stress relief fixing point on the pressure pipeline fixing mechanism;

[0020] One end of the stress relief device is connected to the first stress relief fixing point, and the other end of the stress relief device is connected to the second stress relief fixing point, wherein the pressure pipe fixing mechanism includes a fixing beam, a fixing frame or a supporting platform.

[0021] Optionally, the pressure pipeline under pressure plugging method further includes:

[0022] According to the measured shape and size of the pressure pipeline to be repaired, two axial fixing mechanisms for axially fixing the pressurized leak-proof plugging fixture are prepared.

[0023] Optionally, the two axial fixing mechanisms for axially fixing the pressurized plugging fixture are prepared according to the measured shape and size of the pressure pipeline to be repaired, specifically comprising:

[0024] Determine a first axial fixed point and a second axial fixed point on the pressure pipeline, wherein the leakage point is located between the first axial fixed point and the second axial fixed point;

[0025] Determine a first fixture fixing point and a second fixture fixing point on the pressurized leak plugging fixture, wherein the first fixture fixing point and the second fixture fixing point are arranged opposite to each other along the axial direction of the pressure pipeline;

[0026] One of the axial fixing mechanisms is connected to the first axial fixing point and the first clamp fixing point respectively, and the other axial fixing mechanism is connected to the second axial fixing point and the second clamp fixing point respectively, so as to complete the installation of the two axial fixing mechanisms.

[0027] Optionally, the shape and size of the leak point of the pressure pipeline to be repaired obtained according to the measurement further includes:

[0028] A pressure relief mechanism is provided, wherein the pressure relief mechanism comprises a connecting mechanism and a pressure relief valve;

[0029] Determine the position of the pressure relief point on the first clamp body or the second clamp body;

[0030] A pressure relief hole is processed on the pressure relief point, and the pressure relief mechanism is installed on the pressure relief hole. The pressure relief mechanism is connected with the pressure equalizing chamber.

[0031] Optionally, the method of fixing the first clamp body and the second clamp body at the leakage point of the pressure pipeline by the body connection mechanism further includes:

[0032] A pressure test is performed on the pressurized leak-proof fixture.

[0033] Another technical solution adopted by the present application to solve the technical problem is as follows: a pressure plugging clamp, wherein the pressure plugging clamp is used to implement the pressure pipeline pressure plugging method as described above.

[0034] Optionally, the pressure plugging fixture includes:

[0035] A first clamp body, wherein the first clamp body is provided with a first sink groove and a plurality of first end grooves communicating with the first sink groove;

[0036] A second clamp body, wherein the second clamp body is provided with a second sink groove and a plurality of second end grooves communicating with the first sink groove;

[0037] A sealing groove, the sealing groove is arranged at the outer periphery of the first sink groove and extends to the first end groove, and the sealing groove is also arranged in the second end groove;

[0038] A sealing mechanism, wherein the sealing mechanism is disposed in the sealing groove;

[0039] A sealing adjustment mechanism, the sealing adjustment mechanism is disposed through the sealing groove, and the sealing adjustment mechanism is used to adjust the sealing mechanism;

[0040] A body connection mechanism, the body connection mechanism is used to fixedly connect the first clamp body and the second clamp body;

[0041] Among them, the first clamp body and the second clamp body are used to cooperate and clamp at the leakage point of the pressure pipe, the first sink groove and the second sink groove constitute a pressure equalizing chamber, the first end groove and the second end groove constitute an end hole, the pressure equalizing chamber and the end hole are used to accommodate the pressure pipe, and the pressure equalizing chamber is also used to accommodate materials in the pressure pipe, and the sealing mechanism is used to seal the pressure equalizing chamber.

[0042] Optionally, the sealing groove includes a cavity sealing groove, and an end sealing groove disposed in the first end groove and the second end groove and communicating with the sealing groove;

[0043] The sealing mechanism is configured as a sealing sheet, which is disposed in the cavity sealing groove and the end sealing groove and is interference-fitted with the cavity sealing groove and the end sealing groove;

[0044] The sealing adjustment mechanism passes through the cavity sealing groove and the end sealing groove, and abuts against the sealing sheet.

[0045] Optionally, the sealing adjustment mechanism comprises:

[0046] A plurality of plugs, the bottoms of the cavity sealing groove and the end sealing groove are provided with a plurality of adjustment holes, the plurality of plugs are correspondingly screwed into the plurality of adjustment holes, and one end of the plugs extends out from the first clamp body and the second clamp body;

[0047] A pressing sheet is arranged in the cavity sealing groove and the end sealing groove, and is located between the sealing sheet and a plurality of the plugs. The plurality of the plugs abut against the pressing sheet, and the pressing sheet is used to compress the sealing sheet.

[0048] Optionally, the cavity sealing groove comprises a main cavity sealing groove and a transition cavity sealing groove, and the transition cavity sealing groove is arranged between the main cavity sealing groove and the end sealing groove;

[0049] The sealing sheet comprises a main sealing sheet, a transition sealing sheet and an end sealing sheet, wherein the main sealing sheet is arranged in the main cavity sealing groove, the transition sealing sheet is arranged in the transition cavity sealing groove, and the end sealing sheet is arranged in the end sealing groove;

[0050] The pressing plate includes a main pressing plate, a transition pressing plate and an end pressing plate. The main pressing plate is arranged in the main cavity sealing groove, the transition pressing plate is arranged in the transition cavity sealing groove, and the end pressing plate is arranged in the end sealing groove.

[0051] Optionally, the axial fixing mechanism of the pressurized plugging fixture comprises:

[0052] A clamp connecting piece, wherein the clamp connecting piece is screwed or welded to the first clamp body and the second clamp body;

[0053] A connecting rod, one end of which is connected to the clamp connector, and the connecting rod is configured to have an adjustable length;

[0054] A fixed end connector, which is used to connect a pressure pipe or a fixed structure of a pressure pipe.

[0055] Optionally, the pressurized plugging fixture further comprises an auxiliary support mechanism, which is used to auxiliary support the first fixture body and the second fixture body, or to offset the bending stress borne by the first fixture body and the second fixture body; and / or,

[0056] The pressurized leak plugging fixture is also provided with a pressure relief valve, and the pressure relief valve is communicated with the pressure equalizing chamber.

[0057] Optionally, the pressurized plugging fixture further includes a plurality of sealing protection mechanisms, which are arranged to limit the sealing mechanism in the sealing groove, and the sealing protection mechanism includes:

[0058] An inner gear rack, the inner gear rack being arranged on a side cavity wall of the pressure equalizing cavity;

[0059] A protection strip, one end of which is fixed to the side cavity wall of the pressure equalizing cavity by the inner gear rack;

[0060] An outer rack is arranged on the outer side wall of the first clamp body or the second clamp body, and is used to fix the other end of the protection strip on the outer side wall of the first clamp body or the second clamp body.

[0061] Beneficial effects:

[0062] The present application provides a pressure pipeline under pressure plugging method and a pressure plugging clamp, which can ensure that the pressure plugging clamp will not react with the material in the pressure pipeline and will not contaminate the material; at the same time, a pressure plugging clamp with the most reasonable shape and size is used to plug the leakage point of the pressure pipeline, and there is no need to use sealants, which further ensures the safety of the material, and can facilitate plugging, forming a long-term and effective sealing effect, and is also convenient for subsequent maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 It is a schematic flow chart of a pressure pipeline under pressure plugging method in a preferred embodiment provided in the present application;

[0064] Figure 2 It is a three-dimensional schematic diagram of the three-dimensional structure of the pressure plugging clamp in the preferred embodiment provided in this application;

[0065] Figure 3 It is a partial three-dimensional cross-sectional schematic diagram of the cooperation relationship between the pressure pipe of the pressure plugging fixture and the elbow structure provided in the present application;

[0066] Figure 4 It is a three-dimensional schematic diagram of a partial structure of the pressure plugging fixture provided in the present application;

[0067] Figure 5 It is a schematic diagram of the three-dimensional structure of the first clamp body of the pressure plugging clamp provided in the present application;

[0068] Figure 6 It is a partial cross-sectional schematic diagram of the matching relationship between the pressure plugging fixture and the pressure pipeline provided in this application;

[0069] Figure 7 It is a schematic diagram of the three-dimensional structure of the second clamp body of the pressure plugging clamp provided in the present application;

[0070] Figure 8 It is a partial three-dimensional cross-sectional schematic diagram of the cooperation relationship between the pressure plugging fixture provided in the present application and the pressure pipeline of the three-way structure;

[0071] Fig. 9 It is a three-dimensional schematic diagram of another part of the structure of the pressure plugging fixture provided in the present application;

[0072] Fig.10 It is a three-dimensional schematic diagram of another part of the structure of the pressure plugging fixture provided in this application;

[0073] Fig.11 It is a three-dimensional structural schematic diagram of the axial fixing mechanism of the pressure plugging fixture provided in this application;

[0074] Fig.12It is a three-dimensional structural schematic diagram of the auxiliary support mechanism of the pressure plugging clamp provided in this application.

[0075] Description of reference numerals:

[0076] 10. Pressure plugging fixture; 20. Pressure pipe; 21. Leakage point; 11. First fixture body; 12. Second fixture body; 13. Sealing groove; 14. Sealing mechanism; 15. Sealing adjustment mechanism; 16. Body connection mechanism; 18. Axial fixing mechanism; 19. Sealing protection mechanism; 1a. Auxiliary support mechanism; 1b. Pressure equalization chamber; 1c. End hole; 1d. Adjustment hole; 111. First sink groove; 112. First end groove; 121. Second sink groove; 122. Second end groove; 131. Cavity Sealing groove; 132, end sealing groove; 1311, main cavity sealing groove; 1312, transition cavity sealing groove; 141, sealing plate; 1411, main sealing plate; 1412, transition sealing plate; 1413, end sealing plate; 151, plug; 152, pressing plate; 1521, main pressing plate; 1522, transition pressing plate; 1523, end pressing plate; 181, clamp connector; 182, connecting rod; 183, fixed end connector; 191, inner rack; 192, protective strip; 193, outer rack. DETAILED DESCRIPTION

[0077] In order to make the purpose, technical solution and advantages of the present application clearer and more specific, the present application is further described in detail with reference to the accompanying drawings and examples. It should be understood that the specific examples described here are only used to explain the present application and are not used to limit the present application.

[0078] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present application, unless otherwise specified, "multiple" means two or more.

[0079] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0080] Please refer to Figure 1 In the first embodiment of the present application, a method for plugging leaks in a pressure pipeline under pressure is provided. During the production process of a pressure equipment user, due to medium corrosion and other reasons, pressure pipelines such as pipelines, pressure vessel interface short sections, and boiler interface short sections may leak materials, resulting in material leakage, economic losses, environmental pollution, or personal injury accidents.

[0081] The pressure pipeline under pressure plugging method:

[0082] Step S10, obtaining the preparation materials of the pressurized leak plugging fixture according to the material type, design temperature and design pressure in the pressure pipeline to be repaired.

[0083] When a pressure pipeline leaks, first of all, select the appropriate preparation material according to the type of material in the pressure pipeline to be repaired, the design temperature and the design pressure; specifically, it is preferred to use high temperature resistant, corrosion resistant, and high compressive strength metal materials, such as stainless steel or alloy steel, to ensure the reliability and durability of the clamp in the actual application environment.

[0084] Step S20, obtaining a first clamp body and a second clamp body from the prepared material according to the measured shape and size of the pressure pipe to be repaired.

[0085] It can be seen that the first clamp body and the second clamp body are processed from the selected preparation material according to the measured shape and size of the pressure pipe to be repaired; during the processing, precision cutting and welding technology are used to ensure the dimensional accuracy and structural integrity of the clamp; further, after the first clamp body and the second clamp body are processed, the first clamp body and the second clamp body are heat treated to eliminate the internal stress of the material and improve its strength and deformation resistance.

[0086] Preferably, the method comprises obtaining a first clamp body and a second clamp body from the prepared material according to the measured shape and size of the pressure pipe to be repaired, and then performing nondestructive testing on the first clamp body and the second clamp body.

[0087] It can be seen that the first clamp body and the second clamp body are processed using the selected preparation material (such as stainless steel or alloy steel), and after ensuring that their shapes and sizes match the pressure pipe to be repaired, the first clamp body and the second clamp body are visually inspected and dimensional measured to ensure that there are no obvious defects on their surfaces (such as cracks, pores, pits, etc.), and to confirm that the dimensions of the first clamp body and the second clamp body meet the design requirements.

[0088] Specifically, in order to further ensure the structural integrity and material quality of the first fixture body and the second fixture body, non-destructive testing is performed on the first fixture body and the second fixture body. Before performing the non-destructive testing, the fixture surface is first cleaned to remove oil, rust and other attachments to ensure the detection accuracy; the first fixture body and the second fixture body can be subjected to non-destructive testing, such as ultrasonic testing, X-ray testing, magnetic particle testing or penetration testing. The specific selection depends on the material characteristics of the first fixture body and the second fixture body and the detection objectives (such as detecting pores, cracks or weld defects inside the fixture). For example, ultrasonic probes can be used to transmit and receive sound wave signals to detect whether there are defects such as pores, inclusions, cracks, etc. inside the first fixture body and the second fixture body; X-rays can also be used to penetrate the first fixture body and the second fixture body to obtain internal structural images and detect subtle defects inside the fixture; ferromagnetic materials can also be used to detect cracks and other defects on the surface and near the surface of the first fixture body and the second fixture body by using the magnetic field changes after the fixture is magnetized; finally, the defects on the surface of the fixture can be filled with penetrant liquid, and then the developer can be used to show the position of cracks and other defects on the detection surface. For the first fixture body and the second fixture body with defects within the acceptable range, appropriate repair treatment is carried out, such as welding repair; for the fixtures that cannot be repaired, they are replaced. After completing the non-destructive testing, the surfaces of the first fixture body and the second fixture body are cleaned and treated to remove the media used in the detection process (such as penetrant liquid, magnetic powder) to ensure the cleanliness and safety of the fixture in subsequent use. Finally, the qualified fixtures are stored in an anti-corrosion and anti-pollution environment, ready for subsequent pressure plugging installation.

[0089] Through non-destructive testing, potential defects (such as cracks, pores and inclusions) of the first fixture body and the second fixture body can be quickly and accurately located and evaluated without destroying the fixture structure, which greatly improves the detection efficiency and accuracy, reduces the detection time and cost, and avoids the waste of fixtures that may be caused by traditional destructive testing; it avoids failure and leakage accidents that may be caused by defects in the first fixture body and the second fixture body during the pressurized plugging process, and significantly improves the safety and reliability of the fixture; it ensures that the pressurized plugging fixture and the pressurized plugging method for pressure pipelines meet the corresponding industry safety and quality standards, and are particularly suitable for fields that require high safety and strict quality control, such as high-risk industries such as petrochemicals, nuclear power plants and marine engineering.

[0090] Furthermore, it is also necessary to carry out a pressure test on the first clamp body and the second clamp body, that is, the pressurized leak-plugging clamp; thereby preventing the pressurized leak-plugging clamp from being put into use with defects, especially when the materials in the pressure pipeline are high-risk chemicals, and effectively ensuring the safety and reliability of the pressure pipeline pressurized leak-plugging method.

[0091] Step S30, according to the shape and size of the leakage point of the pressure pipe to be repaired obtained by measurement, prepare a pressure equalizing chamber, an end hole, a sealing groove, a sealing mechanism, a sealing adjustment mechanism and a body connecting mechanism on the first clamp body and the second clamp body, wherein the sealing groove is located on the periphery of the pressure equalizing chamber and extends into the end hole, and the sealing mechanism is located in the sealing groove for sealing the pressure equalizing chamber.

[0092] It can be seen that according to the measurement results of the leakage point, according to the shape and size of the leakage point of the pressure pipeline, the pressure equalizing chamber, the end hole, the sealing groove, the sealing mechanism, the sealing adjustment mechanism and the body connection mechanism are processed on the first fixture body and the second fixture body respectively. The sealing groove is located at the periphery of the pressure equalizing chamber and extends into the end hole; the sealing mechanism is installed in the sealing groove to seal the pressure equalizing chamber; the sealing mechanism, such as an O-ring, a graphite gasket, a rubber gasket or a polytetrafluoroethylene sealing strip, is installed in the sealing groove to form an effective sealing barrier; the pressure pipeline passes through the end hole and the pressure equalizing chamber, and the sealing groove, the sealing mechanism, the sealing adjustment mechanism and the body connection mechanism cooperate to seal the pressure equalizing chamber and the end hole. The sealed pressure equalizing chamber is connected to the inside of the pressure pipeline through the leakage point, that is, the material in the pressure pipeline will enter the pressure equalizing chamber, so that the pressure difference between the inner and outer surfaces of the pressure pipeline located in the pressure equalizing chamber is zero, which avoids stress concentration, avoids the continued expansion of the leakage point, and avoids the use of fillers. Furthermore, the sealing adjustment mechanism can be used to subsequently adjust the sealing pressure of the sealing mechanism, thereby simplifying the subsequent maintenance method.

[0093] Step S40, fixing the first clamp body and the second clamp body at the leakage point of the pressure pipeline through the body connection mechanism, so that the pressure equalization chamber is connected with the interior of the pressure pipeline to complete the pressure plugging of the pressure pipeline.

[0094] The first clamp body and the second clamp body are fixed at the leakage point of the pressure pipe by using a body connection mechanism (such as a bolt connector, a snap connector or a welded part) to ensure that the clamp fits tightly to the leakage point area; the pressure equalization chamber is connected to the inside of the pressure pipe to balance the pressure around the leakage point, effectively preventing the further expansion of the leakage point; through the precise pressure plugging clamp structure and installation steps, the stability and safety of the pressure pipe at the leakage point after the pressure pipe is plugged under pressure are guaranteed, reducing environmental pollution and operational risks caused by pipeline leakage, avoiding the use of fillers, ensuring the purity of the material in the pressure pipe, avoiding the subsequent frequent glue injection maintenance after sealant sealing, and avoiding the short life problem of the glue injection plugging method, and is particularly suitable for pipelines containing high pressure, high temperature or corrosive media; at the same time, the pressure pipe pressure plugging method provided in the present application completes the plugging and repair under the normal operation of the pressure pipe without shutting down, thereby avoiding production interruption and equipment downtime loss.

[0095] In some embodiments, the first clamp body and the second clamp body are fixed at the leaking point of the pipeline by the body connection mechanism to complete the pressure pipe under pressure plugging, and then further comprising:

[0096] Detecting whether the pressurized leak plugging fixture has leakage;

[0097] If so, the sealing pressure of the sealing mechanism is adjusted by the sealing adjustment mechanism to seal the pressure equalizing chamber again.

[0098] It should be noted that, under normal circumstances, the first clamp body and the second clamp body are fixed to the pressure pipe in the leakage point area through the body connection mechanism, and the first clamp body and the second clamp body are pressed tightly through the body connection mechanism, so that the pressure equalization cavity can be effectively sealed, and the pressure pipe can be plugged under pressure. As a preferred embodiment, the sealing pressure of the plugging clamp under pressure can also be adjusted by adjusting the sealing adjustment mechanism, thereby achieving precise sealing of the leakage point and simple leakage maintenance.

[0099] Specifically, the sealing adjustment mechanism adjusts the pressure of the sealing mechanism to enhance the sealing effect by means of an adjusting bolt or a hydraulic adjustment device provided on the clamp body; the pressure pipeline pressure plugging method provided in the present application completes the plugging and repairing of leaks under the condition of normal operation of the pressure pipeline without shutting down the machine, thereby avoiding the time loss of production interruption and equipment downtime; at the same time, the introduction of the sealing adjustment mechanism enables the operator to make flexible adjustments according to the actual leakage situation, thereby enhancing the flexibility and adaptability of the plugging method, thereby making it widely applicable to various types of pressure pipelines and different leakage environments.

[0100] In some embodiments, the pressure pipeline under pressure plugging method further includes:

[0101] According to the measured shape and size of the pressure pipeline to be repaired, a stress relief device for relieving the bending stress of the pipeline is prepared, and the stress relief device includes a supporting mechanism or a hanging mechanism.

[0102] It can be seen that the bending stress generated by the pressure pipeline after repair due to pressure, deadweight or gravity of the pressurized leak-proof clamp can be eliminated by setting a pressure relief device to ensure the sealing effect and pipeline stability.

[0103] Specifically, the shape and size of the pressure pipe to be repaired are measured, especially the pipe diameter, wall thickness, bending angle and fixed support position in the area around the leak point; the stress relief device may include a supporting mechanism (such as a support rod, a support frame) or a hanging mechanism (such as a hanging hook, a chain, a hanger), etc.; it should be emphasized that the material used to prepare the pressure relief device shall meet the requirements of strength, corrosion resistance and load capacity, and high-strength alloy steel, stainless steel or composite materials are usually selected to adapt to the operating environment of the pressure pipe.

[0104] According to the measurement results, set up a stress relief device, determine the installation position and method of the stress relief device, and arrange the support mechanism or suspension mechanism in the leakage point area close to the clamp to ensure that the stress relief device can effectively balance the deadweight of the clamp and reduce the additional stress on the pipeline. One end of the stress relief device is fixed to the fixed beam, fixed frame or support platform of the pressure pipeline, and the other end is connected to the pressurized plugging clamp to balance the weight of the clamp and eliminate bending stress. Furthermore, the stress relief structure is set to adopt an adjustable structure (such as a retractable support rod or a suspension chain with adjustable length), and the height and position of the support point are flexibly adjusted according to the actual situation on site to ensure that the stress relief device can effectively balance the deadweight of the clamp and reduce the additional stress on the pipeline.

[0105] Through the stress relief device, the deadweight of the clamp can be effectively balanced, the bending stress imposed on the pipeline can be reduced, and the pipeline deformation, material fatigue and early failure caused by long-term stress can be prevented, thereby protecting the overall structural integrity of the pipeline, and then improving the stability and sealing effect of the pressure pipeline after the pressure pipeline is plugged by the pressure plugging method, effectively avoiding the sealing failure caused by stress concentration or equipment vibration, and further improving the reliability and safety of the plugging operation; ensuring the service life and operational reliability of the equipment, reducing the frequency of downtime and maintenance caused by equipment or pipeline failure, thereby reducing maintenance and operating costs.

[0106] Furthermore, after the first clamp body and the second clamp body are fixed at the leakage point of the pressure pipeline by the body connection mechanism so that the pressure equalization chamber is connected with the interior of the pressure pipeline, the method further includes:

[0107] Determine a first stress relief fixing point on the pressure plugging fixture and a second stress relief fixing point on the pressure pipeline fixing mechanism;

[0108] One end of the stress relief device is connected to the first stress relief fixing point, and the other end of the stress relief device is connected to the second stress relief fixing point, wherein the pressure pipe fixing mechanism includes a fixing beam, a fixing frame or a supporting platform.

[0109] After completing the installation of the clamp, determine the first stress relief fixing point on the pressure plugging clamp. The first stress relief fixing point is usually located at a suitable position above, below or around the clamp body, and can withstand the weight of the clamp and external stress. At the same time, determine the second stress relief fixing point on the pressure pipeline fixing mechanism. The second stress relief fixing point can be set on structural parts such as fixed beams, fixed frames or support platforms to form a stable support structure. Connect one end of the stress relief device to the first stress relief fixing point, and connect the other end to the second stress relief fixing point. The connection method can be bolt connection, welding or other mechanical connection methods to ensure the firmness and safety of the connection. Furthermore, during the connection process, by adjusting the length, angle and tension of the support mechanism or the suspension mechanism, ensure that the bending stress on the pipeline after the clamp is installed is minimized, thereby reducing the additional stress caused by the deadweight of the clamp or the change in the medium pressure in the pipeline.

[0110] By installing stress relief devices at appropriate locations on the clamp and pressure pipe, the bending stress caused by the deadweight of the clamp and the flow or pressure change of the medium in the pipe is effectively eliminated. This can prevent the clamp from causing additional mechanical load on the pipe after installation and reduce the risk of long-term damage to the pipe and clamp; the support or suspension mechanism can stabilize the connection between the pipe and the clamp and reduce the structural instability of the pipe caused by vibration, temperature difference or pressure fluctuation, thereby improving the safety of equipment operation and reducing the frequency of maintenance and replacement.

[0111] In some embodiments, the pressure pipeline under pressure plugging method further includes:

[0112] According to the measured shape and size of the pressure pipeline to be repaired, two axial fixing mechanisms for axially fixing the pressurized leak-proof plugging fixture are prepared.

[0113] The material of the axial fixing mechanism is a high-strength, corrosion-resistant metal material, such as stainless steel or alloy steel, which can withstand the pressure changes of the medium inside the pipeline and the influence of external environmental conditions; by setting the axial fixing mechanism, the axial relative displacement of the pressure pipeline and the pressure plugging fixture caused by the pressure change of the material in the pipeline or the external force can be effectively prevented. The stability of the pressure plugging fixture in the axial direction of the pipeline is ensured, especially in high pressure or vibration environment, which greatly improves the safety of the pressure pipeline after pressure plugging; at the same time, the setting of the axial fixing mechanism can also effectively disperse the stress at the connection between the pressure plugging fixture and the pressure pipeline; it can also adapt to a variety of complex on-site environments, such as high pressure, high temperature, vibration and other industrial working conditions. Regardless of the shape of the pipeline is a straight pipe, a curved pipe, or other complex pipeline structures, the axial fixing mechanism can flexibly adapt to ensure the firm connection between the pressure plugging fixture and the pipeline, and prevent the sealing failure caused by the relative displacement of the pressure pipeline and the pressure plugging fixture.

[0114] In some embodiments, the two axial fixing mechanisms for axially fixing the pressurized plugging fixture are prepared according to the measured shape and size of the pressure pipeline to be repaired, specifically including:

[0115] Determine a first axial fixed point and a second axial fixed point on the pressure pipeline, wherein the leakage point is located between the first axial fixed point and the second axial fixed point;

[0116] Determine a first fixture fixing point and a second fixture fixing point on the pressurized leak plugging fixture, wherein the first fixture fixing point and the second fixture fixing point are arranged opposite to each other along the axial direction of the pressure pipeline;

[0117] One of the axial fixing mechanisms is connected to the first axial fixing point and the first clamp fixing point respectively, and the other axial fixing mechanism is connected to the second axial fixing point and the second clamp fixing point respectively, so as to complete the installation of the two axial fixing mechanisms.

[0118] It can be understood that two axial fixing mechanisms are designed and prepared according to the measured shape and size of the pressure pipeline to be repaired. The axial fixing mechanism usually includes a metal bracket, bolts, clamps or other suitable mechanical connectors, which are used to firmly fix the pressure plugging fixture on the pipeline; high-strength and corrosion-resistant metal materials (such as stainless steel or alloy steel) are selected as the material of the axial fixing mechanism to ensure that it can be used for a long time in a high-pressure and corrosive environment; the two axial fixing mechanisms are evenly arranged on both sides of the leakage point of the pressure pipeline, which can evenly offset the axial stress of the pressure pipeline and the pressure plugging fixture, reduce the deformation or damage of the pressure pipeline caused by concentrated stress, avoid further expansion of the leakage point, extend the service life of the pipeline and the fixture, reduce the maintenance frequency and cost, and ensure the safety of the pressure pipeline pressure plugging method.

[0119] In some embodiments, the shape and size of the leak point of the pressure pipeline to be repaired obtained by measurement further includes:

[0120] A pressure relief mechanism is provided, wherein the pressure relief mechanism comprises a connecting mechanism and a pressure relief valve;

[0121] Determine the position of the pressure relief point on the first clamp body or the second clamp body;

[0122] A pressure relief hole is processed on the pressure relief point, and the pressure relief mechanism is installed on the pressure relief hole. The pressure relief mechanism is connected with the pressure equalizing chamber.

[0123] By setting up a pressure relief mechanism, temporary pressure relief can be performed when installing a pressurized leak-plugging fixture on a pressure pipeline, thereby reducing the difficulty of installation. After assembling the pressurized leak-plugging fixture, the pressure relief valve is closed to improve the operational safety and convenience of the pressurized leak-plugging method for pressure pipelines.

[0124] Please refer to Figures 2 to 10In the second embodiment of the present application, a pressurized leak-plugging clamp 10 is provided, which is used to seal the leakage point 21 of the pressure pipe 20 under pressure, and no sealant is required in the whole process of completing the plugging. The pressurized leak-plugging clamp 10 includes a first clamp body 11, a second clamp body 12, a sealing groove 13 and a sealing mechanism 14; during the assembly process, the first clamp body 11 and the second clamp body 12 are used to fix on the pressure pipe 20 and cover the leakage point 21 of the pressure pipe 20; including but not limited to pressurized pipes, various pressure vessel interface short sections, boiler interface short sections, etc.; the first clamp body 11 is provided with a first sink groove 111 and a plurality of first end grooves 112, and the plurality of first end grooves 112 are connected to the first sink groove 111 is connected; the second clamp body 12 is provided with a second sink 121 and a plurality of second end grooves 122, and the plurality of second end grooves 122 are all the plurality of second end grooves 122 connected with the first sink 111; it can be known that the first clamp body 11 and the second clamp body 12 are used to cooperate and clamp at the leakage point 21 of the pressure pipe 20. When the first clamp body 11 and the second clamp body 12 are clamped at the leakage point 21 of the pressure pipe 20, the first sink 111 and the second sink 121 constitute the pressure equalization chamber 1b, That is, the positions of the first sink 111 and the second sink 121 correspond to each other, and the opening shapes of the first sink 111 and the second sink 121 are set in the same manner; it should be noted that the pressure pipe 20 is accommodated in the pressure equalizing chamber 1b, and the pressure equalizing chamber 1b is connected to the inside of the pressure pipe 20, that is, the pressure equalizing chamber 1b is also used to accommodate the material in the pressure pipe 20, so that the pressure difference between the inner and outer walls of the pipe wall of the pressure pipe 20 is zero, which can not only prevent the material from being contaminated by the sealant in the prior art, but also prevent the leakage point 21 of the pressure pipe 20 from continuing. expansion; the sealing groove 13 is arranged at the outer periphery of the first sink groove 111 and extends to the first end groove 112, and the sealing groove 13 is also arranged in the second end groove 122; the sealing mechanism 14 is arranged in the sealing groove 13; the first end groove 112 and the second end groove 122 constitute an end hole 1c, the pressure equalizing chamber 1b and the end hole 1c are used to accommodate the pressure pipe 20, and the pressure equalizing chamber 1b is also used to accommodate the material in the pressure pipe 20, and the sealing mechanism 14 is used to seal the pressure equalizing chamber 1b.

[0125] It can be understood that in this embodiment, the connection and fixing structure between the first clamp body 11 and the second clamp body 12 is the prior art; by setting the first end groove 112 and the second end groove 122, when the first clamp body 11 and the second clamp body 12 are in contact with the pressure pipe 20, an end hole 1c for the pressure pipe 20 to enter and exit the pressurized leak-proof clamp 10 is formed, and then a sealing groove 13 is set on the outer periphery of the end hole 1c and the pressure equalizing chamber 1b, and then a sealing mechanism 14 is set in the sealing groove 13, so as to form an effective seal for the pressure equalizing chamber 1b, and then compared with the prior art of injecting sealant into the pressure equalizing chamber 1b, the radial pressure difference between the inner and outer surfaces of the wall of the pressure pipe 20 in the pressure equalizing chamber 1b can be kept at zero, effectively avoiding the subsequent expansion of the leakage point of the pressure pipe 20, and at the same time, preventing the sealant from entering the pressure pipe 20 to contaminate the material, causing a series of subsequent quality and safety problems, thereby achieving effective online plugging and repair under pressure in a true sense. It needs to be emphasized again that the pressure leak-proof clamp 10 provided in the present application does not require the use of sealants, thereby avoiding the contamination of materials in the pipeline caused by sealants, effectively ensuring production quality, avoiding subsequent continuous glue filling, and preventing stress fatigue fracture of the pressure pipeline 20.

[0126] In some preferred embodiments, the pressurized leak plugging clamp 10 further includes a sealing adjustment mechanism 15, which is disposed throughout the sealing groove 13, and is used to adjust the sealing mechanism 14. It should be noted that one end of the sealing adjustment mechanism 15 is located in the sealing groove 13, and the other end of the sealing adjustment mechanism 15 extends from the first clamp body 11 or the second clamp body 12, respectively, that is, the sealing adjustment mechanism 15 located on the first clamp body 11 extends from the first clamp body 11, and the sealing adjustment mechanism 15 located on the second clamp body 12 extends from the second clamp body 12, thereby facilitating the operation of the sealing adjustment mechanism 15; by providing the sealing adjustment mechanism 15, the sealing effect of the sealing mechanism 14 can be adjusted in real time according to the situation during future use, and the sealing adjustment mechanism 15 can perform precise pressure adjustment. Compared with traditional sealing means, the integrated sealing adjustment mechanism The sealing mechanism 15 can accurately control the sealing pressure, thereby optimizing the sealing effect, preventing sealing failure caused by excessive compression or insufficient pressure, and thus ensuring that the pressure plugging clamp 10 is always in an effective sealing state; further, the sealing adjustment mechanism 15 can also dynamically adapt to the operating pressure in the pressure pipeline 20, and can adjust the sealing pressure according to the pressure in the pressure pipeline 20 through the sealing adjustment mechanism 15, thereby practicing a long-term sealing effect, reducing the need for frequent maintenance or readjustment; further, the sealing adjustment mechanism 15 can also improve operational safety, avoid excessive sealing pressure directly acting on the pipeline, and reduce the risk of pipeline damage or leakage deterioration caused by improper sealing operation. It should be noted that the setting of the sealing adjustment mechanism 15 is only an optimized design of the pressure plugging clamp 10 provided in this application; even if the sealing adjustment mechanism 15 is not set, it will not affect the normal sealing effect of the pressure plugging clamp 10.

[0127] In other preferred embodiments, the sealing groove 13 includes a cavity sealing groove 131 and an end sealing groove 132, the end sealing groove 132 is arranged in the first end groove 112 and the second end groove 122, and is connected to the sealing groove 13; the sealing mechanism 14 is configured as a sealing sheet 141, and the sealing sheet 141 is arranged in the cavity sealing groove 131 and the end sealing groove 132, and is interference fit with the cavity sealing groove 131 and the end sealing groove 132; the sealing adjustment mechanism 15 passes through the cavity sealing groove 131 and the end sealing groove 132, and abuts against the sealing sheet 141.

[0128] It can be seen that the cavity sealing groove 131 and the end sealing groove 132 are both designed in the first clamp body 11 and the second clamp body 12 of the clamp, and together constitute the main sealing groove 13. The cavity sealing groove 131 is mainly used to seal and protect the pressure equalization cavity 1b, while the end sealing groove 132 is located in the area of ​​the end hole 1c, and is used to seal the outlet of the pressure pipe 20 extending out of the pressurized plugging clamp 10, thereby enhancing the sealing effect; thereby enabling the sealing mechanism 14 to better adapt to the sealing requirements of different parts, especially showing higher reliability when sealing irregular leakage points 21, and is particularly suitable for leak repair at pipeline interfaces or curved parts.

[0129] By configuring the sealing mechanism 14 as a sealing sheet 141, the sealing sheet 141 is respectively arranged in the cavity sealing groove 131 and the end sealing groove 132, and is interference fit with the respective sealing grooves 13, thereby ensuring that the sealing mechanism 14 can remain stable even in a high-pressure environment to avoid sealing failure; in particular, the sealing effect is maintained under various pressure and temperature conditions, especially in an environment where the temperature and pressure frequently change, and the sealing is still effective; specifically, the material of the sealing sheet 141 is selected from pressure-resistant and wear-resistant materials, such as silicone rubber, PTFE (polytetrafluoroethylene) or graphite, so that the sealing sheet 141 can withstand long-term pressure and chemical corrosion, and can ensure long-term sealing effect, thereby reducing the maintenance and replacement frequency.

[0130] In some preferred embodiments, the sealing adjustment mechanism 15 includes a plurality of plugs 151, a plurality of adjustment holes 1d are provided at the bottom of the cavity sealing groove 131 and the end sealing groove 132, and the plurality of plugs 151 are screwed into the plurality of adjustment holes 1d one by one, one end of the plug 151 extends from the first clamp body 11 and the second clamp body 12, and the other end of the plug 151 abuts against the sealing sheet 141; by abutting against the sealing sheet 141 at one end of each plug 151 and extending from the first clamp body 11 or the second clamp body 12, the sealing adjustment mechanism 15 is configured to adjust the sealing surface of the first clamp body 11 and the second clamp body 12. Instead, each plug 151 can be adjusted directly from the outside to change the pressure and position of the sealing sheet 141 to achieve the optimal sealing state of the sealing sheet 141, thereby adjusting the sealing effect according to the actual leakage conditions and pipeline conditions, increasing the applicability and flexibility of the pressurized plugging fixture 10; at the same time, the plug 151 can be quickly adjusted on site without the need for special tools or disassembly of most equipment, thereby improving maintenance efficiency and the overall reliability of the equipment; finally, precise pressure control also reduces excessive pressure on the sealing sheet 141, avoiding premature damage to the sealing sheet 141, thereby extending the service life of the equipment. It should be noted that the sealing adjustment mechanism 15 can also be set as a hydraulic structure, such as a hydraulic rod or using the space between the sealing sheet 141 and the sealing groove 13 to inject hydraulic oil, etc.

[0131] In some preferred embodiments, the sealing adjustment mechanism 15 further includes a pressing sheet 152, which is disposed in the cavity sealing groove 131 and the end sealing groove 132, and is located between the sealing sheet 141 and a plurality of the plugs 151, and the plugs 151 abut against the pressing sheet 152, and the pressing sheet 152 is used to compress the sealing sheet 141. By providing the pressing sheet 152, the pressure applied by the plug 151 to the sealing sheet 141 can be evenly dispersed to the sealing sheet 141, so as to ensure the balance of the sealing force, avoid local overpressure or underpressure, avoid sealing failure caused by uneven pressure, and improve the sealing efficiency and success rate; at the same time, the provision of the pressing sheet 152 also simplifies the adjustment operation, so that the operator can more easily adjust the sealing pressure, and can respond quickly even under complex or emergency operating conditions; finally, the uniform pressure distribution also helps to reduce the wear of the sealing sheet 141, extend the service life of the sealing configuration, and reduce the long-term maintenance cost.

[0132] In some preferred embodiments, the cavity sealing groove 131 includes a main cavity sealing groove 1311 and a transition cavity sealing groove 1312, and the transition cavity sealing groove 1312 is arranged between the main cavity sealing groove 1311 and the end sealing groove 132, thereby broadening the application scope of the clamp; the sealing sheet 141 includes a main sealing sheet 1411, a transition sealing sheet 1412 and an end sealing sheet 1413, and the main sealing sheet 1411 is arranged in the main cavity sealing groove 1311. The transition sealing sheet 1412 is arranged in the transition cavity sealing groove 1312, and the end sealing sheet 1413 is arranged in the end sealing groove 132; the pressing sheet 152 includes a main pressing sheet 1521, a transition pressing sheet 1522 and an end pressing sheet 1523, wherein the main pressing sheet 1521 is arranged in the main cavity sealing groove 1311, the transition pressing sheet 1522 is arranged in the transition cavity sealing groove 1312, and the end pressing sheet 1523 is arranged in the end sealing groove 132. It can be understood that the specific shapes of the sealing groove 13, the sealing sheet 141 and the pressing sheet 152 can be specially designed according to the specific shape of the pipeline, and can effectively seal the pipeline leakage point 21 with complex shapes, such as straight pipes, elbows, tees, special-shaped pipes, etc., effectively alleviate the stress concentration problem caused by the change of the pipeline shape, prevent secondary leakage, ensure the reliability and durability of the sealing sheet 141, and be suitable for a variety of industrial application environments. It should be noted that the sealing mechanism 14 and the pressing sheet 152 on the first clamp body 11 may be respectively provided as an integrally formed structure. Similarly, the sealing mechanism 14 and the pressing sheet 152 on the second clamp body 12 may be respectively provided as an integrally formed structure.

[0133] In some preferred embodiments, the sealing groove 13 is also arranged in a ring around the second recessed groove 121; that is, a cavity sealing groove 131 is also opened on the second clamp body 12, and a main sealing plate 1411 and a transition sealing plate 1412 are correspondingly arranged, so that the pressure equalizing chamber 1b is completely sealed by the sealing mechanism 14. Compared with the sealing mechanism 14 cooperating with the second clamp body, the sealing effect can be further improved.

[0134] In some preferred embodiments, the sealing groove 13 is also arranged in a ring around the second recessed groove 121; that is, a cavity sealing groove 131 is also opened on the second clamp body 12, and a main sealing plate 1411 and a transition sealing plate 1412 are correspondingly arranged, so that the pressure equalizing chamber 1b is completely sealed by the sealing mechanism 14. Compared with the sealing mechanism 14 cooperating with the second clamp body 12, the sealing effect can be further improved.

[0135] In some preferred embodiments, a groove is provided on the second clamp body 12, and the groove is arranged corresponding to the position of the cavity sealing groove 131. When the first clamp body 11 and the second clamp body 12 are connected together, the main sealing plate 1411 and the transition sealing plate 1412 abut against the groove, thereby improving the sealing effect on the pressure equalizing chamber 1b.

[0136] In some specific real-time modes, the pressure equalization chamber 1b is configured as a curved tube (eg Fig.10 As shown in ), straight tube (as shown in Figures 2 to 7 As shown in ), three-way pipe shape (as shown in Figure 8 and Fig. 9 As shown in ) or special-shaped pipes. Thus, the pressure plugging clamp 10 can be applied to the application scenarios of curved pipes, straight pipes, three-way pipes or special-shaped pipes.

[0137] In some preferred embodiments, the pressurized leak-plugging clamp 10 is further provided with a body connection mechanism 16, and the body connection mechanism 16 is used to fix the first clamp body 11 and the second clamp body 12. Specifically, the body connection mechanism 16 includes a bolt connector or a snap connector, and the present application preferably uses a bolt connector, and the two clamp bodies (the first clamp body 11 and the second clamp body 12) can be tightly connected through the body connection mechanism 16, so that the sealing mechanism 14 seals the pressure equalization chamber 1b; preferably, when the pressurized leak-plugging clamp 10 is provided with a sealing adjustment mechanism 15, the two clamp bodies (the first clamp body 11 and the second clamp body 12) can be tightly connected through the body connection mechanism 16, and then the sealing mechanism 14 is adjusted by the sealing adjustment mechanism 15 to seal the pressure equalization chamber 1b.

[0138] In some preferred embodiments, the sealing grooves 13 are provided in plurality, and the plurality of sealing grooves 13 are provided with spacer rings at the outer periphery of the first sink groove 111, and extend into the first end groove 112 and the second end groove 122. The design of the plurality of sealing grooves 13 provides multiple sealing layers for the pressurized plugging fixture 10. When a sealing groove 13 fails to seal, the subsequent sealing grooves 13 can continue to play a sealing role, thereby greatly enhancing the reliability and safety of the overall seal; and further, by providing a plurality of sealing grooves 13, the sealing effect of the pressurized plugging fixture 10 can be effectively improved, and the problem of sealing failure caused by a single set of sealing mechanisms 14 can be effectively prevented.

[0139] In other preferred embodiments, the plurality of sealing grooves 13 include a proximal sealing groove and a plurality of auxiliary sealing grooves, the proximal sealing groove is spaced the smallest from the sealing groove 13, the sealing sheet 141 is disposed in the proximal sealing groove; and the sealing sheets 141 and / or sealants are disposed in a plurality of the auxiliary sealing grooves.

[0140] It can be seen that by setting up multiple sealing grooves 13, multi-level sealing protection is provided for the pressure equalizing chamber 1b; by setting a sealing sheet 141 on the proximal sealing groove, the sealant can be effectively prevented from contaminating the material in the pressure pipe 20; by setting the sealing mechanism 14 in the auxiliary sealing groove to a sealing sheet 141 and / or a sealant, the sealing mechanism 14 can be selected according to the situation to ensure the sealing effect of the pressurized leak-plugging clamp 10.

[0141] In some preferred embodiments, the pressure plugging fixture 10 is further provided with a pressure relief valve, which is connected to the pressure equalization chamber 1b. When the pressure plugging fixture 10 is installed on the pressure pipe 20, temporary pressure relief can be performed to reduce the difficulty of installation. After the pressure plugging fixture 10 is assembled, the pressure relief valve is closed.

[0142] Please refer to Fig.11 In some preferred embodiments, the pressurized plugging fixture 10 further includes an axial fixing mechanism 18, which is disposed on the first fixture body 11 and the second fixture body 12 and is used to fix the first fixture body 11 and the second fixture body 12 to the pressure pipe 20 along the axial extension direction of the pressure pipe 20. The axial fixing mechanism 18 can prevent the pressurized plugging fixture 10 from detaching from the pressure pipe 20 along the axial direction of the pressure pipe 20 when the pressure pipe 20 is accidentally broken, thereby further improving the safety and stability of the pressurized plugging fixture 10.

[0143] In some preferred embodiments, the axial fixing mechanism 18 includes a clamp connector 181, a connecting rod 182 and a fixed end connector 183; the clamp connector 181 is screwed or welded to the first clamp body 11 and the second clamp body 12; one end of the connecting rod 182 is connected to the clamp connector 181; the fixed end connector 183 is used to connect the pressure pipe 20 or the fixed structure of the pressure pipe 20. It can be seen that the fixed end connector 183 can be set at a position according to the actual assembly situation of the pressure pipe 20; the clamp connector 181 can be screwed or welded to the first clamp body 11 and the second clamp body, and the shape of the connecting rod 182 can be set according to the extended shape of the pressure pipe 20; further, the connecting rod 182 is set to a length-adjustable structure, and then in the subsequent maintenance process, the length of the connecting rod 182 can be adjusted according to the actual situation to ensure the effective connection between the pressure plugging clamp 10 and the pressure pipe 20.

[0144] Please refer to Fig.12 In some preferred embodiments, the pressurized plugging clamp further includes an auxiliary support mechanism 1a, which is used to auxiliary support the first clamp body 11 and the second clamp body 12, or to offset the bending stress borne by the first clamp body 11 and the second clamp body 12. When the leakage point 21 of the pressure pipe 20 is located in the curved section, the pressurized plugging clamp 10 will be subjected to a lateral stress due to the interaction of forces. One end of the auxiliary support mechanism 1a is screwed or welded to the first clamp body 11 and the second clamp body 12, and the other end of the auxiliary support mechanism 1a is fixed to the fixed structure of the pressure pipe 20 or on the ground; when the leakage point 21 of the pressure pipe 20 is located in the straight pipe section, one end of the auxiliary support mechanism 1a can be screwed or welded to the lower end of the first clamp body 11 and the second clamp body 12 to support the pressurized plugging clamp 10 and improve the stability of the pressurized plugging clamp 10.

[0145] In some preferred embodiments, the pressurized leak-plugging clamp 10 also includes a plurality of sealing protection mechanisms 19, and the sealing protection mechanisms 19 are arranged to limit the sealing mechanism 14 in the sealing groove 13; thereby preventing the first clamp body 11 and the second clamp body 12 from just being fastened at the pressure relief point of the pressure pipe 20. When the material in the pressure pipe 20 is rushed out under high pressure under the pipe pressure, the sealing mechanism 14 is rushed out from the sealing groove 13, thereby ensuring that the sealing mechanism 14 effectively seals the pressure equalizing chamber 1b and ensuring the sealing effect of the pressurized leak-plugging clamp 10.

[0146] Please refer to Figures 2 to 12In some preferred embodiments, the sealing protection mechanism 19 includes an inner rack 191, a protection strip 192 and an outer rack 193; the inner rack 191 is arranged on the side cavity wall of the pressure equalizing chamber 1b; one end of the protection strip 192 is fixed to the side cavity wall of the pressure equalizing chamber 1b by the inner rack 191; the outer rack 193 is arranged on the outer side wall of the first clamp body 11 or the second clamp body 12, and is used to fix the other end of the protection strip 192 to the outer side wall of the first clamp body 11 or the second clamp body 12. The inner rack 191 and the outer rack 193 are screwed to the first clamp body 11 or the second clamp body 12; a plurality of the sealing protection mechanisms 19 are arranged at intervals, and it should be noted that the protection strip 192 does not affect the sealing effect of the sealing mechanism 14 on the pressure equalizing chamber 1b.

[0147] In some specific embodiments, a pressure plugging clamp 10 is provided, which is used to seal the leakage point 21 of the pressure pipe 20 under pressure, and no sealant is required in the whole process of completing the plugging. The pressure plugging clamp 10 includes a first clamp body 11, a second clamp body 12, a sealing groove 13, a sealing mechanism 14, a sealing adjustment mechanism 15, a body connecting mechanism 16, a pressure relief valve, an axial fixing mechanism 18, a sealing protection mechanism 19 and an auxiliary support mechanism 1a; during the assembly process, the first clamp body 11 and the second clamp body 12 are used to support and fix on the pressure pipe 20, cover the leakage point 21 of the pressure pipe 20, and connect the first clamp body 11 and the second clamp body 12 through the body connecting mechanism 16. Connection; the first clamp body 11 is provided with a first sink groove 111 and a plurality of first end grooves 112, and the plurality of first end grooves 112 are all connected to the first sink groove 111; the second clamp body 12 is provided with a second sink groove 121 and a plurality of second end grooves 122, and the plurality of second end grooves 122 are all connected to the plurality of second end grooves 122 of the first sink groove 111; the first sink groove 111 and the second sink groove 121 constitute a pressure equalizing chamber 1b, and the first end groove 112 and the second end groove 122 constitute an end hole 1c. The body connecting mechanism 16 is used to fix the first clamp body 11 and the second clamp body 12; the pressurized leak-plugging clamp 10 is also provided with a pressure relief valve, which is connected to the pressure equalizing chamber 1b; the pressurized leak-plugging clamp 10 also includes an axial fixing mechanism 18, which is arranged on the first clamp body 11 and the second clamp body 12, and is used to fix the first clamp body 11 and the second clamp body 12 on the pressure pipe 20 along the axial extension direction of the pressure pipe 20; the pressurized leak-plugging clamp 10 also includes a plurality of sealing protection mechanisms 19, which are arranged to limit the sealing mechanism 14 in the sealing groove 13; the pressurized leak-plugging clamp also includes an auxiliary support mechanism 1a, which is used to auxiliary support the first clamp body 11 and the second clamp body 12, or to offset the bending stress borne by the first clamp body 11 and the second clamp body 12.

[0148] It can be understood that the first clamp body 11 and the second clamp body 12 are used to cooperate and clamp at the leakage point 21 of the pressure pipe 20, that is, the positions of the first sink 111 and the second sink 121 correspond to each other, and the opening shapes of the first sink 111 and the second sink 121 are set in the same manner; it should be noted that the pressure pipe 20 is accommodated in the pressure equalizing chamber 1b, and the pressure equalizing chamber 1b is connected to the inside of the pressure pipe 20, that is, the pressure equalizing chamber 1b is also used to accommodate the material in the pressure pipe 20, so that the pressure The pressure difference between the inner and outer walls of the pipe 20 is zero, which can prevent the material from being contaminated by the sealant in the prior art and prevent the leakage point 21 of the pressure pipe 20 from continuing to expand; the sealing groove 13 is arranged around the outer periphery of the first sink 111 and extends to the first end groove 112, and the sealing groove 13 is also arranged in the second end groove 122; the sealing mechanism 14 is arranged in the sealing groove 13; the pressure equalizing chamber 1b and the end hole 1c are used to accommodate the pressure pipe 20, and the pressure equalizing chamber 1b It is also used to accommodate materials in the pressure pipe 20, and the sealing mechanism 14 is used to seal the pressure equalizing chamber 1b; when the first clamp body 11 and the second clamp body 12 are fixed to the pressure pipe 20, the pressure relief valve can be opened to relieve the pressure of the materials in the pressure equalizing chamber 1b, which is convenient for installation; at the same time, in this process, the sealing protection mechanism 19 protects and ensures that when the materials in the pressure pipe 20 are rushed out under high pressure under the pipeline pressure, the sealing mechanism 14 is rushed out from the sealing groove 13, so as to ensure that the sealing mechanism 14 effectively seals the pressure equalizing chamber 1b and ensures the sealing effect of the pressure plugging fixture 10; then, after adjusting the main body connecting mechanism 16, the pressure relief valve is closed; at this time, under normal circumstances, the sealing mechanism 14 can complete the sealing of the pressure equalizing chamber 1b; if no leakage occurs at this time, the axial fixing mechanism 18 is assembled to complete the pressure plugging operation; if there is a suspected leakage, the sealing pressure of the sealing mechanism 14 is adjusted by adjusting the sealing adjustment mechanism 15 to ensure the effective sealing of the pressure plugging fixture 10, and then the axial fixing mechanism 18 is assembled to complete the pressure plugging operation.

[0149] In summary, the present application provides a method for plugging leaks in a pressure pipeline under pressure, which includes obtaining preparation materials for a pressure plugging fixture according to the type of material, design temperature, and design pressure in the pressure pipeline to be repaired; obtaining a first fixture body and a second fixture body from the preparation materials according to the measured shape and size of the pressure pipeline to be repaired; preparing a pressure equalizing chamber, an end hole, a sealing groove, a sealing mechanism, a sealing adjustment mechanism, and a body connecting mechanism on the first fixture body and the second fixture body according to the measured shape and size of the leakage point of the pressure pipeline to be repaired, wherein the sealing groove is located at the periphery of the pressure equalizing chamber and extends into the end hole, and the sealing mechanism is located in the sealing groove for sealing the pressure equalizing chamber; fixing the first fixture body and the second fixture body at the leakage point of the pressure pipeline through the body connecting mechanism, so that the pressure equalizing chamber is connected to the interior of the pressure pipeline to complete the pressure plugging of the pressure pipeline under pressure. It can ensure that the pressurized leak-plugging fixture will not react with the material in the pressure pipeline and will not contaminate the material. At the same time, the pressurized leak-plugging fixture with the most reasonable shape and size is used to plug the leakage point of the pressure pipeline without the need to use sealants, which further ensures the safety of the material, facilitates sealing, forms a long-term and effective sealing effect, and facilitates subsequent maintenance.

[0150] It should be understood that the application of the present application is not limited to the above examples. For ordinary technicians in this field, improvements or changes can be made based on the above description. All these improvements and changes should fall within the scope of protection of the claims attached to this application.

Claims

1. A method for plugging leaks in a pressure pipeline under pressure, characterized in that: include: According to the material type, design temperature and design pressure in the pressure pipeline to be repaired, the preparation materials of the pressurized plugging fixture are obtained; According to the measured shape and size of the pressure pipe to be repaired, a first clamp body and a second clamp body are obtained from the prepared material; According to the shape and size of the leakage point of the pressure pipeline to be repaired obtained by measurement, a pressure equalizing cavity, an end hole, a sealing groove, a sealing mechanism, a sealing adjustment mechanism and a body connection mechanism are prepared on the first clamp body and the second clamp body, wherein the sealing groove is located at the periphery of the pressure equalizing cavity and extends into the end hole, and the sealing mechanism is located in the sealing groove and is used to seal the pressure equalizing cavity; The first clamp body and the second clamp body are fixed at the leakage point of the pressure pipeline through the body connection mechanism, so that the pressure equalization chamber is connected with the interior of the pressure pipeline to complete the pressure plugging of the pressure pipeline.

2. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: The first clamp body and the second clamp body are fixed at the leakage point of the pipeline by the body connection mechanism to complete the pressure pipe under pressure plugging, and then further comprising: Detecting whether the pressurized leak plugging fixture has leakage; If so, the sealing pressure of the sealing mechanism is adjusted by the sealing adjustment mechanism to seal the pressure equalizing chamber again.

3. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: According to the measured shape and size of the pressure pipe to be repaired, a first clamp body and a second clamp body are obtained from the prepared material, and then the method further includes: Perform nondestructive testing on the first fixture body and the second fixture body.

4. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: The pressure pipeline under pressure plugging method also includes: According to the measured shape and size of the pressure pipeline to be repaired, a stress relief device for relieving the bending stress of the pipeline is prepared, and the stress relief device includes a supporting mechanism or a hanging mechanism.

5. The pressure pipeline under pressure plugging method according to claim 4 is characterized in that: After the first clamp body and the second clamp body are fixed at the leakage point of the pressure pipeline by the body connection mechanism so that the pressure equalization chamber is connected with the interior of the pressure pipeline, the method further comprises: Determine a first stress relief fixing point on the pressure plugging fixture and a second stress relief fixing point on the pressure pipeline fixing mechanism; One end of the stress relief device is connected to the first stress relief fixing point, and the other end of the stress relief device is connected to the second stress relief fixing point, wherein the pressure pipe fixing mechanism includes a fixing beam, a fixing frame or a supporting platform.

6. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: The pressure pipeline under pressure plugging method also includes: According to the measured shape and size of the pressure pipeline to be repaired, two axial fixing mechanisms for axially fixing the pressurized leak-proof plugging fixture are prepared.

7. The pressure pipeline under pressure plugging method according to claim 6 is characterized in that: According to the measured shape and size of the pressure pipeline to be repaired, two axial fixing mechanisms for axially fixing the pressurized plugging fixture are prepared, which specifically include: Determine a first axial fixed point and a second axial fixed point on the pressure pipeline, wherein the leakage point is located between the first axial fixed point and the second axial fixed point; Determine a first fixture fixing point and a second fixture fixing point on the pressurized leak plugging fixture, wherein the first fixture fixing point and the second fixture fixing point are arranged opposite to each other along the axial direction of the pressure pipeline; One of the axial fixing mechanisms is connected to the first axial fixing point and the first clamp fixing point respectively, and the other axial fixing mechanism is connected to the second axial fixing point and the second clamp fixing point respectively, so as to complete the installation of the two axial fixing mechanisms.

8. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: The shape and size of the leak point of the pressure pipeline to be repaired obtained by measurement also include: A pressure relief mechanism is provided, wherein the pressure relief mechanism comprises a connecting mechanism and a pressure relief valve; Determine the position of the pressure relief point on the first clamp body or the second clamp body; A pressure relief hole is processed on the pressure relief point, and the pressure relief mechanism is installed on the pressure relief hole. The pressure relief mechanism is connected with the pressure equalizing chamber.

9. The pressure pipeline under pressure plugging method according to claim 1 is characterized in that: The method of fixing the first clamp body and the second clamp body at the leakage point of the pressure pipeline by the body connection mechanism also includes: A pressure test is performed on the pressurized leak-proof fixture.

10. A pressure plugging fixture, characterized in that: The pressure clamp plugging fixture is used to implement the pressure pipeline pressure plugging method as described in any one of claims 1-9.

11. The pressure plugging fixture according to claim 10, characterized in that: The pressurized plugging fixture comprises: A first clamp body, wherein the first clamp body is provided with a first sink groove and a plurality of first end grooves communicating with the first sink groove; A second clamp body, wherein the second clamp body is provided with a second sink groove and a plurality of second end grooves communicating with the first sink groove; A sealing groove, the sealing groove is arranged at the outer periphery of the first sink groove and extends to the first end groove, and the sealing groove is also arranged in the second end groove; A sealing mechanism, wherein the sealing mechanism is disposed in the sealing groove; A sealing adjustment mechanism, the sealing adjustment mechanism is disposed through the sealing groove, and the sealing adjustment mechanism is used to adjust the sealing mechanism; A body connection mechanism, the body connection mechanism is used to fixedly connect the first clamp body and the second clamp body; Among them, the first clamp body and the second clamp body are used to cooperate and clamp at the leakage point of the pressure pipe, the first sink groove and the second sink groove constitute a pressure equalizing chamber, the first end groove and the second end groove constitute an end hole, the pressure equalizing chamber and the end hole are used to accommodate the pressure pipe, and the pressure equalizing chamber is also used to accommodate materials in the pressure pipe, and the sealing mechanism is used to seal the pressure equalizing chamber.

12. The pressure plugging fixture according to claim 11, characterized in that: The sealing groove comprises a cavity sealing groove, and an end sealing groove disposed in the first end groove and the second end groove and communicating with the sealing groove; The sealing mechanism is configured as a sealing sheet, which is disposed in the cavity sealing groove and the end sealing groove and is interference-fitted with the cavity sealing groove and the end sealing groove; The sealing adjustment mechanism passes through the cavity sealing groove and the end sealing groove, and abuts against the sealing sheet.

13. The pressure plugging fixture according to claim 12, characterized in that: The sealing adjustment mechanism comprises: A plurality of plugs, the bottoms of the cavity sealing groove and the end sealing groove are provided with a plurality of adjustment holes, the plurality of plugs are correspondingly screwed into the plurality of adjustment holes, and one end of the plugs extends out from the first clamp body and the second clamp body; A pressing sheet is arranged in the cavity sealing groove and the end sealing groove, and is located between the sealing sheet and a plurality of the plugs. The plurality of the plugs abut against the pressing sheet, and the pressing sheet is used to compress the sealing sheet.

14. The pressure plugging fixture according to claim 13, characterized in that: The cavity sealing groove comprises a main cavity sealing groove and a transition cavity sealing groove, and the transition cavity sealing groove is arranged between the main cavity sealing groove and the end sealing groove; The sealing sheet comprises a main sealing sheet, a transition sealing sheet and an end sealing sheet, wherein the main sealing sheet is arranged in the main cavity sealing groove, the transition sealing sheet is arranged in the transition cavity sealing groove, and the end sealing sheet is arranged in the end sealing groove; The pressing plate includes a main pressing plate, a transition pressing plate and an end pressing plate. The main pressing plate is arranged in the main cavity sealing groove, the transition pressing plate is arranged in the transition cavity sealing groove, and the end pressing plate is arranged in the end sealing groove.

15. The pressure plugging fixture according to claim 11, characterized in that: An axial fixing mechanism for a pressure plugging fixture, the axial fixing mechanism comprising: A clamp connecting piece, wherein the clamp connecting piece is screwed or welded to the first clamp body and the second clamp body; A connecting rod, one end of which is connected to the clamp connector, and the connecting rod is configured to have an adjustable length; A fixed end connector is used to connect a pressure pipe or a fixed structure of a pressure pipe.

16. The pressure plugging fixture according to claim 11, characterized in that: The pressurized plugging fixture further comprises an auxiliary support mechanism, which is used to auxiliary support the first fixture body and the second fixture body, or to offset the bending stress borne by the first fixture body and the second fixture body; and / or, The pressurized leak plugging fixture is also provided with a pressure relief valve, and the pressure relief valve is communicated with the pressure equalizing chamber.

17. The pressure plugging fixture according to claim 11, characterized in that: The pressurized leak plugging fixture further includes a plurality of sealing protection mechanisms, which are arranged to limit the sealing mechanism in the sealing groove, and the sealing protection mechanism includes: An inner gear rack, the inner gear rack being arranged on a side cavity wall of the pressure equalizing cavity; A protection strip, one end of which is fixed to the side cavity wall of the pressure equalizing cavity by the inner gear rack; An outer rack is arranged on the outer side wall of the first clamp body or the second clamp body, and is used to fix the other end of the protection strip on the outer side wall of the first clamp body or the second clamp body.