Charging protection control method and system for top-speed charging data line

By combining branch shunt and performance prediction model of the charging data cable and setting up an overcurrent protection mechanism, the problem of abnormal current during extreme speed charging is solved, and the stability and progress of the charging process are guaranteed.

CN119070434AInactive Publication Date: 2024-12-03SHENZHEN JINLAI CABLE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411207671.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing fast charging protection methods have delays, which may cause damage to the charged objects and will interrupt charging during protection, resulting in delayed charging progress.

Method used

By branching and shunting the charging data line, a performance prediction model is established, and an overcurrent protection mechanism is set based on the threshold of the extreme speed charging current, combining a uniform magnetic field and characteristic spring for overcurrent protection, ensuring that abnormal branches are instantly cut off when the current is abnormal, and recovery Maintain passageway afterwards to avoid overall charging interruption.

Benefits of technology

It realizes instantaneous response to current abnormalities during extreme speed charging, avoiding protection delay and charging interruptions, and ensuring that the charging progress is not affected.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070434A_ABST
    Figure CN119070434A_ABST
Patent Text Reader

Abstract

The invention discloses a charging protection control method and system for a top-speed charging data line, and relates to the field of charging protection, and the method comprises the steps: obtaining a top-speed charging current upper threshold value of a to-be-charged product; obtaining at least one charging branch; performing connection setting on the charging branch and the bus part; establishing a performance prediction model of the charging data line; setting an over-current protection mechanism based on an upper threshold value of the top-speed charging current; based on an over-current protection mechanism, setting a balance weight for the bus part; according to the actual use time obtained through accumulation and a performance prediction model of the charging data line, performance estimation is carried out, and the current loss rate of the charging data line is obtained; and updating the overcurrent protection mechanism based on the current loss rate of the charging data line. Through the arrangement of the classification module, the connection setting module, the overcurrent protection module and the counterweight setting module, the protection delay can be eliminated, and meanwhile, the condition of protection interruption of charging can be solved, so that the charging progress can be prevented from being influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of charging protection, and in particular to a charging protection control method and system for an ultra-fast charging data cable. Background Art

[0002] In recent years, with the development of smart phones, charging methods have become more diverse. From flash charging, fast charging to wireless charging, the speed and convenience of mobile phone charging have been continuously improved. Among them, fast charging technology is a method of fast charging by increasing voltage and reducing current. Due to its low current and strong compatibility, it does not require high requirements for mobile phone chargers and data cables. You can use a charger that supports flash charging technology without causing substantial damage to the mobile phone battery.

[0003] However, abnormal current will inevitably occur during the high-speed charging process. The existing protection methods usually have a certain delay, which will cause damage to the charged object, and the charging will be interrupted during the protection. If you want to continue charging, you must restart, which will delay the charging progress. Summary of the invention

[0004] In order to solve the above technical problems, a charging protection control method and system for an ultra-fast charging data cable are provided. The technical solution solves the problem that the existing protection method proposed in the above background technology usually has a certain delay, which will cause damage to the charged object, and the charging will be interrupted during the protection. If you want to continue charging, you must restart, which will delay the charging progress.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] A charging protection control method for an ultra-fast charging data cable, comprising:

[0007] A test mechanism for the product to be charged is formed for the charging data line, and an upper threshold value of the extremely fast charging current of the product to be charged is obtained according to the test mechanism for the product to be charged;

[0008] Dividing the charging data line into a bus part and a branch part, evenly branching the branch part to obtain at least one charging branch, and using the at least one charging branch for shunt charging;

[0009] Connect and set the charging branch and the bus part;

[0010] Establish a performance prediction model for charging data cables;

[0011] Set up an overcurrent protection mechanism based on the upper limit of the ultra-fast charging current;

[0012] Based on the overcurrent protection mechanism, a counterweight is set for the bus part;

[0013] According to the accumulated actual usage time and the performance prediction model of the charging data line, the performance is estimated to obtain the current loss rate of the charging data line;

[0014] The overcurrent protection mechanism is updated based on the current loss rate of the charging data line.

[0015] Preferably, the formation of a product to be charged test mechanism for the charging data line comprises the following steps:

[0016] Obtaining a tolerable temperature of at least one sample charging product based on the big data;

[0017] Obtaining a minimum value of the tolerable temperature of at least one sample charging product as an allowable temperature value;

[0018] The product to be charged is charged with constant current. When the temperature of the product to be charged remains unchanged, the current temperature is obtained to determine whether the current temperature is greater than the allowable temperature value. If so, the current of the constant current charging is not the upper threshold value of the extreme charging current. If not, the current of the constant current charging is used as the pre-selected upper threshold value of the extreme charging current.

[0019] Preferably, obtaining the upper threshold value of the extremely fast charging current of the product to be charged according to the testing mechanism of the product to be charged comprises the following steps:

[0020] Based on big data, obtain the charging current range of the product to be charged;

[0021] Divide the charging current range of the product to be charged at equal intervals to obtain at least one test point;

[0022] Using the product testing mechanism to be charged, constant current charging is performed according to the value of at least one test point to obtain at least one preselected upper limit value of the extreme speed charging current;

[0023] The maximum value of at least one preselected upper threshold value of extremely fast charging current is used as the upper threshold value of extremely fast charging current for the product to be charged.

[0024] Preferably, the connection setting between the charging branch and the bus part includes the following steps:

[0025] An insulating protective layer is provided on the outside of the charging branch and the bus part, and at least one branch line head is provided at the connection between the bus part and the charging branch, wherein an insulating protective layer is provided on the outside of the branch line head, and the number of the branch line heads is consistent with the number of the charging branches;

[0026] The charging branch abuts against the branch wire head, and a characteristic spring is fixedly connected between the insulating protective layer of the charging branch and the insulating protective layer of the branch wire head.

[0027] Preferably, the establishment of the performance prediction model of the charging data line comprises the following steps:

[0028] Divide the service life of the charging data cable into equal intervals to obtain at least one time point;

[0029] Under the condition that the usage time of the charging data line is equal to the value at the time point, at least one sample current is input into the charging data line, and an output current after flowing through the charging data line is obtained;

[0030] Accumulate at least one sample current to obtain a total sample current;

[0031] Accumulate at least one output current to obtain a total output current;

[0032] The result of total sample current and total output current is divided by total sample current to obtain current loss rate;

[0033] Pairing the time points with the corresponding current loss rates to obtain at least one test group;

[0034] Fitting at least one test group to obtain a performance prediction fitting function, wherein the time point is an independent variable and the current loss rate is a dependent variable;

[0035] The performance prediction fitting function is used as the performance prediction model of the charging data cable.

[0036] Preferably, the setting of the overcurrent protection mechanism based on the upper threshold of the extremely fast charging current includes the following steps:

[0037] Divide the upper threshold of the extreme-speed charging current by the number of charging branches to obtain the upper threshold of the branch current;

[0038] The maximum resistance of the characteristic spring to the separation of the charging branch and the branch wire head is obtained in advance as the characteristic resistance;

[0039] The weight of the charging branch per unit length is obtained in advance as the first weight, and the weight of the branch line end per unit length is obtained in advance as the second weight;

[0040] A uniform magnetic field is set at the connection between the charging branch and the bus part, and the charging branch and the branch line head are located in the uniform magnetic field. The length is preset;

[0041] The weight of the charging branch with a preset length is calculated as the third weight, and the weight of the branch line end with a preset length is calculated as the fourth weight;

[0042] Using the Ampere force formula, calculate the magnetic field strength of the uniform magnetic field;

[0043] Using the magnetic field strength and setting position of the uniform magnetic field as an overcurrent protection mechanism;

[0044] The Ampere force formula is as follows:

[0045] F = ILBsinβ,

[0046] Among them, F is the sum of the characteristic resistance and the fourth weight, I is the upper threshold of the branch current, L is the preset length, B is the magnetic field strength of the uniform magnetic field, B is unknown, and β is the angle between I and B.

[0047] Preferably, the step of setting a counterweight for the bus portion based on the overcurrent protection mechanism comprises the following steps:

[0048] The maximum value of the magnetic field strength of the uniform magnetic field in the overcurrent protection mechanism corresponding to different upper threshold values ​​of the extremely fast charging current is obtained as the target magnetic field strength;

[0049] Based on historical data, the maximum current when the current in the charging data line is abnormal is obtained as the target current;

[0050] According to the Ampere force formula, the maximum magnetic force on the bus part is the target magnetic field strength multiplied by the target current multiplied by the preset length multiplied by the number of branch line ends;

[0051] Set the counterweight weight of the bus section to twice the maximum magnetic force to which the bus section is subjected.

[0052] Preferably, the performing of performance estimation to obtain the current loss rate of the charging data line comprises the following steps:

[0053] Substitute the actual usage time into the performance prediction fitting function to obtain the current loss rate of the charging data line.

[0054] Preferably, updating the overcurrent protection mechanism based on the current loss rate of the charging data line includes the following steps:

[0055] One minus the current loss rate of the charging data line to obtain the current utilization rate of the charging data line;

[0056] The upper threshold of the ultra-fast charging current is divided by the current utilization rate of the charging data line to obtain an updated value of the ultra-fast charging current;

[0057] In the step of setting the overcurrent protection mechanism based on the upper threshold value of the extreme-speed charging current, the upper threshold value of the extreme-speed charging current is replaced with the extreme-speed charging current update value to complete the updating of the overcurrent protection mechanism.

[0058] A charging protection control system for an ultra-fast charging data line, used to implement the above-mentioned charging protection control method for the ultra-fast charging data line, comprising:

[0059] A data acquisition module, wherein the data acquisition module forms a test mechanism for the product to be charged for the charging data line, and obtains an upper threshold value of the extremely fast charging current of the product to be charged according to the test mechanism;

[0060] a classification module, wherein the classification module divides the charging data line into a bus part and a branch part, evenly branches the branch part to obtain at least one charging branch, and uses the at least one charging branch for shunt charging;

[0061] A connection setting module, which performs connection setting between the charging branch and the bus part;

[0062] A model building module, wherein the model building module builds a performance prediction model of the charging data line;

[0063] An overcurrent protection module, wherein the overcurrent protection module sets an overcurrent protection mechanism based on an upper threshold value of the extremely fast charging current;

[0064] A counterweight setting module, wherein the counterweight setting module sets a counterweight for a bus portion based on an overcurrent protection mechanism;

[0065] A data calculation module, wherein the data calculation module performs performance estimation based on the accumulated actual usage time and the performance prediction model of the charging data line to obtain a current loss rate of the charging data line;

[0066] A data update module is used to update an overcurrent protection mechanism based on a current loss rate of a charging data line.

[0067] Compared with the prior art, the present invention has the following beneficial effects:

[0068] By setting up the classification module, connection setting module, model building module, overcurrent protection module and counterweight setting module, when a sudden current abnormality occurs during the ultra-fast charging process, the abnormal branch can be instantly cut off, and when it returns to normal, the passage is maintained. At the same time, the remaining branches are not affected by the abnormal branch, thereby ensuring that the overall charging is not interrupted. Therefore, it can not only eliminate the delay of protection, but also solve the problem of protection interrupting charging, thereby avoiding the charging progress being affected. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] Figure 1 It is a flow chart of a charging protection control method for an ultra-fast charging data cable of the present invention;

[0070] Figure 2 It is a flow chart of a testing mechanism for a charging data line to form a product to be charged according to the present invention;

[0071] Figure 3 It is a flow chart of obtaining the upper threshold value of the extremely fast charging current of the product to be charged according to the testing mechanism of the product to be charged of the present invention;

[0072] Figure 4 It is a schematic diagram of the process of connecting and setting the charging branch and the bus part of the present invention;

[0073] Figure 5 A schematic diagram of a flow chart of establishing a performance prediction model for a charging data line according to the present invention;

[0074] Figure 6 It is a flow chart of setting an overcurrent protection mechanism based on the upper threshold of the extremely fast charging current of the present invention;

[0075] Figure 7 It is a schematic diagram of a process of setting a counterweight on a bus part based on an overcurrent protection mechanism of the present invention;

[0076] Figure 8 The figure is a flow chart of updating the overcurrent protection mechanism based on the current loss rate of the charging data line according to the present invention. DETAILED DESCRIPTION

[0077] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0078] Reference Figure 1 As shown, a charging protection control method for an ultra-fast charging data cable includes:

[0079] A test mechanism for the product to be charged is formed for the charging data line, and an upper threshold value of the extremely fast charging current of the product to be charged is obtained according to the test mechanism for the product to be charged;

[0080] Dividing the charging data line into a bus part and a branch part, evenly branching the branch part to obtain at least one charging branch, and using the at least one charging branch for shunt charging;

[0081] Connect and set the charging branch and the bus part;

[0082] Establish a performance prediction model for charging data cables;

[0083] Set up an overcurrent protection mechanism based on the upper limit of the ultra-fast charging current;

[0084] Based on the overcurrent protection mechanism, a counterweight is set for the bus part;

[0085] According to the accumulated actual usage time and the performance prediction model of the charging data line, the performance is estimated to obtain the current loss rate of the charging data line;

[0086] The overcurrent protection mechanism is updated based on the current loss rate of the charging data line.

[0087] Reference Figure 2 As shown, forming a charging product testing mechanism for the charging data line includes the following steps:

[0088] Obtaining a tolerable temperature of at least one sample charging product based on the big data;

[0089] Obtaining a minimum value of the tolerable temperature of at least one sample charging product as an allowable temperature value;

[0090] The product to be charged is charged with constant current. When the temperature of the product to be charged remains unchanged, the current temperature is obtained to determine whether the current temperature is greater than the allowable temperature value. If so, the current of the constant current charging is not the upper threshold value of the extreme charging current. If not, the current of the constant current charging is used as the pre-selected upper threshold value of the extreme charging current.

[0091] By forming a testing mechanism for products to be charged, an extremely fast charging current that will not cause damage to the products to be charged can be obtained. As a result, a basis for judging charging overcurrent can be obtained, and an overcurrent protection mechanism can be set based on the judgment basis to complete charging protection.

[0092] Reference Figure 3 As shown, according to the test mechanism of the product to be charged, obtaining the upper threshold value of the extremely fast charging current of the product to be charged includes the following steps:

[0093] Based on big data, obtain the charging current range of the product to be charged;

[0094] Divide the charging current range of the product to be charged at equal intervals to obtain at least one test point;

[0095] Using the product testing mechanism to be charged, constant current charging is performed according to the value of at least one test point to obtain at least one preselected upper limit value of the extreme speed charging current;

[0096] The maximum value of at least one preselected upper threshold value of extremely fast charging current is used as the upper threshold value of extremely fast charging current for the product to be charged.

[0097] Reference Figure 4 As shown, the connection setting between the charging branch and the bus part includes the following steps:

[0098] An insulating protective layer is provided on the outside of the charging branch and the bus part, and at least one branch line head is provided at the connection between the bus part and the charging branch, wherein an insulating protective layer is provided on the outside of the branch line head, and the number of the branch line heads is consistent with the number of the charging branches;

[0099] The charging branch abuts against the branch wire head, and a characteristic spring is fixedly connected between the insulating protective layer of the charging branch and the insulating protective layer of the branch wire head.

[0100] The charging branch and the branch wire head are abutted, therefore, the charging branch and the branch wire head can be separated, and since the characteristic spring is connected to the outside of the insulating part of the charging branch and the branch wire head, the charging branch and the branch wire head can be limited by its elastic force to maintain its passage.

[0101] Reference Figure 5 As shown, establishing a performance prediction model for a charging data line includes the following steps:

[0102] Divide the service life of the charging data cable into equal intervals to obtain at least one time point;

[0103] Under the condition that the usage time of the charging data line is equal to the value at the time point, at least one sample current is input into the charging data line, and an output current after flowing through the charging data line is obtained;

[0104] Accumulate at least one sample current to obtain a total sample current;

[0105] Accumulate at least one output current to obtain a total output current;

[0106] The result of total sample current and total output current is divided by total sample current to obtain current loss rate;

[0107] Pairing the time points with the corresponding current loss rates to obtain at least one test group;

[0108] Fitting at least one test group to obtain a performance prediction fitting function, wherein the time point is an independent variable and the current loss rate is a dependent variable;

[0109] The performance prediction fitting function is used as the performance prediction model of the charging data cable.

[0110] The charging data cable will produce losses when used for a long time. Therefore, when charging with the original parameters, the actual charging current will decrease. Therefore, it is necessary to predict the degree of reduction and then adjust the overcurrent protection mechanism according to the prediction result. Because when the charging data cable loses current, the overcurrent protection mechanism should allow a larger current to pass through, because after the loss, it will drop to a current that meets the demand.

[0111] Reference Figure 6 As shown in the figure, based on the upper threshold of the extremely fast charging current, setting the overcurrent protection mechanism includes the following steps:

[0112] Divide the upper threshold of the extreme-speed charging current by the number of charging branches to obtain the upper threshold of the branch current;

[0113] The maximum resistance of the characteristic spring to the separation of the charging branch and the branch wire head is obtained in advance as the characteristic resistance;

[0114] The weight of the charging branch per unit length is obtained in advance as the first weight, and the weight of the branch line end per unit length is obtained in advance as the second weight;

[0115] A uniform magnetic field is set at the connection between the charging branch and the bus part, and the charging branch and the branch line head are located in the uniform magnetic field. The length is preset;

[0116] The weight of the charging branch with a preset length is calculated as the third weight, and the weight of the branch line end with a preset length is calculated as the fourth weight;

[0117] Using the Ampere force formula, calculate the magnetic field strength of the uniform magnetic field;

[0118] Using the magnetic field strength and setting position of the uniform magnetic field as an overcurrent protection mechanism;

[0119] The Ampere force formula is as follows:

[0120] F = ILBsinβ,

[0121] Among them, F is the sum of the characteristic resistance and the fourth weight, I is the upper threshold of the branch current, L is the preset length, B is the magnetic field strength of the uniform magnetic field, B is unknown, and β is the angle between I and B.

[0122] Based on physical knowledge, a current-carrying conductor will be affected by the Ampere force in a magnetic field, and when the only variable is the current, the magnitude of the force it receives is proportional to the magnitude of the current. Therefore, when there is an overcurrent, the Ampere force exceeds the gravity of the preset length and the characteristic resistance of the characteristic spring, and the charging branch and the branch wire head can be separated. Therefore, the branch will be broken and the Ampere force will disappear. Since the abnormality is momentary and will disappear immediately, under the action of the characteristic spring, the charging branch and the branch wire head will reconnect and recharge, while the remaining charging branches and branch wire heads will not be affected. Here, a counterweight is set on the branch wire head, so it will not be affected by the Ampere force and its movement will be separated. According to the right-hand rule, the direction of the magnetic field can be set so that the Ampere force is vertically upward.

[0123] Reference Figure 7 As shown, based on the overcurrent protection mechanism, setting a counterweight for the bus portion includes the following steps:

[0124] The maximum value of the magnetic field strength of the uniform magnetic field in the overcurrent protection mechanism corresponding to different upper threshold values ​​of the extremely fast charging current is obtained as the target magnetic field strength;

[0125] Based on historical data, the maximum current when the current in the charging data line is abnormal is obtained as the target current;

[0126] According to the Ampere force formula, the maximum magnetic force on the bus part is the target magnetic field strength multiplied by the target current multiplied by the preset length multiplied by the number of branch line ends;

[0127] This is because when the magnetic field is perpendicular to the direction of the current, the sine value is 1, so it can be calculated like this;

[0128] Set the counterweight weight of the bus section to twice the maximum magnetic force to which the bus section is subjected.

[0129] The purpose of setting the counterweight is to keep the branch line head from being lifted by the Ampere force when overcurrent occurs, so that it can be separated from the charging branch, thereby completing the protection function.

[0130] The following steps are included to estimate the performance and obtain the current loss rate of the charging data line:

[0131] Substitute the actual usage time into the performance prediction fitting function to obtain the current loss rate of the charging data line.

[0132] Reference Figure 8 As shown, updating the overcurrent protection mechanism based on the current loss rate of the charging data line includes the following steps:

[0133] One minus the current loss rate of the charging data line to obtain the current utilization rate of the charging data line;

[0134] The upper threshold of the ultra-fast charging current is divided by the current utilization rate of the charging data line to obtain an updated value of the ultra-fast charging current;

[0135] In the step of setting the overcurrent protection mechanism based on the upper threshold value of the extreme-speed charging current, the upper threshold value of the extreme-speed charging current is replaced with the extreme-speed charging current update value to complete the updating of the overcurrent protection mechanism.

[0136] When the power loss of the charging data line increases, the current allowed to pass through the overcurrent protection mechanism will increase, because after the loss of the charging data line, it can be reset to a value that meets the demand. If it is not updated, it will limit the efficiency of fast charging and increase the charging time;

[0137] It should be noted here that the position where the charging branch and the branch line head abut is set at the initial position near the charging data line. Therefore, the length of the line passing through the protection part to the final charging part is almost the same as the length of the charging data line. Therefore, the current loss rate of the charging data line can be used for calculation, and the error caused is within the allowable range.

[0138] A charging protection control system for an ultra-fast charging data line, used to implement the above-mentioned charging protection control method for the ultra-fast charging data line, comprising:

[0139] A data acquisition module, wherein the data acquisition module forms a test mechanism for the product to be charged for the charging data line, and obtains an upper threshold value of the extremely fast charging current of the product to be charged according to the test mechanism;

[0140] a classification module, wherein the classification module divides the charging data line into a bus part and a branch part, evenly branches the branch part to obtain at least one charging branch, and uses the at least one charging branch for shunt charging;

[0141] A connection setting module, which performs connection setting between the charging branch and the bus part;

[0142] A model building module, wherein the model building module builds a performance prediction model of the charging data line;

[0143] An overcurrent protection module, wherein the overcurrent protection module sets an overcurrent protection mechanism based on an upper threshold value of the extremely fast charging current;

[0144] A counterweight setting module, wherein the counterweight setting module sets a counterweight for a bus portion based on an overcurrent protection mechanism;

[0145] A data calculation module, wherein the data calculation module performs performance estimation based on the accumulated actual usage time and the performance prediction model of the charging data line to obtain a current loss rate of the charging data line;

[0146] A data update module is used to update an overcurrent protection mechanism based on a current loss rate of a charging data line.

[0147] Furthermore, the present solution also proposes a storage medium on which a computer-readable program is stored. When the computer-readable program is called, the charging protection control method of the ultra-fast charging data cable is executed.

[0148] It is understandable that the storage medium may be a magnetic medium, such as a floppy disk, a hard disk, or a magnetic tape; an optical medium, such as a DVD; or a semiconductor medium, such as a solid state drive (SSD).

[0149] In summary, the advantages of the present invention are: by setting a classification module, a connection setting module, a model building module, an overcurrent protection module and a counterweight setting module, when a sudden current abnormality occurs during the extremely fast charging process, the abnormal branch can be instantly cut off, and when it returns to normal, the passage is maintained, and at the same time, the remaining branches are not affected by the abnormal branch, thereby ensuring that the overall charging is not interrupted. Therefore, the delay of protection can be eliminated, and at the same time, the situation of protection interrupting charging can be solved, thereby avoiding the charging progress being affected.

[0150] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A charging protection control method for an ultra-fast charging data line, characterized in that: include: A test mechanism for the product to be charged is formed for the charging data line, and an upper threshold value of the extremely fast charging current of the product to be charged is obtained according to the test mechanism for the product to be charged; Dividing the charging data line into a bus part and a branch part, evenly branching the branch part to obtain at least one charging branch, and using the at least one charging branch for split charging; Connect and set the charging branch and the bus part; Establish a performance prediction model for charging data cables; Set up an overcurrent protection mechanism based on the upper limit of the ultra-fast charging current; Based on the overcurrent protection mechanism, a counterweight is set for the bus part; According to the accumulated actual usage time and the performance prediction model of the charging data line, the performance is estimated to obtain the current loss rate of the charging data line; The overcurrent protection mechanism is updated based on the current loss rate of the charging data line.

2. The charging protection control method for a high-speed charging data line according to claim 1, characterized in that: The charging data line is used to form a product testing mechanism to be charged, which includes the following steps: Obtaining a tolerable temperature of at least one sample charging product based on the big data; Obtaining a minimum value of the tolerable temperature of at least one sample charging product as an allowable temperature value; The product to be charged is charged with constant current. When the temperature of the product to be charged remains unchanged, the current temperature is obtained to determine whether the current temperature is greater than the allowable temperature value. If so, the current of the constant current charging is not the upper threshold value of the extreme charging current. If not, the current of the constant current charging is used as the pre-selected upper threshold value of the extreme charging current.

3. The charging protection control method for a high-speed charging data line according to claim 2, characterized in that: The method of obtaining the upper threshold value of the extremely fast charging current of the product to be charged according to the test mechanism of the product to be charged comprises the following steps: Based on big data, obtain the charging current range of the product to be charged; Divide the charging current range of the product to be charged at equal intervals to obtain at least one test point; Using the product testing mechanism to be charged to perform constant current charging according to the value of at least one test point, to obtain at least one preselected upper threshold value of the extreme speed charging current; The maximum value of at least one preselected upper threshold value of extremely fast charging current is used as the upper threshold value of extremely fast charging current for the product to be charged.

4. The charging protection control method for a high-speed charging data line according to claim 3, characterized in that: The connection setting of the charging branch and the bus part comprises the following steps: An insulating protective layer is provided on the outside of the charging branch and the bus part, and at least one branch line head is provided at the connection between the bus part and the charging branch, wherein an insulating protective layer is provided on the outside of the branch line head, and the number of the branch line heads is consistent with the number of the charging branches; The charging branch abuts against the branch wire head, and a characteristic spring is fixedly connected between the insulating protective layer of the charging branch and the insulating protective layer of the branch wire head.

5. The charging protection control method for a high-speed charging data line according to claim 4, characterized in that: The establishment of the performance prediction model of the charging data line comprises the following steps: Divide the service life of the charging data cable into equal intervals to obtain at least one time point; Under the condition that the usage time of the charging data line is equal to the value at the time point, at least one sample current is input into the charging data line, and an output current after flowing through the charging data line is obtained; Accumulate at least one sample current to obtain a total sample current; Accumulate at least one output current to obtain a total output current; The result of total sample current and total output current is divided by total sample current to obtain current loss rate; Pairing the time points with the corresponding current loss rates to obtain at least one test group; Fitting at least one test group to obtain a performance prediction fitting function, wherein the time point is an independent variable and the current loss rate is a dependent variable; The performance prediction fitting function is used as the performance prediction model of the charging data cable.

6. The charging protection control method for a high-speed charging data line according to claim 5, characterized in that: The method of setting an overcurrent protection mechanism based on the upper threshold of the extremely fast charging current includes the following steps: Divide the upper threshold of the extreme-speed charging current by the number of charging branches to obtain the upper threshold of the branch current; The maximum resistance of the characteristic spring to the separation of the charging branch and the branch wire head is obtained in advance as the characteristic resistance; The weight of the charging branch per unit length is obtained in advance as the first weight, and the weight of the branch line end per unit length is obtained in advance as the second weight; A uniform magnetic field is set at the connection between the charging branch and the bus part, and the charging branch and the branch line head are located in the uniform magnetic field. The length is preset; The weight of the charging branch with a preset length is calculated as the third weight, and the weight of the branch line end with a preset length is calculated as the fourth weight; Using the Ampere force formula, calculate the magnetic field strength of the uniform magnetic field; Using the magnetic field strength and setting position of the uniform magnetic field as an overcurrent protection mechanism; The Ampere force formula is as follows: F = ILBsinβ, Among them, F is the sum of the characteristic resistance and the fourth weight, I is the upper threshold of the branch current, L is the preset length, B is the magnetic field strength of the uniform magnetic field, B is unknown, and β is the angle between I and B.

7. The charging protection control method for a high-speed charging data line according to claim 6, characterized in that: The method of setting a counterweight for a bus portion based on an overcurrent protection mechanism comprises the following steps: The maximum value of the magnetic field strength of the uniform magnetic field in the overcurrent protection mechanism corresponding to different upper threshold values ​​of the extremely fast charging current is obtained as the target magnetic field strength; Based on historical data, the maximum current when the current in the charging data line is abnormal is obtained as the target current; According to the Ampere force formula, the maximum magnetic force on the bus part is the target magnetic field strength multiplied by the target current multiplied by the preset length multiplied by the number of branch line ends; Set the counterweight weight of the bus section to twice the maximum magnetic force to which the bus section is subjected.

8. The charging protection control method for a high-speed charging data line according to claim 7, characterized in that: The performance estimation to obtain the current loss rate of the charging data line includes the following steps: Substitute the actual usage time into the performance prediction fitting function to obtain the current loss rate of the charging data line.

9. The charging protection control method for a high-speed charging data line according to claim 8, characterized in that: The updating of the overcurrent protection mechanism based on the current loss rate of the charging data line comprises the following steps: One minus the current loss rate of the charging data line to obtain the current utilization rate of the charging data line; The upper threshold of the ultra-fast charging current is divided by the current utilization rate of the charging data line to obtain an updated value of the ultra-fast charging current; In the step of setting the overcurrent protection mechanism based on the upper threshold value of the extreme-speed charging current, the upper threshold value of the extreme-speed charging current is replaced with the extreme-speed charging current update value to complete the updating of the overcurrent protection mechanism.

10. A charging protection control system for a very fast charging data line, used to implement the charging protection control method for a very fast charging data line as claimed in any one of claims 1 to 9, characterized in that: include: A data acquisition module, wherein the data acquisition module forms a test mechanism for the product to be charged for the charging data line, and obtains an upper threshold value of the extremely fast charging current of the product to be charged according to the test mechanism; a classification module, wherein the classification module divides the charging data line into a bus part and a branch part, evenly branches the branch part to obtain at least one charging branch, and uses the at least one charging branch for shunt charging; A connection setting module, which performs connection setting between the charging branch and the bus part; A model building module, wherein the model building module builds a performance prediction model of the charging data line; An overcurrent protection module, wherein the overcurrent protection module sets an overcurrent protection mechanism based on an upper threshold value of the extremely fast charging current; A counterweight setting module, wherein the counterweight setting module sets a counterweight for a bus portion based on an overcurrent protection mechanism; A data calculation module, wherein the data calculation module performs performance estimation based on the accumulated actual usage time and the performance prediction model of the charging data line to obtain a current loss rate of the charging data line; A data update module is used to update an overcurrent protection mechanism based on a current loss rate of a charging data line.