Casting plant for producing large castings
By designing compact process layout and optimizing logistics equipment in foundry factories, the logistics safety hazards and information management problems in traditional foundry factories have been solved, and the goal of efficient, safe, green and intelligent foundry factories has been achieved.
Patent Information
- Application Number
- CN202411182957.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional resin sand casting factories have great safety hazards and serious interference due to logistics reliance on cranes, and the level of information management is low, making it difficult to achieve green intelligent casting.
A foundry factory for the production of large castings is designed, using a compact layout of molding, sand cleaning, molding, smelting, assembly, pouring, cooling, sand dropping, after-treatment, logistics and sand treatment units, combined with RGV car and AGV car and other logistics equipment to achieve efficient and safe logistics, and improve smelting efficiency by optimizing furnace material configuration and automatic batching truck.
It has achieved the shortest logistics path, improved production efficiency, enhanced safety, highest space utilization rate, lowest equipment investment, and green and intelligent management in the foundry factory.
Smart Images

Figure CN119076933A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of casting, in particular to a casting plant. Background Art
[0002] With the increasingly stringent national environmental protection and safety requirements and the continuous development of information technology, traditional resin sand casting factories can no longer meet the needs of production due to poor working environment, great safety hazards, and low level of information management. Traditional resin sand casting factories have the following disadvantages: relying on cranes for logistics transfer, serious interference and great safety hazards (more than 70% of accidents in foundries are caused by cranes); overlapping areas such as box assembly, casting, and cooling, making it difficult to collect dust and smoke; and difficulty in implementing digitization, networking, and intelligence. Summary of the invention
[0003] In view of the above problems of high logistics safety risks, serious logistics interference and serious environmental pollution in casting operations in traditional foundries, it is necessary to propose a foundry for the production of large castings, which realizes efficient and safe logistics and realizes green and intelligent casting.
[0004] A foundry for producing large castings, comprising a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand shaking unit, a post-processing unit, a logistics unit and a sand processing unit, wherein the molding unit is adjacent to the sand cleaning unit, the cooling unit is adjacent to the post-processing unit, the sand shaking unit is adjacent to the sand processing unit, and the modeling unit, the smelting unit, the assembly unit and the pouring unit are adjacent to each other, forming a zone setting mode, achieving the shortest logistics path of sand cores, castings and molding sand, improving production efficiency and shortening production cycle;
[0005] The molding unit includes sand mold additive manufacturing equipment, core shooting equipment, molding equipment, etc., which are used to produce sand cores, sand molds or moldings with sand boxes, etc.;
[0006] The sand cleaning unit includes a sand cleaning station, a sand cleaning room, etc., which are used to clean the floating sand, loose sand, etc. on the surface of the sand core or sand mold and inside the mold cavity produced by the molding unit;
[0007] The molding unit includes molding equipment, core shooting equipment, etc., which are used to produce a casting mold for a large casting using a mold such as a sand box. The casting mold is a sand mold with a sand box, and the casting mold is used to form the outer contour of the casting;
[0008] The smelting unit includes a smelting furnace, a charge pool, a ladle, etc., which are used to melt the molten metal required for casting;
[0009] The assembly unit includes a carrier for assembling the sand core, sand mold and casting mold. In order to facilitate subsequent transportation, the sand core, sand mold and casting are assembled on the carrier to form a core package with a complete casting cavity and shape.
[0010] The pouring unit includes a pouring machine for pouring the molten metal from the smelting unit into the core bag;
[0011] The cooling unit is used to store the core package after pouring, waiting for the molten metal in the core package to solidify and crystallize and the temperature of the molten metal in the cavity to drop to the set temperature;
[0012] The sand-falling unit includes a sand-falling device, which is used to break the core package and shake off the molding sand adhering to the surface of the casting and the inner wall of the sand box, so that the molding sand wrapped on the surface of the casting and the inner wall of the sand box can be separated;
[0013] The post-processing unit includes shot blasting equipment, grinding equipment, welding equipment, etc., which are used to clean the riser residues, cold iron residues, batch seams, etc. on the surface of the casting, so that the surface quality of the casting meets the set requirements;
[0014] The logistics unit includes logistics equipment, which may be an RGV vehicle, an AGV vehicle, a truss robot, etc., for transporting sand cores, sand molds, castings, core packages, castings, etc. between various processes of casting production;
[0015] The sand processing unit includes a sand recovery device, a sand regeneration device, a regeneration sand storage, etc., which are used to recover and regenerate the scattered, cleaned and fallen molding sand during the whole process of casting production.
[0016] As an optimization of the present technical solution, the foundry for producing large castings also includes a mold library, which is used to make and store sand cores or sand molds or molds, sand boxes, tooling, supports, etc. required in the casting production and assembly process.
[0017] As an optimization of the present technical solution, the sand recovery device includes a sand falling grille, a sand falling transition bucket, a first conveyor, a second conveyor and an old sand storage. The sand falling grille is arranged at the upper end of the sand falling unit pit and is used to level the ground, that is, a pit is provided in the unpacking area, and the sand falling grille is provided above the pit. A plurality of sand falling transition buckets are provided on the side of the sand falling grille facing the pit, and the upper side of the sand falling grille is flush with the ground of the unpacking area, so as to facilitate the unpacking of the core package; the first conveyor is arranged below the sand falling transition bucket to receive the old sand from the sand falling transition bucket, and the second conveyor is arranged at a certain angle to the first conveyor to facilitate the transportation of the old sand to the old sand storage arranged in the sand processing unit.
[0018] As an optimization of the present technical solution, in order to improve the smelting efficiency of the molten metal, the configuration of the charge is optimized. The charge storage area is provided with a charge storage area, a batching area and a standard charge reserve area. The charge required for the current furnace smelting is configured to the standard hopper in advance. When charge needs to be added, the charge in the standard hopper can be directly added to the smelting furnace, thereby avoiding the problem of low batching efficiency caused by adding individual materials one by one.
[0019] As an optimization of the present technical solution, the charge storage area is provided with an aisle, the aisle extends along the length direction of the charge storage area and is located in the middle of the width direction of the charge storage area, the standard charge reserve area is arranged across the aisle at one end of the charge storage area, away from the standard charge reserve area, and a first charge storage area is arranged on both sides of the aisle, and a batching area is arranged, and a second charge storage area and a third charge storage area are arranged on both sides of the aisle respectively; the first charge storage area is used to store pig iron, the second charge storage area is used to store scrap steel, and the third charge storage area is used to store return materials such as pouring channels and risers. Preferably, in order to facilitate timely or implement the acquisition of the weight of the charge in the standard hopper, a weighing device is also provided in the batching area, and the weighing device is used to measure the weight of the charge in the standard hopper. More preferably, a material pool is also provided on the side where the second charge storage area is provided, and the material pool is used to store non-ferrous metal charge.
[0020] As an optimization of the technical solution, the method of adding ingredients to the standard hopper is:
[0021] Feeding: Use logistics equipment to transfer the main metal block pig iron charge to the first charge storage area, transfer the main metal block scrap steel charge to the second charge storage area, transfer the return charge to the third charge storage area, and transfer the non-ferrous metal block to the charge pool;
[0022] Batching preparation: transporting the standard hopper stored in the standard charge storage area to the weighing device in the batching area to place the charge into the standard hopper;
[0023] Batching: the logistics equipment adds the required amount of furnace charge to the standard hopper. When the weight of the furnace charge in the standard hopper reaches about 90% of the set weight, the automatic batching vehicle continues to add furnace charge to the standard hopper until the weight of the furnace charge in the standard hopper reaches the set weight.
[0024] Reserve: Transfer the standard hopper containing the set weight of charge to the standard charge reserve area for use.
[0025] The beneficial effects of the technical solution of the present invention are as follows: under the condition of the same process, the foundry has a more compact layout, a shorter logistics path, and no interference between operations, thereby improving the space utilization rate of the factory building. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the foundry layout using the RGV logistics method;
[0027] Figure 2 This is a schematic diagram of the foundry layout for another RGV logistics method;
[0028] Figure 3 This is a schematic diagram of the foundry layout using an AGV logistics method;
[0029] Figure 4 is a schematic diagram of a sand recovery device;
[0030] Figure 5 It is a schematic diagram of the layout of a smelting unit. DETAILED DESCRIPTION
[0031] In order to more clearly illustrate the technical solution of the present invention, the technical solution of the invention content is described in detail in conjunction with the accompanying drawings. Obviously, the following descriptions are some typical embodiments of the present invention. For ordinary technicians in this field, other solutions can be obtained based on these embodiments without paying creative work.
[0032] The invention aims to solve the problem that the logistics of traditional resin sand casting factories rely on cranes, which causes serious logistics interference and great safety hazards.
[0033] An embodiment of a foundry for producing large castings includes a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand shaking unit, a post-processing unit, a logistics unit and a sand processing unit, wherein the molding unit is adjacent to the sand cleaning unit, the cooling unit is adjacent to the post-processing unit, the sand shaking unit is adjacent to the sand processing unit, and the modeling unit, the smelting unit, the assembly unit and the pouring unit are adjacent to each other to form a zone setting mode, thereby achieving the shortest logistics path for sand cores, castings and molding sand, improving production efficiency and shortening production cycle;
[0034] The molding unit includes sand mold additive manufacturing equipment, core shooting equipment, quicksand equipment, etc., which are used to produce sand cores or sand molds;
[0035] The sand cleaning unit includes a sand cleaning station, a sand cleaning room, etc., which are used to clean the floating sand, loose sand, etc. on the surface of the sand core or sand mold and inside the mold cavity produced by the molding unit;
[0036] The molding unit includes molding equipment, core shooting equipment, etc., which are used to produce a casting mold for large castings using a sand box, etc. The casting mold is a sand mold with a sand box, and the casting mold is used to form the outer contour of the casting;
[0037] The smelting unit includes a smelting furnace, a charge pool, a ladle, etc., which are used to melt the molten metal required for casting;
[0038] The assembly unit includes a carrier, an assembly crane, etc., which are used to assemble the sand core and / or sand mold into a core package with a complete casting cavity, and also to assemble the sand core and / or sand mold on the casting mold to form a core package with a sand box; and in order to facilitate the transportation of the assembled core package, the assembly operation can be directly set on the carrier, and the assembled core package is transported to the casting unit by the logistics equipment together with the carrier;
[0039] The pouring unit includes a pouring crane for pouring the molten metal from the furnace unit into the core bag;
[0040] The cooling unit is used to store the core package after pouring, waiting for the molten metal in the core package to solidify and crystallize and the temperature of the molten metal in the cavity to drop to the set temperature;
[0041] The sand-falling unit includes a sand-falling device, which is used to break the core package and shake off the molding sand adhering to the surface of the casting and the inner wall of the sand box, so that the molding sand wrapped on the surface of the casting and the inner wall of the sand box can be separated;
[0042] The post-processing unit includes shot blasting equipment, grinding equipment, welding equipment, etc., which are used to clean the riser residues, cold iron residues, batch seams, etc. on the surface of the casting, so that the surface quality of the casting meets the set requirements;
[0043] The logistics unit includes logistics equipment, pallets, forklifts, automatic batching vehicles, etc. The logistics equipment can be RGV vehicles, AGV vehicles, truss robots, etc., which are used to park logistics equipment, pallets, forklifts and other freely movable equipment. The logistics equipment is used to transport sand cores, sand molds, castings, core packages, castings, etc. between various processes of casting production;
[0044] The sand processing unit includes a sand recovery device, a sand regeneration device, a regeneration sand storage, etc., which are used to recover and regenerate the scattered, cleaned and fallen molding sand during the whole process of casting production.
[0045] Implementation Method 1
[0046] In this embodiment, the gross weight of the large casting is about 135 tons. Considering factors such as sand-iron ratio, process yield, and the weight of the sand box and pallet, Figure 1 The carrying capacity of the logistics system of the foundry should reach about 1,000 tons. In this embodiment, an RGV vehicle is used as logistics equipment to transport sand cores, sand molds, casting molds, core packs, etc. to complete various processes of castings.
[0047] In this embodiment, the layout of the foundry for producing large castings is as follows:
[0048] It includes a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit;
[0049] The foundry is rectangular in shape as a whole, and is provided with aisles in a parallel length direction and a perpendicular width direction. The smelting unit, the molding unit, and the sand cleaning unit are arranged on one side of the aisle, and the molding unit, the assembly unit, the pouring unit, the cooling unit, the post-processing unit, the sand falling unit, and the sand processing unit are arranged on the other side of the aisle;
[0050] Measured in the length direction of the foundry, the furnace unit is arranged at a side corner of the foundry, and is parallel to the aisle, and a molding unit and a sand cleaning unit are arranged side by side. The molding unit and the sand cleaning unit are arranged side by side parallel to the aisle; on the other side of the aisle, a molding unit is arranged across the aisle from the smelting unit, and is parallel to the aisle, and an assembly unit and a pouring unit are arranged in sequence, and then a cooling unit and a post-processing unit are arranged side by side parallel to the aisle, and a sand falling unit and a sand processing unit are arranged in sequence on the side of the cooling unit away from the molding unit.
[0051] This kind of factory layout enables logistics to take a straight path, ensuring the shortest logistics path. The factory layout is compact, the factory space utilization rate is the highest, the production equipment utilization rate is the highest, and the equipment investment is the lowest.
[0052] As a supplement to this embodiment, the foundry for producing large castings further includes a mold library, which is used to store molds, sand boxes, tooling, supports, etc. required for the production and assembly of sand cores or sand molds. Specifically, the mold library can be set on one side where the smelting unit is located, and on the other end parallel to the aisle away from the smelting unit, and it is close to the aisle, and can directly travel straight to the molding unit through the aisle, realizing the fastest logistics.
[0053] In this embodiment, the molding unit is provided with twenty-two additive manufacturing devices, a work box transfer AGV, a cache line, etc. The printed sand core placed in the work box is transferred to the cache line together with the work box by the work box transfer AGV, and then transferred to the sand cleaning unit by the work box transfer RGV together with the work box.
[0054] In this embodiment, the sand cleaning unit includes a sand cleaning station, a sand core transfer RGV vehicle, a sand cleaning room, a spray room, a surface drying furnace, a turning trolley, a sand core stereoscopic warehouse, and a sand core lifting trolley. The work box transfer RGV vehicle transfers the printed sand core together with the work box to the sand cleaning station, and takes out the sand core produced by the additive manufacturing equipment in the sand cleaning station; the sand core transfer RGV then transfers the sand core to the sand cleaning room to clean the floating sand on the surface of the sand core and the sand core cavity. The sand core cleaned in the sand cleaning room is then transferred to the spray room by the sand core transfer RGV vehicle to apply coating to the sand core surface and the inside of the cavity; the coated sand core is then transferred to the surface drying furnace by the sand core transfer RGV vehicle to surface dry the coated sand core; the surface dried sand core is transferred to the sand core stereoscopic warehouse by the sand core transfer RGV vehicle for standby use.
[0055] In this embodiment, the molding unit is equipped with a mobile sand mixer and a molding crane, which are mainly used to complete the production of large casting molds, avoiding the need to set up a sand box after production using additive manufacturing equipment, and the molding efficiency is much higher than the production speed of additive manufacturing equipment. The finished mold is transported to the assembly unit by an electric flat car and waits for core assembly.
[0056] In this embodiment, the assembly unit is provided with a mobile sand mixer and two assembly cranes. The assembly crane transfers the casting mold transported by the electric flat car to the assembly station. The assembly crane assembles the sand core from the sand core stereoscopic warehouse on the casting mold, and uses the mobile sand mixer to fill the sand in the sand box. The core package filled with sand is transported to the pouring unit by the RGV vehicle to wait for pouring.
[0057] In this embodiment, the pouring unit is provided with two pouring cranes, which lift the pouring ladle to pour the core package. The condensed and solidified core package is transported by the RGV vehicle to the cooling unit for further cooling until it is ready for sand falling.
[0058] In this embodiment, the smelting unit is provided with two high-frequency induction furnaces, an automatic batching vehicle, a plurality of ladle baking devices, and a plurality of ladles, so as to realize fast and efficient smelting of molten metal and drying of the ladles.
[0059] In this embodiment, the cooling unit is a closed area, that is, the cooling unit is not spatially connected to the other process units, which is beneficial to the cooling and dust removal of the core package; at the same time, the closed area will not cause the loss of cooling energy due to the open environment, thereby improving the cooling efficiency and reducing cooling energy consumption.
[0060] In this embodiment, the sand-falling unit includes a sand-falling machine arranged above the pit and a box-removing crane. The sand-falling machine is used to clean the molding sand adhered to the casting and the sand box. After the core package cooled to the point where the sand can be shaken off is transferred to the box-removing area of the sand-falling unit, the box-removing crane lifts the sand box to remove the sand box surrounding the core package. After the sand is shaken off by vibration, the sand box is transferred to the mold library by an electric flat car. After the sand is shaken off by vibration, the casting is transferred to the post-processing unit by an electric flat car.
[0061] In this embodiment, the post-processing unit is provided with a shot blasting machine for rough polishing, a shot blasting machine for fine polishing, eleven telescopic grinding rooms, and two post-processing cranes; the shot blasting machine for rough polishing is used to perform rough finishing on the casting to remove the molding sand firmly bonded to the surface of the casting and achieve the effect of preliminary polishing; the casting that has been roughly finished is polished for batch seams and pouring risers in the grinding room, and the shot blasting machine for fine polishing performs fine polishing on the casting, so that the surface of the casting meets the quality requirements of the customer.
[0062] In this embodiment, the sand processing unit is provided with a sand regeneration system and a new sand adding crane. The sand regeneration system includes a sand recovery device, a sand regeneration device, a regeneration sand storage, etc., which are used to recover and regenerate the scattered, cleaned, and sand-dropped molding sand during the whole process of casting production. Specifically, the sand recovery device includes a sand-dropping grid, a sand-dropping transition bucket, a first conveyor, a second conveyor, and an old sand storage. The sand-dropping grid is arranged at the upper end of the pit of the sand-dropping unit for leveling the ground, that is, a pit is arranged in the unpacking area, and the sand-dropping grid is arranged above the pit. A plurality of sand-dropping transition buckets are arranged on one side of the sand-dropping grid facing the pit, and the side of the sand-dropping grid facing upward is flush with the ground of the unpacking area, so as to facilitate the unpacking of the core package; the first conveyor is arranged below the sand-dropping transition bucket to receive the old sand from the sand-dropping transition bucket, and the second conveyor is arranged at a certain angle to the first conveyor to facilitate the transportation of the old sand to the old sand storage arranged in the sand processing unit. In this embodiment, the first conveyor and the second conveyor are connected in a manner of intersecting at 90 degrees, and the first conveyor and the second conveyor can be belt conveyors or chain conveyors provided with receiving containers.
[0063] Implementation Method 2
[0064] This embodiment is the same as the first embodiment, and both use RGV vehicles as logistics equipment to transport sand cores, sand molds, casting molds, core packages, etc. to complete various processes of castings. For example, it is used to produce large castings with a gross weight of about 150 tons.
[0065] In this embodiment, the layout of the foundry for producing large castings is:
[0066] It includes a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit;
[0067] The foundry is rectangular in shape as a whole, and is provided with aisles in a parallel length direction and a perpendicular width direction. The molding unit is provided across the aisle at one end of the foundry, and the smelting unit and the post-processing unit are provided on one side of the aisle in a direction away from the molding unit, and the assembly unit, the pouring unit, the molding unit, the sand cleaning unit, the cooling unit, the sand falling unit and the sand processing unit are provided on the other side of the aisle;
[0068] The smelting unit is arranged adjacent to the modeling unit, and the post-processing unit is arranged immediately behind the smelting unit in a direction away from the modeling unit;
[0069] The equipment unit is arranged adjacent to the modeling unit, and in the direction away from the modeling unit, the pouring unit and the sand cleaning unit are arranged side by side adjacent to the assembly unit, the molding unit is arranged immediately after the sand cleaning unit, and the pouring unit is sequentially provided with a cooling unit, a sand falling unit and a sand processing unit.
[0070] This kind of factory layout enables logistics to take a straight path, ensuring the shortest logistics path. The factory layout is compact, the factory space utilization rate is the highest, the production equipment utilization rate is the highest, and the equipment investment is the lowest.
[0071] As a supplement to the present embodiment, a mold library is provided on the side where the smelting unit is provided, parallel to the post-processing unit and the material unit and away from the aisle, and the mold library is used to store sand boxes, various tooling and the like.
[0072] In this embodiment, the molding unit is equipped with twelve additive manufacturing devices, a work box transfer AGV vehicle, a cache line, etc. The printed sand core placed in the work box is transferred to the cache line together with the work box by the work box transfer AGV vehicle, and then the sand core is transferred to the sand cleaning unit by the RGV together with the work box.
[0073] In this embodiment, the configuration and layout of the sand cleaning unit are the same as those in the first embodiment, and will not be described in detail herein.
[0074] In this embodiment, the configuration and layout of the modeling unit are the same as those in the first embodiment, and will not be described in detail here.
[0075] In this embodiment, the arrangement and layout of the assembly unit are the same as those in the first embodiment, and will not be described in detail here.
[0076] In this embodiment, the pouring unit is provided with two pouring cranes with different rated loads. The pouring cranes lift the pouring ladle to pour the core package. The condensed and solidified core package is transported by the RGV vehicle to the cooling unit for further cooling until it is ready for sand falling.
[0077] In this embodiment, the configuration and layout of the smelting unit are the same as those in the first embodiment, and will not be described in detail here.
[0078] In this embodiment, the configuration and layout of the cooling unit are the same as those in the first embodiment, and will not be described in detail here.
[0079] In this embodiment, the sand-falling unit includes two sand-falling machines arranged above the pit and a box-removing crane. The sand-falling machine is used to clean the molding sand adhered to the casting and the sand box. After the core package cooled to the point where the sand can be shaken off is transferred to the box-removing area of the sand-falling unit, the sand box surrounding the core package is removed by lifting the sand box by the box-removing crane. After the sand is shaken off by vibration, the sand box is transferred to the mold library by an electric flat car, and after the sand is shaken off by vibration, the casting is transferred to the post-processing unit by an electric flat car. The sand-falling operation of the sand box and the casting can be completed more efficiently.
[0080] In this embodiment, the post-processing unit is provided with a shot blasting machine for rough polishing, ten sets of telescopic grinding rooms, a shot blasting machine for fine polishing, and two post-processing cranes; the rough polishing shot blasting machine is used to perform rough polishing on the casting to remove the molding sand firmly bonded to the surface of the casting and achieve the effect of preliminary polishing; the casting that has been roughly polished is subjected to batch seam grinding and pouring riser grinding and fine polishing in the grinding room to make the casting surface meet the customer's quality requirements.
[0081] In this embodiment, the sand processing unit is provided with two sets of sand regeneration systems, which include a sand recovery device, a sand regeneration equipment, a regeneration sand storage, etc., for recovering and regenerating the scattered, cleaned, and fallen molding sand during the entire casting production process. Specifically, the setting and layout of the sand recovery device are the same as those in the first embodiment, and will not be repeated here.
[0082] Implementation Method 3
[0083] This embodiment uses AGV as the logistics equipment of the entire foundry. Specifically, two 600-ton heavy-load AGVs are set up to transport the heaviest core packages (casting molds) in the entire casting process. Using AGV as logistics equipment can avoid the cost of setting up tracks when using RGV as logistics equipment, and the vehicle path is relatively fixed, which sometimes causes idle RGVs to be unable to be put into logistics operations. However, since AGV vehicles are not restricted by paths, they can be randomly deployed to complete transportation tasks within the load range, and there is no need to set up special logistics units in the foundry, saving the foundry site.
[0084] In this embodiment, the layout of the foundry for producing large castings is:
[0085] It includes a molding unit, a sand cleaning unit, a molding assembly unit, a smelting unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit;
[0086] The foundry is square in shape as a whole, with circular aisles on the four edges. Various processes are arranged in the area surrounded by the aisles. The molding unit is provided at one end, and the sand cleaning unit is provided immediately behind it in the direction away from the molding unit. A molding assembly unit is provided immediately behind the sand cleaning unit. A smelting unit, a pouring unit, a sand falling unit and a sand processing unit are provided immediately behind the molding assembly unit in parallel. The smelting unit is adjacent to the pouring unit, and the sand falling unit is adjacent to the pouring unit. A post-processing unit is provided immediately behind the smelting unit, and a cooling unit is provided between the post-processing unit and the pouring unit, the sand falling unit and the sand processing unit, thereby effectively realizing the effective utilization of the foundry space and shortening the logistics path between processes.
[0087] This factory layout with circular aisles effectively utilizes the characteristics of AGV logistics equipment that are not restricted by tracks and can efficiently complete transfer tasks nearby, thereby achieving the highest logistics efficiency and shortest transfer paths within and between each process of casting production.
[0088] In this embodiment, the molding unit is equipped with twenty-two additive manufacturing equipment, a work box transfer AGV vehicle, a cache line, etc. The printed sand core placed in the work box is transferred to the cache line together with the work box by the work box transfer AGV vehicle, and then the sand core is transferred to the sand cleaning unit by the RGV together with the work box.
[0089] In this embodiment, the configuration and layout of the sand cleaning unit are the same as those in the first embodiment, and will not be described in detail herein.
[0090] In this embodiment, the molding assembly unit is equipped with four mobile sand mixers and four molding cranes, which are mainly used to complete the production of large casting base molds, avoiding the need to set up sand boxes after production using additive manufacturing equipment, and the molding efficiency is much higher than the production speed of additive manufacturing equipment. The completed molding is transported to the assembly station by the AGV vehicle, and after the core assembly, a sand box is set on the outside of the sand core, and then sand is filled to form a core package to be poured. The core package is transported to the pouring unit by the AGV vehicle and waits for pouring.
[0091] In this embodiment, the pouring unit includes two pouring cranes, which carry a pouring ladle to pour the core package. When the molten metal in the core package after pouring solidifies to a level that can be transported, an AGV vehicle is used to transport the core package to be further cooled to the cooling unit.
[0092] In this embodiment, the configuration and layout of the smelting unit are the same as those in the first embodiment, and will not be described in detail here.
[0093] In this embodiment, the cooling unit is a closed area, and the core package cooled to a state where sand can be removed is transported by an AGV vehicle to the sand removal unit for sand removal and part removal.
[0094] In this embodiment, the sand-falling unit includes two sand-falling machines arranged above the pit and a box-removing crane. The sand-falling machines are used to clean the molding sand adhered to the casting and the sand box. After the core package cooled to the point where the sand can be shaken off is transferred to the box-removing area of the sand-falling unit, the sand box surrounding the core package is removed by lifting the sand box by the box-removing crane. After the sand box is shaken off by vibration, it is transferred to the mold library by an electric flat car. After the sand box is shaken off by vibration, the casting is transferred to the post-processing unit by an electric flat car.
[0095] In this embodiment, the post-processing unit is provided with four rough-polishing shot blasting machines, eleven telescopic grinding rooms, two post-processing cranes and one fine-polishing shot blasting machine; the rough-polishing shot blasting machine is used to perform rough-polishing on the casting to remove the molding sand firmly bonded to the surface of the casting and achieve the effect of preliminary polishing; the rough-polished casting is subjected to batch seam grinding and pouring riser grinding and fine-polishing in the grinding room to make the casting surface meet the customer's quality requirements.
[0096] In this embodiment, the sand processing unit is provided with a sand regeneration system and a new sand adding crane. The sand regeneration system includes a sand recovery device, sand regeneration equipment, a regenerated sand storage, etc., which are used to recover and regenerate the scattered, cleaned and fallen molding sand during the whole process of casting production. Specifically, the sand recovery device includes a sand falling grille, a sand falling transition bucket, a first conveyor, a second conveyor and an old sand storage. The sand falling grille is arranged at the upper end of the pit of the sand falling unit and is used to level the ground. That is, a pit is provided in the unpacking area, and the sand falling grille is provided above the pit. A plurality of sand falling transition buckets are provided on the side of the sand falling grille facing the pit, and the upper side of the sand falling grille is flush with the ground of the unpacking area, so as to facilitate the unpacking of the core package; the first conveyor is arranged below the sand falling transition bucket to receive the old sand from the sand falling transition bucket, and the second conveyor is arranged at a certain angle to the first conveyor to facilitate the transportation of the old sand to the old sand storage arranged in the sand processing unit. In this embodiment, the first conveyor and the second conveyor are connected in a 90-degree intersection.
[0097] Implementation Method 4
[0098] In this embodiment, in order to improve the smelting efficiency of the molten metal, the configuration of the charge is optimized, and the charge required for smelting is pre-batched so that the charge can be directly added all at once when needed, avoiding the problem of low charge addition efficiency caused by adding charge multiple times; for this purpose, a charge storage area is specially set up, and the charge storage area is provided with a charge storage area, a batching area and a standard charge reserve area. By configuring the charge required for the current furnace smelting into the standard hopper in advance, when charge needs to be added, the charge in the standard hopper can be directly added to the smelting furnace, thereby avoiding the problem of low batching efficiency caused by adding materials one by one.
[0099] As a supplement to this embodiment, the method of adding ingredients to the standard hopper is:
[0100] Feeding: Use logistics equipment to transfer the main metal block pig iron charge to the first charge storage area, transfer the main metal block scrap steel charge to the second charge storage area, transfer the return charge to the third charge storage area, and transfer the non-ferrous metal block to the charge pool; the return charge can be the pouring channel, riser, etc. in the casting production process, and the non-ferrous metal block can be manganese block, aluminum block, nickel block, etc.;
[0101] Batching preparation: transporting the standard hopper stored in the standard charge storage area to the weighing device in the batching area to place the charge into the standard hopper;
[0102] Batching: the logistics equipment adds the required amount of furnace charge to the standard hopper. When the weight of the furnace charge in the standard hopper reaches about 90% of the set weight, the automatic batching vehicle continues to add furnace charge to the standard hopper until the weight of the furnace charge in the standard hopper reaches the set weight.
[0103] Reserve: Transfer the standard hopper containing the set weight of charge to the standard charge reserve area for use.
[0104] As a further supplement to the present embodiment, in order to facilitate further improvement of the current furnace smelting efficiency, the prepared standard hopper is transported to the rear furnace area near the smelting furnace. When it is necessary to add charge, the charging crane places the standard hopper on the vibrating charging vehicle, and the vibrating charging vehicle adds the charge in the standard hopper into the smelting furnace, thereby realizing timely and efficient charge addition.
[0105] As a further supplement to the present embodiment, a fine batching area is provided near the smelting furnace, and an automatic batching vehicle and a fine batching pool are provided in the fine batching area. When a small amount of fine batching charge is required, the automatic batching vehicle can absorb the charge from the fine batching pool and add it to the smelting furnace to achieve fine batching of the molten metal.
[0106] Implementation Method 5
[0107] In this embodiment, the foundry for producing large castings uses additive manufacturing technology to print sand cores. In order for the assembled sand core group to withstand the expansion force from the molten metal when pouring large castings, a sand box needs to be installed around the sand core group to form the core package or mold for pouring as described in the present invention.
[0108] The process implementation process of the foundry for producing large castings includes:
[0109] S11, the finished base is transported from the logistics equipment to the assembly unit;
[0110] S12, the sand cores produced by the molding unit are cleaned, coated, and dried and stored in a three-dimensional sand core warehouse. When the cores are assembled, the sand cores are transported to the assembly unit by logistics equipment;
[0111] S13, the sand core is hoisted by the assembly crane and assembled into the bottom mold to form a sand core group with the bottom mold;
[0112] S14, the sand box is hoisted by the assembly crane and installed on the outer periphery of the sand core assembly, and sand is filled between the sand box and the sand core to form a core package or a casting mold;
[0113] S15, the core package is transferred to the pouring unit by the logistics equipment, and the qualified molten metal is lifted to the top of the core package by the pouring crane to pour the core package;
[0114] S16, after the molten metal in the core package solidifies to a level that can be transported, the logistics equipment transports the mold to the cooling unit;
[0115] S17, when the mold is cooled to a state where sand can be removed, the mold is transferred to a sand removal unit, the casting is taken out, and the old sand is recovered;
[0116] S18, the casting blank is transferred to the post-processing unit;
[0117] S19, the recovered old sand enters the sand processing unit for regeneration.
[0118] As a further supplement to this embodiment, the sand core printed by the additive manufacturing equipment needs to go through core removal (core removal, i.e., the process of taking the sand core out of the working box of the additive manufacturing equipment), sand cleaning, coating, surface drying, and storage before assembly. Now, taking the foundry of the first embodiment as an example, the specific implementation process from the completion of sand core printing to assembly is described, including:
[0119] S21, when sand cleaning is required, the system sends a command to the work box transfer RGV, and after receiving the command, the work box transfer RGV transfers the work box from the cache line to the sand cleaning station;
[0120] S22, the sand cleaning station is equipped with a lifting mechanism to lift the sand cores in the working box. The lifted sand cores are lifted by a 25t sand core lifting crane and transported to the empty pallet of the mobile turning trolley in the empty pallet storage area;
[0121] S23, the core transfer RGV is equipped with a fork that can pick up pallets and cores from the mobile tipping trolley in the empty pallet storage area and then move them to the sand cleaning room;
[0122] S23, after the shutter door of the sand cleaning room is raised, the sand core transfer RGV uses the cargo fork to transport the sand core and the pallet fork to the mobile flip trolley of the sand cleaning room. The mobile flip trolley moves to the sand cleaning station. The sand cleaning room is equipped with a sand cleaning mechanism to blow off the floating sand on the surface of the sand core;
[0123] S24, after blowing off the floating sand, the flip car is moved to transfer the sand core and the pallet to the area where the sand core transfer RGV can fork and take them, and the sand core transfer RGV transfers the sand core and the pallet to the spray room;
[0124] S25, after the roller shutter door of the spray room is raised, the fork of the sand core transfer RGV transports the sand core and the pallet fork to the spraying station in the spray room. The spray room is equipped with a spray gun to spray the casting paint on the surface of the sand core;
[0125] S26, after spraying is completed, call the sand core transfer RGV to fork the sprayed sand core out of the spraying room, and then the sand core transfer RGV transfers the sprayed sand core and the tray to the entrance of the surface drying furnace;
[0126] S27, the fork of the sand core transfer RGV transports the sand core and the pallet to the transplanting and lifting conveyor line at the entrance of the surface drying furnace, and transports the sand core and the pallet to the sand core surface drying furnace for hot air drying;
[0127] S28, the dried sand core is strongly cooled in the cooling station equipped in the surface drying furnace, and then sent out by the lifting and transplanting mechanism equipped at the exit of the surface drying furnace, and is transported to the three-dimensional warehouse for storage by the fork of the sand core three-dimensional warehouse.
[0128] Implementation Method 5
[0129] In this embodiment, in order to improve the smelting efficiency of the molten metal, the present invention sets up a charge storage area for pre-burdening, that is, when the molten metal of the previous furnace and the next furnace needs to be charged, the charge is weighed and allocated to the standard hopper. When the smelting furnace needs to add charge, it is only necessary to pour the pre-burdened charge in the standard hopper into the smelting furnace, which greatly reduces the charge adding time.
[0130] In this embodiment, the charge storage area is provided with an aisle, which extends along the length direction of the charge storage area and is located in the middle of the width direction of the charge storage area. The standard charge storage area is arranged across the aisle at one end of the charge storage area, away from the standard charge storage area, and then a first charge storage area is provided on both sides of the aisle, followed by the batching area, and then a second charge storage area and a third charge storage area are provided on both sides of the aisle respectively; the first charge storage area is used to store pig iron, the second charge storage area is used to store scrap steel, and the third charge storage area is used to store return charges such as runners and risers.
[0131] As a supplement to the present embodiment, in order to facilitate timely or implement acquisition of the weight of the charge in the standard hopper, a weighing device is further provided in the batching area, and the weighing device is used to measure the weight of the charge in the standard hopper.
[0132] As a supplement to the present embodiment, the standard hopper is arranged in the standard charge storage area, that is, the standard charge storage area is provided with an empty standard hopper placement area and a standard hopper placement area filled with charge.
[0133] As a supplement to the present embodiment, one of the standard hoppers may only pre-store a single charge amount of one type of charge, or may also pre-store a single charge amount of multiple types of charge.
[0134] As a supplement to the present embodiment, a material pool is further provided on the side where the second charge storage area is provided, and the material pool is used to store non-ferrous metal charge.
[0135] As a supplement to the present embodiment, the first charge storage area is used to store metal blocks such as pig iron, the second charge storage area is used to store metal blocks such as scrap steel, the third charge storage area is used to store return charges such as runners and risers, and the charge pool is used to store other metal blocks, such as manganese blocks, aluminum blocks, nickel blocks and other non-ferrous metal blocks.
[0136] By placing the scrap steel and pig iron charges with the largest amount of addition on both sides of the batching area, the shortest transfer distance of the main charge is achieved, and by dividing the first charge storage area for storing pig iron charge into two parts and placing them on both sides of the aisle, the distance between the batching area and the standard charge storage area is shortened, so that the transfer distance of the standard hopper is the shortest. By setting up the charge storage area in this way, efficient transfer of the charge is achieved, and the efficiency of smelting molten metal is improved.
[0137] The present invention is used in a foundry for producing large castings to achieve process separation of main casting processes such as core making, molding, box assembly, pouring, cooling, etc., and can achieve fixed-point operation of each process, which is conducive to achieving environmental protection and safety solutions.
[0138] The present invention is used in foundries producing large castings. In terms of plant buildings, the heavy-load plant buildings can be separated from the light-load plant buildings, thereby reducing engineering investment. The plant building span can also be flexibly arranged according to actual needs. Different span units are equipped with cranes of different tonnages, thereby achieving refined control of overhead crane investment.
[0139] The present invention is used in a foundry that produces large castings. The arrangement of the sand cleaning unit can realize a system solution for the processes of sand cleaning, coating, surface drying, storage, etc. of large-size 3D printed sand cores.
[0140] The invention is used in a foundry for producing large castings, and the sand recovery unit realizes efficient collection and processing of the sand after unpacking.
[0141] The invention is used in a foundry producing large castings, and realizes efficient addition of smelting furnace charge.
[0142] The above embodiments are merely descriptions of a typical application of the technical solution of the present invention, and reasonable expansion can be carried out on a reasonable basis without requiring creative work.
Claims
1. A foundry for producing large castings, It is characterized in that The invention comprises a molding unit, a sand cleaning unit, a modeling unit, an assembly unit, a smelting unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit. The molding unit is adjacent to the sand cleaning unit, the cooling unit is adjacent to the post-processing unit, the sand falling unit is adjacent to the sand processing unit, and the modeling unit, the smelting unit, the assembly unit and the pouring unit are adjacent to each other, forming a zone setting mode, thereby realizing the shortest logistics path of sand cores, castings and molding sand.
2. A foundry for producing large castings as claimed in claim 1, It is characterized in that It also includes a mold library, which is used to make and store sand cores or sand molds or molds, sand boxes, tooling, and supporting parts required for casting production and assembly.
3. A foundry for producing large castings as claimed in claim 1, It is characterized in that The sand processing unit comprises a sand recovery device, a sand regeneration device and a regeneration sand storehouse, so as to realize the recovery and regeneration of old sand.
4. A foundry for producing large castings as claimed in claim 3, It is characterized in that The sand recovery device includes a sand falling grid, a sand falling transition bucket, a first conveyor, a second conveyor and a used sand storage. The sand falling grid is arranged at the upper end of the pit of the sand falling unit, and is used to level the ground and carry the core package; a plurality of sand falling transition buckets are provided on the side of the sand falling grid facing the pit, and the side of the sand falling grid facing upward is flush with the ground of the unpacking area; the first conveyor is arranged below the sand falling transition bucket, and is used to receive the used sand from the sand falling transition bucket, and the second conveyor is arranged at a certain angle to the first conveyor, so as to facilitate the transportation of the used sand to the used sand storage arranged in the sand processing unit.
5. A foundry for producing large castings as claimed in claim 1, It is characterized in that The furnace unit is provided with a charge storage area, and the charge storage area is provided with an aisle. The aisle extends along the length direction of the charge storage area and is located in the middle of the width direction of the charge storage area. The standard charge storage area is arranged across the aisle at one end of the charge storage area, away from the standard charge storage area, and then the first charge storage area is provided on both sides of the aisle, followed by the batching area, and then the second charge storage area and the third charge storage area are respectively provided on both sides of the aisle.
6. A foundry for producing large castings as claimed in claim 5, It is characterized in that Methods of pre-dosing include, Feeding: Use logistics equipment to transfer the main metal block pig iron charge to the first charge storage area, transfer the main metal block scrap steel charge to the second charge storage area, transfer the return charge to the third charge storage area, and transfer the non-ferrous metal block to the charge pool; Batching preparation: transporting the standard hopper stored in the standard charge storage area to the weighing device in the batching area to place the charge into the standard hopper; Batching: the logistics equipment adds the required amount of furnace charge to the standard hopper. When the weight of the furnace charge in the standard hopper reaches about 90% of the set weight, the automatic batching vehicle continues to add furnace charge to the standard hopper until the weight of the furnace charge in the standard hopper reaches the set weight. Reserve: Transfer the standard hopper containing the set weight of charge to the standard charge reserve area for use.
7. A foundry for producing large castings as claimed in any one of claims 1 to 6, It is characterized in that It includes a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit; The foundry is rectangular in shape as a whole, and is provided with aisles in a parallel length direction and a perpendicular width direction. The smelting unit, the molding unit, and the sand cleaning unit are arranged on one side of the aisle, and the molding unit, the assembly unit, the pouring unit, the cooling unit, the post-processing unit, the sand falling unit, and the sand processing unit are arranged on the other side of the aisle; Measured in the length direction of the foundry, the furnace unit is arranged at a side corner of the foundry, and is parallel to the aisle, and a molding unit and a sand cleaning unit are arranged side by side. The molding unit and the sand cleaning unit are arranged side by side parallel to the aisle; on the other side of the aisle, a molding unit is arranged across the aisle from the smelting unit, and is parallel to the aisle, and an assembly unit and a pouring unit are arranged in sequence, and then a cooling unit and a post-processing unit are arranged side by side parallel to the aisle, and a sand falling unit and a sand processing unit are arranged in sequence on the side of the cooling unit away from the molding unit.
8. A foundry for producing large castings as claimed in any one of claims 1 to 6, It is characterized in that It includes a molding unit, a sand cleaning unit, a modeling unit, a smelting unit, an assembly unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit; The foundry is rectangular in shape as a whole, and is provided with aisles in a parallel length direction and a perpendicular width direction. The molding unit is provided across the aisle at one end of the foundry, and the smelting unit and the post-processing unit are provided on one side of the aisle in a direction away from the molding unit, and the assembly unit, the pouring unit, the molding unit, the sand cleaning unit, the cooling unit, the sand falling unit and the sand processing unit are provided on the other side of the aisle; The smelting unit is arranged adjacent to the modeling unit, and the post-processing unit is arranged immediately behind the smelting unit in a direction away from the modeling unit; The equipment unit is arranged adjacent to the modeling unit, and in the direction away from the modeling unit, the pouring unit and the sand cleaning unit are arranged side by side adjacent to the assembly unit, the molding unit is arranged immediately after the sand cleaning unit, and the pouring unit is sequentially provided with a cooling unit, a sand falling unit and a sand processing unit.
9. A foundry for producing large castings as claimed in any one of claims 1 to 6, It is characterized in that It includes a molding unit, a sand cleaning unit, a molding assembly unit, a smelting unit, a pouring unit, a cooling unit, a sand falling unit, a post-processing unit and a sand processing unit; The foundry is square in shape as a whole, with circular aisles on the edges. Various processes are arranged in the area surrounded by the aisles. The molding unit is provided at one end, and the sand cleaning unit is provided immediately behind it in the direction away from the molding unit. A molding assembly unit is provided immediately behind the sand cleaning unit. A smelting unit, a pouring unit, a sand falling unit and a sand processing unit are provided immediately behind the molding assembly unit in parallel. The smelting unit is adjacent to the pouring unit, and the sand falling unit is adjacent to the pouring unit. A post-processing unit is provided immediately behind the smelting unit, and a cooling unit is provided between the post-processing unit and the pouring unit, the sand falling unit and the sand processing unit.
10. A foundry for producing large castings as claimed in claim 1, It is characterized in that The process implementation process of the foundry for producing large castings includes: S11, the finished base is transported from the logistics equipment to the assembly unit; S12, the sand cores produced by the molding unit are cleaned, coated, and dried and stored in a three-dimensional sand core warehouse. When the cores are assembled, the sand cores are transported to the assembly unit by logistics equipment; S13, the sand core is hoisted by the assembly crane and assembled into the bottom mold to form a sand core group with the bottom mold; S14, the sand box is hoisted by the assembly crane and installed on the outer periphery of the sand core group, and sand is filled between the sand box and the sand core to form a core package; S15, the core package is transferred to the pouring unit by the logistics equipment, and the qualified molten metal is lifted to the top of the core package by the pouring crane to pour the core package; S16, after the molten metal in the core package solidifies to a level that can be transported, the logistics equipment transports the mold to the cooling unit; S17, when the mold is cooled to a state where sand can be removed, the mold is transferred to a sand removal unit, the casting is taken out, and the old sand is recovered; S18, the casting blank is transferred to the post-processing unit; S19, the recovered old sand enters the sand processing unit for regeneration.