Boring-free mounting method for ship rudderstock
The boring-free installation of ship rudder stocks using a steel sleeve and epoxy sealing addresses inefficiencies and costs in traditional methods, ensuring precise alignment and reduced time, thereby improving installation quality and safety.
Patent Information
- Application Number
- CN202410615363.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2024-12-06
AI Technical Summary
The existing installation methods for ship rudder stocks are inefficient, costly, and prone to precision errors due to the need for boring operations, which are time-consuming and require specialized boring bars for different ship types.
A boring-free installation method involving a steel sleeve fixed with adjusting bolts to align with the rudder system centerline, sealed with epoxy, and completed with a rudder bushing and retaining ring, eliminating the need for on-site boring.
This method reduces installation time, material costs, and safety risks while ensuring precise alignment, enhancing installation efficiency and reducing operational complexity.
Smart Images

Figure CN119079059A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ships, in particular to a boring-free installation method for a ship rudder stock. Background Art
[0002] The rudder stock is an important component of the steering gear. It connects the rudder blades and the steering gear or the tiller, and is a rotating rod that transmits the turning knob pitch. The installation of the rudder stock requires very accurate installation. If it is not installed accurately, the maneuverability and power of the ship will be reduced.
[0003] The hydraulic nut connected to the lower end of the ship's rudder stock needs to be installed on site, and the nut installation needs to be completed on site through the process hole on the rudder blade.
[0004] During the installation of the ship's rudder system, in order to avoid the precision error caused by the segmented construction and closing, which may lead to the inability to install the rudder system, and to ensure the verticality and concentricity of the entire rudder system hole, boring operations are usually carried out after the rudder arm is installed. However, boring operations have the following disadvantages:
[0005] 1. The cycle is long, which may take a week or even longer, and the efficiency is low;
[0006] 2. Since the sizes of rudder systems of different ship types are different, different types of boring bars are required. Purchasing equipment for processing by yourself or outsourcing processing will incur high costs. Summary of the invention
[0007] To this end, the technical problem to be solved by the present invention is to overcome the problems of long boring construction period and low efficiency in the rudder system installation process in the prior art, as well as high cost caused by different sizes of rudder systems of different ship types.
[0008] In order to solve the above technical problems, the present invention provides a boring-free installation method for a ship rudder stock, comprising the following steps:
[0009] S1. A circular through hole is provided on the lower rudder bearing, the diameter of the circular through hole is larger than the outer diameter of the steel sleeve, and the steel sleeve is placed into the circular through hole of the lower rudder bearing;
[0010] S2. Install steel sleeve fixing fixtures at both the upper and lower ends of the lower rudder bearing, and confine the steel sleeve in the circular through hole through the steel sleeve fixing fixture;
[0011] S3. Adjust the position of the steel sleeve with the adjusting bolt according to the center line of the rudder system so that the center of the steel sleeve and the center line of the rudder system meet the tolerance requirements;
[0012] S4, pouring epoxy seal to connect the gap between the outer wall of the steel sleeve and the inner wall of the circular through hole;
[0013] S5. After epoxy curing, check the position of the centerline of the steel sleeve and the centerline of the rudder system and the inner diameter of the steel sleeve;
[0014] S6. Freeze the rudder bushing in advance, then remove the steel sleeve fixing tooling, and install the frozen rudder bushing into the steel sleeve to ensure that the upper and lower surfaces of the rudder bushing and the steel sleeve are flush;
[0015] S7. After the rudder bushing returns to normal temperature, install the retaining ring, bolts and sealing plate;
[0016] S8. Finally, lift the rudder stock together with the rudder shaft sleeve, install the rudder shaft sleeve into the steel sleeve, and complete the installation of the rudder stock.
[0017] In one embodiment of the present invention, in the above step S1, the inner wall of the steel sleeve and the inner hole of the circular through hole are first cleaned to ensure that the inside of the steel sleeve and the circular through hole are clean.
[0018] In one embodiment of the present invention, the steel sleeve fixing tooling includes a plurality of bolts, a plurality of adjustment bolts, a mounting plate and a plurality of adjustment bolt support blocks, the cross-sectional area of the mounting plate is larger than the cross-sectional area of the circular through hole, the mounting plate is fixed to the upper and lower end surfaces of the lower rudder bearing by a plurality of bolts, the adjustment bolt support block is fixedly mounted on the end surface of the mounting plate opposite to the lower rudder bearing, the adjustment bolt is arranged on the adjustment bolt support block, and the adjustment bolt and the adjustment bolt support block are threadedly connected, and the steel sleeve and the center line of the rudder system are adjusted to meet the tolerance requirements by twisting the adjustment bolt to contact the steel sleeve.
[0019] In one embodiment of the present invention, the number of the plurality of bolts is four, the number of the plurality of adjustment bolt support blocks is four, the plurality of bolts and the plurality of adjustment bolt support blocks are arranged in one-to-one correspondence, and the plurality of adjustment bolt support blocks are arranged in a circular array.
[0020] In one embodiment of the present invention, the mounting plate is provided with a through hole for a human hand to pass through and extend into the interior of the steel sleeve.
[0021] In one embodiment of the present invention, a straight steel wire for indicating the center of the circular through hole is provided at the center of the circular through hole.
[0022] In one embodiment of the present invention, in the above step S3, the position of the steel sleeve is adjusted by an adjusting bolt according to the position of the straight steel wire so that the center of the steel sleeve and the straight steel wire meet the tolerance requirements, that is, the radius values of the straight steel wire and the steel sleeve are measured.
[0023] In one embodiment of the present invention, in the above step S4, the gap between the end face of the mounting plate and the lower end face of the steel sleeve is first sealed with a sponge sealing strip, and then epoxy is poured into the gap between the outer wall of the steel sleeve and the inner wall of the circular through hole.
[0024] In one embodiment of the present invention, in the above step S4, after pouring epoxy, when the steel sleeve is deformed, the deformed part of the steel sleeve is ground and polished according to the measurement data.
[0025] In one embodiment of the present invention, in the above step S7, the sealing plate is fixed to the upper end of the steel sleeve by epoxy putty, and the retaining ring is installed to the lower end of the lower rudder bearing by bolts, and a through hole one is provided at the center of the sealing plate, and the rudder rod passes through the through hole one.
[0026] The above technical solution of the present invention has the following beneficial effects compared with the prior art:
[0027] The boring-free installation method of the ship rudder stock of the present invention comprises the following steps: firstly, the inner holes of the steel sleeve and the lower rudder bearing are cleaned, and then the steel sleeve is placed in the lower rudder bearing, and the upper and lower ends are fixed with a steel sleeve fixing tool, and the steel sleeve fixing tool is connected with the lower rudder bearing with bolts, and the position of the steel sleeve is adjusted with an adjusting bolt according to the center line of the rudder system so that the center of the steel sleeve and the center line of the rudder system meet the tolerance requirements; epoxy is poured between the steel sleeve and the lower rudder bearing for sealing connection, and the center line and inner diameter of the steel sleeve are checked after curing; the rudder bushing is frozen, the steel sleeve fixing tool is removed, and the rudder bushing is installed in the steel sleeve to ensure that the upper and lower surfaces are flat, and the retaining ring, bolts and sealing plate are installed after the rudder bushing returns to normal temperature; finally, the rudder stock is hung down together with the rudder shaft sleeve, and the installation of the rudder stock is completed, which saves the work of boring holes when installing the rudder bushing. The steel sleeve can control the pouring size of the epoxy, and separate the epoxy from the rudder bushing, so as to avoid deformation of the rudder bushing due to the high temperature during epoxy pouring. The installation of the rudder stock can be completed easily and conveniently. This method has low material cost, less installation tooling and high installation efficiency, which greatly reduces the material cost and installation and disassembly time, greatly reduces the difficulty of installation, improves the installation efficiency of the rudder stock nut, and reduces the safety risk of operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below according to specific embodiments of the present invention in conjunction with the accompanying drawings, wherein
[0029] Figure 1 Schematic diagram of the boring-free installation method of the ship rudder stock in the preferred embodiment of the present invention Figure 1 ;
[0030] Figure 2 Schematic diagram of the boring-free installation method of the ship rudder stock in the preferred embodiment of the present invention Figure 2 ;
[0031] Figure 3 Schematic diagram of the boring-free installation method of the ship rudder stock in the preferred embodiment of the present invention Figure 3 ;
[0032] Figure 4Schematic diagram of the boring-free installation method of the ship rudder stock in the preferred embodiment of the present invention Figure 4 .
[0033] Explanation of the reference numerals in the accompanying drawings in the specification: lower rudder bearing 1, steel sleeve 2, epoxy 3, steel sleeve fixing tool 4, bolt 5, adjusting bolt 6, retaining ring 7, sealing plate 9, rudder stock 10, rudder shaft sleeve 10-1, mounting plate 11, adjusting bolt support block 12, through hole 13, straight steel wire 14, through hole one 15, circular through hole 16. DETAILED DESCRIPTION
[0034] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.
[0035] Reference Figure 1-4 As shown, the boring-free installation method of the ship rudder stock of the present invention comprises the following steps:
[0036] S1. A circular through hole 16 is provided on the lower rudder bearing 1. The diameter of the circular through hole 16 is larger than the outer diameter of the steel sleeve 2. The steel sleeve 2 is placed into the circular through hole 16 of the lower rudder bearing 1.
[0037] S2. Install steel sleeve fixing fixtures 4 at both the upper and lower ends of the lower rudder bearing 1, and confine the steel sleeve 2 in the circular through hole through the steel sleeve fixing fixture 4;
[0038] S3, adjusting the position of the steel sleeve 2 with the adjusting bolt 6 according to the center line of the rudder system, so that the center of the steel sleeve 2 and the center line of the rudder system meet the tolerance requirements;
[0039] S4, pouring epoxy 3 into the gap between the outer wall of the steel sleeve 2 and the inner wall of the circular through hole 16 to seal and connect;
[0040] S5. After epoxy curing, check the position of the center line of the steel sleeve 2 and the center line of the rudder system and the inner diameter of the steel sleeve 2;
[0041] S6, pre-freeze the rudder bushing 8, then remove the steel sleeve fixing tool 4, install the frozen rudder bushing 8 into the steel sleeve 2, and ensure that the rudder bushing 8 is flush with the upper and lower surfaces of the steel sleeve 2;
[0042] S7, after the rudder bushing 8 returns to normal temperature, install the retaining ring 7, bolts 5 and sealing plate 9;
[0043] S8. Finally, the rudder stock 10 together with the rudder shaft sleeve 10 - 1 is hoisted down, and the rudder shaft sleeve 10 - 1 is installed into the steel sleeve 2 to complete the installation of the rudder stock 10 .
[0044] In the above step S1, the inner wall of the steel sleeve 2 and the inner hole of the circular through hole 16 are first cleaned to ensure that the inside of the steel sleeve 2 and the circular through hole 16 are clean.
[0045] In the above structure, the steel sleeve fixing tool 4 includes a plurality of bolts 5, a plurality of adjustment bolts 6, a mounting plate 11 and a plurality of adjustment bolt support blocks 12. The cross-sectional area of the mounting plate 11 is larger than the cross-sectional area of the circular through hole. The mounting plate 11 is fixed to the upper and lower end surfaces of the lower rudder bearing 1 by the plurality of bolts 5. The adjustment bolt support blocks 12 are fixedly mounted on the end surfaces of the mounting plate 11 opposite to the lower rudder bearing 1. The adjustment bolts 6 are arranged on the adjustment bolt support blocks 12, and the adjustment bolts 6 and the adjustment bolt support blocks 12 are threadedly connected. The steel sleeve 2 and the center line of the rudder system are adjusted to meet the tolerance requirements by twisting the adjustment bolts 6 to contact the steel sleeve 2. The number of the plurality of bolts 5 is four, the number of the plurality of adjustment bolt support blocks 12 is four, the plurality of bolts 5 and the plurality of adjustment bolt support blocks 12 are arranged one by one, and the plurality of adjustment bolt support blocks 12 are arranged in a circular array.
[0046] In the above structure, the mounting plate 11 is provided with a through hole 13 for a hand to pass through and extend into the interior of the steel sleeve 2 .
[0047] In the above structure, a straight steel wire 14 for indicating the center of the circular through hole 16 is provided at the center of the circular through hole 16 .
[0048] In the above step S3, the position of the steel sleeve 2 is adjusted by the adjusting bolt 6 according to the position of the straight steel wire 14 so that the center of the steel sleeve 2 and the straight steel wire 14 meet the tolerance requirements, that is, the radius values of the straight steel wire 14 and the steel sleeve 2 are measured.
[0049] In the above step S4, the gap between the end surface of the mounting plate 11 and the lower end surface of the steel sleeve 2 is first sealed with a sponge sealing strip, and then epoxy 3 is poured into the gap between the outer wall of the steel sleeve 2 and the inner wall of the circular through hole.
[0050] In the above step S4, after pouring the epoxy 3, when the steel sleeve 2 is deformed, the deformed part of the steel sleeve 2 is ground and polished according to the measurement data.
[0051] In the above step S7, the sealing plate 9 is fixed to the upper end of the steel sleeve 2 by epoxy putty, and the sealing plate 9 is locked to the steel sleeve 2 by bolts, and the retaining ring 7 is installed to the lower end of the lower rudder bearing 1 by bolts 5. A through hole 15 is provided at the center of the sealing plate 9, and the rudder bar 10 passes through the through hole 15.
[0052] Obviously, the above embodiments are merely examples for clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the protection scope of the invention.
Claims
1. A boring-free installation method for a ship rudder stock, characterized in that: The following steps are included: S1. A circular through hole is provided on the lower rudder bearing, the diameter of the circular through hole is larger than the outer diameter of the steel sleeve, and the steel sleeve is placed into the circular through hole of the lower rudder bearing; S2. Install steel sleeve fixing fixtures at both the upper and lower ends of the lower rudder bearing, and confine the steel sleeve in the circular through hole through the steel sleeve fixing fixture; S3. Adjust the position of the steel sleeve with the adjusting bolt according to the center line of the rudder system so that the center of the steel sleeve and the center line of the rudder system meet the tolerance requirements; S4, pouring epoxy seal to connect the gap between the outer wall of the steel sleeve and the inner wall of the circular through hole; S5. After epoxy curing, check the position of the centerline of the steel sleeve and the centerline of the rudder system and the inner diameter of the steel sleeve; S6. Freeze the rudder bushing in advance, then remove the steel sleeve fixing tooling, and install the frozen rudder bushing into the steel sleeve to ensure that the upper and lower surfaces of the rudder bushing and the steel sleeve are flush; S7. After the rudder bushing returns to normal temperature, install the retaining ring, bolts and sealing plate; S8. Finally, lift the rudder stock together with the rudder shaft sleeve, install the rudder shaft sleeve into the steel sleeve, and complete the installation of the rudder stock.
2. The boring-free installation method for a ship rudder stock according to claim 1, characterized in that: In the above step S1, the inner wall of the steel sleeve and the inner hole of the circular through hole are first cleaned to ensure that the inside of the steel sleeve and the circular through hole are clean.
3. The boring-free installation method for a ship rudder stock according to claim 1, characterized in that: The steel sleeve fixing tooling includes a plurality of bolts, a plurality of adjusting bolts, a mounting plate and a plurality of adjusting bolt supporting blocks. The cross-sectional area of the mounting plate is larger than the cross-sectional area of the circular through hole. The mounting plate is fixed to the upper and lower end surfaces of the lower rudder bearing by a plurality of bolts. The adjusting bolt supporting block is fixedly mounted on the end surface of the mounting plate opposite to the lower rudder bearing. The adjusting bolt is arranged on the adjusting bolt supporting block, and the adjusting bolt and the adjusting bolt supporting block are threadedly connected. The steel sleeve and the center line of the rudder system are adjusted to meet the tolerance requirements by twisting the adjusting bolt to contact the steel sleeve.
4. The boring-free installation method for a ship rudder stock according to claim 3, characterized in that: The number of the plurality of bolts is four, the number of the plurality of adjustment bolt support blocks is four, the plurality of bolts and the plurality of adjustment bolt support blocks are arranged in a one-to-one correspondence, and the plurality of adjustment bolt support blocks are arranged in a circular array.
5. The boring-free installation method for a ship rudder stock according to claim 3, characterized in that: The mounting plate is provided with a through hole for a hand to pass through and extend into the interior of the steel sleeve.
6. The boring-free installation method for a ship rudder stock according to claim 1, characterized in that: A straight steel wire for indicating the center of the circular through hole is arranged at the center of the circular through hole.
7. The boring-free installation method for a ship rudder stock according to claim 6, characterized in that: In the above step S3, the position of the steel sleeve is adjusted by using an adjusting bolt according to the position of the straight steel wire so that the center of the steel sleeve and the straight steel wire meet the tolerance requirements, that is, the radius values of the straight steel wire and the steel sleeve are measured.
8. The boring-free installation method for a ship rudder stock according to claim 3, characterized in that: In the above step S4, the gap between the end surface of the mounting plate and the lower end surface of the steel sleeve is first sealed with a sponge sealing strip, and then epoxy is poured into the gap between the outer wall of the steel sleeve and the inner wall of the circular through hole.
9. The boring-free installation method for a ship rudder stock according to claim 8, characterized in that: In the above step S4, after pouring epoxy, when the steel sleeve is deformed, the deformed part of the steel sleeve is ground and polished according to the measurement data.
10. The boring-free installation method for a ship rudder stock according to claim 1, characterized in that: In the above step S7, the sealing plate is fixed to the upper end of the steel sleeve by epoxy putty, and the retaining ring is installed to the lower end of the lower rudder bearing by bolts. A through hole 1 is provided at the center of the sealing plate, and the rudder rod passes through the through hole 1.