Steel structure hoisting device for workshop construction
By designing an adjustable-angle lifting device, the problem of misalignment during steel truss hoisting was solved, enabling efficient and safe hoisting of steel trusses and improving the installation efficiency and safety of steel components.
Patent Information
- Application Number
- CN202411363949.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-28
- Publication Date
- 2024-12-06
Smart Images

Figure CN119079839A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of steel structure hoisting, and in particular to a steel structure hoisting device for factory building construction. Background Art
[0002] A steel structure factory building mainly refers to a building whose main load-bearing components are made of steel, including steel columns, steel beams, steel structure foundations, steel roof trusses, steel roofs, etc. The walls can also be enclosed by brick walls.
[0003] This kind of factory building has the following characteristics: light weight, high strength, and large span: Although steel has a high density, its strength is very high, so it can achieve a larger span, which is suitable for the construction of industrial factories with large spans and large spaces, such as hangars, gymnasiums, etc. Short construction period and low investment cost: All components of the steel structure factory building are prefabricated in the factory, and only assembly work is required on site, which greatly shortens the construction period and reduces the construction cost. Good heat resistance and excellent sealing: Steel can maintain high strength at high temperatures and has good sealing, which is suitable for special environments such as hot workshops and cold storages. Easy to move and green and pollution-free: Steel has good plasticity and toughness, and can withstand overload to a certain extent without breaking. In addition, steel structure factories also have the properties of beautiful and practical, reasonable cost, wind resistance, durability, heat preservation, sound insulation, environmental protection, and comfort.
[0004] The construction process of a steel structure plant mainly includes the following steps: Foundation construction: including ground leveling, foundation excavation, foundation pouring, etc., which is an important step to ensure the stability of the plant. Embedded parts installation: During the foundation construction process, it is necessary to embed bolts and other embedded parts required for steel structure connection. When embedding, the position and extension length of the anchor bolts, the horizontality and elevation of the foundation support surface, etc. must be strictly controlled. Steel structure production and installation: According to the design drawings, steel columns, steel beams and other steel structure components are processed in the factory, and then transported to the site for hoisting and installation. The accuracy and stability of the components need to be ensured during the hoisting and installation process.
[0005] However, when lifting steel components, such as steel trusses, the lifting equipment is used to tie up the steel trusses, and then the steel trusses are lifted to the designed location by a car crane or the like. However, after the lifting equipment is used to tie up the steel trusses, the angle of the steel trusses cannot be adjusted, which makes it difficult for the steel trusses to align with the threaded holes at the installation location, resulting in relatively average installation efficiency of the steel components. Summary of the invention
[0006] The object of the present invention is to provide a steel structure hoisting device for factory building construction, which can improve the installation efficiency of steel components.
[0007] The embodiment of the present invention is achieved through the following technical solutions: a steel structure hoisting device for factory building construction, comprising a hoisting device for fixing to the end of a steel wire rope of the hoisting device, the hoisting device is used to hoist the crossbeam of a steel truss, the hoisting device comprises a first arc plate and a second arc plate, the curvature of the first arc plate is greater than π, the curvature of the second arc plate is less than π, the first arc plate and the second arc plate are hinged to each other and buckled in a cylindrical shape, the second arc plate is located above the first arc plate and is rotatably buckled in the notch of the first arc plate, the steel wire rope of the hoisting device is divided into two and respectively fixed on the outside of the first arc plate and symmetrically arranged along the axis of the first arc plate, a sliding receiving seat is arranged in the hoisting device, the receiving seat is provided with two pieces and respectively located on the inner sides of the first arc plate and the second arc plate, the receiving seat slides along the arc direction of the first arc plate and the second arc plate, and a first driving member for driving the receiving seat to slide is provided in the hoisting device.
[0008] Furthermore, the surface of the receiving seat facing the inner side of the sling is arc-shaped and fits against the inner side of the sling, and the first driving component includes a driving motor arranged on the inner side of the sling and a driving wheel arranged on the output shaft of the driving motor, and the length direction of the output shaft of the driving motor is parallel to the axial direction of the sling, and the bottom of the receiving seat is received on the outer ring of the driving wheel.
[0009] Furthermore, a receiving surface of the receiving seat is slidably provided with a receiving plate, and the receiving plate slides in a direction perpendicular to the receiving surface of the receiving seat. The receiving seat is provided with a second driving member for driving the receiving plate to slide and drive the steel truss to abut against the opposite receiving plate.
[0010] Furthermore, the second driving member includes a receiving airbag and an air pump, the receiving airbag is fixedly arranged on the receiving surface of the receiving seat, the air pump is fixedly arranged on the side of the receiving seat and is connected with the receiving airbag, the receiving airbag is a rectangular body, and the receiving plate is fixedly arranged on the receiving airbag.
[0011] Furthermore, a winding shaft is rotatably provided at the end of the first arc-shaped plate, and the winding shaft is vertically arranged. A limiting rope is wound on the winding shaft, and a clamping plate is fixedly provided at the end of the limiting rope. The clamping plate is used to clamp onto the reinforcement plate of the steel truss to limit the movement tendency of the sling to slide toward the middle of the steel truss.
[0012] Furthermore, a worm gear is coaxially arranged on the winding shaft, and a worm that meshes with the worm gear is rotatably arranged at the end of the first arc-shaped plate.
[0013] Furthermore, an arc rod is slidably arranged in the second arc plate, the arc rod has the same curvature as the second arc plate, the arc rod slides along the curvature of the second arc plate, and the notch of the first arc plate is provided with a plug-in groove for the arc rod to be plugged into toward the inside of the first arc plate.
[0014] Furthermore, the receiving seat is provided with fixing air bags on both sides of the receiving plate, the fixing air bags are connected to the air pump, and the fixing air bags are used to expand into the H-shaped steel truss and abut against the vertical plates of the H-shaped steel to fix the steel truss.
[0015] Furthermore, the steel wire rope on one side close to the hinge axis of the second arc plate is fixedly arranged on the first arc plate, and the steel wire rope on the side away from the hinge axis of the second arc plate is detachably fixedly arranged on the first arc plate.
[0016] Furthermore, a winch is fixedly installed on the outer side of the first curved plate, and there are two winches which are symmetrically arranged along the axis of the first curved plate. A fixing rope is wound on the output shaft of the winch, and screws are fixedly installed on the ends of the fixing ropes. The screws are used for threaded connection to the two sides of the steel truss installation position facing the ground to pull the steel truss and limit the shaking of the steel truss.
[0017] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:
[0018] 1. When hoisting the steel truss, first rotate the second curved plate, the second curved plate opens the gap of the first curved plate, then move the hoist to make the crossbeam on the top of the steel truss relatively move into the first curved plate, then rotate the second curved plate, the second curved plate closes the gap of the first curved plate, after the steel truss enters the first curved plate, the steel truss is received on the receiving seat, then hoist the steel truss, after the steel truss is hoisted to the installation site, when the mounting plate at the end of the steel truss is aligned with the embedded parts at the installation site, the steel truss is fixed and connected by bolts When the mounting hole of the mounting plate at the end of the steel truss beam is not aligned with the mounting hole of the embedded part, the first driving member drives the receiving seat to slide, and the receiving seat slides in the inner ring of the sling to drive the steel truss beam to rotate in the sling, so as to adjust the angle of the mounting plate of the steel truss beam, so that the mounting hole on the mounting plate is aligned with the mounting hole of the embedded part, and then the steel truss beam is fixedly installed. The angle of the steel truss beam is adjusted by the first driving member, so as to facilitate the fixed installation of the steel truss beam, thereby improving the installation efficiency of the steel truss, and then improving the installation efficiency of the steel component;
[0019] 2. The second curved plate rotates into the notch of the first curved plate, and the second curved plate supports the first curved plate, which reduces the possibility of deformation of the first curved plate during the hoisting of the steel truss, thereby facilitating the installation of the steel truss and improving the hoisting safety;
[0020] 3.3. After the second curved plate is buckled into the notch of the first curved plate, the possibility of the steel truss beam accidentally falling from the notch during the hoisting process of the steel truss beam is reduced, thereby improving the safety of the hoisting of the steel component. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 This is a schematic diagram of the overall structure of a steel structure hoisting device for factory building construction according to an embodiment of the present application;
[0023] Figure 2 This is a schematic diagram of the structure of a hoist clamping a steel truss beam in a steel structure hoisting device for factory building construction according to an embodiment of the present application;
[0024] Figure 3 It is a schematic diagram of the arrangement of two hoists in a steel structure hoisting device for factory building construction according to an embodiment of the present application;
[0025] Figure 4 It is a structural schematic diagram of a hoisting device in a steel structure hoisting device for factory building construction according to an embodiment of the present application;
[0026] Figure 5 It is a cross-sectional view of a first curved plate in a steel structure hoisting device for factory building construction according to an embodiment of the present application.
[0027] Icons: 1. Lifting equipment; 2. Wire rope; 3. Lifting equipment; 31. First curved plate; 32. Second curved plate; 4. Steel truss; 5. H-shaped steel; 6. Socket; 7. Driving motor; 8. Driving wheel; 9. Curved groove; 10. Socket plate; 11. Socket airbag; 12. Curved rod; 13. Plug-in groove; 14. Reel; 15. Limiting rope; 16. Snap-in plate; 17. Snap-in groove; 18. Worm gear; 19. Worm; 20. Fixed airbag; 21. Lifting block; 22. Lifting groove; 23. Lifting ring; 24. Winch; 25. Fixed rope; 26. Screw; 27. Reinforcement plate. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0029] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Example 1
[0031] The following is further described in conjunction with specific embodiments. Figure 1-Figure 5 As shown, the present invention is a steel structure hoisting device for factory building construction, including a hoist 3 fixed to the end of a steel wire rope 2 of a hoisting device 1, the hoist 3 is used to hoist the cross beam of a steel truss 4, the steel truss 4 is made by welding an H-shaped steel 5, the hoist 3 is ring-shaped, and the cross beam of the steel truss 4 is placed in the hoist 3 for hoisting. In the embodiment of the present application, the hoist 3 includes a first curved plate 31 and a second curved plate 32, the curvature of the first curved plate 31 is greater than π, and the curvature of the second curved plate 32 is less than π, The first arc plate 31 and the second arc plate 32 are hinged to each other and buckled to form a cylindrical shape. The rotation axis of the second arc plate 32 is parallel to the length direction of the first arc plate 31, and its hinge axis is located on the side wall of the notch of the first arc plate 31. The second arc plate 32 is located above the first arc plate 31 and is rotated and buckled in the notch of the first arc plate 31. The steel wire rope 2 of the hoisting equipment 1 is divided into two and is respectively fixedly arranged on the outside of the first arc plate 31 and symmetrically arranged along the axis of the first arc plate 31.
[0032] Combination Figure 3 A sliding receiving seat 6 is provided in the sling 3. The receiving seat 6 has two pieces and is respectively located on the inner sides of the first arc plate 31 and the second arc plate 32. The receiving seat 6 slides along the arc direction of the first arc plate 31 and the second arc plate 32. A first driving member for driving the receiving seat 6 to slide is provided in the sling 3.
[0033] When the steel truss 4 is hoisted, the second curved plate 32 is first rotated, and the second curved plate 32 opens the gap of the first curved plate 31. Then the hoist 3 is moved to make the crossbeam at the top of the steel truss 4 relatively move into the first curved plate 31, and then the second curved plate 32 is rotated, and the second curved plate 32 closes the gap of the first curved plate 31. After the steel truss 4 enters the first curved plate 31, the steel truss 4 is received on the receiving seat 6, and then the steel truss 4 is hoisted. After the steel truss 4 is hoisted to the installation location, when the mounting plate at the end of the steel truss 4 is aligned with the embedded parts at the installation location, the steel truss is fixed by bolts. 4 is fixedly connected; when the mounting hole of the mounting plate at the end of the steel truss beam 4 is not aligned with the mounting hole of the embedded part, the first driving member drives the receiving seat 6 to slide, and the receiving seat 6 slides in the inner ring of the sling 3 to drive the steel truss beam 4 to rotate in the sling 3, so as to adjust the angle of the mounting plate of the steel truss beam 4, so that the mounting hole on the mounting plate is aligned with the mounting hole of the embedded part, and then the steel truss beam 4 is fixedly installed, and the angle of the steel truss beam 4 is adjusted by the first driving member, so as to facilitate the fixed installation of the steel truss beam 4, thereby improving the installation efficiency of the steel truss, and then improving the installation efficiency of the steel component.
[0034] Reference Figure 3 and Figure 4 In the embodiment of the present application, the connection end between the wire rope 2 of the lifting equipment 1 and the first curved plate 31 is located below the maximum diameter of the first curved plate 31, so that when the wire rope 2 applies tension to the first curved plate 31, the deformation tendency of the first curved plate 31 squeezes the second curved plate 32, so that the second curved plate 32 and the first curved plate 31 are installed as a whole, thereby improving the stability of the lifting device 3, thereby facilitating the lifting of steel components.
[0035] Reference Figure 3 and Figure 4 In the embodiment of the present application, the sling 3 is not only used to hoist the steel truss 4, but also can be used to hoist components such as beams and columns, thereby increasing the scope of use of the sling 3.
[0036] Reference Figure 4 and Figure 5In the embodiment of the present application, the surface of the receiving seat 6 facing the inner side of the sling 3 is arc-shaped and fits against the inner side of the sling 3. The first driving member includes a driving motor 7 arranged on the inner side of the sling 3 and a driving wheel 8 arranged on the output shaft of the driving motor 7. Furthermore, arc grooves 9 are provided on the inner sides of the first arc plate 31 and the second arc plate 32. The driving wheel 8 is located in the arc groove 9 and moves out from the opening of the arc groove 9 to abut against the receiving seat 6. The length direction of the output shaft of the driving motor 7 is parallel to the axial direction of the sling 3, and the bottom of the receiving seat 6 is received on the outer ring of the driving wheel 8. When the direction of the receiving seat 6 is adjusted, the driving motor 7 is started, and the driving motor 7 drives the driving wheel 8 to rotate. The rotation of the driving wheel 8 drives the receiving seat 6 to slide. The sliding of the receiving seat 6 drives the steel truss 4 to rotate in the sling 3, thereby adjusting the angle of the mounting plate. The operation is simple and convenient.
[0037] Reference Figure 4 and Figure 5 In order to improve the stability of the steel truss 4 in the sling 3 and reduce the possibility of the steel truss 4 sliding on the receiving seat 6 during lifting, a receiving surface of the receiving seat 6 is slidably provided with a receiving plate 10. Furthermore, a flexible rubber plate is fixedly provided on the receiving plate 10. After the steel truss 4 is placed on the flexible rubber plate, the flexible rubber plate is deformed and a fixed groove adapted to the steel truss 4 is formed on the flexible rubber plate. The receiving plate 10 slides in a direction perpendicular to the receiving surface of the receiving seat 6. The receiving seat 6 is provided with a second driving member for driving the receiving plate 10 to slide and drive the steel truss 4 to abut against the receiving plate 10 facing it. The second driving member includes a receiving airbag 11 and an air pump. The receiving airbag 11 is fixedly provided on the receiving surface of the receiving seat 6. The air pump is fixedly provided on the side of the receiving seat 6 and is connected to the receiving airbag 11. The receiving airbag 11 is a rectangular body, and the receiving plate 10 is fixedly provided on the receiving airbag 11.
[0038] After the steel truss 4 is placed on the receiving plate 10, the second curved plate 32 rotates to engage with the first curved plate 31, and then the air pump is started. The air pump inflates the receiving airbag 1, and the receiving airbag 1 expands due to the intake of air. The expansion of the receiving airbag 1 drives the receiving plate 10 to move in the direction away from the receiving seat 6. The movement of the receiving plate 10 drives the steel truss 4 to move. The steel truss 4 moves toward the relative receiving plate 10 and abuts against the relative receiving plate 10. At this time, the steel truss 4 is clamped in the receiving plates 10 on both sides, and then the steel truss 4 is fixed in the sling 3, thereby improving the stability of the sling 3; at the same time, under the action of the flexible rubber plate, the friction between the steel truss 4 and the receiving plate 10 is increased, further reducing the possibility of the steel truss 4 slipping on the receiving plate 10.
[0039] Reference Figure 4 and Figure 5In order to reduce the possibility that the first curved plate 31 squeezes the second curved plate 32 during the hoisting of the steel truss 4, causing the second curved plate 32 to accidentally burst out of the notch, in the embodiment of the present application, a curved rod 12 is slidably arranged in the second curved plate 32, and the curvature of the curved rod 12 is consistent with that of the second curved plate 32. The curved rod 12 slides along the curvature of the second curved plate 32, and the notch of the first curved plate 31 is provided with a plug-in groove 13 for the curved rod 12 to be plugged into the inside of the first curved plate 31; after the second curved plate 32 is buckled into the first curved plate 31, the curved rod 12 is slid, and the curved rod 12 slides out of the first curved plate 31 and enters the second curved plate 32, so as to fix the second curved plate 32 on the first curved plate 31, so as to facilitate the second curved plate 32 to seal the first curved plate 31.
[0040] Reference Figure 2 and Figure 4 When the steel truss 4 is hoisted, due to the angle between the hoisting wire rope 2 and the sling 3, the sling 3 is easily pulled toward the middle of the steel truss 4 under the action of the tension of the wire rope 2, thereby causing the lifting point position of the steel truss 4 to change, which is easy to cause the steel truss 4 to tilt and increase the risk of hoisting. Therefore, in the embodiment of the present application, a winding shaft 14 is rotatably provided at the end of the first arc plate 31, and the winding shaft 14 is vertically arranged. The winding shaft 14 is wound on the limit rope 15, and the end of the limit rope 15 is fixedly provided with a clamping plate 16, and a clamping groove 17 is provided on the clamping plate 16. The clamping plate 16 is used to It is clamped on the reinforcement plate 27 of the steel truss 4 to limit the movement tendency of the sling 3 to slide toward the middle of the steel truss 4; after the sling 3 clamps the steel truss 4, the limit rope 15 is pulled to unwind the limit rope 15 from the winding shaft 14, and then the clamping plate 16 is clamped on the reinforcement plate 27 of the steel truss 4. Furthermore, a fixing bolt is threadedly connected on the clamping plate 16, and the end of the fixing bolt is located in the clamping groove 17. After the reinforcement plate 27 is clamped in the clamping groove 17, the fixing bolt is rotated, and the end of the fixing bolt abuts against the reinforcement plate 27, thereby fixing the clamping plate 16 on the reinforcement plate 27.
[0041] When the clamping plate 16 is clamped on the reinforcing plate 27, when the steel truss 4 is hoisted, when the steel truss 4 has a tendency to slide, the clamping plate 16 and the limiting rope 15 restrict the sliding tendency of the sling 3, thereby reducing the possibility of sliding of the sling 3 and further improving the hoisting safety of the steel truss 4.
[0042] Reference Figure 2 and Figure 4In the embodiment of the present application, a worm wheel 18 is coaxially arranged on the winding shaft 14, and a worm 19 meshing with the worm wheel 18 is rotatably arranged at the end of the first arc plate 31; when the limiting rope 15 is unwound, the worm 19 is rotated, and the rotation of the worm 19 drives the worm wheel 18 to rotate, and the rotation of the worm wheel 18 drives the winding shaft 14 to rotate to unwind the limiting rope 15, so that the clamping plate 16 is conveniently clamped on the reinforcement plate 27; when the steel truss 4 is hoisted, the winding shaft 14 is fixed under the action of the self-locking performance of the worm wheel 18 and the worm 19, so as to facilitate the sliding tendency of the lifting device 3 to be limited.
[0043] Reference Figure 2 and Figure 5 Furthermore, in order to reduce the possibility of the steel truss 4 sliding in the hanger 3, the receiving seat 6 and fixed air bags 20 are provided on both sides of the receiving plate 10. The fixed air bags 20 are connected to the air pump. The fixed air bags 20 are used to expand into the H-shaped steel 5 of the steel truss 4 and abut against the vertical plate of the H-shaped steel 5 to fix the steel truss 4; after the steel truss 4 is placed on the receiving seat 6, the air pump is started, and the air pump inflates the fixed air bags 20. The fixed air bags 20 expand and enter the H-shaped steel 5, and gradually move toward the vertical plate of the H-shaped steel 5, and abut against the vertical plate of the H-shaped steel 5, thereby fixing the steel truss 4 on the receiving seat 6, further reducing the possibility of the steel truss 4 sliding.
[0044] Reference Figure 2 and Figure 4 When the steel truss 4 is installed at the designed position, the end of the steel truss 4 is connected to the designed position, so that the sling 3 cannot be removed from the steel truss 4. Therefore, in the embodiment of the present application, in order to facilitate the detachment of the sling 3 from the steel truss 4, the steel wire rope 2 close to the hinge axis of the second arc plate 32 is fixedly set on the first arc plate 31, and the steel wire rope 2 away from the hinge axis of the second arc plate 32 is detachably fixed on the first arc plate 31. Furthermore, a lifting block 21 is fixedly set on the side wall of the first arc plate 31. A lifting groove 22 is formed inwardly on the lifting block 21, and a lifting ring 23 is fixedly provided at the end of the wire rope 2, and the lifting ring 23 is clamped in the lifting groove 22; after the steel truss 4 is installed at the designed position, the height of the lifting wire rope 2 is appropriately lowered to disengage the lifting ring 23 from the lifting block 21, and then the arc rod 12 is slid to disengage the arc rod 12 from the first arc plate 31, and then the second arc plate 32 is rotated to open the first arc plate 31, and then the sling 3 is removed from the steel truss 4. The operation is simple and convenient.
[0045] Reference Figure 2 and Figure 4Furthermore, a torsion spring is sleeved on the hinge shaft of the second arc plate 32, the hinge shaft is rotatably set on the first arc plate 31, the second arc plate 32 is fixedly set on the hinge shaft, one side of the torsion spring is fixedly set on the second arc plate 32, and the other side is fixedly set on the first arc plate 31. The torsion spring drives the second arc plate 32 to have a movement tendency to open the first arc plate 31.
[0046] Reference Figure 2 and Figure 4 Furthermore, the lifting block 21 is inclined toward the lower side of the first arc-shaped plate 31, so that the lifting ring 23 is easily separated from the lifting block 21 when the wire rope 2 falls.
[0047] Reference Figure 3 and Figure 4 In the embodiment of the present application, a winch 24 is fixedly provided on the outside of the first curved plate 31. There are two winches 24 and they are symmetrically arranged along the axis of the first curved plate 31. A fixed rope 25 is wound on the output shaft of the winch 24. A screw 26 is fixedly provided on the end of the fixed rope 25. The screw 26 is used to be threadedly connected to the two sides of the ground at the installation place of the steel truss 4 to pull the steel truss 4 and limit the shaking of the steel truss 4; after the sling 3 is clamped on the steel truss 4, the screw 26 is inserted into the ground. When the steel truss 4 starts to be hoisted, the winch 24 is started, the winch 24 unwinds the fixed rope 25, and the fixed rope 25 suspends the sling 3, thereby limiting the shaking of the sling 3, thereby reducing the possibility of large shaking of the steel truss 4 during the hoisting process.
[0048] The implementation principle of a steel structure hoisting device for factory building construction in the embodiment of the present application is as follows:
[0049] When the steel truss 4 is hoisted, the second curved plate 32 is first rotated, and the second curved plate 32 opens the gap of the first curved plate 31. Then the hoist 3 is moved to make the crossbeam at the top of the steel truss 4 relatively move into the first curved plate 31, and then the second curved plate 32 is rotated, and the second curved plate 32 closes the gap of the first curved plate 31. After the steel truss 4 enters the first curved plate 31, the steel truss 4 is received on the receiving seat 6, and then the steel truss 4 is hoisted. After the steel truss 4 is hoisted to the installation location, when the mounting plate at the end of the steel truss 4 is aligned with the embedded parts at the installation location, the steel truss is fixed by bolts. 4 is fixedly connected; when the mounting hole of the mounting plate at the end of the steel truss beam 4 is not aligned with the mounting hole of the embedded part, the receiving seat 6 is driven to slide by the driving motor 7, and the receiving seat 6 slides in the inner ring of the hanger 3 to drive the steel truss beam 4 to rotate in the hanger 3, so as to adjust the angle of the mounting plate of the steel truss beam 4, so that the mounting hole on the mounting plate is aligned with the mounting hole of the embedded part, and then the steel truss beam 4 is fixedly installed, and the angle of the steel truss beam 4 is adjusted by the first driving member, so as to facilitate the fixed installation of the steel truss beam 4, thereby improving the installation efficiency of the steel truss, and then improving the installation efficiency of the steel component.
[0050] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A steel structure hoisting device for factory building construction, characterized in that: The invention comprises a sling (3) for fixing on the end of a steel wire rope (2) of a slinging device (1), the sling (3) being used for slinging a crossbeam of a steel truss (4), the sling (3) comprising a first curved plate (31) and a second curved plate (32), the curvature of the first curved plate (31) being greater than π, the curvature of the second curved plate (32) being less than π, the first curved plate (31) and the second curved plate (32) being hinged to each other and buckled to form a cylindrical shape, the second curved plate (32) being located above the first curved plate (31) and being rotatably buckled to the first curved plate (31) In the gap, the steel wire rope (2) of the lifting equipment (1) is divided into two and fixedly arranged on the outside of the first arc plate (31) and symmetrically arranged along the axis of the first arc plate (31). The lifting device (3) is provided with a sliding receiving seat (6). The receiving seat (6) is provided with two pieces and is respectively located on the inside of the first arc plate (31) and the second arc plate (32). The receiving seat (6) slides along the arc direction of the first arc plate (31) and the second arc plate (32). The lifting device (3) is provided with a first driving member for driving the receiving seat (6) to slide.
2. A steel structure hoisting device for factory building construction according to claim 1, characterized in that: The surface of the receiving seat (6) facing the inner side of the sling (3) is arc-shaped and fits the inner side of the sling (3). The first driving member includes a driving motor (7) arranged on the inner side of the sling (3) and a driving wheel (8) arranged on the output shaft of the driving motor (7). The length direction of the output shaft of the driving motor (7) is parallel to the axial direction of the sling (3). The bottom of the receiving seat (6) is received on the outer ring of the driving wheel (8).
3. A steel structure hoisting device for factory building construction according to claim 2, characterized in that: The receiving surface of the receiving seat (6) is slidably provided with a receiving plate (10), and the receiving plate (10) slides in a direction perpendicular to the receiving surface of the receiving seat (6). The receiving seat (6) is provided with a second driving member for driving the receiving plate (10) to slide and drive the steel truss (4) to abut against the receiving plate (10) facing it.
4. A steel structure hoisting device for factory building construction according to claim 3, characterized in that: The second driving member comprises a receiving airbag (11) and an air pump, the receiving airbag (11) being fixedly arranged on a receiving surface of a receiving seat (6), the air pump being fixedly arranged on a side of the receiving seat (6) and being connected to the receiving airbag (11), the receiving airbag (11) being in the form of a rectangular body, and the receiving plate (10) being fixedly arranged on the receiving airbag (11).
5. A steel structure hoisting device for factory building construction according to claim 1, characterized in that: A winding shaft (14) is rotatably provided at the end of the first arc-shaped plate (31), and the winding shaft (14) is vertically arranged. A limit rope (15) is wound on the winding shaft (14), and a clamping plate (16) is fixedly provided at the end of the limit rope (15). The clamping plate (16) is used to clamp onto the reinforcement plate (27) of the steel truss (4) to limit the movement tendency of the sling (3) to slide toward the middle of the steel truss (4).
6. A steel structure hoisting device for factory building construction according to claim 5, characterized in that: A worm wheel (18) is coaxially arranged on the reeling shaft (14), and a worm (19) meshing with the worm wheel (18) is rotatably arranged at the end of the first arc-shaped plate (31).
7. A steel structure hoisting device for factory building construction according to claim 1, characterized in that: An arc rod (12) is slidably arranged inside the second arc plate (32), the arc rod (12) and the second arc plate (32) have the same arc, and the arc rod (12) slides along the arc of the second arc plate (32). The notch of the first arc plate (31) is provided with a plug-in groove (13) for the arc rod (12) to be plugged into, facing the inside of the first arc plate (31).
8. A steel structure hoisting device for factory building construction according to claim 4, characterized in that: The receiving seat (6) is provided with fixing air bags (20) on both sides of the receiving plate (10). The fixing air bags (20) are connected to an air pump. The fixing air bags (20) are used to expand into the H-shaped steel (5) of the steel truss (4) and abut against the vertical plate of the H-shaped steel (5) to fix the steel truss (4).
9. A steel structure hoisting device for factory building construction according to claim 1, characterized in that: The steel wire rope (2) on the side close to the hinge axis of the second arc-shaped plate (32) is fixedly arranged on the first arc-shaped plate (31), and the steel wire rope (2) on the side away from the hinge axis of the second arc-shaped plate (32) is detachably fixedly arranged on the first arc-shaped plate (31).
10. A steel structure hoisting device for factory building construction according to claim 1, characterized in that: A winch (24) is fixedly arranged on the outside of the first curved plate (31), and two winches (24) are provided and are symmetrically arranged along the axis of the first curved plate (31). A fixing rope (25) is wound on the output shaft of the winch (24), and a screw rod (26) is fixedly arranged at the end of the fixing rope (25). The screw rod (26) is used to be threadedly connected to the two sides of the steel truss (4) installation position facing the ground to pull the steel truss (4) and limit the shaking of the steel truss (4).
Citation Information
Cited By
Hoisting construction device for steel structure factory building
CN120057725A
A hoisting construction device for a steel structure workshop
CN120057725B