Method and device for recycling cleaning wastewater for vacuum infiltration

By using a system of rotating rubber jars and spray cleaning devices combined with recycling and treatment tanks in the vacuum infiltration process, the pollution and waste problems in cleaning waste water treatment are solved, and recycling efficiency and cleaning are improved Effect.

CN119080115APending Publication Date: 2024-12-06NANJING FEIJIE INTELLIGENT TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411149423.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The cleaning wastewater treatment method generated by the vacuum infiltration process in the prior art has problems of environmental pollution and waste of water resources, and the purity and recycling effect of the cleaning water after using the separator are poor.

Method used

Using a system including a rubber-swinging tank, a spray cleaning device and a recycling and treatment tank, the cleaning wastewater is treated through a robot and a water curtain mechanism, the municipal water is recycled, and the heating components are used to separate to realize the infiltration liquid and water-impregnation. Layered recycling of the seepage mixture and water liquid to avoid the use of separator.

Benefits of technology

It improves the recycling rate of cleaning wastewater, improves the cleaning effect, saves water resources, and improves the recycling efficiency of the infiltration liquid, avoiding the accumulation and contamination of the infiltration liquid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119080115A_ABST
    Figure CN119080115A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for recycling cleaning wastewater for vacuum impregnation. A workpiece subjected to impregnation is subjected to spinning operation and twice spray cleaning operation to respectively generate three types of cleaning wastewater, one type of cleaning wastewater and two types of cleaning wastewater; injecting the three types of cleaning wastewater into a treatment cavity in the recovery treatment tank for heating and standing at constant temperature; the method comprises the following steps: heating cleaning wastewater in a treatment cavity, standing at a constant temperature until an infiltration solution, a water-infiltration mixed solution and a water solution which are layered up and down are obtained, and respectively inputting the infiltration solution, the water-infiltration mixed solution and the water solution into vacuum infiltration equipment, a first spraying tank and a second spraying tank to complete recycling; according to the method and the device for recovering and treating the cleaning wastewater for vacuum infiltration, the cleaning wastewater generated by spraying and cleaning an infiltrated workpiece is recovered and recycled by adopting a scheme of comprehensively heating a constant-temperature standing spraying equipment structure improvement and a spraying process improvement; and not only are environmental pollution and waste of water resources overcome, but also a high workpiece cleaning effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of vacuum impregnation wastewater recovery, and in particular to a recovery and treatment method and device for cleaning wastewater used in vacuum impregnation. Background Art

[0002] Impregnation, also known as dipping, soaking, and penetration, is a microporous penetration sealing process. The sealing medium is infiltrated into the micropores by natural penetration, vacuuming, and pressurization to fill the gaps, and then the sealing medium in the gaps is solidified by room temperature, cooling, or heating to achieve the effect of sealing the gaps. At present, most of the workpieces are impregnated by vacuum, and after the vacuum impregnation operation, the workpiece with the impregnant needs to be sprayed and cleaned twice. Generally, the impregnation process of the workpiece is completed in the order of impregnation-spinning-first spray cleaning-second spray cleaning-thermal curing treatment.

[0003] In the above process, the wastewater generated after spray cleaning is generally treated in two ways in the prior art. One is to directly discharge the cleaning wastewater after two spray cleanings to the outside, and the other is to collect it into a separation box, add a separation agent to mix with the wastewater to achieve phase separation, so that the upper layer of the impregnation agent and the lower layer of the cleaning water can be recovered separately. However, the above two methods for recycling the spray cleaning wastewater have the following problems:

[0004] (1) If the cleaning wastewater is discharged directly, it will cause environmental pollution and waste of water resources;

[0005] (2) The cleaning wastewater is first stored in a separation box and then separated by adding a separation agent. Since the separation agent is added to the cleaning wastewater and the separation agent has chemical components, the separation agent components will remain in the impregnating agent and the cleaning water after separation. Using the separated cleaning water to spray clean the workpiece after impregnation will also result in poor cleaning effect. Summary of the invention

[0006] Purpose of the invention: To provide a method and device for recycling cleaning waste water used in vacuum impregnation, so as to improve the recycling efficiency of cleaning waste water generated in the vacuum impregnation process.

[0007] Technical solution:

[0008] A method for recycling cleaning wastewater used for vacuum impregnation, specifically comprising the following steps:

[0009] S1: The workpiece that has completed the impregnation operation in the vacuum impregnation equipment is moved into the glue-spinning chamber opened in the glue-spinning tank by a robot. The workpiece that has completed the glue-spinning operation in the glue-spinning chamber is moved out by the robot and transferred to the first spray chamber opened in the first spray tank. The first spray assembly arranged in the first spray chamber is connected to the first water storage chamber through the first spray cleaning water transmission mechanism. The first water storage chamber is arranged in the first spray tank and connected to the municipal water pipeline. In the first cycle, the water source for the spray cleaning operation in the first spray tank is completely derived from the municipal water. The municipal water is input into the first water storage chamber through the municipal water pipeline. The first spray cleaning water transmission mechanism arranged on the first spray tank inputs the municipal water in the first water storage chamber into the first spray tank. The first spray cleaning component is used to perform a first spray cleaning operation on the workpiece in the first spray chamber. The first type of cleaning wastewater generated by the first spray cleaning operation falls into the first water passage chamber provided in the first spray tank. The first type of cleaning wastewater in the first water passage chamber enters the recovery tank below the first spray tank through the first cleaning wastewater transmission mechanism. The workpiece that has undergone the first spray cleaning operation is removed by the robot and transferred to the second spray chamber provided in the second spray tank for further cleaning. The second spray component provided in the second spray chamber is connected to the second water storage chamber through the second spray cleaning water transmission mechanism. The second water storage chamber is provided in the second spray tank and is connected to the municipal water pipeline. In the first cycle, The water source for the spray cleaning operation in the second spray tank is completely derived from city water, and the city water is input into the second water storage chamber through the city water pipeline. The second spray cleaning water transmission mechanism provided on the second spray tank inputs the city water in the second water storage chamber into the second spray assembly, and performs a second spray cleaning operation on the workpiece located in the second spray chamber. The second type of cleaning waste water generated by the second spray cleaning operation falls into the second water passage chamber opened in the second spray tank. A water curtain mechanism is also provided in the glue-spinning chamber. The water curtain mechanism is connected to the third water storage chamber through the flowing water transmission mechanism provided on the glue-spinning tank. The third water storage chamber is opened in the glue-spinning tank and is connected to the second storage chamber through the water curtain transmission mechanism. The water chamber, the water curtain transmission mechanism inputs the water in the second water storage chamber into the third water storage chamber, the flowing water transmission mechanism inputs the water in the third water storage chamber into the water curtain mechanism, so that the inner wall of the glue throwing chamber forms a water curtain wall, and the impregnation liquid thrown off during the glue throwing operation of the workpiece in the glue throwing chamber is thrown to the water curtain wall, the water in the water curtain wall blocks the impregnation liquid, and the three types of cleaning wastewater generated by mixing with the impregnation liquid thrown out are input into the second water passage chamber through the third cleaning wastewater transmission mechanism, the three types of cleaning wastewater and the second type of cleaning wastewater in the second water passage chamber are both sent to the recovery tank through the second cleaning wastewater transmission mechanism, and the workpiece after the second spray cleaning operation is transferred to the next process by the robot;

[0010] S2: In the first cycle, the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater flowing to the recycling tank all enter the four processing chambers opened in the recycling tank in turn. After the cleaning wastewater volume in the first processing chamber reaches the first preset volume, it switches to the second processing chamber. When the cleaning wastewater volume in the second processing chamber reaches the first preset volume, it switches to the third processing chamber. When the cleaning wastewater volume in the third processing chamber reaches the first preset volume, at this time, the first water storage chamber contains the second preset volume of municipal water, and the second water storage chamber contains the third preset volume of municipal water. In the process, the third preset volume is equal to the sum of the second preset volume and the water supply of the water curtain mechanism, the municipal water pipeline is closed, and the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater do not enter the fourth treatment chamber, the first cycle ends, and the second cycle begins, wherein the time for the cleaning wastewater volume in a single treatment chamber to reach the first preset volume is half of the time required for the single treatment chamber to be heated and kept at a constant temperature for static treatment, the volume of the first water storage chamber is greater than or equal to the sum of half of the first preset volume and the second preset volume, and the volume of the second water storage chamber is greater than or equal to the sum of half of the first preset volume and the third preset volume;

[0011] S3: In the second cycle, when the first preset volume of cleaning wastewater is injected into the third processing chamber, the cleaning wastewater in the first processing chamber is allowed to stand, and the cleaning wastewater in the first processing chamber is heated and allowed to stand at a constant temperature before separation to obtain upper and lower layered impregnation liquid, water-impregnation mixed liquid and water liquid, and the impregnation liquid, the water liquid and the water-impregnation mixed liquid are sequentially extracted by the impregnation liquid recovery mechanism, the second cleaning water recovery mechanism and the first cleaning water recovery mechanism installed on the recovery tank until the first processing chamber is emptied, and the output ends of the impregnation liquid recovery mechanism, the second cleaning water recovery mechanism and the first cleaning water recovery mechanism are respectively connected to the vacuum impregnation equipment, the second water storage chamber and the first water storage chamber, and the water-impregnation mixed liquid enters the first water storage chamber, and the water-impregnation mixed liquid entering the first water storage chamber is used to perform the first spray cleaning operation on the subsequent workpiece, The water liquid enters the second water storage chamber, and the water liquid entering the second water storage chamber is used to perform a second spray cleaning operation on the subsequent workpiece and supply water to the third water storage chamber. At the same time, the first type of cleaning wastewater discharged from the first water chamber, the second type of cleaning wastewater discharged from the second water chamber, and the third type of cleaning wastewater enter the fourth processing chamber. When the volume of the cleaning wastewater in the fourth processing chamber reaches the first preset volume, the cleaning wastewater in the second processing chamber has been left to stand still. The cleaning wastewater in the second processing chamber is recycled and reused according to the treatment process of the cleaning wastewater in the first processing chamber. The recycled water liquid and water-infiltration mixed liquid flow to the first water chamber and the second water chamber again and are discharged into the first processing chamber. By analogy, by switching the four processing chambers in the second cycle, the city water used for spraying operation in the first cycle is recycled to achieve the purpose of recycling and treating the cleaning wastewater.

[0012] In a further embodiment, the step S1 specifically includes the following steps:

[0013] S1.1: The first spray tank is provided with the first spray chamber, the first water passage chamber and the first water storage chamber, the first water storage chamber is connected to the first spray cleaning water transmission mechanism, the first spray chamber is provided with the first spray assembly and the first cleaning position, the first spray tank is provided with a first inlet connected to the first spray chamber, the first inlet is used for workpieces to enter and exit the first spray chamber, the workpieces entering the first spray chamber are placed on the first cleaning position, the first spray cleaning water transmission mechanism draws water from the first water storage chamber into the first spray assembly to perform the first spray cleaning operation on the workpieces connected to the first cleaning position;

[0014] The second spray tank is provided with the second spray chamber, the second water passage chamber and the second water storage chamber, the second water storage chamber is connected to the second spray cleaning water transmission mechanism, the second spray chamber is provided with the second spray assembly and the second cleaning position, the second spray tank is provided with a second inlet connected to the first spray chamber, the second inlet is used for workpieces to enter and exit the second spray chamber, the workpieces entering the second spray chamber are placed on the second cleaning position, the second spray cleaning water transmission mechanism draws water from the second water storage chamber to the second spray assembly to perform a second spray cleaning operation on the workpieces connected to the second cleaning position;

[0015] S1.2: The glue-spinning tank is provided with a glue-spinning chamber, a third water storage chamber and a third water-passing chamber. A workpiece inlet is provided on the top of the glue-spinning tank, and the workpiece inlet is connected to the glue-spinning chamber. The glue-spinning tank is provided with a tank cover and a translation drive assembly, and the translation drive assembly drives the tank cover to move horizontally so that the tank cover opens and closes the workpiece inlet. The glue-spinning tank is provided with a glue-spinning station and a water curtain mechanism, and the glue-spinning station is arranged in the glue-spinning chamber, and the water curtain mechanism is arranged on the side of the tank cover facing the glue-spinning chamber, and the translation drive assembly drives the tank cover to move to open the workpiece inlet. After the entrance, the workpiece is placed on the glue-spinning station through the workpiece entrance, and the translation drive assembly drives the tank cover to move horizontally to close the workpiece entrance; the flowing water transmission mechanism is connected with the water curtain mechanism under the drive of the power mechanism, so that the third water storage chamber inputs the stored water into the water curtain mechanism through the flowing water transmission mechanism to form a water curtain wall, the power mechanism is arranged on the glue-spinning tank, the third water passage chamber is connected to the bottom of the glue-spinning chamber, and the third water passage chamber is connected with the second water passage chamber through the third cleaning wastewater transmission mechanism;

[0016] S1.3: The three types of cleaning wastewater generated by the spinning operation fall into the third water chamber and are input into the second water chamber through the third cleaning wastewater transmission mechanism. The first type of cleaning wastewater generated by the first spray cleaning operation falls into the first water chamber and enters the processing chamber through the first cleaning wastewater transmission mechanism provided on the recovery processing tank. The second type of cleaning wastewater generated by the second spray cleaning operation falls into the second water chamber. The second and third types of cleaning wastewater in the second water chamber both enter the processing chamber through the second cleaning wastewater transmission mechanism provided on the recovery processing tank.

[0017] In a further embodiment, the step S1.2 specifically comprises the following steps:

[0018] S1.2.1: The water curtain mechanism includes an arc-shaped platform, a plurality of water outlet pipes and a connecting pipe. The arc-shaped platform is a hollow structure and is respectively connected to the connecting pipe and the plurality of water outlet pipes. The plurality of water outlet pipes are fixed on the arc-shaped platform at equal angles with the center of the rubber-throwing cavity as the center. The end of the water outlet pipe not connected to the arc-shaped platform corresponds to the rubber-throwing cavity. One end of the connecting pipe is connected and fixed to the center position of the arc-shaped platform, and the other end passes through the tank cover and extends to the outside and is detachably connected to the flowing water transmission mechanism.

[0019] S1.2.2: The flowing water transmission mechanism comprises a flowing water transmission pump, a flowing water delivery pipe and a flowing water extraction pipe. The flowing water transmission pump is arranged on the glue spinning tank. One end of the flowing water extraction pipe is connected to the water extraction end of the flowing water transmission pump, and the other end is connected and fixed to the third water storage chamber. One end of the flowing water delivery pipe is connected to the water delivery end of the flowing water transmission pump, and the other end is detachably connected to the connecting pipe.

[0020] S1.2.3: After the workpiece is unglued, the connecting pipe and the flowing water delivery pipe are separated by the power mechanism, the translation drive mechanism drives the tank cover to open the workpiece entrance, and the robot takes out the workpiece that has completed the ungluing operation at the ungluing station.

[0021] In a further embodiment, the flowing water delivery pipe described in step S1.2.2 includes a first fixed pipe, a telescopic pipe and a second fixed pipe which are connected in sequence, the first fixed pipe is in an "n" shape, and the end of the first fixed pipe not connected to the telescopic pipe is detachably connected to the connecting pipe, and the end of the second fixed pipe not connected to the telescopic pipe is connected to the water delivery end of the flowing water transmission pump.

[0022] In a further embodiment, the power mechanism described in S1.2.3 includes a lifting assembly and a rotating assembly, and the lifting assembly is used to drive the telescopic tube to extend and retract, thereby adjusting the vertical distance between the first fixed tube and the second fixed tube;

[0023] The lifting assembly includes a support platform provided on the second fixed tube, a connecting platform provided on the first fixed tube, and a lifting electric cylinder, wherein the fixed end of the lifting electric cylinder is provided on the support platform, and the telescopic end is connected to the connecting platform, the lifting electric cylinder is provided in parallel with the telescopic tube, and the telescopic direction and telescopic range of the lifting electric cylinder are consistent with those of the telescopic tube;

[0024] The support platform is penetrated and fixed with the second fixed pipe, the support platform comprises a platform and a driven gear fixedly connected with the platform, and the driven gear is connected with the rotating assembly;

[0025] The rotating assembly is arranged on the glue-spinning tank and is used to drive the flowing water delivery pipe to rotate. The rotating assembly includes a motor and a driving gear installed on the output end of the motor, and the driving gear is meshed and connected with the driven gear;

[0026] The second fixed pipe is rotatably connected to the water delivery end of the flowing water transmission pump via a bearing.

[0027] In a further embodiment, step S2 specifically includes the following steps:

[0028] S2.1: A heating component is provided in each of the four processing chambers, and the heating component is used to heat the cleaning wastewater entering the processing chamber.

[0029] In a further embodiment, step S3 specifically includes the following steps:

[0030] S3.1: The impregnation liquid recovery mechanism comprises an impregnation liquid recovery pump provided on the recovery tank and four impregnation liquid recovery components connected to the impregnation liquid recovery pump, each of the processing chambers is provided with an impregnation liquid recovery component, and the impregnation liquid recovery pump extracts the impregnation liquid separated in the processing chamber through the impregnation liquid recovery component and inputs the extracted impregnation liquid into the vacuum impregnation equipment;

[0031] S3.2: The recovery tank is connected to the second water storage chamber through a second cleaning water recovery mechanism, the second cleaning water recovery mechanism includes a second cleaning water recovery pump, the water delivery end of the second cleaning water recovery pump is connected and fixed to the second water storage chamber, the water extraction end is provided with a second cleaning water transmission pipe, the second cleaning water transmission pipe is provided with four second water extraction branches, and each end of the second water extraction branch not connected to the second cleaning water transmission pipe is connected and fixed to one of the treatment chambers;

[0032] S3.3: The recovery tank is connected to the first water storage chamber through a first cleaning water recovery mechanism. The first cleaning water recovery mechanism includes a first cleaning water recovery pump provided on the recovery tank. The water delivery end of the first cleaning water recovery pump is connected and fixed to the first water storage chamber. The water pumping end is provided with a first cleaning water transmission pipe. The first cleaning water transmission pipe is provided with four first water pumping branches. Each end of the first water pumping branch that is not connected to the first cleaning water transmission pipe is connected and fixed to one of the treatment chambers.

[0033] In a further embodiment, the step S3.1 specifically comprises the following steps:

[0034] S3.1.1: A guide is provided on the upper part of the processing chamber, and the guide performs a diversion operation on the cleaning wastewater input from the first water passage chamber and the second water passage chamber, and the guide is an arc-shaped structure;

[0035] S3.1.2: The impregnation liquid recovery assembly is located on a side of the guide member facing the bottom of the processing chamber, and the impregnation liquid recovery assembly includes a recovery pipe, a movable bracket and a power assembly, wherein the recovery pipe is arranged on the movable bracket, and the power assembly is arranged on the guide member to drive the movable bracket to adjust the vertical distance between the movable bracket and the guide member;

[0036] The recovery pipe includes a recovery vertical pipe of an accordion-type telescopic structure and a recovery horizontal pipe vertically connected to one end of the recovery vertical pipe, the other end of the recovery vertical pipe passes through the processing chamber and is connected to the pumping end of the impregnation liquid recovery pump disposed outside the recovery tank, and the water delivery end of the impregnation liquid recovery pump is connected to the vacuum impregnation equipment;

[0037] The recovery transverse pipe is provided with a plurality of recovery branch pipes at equal intervals along the length direction of the recovery transverse pipe, and the plurality of recovery branch pipes are used to absorb the impregnation liquid located in the upper layer after the cleaning wastewater is heated and placed at a constant temperature for stratification, and the recovery transverse pipe is connected to the movable bracket.

[0038] In a further embodiment, the impregnation liquid recovery assembly in step S3.1.2 comprises a recovery pipe, a movable bracket and a power assembly, wherein the recovery pipe is arranged on the movable bracket, and the power assembly is arranged on the guide member to drive the movable bracket to adjust the vertical distance between the movable bracket and the guide member, further comprising:

[0039] The movable bracket is slidably connected to the processing chamber via a sliding member, wherein the sliding member comprises a slider mounted on the movable bracket, the slider slides up and down in a slide groove, and the slide groove is provided on the cavity wall of the processing chamber;

[0040] The power assembly includes an electromagnetic component and a return spring, the two ends of the return spring are respectively connected to the guide and the movable bracket, the electromagnetic component is arranged on the guide, and the electromagnetic component cooperates with a magnetic block arranged on the movable bracket.

[0041] A device for recycling and treating spray cleaning wastewater by using a vacuum impregnation cleaning wastewater recycling method, the device comprising a glue-spinning tank, a spray cleaning device connected to a municipal water pipeline, and a recycling tank, the spray cleaning device comprising a first spray tank and a second spray tank, the first spray tank and the second spray tank are fixedly arranged above the recycling tank, and the glue-spinning tank is connected to the second spray tank;

[0042] The recycling tank is provided with four processing chambers of the same volume on average, each of which is connected to the first spray tank and the second spray tank through a first cleaning wastewater transmission mechanism and a second cleaning wastewater transmission mechanism, and the second spray tank is connected to the glue spinning tank through a third cleaning wastewater transmission mechanism;

[0043] The processing chamber is used to heat and keep the cleaning wastewater generated after use in the glue-spinning tank, the first spray tank and the second spray tank at a constant temperature, so that the three types of cleaning wastewater generated in the glue-spinning tank, the first type of cleaning wastewater generated by the cleaning operation of the first spray tank and the second type of cleaning wastewater generated by the cleaning operation of the second spray tank are heated and kept at a constant temperature in the same processing chamber to be layered into impregnation liquid, water-impregnation mixed liquid and water liquid. The water liquid is recovered into the second spray tank through the second cleaning water recovery mechanism to supply water for the glue-spinning operation and the secondary spray cleaning operation of the workpiece, the water-impregnation mixed liquid is recovered into the first spray tank through the first cleaning water recovery mechanism to supply water for the first spray cleaning operation of the workpiece, and the impregnation liquid is recovered into the vacuum impregnation equipment through the impregnation liquid recovery mechanism to participate in the impregnation operation of the workpiece.

[0044] Beneficial effects of the present invention:

[0045] (1) A recovery tank is fixedly arranged below the spray tank, and an average of four processing chambers are arranged in the recovery tank, so that the cleaning wastewater after the workpiece is completed by the glue throwing and the two spray cleaning can be recovered and stored. The four processing chambers can be switched for use. In the first cycle, when the first three processing chambers are filled with the first preset volume of cleaning wastewater, while the cleaning wastewater enters the fourth processing chamber, the cleaning wastewater in the first processing chamber has been separated and recovered and input into the spray tank for spraying operation. At this time, the municipal water pipeline is closed and no external water source needs to be input. In the second cycle, the municipal water input before the municipal water pipeline is closed can be recycled. In the second cycle, no municipal water needs to be input, which effectively improves the recycling rate of cleaning wastewater. While improving the cleaning effect, it can also achieve the purpose of saving water resources;

[0046] (2) A heating component is provided in the treatment chamber, and the cleaning wastewater entering the treatment chamber is heated and kept at a constant temperature by the heating component for separation. Since the four switchable treatment chambers can meet the time requirements for heating and keeping at a constant temperature, there is no need to use a separation agent, and thus there is no need to process the separation agent, so that the purity of the recycled cleaning water is better;

[0047] (3) After the cleaning wastewater in the treatment chamber is separated, the upper and lower layers of the impregnation liquid, the water-impregnation mixed liquid and the water liquid are obtained. The water liquid is located below the water-impregnation mixed liquid. It is farther away from the impregnation liquid and has a higher purity, which meets the requirements of the second spray cleaning and the formation of the water curtain wall. Therefore, it is recycled into the second spray tank to perform the second spray cleaning operation on the workpiece and supply water to the water curtain mechanism. The water-impregnation mixed liquid also contains a small amount of impregnation liquid, so it can be recycled into the first spray tank with a lower purity requirement to perform the first spray cleaning operation on the workpiece. The impregnation liquid can be recycled into the vacuum impregnation equipment to participate in the impregnation operation. This recycling method maximizes the utilization rate of the cleaning wastewater.

[0048] (4) By setting a water curtain mechanism in the glue throwing chamber, when the workpiece is subjected to the glue throwing operation at the glue throwing station, the water curtain mechanism continuously forms a water curtain wall on the inner wall of the glue throwing chamber, so that the impregnating liquid mixed with the water of the water curtain wall enters the recovery and processing tank. The impregnating liquid thrown out by each glue throwing operation can be blocked and taken away by the water curtain wall in time, and there is no need to uniformly absorb it through negative pressure operation after the glue throwing is completed. The formation of the continuously flowing water curtain wall can effectively prevent the impregnating liquid from being attached to the glue throwing wall. The setting of the recovery and processing tank not only improves the recovery efficiency of the impregnating liquid, but also prevents the impregnating liquid from accumulating and clogging the pipeline. At the same time, it also prevents the impregnating liquid from being attached to the cavity wall for a long time and being difficult to clean, which causes incomplete recovery. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 The present invention is a flowchart of the steps of a method for recycling and treating cleaning wastewater used for vacuum impregnation.

[0050] Figure 2 It is a recycling process diagram of a method for recycling cleaning wastewater used for vacuum impregnation according to the present invention.

[0051] Figure 3 It is a schematic diagram of the liquid transmission flow direction of a method for recycling and treating cleaning wastewater used for vacuum infiltration of the present invention.

[0052] Figure 4 The present invention is a front sectional structural schematic diagram of a spray device of a recovery and treatment device for cleaning waste water used for vacuum infiltration.

[0053] Figure 5 The present invention Figure 4 Enlarged structural diagram at A in the middle.

[0054] Figure 6 The present invention is a schematic diagram of a top view of a movable bracket of a device for recycling and treating cleaning waste water for vacuum infiltration.

[0055] Figure 7The present invention is a schematic diagram of a top view of the structure of a spray device of a device for recovering and treating cleaning waste water for vacuum infiltration.

[0056] Figure 8 The present invention is a front sectional structural schematic diagram of a glue-spinning tank of a device for recycling and treating cleaning waste water for vacuum impregnation.

[0057] Fig. 9 The present invention Figure 8 Enlarged structural diagram at B in the middle.

[0058] Fig.10 The present invention is a schematic diagram of a top view of a glue-spinning tank of a device for recycling and treating cleaning waste water for vacuum impregnation.

[0059] The accompanying drawings are marked as follows: first spray tank 1, first spray chamber 11, first water storage chamber 12, first water passage chamber 13, first spray assembly 14, first spray cleaning water transmission mechanism 15, first cleaning waste water transmission mechanism 16, second spray tank 2, second spray chamber 21, second water storage chamber 22, second water passage chamber 23, second spray assembly 24, second spray cleaning water transmission mechanism 25, second cleaning waste water transmission mechanism 26, glue spinning tank 3, third cleaning waste water transmission mechanism 31, water curtain transmission mechanism 32, tank cover 33, translation drive assembly 331 , glue-spinning chamber 34, third water storage chamber 35, third water passage chamber 36, recovery and processing tank 4, processing chamber 41, heating component 411, first cleaning water recovery mechanism 42, second cleaning water recovery mechanism 43, city water pipeline 5, water curtain mechanism 6, arc platform 61, connecting pipe 62, opening and closing component 621, water outlet pipe 63, flowing water transmission mechanism 7, flowing water delivery pipe 71, lifting component 72, rotating component 73, impregnation liquid recovery mechanism 8, recovery pipe 81, power component 83, movable bracket 82, impregnation liquid recovery pump 84, guide 9. DETAILED DESCRIPTION

[0060] In the following description, a large number of specific details are provided to provide a more thorough understanding of the present invention. However, it is apparent to those skilled in the art that the present invention can be implemented without one or more of these details. In other examples, in order to avoid confusion with the present invention, some technical features well known in the art are not described.

[0061] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0062] Reference Figure 1-3 , is a method for recycling and treating cleaning wastewater for vacuum impregnation disclosed in the present invention, comprising: specifically comprising the following steps:

[0063] S1: The workpiece that has completed the impregnation operation in the vacuum impregnation equipment (not shown in the figure) is moved into the glue-spinning chamber 34 opened in the glue-spinning tank 3 by a manipulator (not shown in the figure), and the workpiece that has completed the glue-spinning operation in the glue-spinning chamber 34 is moved out by the manipulator (not shown in the figure) and transferred to the first spray chamber 11 opened in the first spray tank 1. The first spray assembly 14 arranged in the first spray chamber 11 is connected to the first water storage chamber 12 through the first spray cleaning water transmission mechanism 15. The first water storage chamber 12 is opened in the first spray tank 1 and connected to the municipal water pipeline 5. In the first cycle, the water source for the spray cleaning operation in the first spray tank 1 is completely derived from municipal water, and the municipal water is input into the first water storage chamber 12 through the municipal water pipeline 5. The first spray cleaning water transmission mechanism 15 provided on the first spray tank 1 inputs the municipal water in the first water storage chamber 12 into the first spray assembly 14, and performs the first spray cleaning operation on the workpiece located in the first spray chamber 11. The type of cleaning waste water generated by the first spray cleaning operation falls into the first water passage chamber 13 opened in the first spray tank 1. The type of cleaning waste water in the first water passage chamber 13 enters the recovery tank 4 located below the first spray tank 1 through the first cleaning waste water transmission mechanism 16. The workpiece that has undergone the first spray cleaning operation is removed by a robot (not shown in the figure) and transferred to the second spray chamber 21 opened in the second spray tank 2 for continued cleaning. The second spray chamber 21 is The second spray assembly 24 is connected to the second water storage chamber 22 through the second spray cleaning water transmission mechanism 25. The second water storage chamber 22 is opened in the second spray tank 2 and is connected to the municipal water pipeline 5. In the first cycle, the water source for the spray cleaning operation in the second spray tank 2 is completely derived from the municipal water. The municipal water is input into the second water storage chamber 22 through the municipal water pipeline 5. The second spray cleaning water transmission mechanism 25 provided on the second spray tank 2 inputs the municipal water in the second water storage chamber 22 into the second spray assembly 24, and performs a second spray cleaning operation on the workpiece located in the second spray chamber 21. The second type of cleaning wastewater generated by the second spray cleaning operation falls into the second spray tank 2 opened in the second spray tank 2. In the second water passage chamber 23, a water curtain mechanism 6 is also arranged in the glue-spinning chamber 34. The water curtain mechanism 6 is connected with the third water storage chamber 35 through the flowing water transmission mechanism 7 arranged on the glue-spinning tank 3. The third water storage chamber 35 is opened in the glue-spinning tank 3 and is connected with the second water storage chamber 22 through the water curtain transmission mechanism 32. The water curtain transmission mechanism 32 inputs the water in the second water storage chamber 22 into the third water storage chamber 35. The flowing water transmission mechanism 7 inputs the water in the third water storage chamber 35 into the water curtain mechanism 6, so that the inner wall of the glue-spinning chamber 34 forms a water curtain wall. During the glue-spinning operation of the workpiece in the glue-spinning chamber 34, the impregnation liquid thrown off is thrown to the water curtain wall, and the water in the water curtain wall blocks the impregnation liquid.The three types of cleaning wastewater generated by mixing with the impregnating liquid is input into the second water chamber 23 through the third cleaning wastewater transmission mechanism 31. The three types of cleaning wastewater and the second type of cleaning wastewater in the second water chamber 23 are both input into the recovery tank 4 through the second cleaning wastewater transmission mechanism 26. The workpiece after the second spray cleaning operation is transferred to the next process by a manipulator (not shown in the figure). The next process is to move the workpiece that has completed the two spray cleanings into the thermal curing treatment operation through a manipulator (not shown in the figure) so that the impregnating agent and the workpiece are better integrated. The water curtain transmission mechanism 32 includes a water curtain transmission pump fixed on the glue spinning tank 3. The water pumping end of the water curtain transmission pump is connected to the second water storage chamber 22 through a pipeline, and the water supply end is connected to the third water storage chamber 35 through a pipeline. The water curtain transmission pump inputs the water in the second water storage chamber 22 into the third water storage chamber 35, so that the third water storage chamber 35 can supply water to the water curtain mechanism 6.

[0064] The step S1 specifically includes the following steps:

[0065] S1.1: The first spray tank 1 is provided with the first spray chamber 11, the first water passage chamber 13 and the first water storage chamber 12, the first water storage chamber 12 is connected to the first spray cleaning water transmission mechanism 15, the first spray chamber 11 is provided with the first spray assembly 14 and the first cleaning position, the first spray tank 1 is provided with a first inlet connected to the first spray chamber 11, the first inlet is used for workpieces to enter and exit the first spray chamber 11, the workpieces entering the first spray chamber 11 are placed on the first cleaning position, the first spray cleaning water transmission mechanism 15 draws water from the first water storage chamber 12 to the first spray assembly 14, and performs the first spray cleaning operation on the workpieces connected to the first cleaning position;

[0066] The second spray tank 2 is provided with the second spray chamber 21, the second water chamber 23 and the second water storage chamber 22. The second water storage chamber 22 is connected to the second spray cleaning water transmission mechanism 25. The second spray chamber 21 is provided with the second spray assembly 24 and the second cleaning position. The second spray tank 2 is provided with a second inlet connected to the first spray chamber 11. The second inlet is used for workpieces to enter and exit the second spray chamber 21. The workpieces entering the second spray chamber 21 are placed on the second cleaning position. The second spray cleaning water transmission mechanism 25 extracts the second spray assembly 24 and the second cleaning position. The water in the two water storage chambers 22 flows into the second spray assembly 24 to perform a second spray cleaning operation on the workpiece connected to the second cleaning position. The first spray cleaning water transmission mechanism 15 and the second spray cleaning water transmission mechanism 25 both include a spray cleaning pump and a spray cleaning water transmission pipe. The water pumping ends of the two spray cleaning pumps are respectively connected to the first water storage chamber 12 and the second water storage chamber 22 through the spray cleaning water transmission pipe. The water delivery ends of the two spray cleaning pumps are respectively connected and fixed to the first spray assembly 14 and the second spray assembly 24;

[0067] S1.2: The glue-spinning tank 3 is provided with a glue-spinning chamber 34, a third water storage chamber 35 and a third water passage chamber 36. A workpiece entrance is provided on the top of the glue-spinning tank 3, and the workpiece entrance is connected to the glue-spinning chamber 34. The glue-spinning tank 3 is provided with a tank cover 33 and a translation drive assembly 331. The translation drive assembly 331 drives the tank cover 33 to move horizontally so that the tank cover 33 opens and closes the workpiece entrance. The translation drive assembly 331 includes an electric cylinder. The fixed end of the electric cylinder is provided on the glue-spinning tank 3, and the telescopic end is connected to the tank cover 33. A guide member is provided between the tank cover 33 and the workpiece entrance. When the electric cylinder is telescopic, the tank cover 33 is driven to move in parallel with the guide member to open and close the workpiece entrance. The glue-spinning tank 3 is provided with a glue-spinning station and a water curtain mechanism 6. The glue-spinning station is provided in the glue-spinning chamber 34. The water curtain The mechanism 6 is arranged on the side of the tank cover 33 facing the glue-spinning chamber 34. After the translation drive component 331 drives the tank cover 33 to move and open the workpiece entrance, the workpiece is placed on the glue-spinning station through the workpiece entrance, and the translation drive component 331 drives the tank cover 33 to move horizontally to close the workpiece entrance; the flowing water transmission mechanism 7 is connected with the water curtain mechanism 6 under the drive of the power mechanism, so that the third water storage chamber 35 inputs the stored water into the water curtain mechanism 6 through the flowing water transmission mechanism 7 to form a water curtain wall. The power mechanism is arranged on the glue-spinning tank 3, and the third water passage chamber 36 is connected and arranged below the glue-spinning chamber 34. The third water passage chamber 36 is connected with the second water passage chamber 23 through the third cleaning wastewater transmission mechanism 31;

[0068] The step S1.2 specifically includes the following steps:

[0069] S1.2.1: The water curtain mechanism 6 includes an arc platform 61, a plurality of water outlet pipes 63 and a connecting pipe 62. The arc platform 61 is a hollow structure and is respectively connected to the connecting pipe 62 and the plurality of water outlet pipes 63. The plurality of water outlet pipes 63 are fixed on the arc platform 61 at equal angles with the center of the rubber-throwing cavity 34 as the center. The centers of the rubber-throwing cavity 34 and the arc platform 61 are located on the same vertical line of the same vertical plane. The end of the water outlet pipe 63 that is not connected to the arc platform 61 corresponds to the rubber-throwing cavity 34. One end of the connecting pipe 62 is connected and fixed to the center position of the arc platform 61, and the other end passes through the tank cover 33 and extends to the outside and is detachably connected to the flowing water transmission mechanism 7. The water outlet end of the water outlet pipe 63 is inclined and faces close to the rubber-throwing cavity 34. The water outlet pipe 63 The water outlet end is slightly higher than the height of the workpiece inlet to avoid affecting the movement and opening and closing of the tank cover 33. A glue-spinning frame for placing the workpiece is provided on the glue-spinning station. The glue-spinning frame rotates around the vertical center line of the glue-spinning chamber 34 under the driving action of an external driving mechanism. When the impregnated liquid is close to the wall of the glue-spinning chamber 34, it can be blocked and mixed away by the water curtain wall formed by the water sprayed from the water outlet pipe 63. The driving mechanism can be arranged on the outside of the glue-spinning tank 3 to drive the glue-spinning frame to rotate through a transmission assembly. The protruding high position of the arc-shaped platform 61 is away from the glue-spinning chamber 34, and the concave position corresponds to the glue-spinning chamber 34, so as to avoid the glue liquid spun out of the workpiece from adhering to the arc-shaped platform 61. A support frame for supporting the rotation of the glue-spinning frame can also be provided in the glue-spinning chamber 34. The support frame and the glue-spinning frame are rotatably connected, so as to ensure the stability of the rotation of the glue-spinning frame without affecting the rotation of the glue-spinning frame.

[0070] S1.2.2: The flowing water transmission mechanism 7 includes a flowing water transmission pump, a flowing water delivery pipe 71 and a flowing water extraction pipe. The flowing water transmission pump is arranged on the glue-spinning tank 3. One end of the flowing water extraction pipe is connected to the water pumping end of the flowing water transmission pump, and the other end is connected and fixed to the third water storage chamber 35. One end of the flowing water delivery pipe 71 is connected to the water delivery end of the flowing water transmission pump, and the other end is detachably connected to the connecting pipe 62. After the workpiece is placed on the glue-spinning station and the tank cover 33 closes the workpiece entrance, the flowing water delivery pipe 71 is connected to the connecting pipe 62 to complete the water delivery operation of forming the water curtain wall.

[0071] The flowing water delivery pipe 71 described in the step S1.2.2 includes a first fixed pipe, a telescopic pipe and a second fixed pipe which are connected in sequence. The first fixed pipe is in an "n" shape, and the end of the first fixed pipe which is not connected to the telescopic pipe is detachably connected to the connecting pipe 62. The end of the second fixed pipe which is not connected to the telescopic pipe is connected to the water delivery end of the flowing water transmission pump. The telescopic pipe is an accordion-type telescopic structure. An opening and closing component 621 is also provided in the connecting pipe 62. The opening and closing component 621 includes an opening and closing plate. The opening and closing plate is hinged to the inner wall of the connecting pipe 62 through a hinge shaft, and a swing spring is provided on the hinge shaft. When the first fixed pipe corresponds to the connecting pipe 62 and is continuously inserted downward into the connecting pipe 62, the opening and closing plate is subjected to pressure to flip downward to open the connecting pipe 62, so that the first fixed pipe can be connected to the arc platform 61 through the connecting pipe 62. When the first fixed pipe moves upward to disengage from the connecting pipe 62, the opening and closing plate flips back and forth to close the connecting pipe 62 under the rotation of the swing spring and the hinge shaft, so as to prevent the connecting pipe 62 from being contaminated.

[0072] S1.2.3: After the workpiece is unglued, the connecting pipe 62 and the flowing water delivery pipe 71 are separated by the power mechanism, the translation drive mechanism drives the tank cover 33 to open the workpiece entrance, and the manipulator (not shown in the figure) takes out the workpiece that has completed the ungluing operation at the ungluing station, and the continuously flowing water curtain wall structure blocks and collects the impregnation liquid unglued during the ungluing process. After the impregnation liquid falls on the water curtain wall during the ungluing process, it is sent to the recycling tank 4 together with the cleaning wastewater generated by the second spray cleaning for treatment. The water liquid treated in the recycling tank 4 is recycled into the second water storage chamber 22, and the water in the second water storage chamber 22 is provided to the water curtain mechanism 6 and the second spray assembly 24. The treated impregnation liquid is recycled into the vacuum impregnation equipment (not shown in the figure). ), the water-impregnation mixture can also supply water to the first spray assembly 14, ensuring the reliable recycling of the impregnation liquid, overcoming environmental pollution and waste of water resources, and satisfying a higher vacuum impregnation effect of the workpiece, effectively avoiding the prior art using vacuum negative pressure extraction to recover the impregnation liquid thrown out during the glue throwing process. The situation of insufficient negative pressure extraction of the impregnation liquid causes the impregnation liquid that has been left in the negative pressure extraction related equipment for a long time to become waste liquid. When a lot of waste liquid accumulates, the negative pressure extraction related equipment needs to be disassembled and cleaned to avoid poor vacuum impregnation effect. During the disassembly and cleaning process, city water (tap water) is often used for direct flushing. The waste water after cleaning contains a lot of impregnation agent waste liquid. If it is directly discharged to the outside, it will cause environmental pollution and waste of water resources.

[0073] The power mechanism described in S1.2.3 includes a lifting assembly 72 and a rotating assembly 73, wherein the lifting assembly 72 is used to drive the telescopic tube to extend and retract, thereby adjusting the vertical distance between the first fixed tube and the second fixed tube;

[0074] The lifting assembly 72 includes a support platform provided on the second fixed tube, a connecting platform provided on the first fixed tube, and a lifting electric cylinder. The fixed end of the lifting electric cylinder is provided on the support platform, and the telescopic end is connected to the connecting platform. The lifting electric cylinder is arranged in parallel with the telescopic tube. The telescopic direction and telescopic range of the lifting electric cylinder and the telescopic tube are consistent. When the tank cover 33 needs to be opened, the lifting electric cylinder extends to drive the telescopic tube to extend. At this time, the first fixed tube is raised, so that the end of the water outlet end of the first fixed tube that is not connected to the telescopic tube is separated from the connecting tube 62.

[0075] The support platform is fixedly connected with the second fixed tube, the support platform comprises a platform and a driven gear fixedly connected with the platform, the driven gear is connected with the rotating assembly 73, and the driven gear is cocentric with the second fixed tube and the telescopic tube;

[0076] The rotating assembly 73 is arranged on the glue-spinning tank 3 and is used to drive the flowing water delivery pipe 71 to rotate. The rotating assembly 73 includes a motor and a driving gear installed on the output end of the motor. The driving gear is meshed and connected with the driven gear. The motor is arranged on the glue-spinning tank 3.

[0077] The second fixed pipe is rotatably connected to the water delivery end of the flowing water transmission pump via a bearing. When the lifting electric cylinder drives the first fixed pipe to rise and disengage from the connecting pipe 62, in order to further facilitate the placement and retrieval of the workpiece, the motor drives the gear to rotate, thereby driving the second fixed pipe to rotate, and also changing the direction of the water outlet end of the first fixed pipe away from the connecting pipe 62, so that the first fixed pipe will not be blocked directly above the tank cover 33, affecting the placement and retrieval of the workpiece.

[0078] S1.3: The three types of cleaning wastewater generated by the spinning operation fall into the third water chamber 36 and are input into the second water chamber 23 through the third cleaning wastewater transmission mechanism 31. The first type of cleaning wastewater generated by the first spray cleaning operation falls into the first water chamber 13 and enters the processing chamber 41 through the first cleaning wastewater transmission mechanism 16 provided on the recycling tank 4. The second type of cleaning wastewater generated by the second spray cleaning operation falls into the second water chamber 23. The second type of cleaning wastewater and the third type of cleaning wastewater in the second water chamber 23 both enter the processing chamber 41 through the second cleaning wastewater transmission mechanism 26 provided on the recycling tank 4. The first type of cleaning wastewater falls from the first spray chamber 11 into the first water chamber 13 opened in the first spray tank 1. The first cleaning wastewater transmission mechanism 16 inputs the first type of cleaning wastewater in the first water chamber 13 into the processing chamber 41. The volume of the first water passage chamber 13 is greater than the first preset volume, the two types of cleaning wastewater fall from the second spray chamber 21 into the second water passage chamber 23 provided in the second spray tank 2, the second cleaning wastewater transmission mechanism 26 inputs the two types of cleaning wastewater in the second water passage chamber 23 into the processing chamber 41, the volume of the second water passage chamber 23 is greater than the first preset volume, the water of the water curtain wall and the impregnation liquid thrown out by the glue throwing are mixed and fall from the glue throwing chamber 34 into the third water passage chamber 36; the first cleaning wastewater transmission mechanism 16 includes a first cleaning wastewater transmission pump, the water pumping end of the first cleaning wastewater transmission pump is connected and fixed with the first water passage chamber 13, the water delivery end is provided with a first cleaning wastewater transmission pipe, the first cleaning wastewater transmission pipe is connected and provided with four first water delivery branches, and each of the first water delivery branches is connected and fixed with one of the processing chambers 41 at one end that is not connected to the first cleaning wastewater transmission pipe;The second cleaning wastewater transmission mechanism 26 includes a second cleaning wastewater transmission pump, the water pumping end of the second cleaning wastewater transmission pump is connected and fixed with the second water chamber 23, the water delivery end is provided with a second cleaning wastewater transmission pipe, the second cleaning wastewater transmission pipe is connected and provided with four second water delivery branches, each of the second water delivery branches is connected and fixed with one of the processing chambers 41 at one end that is not connected to the second cleaning wastewater transmission pipe, and each of the water delivery branches is provided with a separately controlled solenoid valve, the third cleaning wastewater transmission mechanism 31 includes a third cleaning wastewater transmission pump provided on the glue spinning tank 3, the water pumping end of the third cleaning wastewater transmission pump is connected and fixed with the third water chamber 36, the water delivery end is provided with a third cleaning wastewater transmission pipe, the third cleaning wastewater transmission The delivery pipe is connected and fixed with the second water passage chamber 23. The first water passage chamber 13 is located below the first spray chamber 11, and a filter is provided at the communication port between the two. The second water passage chamber 23 is located below the second spray chamber 21, and a filter is also provided at the communication port between the two. The third water passage chamber 36 is located below the rubber-spinning chamber 34, and a filter is also provided at the communication port between the two. The filter is a mesh structure, which can filter solid impurities to prevent solid impurities from entering the water passage chamber. The cross section of the rubber-spinning chamber 34 is circular. The three types of cleaning wastewater generated by the mixed impregnation liquid of the water curtain wall enter the water passage chamber through the filter at the communication port, and then are extracted by the third cleaning wastewater transmission mechanism 31 and input into the recovery tank 4. ;

[0079] S2: In the first cycle, the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater flowing to the recycling tank 4 all enter the four processing chambers 41 opened in the recycling tank 4 in sequence. After the cleaning wastewater volume in the first processing chamber 41 reaches the first preset volume, it switches to the second processing chamber 41. When the cleaning wastewater volume in the second processing chamber 41 reaches the first preset volume, it switches to the third processing chamber 41. When the cleaning wastewater volume in the third processing chamber 41 reaches the first preset volume, at this time, the first water storage chamber 12 contains the second preset volume of municipal water, and the second water storage chamber 22 contains the third preset volume of municipal water. water, wherein the third preset volume is equal to the sum of the second preset volume and the water supply of the water curtain mechanism 6, the municipal water pipe 5 is closed, and the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater do not enter the fourth treatment chamber 41, the first cycle ends, and enters the second cycle, wherein the time for the volume of cleaning wastewater in a single treatment chamber 41 to reach the first preset volume is half of the time required for the single treatment chamber 41 to be heated and kept at a constant temperature for static treatment, the volume of the first water storage chamber 12 is greater than or equal to the sum of half of the first preset volume and the second preset volume, and the volume of the second water storage chamber 22 is greater than or equal to the sum of half of the first preset volume and the third preset volume.

[0080] The step S2 specifically includes the following steps:

[0081] S2.1: A heating assembly 411 is provided in each of the four processing chambers 41 . The heating assembly 411 is used to heat the cleaning wastewater entering the processing chamber 41 . The heating assembly 411 includes a heating plate.

[0082] S3: In the second cycle, when the first preset volume of cleaning waste water is injected into the third treatment chamber 41, the cleaning waste water in the first treatment chamber 41 is allowed to stand, and the cleaning waste water in the first treatment chamber 41 is heated and allowed to stand at a constant temperature, and then separated to obtain upper and lower layered impregnation liquid, water-impregnation mixed liquid and water liquid, and the impregnation liquid, the water liquid and the water-impregnation mixed liquid are sequentially extracted by the impregnation liquid recovery mechanism 8, the second cleaning water recovery mechanism 43 and the first cleaning water recovery mechanism 42 installed on the recovery tank 4 until the first treatment chamber 41 is emptied, and the output ends of the impregnation liquid recovery mechanism 8, the second cleaning water recovery mechanism 43 and the first cleaning water recovery mechanism 42 are respectively connected to the vacuum tank 4. The impregnation equipment, the second water storage chamber 22 and the first water storage chamber 12 are connected, the water-impregnation mixture enters the first water storage chamber 12, the water-impregnation mixture entering the first water storage chamber 12 is used for the first spray cleaning operation on the subsequent workpiece, the water enters the second water storage chamber 22, the water entering the second water storage chamber 22 is used for the second spray cleaning operation on the subsequent workpiece and supplying water to the third water storage chamber 35, and at the same time, the first type of cleaning wastewater discharged from the first water passage chamber 13, the second type of cleaning wastewater discharged from the second water passage chamber 23 and the third type of cleaning wastewater enter the fourth processing chamber 41. When the volume of the cleaning wastewater in the fourth processing chamber 41 reaches the first preset volume, the second processing chamber 41 is used for the second cleaning wastewater. After the cleaning wastewater in the chamber 41 is left to stand, the cleaning wastewater in the second treatment chamber 41 is recycled and reused according to the treatment process of the cleaning wastewater in the first treatment chamber 41, and the recycled water and water-infiltration mixed liquid flow to the first water passage chamber 13 and the second water passage chamber 23 again and are discharged into the first treatment chamber 41. By analogy, by switching the four treatment chambers 41 in the second cycle, the municipal water sprayed in the first cycle is recycled to achieve the purpose of recycling the cleaning wastewater. For example, in the first cycle, before the three treatment chambers 41 reach the first preset volume, the municipal water continues to be input into the first water storage chamber 12 and the second water storage chamber 22 through the municipal water pipe 5 to meet the first three groups of workpieces. The requirements for spray cleaning and water curtain wall formation are respectively carried out twice. When the third treatment chamber 41 has reached the first preset volume in the first cycle, the cleaning wastewater reaching the first preset volume in the first treatment chamber 41 and the second treatment chamber 41 is in a heating constant temperature static process. At this time, the fourth treatment chamber 41 is empty, and the first water storage chamber 12 retains the second preset volume of municipal water, and the second water storage chamber 22 also retains the third preset volume of municipal water. The municipal water pipeline 5 is closed and no municipal water is introduced. The cleaning wastewater in the first treatment chamber 41 is static, and the impregnation liquid, water-impregnation mixed liquid and water liquid generated by the static are respectively recycled into the vacuum impregnation equipment (not shown in the figure), the first water storage chamber 12 and the second water storage chamber 22. In this recycling process,The second preset volume of municipal water in the first water storage chamber 12 is used to spray and clean the workpiece in the first spray chamber 11 through the first spray assembly 14, and the third preset volume of municipal water in the second water storage chamber 22 also continuously supplies water to the second spray assembly 24 and the water curtain mechanism 6, so that the spray cleaning operation and the continuity of water supply to the water curtain wall can be maintained before the water-infiltration mixture and the water liquid enter the two water storage chambers. If the volume of the first water storage chamber 12 is 1.5 tons, the volume of the second water storage chamber 22 is 2 tons, the first preset volume is 2.5 tons of water, the second preset volume is 0.5 tons of water, and the third preset volume is 1 ton, the volume of a single processing chamber 41 is greater than 2.5 tons, and the first spray cleaning of the workpiece produces 1 ton of a type of cleaning water. Wastewater, the second spray cleaning operation of the workpiece generates 1 ton of Class II cleaning wastewater, and the glue spinning operation generates 0.5 tons of Class III cleaning wastewater. In the first cycle, when 2.5 tons of cleaning wastewater are respectively injected into the three processing chambers 41 to reach the first preset volume, there are 7.5 tons of cleaning wastewater in the three processing chambers 41, and 1.5 tons of municipal water in the two water storage chambers. The time for generating 2.5 tons of cleaning wastewater and extracting it into the processing chamber 41 to reach the first preset volume is 2.5 hours, and the heating and standing time of 2.5 tons of cleaning wastewater is 5 hours. After that, the upper layer of the impregnation liquid, the middle layer of the water-impregnation mixed liquid and the lower layer of water are obtained, among which the impregnation liquid accounts for 5%-10%, and the water-impregnation mixed liquid accounts for 35%- 37%, water accounts for 55%-58%. At the same time, the three types of cleaning wastewater generated during the two spray cleaning processes and the glue spinning process are also discharged into the processing chamber 41. This time also includes the time for the pump body and the valve to switch and the time for taking and placing the workpieces. When the first batch of workpieces are completed in the glue spinning operation and the two spray cleaning operations and the generated cleaning wastewater is discharged into the first processing chamber 41 to reach the first preset volume, the glue spinning and the two spray cleaning operations and the generated 2.5 tons of water are discharged into the first processing chamber 41 for a total of 2.5 hours. At this time, the second batch of workpieces began to perform the glue spinning and spraying operation, and the cleaning wastewater in the first processing chamber 41 began to be heated and stood for 5 hours. After the second batch of workpieces completed the spinning, the glue washer was turned off and the cleaning wastewater in the first processing chamber 41 ... When 2.5 tons of cleaning waste water generated by the glue and two spray cleaning operations enter the second processing chamber 41 and are used for a total of 2.5 hours and reach the first preset volume, the third batch of workpieces begins to perform the glue throwing and spraying operation. At this time, the cleaning waste water in the first processing chamber 41 has been standing for 2.5 hours. When the third batch of workpieces complete the glue throwing operation and the two spray cleaning operations and discharge the first preset volume of cleaning waste water into the third processing chamber 41, at this time, the cleaning waste water in the first processing chamber 41 has been standing for 5 hours, and the cleaning waste water in the second processing chamber 41 has been standing for 2.5 hours. The municipal water pipeline 5 is closed, and the fourth batch of workpieces uses the second preset volume and the third preset volume of municipal water to start the glue throwing and spraying operation.At this time, the impregnation liquid, water-impregnation mixed liquid and water in the first processing chamber 41 are recycled into the vacuum impregnation equipment (not shown in the figure), the first water storage chamber 12 and the second water storage chamber 22 respectively while the fourth batch of workpieces are subjected to glue spinning and spray cleaning. The recovered solution entering the first water storage chamber 12 and the second water storage chamber 22 cooperates with the retained city water to supply water to the water curtain mechanism 6 and the spray assembly. When the fourth batch of workpieces completes the glue spinning and two spray cleaning operations and discharges the cleaning wastewater reaching the first preset volume into the fourth processing chamber 41, the cleaning wastewater in the second processing chamber 41 has been standing for 5 hours. At this time, the impregnation liquid, water-impregnation mixed liquid and water in the second processing chamber 41 are recycled into the vacuum impregnation equipment (not shown in the figure), the first water storage chamber 12 and the second water storage chamber 22 respectively while the fifth batch of workpieces are subjected to spray cleaning. The recovered solution entering the first water storage chamber 12 and the second water storage chamber 22 cooperates with the formation of the glue spinning water curtain wall and spray cleaning of the fifth batch of workpieces to provide a water source, and so on, the city water is recycled and utilized. ,

[0083] The step S3 specifically includes the following steps:

[0084] S3.1: The impregnation liquid recovery mechanism 8 includes an impregnation liquid recovery pump 84 provided on the recovery tank 4 and four impregnation liquid recovery components connected to the impregnation liquid recovery pump 84. Each of the processing chambers 41 is provided with an impregnation liquid recovery component. The impregnation liquid recovery pump 84 extracts the impregnation liquid separated from the processing chamber 41 through the impregnation liquid recovery component and inputs the extracted impregnation liquid into the vacuum impregnation equipment (not shown in the figure).

[0085] The step S3.1 specifically includes the following steps:

[0086] S3.1.1: A guide 9 is provided above the interior of the treatment chamber 41, and the guide 9 performs a diversion operation on the cleaning wastewater input from the first water passage chamber 13 and the second water passage chamber 23. The guide 9 is an arc-shaped structure. The guide 9 is above the interior of the treatment chamber 41 and close to the first water supply branch and the second water supply branch. The guide 9 diverts the cleaning wastewater input from the first water supply branch and the second water supply branch into the treatment chamber 41. The front and rear surfaces of the guide 9 are fixed to the front and rear surfaces of the treatment chamber 41. Space for the cleaning wastewater to enter is reserved between the two left and right side surfaces of the guide 9 and the left and right side surfaces of the treatment chamber 41. The position of the guide 9 close to the first water supply branch and the second water supply branch is a high position, and the first water supply branch and the second water supply branch are respectively located on both sides of the high position, which can play a good drainage role for the cleaning wastewater.

[0087] S3.1.2: The impregnation liquid recovery assembly is located on the side of the guide member 9 facing the bottom of the processing chamber 41, that is, it is located below the side of the guide member 9 away from the first water supply branch and the second water supply branch. The impregnation liquid recovery assembly includes a recovery pipe 81, a movable bracket 82 and a power assembly 83. The recovery pipe 81 is arranged on the movable bracket 82, and the power assembly 83 is arranged on the guide member 9 to drive the movable bracket 82 to adjust the vertical distance between the guide member 9;

[0088] The recovery pipe 81 includes a recovery vertical pipe of an accordion-type telescopic structure and a recovery horizontal pipe vertically connected to one end of the recovery vertical pipe. The other end of the recovery vertical pipe penetrates the processing chamber 41 and is connected to the pumping end of the impregnation liquid recovery pump 84 arranged outside the recovery processing tank 4. The water delivery end of the impregnation liquid recovery pump 84 is connected to the vacuum infiltration equipment (not shown in the figure). The pipeline connected to the pumping end of the impregnation liquid recovery pump 84 is provided with four extraction pipes corresponding to the recovery vertical pipes of the four processing chambers 41. The four extraction pipes are provided with individually controlled electromagnetic valves, so as to extract the impregnation liquid in different processing chambers 41.

[0089] The recovery transverse pipe is provided with a plurality of recovery branch pipes at equal intervals along the length direction of the recovery transverse pipe, and the plurality of recovery branch pipes are used to absorb the impregnation liquid located in the upper layer after the cleaning wastewater is heated and placed at a constant temperature and stratified, and the recovery transverse pipe is connected to the mobile bracket 82;

[0090] The impregnation liquid recovery assembly in step S3.1.2 includes a recovery pipe 81, a movable bracket 82 and a power assembly 83, wherein the recovery pipe 81 is arranged on the movable bracket 82, and the power assembly 83 is arranged on the guide member 9 to drive the movable bracket 82 to adjust the vertical distance between the movable bracket 82 and the guide member 9, and further includes:

[0091] The movable bracket 82 is slidably connected to the processing chamber 41 via a sliding member, wherein the sliding member comprises a slider mounted on the movable bracket 82, and the slider slides up and down in a slide groove, and the slide groove is provided on the cavity wall of the processing chamber 41;

[0092] The power assembly 83 includes an electromagnetic component and a return spring, and the two ends of the return spring are respectively connected to the guide member 9 and the movable bracket 82. The electromagnetic component is arranged on the guide member 9, and the electromagnetic component cooperates with the magnetic block arranged on the movable bracket 82. When the electromagnetic component is energized, it absorbs the magnetic block, so that the movable bracket 82 moves and rises in the direction of the guide member 9, and compresses the return spring, and the recovery vertical pipe shrinks. At this time, the recovery horizontal pipe is away from the cleaning wastewater entering the processing chamber 41 to avoid being splashed by the entering cleaning wastewater. When the cleaning wastewater is heated and separated, the electromagnetic component is de-energized, and the return spring is extended and reset, so that the movable bracket 82 drives the recovery horizontal pipe to move toward the upper layer of the separated impregnation liquid, and the recovery vertical pipe is extended, so that the recovery horizontal pipe can be close to the impregnation liquid, and multiple recovery branch pipes can recover and extract the impregnation liquid more evenly;

[0093] S3.2: The recovery tank 4 is connected to the second water storage chamber 22 through a second cleaning water recovery mechanism 43. The second cleaning water recovery mechanism 43 includes a second cleaning water recovery pump. The water delivery end of the second cleaning water recovery pump is connected and fixed to the second water storage chamber 22. The water extraction end is provided with a second cleaning water transmission pipe. The second cleaning water transmission pipe is provided with four second water extraction branches. The end of each of the second water extraction branches that is not connected to the second cleaning water transmission pipe is connected and fixed to one of the treatment chambers 41.

[0094] S3.3: The recovery tank 4 is connected to the first water storage chamber 12 through a first cleaning water recovery mechanism 42. The first cleaning water recovery mechanism 42 includes a first cleaning water recovery pump provided on the recovery tank 4. The water delivery end of the first cleaning water recovery pump is connected and fixed to the first water storage chamber 12. The water pumping end is provided with a first cleaning water transmission pipe. The first cleaning water transmission pipe is provided with four first water pumping branches. Each end of the first water pumping branch that is not connected to the first cleaning water transmission pipe is connected and fixed to one of the processing chambers 41. Each water pumping branch is provided with a separately controlled solenoid valve.

[0095] Reference Figure 4-10, a device for recycling and treating spray cleaning wastewater by a method for recycling and treating spray cleaning wastewater using vacuum impregnation disclosed in the present invention, the device comprises a glue-spinning tank 3, a spray cleaning device connected to a city water pipeline 5, and a recycling and treating tank 4, the spray cleaning device comprises a first spray tank 1 and a second spray tank 2, the first spray tank 1 and the second spray tank 2 are fixedly arranged above the recycling and treating tank 4, the glue-spinning tank 3 is connected to the second spray tank 2; four treatment chambers 41 of the same volume are opened in the recycling and treating tank 4 on average, each of the treatment chambers 41 is connected to the first spray tank 1 and the second spray tank 2 through a first cleaning wastewater transmission mechanism 16 and a second cleaning wastewater transmission mechanism 26, the second spray tank 2 is connected to the glue-spinning tank 3 through a third cleaning wastewater transmission mechanism 31; the treatment chamber 41 is used The cleaning wastewater generated after use in the glue spinning tank 3, the first spray tank 1 and the second spray tank 2 is heated and kept at a constant temperature, so that the three types of cleaning wastewater generated in the glue spinning tank 3, the first type of cleaning wastewater generated by the cleaning operation of the first spray tank 1 and the second type of cleaning wastewater generated by the cleaning operation of the second spray tank 2 are heated and kept at a constant temperature in the same processing chamber 41 to be layered into impregnation liquid, water-impregnation mixed liquid and water liquid. The water liquid is recycled into the second spray tank 2 through the second cleaning water recovery mechanism 43 to supply water for the glue spinning operation and the secondary spray cleaning operation of the workpiece. The water-impregnation mixed liquid is recycled into the first spray tank 1 through the first cleaning water recovery mechanism 42 to supply water for the first spray cleaning operation of the workpiece. The impregnation liquid is recycled into the vacuum impregnation equipment through the impregnation liquid recovery mechanism 8 to participate in the impregnation operation of the workpiece.

[0096] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.

[0097] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings; however, the present invention is not limited to the specific details in the above embodiments; within the technical concept of the present invention, various equivalent transformations can be made to the technical scheme of the present invention, and these equivalent transformations all belong to the protection scope of the present invention.

Claims

1. A method for recycling cleaning wastewater used for vacuum impregnation, characterized in that: The specific steps include: S1: The workpiece that has completed the impregnation operation in the vacuum impregnation equipment is moved into the glue-spinning chamber opened in the glue-spinning tank by a robot. The workpiece that has completed the glue-spinning operation in the glue-spinning chamber is moved out by the robot and transferred to the first spray chamber opened in the first spray tank. The first spray assembly arranged in the first spray chamber is connected to the first water storage chamber through the first spray cleaning water transmission mechanism. The first water storage chamber is arranged in the first spray tank and connected to the municipal water pipeline. In the first cycle, the water source for the spray cleaning operation in the first spray tank is completely derived from the municipal water. The municipal water is input into the first water storage chamber through the municipal water pipeline. The first spray cleaning water transmission mechanism arranged on the first spray tank inputs the municipal water in the first water storage chamber into the first spray tank. The first spray cleaning component is used to perform a first spray cleaning operation on the workpiece in the first spray chamber. The first type of cleaning wastewater generated by the first spray cleaning operation falls into the first water passage chamber provided in the first spray tank. The first type of cleaning wastewater in the first water passage chamber enters the recovery tank below the first spray tank through the first cleaning wastewater transmission mechanism. The workpiece that has undergone the first spray cleaning operation is removed by the robot and transferred to the second spray chamber provided in the second spray tank for further cleaning. The second spray component provided in the second spray chamber is connected to the second water storage chamber through the second spray cleaning water transmission mechanism. The second water storage chamber is provided in the second spray tank and is connected to the municipal water pipeline. In the first cycle, The water source for the spray cleaning operation in the second spray tank is completely derived from city water, and the city water is input into the second water storage chamber through the city water pipeline. The second spray cleaning water transmission mechanism provided on the second spray tank inputs the city water in the second water storage chamber into the second spray assembly, and performs a second spray cleaning operation on the workpiece located in the second spray chamber. The second type of cleaning waste water generated by the second spray cleaning operation falls into the second water passage chamber opened in the second spray tank. A water curtain mechanism is also provided in the glue-spinning chamber. The water curtain mechanism is connected to the third water storage chamber through the flowing water transmission mechanism provided on the glue-spinning tank. The third water storage chamber is opened in the glue-spinning tank and is connected to the second storage chamber through the water curtain transmission mechanism. The water chamber, the water curtain transmission mechanism inputs the water in the second water storage chamber into the third water storage chamber, the flowing water transmission mechanism inputs the water in the third water storage chamber into the water curtain mechanism, so that the inner wall of the glue throwing chamber forms a water curtain wall, and the impregnation liquid thrown off during the glue throwing operation of the workpiece in the glue throwing chamber is thrown to the water curtain wall, the water in the water curtain wall blocks the impregnation liquid, and the three types of cleaning wastewater generated by mixing with the impregnation liquid thrown out are input into the second water passage chamber through the third cleaning wastewater transmission mechanism, the three types of cleaning wastewater and the second type of cleaning wastewater in the second water passage chamber are both sent to the recovery tank through the second cleaning wastewater transmission mechanism, and the workpiece after the second spray cleaning operation is transferred to the next process by the robot; S2: In the first cycle, the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater flowing to the recycling tank all enter the four processing chambers opened in the recycling tank in turn. After the cleaning wastewater volume in the first processing chamber reaches the first preset volume, it switches to the second processing chamber. When the cleaning wastewater volume in the second processing chamber reaches the first preset volume, it switches to the third processing chamber. When the cleaning wastewater volume in the third processing chamber reaches the first preset volume, at this time, the first water storage chamber contains the second preset volume of municipal water, and the second water storage chamber contains the third preset volume of municipal water. In the process, the third preset volume is equal to the sum of the second preset volume and the water supply of the water curtain mechanism, the municipal water pipeline is closed, and the first type of cleaning wastewater, the second type of cleaning wastewater and the third type of cleaning wastewater do not enter the fourth treatment chamber, the first cycle ends, and the second cycle begins, wherein the time for the cleaning wastewater volume in a single treatment chamber to reach the first preset volume is half of the time required for the single treatment chamber to be heated and kept at a constant temperature for static treatment, the volume of the first water storage chamber is greater than or equal to the sum of half of the first preset volume and the second preset volume, and the volume of the second water storage chamber is greater than or equal to the sum of half of the first preset volume and the third preset volume; S3: In the second cycle, when the first preset volume of cleaning wastewater is injected into the third processing chamber, the cleaning wastewater in the first processing chamber is allowed to stand, and the cleaning wastewater in the first processing chamber is heated and allowed to stand at a constant temperature before separation to obtain upper and lower layered impregnation liquid, water-impregnation mixed liquid and water liquid, and the impregnation liquid, the water liquid and the water-impregnation mixed liquid are sequentially extracted by the impregnation liquid recovery mechanism, the second cleaning water recovery mechanism and the first cleaning water recovery mechanism installed on the recovery tank until the first processing chamber is emptied, and the output ends of the impregnation liquid recovery mechanism, the second cleaning water recovery mechanism and the first cleaning water recovery mechanism are respectively connected to the vacuum impregnation equipment, the second water storage chamber and the first water storage chamber, and the water-impregnation mixed liquid enters the first water storage chamber, and the water-impregnation mixed liquid entering the first water storage chamber is used to perform the first spray cleaning operation on the subsequent workpiece, The water liquid enters the second water storage chamber, and the water liquid entering the second water storage chamber is used to perform a second spray cleaning operation on the subsequent workpiece and supply water to the third water storage chamber. At the same time, the first type of cleaning wastewater discharged from the first water chamber, the second type of cleaning wastewater discharged from the second water chamber, and the third type of cleaning wastewater enter the fourth processing chamber. When the volume of the cleaning wastewater in the fourth processing chamber reaches the first preset volume, the cleaning wastewater in the second processing chamber has been left to stand still. The cleaning wastewater in the second processing chamber is recycled and reused according to the treatment process of the cleaning wastewater in the first processing chamber. The recycled water liquid and water-infiltration mixed liquid flow to the first water chamber and the second water chamber again and are discharged into the first processing chamber. By analogy, by switching the four processing chambers in the second cycle, the city water used for spraying operation in the first cycle is recycled to achieve the purpose of recycling and treating the cleaning wastewater.

2. A method for recycling cleaning wastewater for vacuum impregnation according to claim 1, characterized in that: The step S1 specifically includes the following steps: S1.1: The first spray tank is provided with the first spray chamber, the first water passage chamber and the first water storage chamber, the first water storage chamber is connected to the first spray cleaning water transmission mechanism, the first spray chamber is provided with the first spray assembly and the first cleaning position, the first spray tank is provided with a first inlet connected to the first spray chamber, the first inlet is used for workpieces to enter and exit the first spray chamber, the workpieces entering the first spray chamber are placed on the first cleaning position, the first spray cleaning water transmission mechanism draws water from the first water storage chamber into the first spray assembly to perform the first spray cleaning operation on the workpieces connected to the first cleaning position; The second spray tank is provided with the second spray chamber, the second water passage chamber and the second water storage chamber, the second water storage chamber is connected to the second spray cleaning water transmission mechanism, the second spray chamber is provided with the second spray assembly and the second cleaning position, the second spray tank is provided with a second inlet connected to the first spray chamber, the second inlet is used for workpieces to enter and exit the second spray chamber, the workpieces entering the second spray chamber are placed on the second cleaning position, the second spray cleaning water transmission mechanism draws water from the second water storage chamber to the second spray assembly to perform a second spray cleaning operation on the workpieces connected to the second cleaning position; S1.2: The glue-spinning tank is provided with a glue-spinning chamber, a third water storage chamber and a third water-passing chamber. A workpiece inlet is provided on the top of the glue-spinning tank, and the workpiece inlet is connected to the glue-spinning chamber. The glue-spinning tank is provided with a tank cover and a translation drive assembly, and the translation drive assembly drives the tank cover to move horizontally so that the tank cover opens and closes the workpiece inlet. The glue-spinning tank is provided with a glue-spinning station and a water curtain mechanism, and the glue-spinning station is arranged in the glue-spinning chamber, and the water curtain mechanism is arranged on the side of the tank cover facing the glue-spinning chamber, and the translation drive assembly drives the tank cover to move to open the workpiece inlet. After the entrance, the workpiece is placed on the glue-spinning station through the workpiece entrance, and the translation drive assembly drives the tank cover to move horizontally to close the workpiece entrance; the flowing water transmission mechanism is connected with the water curtain mechanism under the drive of the power mechanism, so that the third water storage chamber inputs the stored water into the water curtain mechanism through the flowing water transmission mechanism to form a water curtain wall, the power mechanism is arranged on the glue-spinning tank, the third water passage chamber is connected to the bottom of the glue-spinning chamber, and the third water passage chamber is connected with the second water passage chamber through the third cleaning wastewater transmission mechanism; S1.3: The three types of cleaning wastewater generated by the spinning operation fall into the third water chamber and are input into the second water chamber through the third cleaning wastewater transmission mechanism. The first type of cleaning wastewater generated by the first spray cleaning operation falls into the first water chamber and enters the processing chamber through the first cleaning wastewater transmission mechanism provided on the recovery processing tank. The second type of cleaning wastewater generated by the second spray cleaning operation falls into the second water chamber. The second and third types of cleaning wastewater in the second water chamber both enter the processing chamber through the second cleaning wastewater transmission mechanism provided on the recovery processing tank.

3. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 2, characterized in that: The step S1.2 specifically includes the following steps: S1.2.1: The water curtain mechanism includes an arc-shaped platform, a plurality of water outlet pipes and a connecting pipe. The arc-shaped platform is a hollow structure and is respectively connected to the connecting pipe and the plurality of water outlet pipes. The plurality of water outlet pipes are fixed on the arc-shaped platform at equal angles with the center of the rubber-throwing cavity as the center. The end of the water outlet pipe not connected to the arc-shaped platform corresponds to the rubber-throwing cavity. One end of the connecting pipe is connected and fixed to the center position of the arc-shaped platform, and the other end passes through the tank cover and extends to the outside and is detachably connected to the flowing water transmission mechanism. S1.2.2: The flowing water transmission mechanism comprises a flowing water transmission pump, a flowing water delivery pipe and a flowing water extraction pipe. The flowing water transmission pump is arranged on the glue spinning tank. One end of the flowing water extraction pipe is connected to the water extraction end of the flowing water transmission pump, and the other end is connected and fixed to the third water storage chamber. One end of the flowing water delivery pipe is connected to the water delivery end of the flowing water transmission pump, and the other end is detachably connected to the connecting pipe. S1.2.3: After the workpiece is unglued, the connecting pipe and the flowing water delivery pipe are separated by the power mechanism, the translation drive mechanism drives the tank cover to open the workpiece entrance, and the robot takes out the workpiece that has completed the ungluing operation at the ungluing station.

4. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 3, characterized in that: The flowing water delivery pipe described in step S1.2.2 includes a first fixed pipe, a telescopic pipe and a second fixed pipe which are connected in sequence, wherein the first fixed pipe is in an "n" shape, and the end of the first fixed pipe not connected to the telescopic pipe is detachably connected to the connecting pipe, and the end of the second fixed pipe not connected to the telescopic pipe is connected to the water delivery end of the flowing water transmission pump.

5. A method for recycling cleaning wastewater for vacuum impregnation according to claim 4, characterized in that: The power mechanism described in S1.2.3 includes a lifting assembly and a rotating assembly, wherein the lifting assembly is used to drive the telescopic tube to extend and retract, thereby adjusting the vertical distance between the first fixed tube and the second fixed tube; The lifting assembly includes a support platform provided on the second fixed tube, a connecting platform provided on the first fixed tube, and a lifting electric cylinder, wherein the fixed end of the lifting electric cylinder is provided on the support platform, and the telescopic end is connected to the connecting platform, the lifting electric cylinder is provided in parallel with the telescopic tube, and the telescopic direction and telescopic range of the lifting electric cylinder are consistent with those of the telescopic tube; The support platform is penetrated and fixed with the second fixed pipe, the support platform comprises a platform and a driven gear fixedly connected with the platform, and the driven gear is connected with the rotating assembly; The rotating assembly is arranged on the glue-spinning tank and is used to drive the flowing water delivery pipe to rotate. The rotating assembly includes a motor and a driving gear installed on the output end of the motor, and the driving gear is meshed and connected with the driven gear; The second fixed pipe is rotatably connected to the water delivery end of the flowing water transmission pump via a bearing.

6. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 1, characterized in that: The step S2 specifically includes the following steps: S2.1: A heating component is provided in each of the four processing chambers, and the heating component is used to heat the cleaning wastewater entering the processing chamber.

7. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 1, characterized in that: The step S3 specifically includes the following steps: S3.1: The impregnation liquid recovery mechanism comprises an impregnation liquid recovery pump provided on the recovery tank and four impregnation liquid recovery components connected to the impregnation liquid recovery pump, each of the processing chambers is provided with an impregnation liquid recovery component, and the impregnation liquid recovery pump extracts the impregnation liquid separated in the processing chamber through the impregnation liquid recovery component and inputs the extracted impregnation liquid into the vacuum impregnation equipment; S3.2: The recovery tank is connected to the second water storage chamber through a second cleaning water recovery mechanism, the second cleaning water recovery mechanism includes a second cleaning water recovery pump, the water delivery end of the second cleaning water recovery pump is connected and fixed to the second water storage chamber, the water extraction end is provided with a second cleaning water transmission pipe, the second cleaning water transmission pipe is provided with four second water extraction branches, and each end of the second water extraction branch not connected to the second cleaning water transmission pipe is connected and fixed to one of the treatment chambers; S3.3: The recovery tank is connected to the first water storage chamber through a first cleaning water recovery mechanism. The first cleaning water recovery mechanism includes a first cleaning water recovery pump provided on the recovery tank. The water delivery end of the first cleaning water recovery pump is connected and fixed to the first water storage chamber. The water pumping end is provided with a first cleaning water transmission pipe. The first cleaning water transmission pipe is provided with four first water pumping branches. Each end of the first water pumping branch that is not connected to the first cleaning water transmission pipe is connected and fixed to one of the treatment chambers.

8. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 7, characterized in that: The step S3.1 specifically includes the following steps: S3.1.1: A guide is provided on the upper part of the processing chamber, and the guide performs a diversion operation on the cleaning wastewater input from the first water passage chamber and the second water passage chamber, and the guide is an arc-shaped structure; S3.1.2: The impregnation liquid recovery assembly is located on a side of the guide member facing the bottom of the processing chamber, and the impregnation liquid recovery assembly includes a recovery pipe, a movable bracket and a power assembly, wherein the recovery pipe is arranged on the movable bracket, and the power assembly is arranged on the guide member to drive the movable bracket to adjust the vertical distance between the movable bracket and the guide member; The recovery pipe includes a recovery vertical pipe of an accordion-type telescopic structure and a recovery horizontal pipe vertically connected to one end of the recovery vertical pipe, the other end of the recovery vertical pipe passes through the processing chamber and is connected to the pumping end of the impregnation liquid recovery pump disposed outside the recovery tank, and the water delivery end of the impregnation liquid recovery pump is connected to the vacuum impregnation equipment; The recovery transverse pipe is provided with a plurality of recovery branch pipes at equal intervals along the length direction of the recovery transverse pipe, and the plurality of recovery branch pipes are used to absorb the impregnation liquid located in the upper layer after the cleaning wastewater is heated and placed at a constant temperature for stratification, and the recovery transverse pipe is connected to the movable bracket.

9. The method for recycling cleaning wastewater used for vacuum impregnation according to claim 1, characterized in that: The impregnation liquid recovery assembly in step S3.1.2 includes a recovery pipe, a movable bracket and a power assembly, wherein the recovery pipe is arranged on the movable bracket, and the power assembly is arranged on the guide member to drive the movable bracket to adjust the vertical distance between the movable bracket and the guide member, further comprising: The movable bracket is slidably connected to the processing chamber via a sliding member, wherein the sliding member comprises a slider mounted on the movable bracket, the slider slides up and down in a slide groove, and the slide groove is provided on the cavity wall of the processing chamber; The power assembly includes an electromagnetic component and a return spring, the two ends of the return spring are respectively connected to the guide and the movable bracket, the electromagnetic component is arranged on the guide, and the electromagnetic component cooperates with a magnetic block arranged on the movable bracket.

10. A device for recycling spray cleaning wastewater using the recycling method according to any one of claims 1 to 9, characterized in that: The device comprises a glue-spinning tank, a spray cleaning device connected to a municipal water pipeline, and a recovery tank. The spray cleaning device comprises a first spray tank and a second spray tank. The first spray tank and the second spray tank are fixedly arranged above the recovery tank. The glue-spinning tank is connected to the second spray tank. The recycling tank is provided with four processing chambers of the same volume on average, each of which is connected to the first spray tank and the second spray tank through a first cleaning wastewater transmission mechanism and a second cleaning wastewater transmission mechanism, and the second spray tank is connected to the glue spinning tank through a third cleaning wastewater transmission mechanism; The processing chamber is used to heat and keep the cleaning wastewater generated after use in the glue-spinning tank, the first spray tank and the second spray tank at a constant temperature, so that the three types of cleaning wastewater generated in the glue-spinning tank, the first type of cleaning wastewater generated by the cleaning operation of the first spray tank and the second type of cleaning wastewater generated by the cleaning operation of the second spray tank are heated and kept at a constant temperature in the same processing chamber to be layered into impregnation liquid, water-impregnation mixed liquid and water liquid. The water liquid is recovered into the second spray tank through the second cleaning water recovery mechanism to supply water for the glue-spinning operation and the secondary spray cleaning operation of the workpiece, the water-impregnation mixed liquid is recovered into the first spray tank through the first cleaning water recovery mechanism to supply water for the first spray cleaning operation of the workpiece, and the impregnation liquid is recovered into the vacuum impregnation equipment through the impregnation liquid recovery mechanism to participate in the impregnation operation of the workpiece.

Citation Information

Patent Citations

  • Fully-automatic no-man control infiltration line

    CN104128291A

  • Full-automatic infiltration cleaning line

    CN107520432A

  • Implementation method for subarea control wastewater recycling system

    CN108569732A

  • Impregnation production line equipment

    CN112008070A

  • Truss manipulator type full-automatic infiltration equipment

    CN114799113A