Large-area rockfill area rotary digging hole-forming cast-in-place pile construction technology
By using rotary digging into holes and setting up hole wall reinforcement layer in the construction of cast piles in the stone filling area, combining high-pressure grouting and detachable arc steel cylinder structure, the problems of uniformity and compactness in cast pile construction are solved, and the problem of improvement is improved. Structural strength provides reliable support for building construction under complex geological conditions.
Patent Information
- Application Number
- CN202411208629.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-06
AI Technical Summary
When constructing cast piles in the stone filling area, it is difficult to ensure the uniformity and compactness of cast piles under complex geological conditions, which affects the structural strength.
The rotary digging hole-forming process is adopted. After the hole is formed, the hole wall reinforcement layer is set and a water-stable mortar is formed through a high-pressure grouting equipment. The thickness of the reinforcement layer is not less than 5cm to ensure the uniformity and stability of the hole wall, and use detachable The arc-shaped steel cylinder structure avoids damage to the hole wall reinforcement layer.
Effectively avoid concrete seeping into the soil layer, improve the uniformity and compactness of the cast-injected piles, enhance structural strength, and provide reliable support for building construction under complex geological conditions.
Smart Images

Figure CN119083421A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a construction process for rotary bored cast-in-place piles in a large-area rock-filling area. Background Art
[0002] As land resources in coastal areas become scarce, land reclamation projects such as artificial islands are increasing. In these projects, cast-in-place piles are a common foundation structure, and their construction quality is directly related to the safety and stability of the project. However, when constructing cast-in-place piles in rock-filled areas, it is often difficult to ensure the strength of the cast-in-place piles due to the complexity of geological conditions.
[0003] At present, conventional drilling and pouring methods are usually used for bored pile construction in rock-filled areas. However, these methods often cannot guarantee the uniformity and density of bored piles when faced with complex geological conditions, thus affecting the structural strength of bored piles. Therefore, there is an urgent need for a bored pile construction process that can adapt to complex geological conditions and improve construction efficiency and pile quality. Summary of the invention
[0004] In view of the problems existing in the prior art, the present application provides a construction process for rotary bored cast-in-place piles in a large-area rock-filling area.
[0005] The present application provides a large-area rock-filled area rotary bored cast-in-place pile construction process, which adopts the following technical solutions: A construction process for rotary bored cast-in-place piles in a large-area rock-filled area comprises the following steps: Step 1: Construction preparation: select the construction location in the stone filling area, and level and pre-treat the site; Step 2: Hole-forming operation: a rotary drilling machine is used to perform hole-forming operation. The rotary cutting function of the rotary drilling machine is used to mix and cut the stones and soil in the stone-filling area to form a uniform hole wall; Step 3: Hole cleaning: After the hole is completed, clean the hole to ensure that there are no debris or residual stones in the hole. Step 4: Install the steel cylinder. Place the cylindrical steel cylinder in the hole and press the bottom end of the steel cylinder against the bottom wall of the hole. Step 5: construct the hole wall reinforcement layer, using high-pressure grouting equipment to inject water-stabilized mortar into the space between the steel cylinder and the hole wall to form a hole wall reinforcement layer; Step 6: demoulding. After the hole wall reinforcement layer is formed, the steel cylinder is removed and the uniformity and stability of the hole wall reinforcement layer are tested; Step 7: Cast-in-place pile forming construction: put the tied steel cage into the hole, pour the mixed concrete into the hole through the grouting equipment, and vibrate the concrete to form a dense cast-in-place pile; Step 8: Concrete curing: After grouting is completed, the concrete is cured to ensure that the bored piles reach the designed strength.
[0006] Optionally, in step 4, when the steel cylinder is placed into the hole, the distance difference between the side wall of the steel cylinder at each position and the hole wall is controlled to be no more than 2 cm.
[0007] Optionally, the thickness of the hole wall reinforcement layer is not less than 5 cm.
[0008] Optionally, in step 5, during the construction of the hole wall reinforcement layer, grouting is carried out from the bottom of the hole to the top section, and the water-stabilizing mortar of the upper layer is injected after the water-stabilizing mortar below is initially set. During the grouting process, the grouting pressure and grouting volume are monitored in real time to ensure the grouting quality.
[0009] Optionally, the steel cylinder includes a plurality of arc-shaped steel plates spliced to each other, and fixing parts for fixing each arc-shaped steel plate.
[0010] Optionally, the fixing part includes a reinforcement ring, and a plurality of dovetail blocks are fixedly provided on the side wall of the reinforcement ring, and the dovetail blocks correspond one to one to the arc-shaped steel plates. The inner side wall of the arc-shaped steel plate is provided with a dovetail groove matching the dovetail blocks along the length direction of the arc-shaped steel plate, and the reinforcement ring is fixedly provided with a lifting ear, and the lifting ear is connected with a pull rope.
[0011] Optionally, the steel cylinder further includes a top collar, on which an annular groove is provided along the circumference of the top collar, wherein the annular groove is adapted to the arc-shaped steel plate and is used to be sleeved on the top position of each of the arc-shaped steel plates.
[0012] Optionally, installation grooves are provided on both sides of the arc-shaped steel plates, and when the arc-shaped steel plates are spliced together, the installation grooves of two adjacent arc-shaped steel plates fit together.
[0013] Optionally, a sealing gasket is provided on the side wall of the mounting groove.
[0014] Optionally, when the steel cylinder is installed, a release agent is applied to the outer surfaces of each curved steel plate of the steel cylinder.
[0015] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through process improvement, the present application sets a hole wall reinforcement layer in the hole after the drilling operation is completed. Since the hole wall reinforcement layer is grouted and formed by high-pressure grouting equipment, the gaps on the hole wall are effectively filled. In the subsequent bored pile forming process, the concrete is effectively prevented from penetrating into the soil layer around the hole, thereby ensuring the uniformity and density of the bored piles and improving the structural strength of the bored piles. The present application solves the problem of uniformity and density in the construction of bored piles in stone-filled areas, improves the structural strength of bored piles, and provides reliable technical support for construction under complex geological conditions.
[0016] 2. The present application forms a steel cylinder by splicing a plurality of arc-shaped steel plates. After the hole wall reinforcement layer is formed, it is convenient to remove the steel cylinder from the formed hole without damaging the hole wall reinforcement layer.
[0017] 3. The present application provides installation grooves on both sides of the arc-shaped steel plates. When the arc-shaped steel plates are spliced, the installation grooves of the two adjacent arc-shaped steel plates are matched with each other to improve the structural stability of the steel cylinder, and by laying sealing gaskets on the side walls of the installation grooves, the sealing effect between the two adjacent arc-shaped steel plates is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is a process flow chart of an embodiment of the present application; Figure 2 is a cross-sectional view of the overall structure of an embodiment of the present application; Figure 3 It is a schematic diagram of the structure of the steel cylinder used in the embodiment of the present application; Figure 4 It is a cross-sectional view of the structure of the steel cylinder used to express the embodiment of the present application; Figure 5 It is a structural cross-sectional view used to express the bored pile in the embodiment of the present application.
[0019] Explanation of the reference numerals: 1. Steel cylinder; 11. Arc-shaped steel plate; 111. Dovetail groove; 112. Mounting groove; 113. Sealing gasket; 12. Top collar; 121. Annular groove; 13. Reinforcement ring; 131. Dovetail block; 132. Pull rope; 2. Hole wall reinforcement layer; 3. Cast-in-place pile. DETAILED DESCRIPTION
[0020] The following is combined with Figure 1-5 This application is described in further detail.
[0021] The present application embodiment discloses a construction process for a large area of rock-filled area by rotary drilling and cast-in-place pile 3. Figure 1 , including the following steps: Step 1: Construction preparation.
[0022] Carry out site leveling and pretreatment at the selected stone filling area construction location to ensure the flatness and stability of the construction area.
[0023] Step 2: Drilling operation.
[0024] A rotary drilling rig is used for drilling operations. The rotary drilling rig utilizes its rotary cutting function to mix and cut the stones and soil in the stone filling area to form a uniform hole wall. During the drilling process, the cutting depth and rotation speed of the rotary drilling rig are controlled to ensure the flatness and verticality of the hole wall.
[0025] Step 3: Hole cleaning.
[0026] Remove any stone residue and debris from the hole to ensure the cleanliness of the hole.
[0027] Step 4: Install the steel cylinder 1.
[0028] Reference Figure 2 , install the specially made cylindrical steel cylinder 1 in the hole, and ensure that the bottom end of the steel cylinder 1 presses the bottom wall of the hole. During the placement of the steel cylinder 1, it is necessary to control the distance difference between the side wall of the steel cylinder 1 at each position and the hole wall to not exceed 2 cm, so as to ensure the uniformity of the hole wall reinforcement layer 2 formed subsequently.
[0029] Reference Figure 3 The steel cylinder 1 includes a plurality of arc-shaped steel plates 11 connected to each other, and fixing parts for fixing each arc-shaped steel plate 11. In the embodiment of the present application, the arc-shaped steel plates 11 are arranged in four pieces. The steel cylinder 1 also includes a top ring 12. An annular groove 121 is provided on the top ring 12 along the circumference of the top ring 12, and the annular groove 121 is adapted to the arc-shaped steel plate 11.
[0030] Reference Figure 3 , 4 The fixing part includes a reinforcement ring 13, and a plurality of reinforcement rings 13 are provided. A plurality of dovetail blocks 131 are fixedly provided on the side wall of the reinforcement ring 13. The dovetail blocks 131 are distributed at equal intervals along the circumference of the reinforcement ring 13, and the dovetail blocks 131 correspond to the arc-shaped steel plates 11 one by one. The inner side wall of the arc-shaped steel plate 11 is provided with a dovetail groove 111 matched with the dovetail blocks 131 along the length direction of the arc-shaped steel plate 11.
[0031] When assembling the steel cylinder 1, first splice the arcuate steel plates 11 in sequence, and pre-fix the spliced steel cylinder 1, then install a plurality of reinforcement rings 13 in the spliced steel cylinder 1, and make the dovetail blocks 131 on the reinforcement rings 13 slide into the dovetail grooves 111 of the corresponding arcuate steel plates 11, respectively, to support and reinforce the steel cylinder 1, and finally, put the top sleeve through the annular groove 121 and sleeve it on the top position of each arcuate steel plate 11 to complete the assembly of the steel cylinder 1; during the installation of the steel cylinder 1, it is necessary to apply a release agent to the outer surface of each arcuate steel plate 11 to facilitate the subsequent demolding operation.
[0032] Reference Figure 3 Each reinforcement ring 13 is fixedly provided with at least two lifting ears, and each lifting ear is tied with a pull rope 132. By providing the pull rope 132 on the reinforcement ring 13, it is convenient to take the reinforcement ring 13 out of the steel cylinder 1, and during the construction process, it is convenient to adjust the position of the reinforcement ring 13 in the steel cylinder 1.
[0033] Reference Figure 4, installation grooves 112 are opened on both sides of the arc-shaped steel plate 11, and the two installation grooves 112 located on the same arc-shaped steel plate 11 are located on the outer arc surface or the inner arc surface of the arc-shaped steel plate 11. The side wall of the installation groove 112 is paved with a sealing gasket 113, and the sealing gasket 113 is made of rubber material. When each arc-shaped steel plate 11 is spliced, the installation grooves 112 of the two adjacent arc-shaped steel plates 11 are matched with each other to improve the structural stability of the steel cylinder 1, and by laying the sealing gasket 113 on the side wall of the installation groove 112, the sealing effect between the two adjacent arc-shaped steel plates 11 is improved.
[0034] Step 5: Construction of hole wall reinforcement layer 2.
[0035] Reference Figure 2 , use high-pressure grouting equipment to pour water-stabilizing mortar into the space between the steel cylinder 1 and the hole wall to form a hole wall reinforcement layer 2; during the grouting process, it is necessary to proceed from the bottom of the hole to the top, and inject the upper layer of water-stabilizing mortar after the water-stabilizing mortar below has initially solidified. At the same time, monitor the grouting pressure and grouting volume in real time to ensure the grouting quality. The thickness of the reinforcement layer should be no less than 5cm to provide sufficient reinforcement effect.
[0036] Step 6: Demolding.
[0037] Reference Figure 2 After the reinforcement layer is fully formed and has sufficient strength, first remove the top ring 12 on the top of the steel cylinder 1, take out each reinforcement ring 13 from the steel cylinder 1 by using the pull rope 132, and then remove each arc steel plate 11 of the steel cylinder 1 in turn, so as to remove the steel cylinder 1 from the hole and avoid damaging the hole wall reinforcement layer 2; then carry out a comprehensive test on the uniformity and stability of the reinforcement layer to ensure that it meets the design requirements.
[0038] Furthermore, after the steel cylinder 1 is removed, the surface of the reinforcement layer is processed, such as polishing, cleaning, etc., to improve the bonding force and integrity between it and the subsequent cast-in-place piles 3.
[0039] Step 7: Cast-in-place pile 3 forming construction.
[0040] Reference Figure 5 , put the pre-tied steel cage into the processed hole, then pour the pre-mixed concrete into the hole through the grouting equipment, and fully vibrate the concrete to ensure that the concrete can fully fill the gap around the steel cage to form a dense bored pile 3. During the concrete pouring process, it is necessary to control the concrete ratio and pouring speed to ensure the quality of the bored pile 3.
[0041] Step 8: Concrete curing.
[0042] After the grouting operation is completed, necessary maintenance work is carried out on the bored piles 3, such as regular watering, covering and moisturizing, to ensure that the concrete has sufficient moisture and temperature control during the solidification process, so as to achieve the designed strength.
[0043] The implementation principle of the construction process of rotary bored bored cast-in-place piles 3 in a large-area rock-filled area according to an embodiment of the present application is as follows: after the drilling operation is completed, a hole wall reinforcement layer 2 is set in the hole, and since the hole wall reinforcement layer 2 is grouting-formed by high-pressure grouting equipment, the gaps on the hole wall are effectively filled, and in the subsequent forming process of the cast-in-place piles 3, the concrete is effectively prevented from penetrating into the soil layer around the hole, thereby ensuring the uniformity and density of the cast-in-place piles 3 and improving the structural strength of the cast-in-place piles 3; the present application solves the problem of uniformity and density in the construction of cast-in-place piles 3 in the rock-filled area, improves the structural strength of the cast-in-place piles 3, and provides reliable technical support for construction under complex geological conditions.
[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereby. Any technician familiar with the technical field can modify and change the above embodiments without departing from the principle and spirit of the present application. Therefore, all equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction process for rotary bored cast-in-place piles (3) in a large rock-filled area, characterized in that: The following steps are involved: Step 1: Construction preparation: select the construction location in the stone filling area, and level and pre-treat the site; Step 2: Hole-forming operation: a rotary drilling machine is used to perform hole-forming operation. The rotary cutting function of the rotary drilling machine is used to mix and cut the stones and soil in the stone-filling area to form a uniform hole wall; Step 3: Hole cleaning: After the hole is completed, clean the hole to ensure that there are no debris or residual stones in the hole. Step 4: installing the steel cylinder (1), placing the cylindrical steel cylinder (1) into the hole, and making the bottom end of the steel cylinder (1) press against the bottom wall of the hole; Step 5: constructing the hole wall reinforcement layer (2), using high-pressure grouting equipment to inject water-stable mortar into the space between the steel cylinder (1) and the hole wall to form the hole wall reinforcement layer (2); Step 6, demoulding, after the hole wall reinforcement layer (2) is formed, the steel cylinder (1) is removed, and the uniformity and stability of the hole wall reinforcement layer (2) are tested; Step 7, cast-in-place pile (3) forming construction, placing the tied steel cage into the hole, pouring the mixed concrete into the hole through grouting equipment, and vibrating the concrete to form a dense cast-in-place pile (3); Step 8: Concrete curing: After grouting is completed, the concrete is cured to ensure that the cast-in-place pile (3) reaches the designed strength.
2. The construction process of a large-area rock-filled area rotary bored cast-in-place pile (3) according to claim 1, characterized in that: In step 4, when the steel cylinder (1) is placed in the hole, the distance difference between the side wall of the steel cylinder (1) at each position and the hole wall of the hole is controlled to be no more than 2 cm.
3. The construction process of a large-area rock-filled area rotary bored cast-in-place pile (3) according to claim 2, characterized in that: The thickness of the hole wall reinforcement layer (2) is not less than 5 cm.
4. The construction process of a large-area rock-filled area rotary bored cast-in-place pile (3) according to claim 1, characterized in that: In step 5, during the construction of the hole wall reinforcement layer (2), grouting is carried out from the bottom of the hole to the top section, and the upper layer of water-stabilizing mortar is injected after the water-stabilizing mortar below has initially set. During the grouting process, the grouting pressure and grouting volume are monitored in real time to ensure the grouting quality.
5. The construction process of large-area rock-filled area rotary bored cast-in-place piles (3) according to claim 1, characterized in that: The steel cylinder (1) comprises a plurality of arc-shaped steel plates (11) spliced together, and fixing parts for fixing the arc-shaped steel plates (11).
6. A construction process for rotary bored cast-in-place piles (3) in a large rock-filled area according to claim 5, characterized in that: The fixing member comprises a reinforcing ring (13), a side wall of the reinforcing ring (13) is fixedly provided with a plurality of dovetail blocks (131), the dovetail blocks (131) correspond one to one with the arc-shaped steel plate (11), an inner side wall of the arc-shaped steel plate (11) is provided with a dovetail groove (111) matching with the dovetail block (131) along the length direction of the arc-shaped steel plate (11), and a lifting ear is fixedly provided on the reinforcing ring (13), and a pull rope (132) is connected to the lifting ear.
7. A construction process for rotary bored cast-in-place piles (3) in a large rock-filled area according to claim 6, characterized in that: The steel cylinder (1) further comprises a top collar (12), on which an annular groove (121) is provided along the circumference of the top collar (12), and the annular groove (121) is adapted to the arc-shaped steel plate (11) and is used to be sleeved on the top position of each arc-shaped steel plate (11).
8. The construction process of large-area rock-filled area rotary bored cast-in-place piles (3) according to claim 5, characterized in that: Both sides of the arc-shaped steel plates (11) are provided with mounting grooves (112), and when the arc-shaped steel plates (11) are spliced, the mounting grooves (112) of two adjacent arc-shaped steel plates (11) fit together.
9. A construction process for rotary bored cast-in-place piles (3) in a large rock-filled area according to claim 8, characterized in that: A sealing gasket (113) is provided on the side wall of the installation groove (112).
10. The construction process of rotary bored cast-in-place piles (3) in a large rock-filled area according to claim 5, characterized in that: When the steel cylinder (1) is installed, a mold release agent is applied to the outer surfaces of the arc-shaped steel plates (11) of the steel cylinder (1).
Citation Information
Cited By
Double-machine collaborative pile forming method for construction waste backfill layer and seepage stratum
CN121538973A
A double-machine cooperative pile-forming method for construction waste backfill layer and seepage stratum
CN121538973B