Auxiliary construction device and construction method for pile sinking of water retaining pile

The auxiliary construction device with a mounting and limiting frame stabilizes retaining wall piles, addressing tilting issues and reducing waterway occupation during piling, ensuring efficient and stable installation.

CN119083429AActive Publication Date: 2024-12-06CCCC SHANGHAI DREDGING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411476461.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-12-06
Estimated Expiration
2044-10-22

AI Technical Summary

Technical Problem

Retaining wall piles during construction are prone to tilting and require time-consuming adjustments, occupying waterways during the piling process, especially in canals.

Method used

An auxiliary construction device comprising a mounting frame and limiting frame with C-shaped frames, including a limiting device for limiting the position of the retaining wall during the piling process, the device includes a mounting frame and a limiting frame with C-shaped frames and tightening members to stabilize the piles and reduce waterway occupation.

Benefits of technology

The device stabilizes the retaining wall piles during construction, reducing tilting and minimizing waterway occupation, allowing efficient and stable pile installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083429A_ABST
    Figure CN119083429A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pile sinking of retaining piles, and discloses an auxiliary construction device and method for pile sinking of water retaining piles. The auxiliary construction device comprises a mounting frame used for being fixed to the side wall of a pile driving barge and a limiting frame used for limiting the retaining piles, and the limiting frame is connected to the mounting frame; the limiting frame comprises two fixed limiting pieces which are arranged in parallel, a limiting channel is formed between the two fixed limiting pieces, a first C-shaped frame and a second C-shaped frame are arranged between the two fixed limiting pieces respectively, the first C-shaped frame and the second C-shaped frame are arranged in parallel, and an opening of the first C-shaped frame and an opening of the second C-shaped frame are both vertically downward. According to the auxiliary construction device and method for pile sinking of the water wall protecting pile, the mounting frame and the limiting frame are arranged, the mounting frame is mounted on the pile driving barge, the wall protecting pile penetrates through the limiting frame and then is driven, the wall protecting pile is limited through the limiting frame, and the wall protecting pile is prevented from inclining in the pile driving process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wall protection pile sinking, and in particular to an auxiliary construction device and a construction method for water wall protection pile sinking. Background Art

[0002] A retaining wall pile is a concrete pile with a reinforced cage. It has different shapes such as square, round, and oval. The purpose of the retaining wall pile is to withstand the scouring of water flow, reduce the scouring force of water flow on river banks, and thus achieve stable protection of the river banks. Retaining wall piles usually require the use of a pile-driving ship to drive dozens of meters long piles into the riverbed near the river bank.

[0003] In the prior art, when the retaining wall piles are driven into the riverbed, the retaining wall piles lack a limiting structure, and the pile body of the retaining wall pile is prone to tilt during the piling process. In addition, the currently common piling boats use a T-shaped leaning method. If the piling is carried out in the canal, the piling boat will occupy the waterway, which will affect the normal use of the waterway. At the same time, the direction and position of the piling boat must be adjusted, which makes the piling time of the piling boat more time-consuming. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides an auxiliary construction device and a construction method for sinking water retaining wall piles, which solve the problems mentioned in the above background.

[0005] The present invention provides the following technical solution: an auxiliary construction device for sinking a water retaining wall pile, comprising: a mounting frame for fixing to the side wall of a pile driving ship and a limiting frame for limiting the position of the retaining wall pile, wherein the limiting frame is connected to the mounting frame;

[0006] The limiting frame includes two fixed limiting members arranged parallel to each other, a limiting channel is formed between the two fixed limiting members, a first C-shaped frame and a second C-shaped frame are respectively arranged between the two fixed limiting members, the first C-shaped frame and the second C-shaped frame are arranged parallel to each other, the openings of the first C-shaped frame and the second C-shaped frame are both vertically downward, the openings of the first C-shaped frame and the second C-shaped frame are connected to the limiting channel, and a tightening member is arranged between the two fixed limiting members, and the tightening member is located at one end of the fixed limiting member away from the first C-shaped frame.

[0007] Preferably, the mounting frame includes a horizontally arranged horizontal plate and a vertical plate, the vertical plate is connected to the surface of the horizontal plate, and the vertical plate is perpendicular to the horizontal plate, and the surface of the vertical plate away from the horizontal plate is connected to a plurality of connecting rods, and one end of each of the plurality of connecting rods is connected to the surface of one of the fixed limit members.

[0008] Preferably, both of the two fixed limiting members are provided with installation cavities, and inner walls of the two installation cavities are provided with support plates, and the two support plates are respectively connected to two ends of the second C-shaped frame.

[0009] Preferably, the inner walls of the installation cavity are respectively installed with a reinforcing plate and a driving telescopic rod, the driving telescopic rod is installed on the surface of the reinforcing plate, the telescopic end of the driving telescopic rod is connected with a connecting plate, the connecting plate is slidably connected to the inner wall of the installation cavity, a guide groove is provided on the telescopic end of the driving telescopic rod, and the inner wall of the guide groove is connected with a guide rod, one end of the guide rod passes through the connecting plate and is connected to one end of the tightening member.

[0010] Preferably, the clamping member includes a clamping guide roller, both ends of which are equipped with connecting frames, the connecting frame is installed at one end of the guide rod, and a tension spring is sleeved on the surface of the guide rod, one end of the tension spring is connected to the connecting plate, and the other end of the tension spring is connected to the connecting frame, and the diameter of the guide roller is greater than the thickness of the connecting frame.

[0011] Preferably, a third C-shaped frame which slides horizontally is provided on the second C-shaped frame, an adjusting screw is threadedly connected to the second C-shaped frame, and one end of the adjusting screw is rotatably connected to the inner wall of the third C-shaped frame.

[0012] A construction method for sinking water retaining piles comprises the following steps:

[0013] Step S1: installing the mounting frame to the side wall of the piling vessel in the moving direction;

[0014] Step S2: installing the first wall protection pile, passing through between the second C-shaped frame and the abutting member and then through the limiting channel, rotating the adjusting screw to push the third C-shaped frame to contact the wall protection pile, and further limiting the position of the wall protection pile;

[0015] Step S3: Install the remaining retaining wall piles. After the first retaining wall pile is installed, the third C-shaped frame is rotated away from the area where piles need to be driven by means of the adjusting screw, and then the fixed retaining wall piles are used to achieve stable guidance and limiting of the subsequent retaining wall pile installation process.

[0016] Preferably, in step S1: the mounting frame and the piling vessel are fixed by bolt locking, and the transverse plate and the vertical plate are fixed to each other by welding.

[0017] Preferably, a plurality of counterweights are placed on the transverse plate, and the gravity exerted on the counterweights is used to stabilize the transverse plate, thereby improving the stability of the transverse plate and the vertical plate, and ensuring that the position of the mounting frame and its supporting and limiting functions are more stable.

[0018] Preferably, the piling vessel moves in a compliant direction toward the piling advancement direction.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. The present invention provides a mounting frame and a limiting frame. The mounting frame is installed on a piling ship. The retaining wall pile passes through the limiting frame before piling. The retaining wall pile is limited by the limiting frame to prevent the retaining wall pile from tilting during the piling process.

[0021] 2. The present invention sets a driving telescopic rod, a connecting plate and a fastening member. The movement of the telescopic end of the driving telescopic rod drives the connecting plate to move toward the wall protection pile, and then drives the fastening member to move, so that the fastening member pushes the wall protection pile to be fixed to press against the fixed wall protection pile. Under the action of the fastening member, the distance between the wall protection piles in the program wall protection is smaller, so that the protective function of the formed wall protection is more stable.

[0022] 3. The present invention provides a guide groove and a guide rod, wherein the guide rod is connected to the connection frame and the guide rod slides in the guide groove to support and guide the connection frame.

[0023] 4. The present invention cooperates with the auxiliary construction device of the water retaining wall pile sinking, so that the pile-driving ship can adopt the lateral movement toward the progressive direction of piling. Compared with the traditional T-shaped lateral movement, the T-shaped lateral movement occupies about 40 meters of the waterway and affects the navigation of the canal. After the pile-driving ship is changed from the T-shaped lateral movement to the lateral movement, the pile-driving ship occupies about 20 meters of the waterway, so that the pile-driving ship occupies less space, and the retaining wall piles are driven while ensuring that the waterway can be navigated normally. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the structure of the present invention;

[0025] Figure 2 It is a schematic diagram of the structure of the mounting frame and the limiting frame of the present invention;

[0026] Figure 3 It is a schematic diagram of the side section structure at the installation cavity position of the present invention;

[0027] Figure 4 For the present invention Figure 3 A schematic diagram of the structure at the center A position is enlarged;

[0028] Figure 5 The present invention is a flow chart of the construction method of sinking water retaining wall piles.

[0029] In the figure: 1. mounting frame; 101. horizontal plate; 102. vertical plate; 103. connecting rod; 2. limiting frame; 201. fixed limiting member; 202. limiting channel; 203. first C-shaped frame; 204. second C-shaped frame; 3. tightening member; 301. tightening guide roller; 302. connecting frame; 303. tension spring; 4. mounting cavity; 5. support plate; 6. reinforcement plate; 7. driving telescopic rod; 8. connecting plate; 9. guide groove; 10. guide rod; 11. third C-shaped frame; 12. adjusting screw. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] See also Figure 1-5 , an auxiliary construction device for sinking a water retaining wall pile, comprising: a mounting frame 1 for fixing to the side wall of a pile driving ship and a limiting frame 2 for limiting the retaining wall pile, the limiting frame 2 being connected to the mounting frame 1;

[0032] The limiting frame 2 includes two fixed limiting members 201 arranged parallel to each other, a limiting channel 202 is formed between the two fixed limiting members 201, a first C-shaped frame 203 and a second C-shaped frame 204 are respectively arranged between the two fixed limiting members 201, the first C-shaped frame 203 and the second C-shaped frame 204 are arranged parallel to each other, the openings of the first C-shaped frame 203 and the second C-shaped frame 204 are both vertically downward, the openings of the first C-shaped frame 203 and the second C-shaped frame 204 are connected to the limiting channel 202, and a tightening member 3 is arranged between the two fixed limiting members 201, the tightening member 3 is located at one end of the fixed limiting member 201 away from the first C-shaped frame 203, and the fixed limiting member 201 and the two side walls opposite to the wall protection pile are in contact with each other. This arrangement ensures that the fixed limiting member 201 can achieve stable tightening and limiting of the wall protection pile, and achieve stable guidance and limiting of the wall protection pile installation process, so that the installation effect of the wall protection pile is better. The first and second C-shaped frames 203 and 204 are provided with a plurality of holes 206a and 207b, respectively, and the holes 206b and 207b are provided with a plurality of holes 206b and 207b, respectively.

[0033] The mounting frame 1 includes a horizontally arranged transverse plate 101 and a vertical plate 102, wherein the vertical plate 102 is connected to the surface of the transverse plate 101, and the vertical plate 102 is perpendicularly arranged to the transverse plate 101, and a plurality of connecting rods 103 are connected to the surface of the vertical plate 102 away from the transverse plate 101, and one end of each of the plurality of connecting rods 103 is connected to the surface of one of the fixed limit members 201.

[0034] The two fixed stoppers 201 are both provided with mounting cavities 4 , and the inner walls of the two mounting cavities 4 are both provided with support plates 5 , which are respectively connected to the two ends of the second C-shaped frame 204 .

[0035] The inner walls of the installation cavity 4 are respectively installed with a reinforcement plate 6 and a driving telescopic rod 7. The driving telescopic rod 7 is installed on the surface of the reinforcement plate 6. The telescopic end of the driving telescopic rod 7 is connected with a connecting plate 8. The connecting plate 8 is slidably connected to the inner wall of the installation cavity 4. A guide groove 9 is provided on the telescopic end of the driving telescopic rod 7, and the inner wall of the guide groove 9 is connected with a guide rod 10. One end of the guide rod 10 passes through the connecting plate 8 and is connected to one end of the fastening member 3.

[0036] The tightening member 3 includes a tightening guide roller 301, and connecting frames 302 are installed at both ends of the tightening guide roller 301. The connecting frame 302 is installed at one end of the guide rod 10. A tension spring 303 is sleeved on the surface of the guide rod 10. One end of the tension spring 303 is connected to the connecting plate 8, and the other end of the tension spring 303 is connected to the connecting frame 302. The diameter of the guide roller is greater than the thickness of the connecting frame 302. The movement of the telescopic end of the telescopic rod 7 drives the connecting plate 8 to move toward the wall protection pile, and then drives the connecting plate 8 to drive the tension spring 303 to move. The tension spring 303 pulls the connecting frame 302 to move, and the connecting frame 302 drives the tightening guide roller 301 to move, so that the tightening guide roller 301 pushes the wall protection pile to be fixed to be tightened with the fixed wall protection pile. Under the action of the tightening guide roller 301, the distance between the wall protection piles in the program wall protection is smaller, so that the protective function of the formed wall protection is more stable.

[0037] A third C-shaped frame 11 that slides horizontally is provided on the second C-shaped frame 204, and an adjusting screw 12 is threadedly connected to the second C-shaped frame 204, and one end of the adjusting screw 12 is rotatably connected to the inner wall of the third C-shaped frame 11. The third C-shaped member 8 can achieve stable guidance and position limiting of the wall protection pile when installing the first wall protection pile. After the first wall protection pile is installed, the third C-shaped member 8 is rotated away from the area where piling is required with the help of the adjusting screw 9, and then the stable guidance and position limiting of the subsequent wall protection pile installation process can be achieved with the help of the fixed wall protection pile.

[0038] A construction method for sinking water retaining piles comprises the following steps:

[0039] Step S1: installing the mounting frame 1 to the side wall of the piling vessel in the moving direction;

[0040] Step S2: Install the first wall protection pile. The first wall protection pile passes through the second C-shaped frame 204 and the abutting member 3 and then passes through the limiting channel 202. The adjusting screw 12 is rotated to push the third C-shaped frame 11 to contact the wall protection pile, so as to further limit the position of the wall protection pile.

[0041] Step S3: Install the remaining retaining wall piles. After the first retaining wall pile is installed, the third C-shaped frame 11 is rotated away from the area where piles need to be driven by means of the adjusting screw 12, and then the fixed retaining wall piles are used to achieve stable guidance and limiting of the subsequent retaining wall pile installation process.

[0042] In step S1: the mounting frame 1 is fixed to the piling barge by means of bolt locking, the transverse plate 101 and the vertical plate 102 are fixed to each other by means of welding, a plurality of counterweights are placed on the transverse plate 101, and the gravity exerted on the counterweights is used to stabilize the transverse plate 101, thereby improving the stability of the transverse plate 101 and the vertical plate 102, and ensuring that the position of the mounting frame 1 and its supporting and limiting functions are more stable.

[0043] The piling barge adopts the method of moving along the direction of piling.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An auxiliary construction device for sinking water retaining wall piles, characterized in that: include: A mounting frame (1) for fixing to the side wall of a pile-driving ship and a limiting frame (2) for limiting the position of the retaining wall piles, wherein the limiting frame (2) is connected to the mounting frame (1); The limiting frame (2) comprises two fixed limiting members (201) arranged in parallel with each other, a limiting channel (202) is formed between the two fixed limiting members (201), a first C-shaped frame (203) and a second C-shaped frame (204) are respectively arranged between the two fixed limiting members (201), the first C-shaped frame (203) and the second C-shaped frame (204) are arranged in parallel with each other, the openings of the first C-shaped frame (203) and the second C-shaped frame (204) are both vertically downward, the openings of the first C-shaped frame (203) and the second C-shaped frame (204) are connected to the limiting channel (202), and a pressing member (3) is arranged between the two fixed limiting members (201), and the pressing member (3) is located at one end of the fixed limiting member (201) away from the first C-shaped frame (203).

2. The auxiliary construction device for sinking water retaining wall piles according to claim 1, characterized in that: The mounting frame (1) comprises a horizontally arranged transverse plate (101) and a vertical plate (102), wherein the vertical plate (102) is connected to the surface of the transverse plate (101), and the vertical plate (102) is arranged perpendicular to the transverse plate (101), and a surface of the vertical plate (102) away from the transverse plate (101) is connected to a plurality of connecting rods (103), and one end of each of the plurality of connecting rods (103) is connected to the surface of one of the fixed stoppers (201).

3. The auxiliary construction device for sinking water retaining wall piles according to claim 1, characterized in that: The two fixed stoppers (201) are each provided with an installation cavity (4), the inner walls of the two installation cavities (4) are each provided with a support plate (5), and the two support plates (5) are respectively connected to two ends of the second C-shaped frame (204).

4. The auxiliary construction device for sinking water retaining wall piles according to claim 3 is characterized in that: The inner wall of the installation cavity (4) is respectively installed with a reinforcing plate (6) and a driving telescopic rod (7), the driving telescopic rod (7) is installed on the surface of the reinforcing plate (6), the telescopic end of the driving telescopic rod (7) is connected with a connecting plate (8), the connecting plate (8) is slidably connected to the inner wall of the installation cavity (4), the telescopic end of the driving telescopic rod (7) is provided with a guide groove (9), and the inner wall of the guide groove (9) is connected with a guide rod (10), one end of the guide rod (10) passes through the connecting plate (8) and is connected to one end of the fastening member (3).

5. The auxiliary construction device for sinking water retaining wall piles according to claim 4, characterized in that: The abutting member (3) comprises a abutting guide roller (301), connecting frames (302) are installed at both ends of the abutting guide roller (301), the connecting frame (302) is installed on one end of the guide rod (10), and a tension spring (303) is sleeved on the surface of the guide rod (10), one end of the tension spring (303) is connected to the connecting plate (8), and the other end of the tension spring (303) is connected to the connecting frame (302), and the diameter of the guide roller is greater than the thickness of the connecting frame (302).

6. The auxiliary construction device for sinking water retaining wall piles according to claim 1, characterized in that: The second C-shaped frame (204) is provided with a third C-shaped frame (11) which slides horizontally, and the second C-shaped frame (204) is threadedly connected with an adjusting screw (12), and one end of the adjusting screw (12) is rotatably connected to the inner wall of the third C-shaped frame (11).

7. A construction method for sinking water retaining piles, characterized in that: The following steps are involved: Step S1: installing the mounting frame (1) to the side wall of the piling vessel in the moving direction; Step S2: installing the first wall protection pile, the first wall protection pile passes through between the second C-shaped frame (204) and the abutting member (3) and then passes through the limiting channel (202), rotating the adjusting screw (12) to push the third C-shaped frame (11) to contact the wall protection pile, and further limiting the position of the wall protection pile; Step S3: Install the remaining retaining wall piles. After the first retaining wall pile is installed, the third C-shaped frame (11) is rotated away from the area where piles need to be driven by means of the adjusting screw (12), and then the fixed retaining wall piles are used to achieve stable guidance and position limiting for the subsequent retaining wall pile installation process.

8. The method for constructing a water wall pile sinking according to claim 7, characterized in that: In the step S1, the mounting frame (1) and the piling vessel are fixed by bolt locking, and the transverse plate (101) and the vertical plate (102) are fixed to each other by welding.

9. The method for sinking water retaining piles according to claim 8, characterized in that: A plurality of counterweights are placed on the transverse plate (101), and the gravity exerted on the counterweights is used to stably press the transverse plate (101), thereby improving the stability of the transverse plate (101) and the vertical plate (102), and ensuring that the position of the mounting frame (1) and its supporting and limiting functions are more stable.

10. A method for sinking water retaining piles according to any one of claims 7 to 9, characterized in that: The piling barge adopts the movement along the progressive direction of piling.

Citation Information

Patent Citations

  • Cofferdam-free prefabricated U-shaped sheet pile revetment construction guide frame

    CN113914297A

  • Construction method for sinking steel pipe pile on water

    CN114319352A

  • Leading truck is used in pile

    CN206829139U

  • Guide device for retaining wall pile construction

    CN210395350U

  • Water piling frame

    CN220301336U