Deep foundation pit construction device and construction method

By using a combined structure of positioning piles, guard plates and water pumping mechanisms in deep foundation pit construction, the digging and supporting and simplifying support and reinforcement are achieved, solving the problems of low construction efficiency and cumbersome disassembly in the existing technology, and improving the Construction efficiency and support stability.

CN119083451AActive Publication Date: 2024-12-06CCCC THIRD HIGHWAY ENG CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411346748.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-06
Estimated Expiration
2044-09-26

AI Technical Summary

Technical Problem

In the existing deep foundation pit construction technology, the support structure design is complex, the construction efficiency is low, and the disassembly is complicated, making it difficult to effectively support the side walls of the deep foundation pit to prevent collapse.

Method used

Using a deep foundation pit construction device including positioning piles, guard plates, installation rods, first support mechanisms and second support mechanisms, the combined structure of positioning piles and guard plates provides digging and supporting during the excavation of the foundation pit. and use a water pumping mechanism to simplify the installation and removal of support rods.

Benefits of technology

It realizes digging and supporting while the foundation pit is excavated, improves construction efficiency, simplifies the support and reinforcement process, shortens the construction cycle, and improves support stability and disassembly convenience through the use of the water pumping mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083451A_ABST
    Figure CN119083451A_ABST
Patent Text Reader

Abstract

The invention discloses a deep foundation pit construction device and method. The construction device comprises four positioning piles, four blocking and protecting plates, a mounting rod, a plurality of first supporting mechanisms and a plurality of second supporting mechanisms. According to the deep foundation pit construction device, in the foundation pit excavation process, excavation and supporting can be conducted at the same time, it is avoided that in the excavation process, soil blocks in the soil layer of the side wall of the deep foundation pit fall off, and normal construction is affected, further, the deep foundation pit in the maintenance period after excavation is completed can be supported and reinforced, collapse of the deep foundation pit is avoided, and the device is simple in structure, convenient to operate and low in cost. The construction period is greatly shortened, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building foundation pit construction, and more specifically, to a deep foundation pit construction device and a construction method. Background Art

[0002] A foundation pit excavation depth of 5 meters or more is called a deep foundation pit. During the construction of a deep foundation pit, it is usually necessary to support and block the soil layers on the side walls of the foundation pit to prevent soil blocks on the side walls from falling and affecting construction operations. After the foundation pit excavation is completed, the deep foundation pit needs to be supported and reinforced to prevent the side wall soil layers from moving toward the center during the maintenance of the deep foundation pit, causing the foundation pit structure to collapse.

[0003] The existing support structures of deep foundation pit projects usually include soil nail walls, anchor rods, retaining walls, pile row supports, underground continuous walls, etc. The selection and design of these support structures need to be analyzed and demonstrated according to specific circumstances, and the construction of the above-mentioned support structures is complicated, the construction is difficult, and the construction efficiency is low; for example, the utility model patent with application number 202121165501.7 discloses a deep foundation pit support device, which is provided by setting two protective walls on the inner wall of the deep foundation pit, the first protective wall is firmly connected to the inner wall of the deep foundation pit through multiple first anchor rods and multiple second anchor rods, and further provides a second protective wall formed by a protective net, a first connecting rib, a second connecting rib and a sprayed concrete layer, and a triangular reinforcement plate and a support rod are provided between two adjacent second protective walls to improve the support firmness. The above-mentioned patent technology has many parts and components, the construction is cumbersome, and the construction period required is long, which greatly reduces the construction efficiency. In addition, the support structure of the above-mentioned patent technology is troublesome to disassemble. Summary of the invention

[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0005] In order to achieve these purposes and other advantages according to the present invention, a deep foundation pit construction device is provided, which comprises: Four positioning piles are respectively located at the four corners of the foundation pit, each positioning pile is vertically inserted into the soil layer, the positioning piles include a positioning cylinder with a hollow structure and a positioning rod coaxially rotatably sleeved in the positioning cylinder, the bottom of each positioning cylinder is provided with a first drill bit with a conical structure with a tip facing downward, and the side of the positioning cylinder facing the center of the foundation pit is provided with an arc-shaped notch with a top penetrating along the vertical direction, and the arc formed by the projection of the notch in the vertical direction has an arc angle greater than 90°; the top of each positioning rod protrudes from the corresponding positioning cylinder, and the bottom is connected to the corresponding first drill bit in a circumferential direction through a bearing member, and the positioning rod is provided with two slots with an angle of 90°, the two slots intersect and are connected at the center of the positioning rod, and each slot penetrates the top surface of the positioning rod axially and penetrates the circumferential side surface of the positioning rod radially; the inner wall of the slot is provided with a retaining bar extending in the vertical direction; Four guard plates, one guard plate is provided for each side wall of the foundation pit, and the two sides of each guard plate are inserted into the corresponding two slots; a limit groove corresponding to the stop bar is provided on the side of each guard plate; An installation rod is vertically located in the middle of the foundation pit, and the bottom of the installation rod is inserted into the soil layer below the bottom surface of the foundation pit; A plurality of first support mechanisms are arranged at intervals in the vertical direction, each of the first support mechanisms comprises four first support rods, each positioning pile is provided with a first support rod correspondingly, one end of each first support rod is connected to the mounting rod, and the other end extends horizontally along the diagonal line of the foundation pit and is provided with an arc-shaped first support plate, each first support plate is adapted to and abuts against the circumferential side surface of the corresponding positioning rod, and the first support plate is located between two slots of the corresponding positioning rod; Multiple second support mechanisms are arranged at intervals in the vertical direction, each second support mechanism includes four second support rods, and each guard plate is correspondingly provided with a second support rod. One end of each second support rod is connected to the mounting rod, and the other end extends horizontally in a direction perpendicular to the corresponding guard plate and is provided with a second support plate, and each second support plate abuts against the corresponding guard plate.

[0006] Preferably, in the deep foundation pit construction device, a plurality of first water-permeable holes are provided on the lower circumferential side surface of the mounting rod; The construction device also includes a pumping mechanism, which includes a pumping cylinder coaxially sleeved inside the mounting rod and a pumping auger rotatably arranged inside the pumping cylinder; a second drill bit with a conical structure inserted into the soil layer below the bottom of the foundation pit is provided at the bottom of the pumping cylinder, a second water-permeable hole is provided on the lower circumferential side surface of the pumping cylinder, and a drainage outlet connected to the drainage pipe is provided at the top.

[0007] Preferably, in the deep foundation pit construction device, one end of each first support rod is located inside the mounting rod and is provided with a first push plate of an arc structure, each first push plate is connected to the inner wall of the mounting rod through a horizontally arranged first spring, and the first spring is sleeved on the outside of the corresponding first support rod; One end of each second support rod is located inside the mounting rod and is provided with a second push plate of an arc structure, each second push plate is connected to the inner wall of the mounting rod through a horizontally arranged second spring, and the second spring is sleeved on the outside of the corresponding second support rod; the four second push plates corresponding to each second support mechanism are arranged to form a hollow conical structure adapted to the tip of the second drill bit; The first spring and the second spring are configured as follows: before the water pumping mechanism is inserted into the mounting rod, the four first push plates corresponding to each first support mechanism are arranged to form a first conical structure that matches the tip of the second drill bit, and the four second push plates corresponding to each second support mechanism are arranged to form a second conical structure that matches the tip of the second drill bit. During the process of inserting the water pumping mechanism into the mounting rod, the second drill bit passes through the first conical structure and the second conical structure, and pushes the four first push plates of each first support mechanism and the four second push plates of each second support mechanism radially outward, thereby driving the corresponding first support rod and the second support rod to move horizontally radially outward. At this time, the first spring and the second spring are compressed radially.

[0008] Preferably, in the deep foundation pit construction device, the side of each guard plate is a wedge-shaped structure.

[0009] Preferably, in the deep foundation pit construction device, a detachable cap is provided on the top of the positioning tube of each positioning pile, and the bottom of the cap is detachably connected to the top of the positioning rod.

[0010] Preferably, in the deep foundation pit construction device, each first support plate is provided with a first rubber pad in contact with the circumferential side of the corresponding positioning rod, and each second support plate is provided with a second rubber pad in contact with the corresponding guard plate.

[0011] Preferably, in the deep foundation pit construction device, the outer side surface of each guard plate is provided with an inflatable air bag in contact with the inner wall of the foundation pit.

[0012] The present invention provides a construction method of the deep foundation pit construction device, which comprises: S1. Rotate the positioning rod of each positioning pile to a position where the two slots do not interfere with the notches on the corresponding positioning tubes; before excavating the deep foundation pit, level and compact the construction site, draw the top contour of the deep foundation pit on the ground of the construction site according to the design drawings, and drive the positioning piles vertically downward at the four corners of the preset excavated foundation pit; S2, excavate the first layer of earthwork, and after completion, rotate each positioning rod relative to the positioning cylinder until the two slots are respectively parallel to the two adjacent side walls of the foundation pit, and the two slots are radially located in the notch, and a guard plate is vertically arranged on each side wall of the foundation pit, and the two sides of each guard plate correspond vertically to the slots located on both sides, and insert the guard plate downward in the vertical direction, so that the two sides of the guard plate are respectively inserted into the corresponding slots, the outer side of the guard plate contacts the inner wall of the foundation pit, and the bottom contacts the bottom surface of the foundation pit; S3, repeating the operation S2 to excavate the 2nd to Nth layers of earthwork, and after each layer of earthwork excavation is completed, moving the retaining plate downward to the bottom of the foundation pit; S4, adjust the length of each first support rod to the difference between the distance between the first support plate and the mounting rod and 1 / 2 of the diagonal length of the foundation pit, which is greater than 1 cm of the radius of the pumping cylinder; adjust the length of each second support rod to the difference between the distance between the second support plate and the mounting rod and 1 / 2 of the side length of the foundation pit, which is greater than 1 cm of the radius of the pumping cylinder; S5. After the excavation of the foundation pit is completed, the installation rod is hoisted to the middle of the foundation pit and the bottom of the installation rod is inserted into the soil layer below the bottom surface of the foundation pit. Then the pumping mechanism is vertically inserted into the installation rod, and the second drill bit is inserted into the soil layer below the bottom surface of the foundation pit. The insertion of the pumping mechanism pushes the multiple first push plates and the multiple second push plates radially outward, driving the first support plate and the second support plate to move radially outward. After the pumping mechanism is installed in place, the first support plate abuts against the circumferential side surface of the corresponding positioning rod, and the second support plate abuts against the inner side surface of the corresponding guard plate; S6. Inflate the airbags on the outer side of each baffle plate; transfer the water at the bottom of the foundation pit upward by rotating the pumping auger, and discharge it to the drainage pipe through the drainage port; S7. After the maintenance of the deep foundation pit is completed, when dismantling the installation rod, the first supporting mechanism and the second supporting mechanism, the pumping cylinder is lifted vertically upwards, and under the elastic restoring force of the first spring, the first push plate and the first supporting rod are driven to move radially inward along the installation rod, and then the first supporting plate is driven to move radially inward to release the abutment between the first supporting plate and the corresponding positioning rod. Similarly, under the elastic restoring force of the second spring, the second push plate and the second supporting rod are driven to move radially inward along the installation rod, and then the second supporting plate is driven to move radially inward to release the abutment between the second supporting plate and the corresponding guard plate. The installation rod is lifted vertically upwards to complete the dismantling of the installation rod, the first supporting mechanism and the second supporting mechanism.

[0013] The present invention has at least the following beneficial effects: 1. The deep foundation pit construction device provided by the present invention can support while digging during the foundation pit excavation process, so as to avoid the soil blocks in the soil layer on the side wall of the deep foundation pit falling during the excavation process, which affects the normal construction. Furthermore, the deep foundation pit can be supported and reinforced during the maintenance period after the excavation is completed, so as to avoid the collapse of the deep foundation pit. The device of the present invention has a simple structure, is easy to construct, greatly shortens the construction period, and improves the construction efficiency; 2. The present invention sets a pumping mechanism inside the installation rod, which includes a pumping cylinder coaxially inserted into the installation rod and a pumping auger arranged inside the pumping cylinder. By rotating the auger, water is transported upward and discharged to the drainage pipe through the drainage port on the pumping cylinder, so as to discharge the water collected inside the foundation pit. At the same time, the bottom of the pumping mechanism is inserted deeper into the soil layer below the bottom surface of the deep foundation pit, which can provide support for the installation rod. Preferably, a clamping component can be set between the outer wall of the pumping cylinder and the inner wall of the installation rod, such as a clamping block on the outer wall of the pumping cylinder close to the upper side, and a groove for accommodating the clamping block is correspondingly set on the inner wall of the installation rod, so that the installation rod and the pumping cylinder support each other; 3. The present invention sets a pumping mechanism inside the installation rod, which can be used to extract and discharge the accumulated water inside the foundation pit. At the same time, under the action of the pumping mechanism, the stability of the abutment support between the first support plate and the corresponding positioning rod, and the stability of the abutment support between the second support plate and the corresponding guard plate are improved; further, the installation and removal of the support mechanism are simplified. When removal is required, by lifting the pump cylinder upwards, under the elastic recovery action of the first spring and the second spring, multiple first support rods and second support rods can be automatically reset, the first support plate and the corresponding positioning rod are released from abutment, and the second support plate and the corresponding guard plate are released from abutment, and the installation rod can be lifted upwards to complete the removal of the support and reinforcement equipment.

[0014] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of a deep foundation pit construction device described in a technical solution of the present invention; Figure 2 for Figure 1 A partial enlarged view of middle A; Figure 3 It is a structural schematic diagram of a longitudinal section of the installation rod, the first supporting mechanism and the second supporting mechanism along the center line of the foundation pit in another technical solution of the present invention; Figure 4 for Figure 3 A partial enlarged view of B in the middle; Figure 5 A schematic structural diagram of the longitudinal section of the installation rod, the first supporting mechanism, and the second supporting mechanism along the diagonal line of the foundation pit in another embodiment of the present invention; Figure 6 for Figure 5 A partial enlarged view of middle C; Figure 7 It is a structural schematic diagram of a positioning pile in another technical solution of the present invention before the positioning rod rotates relative to the positioning cylinder; Figure 8It is a schematic structural diagram of the positioning pile in another technical solution of the present invention after the positioning rod rotates relative to the positioning cylinder.

[0016] Explanation of the reference numerals: 1-foundation pit; 21-positioning cylinder; 211-notch; 22-positioning rod; 221-slot; 222-speed bar; 23-first drill bit; 24-cap; 3-guard plate; 31-limiting groove; 41-installation rod; 42-water pumping cylinder; 421-drain pipe; 43-second drill bit; 44-water pumping auger; 51-first support rod; 511-first push plate; 512-first spring; 52-first support plate; 53-first rubber pad; 61-second support rod; 611-cross bar; 612-main support rod; 613-second push plate; 614-second spring; 62-second support plate; 63-second rubber pad. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments so that those skilled in the art can implement the invention with reference to the description.

[0018] It should be understood that terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0019] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial channels unless otherwise specified.

[0020] In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. to indicate directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0021] like Figures 1 to 8 As shown, the present invention provides a deep foundation pit 1 construction device, which includes: Four positioning piles are respectively located at the four corners of the foundation pit 1. Each positioning pile is vertically inserted downward into the soil layer. The positioning pile includes a positioning tube 21 with a hollow structure and a positioning rod 22 coaxially rotatably sleeved in the positioning tube 21. The bottom of each positioning tube 21 is provided with a first drill bit 23 with a downward pointed end. The side of the positioning tube 21 facing the center of the foundation pit 1 is provided with an arc-shaped notch 211 with a top penetrating along the vertical direction. The arc formed by the vertical projection of the notch 211 is greater than 90 °; The top of each positioning rod 22 protrudes from the corresponding positioning tube 21, and the bottom is connected to the corresponding first drill bit 23 in a circumferential rotation through a bearing member. The positioning rod 22 is provided with two slots 221 with an angle of 90°, and the two slots 221 intersect and communicate at the center of the positioning rod 22. Each slot 221 axially penetrates the top surface of the positioning rod 22 (the bottom surface is not penetrated), and radially penetrates the circumferential side surface of the positioning rod 22; the inner wall of the slot 221 is provided with a stop bar 222 extending in the vertical direction; Four guard plates 3, one guard plate 3 is correspondingly arranged on each side wall of the foundation pit 1, and both sides of each guard plate 3 are inserted into the corresponding two slots 221; a limiting groove 31 corresponding to the stop bar is arranged on the side of each guard plate 3; Figure 2 As shown, on two opposite side walls of the card slot, a stop bar protruding toward the center of the card slot is provided, the stop bar extends in the vertical direction, and a corresponding limiting groove for accommodating the stop bar is provided on the side of the guard plate, so that when the side of the guard plate is inserted into the card slot, the stop bar is accommodated in the limiting groove, the connection between the guard plate and the card slot is limited, and the support stability is improved; An installation rod 41 is vertically located in the middle of the foundation pit 1, and the bottom of the installation rod 41 is inserted into the soil layer below the bottom surface of the foundation pit 1; A plurality of first support mechanisms are arranged at intervals in the vertical direction, each of which includes four first support rods 51, each positioning pile is provided with a first support rod 51, one end of each first support rod 51 is connected to the mounting rod 41, and the other end extends horizontally along the diagonal of the foundation pit 1 and is provided with an arc-shaped first support plate 52, each first support plate 52 is adapted to and abuts against the circumferential side surface of the corresponding positioning rod 22, and the first support plate 52 is located between the two slots 221 of the corresponding positioning rod 22; Multiple second support mechanisms are arranged at intervals in the vertical direction, and each second support mechanism includes four second support rods 61. A second support rod 61 is correspondingly arranged for each guard plate 3. One end of each second support rod 61 is connected to the mounting rod 41, and the other end extends horizontally in a direction perpendicular to the corresponding guard plate 3 and is provided with a second support plate 62. Each second support plate 62 abuts against the corresponding guard plate 3.

[0022] In the above scheme, the present invention provides a deep foundation pit 1 construction device, which is used to support the side wall of the foundation pit 1 during the construction of the foundation pit 1, and to support and reinforce the side wall of the foundation pit 1 after the construction of the foundation pit 1 is completed. The deep foundation pit 1 construction device includes four positioning piles respectively arranged at the four corners of the deep foundation pit 1, each positioning pile includes a positioning cylinder 21 and a positioning rod 22 that can rotate relatively around the circumference, the positioning cylinder 21 is a hollow structure, the positioning rod 22 is solid, and the bottom of the positioning cylinder 21 is provided with a first drill bit 23 inserted into the soil layer below the bottom surface of the foundation pit 1 (the bottom surface after the construction of the foundation pit 1 is completed), the first drill bit 23 is set to a conical structure with a tip facing downward, a strip notch 211 is axially provided on the circumferential side surface of the positioning cylinder 21, the notch 211 penetrates the top of the positioning cylinder 21 along the axial direction, and the arc of the notch 211 along the circumferential direction is greater than 1 / 4 circle, and the positioning rod 22 is connected to the first drill bit 23 (which can also be the circumferential side wall of the lower part of the positioning cylinder 21) through a bearing member. The top of the positioning rod 22 protrudes from the top of the positioning tube 21, and two slots 221 with an angle of 90° are provided in the positioning rod 22. Each slot 221 is a vertically arranged rectangular parallelepiped structure. The two adjacent ends of the two slots 221 radially inwardly penetrate each other, and each slot 221 radially penetrates the circumferential side surface of the positioning rod 22 outwardly (the positioning pile is pressed into the soil layer by a static press). Before the positioning pile is lowered into place, the positioning rod 22 is rotated to the two slots 221 thereon and the notch 211 of the positioning tube 21 do not interfere with each other. The notch 211 on the positioning tube 21 is located on a side close to the middle of the deep foundation pit 1, and the two slots 221 are located on a side away from the middle of the deep foundation pit 1. The slots 221 are contained in the positioning tube 21. During the lowering of the positioning pile, no soil will enter the slots 221 to maintain the penetration of the slots 221. At least one stop bar 222 extending in the vertical direction is provided on the side wall of the slot 221.A guard plate 3 is vertically arranged corresponding to each side wall of the foundation pit 1. The guard plate 3 is used to block the soil layer of the side wall of the foundation pit 1 to prevent soil blocks in the soil layer from falling to the middle of the foundation pit 1. According to the horizontal length of the side wall of the foundation pit 1, if the length is too long, the guard plate 3 can be set to a plurality of prefabricated plate bodies that are sequentially spliced ​​with each other along the length direction of the side wall to form an integral guard plate 3 (that is, a guard plate 3 is arranged between any two adjacent positioning piles). Both sides of each guard plate 3 along the horizontal direction can be clamped in the corresponding grooves 221 on the two positioning rods 22. After the positioning piles are put into place, the positioning rod 22 is rotated relative to the positioning tube 21 to rotate the two grooves 221 on the positioning rod 22 to the notch 2 11 is located on the side, and the two slots 221 are parallel to the two side walls of the deep foundation pit 1 in the radial direction, and the two slots 221 correspond to a right angle of the deep foundation pit 1. The guard plate 3 can be inserted into the slots 221 on both sides from top to bottom. The side of the guard plate 3 is provided with a limiting groove 31 corresponding to the stop bar 222. When inserted into the slot 221, the stop bar 222 corresponds to the limiting groove 31 in the vertical direction, and the stop bar 222 is just accommodated in the limiting groove 31. The guard plate 3 is inserted into the slot 221, and under the cooperation of the stop bar 222 and the limit groove 31, the four guard plates 3 and the four positioning piles are firmly connected together and surrounded to form a closed square frame structure. A mounting rod 41 and a plurality of first supporting mechanisms and a plurality of second supporting mechanisms for supporting and reinforcing the deep foundation pit 1 are further provided. The mounting rod 41 is vertically arranged in the middle of the foundation pit 1, and the mounting rod 41 is downwardly inserted into the soil layer below the bottom surface of the foundation pit 1. The plurality of first supporting mechanisms and the plurality of second supporting mechanisms are arranged at intervals in the vertical direction, and the plurality of first supporting mechanisms and the plurality of second supporting mechanisms can be staggered in the vertical direction. Each first supporting mechanism includes four first supporting rods 51, and the four first supporting rods 51 are respectively arranged in one-to-one correspondence with the four positioning rods 22. One end of each first supporting rod 51 is connected to the mounting rod 41, and the other end extends horizontally along the radial direction of the mounting rod 41 toward the direction close to the corresponding positioning rod 22. The extension direction of the first supporting rod 51 is also exactly the deep foundation pit 1. In the direction of the diagonal line, the other end of the first support rod 51 is provided with a first support plate 52 of an arc structure, which can abut against the corresponding positioning rod 22, and the abutting part is located between the two slots 221; the four first support rods 51 provide a stable horizontal supporting force for the four positioning piles; each second supporting mechanism includes four second support rods 61, which are arranged one by one with four guard plates 3, one end of each second support rod 61 is connected to the mounting rod 41, and the other end extends horizontally in a direction perpendicular to the corresponding guard plate 3, and the other end of the second support rod 61 is provided with a second support plate 62, which abuts against the corresponding guard plate 3 to provide a stable horizontal supporting force for the guard plate 3; preferably, the first support rod 51 and the second support rod 61 are both telescopic rod bodies; The deep foundation pit 1 construction device provided by the present invention can support while digging during the excavation process of the foundation pit 1, so as to avoid the soil blocks in the soil layer on the side wall of the deep foundation pit 1 falling during the excavation process and affecting the normal construction. Furthermore, the deep foundation pit 1 can be supported and reinforced during the maintenance period after the excavation is completed to avoid the collapse of the deep foundation pit 1. The device of the present invention has a simple structure, is easy to construct, greatly shortens the construction period, and improves the construction efficiency.

[0023] Preferably, for a guard plate 3 with an excessively large horizontal length, a plurality of second support rods 61 parallel to each other may be provided corresponding to one guard plate 3, which are connected via a horizontally arranged cross bar 611, and the cross bar 611 is connected to the mounting rod 41 via a main support rod, and a second support plate 62 is provided correspondingly at the other end of each second support rod 61 to provide stable support for the guard plate 3.

[0024] In another technical solution, in the deep foundation pit 1 construction device, a plurality of first water-permeable holes are provided on the lower circumferential side surface of the mounting rod 41; The construction device also includes a pumping mechanism, which includes a pumping cylinder 42 coaxially sleeved inside the installation rod 41 and a pumping auger 44 rotatably arranged inside the pumping cylinder 42; the bottom of the pumping cylinder 42 is provided with a second drill bit 43 of a conical structure inserted into the soil layer below the bottom surface of the foundation pit 1 (the insertion depth of the second drill bit 43 is greater than the insertion depth of the installation rod 41), and a second water permeable hole is provided on the lower circumferential side surface of the pumping cylinder 42, and a drainage outlet connected to the drainage pipe 421 is provided on the top.

[0025] In the above technical scheme, the present invention sets a pumping mechanism inside the mounting rod 41, which includes a pumping cylinder 42 coaxially inserted into the mounting rod 41 and a pumping auger 44 arranged inside the pumping cylinder 42. By rotating the auger, water is transported upward and discharged to the drain pipe 421 through the drain port on the pumping cylinder 42, so as to discharge the collected water inside the foundation pit 1. At the same time, the bottom of the pumping mechanism is inserted deeper into the soil layer below the bottom surface of the deep foundation pit 1, which can provide support for the mounting rod 41. Preferably, a locking component can be set between the outer wall of the pumping cylinder 42 and the inner wall of the mounting rod 41, such as a card block is set on the outer wall of the pumping cylinder 42 near the top, and a groove that can accommodate the card block is correspondingly set on the inner wall of the mounting rod 41, so that the mounting rod 41 and the pumping cylinder 42 support each other.

[0026] In another technical solution, in the deep foundation pit 1 construction device, one end of each first support rod 51 is located inside the mounting rod 41 and is provided with a first push plate 511 of an arc structure, each first push plate 511 is connected to the inner wall of the mounting rod 41 through a horizontally arranged first spring 512, and the first spring 512 is sleeved on the outside of the corresponding first support rod 51; One end of each second support rod 61 is located inside the mounting rod 41 and is provided with a second push plate 613 of an arc-shaped structure. Each second push plate 613 is connected to the inner wall of the mounting rod 41 through a horizontally arranged second spring 614, and the second spring 614 is sleeved on the outside of the corresponding second support rod 61; the four second push plates 613 corresponding to each second support mechanism are arranged to form a hollow conical structure adapted to the tip of the second drill bit 43; The first spring 512 and the second spring 614 are configured as follows: before the water pumping mechanism is inserted into the mounting rod 41, the four first thrust plates 511 corresponding to each first supporting mechanism are arranged to form a first conical structure adapted to the tip of the second drill bit 43, and the four second thrust plates 613 corresponding to each second supporting mechanism are arranged to form a second conical structure adapted to the tip of the second drill bit 43. During the process of inserting the water pumping mechanism into the mounting rod 41, the second drill bit 43 passes through the first conical structure and the second conical structure, and pushes the four first thrust plates 511 of each first supporting mechanism and the four second thrust plates 613 of each second supporting mechanism radially outward, thereby driving the corresponding first supporting rod 51 and the second supporting rod 61 to move horizontally radially outward. At this time, the first spring 512 and the second spring 614 are compressed radially.

[0027] In the above technical scheme, the present invention sets the connection between one end of the first support rod 51 and one end of the second support rod 61 and the side wall of the installation rod 41 as an elastic connection, and during the insertion of the pumping mechanism, the thrust force of the second drill bit 43 can be used to synchronously push one end of the multiple first support rods 51 and one end of the multiple second support rods 61 outward in the radial direction, thereby driving the first support rod 51 and the second support rod 61 to move outward in the radial direction, driving the first support plate 52 to move horizontally in the direction close to the positioning rod 22, and driving the second support plate 62 to move in the direction close to the guard plate 3. When the pumping mechanism is inserted into place, the first support rod 51 and the second support plate 61 are in a state of being pushed outward in the radial direction. The arcuate concave surface of the support plate 52 is in sealing contact with the circumferential side surface of the corresponding positioning rod 22, and the second support plate 62 is in sealing contact with the inner side surface of the corresponding guard plate 3 (the side surface close to the foundation pit 1 is the inner side surface), at which time the first spring 512 and the second spring 614 are both in a compressed state; when disassembly is required, the pumping cylinder 42 is lifted upward, and the first support rod 51 is retracted radially inwardly under the elastic force of the first spring 512, and the first support plate 52 is released from contact with the circumferential side surface of the positioning rod 22. Similarly, the second support plate 62 is retracted radially inwardly under the elastic force of the second spring 614, and the second support plate 62 is released from contact with the guard plate 3; Before lowering the mounting rod 41, if the length of the first support rod 51 is directly adjusted to the length at which the first support plate 52 and the positioning rod 22 can abut, and the length of the second support rod 61 is directly adjusted to the length at which the second support plate 62 abuts against the outer side of the guard plate 3, a large friction force will be generated, making it difficult to lower the mounting rod 41. Therefore, in order to ensure the lowering operation of the mounting rod 41, a certain distance should be reserved between the first support plate 52 and the corresponding positioning rod 22 to avoid the friction generated by the contact between the first support plate 52 and the corresponding positioning rod 22. After being put in place, by vertically inserting the pumping mechanism into the installation rod 41, the second drill bit 43 passes through the first cone structure formed by the plurality of first push plates 511 and the second cone structure formed by the plurality of second push plates 613, and the plurality of first push plates 511 and the plurality of second push plates 613 are pushed radially outward, thereby pushing the plurality of first support rods 51 and the plurality of second support rods 61 radially outward, thereby pushing the first support plate 52 toward the direction close to the positioning rod 22, and pushing the second support plate 62 toward the direction close to the guard plate 3. When the second drill bit 43 When the first cone structure and the second cone structure are completely passed, the first push plate 511 abuts against the outer wall of the water pumping cylinder 42, and the first spring 512 is compressed, the first support rod 51 and the first support plate 52 move radially to the limit position, the first support plate 52 abuts against the circumferential side of the positioning rod 22, the second push plate 613 abuts against the outer wall of the water pumping cylinder 42, and the second spring 614 is compressed, the second support rod 61 and the second support plate 62 move radially to the limit position, and the second support plate 62 abuts against the inner side of the baffle plate 3; in the water pumping mechanism Under the action of, the stability of the support between the first support plate 52 and the corresponding positioning rod 22 is improved, and the stability of the support between the second support plate 62 and the corresponding guard plate 3 is improved; when dismantling is needed, by lifting the pump 42 upwards, under the elastic recovery action of the first spring 512 and the second spring 614, multiple first support rods 51 and second support rods 61 can be automatically reset, the first support plate 52 and the corresponding positioning rod 22 are released from abutment, the second support plate 62 and the corresponding guard plate 3 are released from abutment, the installation rod 41 can be lifted upwards to complete the dismantling of the support and reinforcement equipment.

[0028] In another technical solution, in the deep foundation pit 1 construction device, the side of each guard plate 3 is a wedge-shaped structure. The side of the guard plate 3 is set as a wedge-shaped structure, so that the adjacent sides of two adjacent guard plates 3 are better fitted and contacted at the position where the two slots 221 are connected.

[0029] In another technical solution, in the deep foundation pit 1 construction device, a detachable cap 24 is provided on the top of the positioning cylinder 21 of each positioning pile, and its bottom is detachably connected to the top of the positioning rod 22. A detachable cap 24 is provided on the top of the positioning cylinder 21. Before the positioning pile is lowered into place, the cap 24 can be covered on the top of the positioning cylinder 21, and the top of the cap 24 can be connected to the top of the positioning rod 22, thereby temporarily fixing the positioning cylinder 21 and the positioning rod 22 to prevent the positioning rod 22 from rotating relative to the positioning cylinder 21 during the lowering of the positioning pile. The detachable connection between the cap 24 and the positioning cylinder 21 and the positioning rod 22 can be achieved by referring to the structural method of the buckle in the prior art.

[0030] In another technical solution, in the deep foundation pit 1 construction device, each first support plate 52 is provided with a first rubber pad 53 in contact with the circumferential side of the corresponding positioning rod 22, and each second support plate 62 is provided with a second rubber pad 63 in contact with the corresponding guard plate 3. Elastic rubber pads are provided on the first support plate 52 and the second support plate 62, so that there is a certain degree of extrusion elasticity between the first support plate 52 and the positioning rod 22, and between the second support plate 62 and the guard plate 3, so that the abutment is more firm, and at the same time, the first support plate 52 and the positioning rod 22, and the second support plate 62 and the guard plate 3 are prevented from directly and rigidly contacting, thereby preventing friction damage.

[0031] In another technical solution, in the deep foundation pit 1 construction device, the outer side of each guard plate 3 is provided with an inflatable airbag in contact with the inner wall of the foundation pit 1. The inflatable airbag can be used to fill the space between the guard plate 3 and the inner wall of the foundation pit 1 to ensure the stability of the guard plate 3 support.

[0032] The present invention also provides a construction method of the deep foundation pit 1 construction device, which comprises: S1. Rotate the positioning rod 22 of each positioning pile to a position where the two slots 221 do not interfere with the notch 211 on the corresponding positioning tube 21, and cover the top of the positioning tube 21 with the cap 24, so that the bottom of the cap 24 is connected to the top of the positioning rod 22, and then temporarily fix the positioning tube 21 and the positioning rod 22 to prevent the positioning rod 22 from rotating relative to the positioning tube 21 during the lowering of the positioning pile; S2. Before excavating the deep foundation pit 1, the construction site is leveled and compacted. According to the design drawings, the top contour line of the deep foundation pit 1 is drawn on the ground of the construction site. Positioning piles are driven vertically downward at the four corners of the pre-excavated foundation pit 1 (static pressure pile driver performs the pile sinking operation of the positioning piles). The square size surrounded by the axes of the four positioning piles is slightly smaller than the square size of the foundation pit 1; S2. Excavate the first layer of earthwork. After completion, one side of each positioning pile close to the middle of the deep foundation pit 1 is exposed to the outside; remove the cap 24, and rotate each positioning rod 22 relative to the positioning cylinder 21 until the two slots 221 are respectively parallel to the two side walls adjacent to the foundation pit 1, and the two slots 221 are radially located in the notch 211, and a guard plate 3 is vertically arranged on each side wall of the foundation pit 1, and the two sides of each guard plate 3 correspond vertically to the slots 221 located on both sides, and the guard plate 3 is inserted downward in the vertical direction, so that the two sides of the guard plate 3 are respectively inserted into the corresponding slots 221 (at the same time, the stop bar 222 is just accommodated in the corresponding limit groove 31), and the outer side surface of the guard plate 3 contacts the inner wall of the foundation pit 1, and the bottom contacts the bottom surface of the foundation pit 1; S3, repeating operation S2 to excavate the 2nd to Nth layers of earthwork until the depth of the deep foundation pit 1 reaches a preset depth, and after each layer of earthwork excavation is completed, moving the retaining plate 3 downward to the bottom surface of the foundation pit 1; S4, adjust the length of each first support rod 51 to the distance between the first support plate 52 and the installation rod 41, and the difference between the length of the diagonal line of the 1 / 2 foundation pit 1 is greater than 1 cm than the radius of the pumping cylinder 42; adjust the length of each second support rod 61 to the distance between the second support plate 62 and the installation rod 41, and the difference between the length of the side of the 1 / 2 foundation pit 1 is greater than 1 cm than the radius of the pumping cylinder 42; S5. After the excavation of the foundation pit 1 is completed, the installation rod 41 is hoisted to the middle of the foundation pit 1 and the bottom of the installation rod 41 is inserted into the soil layer below the bottom surface of the foundation pit 1. Then, the pumping mechanism is vertically inserted into the installation rod 41, and the second drill bit 43 is inserted into the soil layer below the bottom surface of the foundation pit 1. The insertion of the pumping mechanism pushes the multiple first push plates 511 and the multiple second push plates 613 radially outward, driving the first support plate 52 and the second support plate 62 to move radially outward. After the pumping mechanism is installed in place, the first support plate 52 abuts against the circumferential side surface of the corresponding positioning rod 22, and the second support plate 62 abuts against the inner side surface of the corresponding guard plate 3. S6, inflate the airbag on the outer side of each baffle plate 3 to fill the gap between the baffle plate 3 and the inner wall of the foundation pit 1; by rotating the pumping auger 44, the water at the bottom of the foundation pit 1 is transported upward and discharged to the drainage pipe 421 through the drainage port; S7. After the maintenance of the deep foundation pit 1 is completed, when dismantling the installation rod 41, the first supporting mechanism and the second supporting mechanism, the pumping cylinder 42 is lifted vertically upwards, and under the elastic recovery force of the first spring 512, the first push plate 511 and the first supporting rod 51 are driven to move radially inward along the installation rod 41, and then the first supporting plate 52 is driven to move radially inward, and the abutment between the first supporting plate 52 and the corresponding positioning rod 22 is released. Similarly, under the elastic recovery force of the second spring 614, the second push plate 613 and the second supporting rod 61 are driven to move radially inward along the installation rod 41, and then the second supporting plate 62 is driven to move radially inward, and the abutment between the second supporting plate 62 and the corresponding guard plate 3 is released. The installation rod 41 is lifted vertically upwards, and the dismantling of the installation rod 41, the first supporting mechanism and the second supporting mechanism can be completed.

[0033] The construction method of the deep foundation pit 1 construction device provided by the present invention can realize excavation and support at the same time, and can further support and reinforce the foundation pit 1 after the construction is completed, so as to improve the stability of the foundation pit 1 during the maintenance period. At the same time, the construction method provided by the present invention has high construction efficiency and short construction period.

[0034] The number of devices and processing scales described here are used to simplify the description of the present invention. Applications, modifications and variations of the present invention will be obvious to those skilled in the art.

[0035] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A deep foundation pit construction device, characterized in that: include: Four positioning piles are respectively located at the four corners of the foundation pit, each positioning pile is vertically inserted into the soil layer, the positioning piles include a positioning cylinder with a hollow structure and a positioning rod coaxially rotatably sleeved in the positioning cylinder, the bottom of each positioning cylinder is provided with a first drill bit with a conical structure with a tip facing downward, and the side of the positioning cylinder facing the center of the foundation pit is provided with an arc-shaped notch with a top penetrating along the vertical direction, and the arc formed by the projection of the notch in the vertical direction has an arc angle greater than 90°; the top of each positioning rod protrudes from the corresponding positioning cylinder, and the bottom is connected to the corresponding first drill bit in a circumferential direction through a bearing member, and the positioning rod is provided with two slots with an angle of 90°, the two slots intersect and are connected at the center of the positioning rod, and each slot penetrates the top surface of the positioning rod axially and penetrates the circumferential side surface of the positioning rod radially; the inner wall of the slot is provided with a retaining bar extending in the vertical direction; Four guard plates, one guard plate is provided for each side wall of the foundation pit, and the two sides of each guard plate are inserted into the corresponding two slots; a limit groove corresponding to the stop bar is provided on the side of each guard plate; An installation rod is vertically located in the middle of the foundation pit, and the bottom of the installation rod is inserted into the soil layer below the bottom surface of the foundation pit; A plurality of first support mechanisms are arranged at intervals in the vertical direction, each of the first support mechanisms comprises four first support rods, each positioning pile is provided with a first support rod correspondingly, one end of each first support rod is connected to the mounting rod, and the other end extends horizontally along the diagonal line of the foundation pit and is provided with an arc-shaped first support plate, each first support plate is adapted to and abuts against the circumferential side surface of the corresponding positioning rod, and the first support plate is located between two slots of the corresponding positioning rod; Multiple second support mechanisms are arranged at intervals in the vertical direction, each second support mechanism includes four second support rods, and each guard plate is correspondingly provided with a second support rod. One end of each second support rod is connected to the mounting rod, and the other end extends horizontally in a direction perpendicular to the corresponding guard plate and is provided with a second support plate, and each second support plate abuts against the corresponding guard plate.

2. The deep foundation pit construction device according to claim 1, characterized in that: A plurality of first water-permeable holes are provided on the lower circumferential side surface of the mounting rod; The construction device also includes a pumping mechanism, which includes a pumping cylinder coaxially sleeved inside the mounting rod and a pumping auger rotatably arranged inside the pumping cylinder; a second drill bit with a conical structure inserted into the soil layer below the bottom of the foundation pit is provided at the bottom of the pumping cylinder, a second water-permeable hole is provided on the lower circumferential side surface of the pumping cylinder, and a drainage outlet connected to the drainage pipe is provided at the top.

3. The deep foundation pit construction device according to claim 2, characterized in that: One end of each first support rod is located inside the mounting rod and is provided with a first push plate of an arc structure, each first push plate is connected to the inner wall of the mounting rod through a horizontally arranged first spring, and the first spring is sleeved on the outside of the corresponding first support rod; One end of each second support rod is located inside the mounting rod and is provided with a second push plate of an arc structure, each second push plate is connected to the inner wall of the mounting rod through a horizontally arranged second spring, and the second spring is sleeved on the outside of the corresponding second support rod; the four second push plates corresponding to each second support mechanism are arranged to form a hollow conical structure adapted to the tip of the second drill bit; The first spring and the second spring are configured as follows: before the water pumping mechanism is inserted into the mounting rod, the four first push plates corresponding to each first support mechanism are arranged to form a first conical structure that matches the tip of the second drill bit, and the four second push plates corresponding to each second support mechanism are arranged to form a second conical structure that matches the tip of the second drill bit. During the process of inserting the water pumping mechanism into the mounting rod, the second drill bit passes through the first conical structure and the second conical structure, and pushes the four first push plates of each first support mechanism and the four second push plates of each second support mechanism radially outward, thereby driving the corresponding first support rod and the second support rod to move horizontally radially outward. At this time, the first spring and the second spring are compressed radially.

4. The deep foundation pit construction device according to claim 3, characterized in that: The side edge of each guard plate is a wedge-shaped structure.

5. The deep foundation pit construction device according to claim 4, characterized in that: A detachable cap is provided on the top of the positioning tube of each positioning pile, and the bottom of the cap is detachably connected to the top of the positioning rod.

6. The deep foundation pit construction device according to claim 5, characterized in that: A first rubber pad in contact with the circumferential side of the corresponding positioning rod is disposed on each first supporting plate, and a second rubber pad in contact with the corresponding guard plate is disposed on each second supporting plate.

7. The deep foundation pit construction device according to claim 6, characterized in that: The outer side surface of each guard plate is provided with an inflatable air bag which contacts the inner wall of the foundation pit.

8. The construction method of the deep foundation pit construction device according to claim 7, characterized in that: include: S1. Rotate the positioning rod of each positioning pile to a position where the two slots do not interfere with the notches on the corresponding positioning tubes; Before excavating the deep foundation pit, the construction site is leveled and compacted. According to the design drawings, the top contour of the deep foundation pit is drawn on the ground of the construction site, and positioning piles are driven vertically downward at the four corners of the pre-excavated foundation pit; S2, excavate the first layer of earthwork, and after completion, rotate each positioning rod relative to the positioning cylinder until the two slots are respectively parallel to the two adjacent side walls of the foundation pit, and the two slots are radially located in the notch, and a guard plate is vertically arranged on each side wall of the foundation pit, and the two sides of each guard plate correspond vertically to the slots located on both sides, and insert the guard plate downward in the vertical direction, so that the two sides of the guard plate are respectively inserted into the corresponding slots, the outer side of the guard plate contacts the inner wall of the foundation pit, and the bottom contacts the bottom surface of the foundation pit; S3, repeating the operation S2 to excavate the 2nd to Nth layers of earthwork, and after each layer of earthwork excavation is completed, moving the retaining plate downward to the bottom of the foundation pit; S4, adjust the length of each first support rod to the difference between the distance between the first support plate and the mounting rod and 1 / 2 of the diagonal length of the foundation pit, which is greater than 1 cm of the radius of the pumping cylinder; adjust the length of each second support rod to the difference between the distance between the second support plate and the mounting rod and 1 / 2 of the side length of the foundation pit, which is greater than 1 cm of the radius of the pumping cylinder; S5. After the excavation of the foundation pit is completed, the installation rod is hoisted to the middle of the foundation pit and the bottom of the installation rod is inserted into the soil layer below the bottom surface of the foundation pit. Then the pumping mechanism is vertically inserted into the installation rod, and the second drill bit is inserted into the soil layer below the bottom surface of the foundation pit. The insertion of the pumping mechanism pushes the multiple first push plates and the multiple second push plates radially outward, driving the first support plate and the second support plate to move radially outward. After the pumping mechanism is installed in place, the first support plate abuts against the circumferential side surface of the corresponding positioning rod, and the second support plate abuts against the inner side surface of the corresponding guard plate; S6. Inflate the airbags on the outer side of each baffle plate; transfer the water at the bottom of the foundation pit upward by rotating the pumping auger, and discharge it to the drainage pipe through the drainage port; S7. After the maintenance of the deep foundation pit is completed, when dismantling the installation rod, the first supporting mechanism and the second supporting mechanism, the pumping cylinder is lifted vertically upwards, and under the elastic restoring force of the first spring, the first push plate and the first supporting rod are driven to move radially inward along the installation rod, and then the first supporting plate is driven to move radially inward to release the abutment between the first supporting plate and the corresponding positioning rod. Similarly, under the elastic restoring force of the second spring, the second push plate and the second supporting rod are driven to move radially inward along the installation rod, and then the second supporting plate is driven to move radially inward to release the abutment between the second supporting plate and the corresponding guard plate. The installation rod is lifted vertically upwards to complete the dismantling of the installation rod, the first supporting mechanism and the second supporting mechanism.

Citation Information

Patent Citations

  • Deep foundation pit supporting device

    CN214940212U

  • Deep well protective wall steel structure support and construction method thereof

    CN109113071A

  • Backfill type foundation pit supporting structure

    CN114809016A

  • Composite foundation pit supporting structure

    CN116657612A

  • Supporting structure in foundation pit

    CN214301772U