Plant heightening tool and plant heightening device
The factory height adjustment tooling adjusts the position of the bearing column directly increases the support column, which solves the problem of insufficient height in the factory, simplifies the height increase process, reduces costs and safety risks, and improves operational convenience and efficiency.
Patent Information
- Application Number
- CN202411219031.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-12-06
AI Technical Summary
Some factories did not consider the length of crane slings, material height and lifting height in the early stages of construction, which resulted in insufficient height of the factory building and it was difficult to load and unload materials through cranes. The traditional height-enhancing method was complex, with high safety risks and high costs.
It provides a factory building height-enhancing tool, including the first and second load-bearing columns, adjustment part, connection section and support section. The position of the load-bearing column is adjusted through the adjustment part, and the height of the factory building support column is increased, so that the support column is directly increased without removing the roof structure. Keep the original device to reduce altitude operations and material damage.
It realizes flexible adjustment of the height of the factory building, simplifies the height increase process, reduces costs and safety risks, improves operational convenience and increase efficiency.
Smart Images

Figure CN119083588A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of heightening steel structure factory buildings, and in particular to a factory building heightening tool and a factory building heightening device. Background Art
[0002] With the development of production technology, some materials in the factory need to be lifted by crane to achieve flexible loading and unloading. During the lifting process, the length of the crane rope, the height of the material itself and the lifting height of the material all require the factory to have a certain height condition to meet production needs. However, since some factories did not consider this issue in the early stage of construction, the factory height is insufficient, which makes it inconvenient to load and unload materials in the factory by crane. Summary of the invention
[0003] The present disclosure aims to solve at least one of the technical problems existing in the prior art or related art.
[0004] To this end, a first aspect of the present disclosure provides a plant heightening tool;
[0005] A second aspect of the present disclosure provides a plant height increasing device.
[0006] In view of this, according to a first aspect of an embodiment of the present disclosure, a plant height increasing tool is provided, comprising:
[0007] A first bearing column having a first connecting section, wherein the axis direction of the first bearing column is a first direction;
[0008] A second bearing column, the second bearing column is arranged along the first direction, one end of the first bearing column away from the first connecting section is movably arranged on the second bearing column, and the second bearing column has a second connecting section;
[0009] An adjusting portion, the adjusting portion being used to adjust the first connecting section along a first direction to be closer to or farther from the second connecting section;
[0010] The supporting column in the factory building includes a first supporting section and a second supporting section, the first connecting section is used to be connected to the first supporting section, and the second connecting section is used to be connected to the second supporting section.
[0011] In a feasible implementation manner, along the first direction, one end of the first supporting column away from the first connecting section is slidably disposed on the second supporting column.
[0012] In a feasible implementation manner, along the first direction, the second bearing column is provided with a slideway, and one end of the first bearing column away from the first connecting section can be movably inserted into the slideway.
[0013] In a feasible implementation manner, the adjustment unit includes:
[0014] A fixing frame, disposed at one end of the second bearing column close to the first connecting section;
[0015] The connecting ear is provided with a sliding groove along the first direction on the second bearing column, the sliding groove is connected to the slideway, the connecting ear is slidably inserted into the sliding groove, and the connecting ear is connected to an end of the first bearing column away from the first connecting section;
[0016] The portable hoist comprises a fixed end and a lifting end, wherein the fixed end is arranged on a fixing frame, and the lifting end is connected to a connecting ear, and the portable hoist is used for adjusting the connecting ear to be close to or away from the fixing frame.
[0017] In a feasible implementation manner, the gap between the first bearing column and the channel wall of the slideway is 3 mm to 5 mm.
[0018] In a feasible implementation, it also includes:
[0019] A first connecting arm, one end of which is disposed on the first connecting section, and the other end of which is used to be connected to the first supporting section;
[0020] A second connecting arm, one end of which is arranged on the second connecting section, and the other end of which is used to be connected to the second supporting section.
[0021] In a feasible implementation, at least two first connecting arms are arranged at intervals along the first direction; and / or
[0022] Along the first direction, at least two second connecting arms are arranged at intervals.
[0023] According to a second aspect of an embodiment of the present disclosure, a plant height increasing device is provided, comprising:
[0024] A plurality of factory building height increasing tools as described in any one of the first aspects above, each factory building height increasing tool is used to correspond to a factory building support column.
[0025] In a feasible implementation, it also includes:
[0026] The heightening short section is arranged along the first direction between the first supporting section and the second supporting section, one end of the heightening short section is connected to the first supporting section, and the other end is connected to the second supporting section.
[0027] In a feasible implementation, it also includes:
[0028] An auxiliary part, one end of which is used to be set on a factory building support column, and the other end of which is used to be set on a heightening short section for heightening the factory building support column. The auxiliary part is used to assist in the installation of the heightening short section.
[0029] Compared with the prior art, the present disclosure includes at least the following beneficial effects: the factory building height increasing tooling provided by the embodiment of the present disclosure includes: a first bearing column, a second bearing column and an adjustment part, wherein the first bearing column has a first connecting section, the second bearing column has a second connecting section, the first bearing column is connected to the first supporting section of the factory building support column through the first connecting section, the second bearing column is connected to the second supporting section of the factory building support column through the second connecting section, the axial direction of the first bearing column is the first direction, the first bearing column and the second bearing column are both arranged along the first direction, in actual application, the first direction is the axial direction of the factory building support column, that is, the first direction is the height direction; along the first direction, the connecting section between the first bearing column and the second bearing column is located between the first connecting section and the second connecting section, and along the first direction, the first bearing column can be adjusted relative to the second bearing column by the adjustment part, that is, the adjustment part can adjust the first connecting section to be close to or away from the second adjustment part. In practical applications, the factory building support column can be divided into a first support section and a second support section according to the position where the factory building is to be raised, and the factory building heightening tooling is connected to the factory building support column. After being fixed, the first support section and the second support section in the factory building support column are disconnected, and the first connecting section is adjusted away from the second connecting section by adjusting the adjustment component, so that the first supporting section of the factory building support column can be moved away from the second supporting section, thereby increasing the height of the factory building support column.
[0030] The factory building heightening tooling and factory building heightening device described in the present disclosure, and other advantages, objectives and features of the present disclosure will be reflected in part through the following description, and in part will also be understood by technical personnel in the field through research and practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the exemplary embodiments below. The accompanying drawings are only for the purpose of illustrating exemplary embodiments and are not to be considered as limiting the present disclosure. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0032] Figure 1 A schematic structural diagram of a factory building heightening tooling provided in one embodiment of the present disclosure.
[0033] in, Figure 1 The corresponding relationship between the reference numerals and the component names is as follows:
[0034] A first supporting column 110, a second supporting column 120, and an adjusting portion 130;
[0035] Fixed frame 131, connecting ears 132, hand hoist 133;
[0036] A first connecting arm 140, a second connecting arm 150;
[0037] Heightening nipple 160, auxiliary part 170;
[0038] A first supporting section 210 and a second supporting section 220 . DETAILED DESCRIPTION
[0039] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0040] like Figure 1 As shown, according to the first aspect of the embodiment of the present disclosure, a factory building height increasing tool is proposed, including: a first supporting column 110, having a first connecting section, and the axial direction of the first supporting column 110 is the first direction; a second supporting column 120, the second supporting column 120 is arranged along the first direction, and the first supporting column 110 is movably arranged on the second supporting column 120 at one end away from the first connecting section, and the second supporting column 120 has a second connecting section; an adjusting part 130, the adjusting part 130 is used to adjust the first connecting section along the first direction to be close to or away from the second connecting section; wherein, the support column in the factory building includes a first supporting section 210 and a second supporting section 220, the first connecting section is used to be connected to the first supporting section 210, and the second connecting section is used to be connected to the second supporting section 220.
[0041] According to the implementation of the present disclosure, a factory building height increasing tool is proposed, including a first supporting column 110, a second supporting column 120 and an adjusting portion 130, wherein the first supporting column 110 has a first connecting section, and the second supporting column 120 has a second connecting section. The first supporting column 110 is connected to the first supporting section 210 of the factory building support column through the first connecting section, and the second supporting column 120 is connected to the second supporting section 220 of the factory building support column through the second connecting section. The axial direction of the first supporting column 110 is the first direction, and the first supporting column 110 and the second supporting column 120 are both arranged along the first direction. In practical applications, the first direction is the axial direction of the factory building support column, that is, the first direction is the height direction; along the first direction, the connecting section between the first supporting column 110 and the second supporting column 120 is located between the first connecting section and the second connecting section, and along the first direction, the first supporting column 110 can be adjusted relative to the second supporting column 120 by the adjusting portion 130, that is, the adjusting portion 130 can adjust the first connecting section to be close to or away from the second adjusting portion 130. In actual application, the factory support column can be divided into a first support section 210 and a second support section 220 according to the position where the factory support column is to be raised, and the factory heightening tooling is connected to the factory support column. After fixing, the first support section 210 and the second support section 220 in the factory support column are disconnected, and the first connecting section is adjusted away from the second connecting section by the adjustment part 130, so that the first supporting section 210 of the factory support column can be moved away from the second supporting section 220, thereby increasing the height of the factory support column.
[0042] It is understandable that, since there are multiple supporting columns in the factory building, a factory building heightening tool can be installed on each supporting column, and the height of multiple supporting columns can be adjusted at the same time to increase the overall height of the factory building.
[0043] It can be understood that the factory building support columns are raised by using the factory building heightening tool, and the raising position is set at a lower position to facilitate the operation of the factory building support columns.
[0044] For example, the supporting columns of the factory building can be disconnected at a height of 1 meter from the ground, which is convenient for workers to operate and can retain the supporting columns connected to the foundation at a certain height, which is beneficial to the subsequent stability of the factory building.
[0045] It can be understood that after selecting the heightened position of the factory building support column, the upper end of the factory building support column at the heightened position is the first support section 210, and the lower end of the heightened position is the second support section 220, that is, the first connecting section of the factory building heightening tooling is connected at the upper end of the heightened position, and the second connecting section of the factory building heightening tooling is connected at the lower end of the heightened position, so that when the adjustment part 130 adjusts the first connecting section away from the second connecting section, the first connecting section can drive the first supporting section 210 to move upward along the height direction to achieve height increase.
[0046] It should be noted that for factories with steel frame structures, the traditional method of increasing the height is to first remove the accessories on the original factory roof, such as wires, pipes, etc., and then remove the roof tiles and roof trusses and lift them to the ground. After only the supporting columns are left in the factory, the supporting columns are removed and replaced or the tops of the supporting columns are increased to meet the height requirements. In this process, on the one hand, the roof of the factory is relatively high, and it is not easy to operate whether it is removal and subsequent reinstallation or increasing the height of the supporting columns, and safety accidents are prone to occur. On the other hand, to remove the factory roof, it is necessary to remove these accessories first. The removal amount is huge and it is not easy to operate due to the height. On the other hand, in the process of removing these accessories, some materials will be damaged and cannot be used again. A large amount of new materials need to be added to restore their functions, resulting in a large construction cost. Compared with the traditional technology, the factory building height increasing tooling proposed in the embodiment of the present disclosure can directly increase the height of the factory building support columns without dismantling the roof structure and the roof's accessories, and can retain the original devices, pipelines, etc. on the factory building roof, thereby omitting a large amount of workload and investment costs, reducing the frequency of high-altitude operations, facilitating operation, improving safety, and significantly improving the efficiency of factory building height increase.
[0047] For example, the first bearing column 110 may be a square steel tube with a size of 250 mm×250 mm×12 mm, and the second bearing column 120 may be a square steel tube with a size of 280 mm×280 mm×10 mm. The length of the first bearing column 110 and the second bearing column 120 may be 5 meters.
[0048] In some examples, along the first direction, one end of the first supporting column 110 away from the first connecting section is slidably disposed on the second supporting column 120 .
[0049] In the above technical solution, along the first direction, one end of the first supporting column 110 away from the first connecting section can be set on the second supporting column 120 in a sliding manner. The sliding manner can make the relative movement between the first supporting column 110 and the second supporting column 120 smoother and more gradual. In practical applications, it is more conducive to stably and slowly raising the first supporting section 210 of the factory support column, which is beneficial to improving the safety of the raising process.
[0050] In some examples, such as Figure 1 As shown, along the first direction, the second supporting column 120 is provided with a slideway, and one end of the first supporting column 110 away from the first connecting section is movably inserted into the slideway.
[0051] In the above technical solution, the second supporting column 120 is provided with a slide extending along the first direction, and the end of the first supporting column 110 away from the first connecting section is inserted in the slide. On the one hand, the slide has a guiding function to ensure that the first supporting column 110 can slide along the first direction. On the other hand, the insertion method is adopted, so that the second supporting column 120 can wrap the first supporting column 110 to avoid a large tilt of the first supporting column 110, which is beneficial to relatively fix the first supporting column 110 and the second supporting column 120 at any position, which is beneficial to improve the safety of the device. On the other hand, the insertion method can also save the space occupied by the tooling.
[0052] In some examples, such as Figure 1 As shown, the adjustment unit 130 includes:
[0053] The fixing frame 131 is disposed at one end of the second supporting column 120 close to the first connecting section;
[0054] The ear 132 is provided with a slide groove along the first direction on the second supporting column 120, the slide groove is connected to the slideway, the ear 132 is slidably inserted into the slide groove, and the ear 132 is connected to an end of the first supporting column 110 away from the first connecting section;
[0055] The hand hoist 133 has a fixed end and a lifting end. The fixed end is arranged on the fixing frame 131 , and the lifting end is connected to the connecting ear 132 . The hand hoist 133 is used to adjust the connecting ear 132 to be close to or away from the fixing frame 131 .
[0056] In the above technical solution, the adjustment part 130 includes a fixing frame 131, an ear 132 and a hand hoist 133, wherein the fixing end of the hand hoist 133 is arranged on the fixing frame 131, and the lifting end is connected to the ear 132; the fixing frame 131 is arranged on the second bearing column 120, and is located at one end of the second bearing column 120 close to the first connecting section; at the same time, the second bearing column 120 is also provided with a slide groove connected to the slideway along the first direction; the ear 132 is arranged at one end of the first bearing column 110 away from the first connecting section; since the first bearing column 110 is inserted in the slideway, the ear 132 is slidably inserted into the slide groove; in actual application, the height direction of the support column is from From top to bottom, they are: the first connecting section, the fixed frame 131, the ear 132 and the second connecting section. At this time, by adjusting the height of the lifting end through the hand winch 133, the ear 132 can be adjusted to be close to or away from the fixed frame 131, so that the first bearing column 110 can be adjusted to move along the first direction through the ear 132. When it is necessary to raise the first supporting section 210, the ear 132 can be slowly lifted by the hand winch, so that the first bearing column 110 drives the first supporting section 210 to rise through the first connecting section. When it is necessary to lower the first supporting section 210, the hand winch can be slowly released, and under the action of gravity, the first bearing column 110 and the first supporting section 210 slowly descend.
[0057] It is understandable that hand chain hoists are usually equipped with overload protection devices and have self-locking functions, which can ensure stability and reliability during normal use, and are economical and easy to operate.
[0058] Exemplarily, the fixing frame 131 and the second supporting column 120 are connected by welding, and the connecting ear 132 and the first supporting column 110 are connected by welding.
[0059] For example, the outer dimensions of the lifting lug may be 200 mm×200 mm×40 mm.
[0060] In some examples, the gap between the first supporting column 110 and the channel wall of the slideway is 3 mm to 5 mm.
[0061] In the above technical solution, there is a certain gap between the first supporting column 110 and the channel wall of the slide, and the gap is 3mm to 5mm. On the one hand, the gap can facilitate the first supporting column 110 to slide relative to the channel wall of the slide, and on the other hand, it can also ensure the connection stability between the first supporting column 110 and the second supporting column 120, ensure the safety of the tooling, and avoid safety hazards caused by excessive tilt of the second supporting column 120.
[0062] It is understandable that since there are multiple factory support columns, all of the support columns need to be lifted at the same time when raising the height of the factory support columns, and there is a certain gap between the first supporting column 110 and the second supporting column 120, which allows a slight adjustment angle to exist between the first supporting column 110 and the second supporting column 120, thereby improving the adaptability of the operation process. Even if there are some differences in the progress of lifting multiple factory support columns, the height increase can be completed smoothly.
[0063] It is understandable that grease is applied to the outer surface of the first supporting column 110 to ensure that the first supporting column 110 can slide smoothly in the slideway after being inserted into the slideway.
[0064] In some examples, such as Figure 1 As shown, it also includes: a first connecting arm 140, one end of which is arranged at the first connecting section, and the other end is used to connect to the first supporting section 210; a second connecting arm 150, one end of which is arranged at the second connecting section, and the other end is used to connect to the second supporting section 220.
[0065] In the above technical solution, the factory building height increasing tool also includes a first connecting arm 140 and a second connecting arm 150, wherein the first connecting arm 140 is used to connect the first connecting section and the first supporting section 210, and the second connecting arm 150 is used to connect to the second connecting section and the second supporting section 220. The first connecting arm 140 and the second connecting arm 150 can improve the connection stability between the first bearing column 110, the second bearing column 120 and the factory building support column.
[0066] It can be understood that the first connecting arm 140 and / or the second connecting arm 150 can be directly connected to the factory support column, can be connected to both sides of the factory support column, or can be adapted to the shape of the factory support column and be connected to the factory support column in a surrounding manner.
[0067] Exemplarily, the first connecting arm 140 and / or the second connecting arm 150 are connected to the supporting column of the factory building by welding.
[0068] In some examples, such as Figure 1 As shown,
[0069] At least two first connecting arms 140 are arranged at intervals along the first direction; and / or
[0070] Along the first direction, at least two second connecting arms 150 are arranged at intervals.
[0071] In the above technical solution, the spaced arrangement of at least two first connecting arms 140 along the first direction can ensure that the first supporting column 110 can stably transmit the force along the first direction to the first supporting section 210, which is beneficial to improving the stability and reliability during the height increase process.
[0072] In the above technical solution, the spaced arrangement of at least two second connecting arms 150 along the first direction can ensure that the second supporting column 120 can stably transfer the force along the first direction to the second supporting section 220, which is beneficial to improving the stability and reliability during the height increase process.
[0073] In the above technical solution, at least two first connecting arms 140 and at least two second connecting arms 150 may be arranged at intervals along the first direction, and the technical effects thereof will not be described in detail here.
[0074] For example, when the factory building support column is raised to a height of 1 meter from the ground, a second connecting arm 150 can be welded to the factory building support column close to the ground, and then another second connecting arm 150 can be welded to the factory building support column at a height of 700 mm from the ground.
[0075] According to a second aspect of an embodiment of the present disclosure, a factory building height-raising device is proposed, comprising: a plurality of factory building height-raising tools as proposed in any one of the first aspects above, each factory building height-raising tool being used to correspond to a factory building support column.
[0076] Since the factory building height increasing device provided in the embodiment of the present disclosure includes the factory building height increasing tooling as proposed in any one of the first aspects above, it has all the beneficial effects of the factory building height increasing tooling, which will not be elaborated here.
[0077] It can be understood that the factory building height raising device can also include a lifting assembly, and the lifting point of the lifting assembly is used to connect to the factory building roof. When the factory building support column is raised by the factory building height raising tooling, the lifting assembly can be connected to tighten the roof, and the lifting device can further provide safety protection.
[0078] In some examples, such as Figure 1 As shown, it also includes: a heightened short section 160, which is used to be arranged between the first support section 210 and the second support section 220 along the first direction, and one end of the heightened short section 160 is used to connect to the first support section 210, and the other end is used to connect to the second support section 220.
[0079] In the above technical solution, the factory building heightening device also includes a heightening short section 160, which is used to heighten the factory building support column. In actual application, the first support section 210 and the second support section 220 of the factory building support column are separated by a certain distance through the factory building heightening tooling to ensure that the heightening short section 160 can be set between the first support section 210 and the second support section 220 along the first direction, and then approach the first support section 210 and the second support section 220, so that the first support section 210 and the second support section 220 clamp the heightening short section 160. At this time, the heightening short section 160 can support the first support section 210 and reduce the pressure of the factory building heightening tooling.
[0080] It can be understood that the heightening short section 160 and the factory building support column can be welded. After the heightening short section 160 is installed and fixed, the heightening short section 160 plus the original factory building support column form a new factory building support column. At this time, the factory building heightening tooling can be removed, and the factory building can be supported only by the new factory building support column.
[0081] For example, the heightening short section 160 may be made of the same material and have the same circumferential dimensions as the factory building support column.
[0082] It is understandable that the heightened short section 160 can be selected according to the heightened length.
[0083] For example, a height increasing short section 160 having a length of 1 meter is used. After the height increasing short section 160 is fixed, the height of the factory building can be increased by 1 meter.
[0084] In some examples, such as Figure 1 As shown, it also includes:
[0085] The auxiliary component 170 has one end for being arranged on the supporting column of the plant, and the other end for being arranged on the heightening short section 160 for heightening the supporting column of the plant. The auxiliary component 170 is used for assisting the installation of the heightening short section 160 .
[0086] In the above technical solution, the factory building heightening device also includes an auxiliary component 170, one end of the auxiliary component 170 is arranged on the factory building support column, and the other end is arranged on the heightening short section 160. During the installation process of the heightening short section 160, the auxiliary component 170 can assist the installation of the heightening short section 160 to avoid excessive shaking of the heightening short section 160.
[0087] For example, the auxiliary component 170 may be a flexible component such as a rope or a steel cable, which can provide a certain pulling force for the heightening short section 160 on the one hand, and ensure that the heightening short section 160 has a certain degree of adjustment flexibility on the other hand.
[0088] In the present disclosure, the terms "first", "second", and "third" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise expressly defined. The terms "installed", "connected", "connected", "fixed", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present disclosure can be understood according to the specific circumstances.
[0089] In the description of the present disclosure, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "left", "right", "front", "back", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, should not be understood as a limitation on the present disclosure.
[0090] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0091] The above are only preferred embodiments of the present disclosure and are not intended to limit the present disclosure. For those skilled in the art, the present disclosure may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.
Claims
1. A plant heightening tool, characterized in that: include: A first bearing column having a first connecting section, wherein the axis direction of the first bearing column is a first direction; A second bearing column, the second bearing column is arranged along the first direction, one end of the first bearing column away from the first connecting section is movably disposed on the second bearing column, and the second bearing column has a second connecting section; an adjusting portion, the adjusting portion being used to adjust the first connecting section along the first direction to be closer to or farther from the second connecting section; Wherein, the support column in the factory building includes a first support section and a second support section, the first connecting section is used to be connected to the first support section, and the second connecting section is used to be connected to the second support section.
2. The plant height increasing tooling according to claim 1 is characterized in that: Along the first direction, one end of the first supporting column away from the first connecting section is slidably disposed on the second supporting column.
3. The factory building height increasing tooling according to claim 2 is characterized in that: Along the first direction, the second bearing column is provided with a slideway, and one end of the first bearing column away from the first connecting section can be movably inserted into the slideway.
4. The plant height increasing tooling according to claim 3 is characterized in that: The adjustment unit comprises: A fixing frame, disposed at one end of the second bearing column close to the first connecting section; A connecting ear, along the first direction, the second bearing column is provided with a sliding groove, the sliding groove is connected to the slideway, the connecting ear is slidably inserted into the sliding groove, and the connecting ear is connected to an end of the first bearing column away from the first connecting section; The hand-held hoist comprises a fixed end and a lifting end, wherein the fixed end is arranged on the fixing frame, and the lifting end is connected to the connecting ear. The hand-held hoist is used to adjust the connecting ear to be close to or away from the fixing frame.
5. The factory building height increasing tooling according to claim 3 is characterized in that: The gap between the first bearing column and the channel wall of the slideway is 3 mm to 5 mm.
6. The plant height increasing tooling according to any one of claims 1 to 5, characterized in that: Also includes: A first connecting arm, one end of which is disposed on the first connecting section, and the other end of which is used to be connected to the first supporting section; A second connecting arm, one end of the second connecting arm is arranged on the second connecting section, and the other end is used to be connected to the second supporting section.
7. The factory building height increasing tooling according to claim 6, characterized in that: At least two of the first connecting arms are arranged at intervals along the first direction; and / or At least two of the second connecting arms are arranged at intervals along the first direction.
8. A plant heightening device, characterized in that: include: A plurality of factory building height increasing tools as described in any one of claims 1 to 7, each of the factory building height increasing tools is used to correspond to a factory building support column.
9. The plant height-raising device according to claim 8, characterized in that: Also includes: The heightening short section is used to be arranged between the first supporting section and the second supporting section along the first direction, one end of the heightening short section is used to be connected to the first supporting section, and the other end is used to be connected to the second supporting section.
10. The plant height-raising device according to claim 9, characterized in that: Also includes: An auxiliary part, one end of which is used to be set on the plant support column, and the other end is used to be set on the heightening short section, and the auxiliary part is used to assist in the installation of the heightening short section.
