Construction method of post-cast strip late disassembly type independent supporting scaffold
By building detachable independent support scaffolding and support formwork in the construction of the post-pouring belt, the problem of long-term material occupation in traditional methods is solved, the effective utilization of materials and the improvement of construction efficiency is achieved, and an efficient and economical construction is provided. plan.
Patent Information
- Application Number
- CN202411312467.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of post-pouring tape, traditional methods lead to long-term occupation of materials such as formwork, steel pipes and fasteners, which cannot be effectively utilized, which increases construction costs and reduces efficiency, resulting in waste of resources.
The construction method of the late-demolten independent support scaffolding of the rear pouring belt is adopted. By building the first and second steel pipe scaffolding that can be detachable and the support formwork is installed on it, an independent support system is formed, allowing the construction of the rear pouring belt without affecting the situation of the rear pouring belt construction. The roof support system is removed separately to achieve material turnover and use.
Effectively utilize construction materials, reduce construction costs, avoid material waste, improve construction efficiency, and provide an efficient and economical solution for construction.
Smart Images

Figure CN119083704A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a construction method of a post-cast strip late-dismantling type independent support scaffold. Background Art
[0002] Post-cast strips are a special construction measure. They are temporary strip-shaped joints deliberately left in cast-in-place integral reinforced concrete structures. Post-cast strips play an important role. First, they can effectively release temperature stress. After pouring, concrete will undergo temperature changes due to factors such as hydration heat, resulting in volume expansion or contraction. If the stress is not released, cracks are likely to occur. Post-cast strips provide expansion and contraction space for concrete during temperature changes, which can greatly reduce the occurrence of temperature cracks. For example, in large-volume concrete structures such as foundation slabs, post-cast strips allow concrete to "stretch" when the temperature changes. Secondly, shrinkage cracks can be reduced. Concrete will gradually shrink during the hardening process, and the stress generated may cause cracks. Post-cast strips allow concrete to have a certain amount of deformation space during early shrinkage. After most of the shrinkage is completed, pouring can significantly reduce the probability of shrinkage cracks. Finally, it can avoid uneven settlement. When the building foundation forms are different, the load differences are large, or the geological conditions are complex, uneven settlement may occur. Post-cast strips can coordinate the settlement differences to a certain extent to prevent the structure from being damaged due to excessive and uneven settlement. For example, a post-cast joint is set between the high-rise building and the podium, so that the settlement of the two can be relatively independent and coordinated, ensuring the overall stability of the building.
[0003] When pouring the top plate of an underground structure, it is usually necessary to build a scaffolding, and lay a support system consisting of formwork and wooden planks on the scaffolding. This support system is used to support the top plate on the one hand, and to block the post-casting strip reserved on the top plate on the other hand. Then the concrete top plate and post-casting strip are poured and maintained in turn, and finally the scaffolding and support system are removed. However, in the above construction process, the formwork and scaffolding on both sides of the post-casting strip cannot be removed before the post-casting strip meets the standards. This results in the long-term occupation of turnover materials such as formwork, steel pipes and fasteners, which cannot be effectively utilized. This situation increases construction costs, because these turnover materials cannot be put into use in other projects during the period of occupation, which not only causes a waste of resources, but also increases the capital investment of the project and reduces construction efficiency. Summary of the invention
[0004] The purpose of the present invention is to provide a construction method of a post-cast strip late-dismantling independent support scaffolding, aiming to solve the technical problems in the above-mentioned background technology.
[0005] The technical solution of the present invention is achieved in this way: The technical solution of the present application provides a construction method of a post-cast strip late-dismantling independent support scaffolding, comprising the following steps: S1. Determine the location of the post-casting strip of the top slab of the structure according to the design drawings; S2, constructing an independently supported first steel tube scaffold below the position of the post-casting strip, extending and erecting second steel tube scaffolds on both sides of the first steel tube scaffold, and establishing a detachable connection relationship between the first steel tube scaffold and the two second steel tube scaffolds on both sides; S3, installing the first supporting formwork on the top of the first steel pipe scaffolding, ensuring that the two sides of the first supporting formwork extend out of the two side edges of the post-casting strip respectively, and providing an L-shaped placement groove at the position extending out of the side edge of the post-casting strip on any side edge of the first supporting formwork; S4. Install a second supporting formwork on the top of the second steel pipe scaffolding, and overlap the second supporting formwork on the L-shaped placement groove toward one side of the first steel pipe scaffolding.
[0006] A further technical solution is that in step S3, wooden planks are installed between the bottom side of the first supporting formwork and the first steel pipe scaffolding, and are fixed with screw top screws.
[0007] A further technical solution is that the first steel pipe scaffold is a disc-type steel pipe scaffold; Wherein, the first steel pipe scaffold is formed into a passage by adjusting the rod body of the disc-type steel pipe scaffold.
[0008] A further technical solution is that the second steel pipe scaffolding is a disc-type steel pipe scaffolding or a fastener-type steel pipe scaffolding.
[0009] A further technical solution is that the upper side of the first supporting template is flush with the upper side of the second supporting template.
[0010] A further technical solution is that the design width of the above-mentioned post-casting strip is 800mm-1000mm; Among them, the above-mentioned first supporting formwork is made of steel plate, and the thickness of the above-mentioned steel plate is 20mm. On any side edge of the above-mentioned first supporting formwork, the distance extending from the side edge of the above-mentioned post-casting strip is 250mm, and the width of the above-mentioned L-shaped placement groove is 50mm.
[0011] A further technical solution is that the second supporting formwork is made of bamboo plywood.
[0012] A further technical solution is to provide scissor braces on both the first steel tube scaffold and the second steel tube scaffold.
[0013] Compared with the prior art, the technical solution of the present invention has at least the following advantages or beneficial effects: The scaffolding construction method of the present application has significant advantages. Among them, the support system composed of the first steel pipe scaffolding and the first supporting formwork is specifically used for independent support of post-casting strip construction, and the support system composed of the second steel pipe scaffolding and the second supporting formwork is used for independent support of top plate construction. Such a design enables the top plate support system to be dismantled separately without affecting the construction of the post-casting strip. In this way, the templates, steel pipes, fasteners and other materials of the top plate support system can be used in a cyclical manner, realizing the effective utilization of resources. Compared with the construction method of the traditional post-casting strip, the present application greatly reduces the construction cost. It not only avoids the waste of materials, but also improves the construction efficiency, is more practical, and provides an efficient and economical solution for construction.
[0014] Specifically, in the scaffolding construction method of the present application, a detachable connection relationship is established between the first steel tube scaffolding and the second steel tube scaffolding. In this way, the first steel tube scaffolding and the second steel tube scaffolding form an integral structure, which is conducive to improving the stability of the overall scaffolding support and providing better protection for construction safety. In addition, when the top plate support system is dismantled, this detachable connection relationship will not affect the dismantling of the second steel tube scaffolding, and the operation is convenient and practical. It not only ensures the stability during the construction process, but also facilitates the subsequent dismantling work, bringing convenience to the construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 It is an axonometric diagram after construction based on a post-casting belt late-dismantling type independent support scaffolding construction method according to an embodiment of the present invention; Figure 2 for Figure 1 A front view of Figure 3 for Figure 1 Side view of.
[0017] Icon: 1-top plate, 2-first supporting formwork, 3-first steel pipe scaffolding, 4-second steel pipe scaffolding, 5-spiral top screw, 6-second supporting formwork, 7-scissors brace. DETAILED DESCRIPTION Example
[0018] Please refer to Figure 1-Figure 3 The present application provides a method for constructing a post-cast strip late-dismantling independent support scaffolding, comprising the following steps: First, determining the position of the post-casting strip of the top plate 1 of the structure according to the design drawings is an important prerequisite for construction. The post-casting strip is set to prevent cracks in the concrete due to temperature changes, shrinkage, etc. during the pouring process, and to ensure the integrity and stability of the building. According to the design requirements, the width of the post-casting strip ranges from 800mm to 1000mm, which can meet the shrinkage and deformation requirements of the concrete without causing excessive impact on the structure of the building.
[0019] After determining the position of the post-casting strip, the first steel pipe scaffolding 3 is constructed as an independent support for the post-casting strip construction. The first steel pipe scaffolding 3 includes two rows of disc-type vertical poles with a spacing of 1000mm, which are respectively located on both sides of the post-casting strip. The disc-type vertical poles have the characteristics of firm connection and good stability, and can provide reliable support for the post-casting strip construction. At the same time, horizontal rods connecting the vertical poles are also set, and the horizontal rods are set at a spacing of 600mm, which further enhances the overall stability of the scaffolding. The reasonable spacing of the horizontal rods can ensure that the scaffolding will not be deformed too much when bearing the construction load.
[0020] Next, the second steel tube scaffold 4 is extended on both sides of the first steel tube scaffold 3 to be used as an independent support for the construction of the top plate 1. The construction of the second steel tube scaffold 4 is independent of the first steel tube scaffold 3, but in order to improve the stability of the overall scaffolding support, a detachable connection relationship is established between the first steel tube scaffold 3 and the two second steel tube scaffolds 4 on both sides. This detachable connection relationship plays an important role in the construction process. On the one hand, the first steel tube scaffold 3 and the second steel tube scaffold 4 are formed into an integral structure, which improves the stability of the overall scaffolding support and provides better protection for construction safety. On the other hand, when the top plate 1 support system is dismantled, this detachable connection relationship will not affect the dismantling of the second steel tube scaffold 4, and the operation is convenient and practical. It not only ensures the stability during the construction process, but also facilitates the subsequent dismantling work.
[0021] In order to further improve the structural stability of the first steel tube scaffold 3 and the second steel tube scaffold 4, scissor braces 7 are provided on both. The scissor braces 7 can enhance the lateral rigidity of the scaffold and prevent the scaffold from overturning when subjected to horizontal forces. By reasonably setting the angle and spacing of the scissor braces 7, the overall stability of the scaffold can be effectively improved.
[0022] The first support formwork 2 is installed on the top of the first steel pipe scaffold 3. Ensure that the two sides of the first support formwork 2 extend out of the two side edges of the post-casting strip respectively, so that the first support formwork 2 completely covers the bottom of the post-casting strip, which is convenient for supporting the construction of the post-casting strip. An L-shaped placement groove is provided on either side of the first support formwork 2, where the side edge of the post-casting strip is extended. The L-shaped placement groove runs through the side edge of the first support formwork 2, and its function is to overlap with the second support formwork 6.
[0023] The second support formwork 6 is installed on the top of the second steel pipe scaffold 4, and the second support formwork 6 is overlapped on the L-shaped placement groove facing the side of the first steel pipe scaffold 3. This design forms a continuous support surface between the first support formwork 2 and the second support formwork 6, providing stable support for the construction of the top plate 1. At the same time, the overlap method also makes it easy to remove the second support formwork 6 without affecting the first support formwork 2, ensuring the independence of the post-casting strip construction.
[0024] The scaffolding construction method of the present application has significant advantages. Among them, the support system composed of the first steel pipe scaffolding 3 and the first support formwork 2 is specifically used for independent support of the post-casting strip construction, and the support system composed of the second steel pipe scaffolding 4 and the second support formwork 6 is used for independent support of the top plate 1 construction. Such a design enables the top plate 1 support system to be dismantled separately without affecting the post-casting strip construction. In this way, the templates, steel pipes, fasteners and other materials of the top plate 1 support system can be used in a cyclical manner, realizing the effective use of resources. Compared with the traditional post-casting strip construction method, the present application greatly reduces the construction cost. It not only avoids the waste of materials, but also improves the construction efficiency, is more practical, and provides an efficient and economical solution for construction.
[0025] In some embodiments of the present invention, in step S3 , wooden planks are installed between the bottom side of the first supporting formwork 2 and the first steel pipe scaffold 3 , and are fixed with screw top screws 5 .
[0026] In the above embodiment, the setting of wooden planks in the post-casting strip construction is of great significance. On the one hand, wooden planks can effectively disperse the pressure from above. During the construction process, concrete, steel bars and construction equipment will generate large loads, and wooden planks will evenly transfer these loads to various parts of the first steel pipe scaffolding 3, protecting the first support formwork 2 and the first steel pipe scaffolding 3 from damage caused by concentrated pressure. At the same time, it plays a buffering role between the first support formwork 2 and the first steel pipe scaffolding 3 to reduce direct impact. On the other hand, wooden planks can make up for the unevenness of the surface of the first steel pipe scaffolding 3. Adjusting the flatness can ensure the molding quality of concrete and avoid problems such as cracks. In addition, wooden planks provide a convenient fixing point for fixing the first support formwork 2, which is convenient for formwork adjustment and disassembly, reducing construction costs.
[0027] In some embodiments of the present invention, by adjusting the rods of the disc-type steel tube scaffold, the first steel tube scaffold 3 can form a passage. Such a design is of great significance, which is convenient for construction workers to pass through the passage, and also convenient for the transportation of construction materials, improves construction efficiency, makes the traffic on the construction site smoother, and provides convenient conditions for the smooth progress of the project.
[0028] In some embodiments of the present invention, the second steel pipe scaffolding 4 is a disc-type steel pipe scaffolding or a fastener-type steel pipe scaffolding.
[0029] In the above embodiment, the disc-type steel pipe scaffolding uses disc-type nodes to connect steel pipes, which has the characteristics of quick installation and neat appearance. The fastener-type steel pipe scaffolding is composed of steel pipes and fasteners, which has the advantages of flexible erection and strong versatility. In actual applications, the specific scaffolding to be used can be selected by technicians in this field according to actual conditions.
[0030] In some embodiments of the present invention, the upper side of the first supporting formwork 2 is flush with the upper side of the second supporting formwork 6 .
[0031] In the above embodiment, the upper side of the first support formwork 2 is flush with the upper side of the second support formwork 6. Such a design is of great significance, which can make the bottom plate of the cast top plate 1 smoother, reduce the unevenness of the concrete surface caused by the height difference of the formwork, and improve the construction quality and aesthetics of the top plate 1.
[0032] In some embodiments of the present invention, the first supporting formwork 2 is made of steel plate, and the thickness of the steel plate is 20 mm. On any side of the first supporting formwork 2, the distance extending from the side of the post-casting strip is 250 mm, and the width of the L-shaped placement groove is 50 mm.
[0033] In the above embodiment, the steel plate is selected as the first supporting formwork 2, which has many advantages. First, it has a strong load-bearing capacity and can stably bear various loads during the construction process to ensure the stability of the post-cast strip structure. Second, it has a strong resistance to external impact and can effectively resist various external impacts that may occur at the construction site, providing reliable protection for the post-cast strip. Third, it has excellent flatness and can provide a smooth molding surface for concrete, making the surface of the post-cast strip concrete smooth and clean after pouring, reducing subsequent processing procedures. Fourth, it is easy to reuse, which reduces construction costs and is also in line with the concept of sustainable development.
[0034] In some embodiments of the present invention, the second supporting formwork 6 is made of bamboo plywood.
[0035] In the above embodiment, bamboo plywood is selected as the second supporting formwork 6, which has the advantages of low cost, light weight and easy operation, smooth surface and good thermal insulation performance.
[0036] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction method for a post-casting strip late-dismantling independent support scaffold, characterized in that: The following steps are involved: S1. Determine the position of the post-casting strip of the top plate (1) of the structure according to the design drawing; S2, constructing an independently supported first steel tube scaffold (3) below the position of the post-casting strip, extending and constructing second steel tube scaffolds (4) on both sides of the first steel tube scaffold (3), and establishing a detachable connection relationship between the first steel tube scaffold (3) and the two second steel tube scaffolds (4) on both sides; S3, installing the first supporting formwork (2) on the top of the first steel pipe scaffolding (3), ensuring that the two sides of the first supporting formwork (2) extend out of the two side edges of the post-casting strip respectively, and opening an L-shaped placement groove at a position extending out of the side edge of the post-casting strip on any side edge of the first supporting formwork (2); S4. Install a second supporting formwork (6) on the top of the second steel pipe scaffold (4), and overlap the second supporting formwork (6) on the L-shaped placement groove toward one side of the first steel pipe scaffold (3).
2. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 1, characterized in that: In step S3, wooden planks are installed between the bottom side of the first supporting formwork (2) and the first steel pipe scaffold (3), and fixed with screw top screws (5).
3. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 1, characterized in that: The first steel pipe scaffold (3) is a disc-type steel pipe scaffold; Wherein, by adjusting the rod body of the disc-type steel pipe scaffold, the first steel pipe scaffold (3) forms a passage.
4. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 3 is characterized in that: The second steel pipe scaffold (4) is a disc-type steel pipe scaffold or a fastener-type steel pipe scaffold.
5. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 1, characterized in that: Make the upper side of the first supporting formwork (2) flush with the upper side of the second supporting formwork (6).
6. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 5, characterized in that: The design width of the post-casting strip is 800mm-1000mm; Among them, the first supporting formwork (2) is made of steel plate, and the thickness of the steel plate is 20mm. On any side of the first supporting formwork (2), the distance extending from the side of the post-casting strip is 250mm, and the width of the L-shaped placement groove is 50mm.
7. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 5, characterized in that: The second supporting formwork (6) is made of bamboo plywood.
8. The method for constructing a post-cast strip late-dismantling independent support scaffolding according to claim 1, characterized in that: Scissor braces (7) are provided on both the first steel tube scaffold (3) and the second steel tube scaffold (4).
Citation Information
Patent Citations
Beam plate post-cast strip template support system and construction method thereof
CN102691411A
Temporary support construction method for long-span post-cast strip of shallow-foundation multi-layer frame structure
CN116254999A
Novel disc buckle type post-cast strip independent supporting frame and using method
CN116696046A
Post-cast strip instrumentalized supporting device
CN209163516U
Floor post-cast strip separated supporting formwork structure
CN212271607U