Temporary steel column fixing method in slippage construction process

Through the combination of temporary connector device and reinforcement plate, the problem of poor stability of steel columns in slip construction is solved, efficient temporary fixation of steel columns is achieved, construction process is simplified and costs are reduced.

CN119083725APending Publication Date: 2024-12-06MCC (SHANGHAI) STEEL STRUCTURE TECHNOLOGY CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411386960.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In steel structure slip construction, the temporary fixation stability of steel columns is poor, and conventional construction requires a large number of cable, air ropes and steel support, resulting in complex construction measures, low craftsmanship and high cost.

Method used

Temporary connecting piece devices, including bottom plate, back plate and stiffener plate, are connected to the steel columns through anchor bolts to ensure the stable fixation of the steel columns on the sliding track, and after the structure is stable, the connecting piece is removed to strengthen the outer part of the board. to achieve temporary fixation of steel columns.

Benefits of technology

It reduces the number of construction measures, improves construction efficiency and economy, simplifies construction processes, reduces costs, and can realize the sectional installation of steel columns and trusses, and selects economical lifting equipment for construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083725A_ABST
    Figure CN119083725A_ABST
Patent Text Reader

Abstract

The invention relates to the field of building construction, in particular to sliding construction of a steel structure, and particularly relates to a temporary fixing method for a steel column in the sliding construction process. The method at least comprises the steps that a steel column (601) without a column bottom plate is rapidly installed in place through a temporary connecting piece device, a hoisting machine can be rapidly unhooked, and meanwhile a temporary supporting measure is taken for the steel column (601). The invention provides a measure for temporarily fixing the steel column, the problem that a large number of cable ropes and steel supports are temporarily used for the steel column is solved, a small number of construction measures are used, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, in particular to the sliding construction of a steel structure, and specifically to a temporary fixing method for a steel column during the sliding construction process. Background Art

[0002] like Figure 1 During the sliding construction of the steel structure, the steel column (A) needs to be temporarily fixed independently on the sliding track at the top of the concrete column (B), which has poor stability. In addition, during the continued installation of the components, the loads of the truss (C) and the steel beam (D) are successively loaded on the steel column, which is prone to overturning of the steel column (A), causing certain construction safety hazards. In order to enhance the stability of the steel column (A), a large number of temporary fixing devices at the column base are used in conventional construction in conjunction with steel diagonal braces and cable wind ropes to enhance the stability of the steel column (A). The construction measures are complex in structure, low in construction efficiency, and increase construction costs. Summary of the invention

[0003] The purpose of the present invention is to overcome the above-mentioned defects and propose a device and measures for temporarily fixing steel columns to solve the current problem that a large number of cables and steel supports are needed for temporary fixing of steel columns, thereby improving construction efficiency.

[0004] In order to achieve the above object, the present invention is achieved as follows: A method for temporarily fixing a steel column during a sliding construction process comprises at least the steps of quickly installing a steel column (601) of a column-free bottom plate in place through a temporary connecting device, allowing a lifting machine to quickly release the hook, while also serving as a temporary support measure for the steel column (601).

[0005] The temporary fixing method of the steel column during the sliding construction process includes: Step 1, the anchor bolts (101) are pre-buried during the construction of the concrete column (201); Step 2: After the concrete structure strength reaches the requirement, the sliding rail (301) is laid; Step 3: Make temporary connectors; Step 4, connecting the temporary connection piece to the steel column (601), and temporarily fixing the steel column (601) by adjusting the temporary connection piece; Step 5: After the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, the connecting piece and the steel column (601) are in a disconnected state, and the opening of the flange plate (602) of the steel column (601) is reinforced with an external reinforcement plate (604), and preparation for structural sliding construction begins; Step 6: After the entire structure slides out of the range of the anchor bolts (101), remove the connector and install it on the next set of steel columns (601). Repeat the above installation process until all structural sliding construction is completed.

[0006] The method for temporarily fixing a steel column during a sliding construction process comprises a connecting piece comprising a bottom plate (401), a back plate (402) and two stiffening plates (403); the bottom plate (401) and the back plate (402) are arranged perpendicular to each other, and the two stiffening plates (403) are arranged between the bottom plate (401) and the back plate (402).

[0007] In the method for temporarily fixing a steel column during the sliding construction process, in step 4, before installing the steel column (601), two bolts (501) are used to connect the bolt holes on the back plate (402) of the connector with the bolt holes on the steel column flange plate (602), the connector is installed on the steel column (601) in advance, the bolts (501) are tightened after adjusting the elevation of the corresponding connector bottom plate (401), and then the steel column (601) is hoisted and fixed through the anchor bolt holes of the connector bottom plate (401). 1) Install on the anchor bolt (101), wait for the sliding shoe steel plate (603) at the bottom of the steel column (601) to contact the steel rail (301), adjust the anchor bolt adjustment nut (102) at the bottom of the connector base plate (401) to ensure that the elevation of the steel column (601) meets the design elevation and that the steel column (601) is in close contact with the steel rail (301), and then tighten the anchor bolt (101) fixing nut (103) at the top of the connector base plate (401) to temporarily fix the steel column (601).

[0008] In the method for temporarily fixing the steel column during the sliding construction process, in step 5, after the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, before preparing for sliding, the two bolts (501) fixing the connecting member back plate (402) and the steel column flange plate (602) are first removed, and then the fixing screws (103) on the connecting member bottom plate (401) and the anchor bolt (101) are removed, so that the connecting member and the steel column (601) are in a disconnected state, and the opening of the steel column flange plate (602) is reinforced by externally attaching a reinforcement plate (604), and preparation for structural sliding construction begins.

[0009] The present invention proposes a measure for temporarily fixing a steel column, which solves the problem of temporarily using a large number of cables and steel supports for the steel column, uses a small number of construction measures and improves construction efficiency.

[0010] Furthermore, the advantages or positive effects compared with the prior art are: 1. Install the steel columns and trusses in sections to reduce the overall lifting weight, and choose more economical lifting equipment for construction.

[0011] 2. Temporary measures require small amounts of material and can be used in a rotating manner, making them economical. They can be disassembled for construction, making them convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 Schematic diagram of the structural system.

[0013] Figure 2 Connector construction diagram.

[0014] Figure 3 Front view of connector assembly.

[0015] Figure 4 Side view of the connector assembly.

[0016] Figure 5 Top view of connector assembly.

[0017] Figure 6 Front view of steel column reinforcement plate assembly.

[0018] Figure 7 Side view of steel column reinforcement plate assembly.

[0019] Figure 8 Connector construction process flow chart. DETAILED DESCRIPTION

[0020] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application.

[0021] like Figure 2 A method for temporarily fixing a steel column during a sliding construction process includes at least the steps of quickly installing a steel column (601) of a column-free base plate in place through a temporary connecting device, allowing a lifting machine to quickly release the hook, and at the same time serving as a temporary support measure for the steel column (601).

[0022] like Figures 1 to 8 The temporary fixing method of the steel column during the above sliding construction process specifically includes: Step 1, the anchor bolts (101) are pre-buried during the construction of the concrete column (201); Step 2: After the concrete structure strength reaches the requirement, the sliding rail (301) is laid; Step 3: Make temporary connectors; Step 4, connecting the temporary connection piece to the steel column (601), and temporarily fixing the steel column (601) by adjusting the temporary connection piece; Step 5: After the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, the connecting piece and the steel column (601) are in a disconnected state, and the opening of the flange plate (602) of the steel column (601) is reinforced with an external reinforcement plate (604), and preparation for structural sliding construction begins; Step 6: After the entire structure slides out of the range of the anchor bolts (101), remove the connector and install it on the next set of steel columns (601). Repeat the above installation process until all structural sliding construction is completed.

[0023] The method for temporarily fixing a steel column during a sliding construction process comprises a connecting piece comprising a bottom plate (401), a back plate (402) and two stiffening plates (403); the bottom plate (401) and the back plate (402) are arranged perpendicular to each other, and the two stiffening plates (403) are arranged between the bottom plate (401) and the back plate (402).

[0024] In the method for temporarily fixing a steel column during the sliding construction process, in step 4, before installing the steel column (601), two bolts (501) are used to connect the bolt holes on the back plate (402) of the connector with the bolt holes on the steel column flange plate (602), the connector is installed on the steel column (601) in advance, the bolts (501) are tightened after adjusting the elevation of the corresponding connector bottom plate (401), and then the steel column (601) is hoisted and fixed through the anchor bolt holes of the connector bottom plate (401). 1) Install on the anchor bolt (101), wait for the sliding shoe steel plate (603) at the bottom of the steel column (601) to contact the steel rail (301), adjust the anchor bolt adjustment nut (102) at the bottom of the connector base plate (401) to ensure that the elevation of the steel column (601) meets the design elevation and that the steel column (601) is in close contact with the steel rail (301), and then tighten the anchor bolt (101) fixing nut (103) at the top of the connector base plate (401) to temporarily fix the steel column (601).

[0025] In the method for temporarily fixing the steel column during the sliding construction process, in step 5, after the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, before preparing for sliding, the two bolts (501) fixing the connecting member back plate (402) and the steel column flange plate (602) are first removed, and then the fixing screws (103) on the connecting member bottom plate (401) and the anchor bolt (101) are removed, so that the connecting member and the steel column (601) are in a disconnected state, and the opening of the steel column flange plate (602) is reinforced by externally attaching a reinforcement plate (604), and preparation for structural sliding construction begins.

[0026] The present invention proposes a measure for temporarily fixing a steel column, which solves the problem of temporarily using a large number of cables and steel supports for the steel column, uses a small number of construction measures and improves construction efficiency.

[0027] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A method for temporarily fixing a steel column during a sliding construction process, characterized in that: The method at least comprises the steps of quickly installing the steel column (601) of the column-free base plate in place by means of a temporary connecting device, so that the lifting machine can quickly release the hook and simultaneously serve as a temporary support measure for the steel column (601).

2. The method for temporarily fixing steel columns during sliding construction according to claim 1 is characterized by: include Step 1, the anchor bolts (101) are pre-buried during the construction of the concrete column (201); Step 2: After the concrete structure strength reaches the requirement, the sliding rail (301) is laid; Step 3: Make temporary connectors; Step 4, connecting the temporary connection piece to the steel column (601), and temporarily fixing the steel column (601) by adjusting the temporary connection piece; Step 5: After the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, the connecting piece and the steel column (601) are in a disconnected state, and the opening of the flange plate (602) of the steel column (601) is reinforced with an external reinforcement plate (604), and preparation for structural sliding construction begins; Step 6: After the entire structure slides out of the range of the anchor bolts (101), remove the connector and install it on the next set of steel columns (601). Repeat the above installation process until all structural sliding construction is completed.

3. The method for temporarily fixing steel columns during sliding construction according to claim 2 is characterized by: The connecting member comprises a bottom plate (401), a back plate (402) and two stiffening plates (403); the bottom plate (401) and the back plate (402) are arranged perpendicular to each other, and the two stiffening plates (403) are arranged between the bottom plate (401) and the back plate (402).

4. The method for temporarily fixing a steel column during a sliding construction process according to claim 2 or 3 is characterized in that: in step 4, before the steel column (601) is installed, two bolts (501) are used to connect the bolt holes on the back plate (402) of the connector with the bolt holes on the steel column flange plate (602), the connector is installed on the steel column (601) in advance, the bolts (501) are tightened after adjusting the elevation of the corresponding connector bottom plate (401), and then the steel column (601) is hoisted, and the anchor bolts of the connector bottom plate (401) are used to fix the steel column (601). The steel column (601) is installed on the anchor bolt (101) through the bolt hole. After the sliding shoe steel plate (603) at the bottom of the steel column (601) contacts the steel rail (301), the anchor bolt adjusting nut (102) at the bottom of the connector bottom plate (401) is adjusted to ensure that the elevation of the steel column (601) meets the design elevation and the steel column (601) is in close contact with the steel rail (301). Then, the anchor bolt (101) fixing nut (103) at the top of the connector bottom plate (401) is tightened to temporarily fix the steel column (601).

5. The method for temporarily fixing steel columns during sliding construction according to claim 2 or 3, characterized in that: In step 5, after the construction of the component structures of the adjacent axes is completed, a stable structural system is formed, and the conditions for sliding construction are met, before preparing for sliding, the two bolts (501) fixing the connector back plate (402) and the steel column flange plate (602) are first removed, and then the fixing screws (103) on the connector bottom plate (401) and the anchor bolts (101) are removed, so that the connector and the steel column (601) are in a disconnected state, and the opening of the steel column flange plate (602) is reinforced with an external reinforcement plate (604), and preparation for structural sliding construction begins.

Citation Information

Cited By

  • Construction method for installing foundation and column foot of steel structure through sliding method

    CN120990239A