Frame column concrete pouring concrete layered vibrating equipment
By using adjustable connecting rods and extension pipe structures in frame column concrete pouring equipment, the problem of poor vibration safety in existing equipment at high-level positions is solved, flexible vibration sleeve position adjustment is achieved, and construction efficiency is improved. Security.
Patent Information
- Application Number
- CN202411528627.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-10-30
AI Technical Summary
During the vibration process of existing frame column concrete pouring equipment, the distance between the vibration end and the equipment shell is short and fixed, resulting in a sagging operation when pouring frame column concrete at a high-level position, which requires a sagging operation, which is poor in safety and requires An additional vertical lifting structure is installed to affect construction efficiency and safety.
Through the combination of the connecting rod and the extension tube, the vibration sleeve can be adjusted horizontally to avoid manual vertical entry into the frame column. The motor is fixed to the upper end of the frame column. The extension pipe is gradually connected to be embedded in the pouring position, so as to realize the multi-layer position adjustment of the vibration sleeve. The hydraulic telescopic rod and transmission claw clamping structure facilitates the adjustment and disassembly of extension pipes, improving equipment flexibility.
It improves the construction efficiency of frame column casting, reduces construction difficulty, enhances operational safety, avoids the risk of manual entry into high places, and adapts to the needs of concrete vibration at different depths and locations.
Smart Images

Figure CN119083729A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of frame column concrete pouring, in particular to a concrete layering vibrating device for frame column concrete pouring. Background Art
[0002] The vibrating device for pouring concrete in frame columns is a device used to ensure that concrete is evenly distributed in frame columns and eliminate bubbles. When pouring concrete, in order to enhance the density and strength of concrete, it needs to be vibrated. The vibrating device can effectively rearrange the particles in the concrete, fill the gaps, and reduce bubbles through vibration, thereby making the concrete more uniform and compact. A Chinese patent with publication number CN219993159U discloses a construction concrete vibrating device, including a crawler mobile base, a circular plate rotatably mounted on the top of which a horizontal plate is arranged on the top, two groups of vertical bars distributed left and right are arranged on the front side of the horizontal plate, and a slide plate is arranged on the vertical bars. The device is convenient for walking on a steel mesh and automatically vibrating the concrete, and there is no need for manual operation of inserting a vibrating pipe into the concrete. It is not only more labor-saving, but also avoids the discomfort caused by the vibration of the vibration to the user, thereby enhancing the convenience of use of the device.
[0003] During the vibration process of the construction concrete vibrating equipment of the above-mentioned patent, the distance between the vibrating end and the equipment casing needs to be short and relatively fixed. When pouring concrete of frame columns with higher horizontal positions in layers, the operator, the vibrating end and the connected equipment are often required to be simultaneously lowered into the frame columns and hung to achieve vibration of the corresponding pouring layers. The overall safety is poor and an additional vertical lifting structure needs to be set up, which is not conducive to the pouring of concrete for frame columns with higher horizontal heights. Summary of the invention
[0004] The purpose of the present invention is to provide a concrete layering vibration device for pouring concrete in frame columns. After a connecting rod is pre-installed on one side of a transmission plate, an upper transmission claw and a lower transmission claw are clamped alternately. While alternately clamping, the horizontal position of a vibration sleeve can be gradually adjusted by telescoping a second hydraulic telescopic rod. While the vibration sleeve is continuously adjusted horizontally in the longitudinal direction, an extension pipe can be gradually connected, so that the vibration sleeve falls to concrete of different depths, thereby solving the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a frame column concrete pouring concrete layered vibration equipment, comprising a support base for support and a vibration sleeve for vibration, the upper end of the vibration sleeve is provided with a connecting rod for support and connection, the support base is provided with a motor for output on the side facing the connecting rod, the output shaft of the motor is provided with a second wrapping frame for transmission, extension tubes for extension are longitudinally arranged in sequence between the second wrapping frame and the connecting rod, a second transmission rod is penetrated inside the extension tube, and the upper ends of the second transmission rod and the first transmission rod are both welded with a first connecting end for transmission.
[0006] Preferably, a first wrapping frame which can be wrapped around the outside of the first connecting end is welded to the lower end of the second transmission rod, and the first connecting end corresponding to the uppermost extension tube is connected to the internal slot of the second wrapping frame.
[0007] Preferably, connecting rings are provided at both front and rear ends and one side of the outer upper end of the extension tube, extension blocks are provided at both front and rear ends and one side of the outer lower end of the extension tube, a first support bar is provided at the lower end of the extension block, and a second support bar is provided at both front and rear ends and one side of the motor output shaft, and the outsides of the first support bar and the second support bar are respectively connected to the internal sliding groove of the connecting ring.
[0008] Preferably, an upper transmission claw is provided at the middle position of the support base facing the motor side, a lower transmission claw is provided at the lower end of the upper transmission claw, and one side outside the upper transmission claw is welded and fixed to the outer wall of the motor through a transmission plate, a second hydraulic telescopic rod for telescopic extension is provided at the lower end of the transmission plate, and the second hydraulic telescopic rod is welded and fixed to the lower transmission claw.
[0009] Preferably, a fourth hydraulic telescopic rod is provided on one side of the upper transmission claw and the lower transmission claw, a third hydraulic telescopic rod is provided on the other side of the upper transmission claw and the lower transmission claw, sliding tracks are provided on both sides of the extension tube and the connecting rod, and transmission wheels for clamping and rotating are provided on the outside of the two sliding tracks, respectively facing one end of the extension tube and the connecting rod.
[0010] Preferably, reserved cavities are provided at both the front and rear ends and one side of the lower transmission claw and the upper transmission claw, and the positions of the reserved cavities correspond to the protruding extension block and the first support bar.
[0011] Preferably, connecting brackets are provided on both sides between the vibrating sleeve and the connecting rod, connecting plates for connection are provided on both sides of the upper end of the vibrating sleeve, and a shock absorber for shock absorption is provided between the connecting plate and the connecting bracket.
[0012] Preferably, a first hydraulic telescopic rod for position adjustment is arranged between one side of the support base and the transmission plate, and retractable support telescopic rods are arranged at both upper and lower ends of the first hydraulic telescopic rod, and both ends of the support telescopic rod are respectively welded and fixed to the support base and the transmission plate.
[0013] Preferably, a mounting hole is provided through the interior of the transmission plate, and the position of the mounting hole overlaps with the second wrapping frame.
[0014] Compared with the prior art, the present invention has the following beneficial effects: The present invention aims at the pouring depth of concrete in the frame column, and multiple extension tubes are connected between the motor and the connecting rod in sequence end to end. By connecting the multiple extension tubes in sequence end to end, the vibrating sleeve at the lowest end can be embedded in the pouring position inside the frame column. When the external support structure of the frame column is erected, the support base can be connected to the uppermost end of the frame column, and then the extension tubes can be connected in sequence according to the depth, so as to avoid the need to manually carry the vibrating equipment to vertically enter the frame column during subsequent layered pouring. After the layered pouring, the motor can still be erected on the upper end of the frame column through the support base. When waiting for the poured concrete to solidify and pour again, the horizontal position of the vibrating sleeve can be adjusted by gradually reducing the connection of the extension tubes. The interior of the extension tube, the connecting rod and the vibrating sleeve is connected by the second transmission rod and the first transmission rod in sequence, so that the fixed rod completes the rotation and realizes the vibration, so that the equipment can cope with the layered vibration required for the layered pouring of cement, thereby improving the construction efficiency of the frame column pouring, reducing the construction difficulty of the frame column pouring, and avoiding the danger caused by manual entry into the pouring position of the frame column.
[0015] The support base of the present invention is provided with an upper transmission claw in the middle position of one side of the support base, and a lower transmission claw is provided at the lower end of one side of the support base. When a user stands inside the support base and disassembles and assembles the extension tube, the disassembly and assembly can be assisted by the sequential clamping of the upper transmission claw and the lower transmission claw, thereby reducing the amount of operation for the operator standing on the upper end of the frame column at a higher position, and improving the safety of the operator's construction. The clamping position can be fine-tuned by clamping the upper transmission claw and the lower transmission claw in combination with the rotation of the internal transmission wheel at the sliding track position. At the same time, the clamping position of the upper transmission claw and the lower transmission claw can be replaced by the extension and retraction of the second hydraulic telescopic rod, so as to realize the installation and disassembly of the redundant extension tube, making the position adjustment of the vibrating sleeve more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a stereoscopic diagram of the overall external structure of the present invention; Figure 2 A cross-sectional view of the internal structure of the connecting rod of the present invention; Figure 3 For the present invention Figure 2 A partial enlarged view of the middle A area; Figure 4 It is a cross-sectional view of the connection structure of two adjacent extension pipes of the present invention; Figure 5 It is an exploded view of the connection structure between the extension tube and the motor of the present invention; Figure 6 A cross-sectional view of the internal structure of the upper transmission claw and the lower transmission claw of the present invention; Figure 7 For the present invention Figure 6 A partial enlarged view of the middle B area; Figure 8 It is a schematic diagram of the steps of gradually connecting the extension tube after the connecting rod is erected according to the present invention.
[0017] In the figure: 1. support base; 2. first hydraulic telescopic rod; 3. support telescopic rod; 4. transmission plate; 5. motor; 6. vibrating sleeve; 7. connecting rod; 8. extension tube; 9. first transmission rod; 10. connecting shaft; 11. first connecting end; 12. connecting bracket; 13. fixing rod; 14. shock absorber; 15. connecting plate; 16. sliding track; 17. extension block; 18. first support bar; 19. connecting ring; 20. second transmission rod; 21. first wrapping frame; 22. second wrapping frame; 23. mounting hole; 24. upper transmission claw; 25. lower transmission claw; 26. second hydraulic telescopic rod; 27. third hydraulic telescopic rod; 28. transmission wheel; 29. fourth hydraulic telescopic rod; 30. reserved cavity; 31. second support bar. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] In order to solve the problem that during the vibration process of the existing building concrete vibrating equipment, the distance between the vibrating end and the equipment casing is short and fixed, and when pouring the concrete of the frame column at a higher horizontal position in layers, the operator, the vibrating end and the connected equipment are often required to be simultaneously lowered into the frame column and hung to achieve the vibration of the corresponding pouring layer, the overall safety is poor, and an additional vertical lifting structure is required, which is not conducive to the concrete pouring of the frame column at a higher horizontal height, the present embodiment provides the following technical solutions: A concrete layering vibrating device for pouring concrete of a frame column comprises a supporting base 1 for supporting and a vibrating sleeve 6 for vibrating, such as Figure 1As shown, a connecting rod 7 for support and connection is provided at the upper end of the vibrating sleeve 6, and a first transmission rod 9 for transmission and shaking is provided inside the connecting rod 7, and the first transmission rod 9 penetrates the connecting rod 7 and extends to the inside of the vibrating sleeve 6. A fixing rod 13 is provided on one side of the center position of the vibrating sleeve 6, and the fixing rod 13 is welded and fixed to the first transmission rod 9. The output of the upper end motor 5 can be driven by the first connecting end 11 to drive the fixing rod 13 to rotate, and the rotation of the fixing rod 13 can realize the shaking of the vibrating sleeve 6; In this embodiment, connecting brackets 12 are provided on both sides between the vibrating sleeve 6 and the connecting rod 7, and one end of the connecting bracket 12 is welded and fixed to the outer wall of the connecting rod 7. Figure 1 , Figure 2 and Figure 3 As shown, connecting plates 15 for connection are respectively provided on both sides of the upper end of the vibrating sleeve 6, and a shock absorber 14 for shock absorption is provided between the connecting plate 15 and the connecting bracket 12. The buffering of the shock absorber 14 can prevent the vibrating sleeve 6 from vibrating too much and continuously, thereby preventing the connection between the supporting base 1 and the frame column, and preventing the frame column from being damaged by the shaking after the equipment is erected on the upper end of the frame column. In addition, the connection of the vibrating sleeve 6 by the connecting bracket 12 makes it possible for the clamping structure to contact the vibrating sleeve 6 during the subsequent adjustment and removal of the vibrating sleeve 6, and for the cement to contact the first transmission rod 9 for transmission and the connecting rod 7 for support during the embedding in the cement and vibrating. It is prevented that the third hydraulic telescopic rod 27, the fourth hydraulic telescopic rod 29 and the transmission wheel 28 for clamping and transmission contact the concrete, and cause solidification if the concrete is not cleaned in time, thereby preventing the solidification from affecting the subsequent layered vibration, and preventing the solidification from affecting the clamping and transmission of the extension pipe 8. In this embodiment, a motor 5 for output is provided on one side of the support base 1 facing the connecting rod 7, and a second wrapping frame 22 for transmission is provided on the output shaft of the motor 5. Figure 1 and Figure 5 As shown, an extension tube 8 for extension is sequentially arranged longitudinally between the second wrapping frame 22 and the connecting rod 7. After the output of the motor 5 and the transmission of the extension tube 8, the fixing rod 13 can be driven to rotate. The position of the vibrating sleeve 6 can be adjusted by connecting a plurality of extension tubes 8 end to end in sequence to meet the different concrete vibration requirements. After the motor 5 is fixed at the upper end of one side of the transmission plate 4, the motor 5 will be fixed to the uppermost end of the frame column together with the transmission plate 4 and the supporting base 1. In the process of adjusting the horizontal position of the vibrating sleeve 6, there is no need to adjust the horizontal position of the motor 5, so as to avoid the heavier motor 5 from moving longitudinally downward together with the vibrating sleeve 6. The motor 5 is fixed at the upper end of the outside of the frame column to avoid concrete splashing to the outer wall of the motor 5, thereby improving the service life of the motor 5 and the safety during use. In this embodiment, a second transmission rod 20 is provided inside the extension tube 8, and the upper ends of the second transmission rod 20 and the first transmission rod 9 are both welded with a first connecting end 11 for transmission, and the lower end of the second transmission rod 20 is welded with a first wrapping frame 21 that can be wrapped around the outside of the first connecting end 11. Figure 1 , Figure 2 and Figure 4 As shown, when two adjacent extension tubes 8 are connected, the two second transmission rods 20 are connected to each other through the slot connection between the first connection end 11 and the first wrapping frame 21 to achieve transmission connection, and when the extension tube 8 is connected to the upper end of the connecting rod 7, the first connection end 11 at the upper end of the first transmission rod 9 will be inserted into the outside of the first wrapping frame 21 at the lower end of the extension tube 8. The slot connection between the first wrapping frame 21 and the first connection end 11 can make the second transmission rods 20 between the insides of the two adjacent extension tubes 8 be synchronously transmitted, so that the motor 5 can stably transmit the fixed rod 13 inside the vibrating sleeve 6; In this embodiment, the first connection end 11 corresponding to the uppermost extension tube 8 is connected to the inner slot of the second wrapping frame 22, and the motor 5 drives the fixing rod 13 to rotate by connecting the slots in sequence from top to bottom longitudinally. Figure 1 , Figure 2 , Figure 5 and Figure 6 As shown, the front and rear ends and one side of the outer upper end of the extension tube 8 are provided with a connecting ring 19, the front and rear ends and one side of the outer lower end of the extension tube 8 are provided with an extension block 17, the lower end of the extension block 17 is provided with a first support bar 18, and the lower end of the extension block 17 is welded and fixed to one end of the first support bar 18, the front and rear ends and one side of the output shaft of the motor 5 are provided with a second support bar 31, and the outer parts of the first support bar 18 and the second support bar 31 are respectively connected to the internal sliding groove of the connecting ring 19, and the two extension tubes 8 are connected head to tail in sequence and the extension tube 8 is connected to the connecting rod 7. The first support bar 18 and the second support bar 31 will be embedded in the connecting ring 19, and the nuts on the outside of the first support bar 18 and the second support bar 31 will be rotated to fix the embedding of the first support bar 18 and the second support bar 31. When the two adjacent extension tubes 8 are connected to the first wrapping frame 21 and the first connecting end 11 by the card slot, the first support bar 18 will be slidably inserted into the connecting ring 19. Inserting the connecting ring 19 facilitates improving the stability of the connection between the two adjacent extension tubes 8 and facilitating the support of the lower end vibration sleeve 6, so that the vibration sleeve 6 can continuously adjust the horizontal position to adapt to the position required for vibration. In this embodiment, an upper transmission claw 24 is provided at the middle position of the support base 1 facing the motor 5, and a lower transmission claw 25 is provided at the lower end of the upper transmission claw 24. Figure 6 , Figure 7 and Figure 8As shown, one side of the outer portion of the upper transmission claw 24 is welded and fixed to the outer wall of the motor 5 through a transmission sheet 4, and a second hydraulic telescopic rod 26 for extension and retraction is provided at the lower end of the transmission sheet 4. The second hydraulic telescopic rod 26 is welded and fixed to the lower transmission claw 25. The horizontal position of the lower transmission claw 25 can be adjusted by extending and retracting the second hydraulic telescopic rod 26. The adjustment of the horizontal position of the lower transmission claw 25 can realize the subsequent assembly and disassembly of the extension tube 8. In this embodiment, a fourth hydraulic telescopic rod 29 is disposed on one side of the inner side of the upper transmission claw 24 and the lower transmission claw 25. Figure 6 and Figure 7 As shown, a third hydraulic telescopic rod 27 is provided on the other side of the upper transmission claw 24 and the lower transmission claw 25, and sliding rails 16 are provided on both sides of the extension tube 8 and the connecting rod 7. Transmission wheels 28 for clamping and rotating are provided on the outside of the two sliding rails 16 facing one end of the extension tube 8 and the connecting rod 7 respectively. The recessed sliding rails 16 are connected with the external card slots of the transmission wheels 28. The transmission wheels 28 are embedded in the sliding rails 16 to achieve the clamping process through the card slot connection, which can improve the clamping stability and prevent the corresponding extension tube 8 and the connecting rod 7 clamped in the upper transmission claw 24 and the lower transmission claw 25 from falling off due to the shaking of the lower end vibration sleeve 6. The two transmission wheels 28 can clamp the objects through the extension and contraction of the fourth hydraulic telescopic rod 29 and the third hydraulic telescopic rod 27, and the output of the motor to the transmission wheel 28 can make the transmission wheel 28 rotate. The clamping and rotation can adjust the horizontal position of the extension tube 8 and the connecting rod 7. In this embodiment, if Figure 7 As shown, the front and rear ends and one side of the lower transmission claw 25 and the upper transmission claw 24 are provided with a reserved cavity 30, and the position of the reserved cavity 30 corresponds to the protruding extension block 17 and the first support bar 18. The reserved cavity 30 can facilitate the rotation of the transmission wheel 28 to drive the extension tube 8 and the connecting rod 7 to adjust the horizontal position, so as to avoid the extension block 17 and the first support bar 18 from colliding with the upper transmission claw 24 and the lower transmission claw 25. The rotation of the transmission wheel 28 can directly drive the extension tube 8 and the connecting rod 7 clamped in the upper transmission claw 24 and the lower transmission claw 25 to directly adjust the horizontal position, so as to avoid the influence caused by the collision between the upper transmission claw 24 and the lower transmission claw 25. In this embodiment, a mounting hole 23 is provided inside the transmission plate 4, and the mounting hole 23 penetrates and extends to the front and rear ends of the transmission plate 4. Figure 5 As shown, the position of the mounting hole 23 overlaps with the second wrapping frame 22, which facilitates the installation and removal of the bolts that penetrate the second wrapping frame 22. The user can stand inside the support base 1 to achieve the bolt connection and removal of the connection position of the motor 5; In this embodiment, if Figure 2 , Figure 3 , Figure 4 , Figure 6 and Figure 7 As shown, a rotatable connecting shaft 10 is provided between the outside of the second transmission rod 20 and the inner wall of the extension tube 8. The second transmission rod 20 can be continuously located in the middle position of the extension tube 8 through the rotation and support of the connecting shaft 10. A rotatable connecting shaft 10 is provided between the outside of the first transmission rod 9 and the inside of the connecting rod 7. The first transmission rod 9 can be supported by the connecting shaft 10. The support of the connecting shaft 10 can improve the stability of the motor 5 during output, and avoid large shaking after transmission to the fixed rod 13 at a long distance; In this embodiment, a first hydraulic telescopic rod 2 for position adjustment is provided between one side of the support base 1 and the transmission plate 4. Figure 1 As shown, the lateral position of the vibrating sleeve 6 can be adjusted by extending and retracting the first hydraulic telescopic rod 2. The adjustment of the lateral position of the vibrating sleeve 6 can cope with the vibration of concrete with a larger lateral area. The upper and lower ends of the first hydraulic telescopic rod 2 are provided with retractable supporting telescopic rods 3, and the two ends of the supporting telescopic rod 3 are respectively welded and fixed to the supporting base 1 and the transmission plate 4. The supporting telescopic rod 3 can improve the stability of the extension and retraction of the first hydraulic telescopic rod 2.
[0020] Working principle: When the device is erected, it is fixed to the upper end of the frame column through the support base 1. During the fixing process, one side of the motor 5 is fixed toward the inside of the frame column. When the horizontal longitudinal position of the vibrating sleeve 6 is adjusted and the vibrating sleeve 6 is moved to the inside of the frame column, the structure in which the connecting rod 7 and the vibrating sleeve 6 are integrated is first embedded from one side of the lower transmission claw 25. After the third hydraulic telescopic rod 27 and the fourth hydraulic telescopic rod 29 inside the lower transmission claw 25 are extended and the transmission wheel 28 is embedded in the sliding track 16 to complete the clamping, the extension of the second hydraulic telescopic rod 26 can push the clamped connecting rod 7 and the vibrating sleeve 6 to move horizontally in the longitudinal direction. After adjusting the position, the extension tube 8 to be connected is placed on the upper end of the connecting rod 7. While placing it, the first support bar 18 at one end of the extension tube 8 is embedded in the outside of the connecting ring 19. At the same time, the second transmission rod 20 inside the extension tube 8 drives the first wrapping frame 21 at one end to wrap around the first connecting end 11 at the upper end of the first transmission rod 9. The first wrapping frame 21 and the first connecting end 11 are fixed by bolts, and the lower end of the first support bar 18 rotates the nut and fits the connecting ring 19 to complete the fixation. When the extension tube 8 is fixed, it will be located inside the upper transmission claw 24, and the upper transmission claw 24 is connected to the lower transmission claw 25 by the lower transmission claw 25. The same transmission wheel 28 is set inside for clamping. If the number of extension tubes 8 installed at this time can make the vibrating sleeve 6 reach the required position, the upper transmission claw 24 stops clamping, and the contraction of the second hydraulic telescopic rod 26 and the clamping of the position of the lower transmission claw 25 can make the uppermost extension tube 8 move toward the motor 5. While moving, the second support bar 31 fixed to the outer shell of the motor 5 will be embedded in the connecting ring 19, and the first wrapping frame 21 fixed to the output shaft of the motor 5 will be wrapped around the outside of the first connecting end 11 at the upper end of the second transmission rod 20, and the connection position will be fixed in turn. After fixing, the upper transmission claw 24 The transmission wheel 28 achieves the final clamping. If an additional extension tube 8 needs to be installed, the lower transmission claw 25 stops clamping and the second hydraulic telescopic rod 26 contracts to reset the lower transmission claw 25. After resetting, it clamps again and stops clamping at the upper transmission claw 24. The motor corresponding to the transmission wheel 28 in the lower transmission claw 25 is started, so that the transmission wheel 28 drives the clamping and connected structure to adjust longitudinally and horizontally, and adjusts the extension tube 8 to the horizontal position of the previously fixed connecting rod 7. The steps are repeated, and the extension tubes 8 are connected end to end in sequence until the vibrating sleeve 6 reaches the required position and then the uppermost extension tube 8 is connected to the motor 5.
[0021] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0022] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A concrete layering vibrating device for pouring concrete of a frame column, comprising a supporting base (1) for supporting and a vibrating sleeve (6) for vibrating, characterized in that: A connecting rod (7) for supporting and connecting is arranged at the upper end of the vibrating sleeve (6); a motor (5) for output is arranged on a side of the supporting base (1) facing the connecting rod (7); a second wrapping frame (22) for transmission is arranged on the output shaft of the motor (5); extension tubes (8) for extension are arranged longitudinally between the second wrapping frame (22) and the connecting rod (7); a second transmission rod (20) is arranged inside the extension tube (8); and a first connecting end (11) for transmission is welded to the upper ends of the second transmission rod (20) and the first transmission rod (9).
2. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 1 is characterized by: A first wrapping frame (21) capable of wrapping around the outside of the first connecting end (11) is welded to the lower end of the second transmission rod (20), and the first connecting end (11) corresponding to the uppermost extension tube (8) is connected to an internal slot of the second wrapping frame (22).
3. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 1 is characterized by: A connecting ring (19) is provided at both the front and rear ends and one side of the outer upper end of the extension tube (8); an extension block (17) is provided at both the front and rear ends and one side of the outer lower end of the extension tube (8); a first support bar (18) is provided at the lower end of the extension block (17); a second support bar (31) is provided at both the front and rear ends and one side of the output shaft of the motor (5); and the outer portions of the first support bar (18) and the second support bar (31) are respectively connected to the inner sliding groove of the connecting ring (19).
4. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 1 is characterized by: An upper transmission claw (24) is arranged at a middle position of the support base (1) on a side facing the motor (5), a lower transmission claw (25) is arranged at a lower end of the upper transmission claw (24), and an outer side of the upper transmission claw (24) is welded and fixed to an outer wall of the motor (5) via a transmission sheet (4), a second hydraulic telescopic rod (26) for telescoping is arranged at a lower end of the transmission sheet (4), and the second hydraulic telescopic rod (26) is welded and fixed to the lower transmission claw (25).
5. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 4 is characterized by: A fourth hydraulic telescopic rod (29) is disposed on one side of the upper transmission claw (24) and the lower transmission claw (25), and a third hydraulic telescopic rod (27) is disposed on the other side of the upper transmission claw (24) and the lower transmission claw (25). Sliding rails (16) are disposed on both sides of the extension tube (8) and the connecting rod (7), and transmission wheels (28) for clamping and rotating are disposed on the outside of the two sliding rails (16) at one end facing the extension tube (8) and the connecting rod (7), respectively.
6. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 5 is characterized by: Reserved cavities (30) are provided at both the front and rear ends and one side of the lower transmission claw (25) and the upper transmission claw (24), and the positions of the reserved cavities (30) correspond to the protruding extension block (17) and the first support bar (18).
7. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 1 is characterized by: Connecting brackets (12) are provided on both sides between the vibrating sleeve (6) and the connecting rod (7), connecting plates (15) for connection are provided on both sides of the upper end of the vibrating sleeve (6), and a shock absorber (14) for shock absorption is provided between the connecting plate (15) and the connecting bracket (12).
8. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 4 is characterized by: A first hydraulic telescopic rod (2) for position adjustment is arranged between one side of the support base (1) and the transmission plate (4), and telescopic support telescopic rods (3) are arranged at both upper and lower ends of the first hydraulic telescopic rod (2), and both ends of the support telescopic rod (3) are respectively welded and fixed to the support base (1) and the transmission plate (4).
9. The concrete layering and vibrating equipment for pouring concrete of frame columns according to claim 8, characterized in that: A mounting hole (23) is provided through the interior of the transmission sheet (4), and the position of the mounting hole (23) overlaps with the second wrapping frame (22).
Citation Information
Patent Citations
Integrally-poured building house construction structure and method
CN116427716A
Pouring process for non-orthogonal frame fan-shaped plane bare concrete structure
CN118065495A
Vibrating device for large-area concrete pouring
CN214786086U
Concrete vibrating equipment
CN221779038U
System And Method For Concrete Composition Using Mobile Vibrator
KR1020170036868A