Implementation method of intelligent siphon water supply pipeline system with ultra-large pipe diameter
By using a pressure stabilizing tank and a vacuum intelligent holding device in the siphon piping system, combined with a mixing pump and exhaust hole, the problem of unstable water pressure and vacuum degree is solved, and water supply is achieved without additional power, reducing noise and energy consumption, and improving System stability and environmental friendliness.
Patent Information
- Application Number
- CN202411191654.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-06
AI Technical Summary
The water pressure in the existing siphon is uncontrollable, the stability is weak, and the vacuum level cannot be guaranteed and monitored, resulting in unstable water supply and high noise, affecting the environment.
An intelligent siphon water supply pipeline system with an ultra-large pipe diameter is designed, using a pressure stabilizing tank and a vacuum intelligent holding device combined with a mixed flow pump and exhaust hole. By automatically adjusting the vacuum degree and flow rate, the water pressure is ensured to be stable, noise and vibration are reduced, and the water pressure is used to make use of The natural terrain forms a head height difference, and water supply is completed by relying on its own gravity.
It realizes that water supply can be completed without additional power, save energy, reduce noise, ensure water supply stability and environmental friendliness, conform to the concept of green and sustainable development, and improves the stability and reliability of the system.
Smart Images

Figure CN119084371A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipeline water supply, and specifically is an implementation method of an ultra-large diameter intelligent siphon water supply pipeline system. Background Art
[0002] In temporary water supply projects that divert water from upstream to downstream, the required water supply flow is large, and multiple floating pump stations need to be used simultaneously. As a result, the power consumption is large, the operating costs are high, and the water supply equipment is noisy, which has an adverse impact on the surrounding environment.
[0003] For example, a siphon water supply system of a Chinese invention patent with application publication number CN103015488A utilizes a closed pipe to allow liquid to flow non-dynamically from one side of an obstacle to the other side. The device has a pipe with a certain airtightness and pressure, on which an inlet valve, an outlet valve and an injection valve are installed. A tee is installed at the highest point of the pipe, and the injection valve is installed at the top of the tee.
[0004] In the above-mentioned prior art, atmospheric pressure, liquid pressure in the pipe and suction generated by the downward flow of liquid are used to make water flow from one side of the mountain to the other side. However, the water pressure in the siphon cannot be controlled and has weak stability. At the same time, the vacuum level in the pipe cannot be guaranteed and monitored.
[0005] Therefore, how to effectively solve the problem that the water pressure in the siphon tube cannot be controlled, the stability is weak, and the vacuum level in the tube cannot be guaranteed and monitored is a technical problem that needs to be solved urgently. Summary of the invention
[0006] In view of the deficiencies in the above-mentioned background technology, the present invention proposes an implementation method of an ultra-large diameter intelligent siphon water supply pipeline system, which solves the problems that the water pressure in the siphon pipe cannot be controlled, the stability is weak, and the vacuum level in the pipe cannot be guaranteed and monitored.
[0007] The technical solution of this application is:
[0008] A method for implementing an ultra-large diameter intelligent siphon water supply pipeline system comprises the following installation steps: S1: laying a siphon main pipeline between upstream and downstream, and respectively arranging a siphon branch pipe 1 and a siphon branch pipe 2 at the water inlet end of the siphon main pipeline; S2: installing bottom valves at the water inlets of the siphon main pipeline, the siphon branch pipe 1 and the siphon branch pipe 2, and placing them in an upstream water inlet pool; S3: installing a pressure stabilizing tank 1 and a pressure stabilizing tank 2, and arranging a connecting exhaust pipe between the pressure stabilizing tank 1 and the pressure stabilizing tank 2; S4: connecting the pressure stabilizing tank 2 to a siphon pipeline vacuum intelligent maintaining device; S5: installing a mixed flow pump at the water inlet end of the siphon main pipeline, the siphon branch pipe 1 and the siphon branch pipe 2; S6: connecting a drain pipe to the water outlet end of the siphon main pipeline, and connecting the drain pipe to the downstream water outlet pool; S7: arranging a height-adjustable stacked beam unit at the water outlet of the water outlet pool; S8: installing an exhaust hole and an inspection hole on the siphon main pipeline; S9: operating the siphon water supply pipeline system.
[0009] Furthermore, the operating steps of S8 are as follows: S8.1: close the water outlet valve, open the mixed flow pump, water injection valve, vacuum pump, and exhaust hole, and inject water into the siphon main pipe; S8.2: automatically adjust and maintain the vacuum degree of the siphon main pipe through the siphon pipe vacuum intelligent maintenance device and management system. When the vacuum degree of the siphon main pipe reaches 0.8, open the water outlet valve and supply water to the downstream.
[0010] Furthermore, the pressure-stabilizing tank 1 is arranged above the confluence of the siphon main pipe and the siphon branch pipe 1 through a short pipe, and the siphon branch pipe 1 is connected to the pressure-stabilizing tank 1, which can stabilize the pressure, adjust the flow, prevent cavitation, reduce noise and vibration, and improve the stability and reliability of the siphon pipe system. At the same time, it can also avoid water turbulence caused by the water flow of the siphon branch pipe 1 directly merging into the siphon main pipe.
[0011] Furthermore, the siphon pipeline vacuum intelligent maintaining device includes a vacuum pump and a control valve connected to the second pressure-stabilizing tank.
[0012] Furthermore, the second pressure-stabilizing tank and the vacuum pump are both arranged on the upper surface of the siphon main pipeline, and can automatically replenish water according to the internal pressure or water level of the water tank to maintain a constant water pressure and flow in the siphon pipe, and ensure the stability of the siphon process even if the external water source fluctuates. At the same time, the connected exhaust pipe can also help to remove the gas generated in the pipe during the siphon operation stage, which plays a vital role in achieving effective and safe water flow transfer between the first and second pressure-stabilizing tanks and optimizing system operation.
[0013] Furthermore, a plurality of exhaust holes are provided, and a cross-shaped connecting pipe is connected to the exhaust hole, and exhaust valves are provided at the ends of the cross-shaped connecting pipe. One or more exhaust holes must be provided at the highest point of the siphon main pipeline, that is, the top of the rising section of the pipeline, to ensure that the air can be quickly discharged during the water injection stage to form an effective siphon effect. In areas where the pipeline turns, changes diameter or is relatively flat, gas is likely to accumulate here due to the slowdown of the water flow. Therefore, exhaust holes also need to be provided in these potential gas accumulation areas to prevent gas blockage caused by gas accumulation and ensure unimpeded water supply.
[0014] Furthermore, the diameter of the drainage pipe is smaller than that of the siphon main pipe. Since the water level at the downstream river outlet is shallow, the diameter of the drainage outlet end is designed to be smaller than that of the siphon main pipe based on physical principles, performance and actual engineering conditions.
[0015] Furthermore, the stacked beam unit comprises a first vertical rod and a second vertical rod which are arranged at the water outlet of the water outlet pool, and a plurality of cross rods are detachably connected between the first vertical rod and the second vertical rod.
[0016] Furthermore, flow control valves are provided at both the water inlet and the water outlet of the siphon main pipeline.
[0017] Furthermore, the siphon pipe vacuum intelligent maintaining device is connected to the power system, the intelligent control system and the video monitoring system.
[0018] The specific beneficial effects of the present invention include:
[0019] 1. The present invention utilizes the natural terrain to form the water head height difference and the siphon principle, and only needs one starting power, such as a vacuum pump to assist in starting the siphon. Subsequently, the water supply work can be completed by relying on its own gravity potential energy. No additional power supply or machinery is required to provide water extraction power, which saves energy consumption, does not generate noise, does not affect the ecological environment of the water supply area, and conforms to the concept of green and sustainable development.
[0020] 2. By using wireless network transmission, network transparent transmission, video monitoring, pressure sensing and other technologies, an intelligent information management mode of siphon pipeline vacuum degree is realized;
[0021] 3. Use the outlet diameter change and the movable stacked beam structure of the outlet pool to maintain effective submerged outflow and improve the outflow efficiency of the siphon pipe system;
[0022] 4. Set up observation holes to check and monitor the water flow in the pipeline at any time. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0024] Figure 1 It is a side view of the present invention in use;
[0025] Figure 2 for Figure 1 Enlarged view of point A in the middle;
[0026] Figure 3 for Figure 1 Enlarged view of point B in the middle;
[0027] Figure 4 It is a schematic diagram of the exhaust hole and the inspection hole;
[0028] Figure 5 This is the hydraulic calculation diagram of siphon branch pipe 2;
[0029] Figure 6 for Figure 5 perspective drawing;
[0030] Figure 7 This is the hydraulic calculation diagram of siphon branch pipe 1;
[0031] Figure 8 for Figure 7 Perspective
[0032] Fig. 9 This is a schematic diagram of hydraulic calculation for verifying the maximum installation height of the present invention;
[0033] Fig.10 A bird's-eye view of the present invention.
[0034] Description of Figure Numbers:
[0035] 0. Siphon main pipe; 1. Siphon branch pipe 1; 2. Siphon branch pipe 2;
[0036] 3. Pressure stabilizing tank 1; 4. Pressure stabilizing tank 2;
[0037] 5. Connecting exhaust pipe; 6. Exhaust hole; 7. Inspection hole;
[0038] 8. Drain pipe; 9. Outlet pool; 10. Stoplog unit; 11. Flow control valve;
[0039] 61. Cross-shaped connecting pipe; 62. Exhaust valve. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] An implementation method of an ultra-large diameter intelligent siphon water supply pipeline system includes the following steps:
[0042] S1: Lay a siphon main pipe 0 between the upstream and downstream, and set a siphon branch pipe 1 and a siphon branch pipe 2 at the water inlet end of the siphon main pipe 0; the siphon main pipe 0 adopts a DN1500 steel pipe, and the siphon branch pipe 1 and the siphon branch pipe 2 both adopt a DN700 steel pipe;
[0043] S2: Install bottom valves on the water inlets of the siphon main pipe 0, siphon branch pipe 1, and siphon branch pipe 2, and place them in the upstream water inlet pool; the bottom valve is a one-way valve with a one-way check structure inside, which only allows water to flow from bottom to top, but not the other way around. When negative pressure forms in the pipe, the bottom valve will remain open. When the external pressure is greater than the internal pressure, it will automatically close to achieve one-way control, so that water can flow through and ensure that the bottom valve can be effectively closed when there is no siphon effect to prevent water backflow. A steel grate is provided at the bottom of the bottom valve to block debris in the water. Prevent debris from entering the pipeline and affecting the flow; the bottom valve is also used to maintain the siphon. When the siphon pipeline is started, the bottom valve allows water to flow into the pipeline from bottom to top. As the water level in the pipeline rises, a continuous water column is formed, thereby establishing a siphon effect. The existence of the bottom valve helps to maintain the continuity of the siphon after the initial water injection, reducing energy consumption and time during the startup process; at the same time, it can simplify the operation. The application of the bottom valve simplifies the operation process of the siphon pipeline. There is no need to inject water into the pipeline before each start. Only one-time water injection is required, and then the start and stop of the siphon can be controlled by opening and closing the bottom valve;
[0044] S3: Install the pressure stabilizing tank 13 and the pressure stabilizing tank 24, and set a connecting exhaust pipe 5 between the pressure stabilizing tank 13 and the pressure stabilizing tank 24; a DN60 galvanized steel pipe is set on the downstream side of the pressure stabilizing tank 13 to communicate with the pressure stabilizing tank 24, and is welded at the elevation of 96.65 of the pressure stabilizing tank 13 and the elevation of 96.86 of the pressure stabilizing tank 24 as the connecting exhaust pipe 5. Water can be automatically replenished according to the internal pressure or water level of the water tank to maintain a constant water pressure and flow in the siphon pipe, and the stability of the siphon process can be ensured even if the external water source fluctuates. At the same time, the connecting exhaust pipe 5 can also be used to remove the gas generated in the pipe during the siphon operation stage, which plays a vital role in realizing the effective and safe water flow transfer between the pressure stabilizing tank 13 and the pressure stabilizing tank 24 and optimizing the system operation. The connecting exhaust pipe 5 intersects with the pressure stabilizing tank 13, the pressure stabilizing tank 24, and the siphon main pipeline 0 at an angle of 30o, and is welded and laid along the outside of the main siphon pipeline 0;
[0045] The pressure stabilizing tank 24 is a cylindrical water tank with a diameter of 1.5m and a length of 6m, which is connected to the DN1500 siphon main pipeline 0 through two DN700 short pipes;
[0046] S4: The pressure stabilizing tank 24 is connected to the siphon pipeline vacuum intelligent holding device;
[0047] S5: Install a mixed flow pump at the water inlet end of the siphon main pipe 0, the siphon branch pipe 1, and the siphon branch pipe 2;
[0048] S6: The outlet end of the siphon main pipe 0 is connected to a drain pipe 8, and the drain pipe 8 is connected to a downstream water outlet pool 9;
[0049] S7: Install the exhaust hole 6 and the observation hole 7 on the siphon main pipe 0;
[0050] S8: Siphon water supply pipe system is in operation.
[0051] Based on the above implementation, as a preferred implementation, Figure 1 , Figure 2 As shown, the pressure stabilizing tank 3 is arranged above the confluence of the siphon main pipe 0 and the siphon branch pipe 1 through a short pipe 31, and the siphon branch pipe 1 is connected to the pressure stabilizing tank 3.
[0052] Specifically, the pressure-stabilizing tank 3 is the water inlet tank of the siphon branch pipe 1. Adding a pressure-stabilizing tank 3 above the confluence of the siphon main pipe 0 and the siphon branch pipe 1 can stabilize the pressure, adjust the flow, prevent cavitation, reduce noise and vibration, and improve the stability and reliability of the siphon pipe system. At the same time, it can also avoid water turbulence caused by the water flow of the siphon branch pipe 1 directly merging into the siphon main pipe 0.
[0053] Specifically, the pressure-stabilizing tank 3 is connected to the siphon main pipeline 0 through two short pipes 31. The pressure-stabilizing tank 3 is 12m long and 1.2m in diameter. The pressure-stabilizing tank 3 is added to assist or ensure the normal operation of the siphon pipeline system, stabilize the pressure, adjust the flow, prevent cavitation, reduce noise and vibration, and facilitate maintenance, so as to improve the stability and reliability of the siphon pipeline system, avoid the water flow of the siphon branch pipe 1 from merging into the siphon branch pipe 1, resulting in the weakening of the siphon effect or the inability to start effectively. The interfaces of the siphon branch pipe 1, the pressure-stabilizing tank 3, and the siphon main pipeline 0 must be tight and airtight to avoid affecting the vacuum state and water flow effect of the entire siphon system; ensure that there is a reasonable elevation difference between the siphon branch pipe 1 and the siphon main pipeline 0 so that water can be supplied smoothly with the help of the siphon principle; the diameter of the siphon branch pipe 1 should not be too large to avoid excessive local head loss and affect the generation of the siphon effect. Preferably, the siphon branch pipe 1 and the short pipe 31 are both DN700 steel pipes.
[0054] Specifically, the functions of the surge tank 3 are as follows:
[0055] (1) Buffer pressure fluctuations and stabilize pressure. It can effectively absorb and release instantaneous pressure fluctuations in the system, especially at the branch confluence, where the pressure may change due to the inconsistency of the flow of each branch. The pressure regulating tank helps to maintain the pressure stability at the confluence and downstream pipelines by regulating its own capacity.
[0056] (2) Smooth flow distribution and regulate flow. When the flow of each branch is uneven, the surge tank can temporarily store excess flow or supplement insufficient flow, play a role in flow regulation, ensure the stability of flow at the confluence, and help maintain the continuity of the siphon effect.
[0057] (3) Reduce the flow rate to prevent cavitation. In a siphon pipe with an extra-large diameter, an excessively high flow rate may cause cavitation and damage the pipe and equipment. The surge tank helps prevent cavitation by increasing local resistance and appropriately reducing the flow rate.
[0058] (4) Energy buffering, reducing noise and vibration. The pressure regulating tank can absorb part of the kinetic energy generated by the flow of liquid in the pipeline, reduce the noise and vibration caused by flow velocity changes, and improve the operating comfort of the system and the service life of the equipment.
[0059] On the basis of the above-mentioned implementation manner, as a preferred implementation manner, the pressure stabilizing tank 2 4 and the vacuum pump are both arranged on the upper surface of the siphon main pipeline 0.
[0060] Specifically, a DN60 galvanized steel pipe is provided on the downstream side of the surge tank 13 and connected to the surge tank 24, and is welded at the elevation of 96.65 of the surge tank 13 and the elevation of 96.86 of the surge tank 24 as a connecting exhaust pipe 5. Water can be automatically replenished according to the internal pressure or water level of the water tank to maintain a constant water pressure and flow in the siphon pipe, and the stability of the siphon process can be ensured even if the external water source fluctuates. At the same time, the connecting exhaust pipe 5 can also be used to remove the gas generated in the pipe during the siphon operation stage, which plays a vital role in achieving effective and safe water flow transfer between the surge tank 13 and the surge tank 24 and optimizing the system operation. The connecting exhaust pipe 5 intersects with the surge tank 13, the surge tank 24, and the siphon main pipeline 0 at an angle of 30o, and is welded and laid along the outside of the main siphon pipeline 0; the surge tank 24 is a cylindrical water tank with a diameter of 1.5m and a length of 6 meters, which is connected to the DN1500 siphon main pipeline 0 through two DN700 short pipes.
[0061] Specifically, the functions of the surge tank 24 are as follows:
[0062] (1) Start the siphon. The second surge tank is at the highest point of the pipeline system. A vacuum pump can be used to extract the gas in the siphon system through the second surge tank to put the entire system in a negative pressure state. When the negative pressure and water level reach a certain level at the same time, the gravity of the water and the siphon principle can trigger the siphon effect, allowing the water to continue to flow on its own.
[0063] (2) Maintain constant water pressure. Automatically replenish or drain water according to the internal pressure or water level of the pressure regulating tank to maintain constant water pressure and flow in the siphon tube, ensuring the stability of the siphon process even if the external water source fluctuates.
[0064] (3) Energy storage and buffering. The surge tank plays the role of water storage and energy buffering. It can provide water in a short time to adapt to the changes in instantaneous flow demand. At the same time, it can also avoid siphon failure caused by insufficient or temporary interruption of water supply.
[0065] (4) Prevent water hammer effect. When the water flow in the siphon changes suddenly, water hammer is likely to occur, causing impact or even damage to the pipeline. By connecting the pressure regulating tank and the siphon, this part of energy can be absorbed and released to a certain extent, reducing the impact of the water hammer effect.
[0066] (5) Adapt to terrain conditions. In places with complex terrain, the pressure-surge tank can help overcome the terrain height difference, allowing the siphon tube to cross the undulating terrain and smoothly realize water flow transportation. This enhances the controllability, stability and adaptability of the siphon system and improves the system's operating efficiency and safety.
[0067] Specifically, the diameter of the siphon main pipeline of this project is large, and the pipeline volume is about 530m 3, a vacuum pump is needed to assist in extracting the gas in the pipeline and form a negative pressure in the pipeline to ensure the effective formation of the siphon. According to the upstream and downstream water levels, terrain conditions, and pipeline length, a 2BEA203 water ring vacuum pump is selected, with a motor power of 30kw, a pump speed of 880r / min, and a maximum pumping speed of 16m 3 / min. It takes about 34 minutes to evacuate the air in the pipeline, which can meet the requirements of siphon water supply. In order to enable the vacuum pump to effectively extract the gas in the pipeline to facilitate the formation of siphon, the vacuum pump is placed near the highest point of the siphon main pipeline 0, at the junction of the secondary platform of the foundation pit excavation and the upstream cofferdam, which is also the turning point of the siphon main pipeline 0. This is where the gas in the pipeline is most likely to gather, and the liquid flow rate is the slowest. It is also the place where the pressure in the pipeline is the lowest under the action of siphon. It is close to the pressure-stabilizing tank 24 and is used in conjunction with the pressure-stabilizing tank 24. In the water supply stage, when the gas in the pipeline increases, the gas can be extracted through the pressure-stabilizing tank 24 without affecting the normal flow of water in the pipeline.
[0068] Specifically, after the siphon pipeline is operating normally, the vacuum degree of the pipeline will decrease due to pipeline welding, air entering the valve and outlet, water level, flow rate changes, etc., affecting the siphon water supply effect. The vacuum pump needs to be turned on every 2 hours to discharge the air in the pipeline. This requires a special person to patrol and supervise the vacuum pump 24 hours a day, and the pipeline negative pressure maintenance means are backward. In order to solve the problem of continuous automatic maintenance of the internal vacuum of the super-large siphon pipeline system and greatly improve the management capacity of the temporary water supply pipeline, a siphon pipeline vacuum intelligent maintenance device is set up. The siphon pipeline vacuum intelligent maintenance device includes a vacuum pump and a control valve connected to the pressure regulating tank 24, and the siphon pipeline vacuum intelligent maintenance device is connected to the power system, the intelligent control system, and the video monitoring system.
[0069] According to the characteristics of siphon pipeline management, the equipment is at the construction site, the project department is some distance away from the construction site, there is no network on site, and the project department network needs to be used. The switching frequency is normal but the timeliness is strong, real-time monitoring is required, and the opening and closing operations and collision accidents must be recorded in time. The system is divided into the intelligent siphon pipeline part and the intelligent management system part.
[0070] Smart siphon pipe:
[0071] The on-site equipment is divided into four parts: vacuum pumps, valves and other auxiliary equipment, power system, intelligent control system, and video monitoring system.
[0072] (1) Vacuum pump, electric valve and other auxiliary equipment: Pipeline volume is about 530m 3 , a vacuum pump is needed to assist in extracting the gas in the pipeline and form a negative pressure in the pipeline to ensure the effective formation of the siphon. According to the upstream and downstream water levels, terrain conditions, and pipeline length, a 2BEA 203 water ring vacuum pump is selected, with a motor power of 30kw, a pump speed of 880r / min, and a maximum pumping speed of 16m3 / min.
[0073] (2) Power system: 220V AC power can be provided on site and can be directly introduced into the system for use. The vacuum pump and electronic valve are powered by 220V, and the pressure sensor, remote relay, intermediate relay and other auxiliary equipment are powered by a DC power module converted to 12V DC power. Considering the voltage instability and occasional power outages, a small UPS backup power supply is equipped to ensure the normal operation of the monitoring and transmission equipment. When a pressure relief problem occurs, the alarm can be normally sounded, the valve can be opened manually, and the power supply machine can be used to drive the vacuum pump to ensure the normal operation of the water supply pipeline.
[0074] (3) Intelligent control system: This system is independently developed and has functions such as network transmission, network transparent transmission, valve control, data exchange, and pressure sensing. The system has a standard TCP / IP protocol network interface and can be connected to wired networks such as the Yellow River private network and local broadband. It can also use China Unicom and China Mobile 4G cards to connect to the backend system through network transparent transmission, so that the system can be installed and deployed at any location on the project site. A pressure sensor is used to collect pipeline pressure at a frequency of 20Hz, which is transmitted to the remote management system through the network, and a pressure relief alarm is realized after analysis.
[0075] (4) Video monitoring: To meet regulatory requirements, the vacuum pump is used to observe the on-site situation in real time during operation to ensure safe and stable operation. Two spherical cameras are used for monitoring, one on the north and one on the south side of the project site. One camera captures the situation near the upper half of the pipeline, and the other captures the situation near the lower half of the pipeline. The on-site situation is observed at any time to ensure that the equipment is operating in a safe condition. The pipeline situation can also be observed remotely online after an alarm is triggered.
[0076] Intelligent management system:
[0077] Design and develop a management platform system, which has a graphical management interface, multi-user permission management, switch operation records with on-site pictures, pressure relief alarm records, voice, SMS alarms, real-time video monitoring and other functions.
[0078] The main interfaces and functions of the system are as follows:
[0079] (1) System login interface: The user's identity information can be confirmed. The user has two permissions: system administrator (who can add equipment, personnel, adjust system parameters, etc.) and operator (who can control equipment lifting and lowering, handle alarm records, etc.).
[0080] (2) Equipment control interface: Click the equipment icon on the map to enter the equipment control interface, which can display real-time video monitoring, collision alarm records, lifting records and other information. Each record is accompanied by a scene picture as supporting evidence. When an alarm occurs, you also need to enter this interface to handle the alarm information.
[0081] (3) System settings interface: This interface can be used for personnel management, system information, alarm phone, pressure system sensitivity (which can be set individually according to the equipment), etc., providing an intuitive management interface.
[0082] The system has developed its own platform management interface, which can provide graphical equipment centralized management, opening and closing operation records with on-site pictures, real-time pressure monitoring and alarm, automatic start of vacuum pumps and auxiliary equipment and other functions. Wireless network transmission, network transparent transmission, video monitoring, pressure sensing and other technologies are used to achieve negative pressure protection, low pressure alarm, remote opening and closing, video monitoring, operation records and other functions of the siphon pipeline. All switch operations can be realized, whether remote control or automatic start and stop, the operation records and on-site photos will be automatically saved on the server side. The control right can be handed over to the front-line staff in need to achieve full-field control. The system has achieved powerful management capabilities and greatly improved the utilization rate of equipment. Compared with existing products on the market, it is more in line with the actual needs of temporary water supply management of Zhangcaiyuan Gate Siphon System, enhances the level of informationization of water supply project management, and promotes the deep integration of temporary water supply work and informationization.
[0083] Based on the above implementation, as a preferred implementation, Figure 4 As shown, several exhaust holes 6 are provided, and a cross-shaped connecting pipe 61 is connected to the exhaust hole 6, and exhaust valves 62 are provided at the ends of the cross-shaped connecting pipe 61. At the highest point of the siphon main pipeline 0, that is, the top of the rising section of the pipeline, one or more exhaust holes must be provided to ensure that the air can be quickly discharged during the water injection stage to form an effective siphon effect. In areas where the pipeline turns, changes diameter or is relatively flat, gas is likely to accumulate here due to the slowdown of water flow. Therefore, exhaust holes are also required in these potential gas accumulation areas to prevent gas blockage caused by gas accumulation and ensure unimpeded water supply. Since the vacuum pump is set near the highest point of the siphon pipeline in this project, the total length of the siphon pipeline is 260m. Therefore, an exhaust hole is set in the middle of the smooth section of the pipeline and at the downstream turning point to avoid the reduction of efficiency due to gas generation and ensure the effective operation of the entire siphon system.
[0084] Specifically, the exhaust hole 6 is formed by welding a galvanized steel pipe with a diameter of 6 cm and a length of 1.2 m and two steel pipes with a diameter of 1 cm and a length of 30 cm into a cross shape. The upper end of the galvanized steel pipe is welded and blocked with a steel plate, and the lower end is welded to the siphon pipe and connected to the siphon pipe. An exhaust valve 62 is installed at each end of the steel pipe to facilitate exhaust. The exhaust hole 6 is made of on-site materials, which is simple to make, convenient and practical, and effectively prevents gas blockage caused by gas accumulation, ensuring smooth water supply.
[0085] Specifically, in order to visually see the water flow in the pipe and promptly detect and eliminate faults, an inspection hole 7 is installed 5m upstream of the downstream exhaust hole to monitor the water flow, water quality, and abnormal conditions such as bubbles inside the pipe in real time, so as to promptly detect problems and take corresponding measures.
[0086] Based on the above implementation, as a preferred implementation, Figure 3 As shown, the outlet end of the siphon main pipe 0 is connected to a drain pipe 8, and the pipe diameter of the drain pipe 8 is smaller than the pipe diameter of the siphon main pipe 0. Since the water level of the downstream river outlet is shallow, the pipe diameter at the end of the drain outlet is designed to be smaller than the pipe diameter of the siphon main pipe 0 in consideration of physical principles, performance and actual engineering conditions.
[0087] Specifically, the drain pipe 8 is made of a DN1200 steel pipe and connected to the DN1500 siphon main pipe 0 using a butterfly valve, which can enhance the negative pressure. When water flows through the drain outlet, the flow rate increases due to the smaller pipe diameter. According to Bernoulli's theorem, the static pressure decreases as the water flow rate increases. Therefore, a greater negative pressure (vacuum) is generated at the drain outlet, which is conducive to maintaining and enhancing the siphon effect and reducing the possibility of air entering.
[0088] Specifically, according to the requirement of submerged outflow of siphon pipe, the outlet pool 9 is made of 5mm thick steel plate, with the size of length*width*height=3.0m*1.5m*1.5m. It is fixed in the downstream river channel, and the outlet of the drainage pipe 8 is welded on the steel plate on the upstream side of the outlet pool 9. Steel pipes are placed on the side and front of the outlet to reduce the scouring of the channel by the outflow.
[0089] On the basis of the above-mentioned embodiment, as a preferred embodiment, the stacked beam unit 10 includes a vertical rod 101 and a vertical rod 102 arranged at the water outlet of the water outlet pool 9, and a plurality of horizontal rods 103 are detachably connected between the vertical rod 101 and the vertical rod 102.
[0090] Specifically, the number of crossbars 103 can be adjusted in time according to the outflow situation as needed to adjust the water level of the water outlet pool. The crossbars 103 are arranged in parallel from bottom to top. When the number of crossbars 103 is set more, the height of the water outlet of the water outlet pool 9 is higher, and the effective area of the water outlet is changed, thereby controlling the water level and height of the water outlet pool 9 to ensure that the siphon effect is continuously effective. When the water level of the water outlet pool 9 rises to the set height, the crossbars 103 will be gradually submerged. According to the height and number of the stacked beam design, the water output is adjusted to prevent the submerged outflow water level from being too high to affect the upstream and downstream water level difference, or the water level is too low to cause air to enter the siphon pipe.
[0091] On the basis of the above-mentioned embodiment, as a preferred embodiment, flow control valves 11 are provided on both the water inlet and the water outlet of the siphon main pipe 0 .
[0092] Specifically, the flow control valve 11 is arranged near the intersection of the siphon branch pipe 2 and the siphon main pipe 0. The flow control valve 11 adopts a DN700 butterfly valve, which is easy for workers to operate and maintain. At the same time, the water outlet end of the siphon main pipe 0 is also provided with a flow control valve 11, which is arranged at the connection position of the DN1500 siphon main pipe 0 and the drain pipe 8. The flow control valve is installed parallel to the axis of the siphon main pipe 0 to ensure that the flow control valve is tightly closed without leakage. At the same time, corresponding flanges and clamp connectors are provided at both ends of the flow control valve to ensure a firm connection with the siphon main pipe 0.
[0093] Specifically, the flow control valve 11 disposed at the water inlet end has the following main functions:
[0094] (1) Siphon start. When starting the siphon system, first open the water inlet valve and allow water to flow into the siphon pipe through the valve until the pipe is filled with water and exceeds the highest point to form a siphon effect.
[0095] (2) Control flow. The water inlet valve is used to control the flow rate and amount of water injected into the siphon pipe, which is crucial for smoothly starting the siphon process and maintaining stable pressure inside the pipe.
[0096] (3) Maintenance and shutdown. When the system stops running or undergoes maintenance, close the water inlet valve to prevent water backflow and loss, and also to facilitate cleaning and inspection of the inside of the pipeline.
[0097] Specifically, the flow control valve 11 disposed at the water outlet has the following main functions:
[0098] (1) Ensure that it is conducive to controlling the direction and flow of water, and also facilitate subsequent maintenance and adjustment.
[0099] (2) The water outlet valve is used to regulate and control the water outlet flow rate of the siphon pipe system. The valve opening can be adjusted according to actual needs to achieve effective management of water volume.
[0100] (3) When it is necessary to temporarily shut down the siphon pipe system, the water outlet valve can be completely closed to cut off the water flow output to achieve the purpose of suspending the system operation.
[0101] At the beginning of the siphon system startup, according to the siphon principle, first close the water outlet valve, and then gradually add water to the siphon state. When the system is shut down, wait until the water in the pipe is basically drained before closing the water outlet valve to avoid excessive pressure fluctuations in the pipe and damage to the pipe.
[0102] Application force
[0103] The present invention is applied to the reconstruction of the culvert of Zhangcaiyuan Gate in Jiaozuo. The construction period of the reconstruction project of the Yellow River culvert in Jiaozuo is mainly in the non-flood season, from September to June of the following year. This is also the main water diversion period of the Yellow River Irrigation District. The main water demand time of the irrigation district is spring irrigation from February to June, autumn irrigation in mid-to-late September, and winter irrigation in early to mid-December. The maximum monthly water diversion during the spring irrigation period basically occurs during the construction period, and the peak period of culvert water supply and the peak period of culvert reconstruction overlap. During the construction period, the old gate needs to be dismantled and rebuilt to excavate the levee for cofferdam sealing, interrupting water diversion. If the temporary water supply to the downstream irrigation area cannot be guaranteed during the construction of the culvert, it will seriously affect the industrial and agricultural production of the irrigation area along the Yellow River.
[0104] Zhangcaiyuan is located at the levee pile number 86+620 on the left bank of the Yellow River, with a bottom plate top elevation of 85.80m and a distance of 240m between the upstream and downstream cofferdams. The temporary water supply design flow is 18m 3 / s, the total water diversion volume during the construction period is 200 million m 3 The contract investment for this scheme is 23.02 million yuan, including 14.73 million yuan for civil construction and installation and 8.29 million yuan for operating hours.
[0105] According to the temporary water supply design of Zhangcaiyuan Gate, the water supply flow of this project is 18m 3 / s, 1.5m is required 3 / s There are 12 sets of floating pump stations, which consume a lot of electricity and have very high operating costs. According to the on-site investigation, the water level difference between the upstream and downstream of the temporary water supply is about 1.8m. How to use the pressure difference formed by the water level difference between the upstream river and the downstream as a power source to achieve environmentally friendly water supply without increasing investment, and solve the problem of high power consumption and high operating costs of the original temporary water supply design. Using the existing environment and conditions, combined with the actual project, and based on the siphon principle, a set of ultra-large diameter siphon water supply pipeline systems suitable for the project with small investment, low electricity consumption, low operating costs, and energy saving are developed, so as to save temporary water supply investment and improve temporary water supply efficiency, provide new ideas for the future reconstruction of temporary water supply construction of the Yellow River culvert, and provide new experience for the application of ultra-large diameter siphon water supply systems in the Yellow River water supply.
[0106] Specifically, Figure 5 , Figure 6 As shown, firstly, a siphon branch pipe 2 with a diameter of DN700 is set on the siphon main pipe 0. Siphon branch pipe 2 also serves as a siphon branch and must meet the hydraulic calculation conditions for the bifurcated pipe: 1. The node flow meets the continuity condition, that is, the flow flowing into the node is equal to the flow flowing out of the node; 2. There is only one pressure head on the node, that is, the pressure heads of each pipeline at the confluence are equal.
[0107] According to the node flow continuity condition, we get: Q 汇 =Q1+Q 支The water inlet of siphon branch pipe 2 and pipe 1 are both in the water inlet pool upstream of the cofferdam. The water surface elevation of the water inlet is 91.0m, and the water surface elevation of the water outlet is the same as that of pipe 1, 89.2m. The water level difference between upstream and downstream is Z = 1.8m. The DN700 pipe is 30m long, with a bottom valve filter, three 45o bends, three 30o bends, one 90o bend, and a lateral three-way plug.
[0108] The hydraulic calculation of the water injection siphon branch pipe is calculated according to the simple short pipe. The pipe is a welded steel pipe with a roughness n = 0.0125, d branch = 700mm, L branch = 30m, d sink = 1500mm, L sink = 200m, and the water surface height difference between the upstream and downstream of the siphon pipe is Z = 1.8m. The water flow direction in the branch pipe is known, Q1 = 3.331m3 / s. The branch pipe and the siphon main pipe 1 are equivalent to two series pipes. The flow rate of each pipe can be calculated by the branch pipe calculation formula.
[0109] Q 汇 =Q1+Q 支
[0110]
[0111] Where Q1=3.331m 3 / s, h1+h3=1.8m, H2+h3=1.8m
[0112] L1=60m,L 支 =30m, L 汇 =200m
[0113]
[0114] ζ1 is the local loss coefficient of pipeline 1, the bottom valve with filter is ζ1 mesh = 3.3, ζ1 right angle = 0.6, ζ1 30o bend = 3*0.2 = 0.6, ζ1 45o bend = 2*0.36 = 0.72, ζ1 butterfly valve is 0.2, ζ1 pipeline reduction = 0.5*(1-1.2^2 / 1.5^2) = 0.28, ζ1 outlet = 1.
[0115] Calculation yields: ξ=3.3+0.6+0.6+0.72+0.2+0.28+1=6.7
[0116] First assume that the water flow in the pipeline is in the square resistance area, and the Xie Cai formula can be used to calculate the head loss along the way.
[0117] Flow modulus Xie Cai coefficient R is the hydraulic radius.
[0118] R1 = pipe cross-sectional area / inner wall circumference = d1 / 4 = 0.375m,
[0119] R 支 = Pipeline cross-sectional area / inner wall circumference = d2 / 4 = 0.175m,
[0120] R 汇 =R1
[0121]
[0122]
[0123] C 汇 =C1
[0124]
[0125] K 汇 =K1=73.479m 3 / s
[0126]
[0127] Q 汇 =3.54m 3 / s
[0128] By Q 汇 =Q1+Q 支 Get Q 支 =3.54-3.331=0.209m 3 / s
[0129] After the water injection pipeline is transformed into a water injection siphon branch pipe, Q 汇 =3.54m 3 / s<4.5m 3 / s, it still cannot meet the designed water supply demand, and the water supply system needs to be further modified by adding another branch pipe, that is, setting a siphon branch pipe 1. Figure 7 , Figure 8 shown.
[0130] According to the node flow continuity condition, we get: Q 汇 =Q1+Q 支1 , Q1 is the pipeline flow rate of the siphon main pipeline 0 water inlet section, Q 支 is the pipe flow rate of siphon branch pipe 1, Q 汇 It is the pipeline flow rate of the confluence section 0 of the siphon main pipeline.
[0131] The water flow direction in the siphon main pipe 0 and the siphon branch pipe 1 is known, Q1 = 3.331m 3 / s. Siphon branch pipe 1 and siphon main pipe 0 are equivalent to two series pipes, and the flow rate of each pipe can be calculated by the calculation formula of siphon branch pipe 1.
[0132] Q 汇 =Q1+Q支
[0133]
[0134] Where Q1=3.331m 3 / s, h1+h3=1.8, H2+h3=1.8m
[0135] L1=15m,L 支 =13m, L 汇 =235m
[0136]
[0137] ζ1 is the local loss coefficient of pipeline 1, the bottom valve with filter is ζ1 mesh = 3.3, ζ1 right angle = 0.6, ζ1 30o bend = 3*0.2 = 0.6, ζ1 45o bend = 2*0.36 = 0.72, ζ1 butterfly valve is 0.2, ζ1 pipeline reduction = 0.5*(1-1.2^2 / 1.5^2) = 0.28, ζ1 outlet = 1.
[0138] Calculation yields: ζ1=3.3+0.6+0.6++0.72+0.2+0.28+1=6.7.
[0139] First assume that the water flow in the pipeline is in the square resistance area, and the Xie Cai formula can be used to calculate the head loss along the way.
[0140] Flow modulus Xie Cai coefficient R is the hydraulic radius.
[0141] R1 = pipe cross-sectional area / inner wall circumference = d1 / 4 = 0.375m,
[0142] R 支 = Pipeline cross-sectional area / inner wall circumference = d2 / 4 = 0.175m,
[0143] R 汇 =R1
[0144]
[0145]
[0146] C 汇 =C1
[0147]
[0148] K 汇 =K1=73.479m 3 / s
[0149]
[0150] Q 汇 =3.551m 3 / s
[0151] By Q 汇 =Q1+Q 支 Get Q 支 =3.551-3.331=0.22m 3 / s
[0152] In addition, the water injection pump of the siphon branch of the water injection pipeline is a 37KW mixed flow pump, which can provide 0.222m 3 / s water supply flow rate.
[0153] Q 总 =Q1+Q 支1 +Q 支 +Q 注水泵 =3.331+0.209+0.22+0.222=3.982m 3 / s
[0154] Q 总 =3.982m 3 / s<4.5m 3 / s, according to the design requirements, the design flow rate of each pipeline is 4.5m 3 / s is the water supply flow rate when the irrigation area has the maximum water consumption. Siphon system 3.982m 3 The water supply flow of / s is combined with the pump station to meet the water supply demand.
[0155] Specifically, the maximum vacuum value in the siphon generally occurs at the highest position of the pipe and the farthest from the pipe inlet. In this project, the maximum vacuum value occurs near the corner of the siphon pipe where the upstream cofferdam and the secondary platform of the foundation pit excavation meet, that is, section 2-2, with an elevation of 95.26m. Fig. 9 As shown, let the height difference between the upstream water surface and the center of section 2-2 be h, and list the energy equation for the upstream sections 1-1 and 2-2:
[0156] Where l 1-2 =60m Pipe length from siphon inlet to 2-2 section
[0157] Ignore the flow velocity head, that is The pipe flow is turbulent, so a=1.0
[0158] ζ is the local loss coefficient of the pipeline. The bottom valve with filter screen has ζ screen = 3.3, ζ right angle = 0.6, ζ 30o bends (2) = 0.2*3 = 0.4. The calculation result is: ζ = 3.3 + 0.6 + 0.4 = 4.3.
[0159]
[0160] but
[0161] According to the performance of the vacuum pump, the vacuum value in the pipe is not greater than 8 meters, that is
[0162] In order to ensure the normal operation of the siphon, the height of the top of the siphon from the upstream water level should not exceed 6.91m. The top elevation of the siphon main pipe is 95.26m+1.5m=96.76m, the upstream water level is 91.0m, h s =96.76-91=5.76m≤6.91m.
[0163] The maximum installation elevation of branch pipe 1 is 96.56m, 96.56-91=5.26≤6.91m,
[0164] That is, the installation height of the siphon pipe meets the vacuum requirements.
[0165] The present invention utilizes the existing environment and conditions, combines the actual project, and develops a set of ultra-large diameter siphon water supply pipeline system suitable for the project based on the siphon principle, which has small investment, low electricity consumption, low operating cost and energy saving, so as to save temporary water supply investment and improve temporary water supply efficiency, provide new ideas for the temporary water supply construction of the Yellow River culvert reconstruction in the future, and provide new experience for the application of ultra-large diameter siphon water supply system in the Yellow River water supply.
[0166] The present invention effectively alleviates the electricity demand for water supply in pumping stations, greatly reduces the operation and maintenance cost of water supply, can realize efficient and reliable water diversion and supply functions, provides a new solution, adapts to different hydrological environments and engineering needs, and can be widely used in temporary water supply for culvert reconstruction, Yellow River water supply, flood control and drainage, etc. It is of great significance to improve water resource scheduling capabilities and reduce flood disasters. The system combines modern engineering technology with traditional siphon principles. It not only has high innovation and practicality in design, but also has good reliability and risk resistance in actual operation.
[0167] Any details not provided in the present invention are conventional technical means known to those skilled in the art. The above content shows and describes the basic principles, main features and beneficial effects of the present invention. The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for implementing an ultra-large diameter intelligent siphon water supply pipeline system, characterized in that: The installation steps include: S1: Lay a siphon main pipe (0) between the upstream and downstream, and respectively provide a siphon branch pipe 1 (1) and a siphon branch pipe 2 (2) at the water inlet end of the siphon main pipe (0); S2: Install bottom valves on the water inlet ends of the siphon main pipe (0), siphon branch pipe 1 (1), and siphon branch pipe 2 (2), and place them in the upstream water inlet pool; S3: Install a first pressure stabilizing tank (3) and a second pressure stabilizing tank (4) on the siphon main pipeline (0), and provide a connecting exhaust pipe (5) between the first pressure stabilizing tank (3) and the second pressure stabilizing tank (4); S4: The second pressure stabilizing tank (4) is connected to the siphon pipeline vacuum intelligent maintaining device; S5: Install a mixed flow pump at the water inlet end of the siphon main pipe (0) and the siphon branch pipe 2 (2); S6: The outlet end of the siphon main pipe (0) is connected to a drain pipe (8), and the drain pipe (8) is connected to a downstream water outlet pool (9); S7: a height-adjustable stoplog unit (10) is arranged at the outlet of the water outlet pool (9); S7: Install an exhaust hole (6) and an inspection hole (7) on the siphon main pipe (0); S8: Siphon water supply pipe system is in operation.
2. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 is characterized in that: The operation steps of S8 are as follows: S8.1: Close the water outlet valve, open the mixed flow pump, water injection valve, vacuum pump, and exhaust hole (6), and inject water into the siphon main pipe (0); S8.2: The vacuum degree of the siphon main pipe (0) is automatically adjusted and maintained through the siphon pipe vacuum intelligent maintenance device and management system. When the vacuum degree of the siphon main pipe (0) reaches 0.8, the water outlet valve is opened to supply water to the downstream.
3. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2 is characterized in that: The pressure stabilizing tank 1 (3) is arranged above the confluence of the siphon main pipe (0) and the siphon branch pipe 1 (1) through a short pipe (31), and the siphon branch pipe 1 (1) is connected to the pressure stabilizing tank 1 (3).
4. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2 is characterized in that: The siphon pipeline vacuum intelligent maintenance device comprises a vacuum pump and a control valve connected to the second pressure regulating tank (4).
5. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 4 is characterized in that: The second pressure-stabilizing tank (4) and the vacuum pump are both arranged on the upper surface of the siphon main pipeline (0).
6. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2 is characterized in that: A plurality of exhaust holes (6) are provided, and a cross-shaped connecting pipe (61) is connected to the exhaust hole (6), and exhaust valves (62) are provided at the ends of the cross-shaped connecting pipe (61).
7. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2 is characterized in that: The diameter of the drainage pipe (8) is smaller than the diameter of the siphon main pipe (0).
8. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2 is characterized in that: The stacked beam unit (10) comprises a first vertical rod (101) and a second vertical rod (102) arranged at a water outlet of the water outlet pool (9), and a plurality of horizontal rods (103) are detachably connected between the first vertical rod (101) and the second vertical rod (102).
9. The implementation method of the ultra-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2, characterized in that: The water inlet and outlet ends of the siphon main pipe (0) are both provided with flow control valves (11).
10. The implementation method of the super-large diameter intelligent siphon water supply pipeline system according to claim 1 or 2, characterized in that: The siphon pipeline vacuum intelligent maintaining device is connected with the power system, the intelligent control system and the video monitoring system.