Intelligent charging equipment and charging method for open-pit mine rock perforation blasting

The intelligent charging equipment and method address the issue of inadequate charge control in open-pit mining by using a branch attention fusion model and quadratic programming to optimize charge amounts, enhancing precision and safety while reducing waste and environmental impact.

CN119085441APending Publication Date: 2024-12-06CHINA NON-METALLIC MATERIALS NANJING MINE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411427374.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing intelligent charging technologies for open-pit mining do not comprehensively consider geological characteristics and blasthole information, leading to inadequate control of charge amounts, resulting in resource waste and reduced blasting safety.

Method used

An intelligent charging equipment and method that utilizes a branch attention fusion model, multivariate regression, and quadratic programming to analyze optimal charge ranges and amounts, incorporating geological and drilling parameters, and considering environmental impact to achieve precise control of charge amounts in each blasthole.

Benefits of technology

Enables accurate and efficient charging, reducing resource waste and environmental impact by minimizing deviations in charge amounts, ensuring safety and optimizing blasting efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119085441A_ABST
    Figure CN119085441A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent charging, in particular to intelligent charging equipment and charging method for open-pit mine rock perforation blasting, and the intelligent charging equipment comprises a movable chassis, a charging pump, a storage bin, a charging mechanical arm, an explosive conveying pipe, an explosive conveying pipe telescopic mechanism and a controller; the method comprises the following steps: firstly, analyzing an optimal explosive load interval of each blast hole through a controller, calculating the maximum allowable single-section blasting explosive load in each delay period, and determining the optimal explosive load of each blast hole according to the optimal explosive load interval and the maximum allowable single-section blasting explosive load; then, according to the optimal explosive loading amount, a controller controls an explosive loading pump, a storage bin, an explosive loading mechanical arm and an explosive conveying pipe telescopic mechanism to complete explosive loading on each blast hole; according to the invention, the charging accuracy is improved, so that the waste of explosives and the influence of blasting on the surrounding environment can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent charging, and in particular to intelligent charging equipment and a charging method for rock perforating blasting in an open-pit mine. Background Art

[0002] Open-pit mining is one of the important ways to develop mineral resources. In the process of open-pit mining, perforation blasting technology is the key link to achieve efficient mining. The perforation blasting process includes several main steps: drilling, charging, plugging and detonation. Among them, the charging link has a decisive influence on the blasting effect. The amount of charging, the type of explosives and the uniformity of charging will directly affect the crushing effect of blasting. If the charging amount is insufficient, the rock will not be completely crushed, affecting the mining efficiency; too much charging will lead to waste of resources and even cause excessive crushing, increase the subsequent cleaning workload, and also increase safety risks.

[0003] In recent years, with the development of intelligent and automated technologies, intelligent charging technology has been gradually applied to open-pit mining, and has brought significant advantages. For example, the Chinese patent with publication number CN117053643A provides an intelligent blasting blasthole charging robot and charging method. In this invention, the intelligent blasting blasthole charging robot carries the overall design of the charge pack storage module, the charge pack grabbing module, the blasthole charging module, the rock cuttings backfilling module and the charge information processing module through the charge walking module, which solves the problem of more manpower required to place explosive packs.

[0004] However, the existing technology does not comprehensively consider the geological characteristics of the open-pit mine, the relevant information of the blastholes and the impact of blasting on the surrounding environment, resulting in insufficient precise control of the charge amount in each blasthole, which in turn causes waste of resources and reduced blasting safety.

[0005] Therefore, an intelligent charging device and charging method for open-pit mine rock perforating blasting are proposed. Summary of the invention

[0006] The purpose of the present invention is to provide an open-pit mine rock perforating blasting intelligent charging equipment and a charging method, the intelligent charging equipment comprising a mobile chassis, a charging pump, a storage bin, a charging robot arm, a drug delivery pipe, a drug delivery pipe telescopic mechanism and a controller; first, the controller analyzes the optimal charging amount interval of each blast hole, calculates the maximum allowable single-stage blasting amount in each delay period, and determines the optimal charging amount of each blast hole according to the optimal charging amount interval and the maximum allowable single-stage blasting amount; then, according to the optimal charging amount, the controller controls the charging pump, the storage bin, the charging robot arm and the drug delivery pipe telescopic mechanism to complete the charging of each blast hole, thereby realizing precise control of intelligent charging.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] An open-pit mine rock perforating blasting intelligent charging equipment, comprising: a mobile chassis, a charging pump, a storage bin, a charging mechanical arm, a drug delivery tube, a drug delivery tube telescopic mechanism and a controller; the charging pump and the storage bin are located on the mobile chassis; the storage bin comprises a first charging switch, a second charging switch, a medicine tank and a weight sensor; the medicine tank is located inside the storage bin; the medicine tank is installed on the weight sensor; the first end of the medicine tank is connected to the charging pump, and the first charging switch is installed at the connecting part; the second end of the medicine tank is connected to the first end of the drug delivery tube, and the second charging switch is installed at the connecting part; the second end of the drug delivery tube is telescopically extended by the drug delivery tube telescopic mechanism; the drug delivery tube telescopic mechanism The mechanism is connected to the end effector of the charging robot arm; the controller is located inside the mobile chassis; the controller communicates with the charging pump, the storage bin, the charging robot arm and the telescopic mechanism of the drug delivery tube; the controller is used to analyze the optimal charging amount of the blasthole, and control the charging pump, the storage bin, the charging robot arm and the telescopic mechanism of the drug delivery tube to complete the charging of the blasthole according to the optimal charging amount; the step of the controller analyzing the optimal charging amount of the blasthole includes: analyzing the optimal charging amount interval of each blasthole; calculating the maximum allowable single-stage blasting amount of each delay period; determining the optimal charging amount of each blasthole according to the optimal charging amount interval and the maximum allowable single-stage blasting amount.

[0009] Preferably, the controller completes charging of the blasthole according to the optimal charge amount, specifically comprising:

[0010] Controlling the charging mechanical arm to align the drug delivery tube telescopic mechanism with the blast hole;

[0011] Controlling the drug delivery tube telescopic mechanism to extend the drug delivery tube into the blast hole to a predetermined depth;

[0012] Recording the initial value of the weight sensor and monitoring the current value of the weight sensor in real time;

[0013] Turning on the first charge switch, the second charge switch and the charge pump to charge the medicine;

[0014] Calculate the difference between the current value and the initial value in real time to obtain the real-time charge amount;

[0015] When the real-time charge amount reaches the optimal charge amount, the first charge switch, the second charge switch and the charge pump are closed to complete the charge.

[0016] Preferably, the controller analyzes the optimal charge interval through a branch attention fusion model; the branch attention fusion model includes an input layer, a feature extraction layer, an attention mechanism layer, a feature fusion layer and an output layer; the step of analyzing the optimal charge interval includes:

[0017] Obtain geological parameters of open-pit mines and drilling parameters of blastholes;

[0018] The geological parameters and the drilling parameters are preprocessed and feature constructed through the input layer to obtain a first feature vector set X={X g ,X d};in, represents the first geological parameter characteristic vector; a n represents the learnable weight of the nth feature in the first geological parameter feature vector; represents the nth feature of the first geological parameter feature vector; n represents the number of features in the first geological parameter feature vector; represents the first while-drilling parameter feature vector; b m represents the learnable weight of the mth feature in the first while drilling parameter feature vector; represents the mth feature of the first while-drilling parameter feature vector; m represents the number of features in the first while-drilling parameter feature vector;

[0019] The feature extraction layer extracts features from the elements in the first feature vector set respectively to obtain a second feature vector set X′={X′ g ,X′ d}; where X′ g represents the second geological parameter characteristic vector; X d ′ represents the second while-drilling parameter characteristic vector;

[0020] The attention mechanism layer performs attention calculation on the elements in the second feature vector set respectively to obtain a third feature vector set X″={X″ g ,X″ d}; where X″ g Represents the third geological parameter characteristic vector; X″ d represents the third while-drilling parameter eigenvector;

[0021] The elements in the third feature vector set are fused through the feature fusion layer to obtain a fused feature X gd ;

[0022] The fused features are processed by the output layer to obtain the upper and lower bounds of the optimal charge amount interval.

[0023] Preferably, the input layer includes a first geological parameter branch and a first drilling-while-drilling parameter branch; the feature extraction layer includes a second geological parameter branch and a second drilling-while-drilling parameter branch; the attention mechanism layer includes a third geological parameter branch and a third drilling-while-drilling parameter branch; the first geological parameter feature vector is obtained through the first geological parameter branch; the first drilling-while-drilling parameter feature vector is obtained through the first drilling-while-drilling parameter branch; the second geological parameter feature vector is obtained through the second geological parameter branch; the second drilling-while-drilling parameter feature vector is obtained through the second drilling-while-drilling parameter branch; the third geological parameter feature vector is obtained through the third geological parameter branch; the third drilling-while-drilling parameter feature vector is obtained through the third geological parameter branch.

[0024] Preferably, the training data set of the branch attention fusion model includes historical geological parameters, historical drilling parameters and corresponding historical optimal charge ranges in historical open-pit mine perforation blasting.

[0025] Preferably, the step of the controller calculating the maximum allowable single-stage blasting charge comprises:

[0026] Obtaining the blasting source distance; the blasting source distance is the minimum distance between the blasting center point and surrounding buildings;

[0027] Determine the permissible vibration velocity limit of blasting based on the main vibration frequency of historical blasting and the type of surrounding buildings;

[0028] The maximum allowable single-stage blasting charge amount for each delay period is calculated according to the blasting source distance and the allowable vibration speed limit value through the maximum allowable single-stage blasting charge amount equation.

[0029] Preferably, the step of establishing the maximum allowable single-stage blasting charge amount equation comprises:

[0030] The historical peak vibration velocity of each blast in the historical open-pit mine perforation blasting, the maximum value of the single-stage blasting charge in each delay period, and the historical blasting source distance are obtained to obtain the blasting vibration data set;

[0031] By analyzing the blasting vibration data set through multiple regression, a vibration attenuation equation is established;

[0032] The maximum allowable single-stage blasting charge equation is established based on the vibration attenuation equation.

[0033] Preferably, the controller determines the optimal charge amount of each blasthole during the delay period by a quadratic programming algorithm, specifically including:

[0034] Establishing an objective function for minimizing the deviation between the optimal charge amount of each blasthole and the center value of the optimal charge amount interval;

[0035] Establishing constraint conditions; the constraint conditions include interval constraints and total amount constraints; the interval constraints are used to ensure that the charge amount of each blast hole is within the optimal charge amount interval; the total amount constraints are used to ensure that the total charge amount of all blast holes within the delay period does not exceed the maximum allowable single-stage blasting charge amount;

[0036] The optimal charge for each blast hole is obtained using a quadratic programming solver.

[0037] Preferably, a relaxation technique is introduced into the quadratic programming algorithm, specifically including: introducing a slack variable into the interval constraint; and adding a slack variable penalty term into the objective function.

[0038] An open-pit mine rock perforation blasting intelligent charging method uses the open-pit mine rock perforation blasting intelligent charging equipment.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] 1. The invention adopts a branch attention fusion model to analyze the optimal charge range of each blasthole; the model is trained by historical data, the model can be continuously optimized, and has strong adaptability; it includes an input layer, a feature extraction layer, an attention mechanism layer, a feature fusion layer, and an output layer, and can simultaneously process two types of data, geological parameters and drilling parameters, to adapt to complex and changeable geological environments; learnable feature weights are designed in the input layer, and important features are automatically selected through back propagation; attention calculations are performed on different features in the attention mechanism layer to highlight important information; the use of a branch attention fusion model to analyze the optimal charge range lays the foundation for the subsequent determination of the optimal charge.

[0041] 2. The present invention analyzes historical blasting data through multivariate regression, establishes a vibration attenuation equation, and then derives the maximum allowable single-stage blasting charge equation for each delay period in delayed blasting; this method takes into account multiple factors such as blasting source distance, vibration frequency, surrounding building types, etc., and can accurately calculate the maximum allowable single-stage blasting charge in each delay period, which can effectively reduce the impact on the surrounding environment, help to accurately control the charge amount, and thus avoid the waste of resources caused by excessive charging.

[0042] 3. The present invention adopts a quadratic programming method to determine the optimal charge of each blasthole; by establishing an objective function and constraint conditions, the deviation between the charge of each blasthole and the ideal value is minimized while satisfying the optimal charge range and the maximum allowable single-stage blasting charge. At the same time, the relaxation technology is introduced to improve the flexibility and adaptability of the optimization process; multi-objective optimization is achieved, which not only ensures the rationality of the single-hole charge, but also ensures the safety of the total charge of each delay period, obtains the optimal charge of each blasthole, and reduces resource waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 A schematic diagram of the structure of an open-pit mine rock perforating blasting intelligent charging equipment provided by an embodiment of the present invention;

[0044] Figure 2 A schematic flow chart of an intelligent charging method for rock perforating blasting in an open-pit mine provided in an embodiment of the present invention.

[0045] In the figure: 10, mobile chassis; 20, charging pump; 30, storage bin; 40, charging robot arm; 50, drug delivery tube; 60, drug delivery tube telescopic mechanism; 70, controller; 31, first charging switch; 32, second charging switch; 33, medicine tank; 34, weight sensor; 41, end effector of charging robot arm. DETAILED DESCRIPTION

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] In open-pit mine perforation blasting, delayed blasting refers to a blasting technology that uses delayed detonators to detonate blastholes in sections in different time sequences. When using delayed blasting technology for sectioned blasting, each delayed period blasting includes multiple blastholes, and the total amount of charge in these blastholes is the single-section blasting charge. During the blasting process, it is crucial to accurately control the charge of each blasthole; too much charge may lead to excessive crushing, increase the difficulty of subsequent processing, and also increase the blasting cost; too little charge may lead to insufficient rock crushing and fail to achieve the expected mining effect. Accurate control of charge can improve blasting efficiency and reduce resource waste. In addition, a reasonable charge can effectively control the vibration and noise generated by blasting, reducing the impact on the surrounding environment and personnel.

[0048] The present invention provides an open-pit mine rock perforating blasting intelligent charging equipment and charging method, which can comprehensively consider the geological characteristics of the open-pit mine, blasthole related information and the impact of blasting on the surrounding environment to achieve accurate charging. The effectiveness of the present invention will be illustrated from two embodiments below.

[0049] Embodiment 1

[0050] See also Figure 1, an open-pit mine rock perforating blasting intelligent charging equipment, comprising: a mobile chassis 10, a charging pump 20, a storage bin 30, a charging mechanical arm 40, a drug delivery tube 50, a drug delivery tube telescopic mechanism 60 and a controller 70; the charging pump 20 and the storage bin 30 are located on the mobile chassis 10; the storage bin 30 comprises a first charging switch 31, a second charging switch 32, a medicine tank 33 and a weight sensor 34; the medicine tank 33 is located inside the storage bin 30; the medicine tank 33 is installed on the weight sensor 34; the first end of the medicine tank 33 is connected to the charging pump 20, and the first charging switch 31 is installed at the connecting part; the second end of the medicine tank 33 is connected to the first end of the drug delivery tube 50, and the second charging switch 32 is installed at the connecting part; the second end of the drug delivery tube 50 is connected to the first end of the drug delivery tube 50, and the second charging switch 32 is installed at the connecting part; the second end of the drug delivery tube 50 is connected to the drug delivery tube telescopic mechanism 6 0 for extension and retraction; the drug delivery tube extension mechanism 60 is connected to the end effector 41 of the charging robot arm; the controller 70 is located inside the mobile chassis 10; the controller 70 communicates with the charging pump 20, the storage bin 30, the charging robot arm 40 and the drug delivery tube extension mechanism 60; the controller 70 is used to analyze the optimal charge amount of the blasthole, and control the charging pump 20, the storage bin 30, the charging robot arm 40 and the drug delivery tube extension mechanism 60 to complete the charging of the blasthole according to the optimal charge amount; the step of the controller 70 analyzing the optimal charge amount of the blasthole includes: analyzing the optimal charge amount interval of each blasthole; calculating the maximum allowable single-stage blasting charge amount of each delay period; determining the optimal charge amount of each blasthole according to the optimal charge amount interval and the maximum allowable single-stage blasting charge amount.

[0051] Intelligent charging equipment has realized the automation and intelligence of the charging process, improved the operation efficiency, reduced the risk of manual operation and improved the safety; at the same time, it has realized the precise control of charging amount, reduced the waste of resources and the impact on the surrounding environment.

[0052] Further, see Figure 1 The controller 70 completes charging of the blasthole according to the optimal charge amount, specifically including:

[0053] Controlling the charging robot arm 40 to align the drug delivery tube telescopic mechanism 60 with the blast hole;

[0054] Controlling the drug delivery tube retracting mechanism 60 to extend the drug delivery tube 50 into the blast hole to a predetermined depth;

[0055] Recording the initial value of the weight sensor 34;

[0056] Turn on the first charging switch 31, the second charging switch 32 and the charging pump 20 to charge the medicine;

[0057] Real-time monitoring of the current value of the weight sensor 34 during the charging process;

[0058] Calculate the difference between the current value and the initial value in real time to obtain the real-time charge amount;

[0059] When the real-time charge amount reaches the optimal charge amount, the first charge switch 31, the second charge switch 32 and the charge pump 20 are closed to complete the charge.

[0060] It realizes precise control and real-time monitoring of the charging process. The real-time feedback of the weight sensor ensures precise control of the charging. The automated charging process reduces human errors and improves operating efficiency and safety.

[0061] Further, the controller analyzes the optimal charge interval through a branch attention fusion model; the branch attention fusion model includes an input layer, a feature extraction layer, an attention mechanism layer, a feature fusion layer and an output layer; the step of analyzing the optimal charge interval includes:

[0062] Obtain geological parameters of open-pit mines and drilling parameters of blastholes;

[0063] The geological parameters and the drilling parameters are preprocessed and feature constructed through the input layer to obtain a first feature vector set X={X g ,X d};in, represents the first geological parameter characteristic vector; a n represents the learnable weight of the nth feature in the first geological parameter feature vector; represents the nth feature of the first geological parameter feature vector; n represents the number of features in the first geological parameter feature vector; represents the first while-drilling parameter feature vector; b m represents the learnable weight of the mth feature in the first while drilling parameter feature vector; represents the mth feature of the first while-drilling parameter feature vector; m represents the number of features in the first while-drilling parameter feature vector;

[0064] The feature extraction layer extracts features from the elements in the first feature vector set respectively to obtain a second feature vector set X′={X′ g ,X′ d}; where X′ g represents the second geological parameter characteristic vector; X d ′ represents the second while-drilling parameter characteristic vector;

[0065] The attention mechanism layer performs attention calculation on the elements in the second feature vector set respectively to obtain a third feature vector set X″={X″ g ,X″d}; where X″ g Represents the third geological parameter characteristic vector; X″ d represents the third while-drilling parameter eigenvector;

[0066] The elements in the third feature vector set are fused through the feature fusion layer to obtain a fused feature X gd ;

[0067] The fused features are processed by the output layer to obtain the upper and lower bounds of the optimal charge amount interval.

[0068] The first geological parameter characteristic vector X g ∈R n*D , R n*D represents a real number matrix with n rows and D columns, where D represents the dimension of each feature in the first geological parameter feature vector; the dimension of each feature in the first geological parameter feature vector; X in the first while drilling parameter feature vector d ∈R m*T , T represents the dimension of each feature in the first geological parameter feature vector, is a time series data with a length of T; the second geological parameter characteristic vector C g represents the dimension of each feature in the second geological parameter feature vector; the second drilling parameter feature vector C d represents the dimension of each feature in the second drilling parameter feature vector; the feature fusion layer projects the elements in the third feature vector set to the same dimension, and then concatenates them to obtain the fused feature X gd ∈R (n+m)*C , C represents the dimension after linear projection.

[0069] In the embodiment of the present application, the geological data of the open-pit mine and the drilling data of the blasthole are preliminarily selected to obtain geological parameters and drilling parameters. Specific parameter examples are shown in Table 1; the geological parameters of 5 measuring points are recorded through the geological survey and geographic information system of the open-pit mine; the drilling parameters are obtained through the drilling measurement instrument during the drilling process; the input layer first cleans the data in the geological parameters and the drilling parameters, and then uniquely encodes the classification features, standardizes the continuous features, processes the time series data, ensures that all time series data have the same length, and finally constructs a feature vector based on the preprocessed data.

[0070] Table 1 Examples of geological parameters and drilling parameters

[0071]

[0072] The simultaneous processing of geological parameters and drilling parameters improves the accuracy of the optimal charge interval analysis; the use of learnable weights in the feature vector enhances the adaptability of the model; the attention mechanism highlights important features, enhances the interpretability of the model, and improves the generalization ability of the model; the model can adapt to different open-pit mines and can be continuously optimized through training with historical data.

[0073] Further, the input layer includes a first geological parameter branch and a first drilling-while-drilling parameter branch; the feature extraction layer includes a second geological parameter branch and a second drilling-while-drilling parameter branch; the attention mechanism layer includes a third geological parameter branch and a third drilling-while-drilling parameter branch; the first geological parameter feature vector is obtained through the first geological parameter branch; the first drilling-while-drilling parameter feature vector is obtained through the first drilling-while-drilling parameter branch; the second geological parameter feature vector is obtained through the second geological parameter branch; the second drilling-while-drilling parameter feature vector is obtained through the second drilling-while-drilling parameter branch; the third geological parameter feature vector is obtained through the third geological parameter branch; the third drilling-while-drilling parameter feature vector is obtained through the third geological parameter branch.

[0074] In an embodiment of the present application, the second geological parameter branch includes a one-dimensional convolutional neural network layer and a self-attention mechanism layer; the second while-drilling parameter branch includes a one-dimensional convolutional neural network layer and a bidirectional long short-term memory network layer.

[0075] The local features in the geological parameters are captured by a one-dimensional convolutional neural network, and then the feature vector extracted by the one-dimensional convolutional neural network is processed by the self-attention mechanism to capture the relationship between different geological parameters and obtain the second geological parameter feature vector; the local time features in the drilling parameters are captured by a one-dimensional convolutional neural network, and then the feature vector extracted by the one-dimensional convolutional neural network is processed by a bidirectional long short-term memory network to capture the long-term time dependency and obtain the second drilling parameter feature vector; in addition, the design of the branch structure realizes the effective fusion of different types of data and improves the accuracy of the model.

[0076] Furthermore, the training data set of the branch attention fusion model includes historical geological parameters, historical drilling parameters and corresponding historical optimal charge amount ranges in historical open-pit mine perforation blasting; the historical optimal charge amount range is summarized based on the results of historical open-pit mine perforation blasting and charging data according to expert experience.

[0077] The use of historical data and expert experience improves the practicality of the model, ensures the reliability of the model analysis results, and the model can be continuously optimized as data accumulates.

[0078] Furthermore, the step of the controller calculating the maximum allowable single-stage blasting charge comprises:

[0079] Obtaining the blasting source distance; the blasting source distance is the minimum distance between the blasting center point and surrounding buildings;

[0080] Determine the permissible vibration velocity limit of blasting based on the main vibration frequency of historical blasting and the type of surrounding buildings;

[0081] The maximum allowable single-stage blasting charge amount for each delay period is calculated according to the blasting source distance and the allowable vibration speed limit value through the maximum allowable single-stage blasting charge amount equation.

[0082] In the embodiment of the present application, the allowable vibration speed limit is determined according to the national standard document "Safety Regulations for Blasting" based on the main vibration frequency of historical blasting and the building type of the surrounding environment.

[0083] Taking into account the distance from the blasting source and the vibration limit specified by the standard, an equation for the maximum allowable single-stage blasting charge is established. The maximum allowable single-stage blasting charge for each delay period is obtained through the equation, which further ensures precise charge control, effectively controls the impact of blasting on the surrounding environment, improves blasting safety, and reduces environmental risks.

[0084] Furthermore, the step of establishing the maximum allowable single-stage blasting charge amount equation includes:

[0085] The historical peak vibration velocity of each blast in the historical open-pit mine perforation blasting, the maximum value of the single-stage blasting charge in each delay period, and the historical blasting source distance are obtained to obtain the blasting vibration data set;

[0086] The vibration attenuation equation was established by multivariate regression analysis of the blasting vibration data set. The formula is as follows:

[0087]

[0088] Where v represents the peak vibration velocity of the particle; Q max represents the maximum value of the single-stage blasting charge in each delay period; r represents the distance from the blasting source; k and α represent the parameters determined by regression analysis;

[0089] The maximum allowable single-stage blasting charge equation is established based on the vibration attenuation equation, and the formula is as follows:

[0090]

[0091] Among them, Q a Indicates the maximum allowable single-stage blasting charge; v lim Indicates the allowable vibration speed limit.

[0092] Based on the regression analysis of historical data, the accuracy and reliability of the equation are improved, and the vibration attenuation equation is established, which provides a scientific basis for charge quantity control. The method is universal and can be applied to different open-pit mines and blasting environments.

[0093] Furthermore, the controller determines the optimal charge amount of each blast hole within the delay period by a quadratic programming algorithm, specifically including:

[0094] Establishing an objective function for minimizing the deviation between the optimal charge amount of each blasthole and the center value of the optimal charge amount interval;

[0095] Establishing constraint conditions; the constraint conditions include interval constraints and total amount constraints; the interval constraints are used to ensure that the charge amount of each blast hole is within the optimal charge amount interval; the total amount constraints are used to ensure that the total charge amount of all blast holes within the delay period does not exceed the maximum allowable single-stage blasting charge amount;

[0096] The optimal charge for each blast hole is obtained using a quadratic programming solver.

[0097] Multi-objective optimization was achieved through quadratic programming, taking into account both the rationality of a single hole and overall safety, minimizing the deviation between the actual charge and the ideal charge, improving the consistency of the blasting effect, considering interval constraints and total amount constraints, and ensuring the feasibility of the optimization results.

[0098] Furthermore, a relaxation technique is introduced into the quadratic programming algorithm, specifically including: introducing a slack variable into the interval constraint; and adding a slack variable penalty term into the objective function.

[0099] The constraints are as follows:

[0100]

[0101]

[0102] Among them, q i represents the charge amount of the ith blast hole in each delay period; It represents the lower bound of the optimal charge amount interval of the ith blasthole in each delay period; represents the upper bound of the optimal charge amount interval for the ith blasthole in each delay period; s i represents the slack variable of the i-th blasthole in each delay period; N represents the number of blastholes in the delay period;

[0103] The objective function is as follows:

[0104]

[0105] Among them, λ represents the weight of the slack variable penalty term.

[0106] The relaxation variables avoid the situation where the sum of the lower bounds of the optimal charge amount interval for each blasthole during the delay period is still greater than the maximum allowable single-stage blasting charge, which improves the efficiency and stability of solving the optimization problem and the flexibility of the optimization process.

[0107] Embodiment 2

[0108] See also Figure 2 , an open-pit mine rock perforation blasting intelligent charging method, using the open-pit mine rock perforation blasting intelligent charging equipment, the open-pit mine rock perforation blasting intelligent charging method comprises:

[0109] The controller analyzes the optimal charge range for each blast hole;

[0110] The maximum permissible single-stage blasting charge quantity for each delay period is calculated by the controller;

[0111] According to the optimal charge range and the maximum allowable single-stage blasting charge, the optimal charge of each blast hole is determined by a controller;

[0112] The controller controls the charging mechanical arm to align the drug delivery tube telescopic mechanism with the blast hole;

[0113] The controller controls the drug delivery tube extension mechanism to extend the drug delivery tube into the blast hole to a predetermined depth;

[0114] Record the initial value of the weight sensor through the controller;

[0115] Turn on the first charging switch, the second charging switch and the charging pump through the controller to start charging;

[0116] The current value of the weight sensor during the charging process is monitored in real time by the controller;

[0117] The controller calculates the difference between the current value and the initial value in real time to obtain the real-time charge amount;

[0118] When the real-time charge amount reaches the optimal charge amount, the first charge switch, the second charge switch and the charge pump are turned off by the controller to end the charge.

[0119] Further, the controller analyzes the optimal charge interval through a branch attention fusion model; the branch attention fusion model includes an input layer, a feature extraction layer, an attention mechanism layer, a feature fusion layer and an output layer; the step of analyzing the optimal charge interval includes:

[0120] Obtain geological parameters of open-pit mines and drilling parameters of blastholes;

[0121] The geological parameters and the drilling parameters are preprocessed and feature constructed through the input layer to obtain a first feature vector set X={X g ,X d};in, represents the first geological parameter characteristic vector; a i represents the learnable weight of the ith feature in the geological parameter feature vector; represents the i-th feature in the geological parameter feature vector, i=1, 2, ..., n; n represents the number of features in the first geological parameter feature vector; represents the first while-drilling parameter eigenvector; b j represents the learnable weight of the jth feature in the first while drilling parameter feature vector; represents the jth feature in the while-drilling parameter feature vector, j=1, 2, ..., m; m represents the number of features in the first while-drilling parameter feature vector;

[0122] The feature extraction layer extracts features from the elements in the first feature vector set respectively to obtain a second feature vector set X′={X′ g ,X′ d}; where X′ g represents the second geological parameter characteristic vector; X d ′ represents the second while-drilling parameter characteristic vector;

[0123] The attention mechanism layer performs attention calculation on the elements in the second feature vector set respectively to obtain a third feature vector set X″={X″ g ,X″ d}; where X″ g Represents the third geological parameter characteristic vector; X″ d represents the third while-drilling parameter eigenvector;

[0124] The elements in the third feature vector set are fused through the feature fusion layer to obtain a fused feature X gd ;

[0125] The fused features are processed by the output layer to obtain the upper and lower bounds of the optimal charge amount interval.

[0126] Furthermore, the step of the controller calculating the maximum allowable single-stage blasting charge comprises:

[0127] Obtaining the blasting source distance; the blasting source distance is the minimum distance between the blasting center point and surrounding buildings;

[0128] Determine the permissible vibration velocity limit of blasting based on the main vibration frequency of historical blasting and the type of surrounding buildings;

[0129] The maximum allowable single-stage blasting charge amount for each delay period is calculated according to the blasting source distance and the allowable vibration speed limit value through the maximum allowable single-stage blasting charge amount equation.

[0130] Furthermore, the step of establishing the maximum allowable single-stage blasting charge amount equation includes:

[0131] The historical peak vibration velocity of each blast in the historical open-pit mine perforation blasting, the maximum value of the single-stage blasting charge in each delay period, and the historical blasting source distance are obtained to obtain the blasting vibration data set;

[0132] The vibration attenuation equation was established by multivariate regression analysis of the blasting vibration data set. The formula is as follows:

[0133]

[0134] Where v represents the peak vibration velocity of the particle; Q max represents the maximum value of the single-stage blasting charge in each delay period; r represents the distance from the blasting source; k and α represent the parameters determined by regression analysis;

[0135] The maximum allowable single-stage blasting charge equation is established based on the vibration attenuation equation, and the formula is as follows:

[0136]

[0137] Among them, Q a Indicates the maximum allowable single-stage blasting charge; v lim Indicates the allowable vibration speed limit.

[0138] Furthermore, the controller determines the optimal charge amount of each blast hole within the delay period by a quadratic programming algorithm, specifically including:

[0139] Establishing an objective function for minimizing the deviation between the optimal charge amount of each blasthole and the center value of the optimal charge amount interval;

[0140] Establishing constraint conditions; the constraint conditions include interval constraints and total amount constraints; the interval constraints are used to ensure that the charge amount of each blast hole is within the optimal charge amount interval; the total amount constraints are used to ensure that the total charge amount of all blast holes within the delay period does not exceed the maximum allowable single-stage blasting charge amount;

[0141] The optimal charge for each blast hole is obtained using a quadratic programming solver.

[0142] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An open-pit mine rock perforating blasting intelligent charging equipment, characterized in that: include: A mobile chassis, a drug charging pump, a storage bin, a drug charging mechanical arm, a drug delivery tube, a drug delivery tube telescopic mechanism and a controller; the drug charging pump and the storage bin are located on the mobile chassis; the storage bin includes a first drug charging switch, a second drug charging switch, a drug tank and a weight sensor; the drug tank is located inside the storage bin; the drug tank is installed on the weight sensor; the first end of the drug tank is connected to the drug charging pump, and the first drug charging switch is installed at the connecting part; the second end of the drug tank is connected to the first end of the drug delivery tube, and the second drug charging switch is installed at the connecting part; the second end of the drug delivery tube is telescopically extended by the drug delivery tube telescopic mechanism; the drug delivery tube telescopic mechanism is connected to the end effector of the drug charging mechanical arm; the controller is located inside the mobile chassis; the controller communicates with the drug charging pump, the storage bin, the drug charging mechanical arm and the drug delivery tube telescopic mechanism; the controller is used to analyze the optimal charge amount of the blast hole, and control the drug charging pump, the storage bin, the drug charging mechanical arm and the drug delivery tube telescopic mechanism to complete the charge of the blast hole according to the optimal charge amount; The step of the controller analyzing the optimal charge of the blasthole includes: analyzing the optimal charge range of each blasthole; calculating the maximum allowable single-stage blasting charge of each delay period; and determining the optimal charge of each blasthole based on the optimal charge range and the maximum allowable single-stage blasting charge.

2. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 1 is characterized in that: The controller completes charging of the blasthole according to the optimal charge amount, specifically comprising: Controlling the charging mechanical arm to align the drug delivery tube telescopic mechanism with the blast hole; Controlling the drug delivery tube telescopic mechanism to extend the drug delivery tube into the blast hole to a predetermined depth; Recording the initial value of the weight sensor and monitoring the current value of the weight sensor in real time; Turning on the first charge switch, the second charge switch and the charge pump to charge the medicine; Calculate the difference between the current value and the initial value in real time to obtain the real-time charge amount; When the real-time charge amount reaches the optimal charge amount, the first charge switch, the second charge switch and the charge pump are closed to complete the charge.

3. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 1 is characterized in that: The controller analyzes the optimal charge amount interval through a branch attention fusion model; The branch attention fusion model includes an input layer, a feature extraction layer, an attention mechanism layer, a feature fusion layer and an output layer; The step of analyzing the optimal charge amount interval comprises: Obtain geological parameters of open-pit mines and drilling parameters of blastholes; The geological parameters and the drilling parameters are preprocessed and feature constructed through the input layer to obtain a first feature vector set X={X g ,X d };in, represents the first geological parameter characteristic vector; a n represents the learnable weight of the nth feature in the first geological parameter feature vector; represents the nth feature of the first geological parameter feature vector; n represents the number of features in the first geological parameter feature vector; represents the first while-drilling parameter eigenvector; b m represents the learnable weight of the mth feature in the first while-drilling parameter feature vector; d m represents the mth feature of the first while-drilling parameter feature vector; m represents the number of features in the first while-drilling parameter feature vector; The feature extraction layer extracts features from the elements in the first feature vector set respectively to obtain a second feature vector set X′={X′ g ,X′ d }; where X′ g represents the second geological parameter characteristic vector; X d ′ represents the second while-drilling parameter characteristic vector; The attention mechanism layer performs attention calculation on the elements in the second feature vector set respectively to obtain a third feature vector set X″={X′ g ′,X′ d ′}; where X′ g ′ represents the third geological parameter characteristic vector; X d ″ represents the third while drilling parameter characteristic vector; The elements in the third feature vector set are fused through the feature fusion layer to obtain a fused feature X gd ; The fused features are processed by the output layer to obtain the upper and lower bounds of the optimal charge amount interval.

4. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 3 is characterized in that: The input layer includes a first geological parameter branch and a first drilling-while-drilling parameter branch; the feature extraction layer includes a second geological parameter branch and a second drilling-while-drilling parameter branch; the attention mechanism layer includes a third geological parameter branch and a third drilling-while-drilling parameter branch; the first geological parameter feature vector is obtained through the first geological parameter branch; the first drilling-while-drilling parameter feature vector is obtained through the first drilling-while-drilling parameter branch; the second geological parameter feature vector is obtained through the second geological parameter branch; the second drilling-while-drilling parameter feature vector is obtained through the second drilling-while-drilling parameter branch; the third geological parameter feature vector is obtained through the third geological parameter branch; the third drilling-while-drilling parameter feature vector is obtained through the third geological parameter branch.

5. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 3 is characterized in that: The training data set of the branch attention fusion model includes historical geological parameters, historical drilling parameters and corresponding historical optimal charge amount intervals in historical open-pit mine perforation blasting.

6. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 1 is characterized in that: The step of the controller calculating the maximum allowable single-stage blasting charge comprises: Obtaining the blasting source distance; the blasting source distance is the minimum distance between the blasting center point and surrounding buildings; Determine the permissible vibration velocity limit of blasting based on the main vibration frequency of historical blasting and the type of surrounding buildings; The maximum allowable single-stage blasting charge amount for each delay period is calculated according to the blasting source distance and the allowable vibration speed limit value through the maximum allowable single-stage blasting charge amount equation.

7. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 6 is characterized in that: The steps of establishing the maximum allowable single-stage blasting charge amount equation include: The historical peak vibration velocity of each blast in the historical open-pit mine perforation blasting, the maximum value of the single-stage blasting charge in each delay period, and the historical blasting source distance are obtained to obtain the blasting vibration data set; By analyzing the blasting vibration data set through multiple regression, a vibration attenuation equation is established; The maximum allowable single-stage blasting charge equation is established based on the vibration attenuation equation.

8. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 1 is characterized in that: The controller determines the optimal charge amount of each blast hole within the delay period by a quadratic programming algorithm, specifically including: Establishing an objective function for minimizing the deviation between the optimal charge amount of each blasthole and the center value of the optimal charge amount interval; Establishing constraint conditions; the constraint conditions include interval constraints and total amount constraints; the interval constraints are used to ensure that the charge amount of each blast hole is within the optimal charge amount interval; the total amount constraints are used to ensure that the total charge amount of all blast holes within the delay period does not exceed the maximum allowable single-stage blasting charge amount; The optimal charge for each blast hole is obtained using a quadratic programming solver.

9. The intelligent charging equipment for open-pit mine rock perforating blasting according to claim 7 is characterized in that: Introducing relaxation technology into the quadratic programming algorithm specifically includes: introducing slack variables into the interval constraints; and adding slack variable penalty terms into the objective function.

10. An intelligent charging method for open-pit mine rock perforation blasting, characterized in that: An open-pit mine rock perforating blasting intelligent charging equipment is used as described in any one of claims 1 to 9.