Real-time prediction device and method for tunnel rock and soil stability
By using a real-time prediction device that combines hard support and pressure support in the tunnel, the mixing and chromaticity analysis of pigment liquids is used to solve the problem of inaccurate monitoring of the deformation of the tunnel soil layer structure, and the tunnel arches and arches are realized Accurate prediction of waist deformation improves the accuracy and safety of tunnel stability monitoring.
Patent Information
- Application Number
- CN202411237674.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-06
AI Technical Summary
Existing tunnel monitoring devices cannot accurately monitor the deformation changes of tunnel soil layer structure, especially at the vault and arch waist, resulting in inaccurate prediction of tunnel stability, which may ignore slight deformation and affect safety.
A real-time prediction device for tunnel geotechnical stability is designed, using hard support and pressure support combined with real-time prediction mechanism, to realize deformation monitoring of tunnel soil layer structure through the mixing of pigment liquid and chromaticity analysis, and to use arc-shaped counters The mixing and flow design of the pigment liquid, combined with the mixing mechanism and color analyzer, realize real-time prediction of the deformation size of the soil layer structure at the tunnel arch and arch waist .
Accurate monitoring of the deformation of the tunnel soil layer structure can be achieved, and the deformation size at the vault and arch waist can be predicted in real time, which improves the sensitivity and accuracy of the monitoring system, ensuring the safety of the tunnel and the protection of construction personnel.
Smart Images

Figure CN119085468A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel rock soil stability prediction, and in particular to a real-time prediction device and method for tunnel rock soil stability. Background Art
[0002] In the process of tunnel excavation, the original balance of the soil will inevitably be destroyed. In order to establish a new balance, it is necessary to install support frames for support, such as Figure 1 The support frame includes a hard support 1 and a compression support 3. The hard support is used to provide strong support, and the compression support 3 is used to play an elastic support and release stress. In order to ensure the safety of foundation pits and cave construction, it is necessary to monitor the tunnel in order to evaluate the safety status of the tunnel and take effective measures to ensure the safety of the tunnel itself, the protection target and the relevant construction personnel.
[0003] After the original equilibrium state of the soil structure around the tunnel is broken, the stress in the soil structure will be redistributed. The presence of soil stress on the support frame will cause the yield support 3 to gradually deform. This process is in a very slow state. This change is not obvious to the tunnel. However, when this slow amount accumulates to a certain extent, a sudden change of the tunnel may occur. In the actual detection and monitoring process, the small deformation distance of the tunnel is easily ignored by factors such as the displacement and error of the detection instrument, so that it cannot play a more effective detection and monitoring effect.
[0004] The tunnel consists of a vault, a waist and a bottom. The existing monitoring devices cannot accurately monitor the overall change in deformation after the tunnel soil structure is broken, and the individual movement distance of the soil structure at the vault and waist after the vault is broken. Therefore, we propose a real-time prediction device and method for tunnel rock and soil stability to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a real-time prediction device and method for tunnel rock and soil stability to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] An optional installation relationship between the strong support and the pressure-yielding support is that two semicircular blocks are fixedly connected to the inner bottom of the pressure-yielding support, a rotating rod is rotatably connected between the two corresponding semicircular blocks, two vertical rods are fixedly sleeved on the outer side of the rotating rod, six round rods are fixedly connected to the top of the hard support, the vertical rods are slidably sleeved on the outer sides of the corresponding round rods, a spring is fixedly connected between the bottom end of the vertical rod and the top of the hard support, and the spring is movably sleeved on the outer sides of the corresponding round rods.
[0008] A real-time prediction device for tunnel rock and soil stability, comprising hard support and yield support, wherein the hard support is provided with a real-time prediction mechanism, the real-time prediction mechanism comprising a fixing box, a first rectangular plate and a fixing box;
[0009] The fixing box is fixedly installed on the inner bottom of the hard support, and is respectively arranged at an arch and two arch waists. The three fixing boxes are filled with red, yellow and blue pigment liquids respectively. The first rectangular plate is slidably sleeved on the inner side of the fixing box. The top of the first rectangular plate is fixedly connected with a square rod. The outer side of the square rod is slidably connected with the hard support. The top of the square rod is fixedly connected with an arc-shaped abutment block, and the arc-shaped abutment block abuts against the lower side of the yield support. An arc-shaped seat is provided on the inner side of the hard support, and an arc-shaped cavity is opened on the arc-shaped seat. The arc-shaped cavity and the fixing box are filled with a white base. Liquid, the bottom of the fixed box is connected to the top of the arc seat and a first one-way valve is fixed therebetween, the output end of the first one-way valve faces downward, and the fixed box is fixedly installed at the bottom of the arc seat. When the original equilibrium state of the soil structure at the tunnel vault and the arch waist is broken, the soil stress acts on the yield support, causing the yield support to deform, and the inner bottom of the fixed box contacts the arc abutment block and drives the arc abutment block to move downward. The arc abutment block drives the corresponding first rectangular plates to move downward through the square rod, and the three first rectangular plates respectively discharge the pigment liquid in the corresponding fixed box into the arc cavity through the first one-way valve.
[0010] Further preferably, the arc-shaped seat is connected to and fixed with a circular tube, the bottom end of the circular tube extends into the fixed box, and the red, yellow and blue pigment liquids are mixed with the white base liquid and discharged into the fixed box through the circular tube. Red, yellow and blue are the three primary colors of pigments, and after mixing, the mixing ratio of red, yellow and blue can be reversely deduced. This is the prior art and no unnecessary elaboration is made here.
[0011] Further preferably, a fixed plate is fixedly sleeved inside the fixed box, a second rectangular plate is slidably sleeved between the right side of the fixed plate and the side wall of the fixed box, the surface area of the first rectangular plate is 5-10 times the surface area of the second rectangular plate, and the top of the fixed box is connected to and fixed with a rectangular box with an opening at the bottom.
[0012] Further preferably, a scale plate is fixedly connected to the top of the second rectangular plate, the top end of the scale plate extends to the top of the rectangular box, and the rectangular box is slidably mounted on the outer side of the scale plate.
[0013] Further preferably, a second one-way valve is provided in the fixed box, and the fixed plate is fixedly sleeved on the outside of the second one-way valve. The opening of the second one-way valve faces right, and the red, yellow and blue pigment liquids are mixed with the white base liquid and discharged into the right side of the fixed plate through the second one-way valve. The mixed liquid drives the second rectangular plate to move upward, and the second rectangular plate drives the scale plate to move upward, thereby reflecting the overall deformation size of the soil structure at the tunnel arch and waist after being broken.
[0014] Further preferably, a support plate is fixedly connected to the right side of the hard support, the top of the support plate is fixedly connected to the bottom of the fixed box, and the front side of the fixed box is fixedly connected to a colorimeter, the detection head of the colorimeter extends into the fixed box, and the colorimeter can analyze the proportion of red, yellow and blue in the mixed liquid, and the distance moved upward by the scale plate can be used to calculate the individual deformation sizes of the soil structure at the arch crown and the arch waist after being broken, thereby facilitating the one-way targeted treatment of the arch crown and the arch waist.
[0015] Further preferably, a stirring mechanism is provided in the arc-shaped cavity, the stirring mechanism includes an arc-shaped plate, a third one-way valve and a trapezoidal block, the arc-shaped plate is fixedly installed on the inner bottom of the arc-shaped cavity, the arc-shaped plate divides the arc-shaped cavity into an upper flow channel and a lower flow channel, the third one-way valve is arranged on the inner side of the arc-shaped plate, the side of the third one-way valve away from the hard support is the outlet end, a plurality of trapezoidal blocks are fixedly installed on the side of the arc-shaped plate away from the hard support, and the width of the upper flow channel is greater than the width of the lower flow channel.
[0016] Further preferably, a plurality of first triangular blocks are fixedly connected to the side of the arc plate away from the hard support, a plurality of second triangular blocks are fixedly connected to the inner wall of the side of the arc cavity away from the hard support, and a water pump is fixedly connected to the top of the fixed box. When the water pump works, the mixed liquid entering the fixed box is extracted and discharged into the lower flow channel. If the flow velocity of the mixed liquid in the lower flow channel is too fast, the fluid will flow to the side with fast flow velocity, so that the mixed liquid in the upper flow channel passes through the third one-way valve and is fully mixed with the mixed liquid in the lower flow channel. The trapezoidal block, the first triangular block and the second triangular block are arranged at the third one-way valve. The trapezoidal block can further limit the flow area, increase the flow velocity of the lower flow channel at the one-way valve, and increase the flow velocity in the one-way valve. The arrangement of the first triangular block and the second triangular block has a turbulent effect, so that the mixed liquid is mixed more thoroughly.
[0017] Further preferably, the water outlet of the water pump is connected to and fixed with the same L-shaped pipe to the right side of the arc seat, the water inlet of the water pump is connected to and fixed with a vertical pipe, and a paddle is rotatably installed on the left inner wall of the fixed box. The impact of the mixed liquid on one side of the paddle can drive the paddle to rotate, and the paddle during the rotation process can accelerate the mixing efficiency of the mixed liquid.
[0018] The present invention also proposes a prediction method of a real-time prediction device for tunnel rock and soil stability, comprising the following steps:
[0019] Step 1: The soil layer stress acts on the compression support to drive the arc-shaped abutment block to move downward, and the arc-shaped abutment block drives the first rectangular plate to move downward through the square rod, and the pigment liquid in the fixed box is discharged into the upper flow channel through the first one-way valve, and the mixed liquid is discharged into the fixed box through the round pipe;
[0020] Step 2: The water pump extracts the mixed liquid entering the fixed box and discharges it into the lower flow channel through the L-shaped pipe. The mixed liquid in the upper flow channel passes through the third one-way valve and is fully mixed with the mixed liquid in the lower flow channel.
[0021] Step 3: The mixed liquid is discharged to the right side of the fixed plate through the second one-way valve, and the mixed liquid drives the scale plate to move upward through the second rectangular plate, reflecting the overall deformation size of the soil structure at the tunnel vault and arch waist after being broken;
[0022] Step 4: Start the colorimeter to detect the ratio of red, yellow and blue in the fully mixed liquid. It can calculate the individual deformation amount after the soil structure at the arch crown and arch waist is broken, achieving the purpose of real-time prediction.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1. In the present invention, when the original equilibrium state of the soil structure at the tunnel vault and the arch waist is broken, the existence of the soil stress acts on the compression support to drive the arc-shaped abutment block to move downward, and the arc-shaped abutment block drives the corresponding first rectangular plate to move downward through the square rod, and the pigment liquid in the fixed box is discharged into the upper flow channel through the first one-way valve, and the red, yellow and blue pigment liquids are mixed with the white base liquid in the arc-shaped cavity and discharged into the fixed box through the round pipe.
[0025] 2. The water pump of the present invention extracts the mixed liquid entering the fixed box through the vertical pipe and discharges it into the lower flow channel through the L-shaped pipe. If the flow rate of the mixed liquid in the lower flow channel is too fast, the fluid will flow to the side with a faster flow rate, so that the mixed liquid in the upper flow channel passes through the third one-way valve and is fully mixed with the mixed liquid in the lower flow channel. The mixed liquid forms a cycle in the upper flow channel and the lower flow channel area, and finally achieves full mixing and is discharged into the fixed box.
[0026] 3. The mixed liquid of the red, yellow and blue pigment liquids and the white base liquid of the present invention is discharged to the right side of the fixed plate through the second one-way valve, and the mixed liquid drives the second rectangular plate to move upward, and the second rectangular plate drives the scale plate to move upward. The distance that the scale plate moves upward reflects the overall deformation size. The colorimeter can detect the proportion of red, yellow and blue in the mixed liquid. According to the distance that the scale plate moves upward, the size of the overall deformation after the soil structure at the arch crown and arch waist is broken can be calculated respectively, thereby achieving the purpose of real-time prediction and realizing more accurate deformation monitoring. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the main stereoscopic structure of the present invention;
[0028] Figure 2 It is a bottom-up three-dimensional structural schematic diagram of the present invention;
[0029] Figure 3 It is a front view structural schematic diagram of the present invention;
[0030] Figure 4 It is a three-dimensional diagram of the connection between the arc seat and the fixed box in the present invention;
[0031] Figure 5 This is a schematic diagram of the enlarged three-dimensional structure of area A in the present invention;
[0032] Figure 6 It is a schematic diagram of the internal cross-sectional structure of the fixing box in the present invention;
[0033] Figure 7 It is a schematic diagram of the internal cross-sectional structure of the arc seat and the fixing box in the present invention;
[0034] Figure 8 It is a schematic diagram of the enlarged structure of area B in the present invention;
[0035] Fig. 9 It is a schematic diagram of the enlarged structure of region C in the present invention.
[0036] In the figure:
[0037] 1. Hard support; 101. Fixed box; 102. First rectangular plate; 103. Square rod; 104. Arc-shaped abutment block; 105. Arc-shaped seat; 106. Arc-shaped cavity; 107. First one-way valve; 108. Fixed box; 109. Round tube; 110. Fixed plate; 111. Second rectangular plate; 112. Rectangular box; 113. Scale plate; 114. Second one-way valve; 115. Support plate; 116. Colorimeter;
[0038] 2. arc plate; 201. third one-way valve; 202. trapezoidal block; 203. first triangular block; 204. second triangular block; 205. water pump; 206. L-shaped pipe; 207. vertical pipe; 208. paddle;
[0039] 3. Allowable support; 4. Semicircular block; 5. Rotating rod; 6. Vertical rod; 7. Round rod; 8. Spring. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] An optional installation relationship between the hard support 1 and the pressure-yielding support 3 is that two semicircular blocks 4 are fixedly connected to the inner bottom of the pressure-yielding support 3, and a rotating rod 5 is rotatably connected between the two corresponding semicircular blocks 4. Two vertical rods 6 are fixedly sleeved on the outer side of the rotating rod 5. Six round rods 7 are fixedly connected to the top of the hard support 1, and the vertical rods 6 are slidably sleeved on the outer sides of the corresponding round rods 7. A spring 8 is fixedly connected between the bottom end of the vertical rod 6 and the top of the hard support 1, and the spring 8 is movably sleeved on the outer sides of the corresponding round rods 7.
[0042] Example 1, please refer to Figure 1-9 , the present invention provides a technical solution: a real-time prediction device for tunnel rock and soil stability, including a hard support 1 and a yield support 3, a real-time prediction mechanism is provided on the hard support 1, and the real-time prediction mechanism includes a fixing box 101, a first rectangular plate 102 and a fixing box 108;
[0043] The fixing box 101 is fixedly installed on the inner bottom of the hard support 1, and is respectively arranged at an arch and two arch waists. The three fixing boxes 101 are filled with red, yellow and blue pigment liquids respectively. The first rectangular plate 102 is slidably sleeved on the inner side of the fixing box 101. The top of the first rectangular plate 102 is fixedly connected with a square rod 103. The outer side of the square rod 103 is slidably connected with the hard support 1. The top of the square rod 103 is fixedly connected with an arc-shaped abutment block 104, and the arc-shaped abutment block 104 abuts against the lower side of the pressure-relieving support 3. An arc seat 105 is provided on the inner side of the hard support 1, and an arc-shaped cavity 106 is opened on the arc seat 105. The arc cavity 106 and the fixing box 108 are filled with white base liquid. The size of the fixing box 108 can be set to be smaller, which is used to reduce To reduce the usage of white base liquid, the bottom of the fixed box 101 is connected to the top of the arc seat 105 and a first one-way valve 107 is fixed therebetween, the output end of the first one-way valve 107 is downward, and the fixed box 108 is fixedly installed at the bottom of the arc seat 105. When the original equilibrium state of the soil structure at the tunnel arch and the arch waist is broken, the soil stress acts on the compression support 3, which deforms the compression support 3. The inner bottom of the fixed box 101 contacts the arc abutment block 104 and drives the arc abutment block 104 to move downward. The arc abutment block 104 drives the corresponding first rectangular plate 102 to move downward through the square rod 103. The three first rectangular plates 102 respectively discharge the pigment liquid in the corresponding fixed box 101 into the arc cavity 106 through the first one-way valve 107.
[0044] In this embodiment, specifically: the arc seat 105 is connected to and fixed with a round tube 109, the bottom end of the round tube 109 extends into the fixed box 108, and the red, yellow and blue pigment liquids are mixed with the white base liquid and discharged into the fixed box 108 through the round tube 109;
[0045] In this embodiment, specifically: a fixed plate 110 is fixedly sleeved in the fixed box 108, a second rectangular plate 111 is slidably sleeved between the right side of the fixed plate 110 and the side wall of the fixed box 108, the surface area of the first rectangular plate 102 is 5-10 times the surface area of the second rectangular plate 111, and a rectangular box 112 with an opening at the bottom is connected and fixed to the top of the fixed box 108;
[0046] In this embodiment, specifically: a scale plate 113 is fixedly connected to the top of the second rectangular plate 111, the top of the scale plate 113 extends to the top of the rectangular box 112, and the rectangular box 112 is slidably sleeved on the outside of the scale plate 113;
[0047] In this embodiment, specifically: a second one-way valve 114 is provided in the fixed box 108, and the fixed plate 110 is fixedly sleeved on the outer side of the second one-way valve 114, and the opening of the second one-way valve 114 faces rightward. After the red, yellow and blue pigment liquids are mixed with the white base liquid, they are discharged to the right side of the fixed plate 110 through the second one-way valve 114, and the mixed liquid drives the second rectangular plate 111 to move upward, and the second rectangular plate 111 drives the scale plate 113 to move upward, so as to reflect the overall deformation size of the soil layer structure at the tunnel arch and the arch waist after being broken;
[0048] In this embodiment, specifically: a support plate 115 is fixedly connected to the right side of the hard support 1, the top of the support plate 115 is fixedly connected to the bottom of the fixed box 108, and a colorimeter 116 is fixedly connected to the front side of the fixed box 108. The detection head of the colorimeter 116 extends into the fixed box 108. The colorimeter 116 can analyze the proportion of red, yellow and blue in the mixed liquid, and the distance of the upward movement of the scale plate 113 can be used to calculate the individual deformation size of the soil structure at the arch and the waist after being broken, so as to realize the one-way targeted treatment at the arch and the waist;
[0049] In this embodiment, specifically: a stirring mechanism is provided in the arc-shaped cavity 106, and the stirring mechanism includes an arc-shaped plate 2, a third one-way valve 201 and a trapezoidal block 202. The arc-shaped plate 2 is fixedly installed on the inner bottom of the arc-shaped cavity 106, and the arc-shaped plate 2 divides the arc-shaped cavity 106 into an upper flow channel and a lower flow channel. The third one-way valve 201 is arranged on the inner side of the arc-shaped plate 2, and the side of the third one-way valve 201 away from the hard support 1 is the outlet end. A plurality of trapezoidal blocks 202 are fixedly installed on the side of the arc-shaped plate 2 away from the hard support 1, and the width of the upper flow channel is greater than the width of the lower flow channel.
[0050] In this embodiment, specifically: a plurality of first triangular blocks 203 are fixedly connected to one side of the arc plate 2 away from the hard support 1, a plurality of second triangular blocks 204 are fixedly connected to the inner wall of the side of the arc cavity 106 away from the hard support 1, a water pump 205 is fixedly connected to the top of the fixed box 108, and the water pump 205 works to extract the mixed liquid entering the fixed box 108 and discharge it into the lower flow channel. If the flow rate of the mixed liquid in the lower flow channel is too fast, the fluid will flow to the side with a fast flow rate, so that the mixed liquid in the upper flow channel passes through the third one-way valve 201 and is fully mixed with the mixed liquid in the lower flow channel. The trapezoidal block 202, the first triangular block 203 and the second triangular block 204 are arranged at the third one-way valve 201, and the trapezoidal block 202 can further limit the flow area, increase the flow rate of the lower flow channel at the one-way valve, and increase the flow rate in the one-way valve. The arrangement of the first triangular block 203 and the second triangular block 204 has a disturbing effect, so that the mixed liquid is mixed more thoroughly;
[0051] In this embodiment, specifically: the water outlet of the water pump 205 is connected to and fixed with the same L-shaped tube 206 with the right side of the arc seat 105, the water inlet of the water pump 205 is connected to and fixed with a vertical pipe 207, and a paddle 208 is rotatably installed on the left inner wall of the fixed box 108. The impact of the mixed liquid on one side of the paddle 208 can drive the paddle 208 to rotate, and the paddle 208 during the rotation process can accelerate the mixing efficiency of the mixed liquid.
[0052] The present invention uses the second rectangular plate 111 to drive the scale plate 113 to move upward to reflect the overall displacement size. The colorimeter 116 can detect the proportion of red, yellow and blue in the mixed liquid. The distance that the soil structure at the arch crown and the arch waist is broken can be calculated in conjunction with the distance that the scale plate 113 moves upward. The overall deformation size after the soil structure at the tunnel arch crown and the arch waist is broken, as well as the individual deformation size after the soil structure at the arch crown and the arch waist is broken can be monitored and reflected synchronously, achieving the purpose of real-time prediction. The small deformation generated at the tunnel arch crown and the arch waist can be amplified by the scale plate, thereby increasing the sensitivity and accuracy of the monitoring system. The amplification multiple is expressed by the distance that the scale plate moves upward, and an amplification of more than 10 times can be achieved, thereby achieving more accurate deformation monitoring, which is convenient for subsequent targeted preventive measures for different deformation sizes at the arch crown and the arch waist.
[0053] When the present invention is working: after the original equilibrium state of the soil structure at the tunnel vault and the arch waist is broken, the existence of the soil stress acts on the compression support 3, the compression support 3 is deformed, and its inner bottom contacts the arc-shaped abutment block 104 and drives the arc-shaped abutment block 104 to move downward, and the arc-shaped abutment block 104 drives the corresponding first rectangular plate 102 to move downward through the square rod 103, and the three first rectangular plates 102 respectively discharge the color liquid in the corresponding fixed box 101 into the upper flow channel through the first one-way valve 107, and the red, yellow and blue color liquids are mixed with the white base liquid in the arc-shaped cavity 106 and discharged into the fixed box 108 through the circular tube 109, and the mixed liquid impacts the outer side of the paddle 208 to drive the paddle 208 to rotate, and the paddle 208 during the rotation process can accelerate the mixing efficiency of the mixed liquid;
[0054] Then, the water pump 205 is started. The water pump 205 works to extract the mixed liquid entering the fixed box 108 through the vertical pipe 207 and discharge it into the lower flow channel through the L-shaped pipe 206. The flow rate of the mixed liquid in the lower flow channel is too fast, and the fluid will flow to the side with a faster flow rate, so that the mixed liquid in the upper flow channel passes through the third one-way valve 201 and is fully mixed with the mixed liquid in the lower flow channel. The arrangement of the trapezoidal block 202, the first triangular block 203 and the second triangular block 204 has a turbulent effect, so that the mixed liquid is mixed more thoroughly. The mixed liquid forms a cycle in the upper flow channel and the lower flow channel area, and finally achieves full mixing and is discharged into the fixed box 108.
[0055] At the same time, the mixed liquid of the red, yellow and blue pigment liquids and the white base liquid is discharged to the right side of the fixed plate 110 through the second one-way valve 114, and the mixed liquid drives the second rectangular plate 111 to move upward, and the second rectangular plate 111 drives the scale plate 113 to move upward, and the distance that the scale plate 113 moves upward reflects the overall deformation of the soil structure at the tunnel vault and the arch waist after being broken;
[0056] At this time, the colorimeter 116 is started. The colorimeter 116 can detect the proportion of red, yellow and blue in the fully mixed mixture. Combined with the distance the scale plate 113 moves upward, the distance the soil structure at the arch crown and arch waist moves after being broken can be calculated respectively, thereby achieving the purpose of real-time prediction and realizing more accurate deformation monitoring.
[0057] The colorimeter 116 in the present invention may also be a camera, which takes pictures to obtain the primary colors of the mixed pigments, and obtains the proportions of red, yellow and blue through the color picker function in Photoshop.
[0058] The present invention can also set up multiple groups of real-time prediction mechanisms on the hard support 1 to further refine the partitions on the support to achieve more accurate prediction and prevention.
[0059] The present invention also proposes a prediction method of a real-time prediction device for tunnel rock and soil stability, comprising the following steps:
[0060] Step 1: The soil layer stress acts on the compression support 3 to drive the arc-shaped abutment block 104 to move downward, and the arc-shaped abutment block 104 drives the first rectangular plate 102 to move downward through the square rod 103, and the pigment liquid in the fixed box 101 is discharged into the upper flow channel through the first one-way valve 107, and the mixed liquid is discharged into the fixed box 108 through the round pipe 109;
[0061] Step 2: The water pump 205 extracts the mixed liquid entering the fixed box 108 and discharges it into the lower flow channel through the L-shaped pipe 206. The mixed liquid in the upper flow channel passes through the third one-way valve 201 to be fully mixed with the mixed liquid in the lower flow channel.
[0062] Step 3: The mixed liquid is discharged to the right side of the fixed plate 110 through the second one-way valve 114, and the mixed liquid drives the scale plate 113 to move upward through the second rectangular plate 111, reflecting the overall deformation size of the soil layer structure at the tunnel vault and arch waist after being broken;
[0063] Step 4: Start the colorimeter 116 to detect the ratio of red, yellow and blue in the fully mixed mixture, so as to calculate the single deformation amount after the soil structure at the arch crown and arch waist is broken, thereby achieving the purpose of real-time prediction.
[0064] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A real-time prediction device for tunnel rock and soil stability, comprising hard support (1) and yield support (3), characterized in that: The hard support (1) is provided with a real-time prediction mechanism, which comprises a fixing box (101), a first rectangular plate (102) and a fixing box (108); The fixing box (101) is fixedly installed on the inner bottom of the hard support (1), and is respectively arranged at a dome and two waists. The three fixing boxes (101) are filled with red, yellow and blue pigment liquids respectively. The first rectangular plate (102) is slidably sleeved on the inner side of the fixing box (101). The top of the first rectangular plate (102) is fixedly connected with a square rod (103). The outer side of the square rod (103) is slidably connected with the hard support (1). The top of the square rod (103) is fixedly connected with an arc-shaped abutment block (104). The arc-shaped abutment block (104) abuts against the lower side of the pressure-releasing support (3). The inner side of the hard support (1) is provided with an arc seat (105). The arc seat (105) is provided with an arc cavity (106). The arc cavity (106) and the fixing box (108) are filled with white pigment. The bottom of the fixed box (101) is connected to the top of the arc seat (105) and a first one-way valve (107) is fixed thereto. The output end of the first one-way valve (107) is downwardly directed. The fixed box (108) is fixedly mounted on the bottom of the arc seat (105). When the original equilibrium state of the soil layer structure at the tunnel vault and the arch waist is broken, the soil layer stress acts on the compression support (3), causing the compression support (3) to deform. The inner bottom of the fixed box (101) contacts the arc abutment block (104) and drives the arc abutment block (104) to move downward. The arc abutment block (104) drives the corresponding first rectangular plates (102) to move downward through the square rod (103). The three first rectangular plates (102) respectively discharge the pigment liquid in the corresponding fixed box (101) into the arc cavity (106) through the first one-way valve (107).
2. The real-time prediction device for tunnel rock and soil stability according to claim 1, characterized in that: The arc seat (105) is connected to and fixed with a circular tube (109), the bottom end of which extends into the fixed box (108), and the red, yellow and blue pigment liquids are mixed with the white base liquid and discharged into the fixed box (108) through the circular tube (109).
3. A real-time prediction device for tunnel rock and soil stability according to claim 2, characterized in that: A fixed plate (110) is fixedly sleeved in the fixed box (108); a second rectangular plate (111) is slidably sleeved between the right side of the fixed plate (110) and the side wall of the fixed box (108); the surface area of the first rectangular plate (102) is 5-10 times the surface area of the second rectangular plate (111); and a rectangular box (112) with an opening at the bottom is connected to and fixed on the top of the fixed box (108).
4. The real-time prediction device for tunnel rock and soil stability according to claim 3 is characterized by: A scale plate (113) is fixedly connected to the top of the second rectangular plate (111), the top end of the scale plate (113) extends to the top of the rectangular box (112), and the rectangular box (112) is slidably sleeved on the outside of the scale plate (113).
5. The real-time prediction device for tunnel rock and soil stability according to claim 4, characterized in that: The fixed box (108) is provided with a second one-way valve (114), and the fixed plate (110) is fixedly sleeved on the outer side of the second one-way valve (114). The opening of the second one-way valve (114) faces rightward. After the red, yellow and blue pigment liquids are mixed with the white base liquid, they are discharged into the right side of the fixed plate (110) through the second one-way valve (114). The mixed liquid drives the second rectangular plate (111) to move upward, and the second rectangular plate (111) drives the scale plate (113) to move upward, so as to reflect the overall deformation size of the soil layer structure at the tunnel arch and arch waist after being broken.
6. A real-time prediction device for tunnel rock and soil stability according to claim 5, characterized in that: A support plate (115) is fixedly connected to the right side of the hard support (1), the top of the support plate (115) is fixedly connected to the bottom of the fixed box (108), and a colorimeter (116) is fixedly connected to the front side of the fixed box (108). The detection head of the colorimeter (116) extends into the fixed box (108). The colorimeter (116) can analyze the proportion of red, yellow and blue in the mixed liquid. In conjunction with the distance that the scale plate (113) moves upward, the individual deformation sizes of the soil layer structures at the arch crown and the arch waist after being broken can be calculated respectively, so as to facilitate the one-way targeted treatment of the arch crown and the arch waist.
7. A real-time prediction device for tunnel rock and soil stability according to claim 6, characterized in that: A stirring mechanism is provided in the arc-shaped cavity (106), the stirring mechanism comprising an arc-shaped plate (2), a third one-way valve (201) and a trapezoidal block (202); the arc-shaped plate (2) is fixedly mounted on the inner bottom of the arc-shaped cavity (106); the arc-shaped plate (2) divides the arc-shaped cavity (106) into an upper flow channel and a lower flow channel; the third one-way valve (201) is arranged on the inner side of the arc-shaped plate (2); a side of the third one-way valve (201) away from the hard support (1) is an outlet end; a plurality of trapezoidal blocks (202) are fixedly mounted on a side of the arc-shaped plate (2) away from the hard support (1); and the width of the upper flow channel is greater than the width of the lower flow channel.
8. A real-time prediction device for tunnel rock and soil stability according to claim 7, characterized in that: A plurality of first triangular blocks (203) are fixedly connected to a side of the arc plate (2) away from the hard support (1); a plurality of second triangular blocks (204) are fixedly connected to an inner wall of a side of the arc cavity (106) away from the hard support (1); a water pump (205) is fixedly connected to the top of the fixed box (108); the water pump (205) works to extract the mixed liquid entering the fixed box (108) and discharge it into the lower flow channel; if the flow rate of the mixed liquid in the lower flow channel is too fast, the fluid will flow to the side with a faster flow rate, so that the mixed liquid in the upper flow channel passes through the third one-way valve (201) and is fully mixed with the mixed liquid in the lower flow channel; the trapezoidal block (202), the first triangular block (203) and the second triangular block (204) are arranged at the third one-way valve (201); and the first triangular block (203) and the second triangular block (204) are arranged alternately.
9. A real-time prediction device for tunnel rock and soil stability according to claim 8, characterized in that: The water outlet of the water pump (205) is connected to and fixed with the same L-shaped pipe (206) on the right side of the arc-shaped seat (105); the water inlet of the water pump (205) is connected to and fixed with a vertical pipe (207); a paddle (208) is rotatably mounted on the left inner wall of the fixed box (108); the mixed liquid impacts one side of the paddle (208) to drive the paddle (208) to rotate; and the paddle (208) in the rotating process can accelerate the mixing efficiency of the mixed liquid.
10. The prediction method of the real-time prediction device for tunnel rock and soil stability according to claim 9, wherein the steps are: Step 1: The soil layer stress acts on the yield support (3) to drive the arc-shaped abutment block (104) to move downward, and the arc-shaped abutment block (104) drives the first rectangular plate (102) to move downward through the square rod (103), and the pigment liquid in the fixed box (101) is discharged into the upper flow channel through the first one-way valve (107), and the mixed liquid is discharged into the fixed box (108) through the circular pipe (109); Step 2: The water pump (205) extracts the mixed liquid entering the fixed box (108) and discharges it into the lower flow channel through the L-shaped pipe (206), and the mixed liquid in the upper flow channel passes through the third one-way valve (201) and is fully mixed with the mixed liquid in the lower flow channel; Step 3: The mixed liquid is discharged to the right side of the fixed plate (110) through the second one-way valve (114), and the mixed liquid drives the scale plate (113) to move upward through the second rectangular plate (111), reflecting the overall deformation size of the soil layer structure at the tunnel vault and arch waist after being broken; Step 4: Start the colorimeter (116) to detect the proportion of red, yellow and blue in the fully mixed mixture, so as to calculate the single deformation amount after the soil structure at the arch crown and arch waist is broken, thereby achieving the purpose of real-time prediction.
