Device and method for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage

By designing a measuring device for lead-bismuth reactors, the problem of difficult determination of aerosol and bubble parameters after fuel damage is solved, and the accurate measurement of the migration process of lead-bismuth reactor fission products is achieved, which simplifies waste treatment and improves the reliability of the device. Sex and environmentally friendly.

CN119086363APending Publication Date: 2024-12-06XI AN JIAOTONG UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411250413.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

After the fuel of the lead-bismuth reactor is damaged, the aerosol and bubble parameters of the fission product are difficult to determine, which affects the accuracy of the source term analysis and calculation.

Method used

A measuring device was designed, including a high-pressure gas tank, aerosol mixing device, liquid container, suction device, high-speed camera and particle size spectrometer. By simulating different fission gas pressures and breakage sizes, aerosols are measured in liquid lead Washing properties in bismuth substitute fluids.

Benefits of technology

Provides true and reliable measurement of aerosol and bubble parameters, simplifies waste disposal and improves the reliability and environmental friendliness of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119086363A_ABST
    Figure CN119086363A_ABST
Patent Text Reader

Abstract

The invention discloses a device and a method for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel breakage. The device comprises a high-pressure gas tank, an aerosol mixing device, a liquid container, a suction device, a high-speed camera, a particle size spectrometer, a pipeline valve, a flow pressure measuring instrument and the like. The high-pressure gas tank is used for providing gas required by the whole loop, the aerosol mixing device is used for mixing the gas and used aerosol powder to form aerosol to replace fission products in the lead-bismuth reactor, and the liquid container is used for bearing alternative fluid screened out based on lead-bismuth reactor coolant liquid lead-bismuth modeling. The particle size spectrometer is a main place for aerosol washing, the particle size spectrometer is used for measuring the aerosol particle concentration of sample gas, and the high-speed camera is used for shooting the migration behavior of the gas in liquid. The device disclosed by the invention can be used for measuring the removal factor after the aerosol is washed by the fluid, and can be used for researching the washing characteristics of the aerosol under different gas flows and different gas inlet sizes and morphologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of gas-liquid two-phase flow visualization, and in particular relates to a device and method for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage. Background Art

[0002] During reactor operation, the fission process in the core fuel assemblies produces a large amount of radioactive fission products. However, fretting erosion, foreign body abrasion, chemical corrosion, irradiation creep and swelling, and the high pressure of fission products within the fuel cladding can cause the fuel cladding to rupture, releasing fission products into the coolant. In addition to the common fission gases, the fission products released from the rupture also include non-gaseous fission products such as solid and liquid fission products. In computational programs, both liquid and solid fission products are typically simulated using aerosol particles. However, in current mechanistic source term analysis for lead-bismuth (Bismuth) reactors, an assumed value for the aerosol fraction released from the rupture is used, introducing uncertainty into the source term calculation results. Therefore, it is urgent to investigate the complex physical process of fission product migration in liquid lead-bismuth alloy coolant in lead-bismuth fast reactors. Key parameters of the fission product migration process, such as gas kinetic parameters and aerosol removal factors, are needed to support model development and source term analysis. Summary of the Invention

[0003] To solve the above problems, the present invention provides a device and method for measuring the aerosol and bubble parameters in the lead-bismuth replacement fluid after fuel damage, which can be used to study the washing characteristics of aerosol in liquid lead-bismuth replacement fluid under different fission gas pressures and different rupture sizes and morphologies.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A device for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage, the device comprising a high-pressure gas tank 1, an aerosol mixing device 2, a liquid container 3, a suction device 4, a high-speed camera 5, a particle size spectrometer 6, a pipeline valve, and a flow and pressure measuring instrument;

[0006] The high-pressure gas tank 1 is used to provide the gas required for the entire circuit, is located at the front end of the device, and is connected to the aerosol mixing device 2 through a ventilation pipe;

[0007] The aerosol mixing device 2 is used to uniformly mix the gas and the aerosol powder used to form an aerosol, which replaces the fission products in the lead-bismuth pile. The high-pressure gas tank 1 and the liquid container 3 are respectively connected through the gas pipeline, and aerosol of a specified concentration is introduced into the liquid container 3. The outlet of the aerosol mixing device 2 is also provided with an aerosol stabilization bypass, and the aerosol stabilization bypass is provided with a stabilization bypass pressure regulating valve 8.

[0008] The liquid container 3 is used to carry the alternative fluid selected based on the liquid lead-bismuth modeling of the lead-bismuth stack coolant, is connected to the aerosol mixing device 2 through the gas pipeline, and serves as the main place for the aerosol to migrate and wash in the liquid;

[0009] The suction device 4 is used to discharge the gas accumulated in the gas space of the liquid container 3 after washing to ensure that the pressure of the gas space remains unchanged, and is connected to the gas space in the liquid container 3 through a gas hose;

[0010] The high-speed camera 5 is used to capture the behavioral parameters of the aerosol migration and washing process, and is set at a position where it can fully record the gas migration after adjusting the height;

[0011] The particle size spectrometer 6 is used to measure the particle concentration of the initial aerosol and the washed aerosol, and the gas inlet is connected to the initial measurement branch and the gas space in the liquid container 3 through a gas hose.

[0012] The high-pressure gas tank 1 is composed of multiple gas tanks to provide gas with different pressures and flows to the device. The gas tank pressure regulating valve 7 of the high-pressure gas tank 1 is connected to the aerosol injection section through a gas hose to adjust the upper end pressure of the aerosol injection section.

[0013] The gas in the high-pressure gas tank 1 is helium.

[0014] The main body of the aerosol mixing device 2 is composed of a mixing device shell 2-2 and a rotating screw 2-1 arranged in the mixing device shell 2-2. The mixing device shell 2-2 is provided with a mixing device gas inlet 2-3 and a mixing device aerosol outlet 2-4. The rotating screw 2-1 is powered by an external motor 2-5 to drive the rotating screw rotating shaft 2-6 to rotate, thereby rotating the rotating screw 2-1. Aerosol powder 2-7 is arranged at the bottom of the mixing device shell 2-2, and is driven upward by the rotation of the blades of the rotating screw 2-1 to mix with the incoming gas to form an aerosol.

[0015] The aerosol powder 2-7 is titanium dioxide powder.

[0016] The main body of the liquid container 3 is composed of an outer shell 3-1 and a sealing cover 3-2, and the outer shell 3-1 and the sealing cover 3-2 are connected and sealed by bolts; an inlet pipe 3-5 and an outlet pipe 3-4 are provided in the gas space above the outer shell 3-1, the inlet pipe 3-5 is used to fill gas into the liquid container, and the outlet pipe 3-4 is used to discharge gas for measurement; a gas injection port 3-3 is provided at the lower part of the outer shell 3-1, which simulates the rupture of the lead-bismuth pile fuel after damage, and is used to inject gas into the liquid container. The gas injection port 3-3 can be replaced according to different working conditions.

[0017] The suction device 4 is arranged behind the gas outlet pipe 3-4 of the liquid container 3, and the two are connected by a gas hose, which is used to promptly extract the gas accumulated in the liquid container to ensure the normal pressure state of the gas in the liquid container.

[0018] The high-speed camera 5 is arranged in front of the liquid container, and a light source or a reflector needs to be arranged on the back side of the liquid container for shooting.

[0019] The particle size spectrometer 6 includes a scanning mobility particle size spectrometer 6-1 and a post-washing aerosol measurement channel 6-2, an initial aerosol measurement channel 6-4 and a residual gas cleaning channel 6-7 directly connected to the scanning mobility particle size spectrometer 6-1; a post-washing aerosol measurement channel valve 6-3 is provided on the post-washing aerosol measurement channel 6-2, an initial aerosol measurement channel valve 6-5 is provided on the initial aerosol measurement channel 6-4, and a residual gas cleaning channel valve 6-6 is provided on the residual gas cleaning channel 6-7; wherein the post-washing aerosol measurement channel 6-2 is connected to the gas space of the liquid container, and the initial aerosol measurement channel 6-4 is connected to the aerosol stabilization bypass.

[0020] The method for using the device for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage comprises the following steps:

[0021] First, assemble the entire device and check to ensure that all components are working properly, all connections are sealed well, there is no obvious damage or leakage, and the gas supply meets the requirements;

[0022] After the device is assembled, close the valve of the aerosol injection section, add liquid to the liquid container 3 to the specified height, let it stand for a preset time, and observe whether there is liquid leakage in the liquid container 3 and the gas injection port 3-3 of the liquid container. If there is, it is necessary to reassemble the sealed liquid container; if not, it means that the liquid container is well sealed and meets the subsequent requirements;

[0023] A preset amount of aerosol powder 2-7 is placed into the aerosol mixing device 2 and the motor 2-5 is turned on. After the rotating screw 2-1 transports the powder stably, the high-pressure gas tank 1 and the gas tank pressure regulating valve 7 are turned on to inject gas into the aerosol mixing device 2 at a specified pressure. At this time, the stabilizing bypass pressure regulating valve 8 is opened to discharge the aerosol outward through the aerosol stabilizing bypass. After a preset time, the initial aerosol measurement channel valve 6-5 is opened to absorb the aerosol in the aerosol stabilizing bypass through the initial aerosol measurement channel 6-4, and the aerosol concentration at different times is measured. After the aerosol concentration stabilizes, the stabilizing bypass pressure regulating valve 8 is closed, the aerosol injection section is connected to the liquid container 3, and the aerosol is injected into the liquid container 3; the suction device 4 at the gas outlet of the liquid container is turned on, and the pressure of the liquid container pressure gauge is always paid attention to to keep the pressure of the gas space in the liquid container stable at normal pressure;

[0024] After the device is operating stably, the valve 6-3 of the washed aerosol measurement channel is opened to draw a certain amount of washed gas from the gas space of the liquid container through the washed aerosol measurement channel 6-2 into the scanning mobility particle size spectrometer 6-1 to measure its concentration. The gas is sampled at different positions through different sampling tubes in the gas space of the liquid container, and the high-speed camera 5 is simultaneously turned on to capture the gas behavior.

[0025] After the injection and measurement phases, the relevant equipment is turned off, the residual gas cleaning channel 6-7 and the residual gas cleaning channel valve 6-6 are opened, the residual aerosol in the device is cleaned, the data is recorded and organized, and the aerosol and bubble parameters in the lead-bismuth replacement fluid after fuel damage are obtained; replacement is performed according to the different set working conditions and the same method is used.

[0026] Technical problems and advantages solved by the present invention:

[0027] Technical problems solved by the present invention:

[0028] 1) The device described in the present invention can measure the particle concentration of the fission product replacement gas before and after it is washed with the replacement fluid, thereby solving the problem of difficulty in determining the amount of fission product released after the lead-bismuth reactor fuel is damaged;

[0029] 2) The gas injection port of the device described in the present invention simulates the rupture of the lead-bismuth pile fuel after damage. The size and shape of the rupture can be changed by replacing the gas injection port, thus solving the problem of difficulty in determining the change of the rupture when the fission products are released after the lead-bismuth pile fuel is damaged.

[0030] The present invention has the following advantages and beneficial effects:

[0031] 1) The fluid used in the present invention is obtained through liquid lead-bismuth modeling analysis, which lays a foundation for the authenticity and reliability of the data.

[0032] 2) The gas and aerosol powder of the present invention respectively use helium and titanium dioxide powder, which are non-polluting and harmless to the environment and human body, and can therefore be directly discharged into the environment, greatly simplifying the waste collection process.

[0033] 3) Due to its special gas supply method (high-pressure gas cylinder supply), the device of the present invention can increase or decrease the number of gas cylinders according to demand to meet time requirements.

[0034] 4) The device of the present invention has a simple structure, is easy to process and disassemble, and has high reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0036] Figure 1It is a schematic diagram of the overall experimental bench of the present invention.

[0037] Figure 2 Schematic diagram of the structure of the aerosol mixing device of the present invention.

[0038] Figure 3 It is a schematic structural diagram of the liquid container of the present invention.

[0039] Figure 4 This is a schematic diagram of the liquid container gas sampling design of the present invention.

[0040] Figure 5 Schematic diagram of the appearance of the measurement system of the present invention.

[0041] 1- High-pressure gas tank, 2- Aerosol mixing device, 2-1- Rotating screw, 2-2- Mixing device housing, 2-3- Mixing device gas inlet, 2-4- Mixing device aerosol outlet, 2-5- Motor, 2-6- Rotating screw rotating axis, 2-7- Aerosol powder, 3- Liquid container, 3-1- Housing, 3-2- Sealing cover, 3-3- Gas injection port, 3-4- Gas outlet pipe, 3-5- Gas inlet pipe, 4- Suction device, 5- High-speed camera, 6- Particle size spectrometer, 6-1- Scanning mobility particle size spectrometer, 6-2- Post-washing aerosol measurement channel, 6-3- Post-washing aerosol measurement channel valve, 6-4- Initial aerosol measurement channel, 6-5- Initial aerosol measurement channel valve, 6-6- Residual gas cleaning channel valve, 6-7- Residual gas cleaning channel, 7- Gas tank pressure regulating valve, 8- Stable bypass pressure regulating valve. DETAILED DESCRIPTION

[0042] The following embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples. The following embodiments are used to illustrate the present invention but are not intended to limit the scope of the present invention.

[0043] like Figure 1 As shown, the device of the present invention for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage comprises a high-pressure gas tank 1, an aerosol mixing device 2, a liquid container 3, a suction device 4, a high-speed camera 5, a particle size spectrometer 6, a pipeline valve, and a flow pressure measuring instrument;

[0044] The high-pressure gas tank 1 is used to provide the gas required for the entire circuit, is located at the front end of the device, and is connected to the aerosol mixing device 2 through a ventilation pipe;

[0045] The aerosol mixing device 2 is used to uniformly mix the gas and the aerosol powder used to form an aerosol, which replaces the fission products in the lead-bismuth pile. The high-pressure gas tank 1 and the liquid container 3 are respectively connected through the gas pipeline, and aerosol of a specified concentration is introduced into the liquid container 3. The outlet of the aerosol mixing device 2 is also provided with an aerosol stabilization bypass, and the aerosol stabilization bypass is provided with a stabilization bypass pressure regulating valve 8.

[0046] The liquid container 3 is used to carry the alternative fluid selected based on the liquid lead-bismuth modeling of the lead-bismuth stack coolant, is connected to the aerosol mixing device 2 through the gas pipeline, and serves as the main place for the aerosol to migrate and wash in the liquid;

[0047] The suction device 4 is used to discharge the gas accumulated in the gas space of the liquid container 3 after washing to ensure that the pressure of the gas space remains unchanged, and is connected to the gas space in the liquid container 3 through a gas hose;

[0048] The high-speed camera 5 is used to capture the behavioral parameters of the aerosol migration and washing process, and is set at a position where it can fully record the gas migration after adjusting the height;

[0049] The particle size spectrometer 6 is used to measure the particle concentration of the initial aerosol and the washed aerosol, and the gas inlet is connected to the initial measurement branch and the gas space in the liquid container 3 through a gas hose.

[0050] like Figure 1 As shown, the high-pressure gas tank 1 is composed of multiple gas tanks to provide gas with different pressures and flow rates to the device. The gas tank pressure regulating valve 7 of the high-pressure gas tank 1 is connected to the aerosol injection section through a gas hose to adjust the upper end pressure of the aerosol injection section.

[0051] Preferably, the gas in the high-pressure gas tank 1 is helium, which has a low density and is easy to adjust its physical properties by pressure, and has a wide range of adaptability.

[0052] Preferably, Figure 2 As shown, the main body of the aerosol mixing device 2 is composed of a mixing device housing 2-2 and a rotating screw 2-1 disposed within the mixing device housing 2-2. The mixing device housing 2-2 is provided with a mixing device gas inlet 2-3 and a mixing device aerosol outlet 2-4. The rotating screw 2-1 is powered by an external motor 2-5, which drives the rotating screw rotating shaft 2-6 to rotate, thereby rotating the rotating screw 2-1. Aerosol powder 2-7 is arranged at the bottom of the mixing device housing 2-2. The rotating blades of the rotating screw 2-1 drive the aerosol powder 2-7 upward to mix with the incoming gas to form an aerosol. The design of the aerosol mixing device can meet the requirements of working under high-pressure gas, and the feeding amount is adjustable, which can meet a wide range of working conditions.

[0053] Preferably, the aerosol powders 2-7 are titanium dioxide powders, which are low in cost, easy to obtain, harmless to the human body, and highly safe. At the same time, the particle diameter can be changed according to demand.

[0054] Preferably, Figure 3 and Figure 4 As shown, the main body of the liquid container 3 consists of an outer shell 3-1 and a sealing cover 3-2, which are connected and sealed by bolts. The gas space above the outer shell 3-1 is equipped with an inlet pipe 3-5 and an outlet pipe 3-4. The inlet pipe 3-5 is used to fill the liquid container with gas, and the outlet pipe 3-4 is used to discharge the gas for measurement. The lower portion of the outer shell 3-1 is provided with a gas injection port 3-3, which simulates the damage caused by the lead-bismuth fuel pile and is used to inject gas into the liquid container. The gas injection port 3-3 can be replaced according to different operating conditions. The liquid container is made of visual materials to meet the requirements of visual photography. The height dimension and sampling port design meet the requirements for measuring aerosol morphology and migration parameters.

[0055] Preferably, the suction device 4 is arranged behind the air outlet pipe 3-4 of the liquid container 3, and the two are connected by a gas hose, which is used to promptly extract the gas accumulated in the liquid container to ensure the normal pressure state of the gas in the liquid container.

[0056] Preferably, the high-speed camera 5 is arranged in front of the liquid container, and a light source or a reflector is provided on the back side of the liquid container for shooting, so that clear shooting can be performed under various lighting conditions.

[0057] Preferably, Figure 5 As shown, the particle size spectrometer 6 includes a scanning mobility particle size spectrometer 6-1 and a post-wash aerosol measurement channel 6-2, an initial aerosol measurement channel 6-4, and a residual gas cleaning channel 6-7 directly connected to the scanning mobility particle size spectrometer 6-1. The post-wash aerosol measurement channel 6-2 is provided with a post-wash aerosol measurement channel valve 6-3, the initial aerosol measurement channel 6-4 is provided with an initial aerosol measurement channel valve 6-5, and the residual gas cleaning channel 6-7 is provided with a residual gas cleaning channel valve 6-6. The post-wash aerosol measurement channel 6-2 is connected to the gas space of the liquid container, and the initial aerosol measurement channel 6-4 is connected to the aerosol stabilization bypass. The measurement arrangement of this particle size spectrometer can complete the measurement of all parameters during the experiment and fully utilize the instrument.

[0058] The method for using the device for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage comprises the following steps:

[0059] First, assemble the entire device and check to ensure that all components are working properly, all connections are sealed well, there is no obvious damage or leakage, and the gas supply meets the requirements;

[0060] After the device is assembled, close the valve of the aerosol injection section, add liquid to the liquid container 3 to the specified height, let it stand for a preset time, and observe whether there is liquid leakage in the liquid container 3 and the gas injection port 3-3 of the liquid container. If there is, it is necessary to reassemble the sealed liquid container; if not, it means that the liquid container is well sealed and meets the subsequent requirements;

[0061] A preset amount of aerosol powder 2-7 is placed into the aerosol mixing device 2 and the motor 2-5 is turned on. After the rotating screw 2-1 transports the powder stably, the high-pressure gas tank 1 and the gas tank pressure regulating valve 7 are turned on to inject gas into the aerosol mixing device 2 at a specified pressure. At this time, the stabilizing bypass pressure regulating valve 8 is opened to discharge the aerosol outward through the aerosol stabilizing bypass. After a preset time, the initial aerosol measurement channel valve 6-5 is opened to absorb the aerosol in the aerosol stabilizing bypass through the initial aerosol measurement channel 6-4, and the aerosol concentration at different times is measured. After the aerosol concentration stabilizes, the stabilizing bypass pressure regulating valve 8 is closed, the aerosol injection section is connected to the liquid container 3, and the aerosol is injected into the liquid container 3; the suction device 4 at the gas outlet of the liquid container is turned on, and the pressure of the liquid container pressure gauge is always paid attention to to keep the pressure of the gas space in the liquid container stable at normal pressure;

[0062] After the device is operating stably, the valve 6-3 of the washed aerosol measurement channel is opened to draw a certain amount of washed gas from the gas space of the liquid container through the washed aerosol measurement channel 6-2 into the scanning mobility particle size spectrometer 6-1 to measure its concentration. The gas is sampled at different positions through different sampling tubes in the gas space of the liquid container, and the high-speed camera 5 is simultaneously turned on to capture the gas behavior.

[0063] After the injection and measurement phases, the relevant equipment is turned off, the residual gas cleaning channel 6-7 and the residual gas cleaning channel valve 6-6 are opened, the residual aerosol in the device is cleaned, the data is recorded and organized, and the aerosol and bubble parameters in the lead-bismuth replacement fluid after fuel damage are obtained; replacement is performed according to the different set working conditions and the same method is used.

[0064] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A device for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage, the device comprising a high-pressure gas tank (1), an aerosol mixing device (2), a liquid container (3), a suction device (4), a high-speed camera (5), a particle size spectrometer (6), a pipeline valve, and a flow pressure measuring instrument; in, The high-pressure gas tank (1) is used to provide the gas required by the entire circuit, is arranged at the front end of the device, and is connected to the aerosol mixing device (2) through a ventilation pipeline; The aerosol mixing device (2) is used to uniformly mix gas and aerosol powder to form an aerosol, replace the fission products in the lead-bismuth pile, respectively connect the high-pressure gas tank (1) and the liquid container (3) through a gas transmission pipeline, and introduce aerosol of a specified concentration into the liquid container (3); the outlet of the aerosol mixing device (2) is also provided with an aerosol stabilization bypass, and a stabilization bypass pressure regulating valve (8) is provided on the aerosol stabilization bypass; The liquid container (3) is used to carry the alternative fluid selected based on the lead-bismuth stack coolant liquid lead-bismuth modeling, is connected to the aerosol mixing device (2) through a gas pipeline, and serves as the main place for the aerosol to migrate and wash in the liquid; The suction device (4) is used to discharge the gas accumulated in the gas space of the liquid container (3) after washing to ensure that the pressure of the gas space remains unchanged, and is connected to the gas space in the liquid container (3) through a gas delivery hose; The high-speed camera (5) is used to capture the behavior parameters of the aerosol migration during the washing process, and is set at a position where the gas migration can be fully recorded after adjusting the height; The particle size spectrometer (6) is used to measure the particle concentration of the initial aerosol and the washed aerosol, and the gas inlet is connected to the initial measurement branch and the gas space in the liquid container (3) respectively through a gas transmission hose.

2. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The high-pressure gas tank (1) is composed of a plurality of gas tanks to provide gas with different pressures and flow rates to the device. The gas tank pressure regulating valve (7) of the high-pressure gas tank (1) is connected to the aerosol injection section via a gas delivery hose, thereby adjusting the upper end pressure of the aerosol injection section.

3. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The gas in the high-pressure gas tank (1) is helium.

4. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The aerosol mixing device (2) is mainly composed of a mixing device housing (2-2) and a rotating screw (2-1) arranged in the mixing device housing (2-2); the mixing device housing (2-2) is provided with a mixing device gas inlet (2-3) and a mixing device aerosol outlet (2-4); the rotating screw (2-1) is driven by an external motor (2-5) to drive a rotating screw shaft (2-6) to rotate so as to rotate the rotating screw (2-1); aerosol powder (2-7) is arranged at the bottom of the mixing device housing (2-2); the rotating screw (2-1) is driven by the rotating blades of the rotating screw (2-1) to move upward so as to mix with the incoming gas to form an aerosol.

5. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 4, characterized in that: The aerosol powder (2-7) is titanium dioxide powder.

6. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The main body of the liquid container (3) is composed of an outer shell (3-1) and a sealing cover (3-2), and the outer shell (3-1) and the sealing cover (3-2) are connected and sealed by bolts; an air inlet pipe (3-5) and an air outlet pipe (3-4) are arranged in the gas space at the upper part of the outer shell (3-1), the air inlet pipe (3-5) is used to fill gas into the liquid container, and the air outlet pipe (3-4) is used to lead out gas for measurement; a gas injection port (3-3) is arranged at the lower part of the outer shell (3-1), simulating the broken port of the lead-bismuth pile fuel after the broken port, and is used to inject gas into the liquid container, and the gas injection port (3-3) can be replaced according to different working conditions.

7. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The suction device (4) is arranged behind the gas outlet pipe (3-4) of the liquid container (3), and the two are connected by a gas hose, so as to timely extract the gas accumulated in the liquid container to ensure the normal pressure state of the gas in the liquid container.

8. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The high-speed camera (5) is arranged in front of the liquid container, and a light source or a reflector needs to be arranged on the back side of the liquid container for shooting.

9. The device for measuring aerosol and bubble parameters in lead-bismuth replacement fluid after fuel damage according to claim 1, characterized in that: The particle size spectrometer (6) comprises a scanning mobility particle size spectrometer (6-1) and a post-washing aerosol measurement channel (6-2), an initial aerosol measurement channel (6-4) and a residual gas cleaning channel (6-7) directly connected to the scanning mobility particle size spectrometer (6-1); the post-washing aerosol measurement channel (6-2) is provided with a post-washing aerosol measurement channel valve (6-3), the initial aerosol measurement channel (6-4) is provided with an initial aerosol measurement channel valve (6-5), and the residual gas cleaning channel (6-7) is provided with a residual gas cleaning channel valve (6-6); wherein the post-washing aerosol measurement channel (6-2) is connected to the gas space of the liquid container, and the initial aerosol measurement channel (6-4) is connected to the aerosol stabilization bypass.

10. A method for using the device for measuring aerosol and bubble parameters in a lead-bismuth replacement fluid after fuel damage as claimed in any one of claims 1 to 9, characterized in that: The method comprises the following steps: First, assemble the entire device and check to ensure that all components are working properly, all connections are well sealed, there is no obvious damage or leakage, and the gas supply meets the demand; After the device is assembled, close the valve of the aerosol injection section, add liquid to the liquid container (3) to a specified height, let it stand for a preset time, and observe whether there is liquid leakage in the liquid container (3) and the gas injection port (3-3) of the liquid container gas. If there is, it is necessary to reassemble the sealed liquid container; if not, it means that the liquid container is well sealed and meets the subsequent requirements; A preset amount of aerosol powder (2-7) is placed in the aerosol mixing device (2) and the motor (2-5) is turned on. After the rotating screw (2-1) transports the powder stably, the high-pressure gas tank (1) and the gas tank pressure regulating valve (7) are turned on to inject gas into the aerosol mixing device (2) at a specified pressure. At this time, the stabilizing bypass pressure regulating valve (8) is turned on to discharge the aerosol outward through the aerosol stabilizing bypass. After a preset time, the initial aerosol measurement channel valve (6-5) is turned on to absorb the aerosol in the aerosol stabilizing bypass through the initial aerosol measurement channel (6-4), and the aerosol concentration at different times is measured. After the aerosol concentration is stabilized, the stabilizing bypass pressure regulating valve (8) is turned on, the aerosol injection section is connected to the liquid container (3), and the aerosol is injected into the liquid container (3); the suction device (4) at the gas outlet of the liquid container is turned on, and the pressure of the pressure gauge of the liquid container is always paid attention to to keep the pressure of the gas space in the liquid container stable at normal pressure; After the device is working stably, the valve (6-3) of the washed aerosol measurement channel is opened to absorb a certain amount of washed gas from the gas space of the liquid container through the washed aerosol measurement channel (6-2) and enter the scanning electric mobility particle size spectrometer (6-1) to measure its concentration, and the gas at different positions is sampled through different sampling tubes in the gas space of the liquid container, and the high-speed camera (5) is simultaneously turned on to shoot the gas behavior; After the injection and measurement phases are completed, the relevant equipment is turned off, the residual gas cleaning channel (6-7) and the residual gas cleaning channel valve (6-6) are opened, the residual aerosol in the device is cleaned, the data is recorded and sorted, and the aerosol and bubble parameters in the lead-bismuth replacement fluid after the fuel is damaged are obtained; replacement is performed according to the different set working conditions, and the same method is used.

Citation Information

Cited By

  • Sludge screening system and control method thereof

    CN121248010A