Remote test method and system for transmission of 110kV spare power automatic switching device

Through remote testing methods and systems, an automated transmission test of 110kV self-loading device was realized, solving the problems of low efficiency and poor safety in the existing technology, and improving the test efficiency and accuracy.

CN119087093AActive Publication Date: 2024-12-06ZHONGSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411265788.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-06
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The existing 110kV self-loading device transmission test method has low efficiency, poor safety, and complex operation, which limits the maintenance and commissioning efficiency and safety of the power system.

Method used

Using remote testing methods and systems, the transmission operation ticket is generated through the power grid scheduling platform, the equipment of the Baoxin main station remotely controls the target load station and the backup load station, simulates the busbar pressure loss environment, and realizes the automatic transmission test of the 110kV self-injection device to avoid The complexity and time-consuming of manual operations.

Benefits of technology

It improves the test efficiency and accuracy, reduces operating errors, improves the reliability of test results, and solves the problem of low testing efficiency in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119087093A_ABST
    Figure CN119087093A_ABST
Patent Text Reader

Abstract

The invention discloses a remote test method and system for transmission of a 110kV spare power automatic switching device, and relates to the technical field of spare power automatic switching control, and the method comprises the steps: determining a to-be-tested 110kV spare power automatic switching device, and determining a target load station, a spare load station and an open loop point of the spare power automatic switching device; generating a transmission operation order for the target load station and the standby load station based on the power grid dispatching platform, and issuing the transmission operation order to the information protection master station; executing a transmission operation ticket based on the information protection master station; after the transmission operation order is executed, the state of the open-loop point and the bus voltage of the target load station are checked, and the transmission test result of the 110 kV spare power automatic switching device of the target load station and the transmission test result of the 110 kV spare power automatic switching device of the spare load station are determined based on the state of the open-loop point and the bus voltage of the target load station. According to the invention, the technical problem that the test efficiency is relatively low because the spare power automatic switching device is often tested in a field manual test mode before the 110kV spare power automatic switching device is put into use in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of automatic standby switching control, and in particular to a remote test method and system for a 110kV automatic standby switching device transmission. Background Art

[0002] In the multi-stage series supply 110kV power system, in order to improve the reliability of power supply, the remote standby automatic input (standby automatic input) system is widely used in the case of 110kV busbar loss of voltage in the substation. It automatically inputs the standby power supply at the system open-loop point and quickly restores the busbar power supply to the substation with lost voltage. The working principle of the standby automatic input system is that when the main power supply is detected to lose voltage and a series of logical conditions are met, the system will automatically trip the switch of the voltage loss line and close the standby switch at the open-loop point within a predetermined time to complete the automatic switching of the power supply and restore the busbar power supply of the substation with lost voltage in time.

[0003] Verifying the effectiveness of the 110kV automatic standby device and ensuring that it can operate accurately in actual operation is a necessary step before the automatic standby device of the power system is put into operation. In the related art, the method adopted for the transmission verification of the 110kV automatic standby device is to conduct a full-fledged transmission test at the substation site. This process includes adjusting the system to a specific operating state so that the automatic standby device is in a charging state, and then manually disconnecting the switch of the main power supply line to simulate the busbar pressure loss scenario. Under this condition, the automatic standby system should trigger the action, trip the relevant switch, and close the standby switch at the open loop point after a delay to restore power supply. However, this traditional method has obvious limitations, especially the problems of efficiency and operation time: First, the whole process requires manual operation, including adjusting the equipment to the state required for the test and disconnecting and closing the switch, which is not only time-consuming but also prone to errors; second, due to the frequent and complex operations, the workload of the on-site operators is increased, and the test cycle is long, which affects the overall operation efficiency of the system; third, manual operation has safety risks in a high-voltage environment, especially when the operator needs to frequently contact high-voltage equipment.

[0004] Therefore, the 110kV automatic transmission test method in the related art has obvious deficiencies in efficiency, safety and operational convenience, which limits the efficiency and safety of power system maintenance and commissioning. In view of the above problems, no effective solution has been proposed so far. Summary of the invention

[0005] The embodiment of the present invention provides a remote test method and system for a 110kV standby automatic switching device transmission, so as to at least solve the technical problem in the related art that before the 110kV standby automatic switching device is put into use, the standby automatic switching device is often tested by on-site manual testing, resulting in low test efficiency.

[0006] According to one aspect of an embodiment of the present invention, a remote test method for a 110kV automatic standby device transmission is provided, which is applied to a remote test system for a 110kV automatic standby device transmission. The remote test system for the 110kV automatic standby device transmission at least includes a power grid dispatching platform and a trustworthy master station. The remote test method for the 110kV automatic standby device transmission includes: determining a 110kV automatic standby device to be tested, and determining a target load station to be acted upon by the 110kV automatic standby device to be tested, a standby load station closest to the target load station, and a standby load station closest to the target load station. The target load station is the nearest open-loop point; based on the power grid dispatching platform, a transmission operation ticket is generated for the target load station and the standby load station, and the transmission operation ticket is sent to the Baoxin master station; based on the Baoxin master station, the transmission operation ticket is executed; after the execution of the transmission operation ticket, the state of the open-loop point and the bus voltage of the target load station are checked, and the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined based on the state of the open-loop point and the bus voltage of the target load station.

[0007] Optionally, the step of executing the transmission operation ticket based on the security master station includes: exiting the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the security master station; executing a transmission command on the high-voltage side bus circuit breaker of the target load station based on the security master station to open the high-voltage side bus circuit breaker of the target load station.

[0008] Optionally, after executing the transmission operation ticket based on the security master station, it also includes: determining the execution result of the transmission operation ticket based on the standby automatic transfer action criterion; when the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion, determining that the execution of the transmission operation ticket is completed.

[0009] Optionally, the standby automatic reclosing action criterion includes at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the fault bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the fault bus.

[0010] Optionally, after determining the target load station on which the 110kV standby automatic re-start device to be tested acts, the standby load station closest to the target load station, and the open-loop point closest to the target load station, it also includes: checking the working status of the protection device of the target load station, checking the working status of the 110kV standby automatic re-start device of the target load station, and checking the working status of the 110kV standby automatic re-start device of the standby load station to obtain an inspection result; when the inspection result indicates that the inspection is passed, generating an inspection pass signal, and sending the inspection pass signal to the power grid dispatching platform.

[0011] Optionally, the step of checking the working status of the protection device of the target load station includes: checking the working status of the circuit breaker on the high-voltage side bus of the target load station, and the working status includes at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the reclosing switch of the circuit breaker, the remote operation hard pressure plate input status of the circuit breaker, the remote non-stop transmission soft pressure plate input status of the circuit breaker, and the remote throwing and retracting soft pressure plate input status of the circuit breaker.

[0012] Optionally, the step of checking the working status of the 110kV standby automatic start-up device of the target load station includes: checking the charging status of the 110kV standby automatic start-up device of the target load station; checking the alarm information of the operating status of the 110kV standby automatic start-up device of the target load station; comparing the device data of the 110kV standby automatic start-up device of the target load station with the device data in the setting list; checking the soft pressure plate throw-in and throw-out status of the 110kV standby automatic start-up device of the target load station.

[0013] Optionally, the step of checking the working status of the 110kV standby automatic transfer device of the standby load station includes: checking the charging status of the 110kV standby automatic transfer device of the standby load station; checking the alarm information of the operating status of the 110kV standby automatic transfer device of the standby load station; comparing the device data of the 110kV standby automatic transfer device of the standby load station with the device data in the setting list; checking the soft pressure plate throw-in and throw-out status of the 110kV standby automatic transfer device of the standby load station.

[0014] Optionally, the step of checking the state of the open-loop point and the bus voltage of the target load station, and determining the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station includes: acquiring the circuit breaker position signal of the open-loop point, and comparing the circuit breaker position signal with the closed switch position signal to obtain a first comparison result; collecting the bus voltage of the target load station, and comparing the bus voltage with the fault bus voltage threshold value; The first comparison result is compared with the second comparison result to obtain a second comparison result; based on the first comparison result and the second comparison result, the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the after-closing switch position signal and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

[0015] According to another aspect of an embodiment of the present invention, a remote test system for a 110kV standby automatic re-start device transmission is provided, comprising: a dispatching system for determining a 110kV standby automatic re-start device to be tested, and determining a target load station acted upon by the 110kV standby automatic re-start device to be tested, a standby load station closest to the target load station, and an open-loop point closest to the target load station; a power grid dispatching platform for generating a transmission operation ticket for the target load station and the standby load station based on the power grid dispatching platform; a trustworthy master station for receiving the transmission operation ticket issued by the power grid dispatching platform, and executing the transmission operation ticket; an automatic safety station for checking the state of the open-loop point and the bus voltage of the target load station after the execution of the transmission operation ticket is completed, and determining the transmission test results of the 110kV standby automatic re-start device of the target load station and the 110kV standby automatic re-start device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

[0016] Optionally, the trust-protecting master station includes: a first exit module, used to exit the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the trust-protecting master station; a first execution module, used to execute a transmission command on the high-voltage side bus circuit breaker of the target load station based on the trust-protecting master station, so that the high-voltage side bus circuit breaker of the target load station is opened.

[0017] Optionally, the remote test system of the 110kV standby automatic transfer device transmission also includes: a first determination module, used to determine the execution result of the transmission operation ticket based on the standby automatic transfer action criterion; a second determination module, used to determine the completion of the execution of the transmission operation ticket when the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion.

[0018] Optionally, the standby automatic reclosing action criterion includes at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the fault bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the fault bus.

[0019] Optionally, the remote test system for the 110kV standby automatic transfer device transmission also includes: a first inspection module, used to check the working status of the protection device of the target load station, check the working status of the 110kV standby automatic transfer device of the target load station and check the working status of the 110kV standby automatic transfer device of the standby load station to obtain an inspection result; a first generation module, used to generate an inspection pass signal when the inspection result indicates that the inspection is passed, and send the inspection pass signal to the power grid dispatching platform.

[0020] Optionally, the first inspection module includes: a first inspection sub-module, used to check the working status of the circuit breaker on the high-voltage side bus of the target load station, the working status including at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the reclosing switch of the circuit breaker, the remote operation hard pressure plate input status of the circuit breaker, the remote non-stop transmission soft pressure plate input status of the circuit breaker, and the remote throwing and withdrawing soft pressure plate input status of the circuit breaker.

[0021] Optionally, the first inspection module also includes: a second inspection sub-module, used to check the charging status of the 110kV standby automatic start-up device of the target load station; a third inspection sub-module, used to check the alarm information of the operating status of the 110kV standby automatic start-up device of the target load station; a first comparison sub-module, used to compare the device data of the 110kV standby automatic start-up device of the target load station with the device data in the setting list; and a fourth inspection sub-module, used to check the soft pressure plate throw-in and throw-out status of the 110kV standby automatic start-up device of the target load station.

[0022] Optionally, the first inspection module also includes: a fifth inspection sub-module, used to check the charging status of the 110kV standby automatic transfer device of the standby load station; a sixth inspection sub-module, used to check the alarm information of the operating status of the 110kV standby automatic transfer device of the standby load station; a second comparison sub-module, used to compare the device data of the 110kV standby automatic transfer device of the standby load station with the device data in the setting list; and a seventh inspection sub-module, used to check the soft pressure plate throw-in and throw-out status of the 110kV standby automatic transfer device of the standby load station.

[0023] Optionally, the safety main station includes: a first acquisition module, used to acquire the circuit breaker position signal of the open-loop point, and compare the circuit breaker position signal with the switch position signal after closing to obtain a first comparison result; a first acquisition module, used to acquire the bus voltage of the target load station, and compare the bus voltage with the fault bus voltage threshold to obtain a second comparison result; a third determination module, used to determine the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the first comparison result and the second comparison result, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the switch position signal after closing and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

[0024] In the present application, the following steps are taken: first, the 110kV standby automatic start-up device to be tested is determined, and the target load station on which the 110kV standby automatic start-up device to be tested acts, the standby load station closest to the target load station, and the open-loop point closest to the target load station are determined, and a transmission operation ticket is generated for the target load station and the standby load station based on the power grid dispatching platform, and the transmission operation ticket is sent to the Baoxin main station, and then the transmission operation ticket is executed based on the Baoxin main station, and finally, after the execution of the transmission operation ticket, the state of the open-loop point and the bus voltage of the target load station are checked, and the transmission test results of the 110kV standby automatic start-up device of the target load station and the 110kV standby automatic start-up device of the standby load station are determined based on the state of the open-loop point and the bus voltage of the target load station.

[0025] In the present application, a transmission operation ticket is generated by the one-key sequential control function of the power grid dispatching platform in the power grid dispatching system, and the ticket is sent to the Baoxin master station. The operation ticket is executed by the remote non-stop transmission function of the Baoxin master station, and the primary equipment of the target load station and the standby load station are remotely controlled to simulate the power system bus pressure loss environment, so as to carry out remote automatic transmission test on the 110kV standby automatic transfer device, realize the automation of the standby automatic transfer transmission test, avoid the complexity and time-consuming of manual judgment in the field test, improve the test efficiency, reduce operational errors, and improve the reliability of the test results, thereby solving the technical problem in the related technology that before the 110kV standby automatic transfer device is put into use, the standby automatic transfer device is often tested by on-site manual testing, and the test efficiency is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0027] Figure 1 It is a flow chart of an optional remote test method of a 110kV standby automatic switching device transmission according to an embodiment of the present invention;

[0028] Figure 2 is an optional primary wiring diagram of a power system according to an embodiment of the present invention;

[0029] Figure 3 It is a structural diagram of an optional remote test system for a 110kV automatic standby device transmission according to an embodiment of the present invention;

[0030] Figure 4 It is a schematic diagram of a remote test process of an optional 110kV automatic standby device transmission according to an embodiment of the present invention;

[0031] Figure 5 It is a schematic diagram of an optional remote test system for a 110kV standby automatic switching device transmission according to an embodiment of the present invention;

[0032] Figure 6 The hardware structure block diagram of an electronic device (or mobile device) for a remote test method of a 110kV automatic standby switching device transmission according to an embodiment of the present invention. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0034] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0035] It should be noted that the remote test method and device for the 110kV standby automatic switching device transmission in the present application can be used in the field of standby automatic switching control technology when the 110kV standby automatic switching transmission test is performed based on the remote non-stop power supply function, and can also be used in any field except the field of standby automatic switching control technology when the 110kV standby automatic switching transmission test is performed based on the remote non-stop power supply function. The application of the remote test method and device for the 110kV standby automatic switching device transmission is not limited in the present application.

[0036] The following embodiments of the present invention can be applied to various remote test systems / applications / equipment for transmission of 110kV standby automatic switching devices. The present invention issues a transmission operation ticket to the Baoxin master station through the one-key sequential control function of the power grid dispatching platform, controls the primary equipment in the target load station and the standby load station through the remote non-stop transmission function of the Baoxin master station, trips the main power supply switch of the non-open-loop point substation, and remotely simulates the busbar pressure loss environment, thereby realizing the 110kV standby automatic switching automatic transmission test, avoiding the complexity and time-consuming nature of manual judgment in traditional tests, and significantly improving the efficiency and accuracy of the test.

[0037] The present invention is described in detail below in conjunction with various embodiments.

[0038] Embodiment 1

[0039] According to an embodiment of the present invention, an embodiment of a remote testing method for a 110kV backup automatic reclosing device transmission is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0040] Figure 1 1 is a flow chart of an optional remote test method for a 110kV automatic standby device transmission according to an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:

[0041] Step S101, determine the 110kV standby automatic transfer device to be tested, and determine the target load station acted by the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station.

[0042] It should be noted that the 110kV standby automatic switching device is used in a 110kV system with multi-stage series supply. When the 110kV busbar of the substation loses voltage, the standby power supply is switched on at the system open-loop point to promptly restore the power supply of the busbar of the substation that has lost voltage. In order to verify the correctness of the 110kV standby automatic switching circuit wiring and logic functions and ensure that the 110kV standby automatic switching can operate reliably after being put into operation, a full-fledged transmission test needs to be carried out before the 110kV standby automatic switching is put into operation.

[0043] It should be noted that when conducting a transmission test, it is first necessary to determine the 110kV standby automatic switching device to be tested, and take the load station on which the 110kV standby automatic switching device to be tested acts as the target load station, and take the load station closest to the target load station as the backup load station, and find the open-loop point of the 110kV standby automatic switching device to be tested. In the power system, the load station refers to a station used to supply power to the load, such as a substation, etc. Generally speaking, two or more adjacent load stations are backup for each other. When the busbar of one of the load stations loses pressure, the load station with the busbar losing pressure is disconnected, the open-loop point is closed, and the backup load station is switched to supply power, so that the faulty distribution network can be quickly restored to power supply, ensuring the stable operation of the power system. Before the experiment, the 110kV standby automatic switching device to be tested, the target load station, the backup load station and the open-loop point are determined, and the 110kV standby automatic switching device to be tested can be subjected to automated remote testing, and the standby automatic switching transmission test can be completed accurately and quickly to ensure the normal operation of the 110kV standby automatic switching device after it is put into use.

[0044] Optionally, after determining the target load station on which the 110kV standby automatic transfer device to be tested acts, the standby load station closest to the target load station, and the open-loop point closest to the target load station, it also includes: checking the working status of the protection device of the target load station, checking the working status of the 110kV standby automatic transfer device of the target load station, and checking the working status of the 110kV standby automatic transfer device of the standby load station to obtain an inspection result; when the inspection result indicates that the inspection is passed, generating an inspection pass signal, and sending the inspection pass signal to the power grid dispatching platform.

[0045] It should be noted that after determining the target load station of the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station, it is first necessary to check the power system where the target load station and the standby load station are located to ensure that the protection device of the target load station can work normally and that the 110kV standby automatic transfer device of the standby load station can work normally. This is a prerequisite for remote execution of the standby automatic transfer transmission test.

[0046] Optionally, the step of checking the working status of the protection device of the target load station includes: checking the working status of the circuit breaker on the high-voltage side bus of the target load station, the working status including at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the reclosing switch of the circuit breaker, the remote operation hard pressure plate input status of the circuit breaker, the remote non-stop transmission soft pressure plate input status of the circuit breaker, and the remote throwing and retracting soft pressure plate input status of the circuit breaker.

[0047] It should be noted that the inspection of the working status of the protection device of the target load station is performed by the power system's security master station. The security master station needs to check whether the protection device of the target load station is in normal operating status. The protection device here at least includes: the circuit breaker on the high-voltage side bus of the target load station. The circuit breaker plays a key role in simulating the bus pressure loss of the target load station. Therefore, it is necessary to ensure that the circuit breaker can work normally before the experiment. Checking the working status of the circuit breaker can specifically include: communication status, confirming whether the communication channel between the circuit breaker and the target load station is unobstructed and there is no communication abnormality, so as to ensure that the circuit breaker on the bus of the target load station can be remotely tripped during subsequent tests to simulate the bus pressure loss environment; operating status, the circuit breaker should be in the operating state, that is, the closed state, and the circuit breaker has no abnormal alarm or fault signal; reclosing state, for the circuit breaker reclosing, it is necessary to check whether the reclosing is charged normally and there is no reclosing related alarm; soft pressure plate and hard pressure plate, confirm that the remote non-stop transmission soft pressure plate and remote throw-in and throw-out hard pressure plate of the circuit breaker are in the correct throw-in and throw-out state to ensure the feasibility of remote operation.

[0048] Optionally, the step of checking the working status of the 110kV standby automatic start-up device of the target load station includes: checking the charging status of the 110kV standby automatic start-up device of the target load station; checking the alarm information of the operating status of the 110kV standby automatic start-up device of the target load station; comparing the device data of the 110kV standby automatic start-up device of the target load station with the device data in the setting list; checking the soft pressure plate throw-in and throw-out status of the 110kV standby automatic start-up device of the target load station.

[0049] It should be noted that the inspection of the working status of the 110kV standby automatic transfer device of the target load station is performed by the safety and self-service station of the power system. The safety and self-service station communicates with the standby automatic transfer device of each load station to check the working status of the standby automatic transfer device, which specifically includes: checking the charging status of the 110kV standby automatic transfer device of the target load station. The standby automatic transfer device being in the charging state indicates that the standby automatic transfer device is in the ready state and can realize self-start; checking the alarm information of the 110kV standby automatic transfer device of the target load station to ensure that there is no potential fault or abnormality in the standby automatic transfer device; checking whether the device data of the 110kV standby automatic transfer device of the target load station is consistent with the data in the setting list. The setting list contains the preset parameters of the standby automatic transfer device, such as voltage threshold value, time delay, etc. These parameters determine under what conditions the device will operate. By comparing the current configuration data of the standby automatic transfer device with the setting list, it can be confirmed whether the device settings are correct and whether they are consistent with the expected test conditions. If inconsistencies are found, adjustments need to be made to ensure the accuracy of the test conditions; finally, it is also necessary to check the soft pressure plate of the 110kV standby automatic transfer device of the target load station. The soft pressure plate is a logical switch that controls the enablement or disablement of the standby automatic transfer device function. The soft pressure plate of the remote operation function needs to be in the enabled state so that it can be remotely controlled through the Baoxin master station.

[0050] Optionally, the step of checking the working status of the 110kV standby automatic transfer device of the standby load station includes: checking the charging status of the 110kV standby automatic transfer device of the standby load station; checking the alarm information of the operating status of the 110kV standby automatic transfer device of the standby load station; comparing the device data of the 110kV standby automatic transfer device of the standby load station with the device data in the setting list; checking the soft pressure plate throw-in and throw-out status of the 110kV standby automatic transfer device of the standby load station.

[0051] Similarly, before conducting a formal transmission test, the An autonomous station needs to check the working status of the 110kV standby automatic start-up device of the standby load station, which is the same as the inspection of the 110kV standby automatic start-up device of the target load station. The inspection of the working status of the 110kV standby automatic start-up device of the standby load station specifically includes: checking whether the 110kV standby automatic start-up device of the standby load station is in a charging state, and checking whether there is any alarm information in the operating status of the 110kV standby automatic start-up device of the standby load station; checking whether the device data of the 110kV standby automatic start-up device of the standby load station is consistent with the data configured in the set value sheet; checking whether the soft pressure plate of the 110kV standby automatic start-up device of the standby load station is in the engaged state, so as to ensure that the 110kV standby automatic start-up device of the standby load station is available.

[0052] Step S102: Generate a transmission operation ticket for the target load station and the standby load station based on the power grid dispatching platform, and send the transmission operation ticket to the Baoxin master station.

[0053] It should be noted that the Anzi station and the Baoxin master station upload the inspection results to the power grid dispatching platform. When it is determined that there are no problems in the inspection, the power grid dispatching platform generates a transmission operation ticket for the target load station and the standby load station, and sends the transmission operation ticket to the Baoxin master station to realize intelligent dispatch and control of the power grid. The power grid dispatching platform is deployed in the control center and can be used to generate operation tickets, and send operation instructions to the dispatching automation system to complete primary equipment control, send operation instructions to the Baoxin master station to complete the control of the protection device, and send operation commands to the Anzi station to complete the control of the Anzi device. The transmission operation ticket contains transmission test instructions, which are used to control the Baoxin master station to execute the transmission test instructions to simulate the test environment of busbar depressurization of the target load station.

[0054] Step S103, executing the transmission operation ticket based on the Baoxin master station.

[0055] It should be noted that the transmission operation ticket is used to control the primary equipment of the target load station and the standby load station based on the security master station, thereby tripping the switch of the target load station, causing the busbar of the target load station to lose pressure, thereby performing a transmission test on the 110kV standby automatic transfer device.

[0056] Optionally, the step of executing a transmission operation ticket based on the Baoxin master station includes: exiting the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station; executing a transmission command on the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station to open the high-voltage side bus circuit breaker of the target load station.

[0057] It should be noted that, based on the transmission test instructions in the transmission operation ticket, the Baoxin master station first exits the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station to prevent the reclosing function from automatically closing the circuit breaker after the circuit breaker is tripped, thereby affecting the normal operation of the 110kV standby automatic transfer. Secondly, it is necessary to execute a transmission command on the high-voltage side bus circuit breaker of the target load station to trip the circuit breaker switch and make the circuit breaker open, thereby simulating the scenario of bus pressure loss in the target load station.

[0058] Optionally, after executing the transmission operation ticket based on the security master station, it also includes: determining the execution result of the transmission operation ticket based on the standby automatic transfer action criterion; when the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion, determining that the execution of the transmission operation ticket is completed.

[0059] It should be noted that after simulating the busbar pressure loss scenario of the target load station, the power system where the target load station and the standby load station are located is judged by the pre-set standby automatic transfer action criteria to determine whether the transmission operation ticket has been executed and whether the simulated busbar pressure loss scenario meets the expected requirements.

[0060] Optionally, the standby automatic reclosing action criteria include at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the fault bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the fault bus.

[0061] Specifically, if the power system meets at least one of the following conditions, it indicates that the transmission operation ticket has been successfully executed. First, the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, that is, in the simulation environment, the bus circuit breaker of the target load station is in the open state; second, any non-maintenance bus voltage of the power system meets the reclosing waveform. The waveform discrimination conditions are as follows: the bus voltage should satisfy the process of "voltage → no voltage → voltage", that is, the three-phase voltages of the bus are all lower than the no-voltage value for more than the first delay, and within the start-up delay Tq of the 110kV standby automatic transfer device, any phase voltage of any bus is higher than 0.5Un for more than the second delay, and Un represents the rated voltage of the bus; third, at least within the second delay, the negative-sequence voltage of any non-maintenance bus is greater than the negative-sequence voltage threshold of the faulty bus. When a fault occurs in the power system, negative-sequence voltage may be generated. By checking the negative-sequence voltage of any non-maintenance bus, it is ensured that the power system will not affect the start-up of the 110kV standby automatic transfer; fourth, at least within the second delay, the zero-sequence voltage of any non-maintenance bus is greater than the zero-sequence voltage threshold of the faulty bus, thereby ensuring that the 110kV standby automatic transfer can be started normally.

[0062] Step S104, after the execution of the transmission operation ticket is completed, check the state of the open-loop point and the bus voltage of the target load station, and determine the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

[0063] It should be noted that in the scenario of simulating busbar pressure loss at the target load station, under normal circumstances, when the 110kV standby automatic transfer device detects busbar pressure loss at the target load station, it will automatically switch the standby power supply to supply power to the load. In order to obtain the transmission test results of the standby automatic transfer device, after the execution of the transmission operation ticket, the open-loop point circuit breaker and the busbar voltage of the target load station are checked to determine whether the 110kV standby automatic transfer device is successfully started.

[0064] Optionally, the step of checking the state of the open-loop point and the bus voltage of the target load station, and determining the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station includes: acquiring the circuit breaker position signal of the open-loop point, and comparing the circuit breaker position signal with the switch position signal after closing to obtain a first comparison result; collecting the bus voltage of the target load station, and comparing the bus voltage with a fault bus voltage threshold to obtain a second comparison result; determining the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the first comparison result and the second comparison result, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the switch position signal after closing and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

[0065] It should be noted that when verifying with the transmission test results, the circuit breaker position information of the open-loop point is first obtained to determine whether the circuit breaker position signal is consistent with the switch position signal after closing, and the bus voltage of the target load station is collected to determine whether the bus voltage loss fault of the target load station is restored. If the circuit breaker position signal is consistent with the switch position signal after closing and the bus voltage is greater than the fault bus voltage threshold, it indicates that under the simulation environment, the 110kV standby automatic transfer device is successfully started and can be put into work in the actual scenario, and the test result of the 110kV standby automatic transfer device passing the transmission test is obtained.

[0066] In another embodiment, when the 110kV standby automatic switching device passes the transmission test, the transmission test result is uploaded to the distribution network dispatching platform, the distribution network dispatching platform generates a recovery operation ticket, and sends the recovery operation ticket to the Baoxin master station. The Baoxin master station executes the recovery instruction, and the circuit breaker reclosing outlet soft pressure plate of the high-voltage side bus of the target load station is put into operation, so that the reclosing can automatically restore the disconnected circuit breaker switch, release the simulated busbar pressure loss environment, and allow the power system to return to normal.

[0067] Through the above steps, the 110kV standby automatic transfer device to be tested is first determined, and the target load station acted by the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station are determined, and a transmission operation ticket is generated for the target load station and the standby load station based on the power grid dispatching platform, and the transmission operation ticket is sent to the Baoxin master station, and then the transmission operation ticket is executed based on the Baoxin master station, and finally after the execution of the transmission operation ticket, the state of the open-loop point and the bus voltage of the target load station are checked, and the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined based on the state of the open-loop point and the bus voltage of the target load station.

[0068] In this embodiment, a transmission operation ticket is generated by the one-key sequential control function of the power grid dispatching platform in the power grid dispatching system, and the ticket is sent to the Baoxin master station. The operation ticket is executed by the remote non-stop transmission function of the Baoxin master station, and the primary equipment of the target load station and the standby load station is remotely controlled to simulate the power system bus pressure loss environment, so as to perform a remote automatic transmission test on the 110kV standby automatic transfer device, realize the automation of the standby automatic transfer transmission test, avoid the complexity and time-consuming of manual judgment in the field test, improve the test efficiency, reduce operating errors, and improve the reliability of the test results, thereby solving the technical problem in the related technology that before the 110kV standby automatic transfer device is put into use, the standby automatic transfer device is often tested by on-site manual testing, and the test efficiency is low.

[0069] Another optional specific implementation is described in detail below.

[0070] The remote test method of the 110kV automatic standby device transmission of the embodiment of the present invention is applied to the remote test system of the 110kV automatic standby device transmission. In addition to the 110kV power system, the embodiment of the present invention can also be used to perform transmission tests on automatic standby devices in power systems of other specifications. Figure 2 is an optional primary wiring diagram of a power system according to an embodiment of the present invention, such as Figure 2As shown, on the 110kV busbar, Station A and Station D are power stations, Station B and Station C are load stations that serve as backup for each other, Station A and Station B are connected via the AB line, Station B and Station C are connected via the BC line, Station C and Station D are connected via the CD line, with the position of the BC circuit breaker as the open-loop point, the BC circuit breaker at Station B is in the open position, the CB circuit breaker at Station C is in the closed position, Station B is powered by Station A via the AB line, and Station C is powered by Station D via the CD line. Station B and Station C are each equipped with a set of 110kV standby automatic re-starting devices, and their action logic is as follows: When Station C detects that the 110kV busbar has no voltage, the main supply line has no current, and the KRU conditions are met (corresponding to the above-mentioned standby automatic re-starting action criteria), the 110kV standby automatic re-starting device of Station C is started, and the CD circuit breaker of Station C is tripped after a delay. After the 110kV standby automatic re-starting device detects that the CD circuit breaker has tripped, it sends a remote closing command to the 110kV standby automatic re-starting device of Station B through the channel after a delay. The 110kV standby automatic re-starting device of Station B is activated to close the BC circuit breaker of Station B, switch the power supply of Station B, and restore the power supply of Station C.

[0071] Figure 3 1 is an architecture diagram of an optional remote test system for a 110kV automatic standby device transmission according to an embodiment of the present invention, such as Figure 3 As shown, the remote test system of the 110kV standby automatic switching device transmission includes: DICP system, firewall, security system, safety and automation system, and telecontrol system. Among them, the DICP system communicates with the safety and automation system, security system and telecontrol system through the firewall. The safety and automation system is composed of the safety and automation station. The safety and automation station is connected to the 110kV standby automatic switching device of the load station in the power system through the dispatching data network. The security system is composed of the security master station and the security substation deployed in the power system, and is connected to the protection device in the power system. The telecontrol system is composed of the OSC system, and is connected to the measurement and control devices of each power station or load station through the telemotors deployed in the power system. Specifically,

[0072] The OCS system refers to the dispatching automation system, which is deployed in the control center and refers to a system that directly collects and monitors data for the operation of the power grid. It can monitor the operating status of primary equipment (switches, knife switches, etc.) in real time, complete primary equipment operations, communicate with the remote motor deployed in the substation through the dispatching data network, and then control the protection device of the substation through the remote motor.

[0073] The DICP system refers to the power grid dispatching platform, which is deployed in the control center. It can generate operation tickets and send operation commands to the OCS system to complete a device operation, send operation commands to the Baoxin master station to complete the operation of the protection device, and send operation commands to the Anzi station to complete the operation of the Anzi device.

[0074] The Baoxin main station is deployed in the control center, connected to the Baoxin substation through the dispatching data network, collects data of the protection equipment in real time, and completes the operation of the protection equipment through the Baoxin substation. It can realize operations such as remote insertion and withdrawal of soft pressure plates of the protection device, remote modification of set values, and remote non-stop power transmission.

[0075] Remote non-stop power transmission means that the transmission command is sent from the Baoxin master station to the protection device. After receiving the command, the protection device completes the protection tripping and reclosing process of the switch. The whole process can be executed remotely without causing power outages to users.

[0076] The automatic power station is deployed in the control center and communicates with the 110kV standby automatic switching device of the load station through the dispatching data network. It is used to forward the remote control commands of the low-frequency and low-voltage load reduction device issued by the DICP system. It has functions such as remote switching on and off of soft pressure plates and remote modification of set values.

[0077] The Baoxin substation includes intelligent recorders, control substations, etc., which are deployed in substations to forward the data of protection devices to the Baoxin main station, and forward the remote soft pressure plate, remote setting modification, and remote non-stop transmission commands of the Baoxin main station to the protection devices.

[0078] The data of the protection device include analog quantity, input quantity, soft pressure plate, set value, alarm information, etc.

[0079] The telemotor is deployed in the substation and can realize functions such as remote control, remote signaling, remote measurement, and remote adjustment.

[0080] The remote test system for the 110kV automatic switching device transmission of the embodiment of the present invention is used to execute the remote test method for the 110kV automatic switching device transmission. Figure 4 is a schematic diagram of a remote test process of an optional 110kV automatic standby device transmission according to an embodiment of the present invention, Figure 2 Station C in the experiment is the target load station, and station B is the backup load station. Figure 4 As shown in the figure, the transmission test steps before the standby automatic transfer device is put into use include:

[0081] Step 1: Initialization;

[0082] Step 2: The OSC system checks whether the open loop point is at station B. If so, execute step 3. If not, adjust the open loop point to station B and execute step 2 again.

[0083] Step 3: The Baoxin master station checks whether the CD line protection device (i.e., CD circuit breaker) of station C is operating normally and whether the reclosing switch is charged normally. If so, execute step 4; if not, check and process the CD line protection device of station C and then execute step 3 again;

[0084] Step 4: Check at the main station whether the standby automatic transfer devices at stations B and C are operating normally and whether the standby automatic transfer devices are charging normally. If yes, proceed to step 5. If not, check and process the standby automatic transfer devices at stations B and C and then proceed to step 4 again.

[0085] Step 5: The DICP system generates a 110V standby automatic transfer device transmission test operation ticket and sends it to the Baoxin master station;

[0086] Step 6: The Baoxin master station executes the operation ticket: exit the CD line protection device reclosing outlet soft pressure plate;

[0087] Step 7: The Baoxin master station executes the operation ticket: the remote transmission trips the CD line switch (i.e., CD circuit breaker) of station C without power outage;

[0088] Step 8: Check whether the backup automatic switching devices of station B and station C are operating correctly at the main station: Check whether the BC switch of station B is closed and whether the bus voltage of station C is restored. If yes, proceed to step 9; if not, skip step 9 and proceed to step 10;

[0089] Step 9: The automatic transfer devices of stations B and C are successfully transmitted;

[0090] Step 10: The transmission of the standby automatic transfer device of Station B and Station C fails;

[0091] Step 11, the Baoxin master station executes the operation ticket: put the soft pressure plate at the reclosing outlet of the CD line protection device at station C into operation.

[0092] In the embodiment of the present invention, a transmission operation ticket is issued to the Baoxin master station through the one-key sequential control function of the power grid dispatching platform, and the primary equipment in the target load station and the standby load station is controlled through the remote non-stop transmission function of the Baoxin master station, the main power supply switch of the non-open-loop point substation is tripped, and the busbar pressure loss environment is remotely simulated, thereby realizing the 110kV standby automatic transmission test, avoiding the complexity and time-consuming manual judgment in traditional tests, and significantly improving the efficiency and accuracy of the test.

[0093] The following is a detailed description in conjunction with another embodiment.

[0094] Embodiment 2

[0095] A remote test system for a 110kV standby automatic switching device transmission provided in this embodiment includes multiple implementation units, each of which corresponds to each implementation step in the above-mentioned embodiment 1. Its specific implementation methods and beneficial effects can be referred to the above-mentioned method embodiments, and will not be repeated here.

[0096] Figure 5 1 is a schematic diagram of an optional remote test system for a 110 kV automatic standby device transmission according to an embodiment of the present invention. Figure 5As shown, the remote test device for the 110kV automatic standby device transmission may include: a dispatching system 51, a power grid dispatching platform 52, a security master station 53, and a safety master station 54, wherein:

[0097] The dispatching system 51 is used to determine the 110kV standby automatic transfer device to be tested, and determine the target load station acted by the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station;

[0098] A power grid dispatching platform 52, used to generate transmission operation tickets for target load stations and standby load stations based on the power grid dispatching platform;

[0099] The trust-guaranteeing master station 53 is used to receive the transmission operation ticket issued by the power grid dispatching platform and execute the transmission operation ticket;

[0100] Install the main station 54, which is used to check the state of the open-loop point and the bus voltage of the target load station after the execution of the transmission operation ticket is completed, and determine the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

[0101] The remote test system for the transmission of the above-mentioned 110kV standby automatic start-up device determines the 110kV standby automatic start-up device to be tested through the dispatching system 51, and determines the target load station acted by the 110kV standby automatic start-up device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station; generates a transmission operation ticket for the target load station and the standby load station based on the power grid dispatching platform through the power grid dispatching platform 52; receives the transmission operation ticket issued by the power grid dispatching platform through the security master station 53, and executes the transmission operation ticket; after the execution of the transmission operation ticket, checks the state of the open-loop point and the bus voltage of the target load station through the safety master station 54, and determines the transmission test results of the 110kV standby automatic start-up device of the target load station and the 110kV standby automatic start-up device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

[0102] In this embodiment, a transmission operation ticket is generated by the one-key sequential control function of the power grid dispatching platform in the power grid dispatching system, and the ticket is sent to the Baoxin master station. The operation ticket is executed by the remote non-stop transmission function of the Baoxin master station, and the primary equipment of the target load station and the standby load station is remotely controlled to simulate the power system bus pressure loss environment, so as to perform a remote automatic transmission test on the 110kV standby automatic transfer device, realize the automation of the standby automatic transfer transmission test, avoid the complexity and time-consuming of manual judgment in the field test, improve the test efficiency, reduce operating errors, and improve the reliability of the test results, thereby solving the technical problem in the related technology that before the 110kV standby automatic transfer device is put into use, the standby automatic transfer device is often tested by on-site manual testing, and the test efficiency is low.

[0103] Optionally, the Baoxin master station 53 includes: a first exit module, used to exit the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station; a first execution module, used to execute a transmission command on the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station, so that the high-voltage side bus circuit breaker of the target load station is deployed.

[0104] Optionally, the remote test system for the 110kV standby automatic transfer device transmission also includes: a first determination module, used to determine the execution result of the transmission operation ticket based on the standby automatic transfer action criterion; a second determination module, used to determine the completion of the transmission operation ticket execution when the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion.

[0105] Optionally, the standby automatic reclosing action criteria include at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the fault bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the fault bus.

[0106] Optionally, the remote test system for the 110kV standby automatic transfer device transmission also includes: a first inspection module, used to check the working status of the protection device of the target load station, check the working status of the 110kV standby automatic transfer device of the target load station and check the working status of the 110kV standby automatic transfer device of the standby load station to obtain an inspection result; a first generation module, used to generate an inspection pass signal when the inspection result indicates that the inspection is passed, and send the inspection pass signal to the power grid dispatching platform.

[0107] Optionally, the first inspection module includes: a first inspection sub-module, used to check the working status of the circuit breaker on the high-voltage side bus of the target load station, the working status including at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the reclosing switch of the circuit breaker, the remote operation hard pressure plate input status of the circuit breaker, the remote non-stop transmission soft pressure plate input status of the circuit breaker, and the remote throwing and withdrawing soft pressure plate input status of the circuit breaker.

[0108] Optionally, the first inspection module also includes: a second inspection sub-module, used to check the charging status of the 110kV standby automatic transfer device of the target load station; a third inspection sub-module, used to check the alarm information of the operating status of the 110kV standby automatic transfer device of the target load station; a first comparison sub-module, used to compare the device data of the 110kV standby automatic transfer device of the target load station with the device data in the setting list; a fourth inspection sub-module, used to check the soft pressure plate throw-in and throw-out status of the 110kV standby automatic transfer device of the target load station.

[0109] Optionally, the first inspection module also includes: a fifth inspection sub-module, used to check the charging status of the 110kV standby automatic transfer device of the standby load station; a sixth inspection sub-module, used to check the alarm information of the operating status of the 110kV standby automatic transfer device of the standby load station; a second comparison sub-module, used to compare the device data of the 110kV standby automatic transfer device of the standby load station with the device data in the setting list; and a seventh inspection sub-module, used to check the soft pressure plate throw-in and throw-out status of the 110kV standby automatic transfer device of the standby load station.

[0110] Optionally, the main station 54 includes: a first acquisition module, used to acquire the circuit breaker position signal of the open-loop point, and compare the circuit breaker position signal with the switch position signal after closing to obtain a first comparison result; a first acquisition module, used to acquire the bus voltage of the target load station, and compare the bus voltage with the fault bus voltage threshold to obtain a second comparison result; a third determination module, used to determine the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the first comparison result and the second comparison result, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the switch position signal after closing and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

[0111] The remote test system for the above-mentioned 110kV standby automatic transfer device transmission may also include a processor and a memory. The above-mentioned dispatching system 51, power grid dispatching platform 52, security master station 53, safety master station 54, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions.

[0112] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the 110kV standby automatic switching device can be remotely tested for non-stop power transmission by adjusting kernel parameters.

[0113] The above-mentioned memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash memory (fl ash RAM), and the memory includes at least one storage chip.

[0114] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium including a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the above-mentioned remote test methods for the transmission of the 110kV standby automatic switching device.

[0115] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising one or more processors and a memory, the memory being used to store one or more programs, wherein when the one or more programs are executed by one or more processors, the one or more processors implement any one of the above-mentioned remote testing methods for the transmission of the 110kV standby automatic switching device.

[0116] According to another aspect of an embodiment of the present invention, a computer program product is provided. The computer program product includes a computer program, wherein when the computer program is executed by a processor, any one of the above-mentioned remote test methods for the transmission of a 110kV backup automatic switching device is implemented.

[0117] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing an initialization program having the following method steps: determining a 110kV standby automatic start-up device to be tested, and determining the target load station acted upon by the 110kV standby automatic start-up device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station; generating a transmission operation ticket for the target load station and the standby load station based on the power grid dispatching platform, and sending the transmission operation ticket to the Baoxin master station; executing the transmission operation ticket based on the Baoxin master station; after the execution of the transmission operation ticket, checking the state of the open-loop point and the bus voltage of the target load station, and determining the transmission test results of the 110kV standby automatic start-up device of the target load station and the 110kV standby automatic start-up device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

[0118] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program that initializes the following method steps: the steps of executing a transmission operation ticket based on the Baoxin master station include: exiting the reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station; executing a transmission command on the high-voltage side bus circuit breaker of the target load station based on the Baoxin master station to open the high-voltage side bus circuit breaker of the target load station.

[0119] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program that initializes the following method steps: after executing the transmission operation ticket based on the security master station, it also includes: determining the execution result of the transmission operation ticket based on the standby automatic transfer action criterion; when the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion, determining that the execution of the transmission operation ticket is completed.

[0120] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program that is initialized with the following method steps: the standby automatic reclosing action criterion includes at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the fault bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the fault bus.

[0121] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program that initializes the following method steps: after determining the target load station where the 110kV standby automatic transfer device to be tested acts, the standby load station closest to the target load station, and the open-loop point closest to the target load station, it also includes: checking the working status of the protection device of the target load station, checking the working status of the 110kV standby automatic transfer device of the target load station, and checking the working status of the 110kV standby automatic transfer device of the standby load station to obtain an inspection result; if the inspection result indicates that the inspection is passed, generating an inspection pass signal, and sending the inspection pass signal to the power grid dispatching platform.

[0122] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program initialized with the following method steps: the step of checking the working status of the protection device of the target load station includes: checking the working status of the circuit breaker on the high-voltage side bus of the target load station, and the working status includes at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the circuit breaker's reclosing switch, the remote operation hard pressure plate of the circuit breaker, the remote non-stop transmission soft pressure plate of the circuit breaker, and the remote throwing and retracting soft pressure plate of the circuit breaker.

[0123] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program initialized with the following method steps: the step of checking the working status of the 110kV standby automatic start-up device of the target load station includes: checking the charging status of the 110kV standby automatic start-up device of the target load station; checking the alarm information of the operating status of the 110kV standby automatic start-up device of the target load station; comparing the device data of the 110kV standby automatic start-up device of the target load station with the device data in the setting list; checking the soft pressure plate throw-in and throw-out status of the 110kV standby automatic start-up device of the target load station.

[0124] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program initialized with the following method steps: the step of checking the working status of the 110kV standby automatic transfer device of the standby load station includes: checking the charging status of the 110kV standby automatic transfer device of the standby load station; checking the alarm information of the operating status of the 110kV standby automatic transfer device of the standby load station; comparing the device data of the 110kV standby automatic transfer device of the standby load station with the device data in the setting list; checking the soft pressure plate throwing and retracting status of the 110kV standby automatic transfer device of the standby load station.

[0125] The present application also provides a computer program product, which, when executed on a data processing device, is also suitable for executing a program having the following method steps: checking the state of the open-loop point and the bus voltage of the target load station, and determining the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station, including: obtaining the circuit breaker position signal of the open-loop point, and comparing the circuit breaker position signal with the after-closing switch position signal to obtain a first comparison result; collecting the target load The bus voltage of the load station is measured, and the bus voltage is compared with the fault bus voltage threshold to obtain a second comparison result; based on the first comparison result and the second comparison result, the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the after-closing switch position signal and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

[0126] Figure 6 1 is a hardware structure block diagram of an electronic device (or mobile device) for a remote test method of a 110kV automatic switching device transmission according to an embodiment of the present invention. Figure 6 As shown, the electronic device may include one or more ( Figure 6 602a, 602b, ..., 602n are used to illustrate) processor 602 (processor 602 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), and memory 604 for storing data. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the I / O interface), a network interface, a keyboard, a power supply and / or a camera. It can be understood by those skilled in the art that Figure 6 The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 6 More or fewer components as shown, or with Figure 6 Different configurations shown.

[0127] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0128] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0129] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0130] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0131] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0132] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0133] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A remote test method for 110kV automatic standby device transmission, characterized in that: A remote test system for a 110kV automatic standby device transmission, the remote test system for the 110kV automatic standby device transmission at least comprises a power grid dispatching platform and a security master station, and the remote test method for the 110kV automatic standby device transmission comprises: Determine the 110kV standby automatic transfer device to be tested, and determine the target load station acted by the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station; Generate a transmission operation ticket for the target load station and the standby load station based on the power grid dispatching platform, and send the transmission operation ticket to the trustworthy master station; Execute the transmission operation ticket based on the trust-guaranteeing master station; After the execution of the transmission operation ticket is completed, the state of the open-loop point and the bus voltage of the target load station are checked, and the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined based on the state of the open-loop point and the bus voltage of the target load station.

2. The method according to claim 1, characterized in that The steps of executing the transmission operation ticket based on the security master station include: A reclosing soft pressure plate of the high-voltage side bus circuit breaker of the target load station based on the trust-guaranteeing master station exiting; Based on the information-guaranteeing master station, a transmission command is executed on the high-voltage side busbar circuit breaker of the target load station, so that the high-voltage side busbar circuit breaker of the target load station is opened.

3. The method according to claim 1, characterized in that: After executing the transmission operation ticket based on the security master station, it also includes: Determine the execution result of the transmission operation ticket based on the standby automatic throw action criterion; When the power system where the target load station and the standby load station are located meets the standby automatic transfer action criterion, it is determined that the execution of the transmission operation ticket is completed.

4. The method according to claim 3, characterized in that The standby automatic reclosing action criterion includes at least one of the following: the circuit breaker position signal of the target load station is inconsistent with the switch position signal after closing, the voltage signal of the bus other than the bus of the target load station in the power system satisfies the reclosing waveform, the negative sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the negative sequence voltage threshold of the faulty bus, and the zero sequence voltage of the bus other than the bus of the target load station in the power system within the target time period is greater than the zero sequence voltage threshold of the faulty bus.

5. The method according to claim 1, characterized in that After determining the target load station on which the 110 kV standby automatic switching device to be tested acts, the standby load station closest to the target load station, and the open-loop point closest to the target load station, the method further includes: Check the working status of the protection device of the target load station, check the working status of the 110kV standby automatic transfer device of the target load station and check the working status of the 110kV standby automatic transfer device of the standby load station to obtain the inspection results; When the inspection result indicates that the inspection is passed, an inspection pass signal is generated and sent to the power grid dispatching platform.

6. The method according to claim 5, characterized in that The step of checking the working status of the protection device of the target load station includes: Check the working status of the circuit breaker on the high-voltage side bus of the target load station, the working status including at least one of the following: the communication status between the circuit breaker and the target load station, the operating status of the circuit breaker, the alarm information of the circuit breaker, the charging status of the reclosing switch of the circuit breaker, the remote operation hard pressure plate input status of the circuit breaker, the remote non-stop transmission soft pressure plate input status of the circuit breaker, and the remote throwing and pulling soft pressure plate input status of the circuit breaker.

7. The method according to claim 5, characterized in that The steps of checking the working status of the 110kV standby automatic switching device of the target load station include: Check the charging status of the 110kV standby automatic transfer device of the target load station; Check the alarm information of the operating status of the 110kV standby automatic switching device of the target load station; Compare the device data of the 110kV standby automatic switching device of the target load station with the device data in the setting list; Check the soft pressure plate launch and retraction status of the 110kV standby automatic switching device of the target load station.

8. The method according to claim 5, characterized in that The steps of checking the working status of the 110kV standby automatic switching device of the standby load station include: Check the charging status of the 110kV standby automatic switching device of the standby load station; Check the alarm information of the operating status of the 110kV standby automatic switching device of the standby load station; Compare the device data of the 110kV standby automatic switching device of the standby load station with the device data in the setting list; Check the soft pressure plate throwing and retraction status of the 110kV standby automatic switching device of the standby load station.

9. The method according to claim 1, characterized in that: The step of checking the state of the open-loop point and the bus voltage of the target load station, and determining the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station comprises: Acquire a circuit breaker position signal of the open-loop point, and compare the circuit breaker position signal with a closed switch position signal to obtain a first comparison result; Collecting the bus voltage of the target load station, and comparing the bus voltage with a fault bus voltage threshold to obtain a second comparison result; The transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station are determined based on the first comparison result and the second comparison result, wherein, when the first comparison result indicates that the circuit breaker position signal is consistent with the switch position signal after closing and the bus voltage is greater than the fault bus voltage threshold, it is determined that the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station have passed the transmission test.

10. A remote test system for 110kV automatic standby device transmission, characterized in that: include: The dispatching system is used to determine the 110kV standby automatic transfer device to be tested, and determine the target load station acted by the 110kV standby automatic transfer device to be tested, the standby load station closest to the target load station, and the open-loop point closest to the target load station; A power grid dispatching platform, used for generating transmission operation tickets for the target load station and the standby load station based on the power grid dispatching platform; A trustworthy master station, used to receive the transmission operation ticket issued by the power grid dispatching platform and execute the transmission operation ticket; The main station is used to check the state of the open-loop point and the bus voltage of the target load station after the execution of the transmission operation ticket, and determine the transmission test results of the 110kV standby automatic transfer device of the target load station and the 110kV standby automatic transfer device of the standby load station based on the state of the open-loop point and the bus voltage of the target load station.

Citation Information

Patent Citations

  • Spare power automatic switching logic test method for verifying automatic switching modes of high voltage side buscouple switch

    CN102023271A

  • Backup automatic switch on-load transmission test method for 110kV intelligent substation

    CN105203873A

  • Automatic bus transfer testing device

    CN110333410A

  • Control method and device for spare power automatic switching device of transformer substation and storage medium

    CN118137670A