Method for calculating gas-water interface of condensate gas reservoir of disconnection control body

By calculating the depth of the gas-water interface and the time of water seeping, the problem of large differences in the gas-water interface in the disconnected condensate gas reservoir is solved, the accurate prediction of the water seeping time of the gas well and the optimization of the water energy, and the efficiency of the oil and gas fields is improved. Development efficiency.

CN119089075APending Publication Date: 2024-12-06CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410418449.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the fault-controlled carbonate reservoir in Shunbei Oil and Gas Field, the gas-water interface is very different, which makes it difficult to accurately judge the water see time of the gas well, affecting efficient development. In addition, traditional methods are in the multi-gate, multi-cluster structure and bottom water development mode. It is difficult to predict the gas-water interface, resulting in a small calculation of water invasion and inconsistent lifting speed of the gas-water interface, affecting production efficiency.

Method used

By calculating the position depth of the original gas-water interface and the current position depth of the gas-water interface, combining the historical mining data of the gas well and the difference in fluid density, the gas-water interface is determined using the intersection of the static pressure gradient line and the water column pressure gradient line, the water see time is calculated, and the water see is passed through Intervention of gas injection or control the production speed to delay the water seepage time, and optimize the production status of gas wells.

Benefits of technology

Accurate prediction and optimization of the water see time of gas wells with broken body condensate gas reservoirs is achieved, the water energy is controlled, the water see time is delayed, and the efficient development effect of gas wells is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089075A_ABST
    Figure CN119089075A_ABST
Patent Text Reader

Abstract

The invention provides a method for calculating a gas-water interface of a cutoff-control condensate gas reservoir, and the method comprises the steps: calculating the position depth of an original gas-water interface through the density difference of an original gas column and a water column, and calculating the position depth of a current gas-water interface through a fluid property method and an engraving volume method; based on the original gas-water interface position depth and the current gas-water interface position depth, the oil-water interface lifting speed is calculated, and then the water breakthrough time of the gas well is predicted; drilling, recording and measuring data are fully utilized, well testing data and static data are comprehensively utilized, dynamic and static combined analysis is achieved, the original gas-water interface position depth and the current gas-water interface position depth are accurately calculated, and important indexes are provided for the development process of oil reservoir developers; a basis is provided for reasonable development of the disconnection control type carbonate condensate gas reservoir; according to the water breakthrough time and the gas well condition, gas injection is intervened or the recovery speed is controlled in advance, the water breakthrough time is delayed, water energy is controlled and utilized, and the high recovery degree is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas exploration and development, and in particular relates to a method for calculating a gas-water interface in a fault-controlled condensate gas reservoir. Background Art

[0002] Exploration and development results show that deep fault-controlled carbonate reservoirs are developed in Shunbei Oil and Gas Field in Tarim Basin, my country. The reservoirs are mainly affected by fault zones, with complex spatial structures, strong random distribution of internal fracture zones, large spatial differences in fracture development frequency, and undeveloped karstification. With the increase of drilling data and production data, the gas-water interface of the gas reservoir in the same fault zone of Shunbei Oil and Gas Field is not uniform. In traditional sandstone oil and gas reservoirs, the gas (oil)-water interface is considered to be uniform. The gas (oil)-water interface of the entire oil and gas reservoir can be determined by determining the position of the gas (oil)-water interface through a deep well. However, the gas-water interface of the Shunbei No. 4 condensate gas reservoir in the same fault zone is very different, and even the original gas-water interface in the same connected well group is different. Therefore, a method is needed to match the one-well-one-reservoir gas-water interface calculation method.

[0003] The fault-controlled carbonate reservoirs in Shunbei Oil and Gas Field are mainly formed by fault zone activities, and have the characteristics of large heterogeneity in the fracture zone and diversified water invasion channels. The unique multi-grid and multi-cluster structure and bottom water development pattern have caused many difficulties for the current prediction of the gas-water interface, including but not limited to the following problems: the energy change of water invasion in weak water bodies is not obvious, the calculated water invasion amount is generally too small, the conductivity of different water invasion dominant channels is inconsistent, the lifting speed of the gas-water interface is different, the gas reservoir filling and displacement is incomplete, and the condensate water produced during the production process interferes with the calculation of the gas-water interface. Therefore, it is urgent to develop new ideas to judge the current gas-water interface and water invasion height, so as to calculate the water breakthrough time of the gas well, optimize the gas well production, control and utilize the water body energy, and achieve efficient development. Summary of the invention

[0004] In order to solve the technical problems of accurately calculating the water breakthrough time of gas wells in fault-controlled condensate gas reservoirs, optimizing the production of gas wells, controlling and utilizing water energy, and realizing efficient development, the present invention provides a gas-water interface calculation method for fault-controlled condensate gas reservoirs.

[0005] The technical solution of the present invention is as follows:

[0006] A method for calculating gas-water interface in a fault-controlled condensate gas reservoir, comprising:

[0007] S1. Calculate the depth of the original gas-water interface position: The gas layer pressure gradient line and the water layer pressure gradient line can be obtained according to the original formation static pressure of the gas well. The intersection of the gas layer pressure gradient line and the water layer pressure gradient line is the gas-water interface. The calculation method of the original gas-water interface position depth is:

[0008] Establish the original formation pressure P i The depth D of the middle gas layer of the condensate gas well g relationship,

[0009] P gwc -P i =G Dg (D gwc -D g ) (1)

[0010] Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g is the depth of the middle gas layer of the condensate gas well;

[0011] Establish hydrostatic pressure P wD Pressure gradient with the air layer D g relationship,

[0012] P gwc -P wD =G Dw (D gwc -D g ) (2)

[0013] Among them, P gwc is the pressure at the air-water interface, P wD is the hydrostatic pressure, G Dw is the pressure gradient of the water layer, D g is the pressure gradient of the gas layer;

[0014] Substituting equations (1) and (2) into equation (3), the depth of the original gas-water interface position is calculated:

[0015]

[0016] Among them, D gwc is the depth of the original gas-water interface, D g is the depth of the middle gas layer of the condensate gas well, P i is the original formation pressure, P wD is the hydrostatic column pressure, ρ w is the density of formation water, ρ g is the density of the condensate gas in the formation; the original water avoidance height can be calculated by the depth of the original gas-water interface position and the vertical depth of the actual drilling bottom of the gas well:

[0017] Original water avoidance height = original gas-water interface position depth - actual drilling bottom vertical depth of gas well (4)

[0018] S2. Calculate the current depth of the air-water interface. The specific calculation steps are as follows:

[0019] Based on the historical production data of gas wells, the fitting relationship between condensate oil density and water avoidance height is established;

[0020] Sampling and testing to obtain the current condensate density of the gas well, and calculating the current water avoidance height according to the fitting relationship;

[0021] The current gas-water interface position depth is calculated based on the current water avoidance height and the actual drilling bottom vertical depth of the gas well;

[0022] S3. Calculate the cumulative pressure drop, subsequent pressure drop and subsequent cumulative production when water appears by the original gas-water interface position depth, the current gas-water interface position depth and the current production, and calculate the water appearance time according to the subsequent pressure drop, subsequent cumulative production, elastic yield and daily production;

[0023] S4. Based on the water breakthrough time, take measures in advance to delay the water breakthrough time and control and utilize the energy of the water body; the measures include intervening gas injection and controlling the extraction rate.

[0024] Preferably, the initial formation pressure P i The depth D of the middle gas layer of the condensate gas well g The relationship method is:

[0025]

[0026] Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, p is the pressure, and D is the depth;

[0027] After integration, we get:

[0028] P gwc -P i =G Dg (D gwc -D g ) (6)

[0029] Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g It is the depth of the middle gas layer of condensate gas well.

[0030] Preferably, the calculation formula for the current air-water interface position depth is as follows:

[0031] Current gas-water interface position depth = current water avoidance height + actual drilling bottom vertical depth of gas well (7) Preferably, the calculation method of the cumulative pressure drop when water is seen is:

[0032]

[0033]

[0034] Based on the equations (8) and (9), the cumulative pressure drop when water appears can be obtained.

[0035] Preferably, the subsequent pressure drop is calculated as follows:

[0036] Cumulative pressure drop when water appears = current cumulative pressure drop + subsequent pressure drop (10) Preferably, the subsequent cumulative production is calculated as follows:

[0037]

[0038] Among them, the current state of elastic yield is given, and the subsequent cumulative yield can be obtained by rearranging formula (11).

[0039] Preferably, the water breakthrough time is calculated as follows:

[0040]

[0041] The daily production is the total production of the gas well in a single day.

[0042] Preferably, the method for calculating the current air-water interface position depth may also be:

[0043] The distribution scale and spatial position of the single well reservoir are displayed by various seismic interpretation and carving methods. The original gas-water interface is projected on the carving map, and the reservoir below the gas-water interface is divided into the first effective volume, the reservoir above the gas-water interface to the bottom of the well is divided into the second effective volume, and all the reservoirs above the gas-water interface are divided into the third effective volume, where:

[0044] Water intrusion dominant channel volume = second effective volume × net-to-gross ratio (13)

[0045]

[0046]

[0047] Substituting equations (13), (14), and (15) into equation (16), the basic water intrusion velocity can be obtained:

[0048]

[0049] Substituting the above calculation results into formula (17), the current water intrusion height can be obtained:

[0050] Current water invasion height = basic water invasion speed × cumulative pressure drop of unseen wells × water body multiple × volume of water invasion dominant channel (17)

[0051] Current air-water interface position depth=original air-water interface position depth-current water invasion height (18) Based on the original air-water interface position depth and the current water invasion height, the current air-water interface position depth can be calculated.

[0052] Preferably, the gas wells are classified according to the original water avoidance height: the wells with the original water avoidance height less than 200 meters are classified as high-risk wells; the wells with the original water avoidance height greater than or equal to 200 meters and less than 400 meters are classified as medium-risk wells; the wells with the original water avoidance height greater than or equal to 400 meters are classified as low-risk wells; and corresponding development plans are formulated for different types of gas wells.

[0053] Preferably, the corresponding development plans are formulated for different types of gas wells, including: immediate control of high-risk wells, the control means are to reduce the production rate or inject gas in advance; establish a monitoring plan for medium-risk wells, and take immediate measures in case of abnormalities, the control means are to reduce the production rate or inject gas in advance; for low-risk wells, the current production rate can be used and timely monitoring can be carried out.

[0054] The beneficial effects of the present invention are:

[0055] The present invention makes full use of drilling, recording and measuring data, and comprehensively utilizes well test data and static data to realize dynamic and static combined analysis, accurately calculates the original gas-water interface and the current gas-water interface, which can be used as an important indicator in the development process of reservoir developers and provide a basis for the rational development of fault-controlled carbonate condensate gas reservoirs.

[0056] The gas-water interface calculation method of the fault-controlled condensate gas reservoir of the present invention is suitable for rationally developing, controlling and utilizing water bodies in the condensate gas reservoir and has excellent application prospects.

[0057] The present invention provides a method for the original gas-water interface and the current gas-water interface of a fault-controlled condensate gas reservoir. The method mainly calculates the original gas-water interface by the density difference between the original gas column and the water column, calculates the current gas-water interface by two methods, namely, fluid property and carving volume, predicts the time when water appears in the gas well, intervenes in gas injection or controls the production rate in advance, delays the time when water appears, controls and utilizes the energy of the water body, and achieves a higher degree of recovery. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 It is a schematic diagram of the gas-water distribution pattern of the original fault-controlled gas reservoir in the gas-water interface calculation method of the fault-controlled condensate gas reservoir provided by the present invention.

[0059] Figure 2 It is a gradient difference diagram of the original gas-water interface in a gas-water interface calculation method for a fault-controlled condensate gas reservoir provided by the present invention.

[0060] Figure 3 It is a schematic diagram of the change of condensate oil density in a gas-water interface calculation method for a fault-controlled condensate gas reservoir provided by the present invention.

[0061] Figure 4 It is a schematic diagram of the relationship between the water avoidance height and the condensate oil density in a method for calculating the gas-water interface of a fault-controlled condensate gas reservoir provided by the present invention.

[0062] Figure 5 It is a schematic diagram of the spatial position distribution of a single well reservoir and an original gas-water interface in a method for calculating the gas-water interface in a fault-controlled condensate gas reservoir provided by the present invention. DETAILED DESCRIPTION

[0063] In order to make the purpose, technical scheme and some points of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of protection of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application. The present invention is further described below in conjunction with the drawings.

[0064] Embodiment 1:

[0065] The present invention provides a method for calculating the gas-water interface of a fault-controlled condensate gas reservoir, comprising:

[0066] S1. Calculate the depth of the original gas-water interface position: The gas layer pressure gradient line and the water layer pressure gradient line can be obtained according to the original formation static pressure of the gas well. The intersection of the gas layer pressure gradient line and the water layer pressure gradient line is the gas-water interface. The calculation method of the original gas-water interface position depth is:

[0067] Establish the original formation pressure P i The depth D of the middle gas layer of the condensate gas well g relationship,

[0068] P gwc -P i =G Dg (D gwc -D g ) (1)

[0069] Among them, P gwc is the pressure at the air-water interface, Pi is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g is the depth of the middle gas layer of the condensate gas well;

[0070] Establish hydrostatic pressure P wD Pressure gradient with the air layer D g relationship,

[0071] P gwc -P wD =G Dw (D gwc -D g ) (2)

[0072] Among them, P gwc is the pressure at the air-water interface, P wD is the hydrostatic pressure, G Dw is the pressure gradient of the water layer, D g is the pressure gradient of the gas layer;

[0073] Substituting equations (1) and (2) into equation (3), the depth of the original air-water interface is calculated:

[0074]

[0075] Among them, D gwc is the depth of the original gas-water interface, D g is the depth of the middle gas layer of the condensate gas well, P i is the original formation pressure, P wD is the hydrostatic column pressure, ρ w is the density of formation water, ρ g is the density of formation condensate;

[0076] The original water avoidance height can be calculated by the original gas-water interface position depth and the actual drilling bottom vertical depth of the gas well:

[0077] Original water avoidance height = original gas-water interface position depth - actual drilling bottom vertical depth of gas well (4)

[0078] Specifically, the initial formation pressure P established in S1 is i The depth D of the middle gas layer of the condensate gas well g The relationship method is:

[0079]

[0080] Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, p is the pressure, and D is the depth;

[0081] After integration, we can simplify and get:

[0082] P gwc -P i =G Dg (D gwc -D g ) (6)

[0083] Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g It is the depth of the middle gas layer of condensate gas well.

[0084] For example, Figure 1 As shown in the figure, assuming that the source rock layers in the same fault zone have uniform formation pressure, the source rock layers (T 9 0) After hydrocarbon generation, the condensate gas is replaced by the formation water, and the condensate gas is located in the gas reservoir, and the formation water is located below the condensate gas, forming the original gas-water distribution pattern. Under the above original gas-water distribution pattern, the relationship diagram between the gas layer pressure gradient and the water layer pressure gradient drawn based on the original formation static pressure of the gas well is as follows: Figure 2 As shown in the figure, the difference in the slope of the gas layer pressure gradient line and the water layer pressure gradient line can reflect the density difference of the formation fluid, thereby determining the position of the original gas-water interface. The intersection of the two lines is the position of the gas-water interface. Based on the above relationship, a relationship equation for solving the position depth of the original gas-water interface can be constructed.

[0085] S2. Calculate the current depth of the air-water interface. The specific calculation steps are as follows:

[0086] Based on the historical production data of gas wells, the fitting relationship between condensate oil density and water avoidance height is established;

[0087] Sampling and testing to obtain the current condensate density of the gas well, and calculating the current water avoidance height according to the fitting relationship;

[0088] The current gas-water interface position depth is calculated based on the current water avoidance height and the actual drilling bottom vertical depth of the gas well;

[0089] Specifically, the calculation formula of the current air-water interface of S2 is as follows:

[0090] Current gas-water interface position depth = current water avoidance height + actual drilling bottom vertical depth of gas well (7)

[0091] For example, Figure 3As shown in the figure, in the actual production process, it is found that the vertical fluid properties of the condensate gas reservoir in the fault-controlled body of the oil and gas field are that the deeper the effective depth into the mountain, the lower the gas-oil ratio of the single well. For example, in the northern section of a certain production zone, the gas-oil ratio decreases by 190m when the depth into the mountain increases by 100m. 3 / t; the southern section increases 100m into the mountain, and the gas-oil ratio decreases 639m 3 / t, so at the top of the gas reservoir T 7 4 The rule in the vertical direction of effective entry into the mountain is that the deeper the depth, the lower the gas-oil ratio and the greater the density of condensate oil; this rule is applied to the gas-water interface, and it is believed that the closer the distance to the gas-water interface, the lower the gas-oil ratio and the greater the density of condensate oil; and according to the summary of actual production data, it can be seen that the characteristics of gas wells before water breakthrough are consistent with the above rule. The results of the full analysis of condensate oil show that as the water avoidance height gradually decreases, the density of condensate oil increases; Figure 4 As shown in the figure, a fitting relationship between condensate oil density and water avoidance height is established based on production data. In actual production, samples are taken from gas wells for testing to obtain condensate oil density. Based on the above fitting relationship, the current water avoidance height can be calculated. The current gas-water interface position depth is obtained by summing the actual drilling bottom vertical depth of the gas well and the current water avoidance height.

[0092] S3. Calculate the cumulative pressure drop, subsequent pressure drop and subsequent cumulative production when water appears by the original gas-water interface position depth, the current gas-water interface position depth and the current production, and calculate the water appearance time according to the subsequent pressure drop, subsequent cumulative production, elastic yield and daily production;

[0093] Specifically, the calculation method of the cumulative pressure drop when water appears in the above S3 is:

[0094]

[0095]

[0096] Based on the equations (8) and (9), the cumulative pressure drop when water appears can be obtained.

[0097] Specifically, the calculation method of the subsequent pressure drop in the above S3 is:

[0098] Cumulative pressure drop when water appears = current cumulative pressure drop + subsequent pressure drop (10) Specifically, the calculation method of subsequent cumulative production in the above S3 is:

[0099]

[0100] Among them, the current state of elastic yield is given, and the subsequent cumulative yield can be obtained by rearranging formula (11).

[0101] Specifically, the calculation method of the water breakthrough time in the above S3 is:

[0102]

[0103] The daily production is the total production of the gas well in a single day.

[0104] S4. Based on the water breakthrough time, take measures in advance to delay the water breakthrough time and control and utilize the energy of the water body; the measures include intervening gas injection and controlling the extraction rate.

[0105] Specifically, the method for calculating the current depth of the air-water interface position may also be:

[0106] The distribution scale and spatial position of the single well reservoir are displayed by various seismic interpretation and carving methods. The original gas-water interface is projected on the carving map, and the reservoir below the gas-water interface is divided into the first effective volume, the reservoir above the gas-water interface to the bottom of the well is divided into the second effective volume, and all the reservoirs above the gas-water interface are divided into the third effective volume, where:

[0107] Water intrusion dominant channel volume = second effective volume × net-to-gross ratio (13)

[0108]

[0109]

[0110] Substituting equations (13), (14), and (15) into equation (16), the basic water intrusion velocity can be obtained:

[0111]

[0112] Substituting the above calculation results into formula (17), the current water intrusion height can be obtained:

[0113] Current water invasion height = basic water invasion speed × cumulative pressure drop of unseen wells × water body multiple × volume of water invasion dominant channel (17)

[0114] Current air-water interface position depth=original air-water interface position depth-current water invasion height (18) Based on the original air-water interface position depth and the current water invasion height, the current air-water interface position depth can be calculated.

[0115] For example, Figure 5As shown in the figure, the fluid below the original gas-water interface is divided into water bodies, the water invasion speed of the water body under the dominant channel is calculated, the current water avoidance height and the current gas-water interface position depth are obtained, and the water breakthrough time is predicted. The main parameters of the calculation are: the volume of the water body below the original gas-water interface is recorded as the first effective volume, the effective volume from the original gas-water interface to the bottom of the single well is recorded as the second effective volume, the volume of the dominant channel for water invasion, the water body multiple, the cumulative pressure drop of a single well, the net-to-gross ratio, and the basic water invasion speed; firstly, the net-to-gross ratio is calculated through the fault zone data parameters, and then the volume of the dominant channel for water invasion is calculated in combination with the second effective volume, and the basic water invasion speed is calculated using the actual data in the mining, such as the water avoidance height of the wells where water has been seen, the cumulative pressure drop when water has been seen in the wells where water has been seen, the water body multiple combined with the volume of the dominant channel for water invasion; the water invasion speed can be used to calculate the current water invasion height of the wells where no water has been seen, and finally, the depth of the current gas-water interface position can be calculated in combination with the original gas-water interface.

[0116] Specifically, gas wells are classified according to the original water avoidance height: those with an original water avoidance height of less than 200 meters are classified as high-risk wells; those with an original water avoidance height of greater than or equal to 200 meters and less than 400 meters are classified as medium-risk wells; those with an original water avoidance height of greater than or equal to 400 meters are classified as low-risk wells; and corresponding development plans are formulated for different types of gas wells.

[0117] Specifically, corresponding development plans are formulated for different types of gas wells, including: immediate control of high-risk wells by reducing the production rate or injecting gas in advance; establishment of a monitoring plan for medium-risk wells, and immediate measures are taken in case of abnormalities by reducing the production rate or injecting gas in advance; low-risk wells can continue to use the current production rate and conduct timely monitoring.

[0118] Embodiment 2:

[0119] In a certain oil and gas field, the original water avoidance height of a gas well was 290m, and the water avoidance height before adjustment was 157m. According to the calculation method provided in this application, the estimated time of water breakthrough is mid-March 2024. In October 2023, this well took measures: injecting gas and water cone to the well group. At present, the well is producing steadily, the water invasion signal is weakened, the water avoidance height is expected to be 150m, and the water invasion speed is slowed down.

[0120] Embodiment three:

[0121] In a certain oil and gas field, the original water avoidance height of another gas well was 468m, and the water avoidance height before adjustment was 93m. According to the calculation method provided in this application, the estimated time of water breakthrough is October 2023. This well took measures in May 2023: the production was reduced from 8.0mm working system to 6.0mm. At present, the water content of the well has decreased, and the water avoidance height is expected to be 50m, and the water invasion speed has slowed down; the next step is to inject gas pressure water cone into the well group.

[0122] Embodiment 4:

[0123] In a certain oil and gas field, the original water avoidance height of another gas well was 369m, and the water avoidance height before adjustment was 148m. According to the calculation method provided in this application, the estimated time of water breakthrough is September 2023. This well took measures in October 2023: injecting gas pressure cone into the well group; currently the water invasion signal of the well has weakened, the estimated water avoidance height is 128m, and the water invasion speed has slowed down.

[0124] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.

Claims

1. A method for calculating the gas-water interface of a fault-controlled condensate gas reservoir, characterized in that: include: S1. Calculate the depth of the original gas-water interface position: The gas layer pressure gradient line and the water layer pressure gradient line can be obtained according to the original formation static pressure of the gas well. The intersection of the gas layer pressure gradient line and the water layer pressure gradient line is the gas-water interface. The calculation method of the original gas-water interface position depth is: Establish the original formation pressure P i The depth D of the middle gas layer of the condensate gas well g relationship, P gwc -P i =G Dg (D gwc -D g ) (1) Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g is the depth of the middle gas layer of the condensate gas well; Establish hydrostatic pressure P wD Pressure gradient with the air layer D g relationship, P gwc -P wD =G Dw (D gwc -D g ) (2) Among them, P gwc is the pressure at the air-water interface, P wD is the hydrostatic column pressure, G Dw is the pressure gradient of the water layer, D g is the pressure gradient of the gas layer; Substituting equations (1) and (2) into equation (3), the depth of the original gas-water interface position is calculated: Among them, D gwc is the depth of the original gas-water interface, D g is the depth of the middle gas layer of the condensate gas well, P i is the original formation pressure, P wD is the hydrostatic column pressure, ρ w is the density of formation water, ρ g is the density of the condensate gas in the formation; the original water avoidance height can be calculated by the depth of the original gas-water interface position and the vertical depth of the actual drilling bottom of the gas well: Original water avoidance height = original gas-water interface position depth - actual drilling bottom vertical depth of gas well (4) S2. Calculate the current depth of the air-water interface. The specific calculation steps are as follows: Based on the historical production data of gas wells, the fitting relationship between condensate oil density and water avoidance height is established; Sampling and testing to obtain the current condensate density of the gas well, and calculating the current water avoidance height according to the fitting relationship; The current depth of the gas-water interface position is calculated based on the current water avoidance height and the actual vertical depth of the gas well bottom; S3. Calculate the cumulative pressure drop, subsequent pressure drop and subsequent cumulative production when water is seen through the depth of the original gas-water interface position, the current gas-water interface position depth and the current production, and calculate the water-seeking time according to the subsequent pressure drop, subsequent cumulative production, elastic yield and daily production; S4. Based on the water breakthrough time, take measures in advance to delay the water breakthrough time and control and utilize the energy of the water body; the measures include intervening gas injection and controlling the extraction rate.

2. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The initial formation pressure P i The depth D of the middle gas layer of the condensate gas well g The relationship method is: Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, p is the pressure, and D is the depth; After integration, we get: P gwc -P i =G Dg (D gwc -D g ) (6) Among them, P gwc is the pressure at the air-water interface, P i is the original formation pressure, G Dg is the pressure gradient of the gas layer, D g It is the depth of the middle gas layer of condensate gas well.

3. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The calculation formula for the current air-water interface position depth is as follows: The current depth of the gas-water interface = the current water avoidance height + the actual vertical depth of the gas well bottom (7).

4. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The calculation method of the cumulative pressure drop when water is seen is: Based on the equations (8) and (9), the cumulative pressure drop when water appears can be obtained.

5. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The subsequent pressure drop is calculated as: Cumulative pressure drop when water appears = current cumulative pressure drop + subsequent pressure drop (10).

6. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The calculation method of the subsequent cumulative production is: Among them, the current state of elastic yield is given, and the subsequent cumulative yield can be obtained by rearranging formula (11).

7. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The calculation method of the water breakthrough time is: The daily production is the total production of the gas well in a single day.

8. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: The method for calculating the current air-water interface may also be: The distribution scale and spatial position of the single well reservoir are displayed by various seismic interpretation and carving methods. The original gas-water interface is projected on the carving map, and the reservoir below the gas-water interface is divided into the first effective volume, the reservoir above the gas-water interface to the bottom of the well is divided into the second effective volume, and all the reservoirs above the gas-water interface are divided into the third effective volume, where: Water intrusion dominant channel volume = second effective volume × net-to-gross ratio (13) Substituting equations (13), (14), and (15) into equation (16), the basic water intrusion velocity can be obtained: Substituting the above calculation results into formula (17), the current water intrusion height can be obtained: Current water invasion height = basic water invasion speed × cumulative pressure drop of unseen wells × water body multiple × volume of water invasion dominant channel (17) Current gas-water interface depth = original gas-water interface - current water invasion height (18) Based on the original air-water interface position depth and the current water invasion height, the current air-water interface position depth can be calculated.

9. The method for calculating the gas-water interface of a fault-controlled condensate gas reservoir according to claim 1, characterized in that: Gas wells are classified according to the original water avoidance height: The original water avoidance height is less than 200 meters, which is defined as a high-risk well; The original water avoidance height is greater than or equal to 200 meters and less than 400 meters, which is defined as a medium-risk well; The original water avoidance height is greater than or equal to 400 meters, which is defined as a low-risk well; Formulate corresponding development plans for different types of gas wells.

10. A method for calculating gas-water interface in a fault-controlled condensate gas reservoir according to claim 9, characterized in that: The corresponding development plans are formulated for different types of gas wells, including: The high-risk wells are immediately controlled by reducing the production rate or injecting gas in advance; A monitoring plan is established for the medium-risk wells, and measures are taken immediately if there are any abnormalities. The control measures include reducing the production rate or injecting gas in advance; The low-risk wells may continue to use the current production rate and carry out timely monitoring.