Tunnel excavation face hygrothermal environment parameter prediction and optimization method, medium and equipment

By establishing a prediction model for humidity and heat environment parameters of tunnel excavation surface and particle swarm algorithm to optimize ventilation parameters, the safety problem of humidity and heat environment control in high rock temperature tunnels is solved, and the effect of rapid control and cost saving is achieved.

CN119089659AActive Publication Date: 2024-12-06CENT SOUTH UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411121074.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-12-06
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The existing technology has failed to effectively predict and control the humid and heat environment of the excavation surface of high rock temperature tunnels, which has led to the threat of the safety of construction workers. It is only concerned about the design of a single temperature cooling equipment, and lacks quantitative prediction and control measures for the humid and heat environment.

Method used

The prediction and optimization method of the wet and heat environment parameter of the tunnel excavation surface is adopted. By collecting geological, environmental and ventilation parameters, a three-dimensional numerical calculation model and response surface function are established, and the ventilation parameters are optimized by the particle swarm algorithm to achieve the prediction and control of the wet and heat environment.

Benefits of technology

Rapidly control the humid and hot environment of the excavation surface, reduce the waiting time for construction, save the cost of control measures, and ensure the safety of high-rock temperature tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089659A_ABST
    Figure CN119089659A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel and underground engineering, in particular to a tunnel excavation face damp and hot environment parameter prediction and optimization method which comprises the steps that geological condition parameters, environment parameters and ventilation parameters of a certain tunnel excavation face are collected; establishing an effective tunnel excavation three-dimensional numerical calculation model according to the tunnel construction design data and based on the acquired geological condition parameters, environmental parameters and ventilation parameters; according to the tunnel excavation three-dimensional numerical calculation model and a response surface function based on a quadratic polynomial form, establishing a tunnel excavation surface humid and hot environment parameter prediction model; and performing parameter optimization according to the prediction model of the damp and hot environment parameters of the tunnel excavation face and based on a particle swarm algorithm, and outputting an optimal solution of the damp and hot environment parameters of the tunnel excavation face. According to the method, the damp and hot environment of the tunnel excavation face can be predicted, control parameters can be optimized, the damp and hot environment of the excavation face can be rapidly controlled after a new tunnel face of the tunnel is exposed, and personnel, machines and the like can rapidly enter a working area for construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnels and underground engineering, and in particular to a method, medium and equipment for predicting and optimizing the wet and hot environmental parameters of a tunnel excavation surface. Background Art

[0002] As a semi-enclosed underground space, a high-temperature and high-humidity environment is easily formed in a high-rock temperature (water temperature) tunnel. The tunnel, which is already in a harsh underground environment, coupled with extreme hot and humid conditions, will have a serious impact and harm on the safety of on-site construction workers. Therefore, the prediction and control of the hot and humid environment of the tunnel excavation face during the construction period of a high-rock temperature (water temperature) tunnel is an important and practical need to ensure the safety of the high-rock temperature (water temperature) tunnel during the construction period.

[0003] In response to the hot and humid environment of the excavation face during the tunnel construction period, the relevant specifications have imposed restrictions from the perspectives of air temperature, air humidity and equivalent temperature in the tunnel. The existing technology only proposes the use of liquid carbon dioxide to quickly cool the excavation face of a high geothermal tunnel, and the use of an ultra-long high geothermal tunnel step cooling device and method to perform step cooling on an ultra-long high geothermal tunnel. However, the current specifications only impose numerical restrictions on the hot and humid environment during the tunnel construction period, and do not propose specific and feasible control measures. They also only focus on the design of cooling equipment for a single temperature, and do not conduct quantitative predictions and control measures or equipment research and development for the hot and humid environment in the tunnel construction area. Summary of the invention

[0004] The present invention aims to provide a method, medium and device for predicting and optimizing the parameters of the humid and hot environment of the tunnel excavation face, which can quickly control the humid and hot environment of the excavation face after the new tunnel face is exposed. The specific technical scheme is as follows:

[0005] The present invention provides a method, medium and device for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation surface. The method for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation surface comprises the following steps:

[0006] S1: Collect geological condition parameters, environmental parameters and ventilation parameters of a tunnel excavation face, wherein: the geological condition parameters include the rock temperature of the tunnel face and the water seepage of the tunnel face; the environmental parameters include the air temperature in the tunnel and the relative humidity of the air in the tunnel; the ventilation parameters include the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment and the air volume transported into the tunnel by the ventilation equipment;

[0007] S2: Establish an effective three-dimensional numerical calculation model for tunnel excavation based on the tunnel construction design data and the geological condition parameters, environmental parameters and ventilation parameters collected in S1;

[0008] S3: A prediction model for the hygrothermal environmental parameters of the tunnel excavation surface is established based on the three-dimensional numerical calculation model of tunnel excavation and the response surface function based on the quadratic polynomial form;

[0009] S4: Based on the prediction model of the humid and hot environmental parameters of the tunnel excavation surface and the particle swarm algorithm, the parameters are optimized and the optimal solution of the humid and hot environmental parameters of the tunnel excavation surface is output.

[0010] Optionally, the S3 includes:

[0011] S3.1. Determine the influencing factors and the affected factors of the hot and humid environment of tunnel excavation, where: the influencing factors are the rock temperature of the tunnel face, the water seepage of the tunnel face, the temperature of the air transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time; the affected factors are the air temperature and relative humidity of the working area of ​​the tunnel excavation face;

[0012] S3.2, set three level values ​​for each parameter in the influencing factors;

[0013] S3.3. Use the three-dimensional numerical calculation model of tunnel excavation to establish numerical calculation models of different influencing factors and different level value combinations, and calculate the air temperature and relative humidity of the working area of ​​the tunnel excavation face corresponding to each combination;

[0014] S3.4. Based on the calculation results in S3.3, a response surface function in the form of a quadratic polynomial is used to establish a prediction model for the hygrothermal environmental parameters of the tunnel excavation face.

[0015] Optionally, among the three level values ​​of S3.2, the maximum level value is greater than the upper limit value of the influencing factor value, the minimum level value is less than the lower limit value of the influencing factor level value, and the middle level value is the average value of the maximum level value and the minimum level value;

[0016] In S3.3, the number of numerical calculation models for different influencing factors and different level value combinations established is m, where: m≥(n+1)(n+2) / 2, n is the total number of influencing factors;

[0017] In S3.4, the specific expression of the prediction model of the hygrothermal environment parameters of the tunnel excavation surface is:

[0018]

[0019] Where: f1(x1,x2,···,x n ) is the air temperature prediction model of the tunnel excavation working area, f2(x1,x2,···,x n ) is the relative humidity prediction model of the air in the tunnel excavation working area; x gis the g-th influencing factor, x h is the hth influencing factor; a0 is a constant term, a g is the coefficient of the first-order term to be determined, a gh is the unknown coefficient of the quadratic term; n is the total number of influencing factors; g and h are the influencing factor numbers, and g and h are natural numbers ranging from 1 to n respectively.

[0020] Optionally, the S4 includes:

[0021] S4.1. Determine the objective function for optimizing the control parameters of the humid and hot environment, specifically:

[0022] S4.1.1. Substitute the rock temperature of the tunnel face collected in S1 into the air temperature prediction model of the tunnel excavation working area to obtain the air temperature prediction function f1(x e ), the tunnel face water seepage collected in S1 is substituted into the relative humidity prediction model of the air in the tunnel excavation working area to obtain the relative humidity prediction function f2(x e );

[0023] S4.1.2. Determine the objective function Y for optimizing the control parameters of the humid and hot environment. The specific expression is:

[0024]

[0025] Among them: st is the constraint condition, x e are the control parameters of the humid and hot environment to be designed, including the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time. The constraint condition of the continuous ventilation time is to approach the specified value q of the continuous ventilation time; lb is the lower limit level of the control parameters of the humid and hot environment to be designed, ub is the upper limit level of the control parameters of the humid and hot environment to be designed, and RH min RH is the lower limit of relative humidity in the working area of ​​the excavation face. max is the lower limit level of relative humidity of the air in the working area of ​​the excavation face, and k is the specified value of the air temperature in the working area of ​​the tunnel excavation face;

[0026] S4.2. Use particle swarm algorithm to design control parameters, specifically:

[0027] S4.2.1. Initialize the particle swarm. Specifically, set the number of iterations t = 1, construct the initial particle swarm, and randomly generate the initial position x of each particle. ij (1) and initial velocity v ij (1);

[0028] S4.2.2. Calculate the current position x ij(t) The objective function value corresponding to each particle;

[0029] S4.2.3. For each particle, if the objective function value corresponding to the current iteration is less than the objective function value of the previous iteration, the objective function corresponding to the current iteration is taken as the optimal solution of the particle itself, and the optimal solution and the corresponding location x are shared with other particles. ij (t); For a particle swarm, if the objective function value corresponding to a particle in the current iteration is the minimum value among all particles, then the objective value is the optimal solution for the particle swarm in the current iteration;

[0030] S4.2.4, if t reaches the set number of iterations, the iteration is stopped, and the position x corresponding to the optimal solution of the particle swarm of the current iteration is ij (t) is the optimal solution, that is, the optimal solution of the wet and hot environment control parameters to be designed; otherwise, let t=t+1, use the update formula to adjust the current position and speed, and return to S4.2.2 to update the optimal solution of the objective function value until t reaches the set number of iterations.

[0031] Optionally, the update formula in S4.2.4 is specifically:

[0032] v ij (t) = wv ij (t-1)+c1r 1j [p ij -x ij (t-1)]+c2r 2j [p gj -x ij (t-1)];

[0033] x ij (t) = x ij (t-1)+v ij (t-1);

[0034] Where: i is the particle number; j is the spatial dimension of the particle; v ij (t-1) is the particle velocity in the t-1th iteration; x ij (t-1) is the particle position in the t-1th iteration; p ij is the optimal position of particle i in the jth dimension; p gj is the optimal position of all particles in the j-th dimension; w is the inertia weight; c1 is the learning factor of the individual particle, c2 is the learning factor of the particle group; r 1j and r 2j are mutually independent random numbers with values ​​between 0 and 1.

[0035] Optionally, the particle swarm algorithm uses a dynamically decreasing inertia weight and a dynamic learning factor. The dynamic decreasing expression w(t) of the inertia weight is:

[0036] w(t)=w ini (w ini -w fin )(T max -t) / T max ;

[0037] Where: w ini is the initial value of the inertia weight, w fin is the final value of the inertia weight, T max is the total number of iterations;

[0038] The dynamic expression of the learning factor of the individual particle c1(t) is:

[0039] c1(t)=c 1ini -(c 1ini -c 1fin )×(t / T max );

[0040] Where: c 1ini is the initial value of the particle individual’s volume learning factor, c 1fin is the final value of the volume learning factor of the individual particle;

[0041] The dynamic expression of the learning factor of the particle swarm c2(t) is:

[0042] c2(t)=c 2ini +(c 2ini -c 2fin )×(t / T max );

[0043] Where: c 2ini is the initial value of the particle swarm’s learning factor, c 2fin is the final value of the particle swarm’s volume learning factor.

[0044] Optionally, the method for obtaining the geological condition parameters, environmental parameters, and ventilation parameters in S1 includes:

[0045] Install geological condition parameter monitoring equipment, environmental parameter monitoring equipment, and ventilation parameter monitoring equipment in the tunnel excavation working area;

[0046] During the tunnel excavation process, each monitoring device starts acquiring data when a new face is exposed, and collects data every 10 minutes for 5 hours.

[0047] Optionally, the S2 includes:

[0048] S2.1. Assume that the number of cycles P = 1 and establish a three-dimensional numerical calculation model O1 based on the tunnel geometry, ventilation facilities, and drainage facilities in the tunnel construction design data;

[0049] S2.2, set the initial material values ​​and physical field initial values ​​of the three-dimensional numerical calculation model O1 according to the tunnel geological survey report and the geological condition parameters, environmental parameters and ventilation parameters collected in S1;

[0050] S2.3. Run the three-dimensional numerical calculation model in the current cycle O p , where: three-dimensional numerical calculation model O p The running time is consistent with the continuous collection time of each monitoring device in S1;

[0051] S2.4, if running the three-dimensional numerical calculation model O p If the difference between the obtained air temperature and relative humidity in the working area of ​​the tunnel excavation face and the air temperature and relative humidity in the environmental parameters collected in S1 is not greater than 5%, the three-dimensional numerical calculation model O is considered to be p Effective, O p That is, it is an effective three-dimensional numerical calculation model for tunnel excavation; otherwise, p The material parameters are adjusted based on the initial value of the material to obtain O p+1 , let O p =O p+1 Return to S2.3.

[0052] The present invention also provides a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, implements the above-mentioned method for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation face.

[0053] The present invention also provides an electronic device, comprising: at least one processor, at least one memory and computer program instructions stored in the memory. When the computer program instructions are executed by the processor, the method for predicting and optimizing the humid and hot environmental parameters of the tunnel excavation surface as described above is implemented.

[0054] The present invention collects geological condition parameters, environmental parameters and ventilation parameters of a certain tunnel excavation face to establish a three-dimensional numerical calculation model for tunnel excavation, and establishes a tunnel excavation face humid and hot environmental parameter prediction model based on a response surface function in the form of a quadratic polynomial according to the three-dimensional numerical calculation model for tunnel excavation, and then optimizes the humid and hot environmental parameters of the tunnel excavation face based on a particle swarm algorithm according to the tunnel excavation face humid and hot environmental parameter prediction model. The present invention can predict the humid and hot environment of the tunnel excavation face and optimize the control parameters, and can quickly control the humid and hot environment of the excavation face after the new tunnel face is exposed, so that personnel and machinery can quickly enter the working area for construction, thereby achieving the purpose of reducing the waiting time for construction and saving the cost of humid and hot environmental control measures for the tunnel excavation face, and providing safety protection for the construction period of high-altitude and high rock temperature (water temperature) tunnels.

[0055] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0057] Figure 1 It is a flow chart of a method for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation face in an embodiment of the present invention. DETAILED DESCRIPTION

[0058] The embodiments of the present invention are described in detail below with reference to the accompanying drawings. However, the present invention can be implemented in many different ways that are defined and covered.

[0059] In one embodiment, a method, medium and device for predicting and optimizing hygrothermal environmental parameters of a tunnel excavation face comprises the following steps:

[0060] S1: Collect geological condition parameters, environmental parameters and ventilation parameters of a tunnel excavation face, wherein: the geological condition parameters include the rock temperature of the tunnel face and the water seepage of the tunnel face; the environmental parameters include the air temperature in the tunnel and the relative humidity of the air in the tunnel; the ventilation parameters include the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment and the air volume transported into the tunnel by the ventilation equipment;

[0061] Specifically, the rock temperature of the tunnel face is the temperature of the face exposed during tunnel excavation operations, and is measured by an infrared temperature gun; the water seepage of the tunnel face is the volume of water flowing through the ditch in front of the tunnel face per unit time, and is measured by a fluid flow meter; the air temperature and relative humidity of the air in the tunnel are the air temperature and relative humidity of the air in the working area of ​​the tunnel excavation face, and are measured by an air thermometer and an air hygrometer respectively; the air temperature and relative humidity of the air transported into the tunnel by the ventilation equipment are the air temperature and relative humidity of the air at the outlet of the ventilation duct in the tunnel, and are measured by an air thermometer and an air hygrometer respectively; the air volume transported into the tunnel by the ventilation equipment is the volume of air transported into the tunnel by the tunnel ventilation equipment per unit time, and is measured by a fluid flow meter.

[0062] The methods for obtaining geological condition parameters, environmental parameters, and ventilation parameters in S1 include:

[0063] Install geological condition parameter monitoring equipment, environmental parameter monitoring equipment, and ventilation parameter monitoring equipment in the tunnel excavation working area;

[0064] During the tunnel excavation process, each monitoring device starts acquiring data when a new face is exposed, and collects data every 10 minutes for 5 hours.

[0065] S2: Establish an effective three-dimensional numerical calculation model for tunnel excavation based on the tunnel construction design data and the geological condition parameters, environmental parameters and ventilation parameters collected in S1;

[0066] S2 includes:

[0067] S2.1. Assume that the number of cycles P = 1 and establish a three-dimensional numerical calculation model O1 based on the tunnel geometry, ventilation facilities, and drainage facilities in the tunnel construction design data;

[0068] S2.2, set the initial material values ​​and physical field values ​​of the three-dimensional numerical calculation model O1 according to the tunnel geological survey report and the geological condition parameters, environmental parameters and ventilation parameters collected in S1;

[0069] S2.3. Run the three-dimensional numerical calculation model in the current cycle p , where: three-dimensional numerical calculation model O p The running time is consistent with the continuous collection time of each monitoring device in S1;

[0070] S2.4, if running the three-dimensional numerical calculation model O p If the difference between the obtained air temperature and relative humidity in the working area of ​​the tunnel excavation face and the air temperature and relative humidity in the environmental parameters collected in S1 is not greater than 5%, the three-dimensional numerical calculation model O is considered to be p Effective, O p That is, it is an effective three-dimensional numerical calculation model for tunnel excavation; otherwise, p The material parameters are adjusted based on the initial value of the material to obtain O p+1 , let O p =O p+1 Return to S2.3.

[0071] S3: A prediction model for the hygrothermal environmental parameters of the tunnel excavation surface is established based on the three-dimensional numerical calculation model of tunnel excavation and the response surface function based on the quadratic polynomial form;

[0072] S3 includes:

[0073] S3.1. Determine the influencing factors and the affected factors of the hot and humid environment of tunnel excavation, where: the influencing factors are the rock temperature of the tunnel face, the water seepage of the tunnel face, the temperature of the air transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time; the affected factors are the air temperature and relative humidity of the working area of ​​the tunnel excavation face;

[0074] S3.2, set three level values ​​for each parameter in the influencing factors;

[0075] Among the three level values ​​of S3.2, the maximum level value is greater than the upper limit of the influencing factor value, the minimum level value is less than the lower limit of the influencing factor value, and the middle level value is the average of the maximum level value and the minimum level value;

[0076] According to the determined 6 factors, 3 levels are set for different factors respectively. The specific level settings are shown in Table 1. The three-dimensional numerical calculation model of tunnel excavation established in step S2 is adopted. The BBD (Box-Behnken Design) design method built in the Design-Expert software is used to design 54 numerical calculation groups with different level combinations of different factors, and the corresponding three-dimensional numerical calculation model of tunnel excavation is established. The three-dimensional numerical calculation model of tunnel excavation is run to calculate the air temperature and relative humidity of the working area of ​​the tunnel excavation face corresponding to each combination.

[0077] Table 1 Setting of different factor level values

[0078]

[0079]

[0080] S3.3. Use the three-dimensional numerical calculation model of tunnel excavation to establish numerical calculation models of different influencing factors and different level value combinations, and calculate the air temperature and relative humidity of the working area of ​​the tunnel excavation face corresponding to each combination;

[0081] In S3.3, the number of numerical calculation models for different influencing factors and different level value combinations established is m, where: m ≥ (n+1)(n+2) / 2, n is the total number of influencing factors;

[0082] S3.4. Based on the calculation results in S3.3, a response surface function in the form of a quadratic polynomial is used to establish a prediction model for the hygrothermal environmental parameters of the tunnel excavation face.

[0083] The specific expression of the prediction model of the hygrothermal environment parameters of the tunnel excavation face is:

[0084]

[0085] Where: f1(x1,x2,···,x n ) is the air temperature prediction model of the tunnel excavation working area, f2(x1,x2,···,x n ) is the relative humidity prediction model of the air in the tunnel excavation working area; x g is the g-th influencing factor, x his the hth influencing factor; a0 is a constant term, a g is the coefficient of the first-order term to be determined, a gh is the coefficient of the quadratic term to be determined; n is the total number of influencing factors, n is 6; g and h are the influencing factor numbers, g and h are natural numbers from 1 to n respectively; the coefficient of the linear term to be determined a g and the quadratic term coefficient a gh It is calculated using the unknown coefficient vector.

[0086] S4: Based on the prediction model of the humid and hot environmental parameters of the tunnel excavation surface and the particle swarm algorithm, the parameters are optimized and the optimal solution of the humid and hot environmental parameters of the tunnel excavation surface is output.

[0087] S4 includes:

[0088] S4.1. Determine the objective function for optimizing the control parameters of the humid and hot environment, specifically:

[0089] S4.1.1. Substitute the rock temperature of the tunnel face collected in S1 into the air temperature prediction model of the tunnel excavation working area to obtain the air temperature prediction function f1(x e ), the tunnel face water seepage collected in S1 is substituted into the relative humidity prediction model of the air in the tunnel excavation working area to obtain the relative humidity prediction function f2(x e );

[0090] S4.1.2. Determine the objective function Y for optimizing the control parameters of the humid and hot environment. The specific expression is:

[0091]

[0092] Among them: st is the constraint condition, x e are the control parameters of the humid and hot environment to be designed, including the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time. The constraint condition of the continuous ventilation time is to approach the specified value q of the continuous ventilation time; lb is the lower limit level of the control parameters of the humid and hot environment to be designed, ub is the upper limit level of the control parameters of the humid and hot environment to be designed, and RH min RH is the lower limit of relative humidity in the working area of ​​the excavation face. max is the lower limit level of relative humidity of the air in the working area of ​​the excavation face, and k is the specified value of the air temperature in the working area of ​​the tunnel excavation face;

[0093] In this embodiment, e is a natural number of 1-4, x1 is the air temperature transported into the tunnel by the ventilation equipment, 0℃≤x1≤30℃; x2 is the relative humidity of the air transported into the tunnel by the ventilation equipment, 0%≤x2≤100%; x3 is the air volume x3 transported into the tunnel by the ventilation equipment, 0.5m3 / s≤x3≤30m3 / s; x4 is the continuous ventilation time, 0h≤x2≤5h; k is 28℃, q is 1h, RH min Take 30, RH max Take 80. On the basis of ensuring that the air temperature in the working area of ​​the tunnel excavation face is less than the specified value of 28°C and the continuous ventilation time is less than and close to the specified value of 1h, economic factors are considered to ensure that the closer the air temperature in the working area of ​​the tunnel excavation face is to 28°C and the closer the continuous ventilation time is to 1h, the faster the wet and hot environment of the excavation face can be controlled after the new tunnel face is exposed, so that personnel and machinery can quickly enter the working area for construction, thereby reducing the waiting time for construction and saving the cost of measures to control the wet and hot environment of the tunnel excavation face. The relative humidity of the air in the working area of ​​the tunnel excavation face is in the range of 30% to 80% as an additional constraint.

[0094] S4.2. Use particle swarm algorithm to design control parameters, specifically:

[0095] S4.2.1. Initialize the particle swarm. Specifically, set the number of iterations t = 1, construct the initial particle swarm, and randomly generate the initial position x of each particle. ij (1) and initial velocity v ij (1);

[0096] S4.2.2. Calculate the current position x ij (t) The objective function value corresponding to each particle;

[0097] S4.2.3. For each particle, if the objective function value corresponding to the current iteration is less than the objective function value of the previous iteration, the objective function corresponding to the current iteration is taken as the optimal solution of the particle itself, and the optimal solution and the corresponding location x are shared with other particles. ij (t); For a particle swarm, if the objective function value corresponding to a particle in the current iteration is the minimum value among all particles, then the objective value is the optimal solution for the particle swarm in the current iteration;

[0098] S4.2.4, if t reaches the set number of iterations, the iteration is stopped, and the position x corresponding to the optimal solution of the particle swarm of the current iteration is ij (t) is the optimal solution, that is, the optimal solution of the wet and hot environment control parameters to be designed; otherwise, let t=t+1, use the update formula to adjust the current position and speed, and return to S4.2.2 to update the optimal solution of the objective function value until t reaches the set number of iterations.

[0099] The update formula in S4.2.4 is as follows:

[0100] v ij (t) = wv ij (t-1)+c1r 1j [p ij -x ij (t-1)]+c2r 2j [p gj -x ij (t-1)];

[0101] x ij (t) = x ij (t-1)+v ij (t-1);

[0102] Where: i is the particle number; j is the spatial dimension of the particle; v ij (t-1) is the particle velocity in the t-1th iteration; x ij (t-1) is the particle position in the t-1th iteration; p ij is the optimal position of particle i in the jth dimension; p gj is the optimal position of all particles in the j-th dimension; w is the inertia weight, which is decreasing; c1 is the learning factor of the individual particle, which is decreasing; c2 is the learning factor of the particle group, which is increasing; the value range of c1 and c2 is 1 to 2.5; r 1j and r 2j are mutually independent random numbers with values ​​between 0 and 1.

[0103] The particle swarm algorithm uses a dynamically decreasing inertia weight and a dynamic learning factor. The dynamic decreasing expression of the inertia weight w(t) is:

[0104] w(t)=w ini (w ini -w fin )(T max -t) / T max ;

[0105] Where: w ini is the initial value of the inertia weight, w fin is the final value of the inertia weight, T max is the total number of iterations;

[0106] The dynamic expression of the learning factor of the individual particle c1(t) is:

[0107] c1(t)=c 1ini -(c 1ini -c 1fin )×(t / T max );

[0108] Where: c 1ini is the initial value of the particle individual’s volume learning factor, c 1fin is the final value of the volume learning factor of the individual particle;

[0109] The dynamic expression of the learning factor of the particle swarm c2(t) is:

[0110] c2(t)=c 2ini +(c 2ini -c 2fin )×(t / T max );

[0111] Where: c 2ini is the initial value of the particle swarm’s learning factor, c 2fin is the final value of the particle swarm’s volume learning factor.

[0112] In this example, the number of particles is 100, and the initial value of the particle individual learning factor c is 1ini and the final value c 1fin The values ​​are 0.8 and 0.2 respectively, and the initial value of the particle group learning factor c 2ini and the final value c 2fin The values ​​are 0.2 and 0.9 respectively, and the initial value of the inertia weight w ini With the final value w fin are 0.8 and 0.4 respectively, and the total number of iterations is T max is 500. The optimal solution of the wet and hot environment control parameters to be designed in this embodiment is shown in Table 2.

[0113] Table 2 Optimal solution of the control parameters of the wet and hot environment to be designed

[0114]

[0115] This embodiment also includes a computer-readable storage medium on which computer program instructions are stored. When the computer program instructions are executed by a processor, the method for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation face as described above is implemented.

[0116] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0117] This embodiment also includes an electronic device, including: at least one processor, at least one memory and computer program instructions stored in the memory. When the computer program instructions are executed by the processor, the method for predicting and optimizing the humid and hot environmental parameters of the tunnel excavation surface is performed.

[0118] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program in the electronic device.

[0119] The electronic device may be a computing device such as a mobile phone, a desktop computer, a notebook, a PDA, and a cloud server. The electronic device may include, but is not limited to, a processor and a memory. For example, the electronic device may also include an input and output device, a network access device, a bus, etc. In this embodiment, the electronic device includes at least one cooling and heating device, at least one humidification and dehumidification device, and at least one ventilation air volume control device.

[0120] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the electronic device, and uses various interfaces and lines to connect various parts of the entire electronic device.

[0121] The memory can be used to store the computer program and / or module, and the processor implements the computer program by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0122] Wherein, if the module / unit integrated in the electronic device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0123] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for predicting and optimizing the hygrothermal environment parameters of a tunnel excavation face, characterized in that: The steps include: S1: Collect geological condition parameters, environmental parameters and ventilation parameters of a tunnel excavation face, wherein: the geological condition parameters include the rock temperature of the tunnel face and the water seepage of the tunnel face; the environmental parameters include the air temperature in the tunnel and the relative humidity of the air in the tunnel; the ventilation parameters include the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment and the air volume transported into the tunnel by the ventilation equipment; S2: Establish an effective three-dimensional numerical calculation model for tunnel excavation based on the tunnel construction design data and the geological condition parameters, environmental parameters and ventilation parameters collected in S1; S3: A prediction model for the hygrothermal environmental parameters of the tunnel excavation surface is established based on the three-dimensional numerical calculation model of tunnel excavation and the response surface function based on the quadratic polynomial form; S4: Based on the prediction model of the humid and hot environmental parameters of the tunnel excavation surface and the particle swarm algorithm, the parameters are optimized and the optimal solution of the humid and hot environmental parameters of the tunnel excavation surface is output.

2. The method for predicting and optimizing the hygrothermal environment parameters of a tunnel excavation face according to claim 1, characterized in that: The S3 includes: S3.

1. Determine the influencing factors and the affected factors of the hot and humid environment of tunnel excavation, where: the influencing factors are the rock temperature of the tunnel face, the water seepage of the tunnel face, the temperature of the air transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time; the affected factors are the air temperature and relative humidity of the working area of ​​the tunnel excavation face; S3.2, set three level values ​​for each parameter in the influencing factors; S3.

3. Use the three-dimensional numerical calculation model of tunnel excavation to establish numerical calculation models of different influencing factors and different level value combinations, and calculate the air temperature and relative humidity of the working area of ​​the tunnel excavation face corresponding to each combination; S3.

4. Based on the calculation results in S3.3, a response surface function in the form of a quadratic polynomial is used to establish a prediction model for the hygrothermal environmental parameters of the tunnel excavation face.

3. The method for predicting and optimizing the humid and hot environment parameters of a tunnel excavation face according to claim 2, characterized in that: Among the three level values ​​of S3.2, the maximum level value is greater than the upper limit value of the influencing factor value, the minimum level value is less than the lower limit value of the influencing factor level value, and the middle level value is the average value of the maximum level value and the minimum level value; In S3.3, the number of numerical calculation models for different influencing factors and different level value combinations established is m, where: m≥(n+1)(n+2) / 2, n is the total number of influencing factors; In S3.4, the specific expression of the prediction model of the hygrothermal environment parameters of the tunnel excavation surface is: Where: f1(x1,x2,···,x n ) is the air temperature prediction model of the tunnel excavation working area, f2(x1,x2,···,x n ) is the relative humidity prediction model of the air in the tunnel excavation working area; x g is the g-th influencing factor, x h is the hth influencing factor; a0 is a constant term, a g is the coefficient of the first-order term to be determined, a gh is the unknown coefficient of the quadratic term; n is the total number of influencing factors; g and h are the influencing factor numbers, and g and h are natural numbers ranging from 1 to n respectively.

4. The method for predicting and optimizing the humid and hot environment parameters of a tunnel excavation face according to claim 3, characterized in that: The S4 includes: S4.

1. Determine the objective function for optimizing the control parameters of the humid and hot environment, specifically: S4.1.

1. Substitute the rock temperature of the tunnel face collected in S1 into the air temperature prediction model of the tunnel excavation working area to obtain the air temperature prediction function f1(x e ), the tunnel face water seepage collected in S1 is substituted into the relative humidity prediction model of the air in the tunnel excavation working area to obtain the relative humidity prediction function f2(x e ); S4.1.

2. Determine the objective function Y for optimizing the control parameters of the humid and hot environment. The specific expression is: Among them: st is the constraint condition, x e are the control parameters of the humid and hot environment to be designed, including the air temperature transported into the tunnel by the ventilation equipment, the relative humidity of the air transported into the tunnel by the ventilation equipment, the air volume transported into the tunnel by the ventilation equipment, and the continuous ventilation time. The constraint condition of the continuous ventilation time is to approach the specified value q of the continuous ventilation time; lb is the lower limit level of the control parameters of the humid and hot environment to be designed, ub is the upper limit level of the control parameters of the humid and hot environment to be designed, and RH min RH is the lower limit of relative humidity in the working area of ​​the excavation face. max is the lower limit level of relative humidity of the air in the working area of ​​the excavation face, and k is the specified value of the air temperature in the working area of ​​the tunnel excavation face; S4.

2. Use particle swarm algorithm to design control parameters, specifically: S4.2.

1. Initialize the particle swarm. Specifically, set the number of iterations t = 1, construct the initial particle swarm, and randomly generate the initial position x of each particle. ij (1) and initial velocity v ij (1); S4.2.

2. Calculate the current position x ij (t) The objective function value corresponding to each particle; S4.2.

3. For each particle, if the objective function value corresponding to the current iteration is less than the objective function value of the previous iteration, the objective function corresponding to the current iteration is taken as the optimal solution of the particle itself, and the optimal solution and the corresponding location x are shared with other particles. ij (t); For a particle swarm, if the objective function value corresponding to a particle in the current iteration is the minimum value among all particles, then the objective value is the optimal solution for the particle swarm in the current iteration; S4.2.4, if t reaches the set number of iterations, the iteration is stopped, and the position x corresponding to the optimal solution of the particle swarm in the current iteration is ij (t) is the optimal solution, that is, the optimal solution of the wet and hot environment control parameters to be designed; otherwise, let t=t+1, use the update formula to adjust the current position and speed, and return to S4.2.2 to update the optimal solution of the objective function value until t reaches the set number of iterations.

5. The method for predicting and optimizing the hygrothermal environment parameters of a tunnel excavation face according to claim 4, characterized in that: The update formula in S4.2.4 is specifically: v ij (t)=wv ij (t-1)+c1r 1j [p ij -x ij (t-1)]+c2r 2j [p gj -x ij (t-1)]; x ij (t)=x ij (t-1)+v ij (t-1); Where: i is the particle number; j is the spatial dimension of the particle; v ij (t-1) is the particle velocity in the t-1th iteration; x ij (t-1) is the particle position in the t-1th iteration; p ij is the optimal position of particle i in the jth dimension; p gj is the optimal position of all particles in the j-th dimension; w is the inertia weight; c1 is the learning factor of the individual particle, c2 is the learning factor of the particle group; r 1j and r 2j are mutually independent random numbers with values ​​between 0 and 1.

6. The method for predicting and optimizing the humid and hot environment parameters of a tunnel excavation face according to claim 5, characterized in that: The particle swarm algorithm uses a dynamically decreasing inertia weight and a dynamic learning factor. The dynamic decreasing expression of the inertia weight w(t) is: w(t)=w ini (w ini -w fin )(T max -t) / T max ; Where: w ini is the initial value of the inertia weight, w fin is the final value of the inertia weight, T max is the total number of iterations; The dynamic expression of the learning factor of the individual particle c1(t) is: c1(t)=c 1ini -(c 1ini -c 1fin )×(t / T max ); Where: c 1i ni is the initial value of the particle individual's volume learning factor, c 1fin is the final value of the volume learning factor of the individual particle; The dynamic expression of the learning factor of the particle swarm c2(t) is: c2(t)=c 2ini +(c 2ini -c 2fin )×(t / T max ); Where: c 2ini is the initial value of the particle swarm’s learning factor, c 2fin is the final value of the particle swarm’s volume learning factor.

7. The method for predicting and optimizing the hygrothermal environment parameters of a tunnel excavation face according to any one of claims 1 to 6, characterized in that: The method for obtaining the geological condition parameters, environmental parameters, and ventilation parameters in S1 includes: Install geological condition parameter monitoring equipment, environmental parameter monitoring equipment, and ventilation parameter monitoring equipment in the tunnel excavation working area; During the tunnel excavation process, each monitoring device starts acquiring data when a new face is exposed, and collects data every 10 minutes for 5 hours.

8. The method for predicting and optimizing the humid and hot environment parameters of a tunnel excavation face according to claim 7, characterized in that: The S2 includes: S2.

1. Assume that the number of cycles P = 1 and establish a three-dimensional numerical calculation model O1 based on the tunnel geometry, ventilation facilities, and drainage facilities in the tunnel construction design data; S2.2, set the initial material values ​​and physical field values ​​of the three-dimensional numerical calculation model O1 according to the tunnel geological survey report and the geological condition parameters, environmental parameters and ventilation parameters collected in S1; S2.

3. Run the three-dimensional numerical calculation model in the current cycle O p , where: three-dimensional numerical calculation model O p The running time is consistent with the continuous collection time of each monitoring device in S1; S2.4, if running the three-dimensional numerical calculation model O p If the difference between the obtained air temperature and relative humidity in the working area of ​​the tunnel excavation face and the air temperature and relative humidity in the environmental parameters collected in S1 is not greater than 5%, the three-dimensional numerical calculation model O is considered to be p Effective, O p That is, it is an effective three-dimensional numerical calculation model for tunnel excavation; otherwise, p The material parameters are adjusted based on the initial value of the material to obtain O p+1 , let O p =O p+1 Return to S2.

3.

9. A computer-readable storage medium, characterized in that: Computer program instructions are stored thereon, and when the computer program instructions are executed by a processor, a method for predicting and optimizing the humid and hot environmental parameters of a tunnel excavation face as described in any one of claims 1 to 8 is implemented.

10. An electronic device, characterized in that: include: At least one processor, at least one memory and computer program instructions stored in the memory, when the computer program instructions are executed by the processor, it is a method for predicting and optimizing the hygrothermal environment parameters of a tunnel excavation face as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Tunnel ventilation scheme optimization method and system

    CN114658465A

  • Advanced geological forecasting method for tunnel construction under high ground temperature condition

    CN116609851A