Internet-based enterprise resource coordination management method and system

By screening enterprises of the same type, analyzing their resource management structure and allocation management data, establishing and adjusting prediction models, optimizing enterprise resource management, the problems of inefficiency and high cost of resource management in the existing technology are solved, and more efficient resources are achieved use.

CN119090231AInactive Publication Date: 2024-12-06OUTLAND (SUZHOU) CLOUD TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411271264.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing enterprise resource management method only conducts a single data analysis of the target enterprises, and does not consider the correlation between resource development and change characteristics of the same type of enterprises in the market and the resource information, resulting in inefficiency and high cost of management solutions and waste of resources.

Method used

By obtaining the characteristic information of the target enterprise, filtering the same type of enterprises, analyzing their resource management structure and allocation management data, establishing a structural management prediction model and allocation management prediction model, and adjusting the model according to the degree of environmental correlation impact, verifying the prediction results Optimize resource management solutions.

Benefits of technology

It improves the reliability and efficiency of resource information management solutions, reduces analysis errors, and avoids waste of resources that are separated from market changes in traditional technologies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090231A_ABST
    Figure CN119090231A_ABST
Patent Text Reader

Abstract

The invention discloses an internet-based enterprise resource coordination management method and system, and relates to the technical field of resource management, and the method comprises the steps: extracting a first, second and third combination structure from an obtained resource management total combination structure of a first enterprise, performing comparative statistics on the development trends of the resource management combination structures on the first combination structure and the second combination structure and the third combination structure so as to establish a structure management prediction model, and extracting first distribution quantity management and second distribution quantity management from the obtained total resource distribution quantity management data information of the second enterprise; and performing comparative statistics of resource allocation quantity management development trends on the first allocation quantity management and the second allocation quantity management so as to establish an allocation quantity management prediction model. According to the enterprise resource coordination management method and system based on the Internet, the resource management efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of resource management, and in particular to an enterprise resource coordination management method and system based on the Internet. Background Art

[0002] In today's rapidly changing business environment, companies need to effectively manage and allocate a large number of resources to remain competitive and efficient.

[0003] At present, enterprise resource management only conducts single data analysis and processing on the target enterprise, without taking into account the development and change characteristics of resources of similar enterprises in the market, and the different correlations and influences between various types of resource information. This results in low efficiency and high cost in the implementation of the final enterprise resource management plan, leading to waste of resources. Summary of the invention

[0004] In order to overcome the above-mentioned deficiencies of the prior art, the present application provides an enterprise resource coordination management method and system based on the Internet.

[0005] In a first aspect, the present application provides an Internet-based enterprise resource coordination management method, the method comprising:

[0006] Acquire characteristic information of the target enterprise, and select a first enterprise and a second enterprise from a plurality of similar enterprises of the same type according to the characteristic information;

[0007] Obtaining the total resource management combination structure of the first enterprise, extracting a first combination structure, a second combination structure, and a third combination structure from the total resource management combination structure, processing the first combination structure, the second combination structure, and the third combination structure according to the resource management combination structure development trend to obtain structure optimization trend characteristics, and establishing a structure management prediction model according to the structure optimization trend characteristics;

[0008] Obtaining the total resource allocation management data information of the second enterprise, extracting the first allocation management and the second allocation management from the total resource allocation management data information, performing a comparative statistical analysis of the resource allocation management development trends of the first allocation management and the second allocation management to obtain allocation optimization trend characteristics, and establishing an allocation management prediction model based on the allocation optimization trend characteristics;

[0009] The first enterprise, the second enterprise and the target enterprise are respectively evaluated for the degree of environmental relevance to obtain a first environmental relevance degree set, a second environmental relevance degree set and a third environmental relevance degree set, and the target environmental relevance degree set and the first environmental relevance degree set are statistically varied in proportion to adjust the structure management prediction model to obtain an adjusted structure management prediction model, and the target environmental relevance degree set and the second environmental relevance degree set are statistically varied in proportion to adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model;

[0010] Obtain the historical effective compliance effect value of the target enterprise, and verify the resource allocation quantity prediction results predicted by the adjusted structure management prediction model and the adjusted allocation quantity management prediction model based on the historical effective compliance effect value. If the verification is satisfactory, obtain the current demand compliance effect value of the target enterprise in the current period, and use the two adjusted prediction models to predict the resource information management plan and output the current allocation quantity prediction result.

[0011] Preferably, the characteristic information of the target enterprise is obtained, and a plurality of similar enterprises of the same type are collected according to the characteristic information;

[0012] Statistically analyzing the optimization efficiency of the combined management structure of resource information of each enterprise in the same category over the years to obtain a structure statistical result set;

[0013] The optimization efficiency of the allocation quantity of the combination management of the resource information of each enterprise in the same type of enterprises in previous years is statistically analyzed to obtain a statistical result set of the allocation quantity;

[0014] Extract the first enterprise with the highest efficiency value in the structure statistical result set from the same type of enterprises;

[0015] From the same type of enterprises, extract the second enterprise with the highest efficiency value in the statistical result set of the allocated quantity.

[0016] Preferably, the resource management total combination structure of the first enterprise is obtained, three different resource management combination structures are extracted from the resource management total combination structure, and the first combination structure, the second combination structure and the third combination structure are output;

[0017] Respectively obtain the target effect values ​​of the first combination structure, the second combination structure and the third combination structure, and output the target effect value of the first structure, the target effect value of the second structure and the target effect value of the third structure, wherein the target effect value refers to the efficiency value achieved by the resource information after the management of the first combination structure;

[0018] Extracting a first difference structure between the first combination structure and the second combination structure, performing a difference calculation between the first structure's standard-reaching effect value and the second structure's standard-reaching effect value to obtain a first-category difference effect value one;

[0019] The first difference structure and the first type of difference effect value are combined into a first structure development trend feature;

[0020] Extracting the second difference structure between the first combination structure and the third combination structure, performing difference calculation on the standard-reaching effect value of the first structure and the standard-reaching effect value of the third structure to obtain the first-category difference effect value 2;

[0021] The second difference structure and the first type difference effect value are combined to form the second structure development trend characteristics;

[0022] Selecting the most effective structural development trend feature from the first structural development trend feature and the second structural development trend feature, and outputting a structural optimization trend feature;

[0023] According to the structural optimization trend characteristics, a structural management prediction model for optimizing the combined management structure of resource information is established.

[0024] Preferably, the total resource allocation management data information of the second enterprise is obtained, three different resource allocation management data information are extracted from the total resource allocation management data information, and the first allocation management and the second allocation management are output;

[0025] Respectively obtain the target effect values ​​of the first allocation amount management and the second allocation amount management, and output the target effect value of the first allocation amount and the target effect value of the second allocation amount, wherein the target effect value refers to the efficiency value achieved by the resource information after the first allocation amount management is applied;

[0026] The difference between the same category of resource information with different allocation amounts in the first allocation amount management and the second allocation amount management is calculated to obtain the difference allocation amount, and the first allocation amount compliance effect value and the second allocation amount compliance effect value are calculated to obtain the second category difference effect value;

[0027] The difference allocation amount and the second type of difference effect value are combined into a distribution amount optimization trend feature;

[0028] According to the allocation quantity optimization trend characteristics, an allocation quantity management prediction model for optimizing allocation quantity management of resource information is established.

[0029] Preferably, the environmental impact characteristic information of the first enterprise and various value indicators of various types of resource information in the first enterprise are obtained, and according to the various value indicators, the correlation impact degree between the environmental impact characteristic information and the various types of resource information is evaluated to obtain a first environmental correlation impact degree set;

[0030] According to the first environment-related impact degree set, a second environment-related impact degree set corresponding to the second enterprise and a target environment-related impact degree set corresponding to the target enterprise are evaluated;

[0031] Calculating the change difference ratio between the target environment association impact degree set and the first environment association impact degree set to obtain an association change range set 1;

[0032] Calculate the change difference ratio between the target environment association impact degree set and the second environment association impact degree set to obtain the second association change range set;

[0033] According to the associated change amplitude set 1, the structure management prediction model is adjusted by corresponding structural combination characteristic part changes to obtain an adjusted structure management prediction model;

[0034] According to the second set of associated change amplitudes, the allocation quantity management prediction model is adjusted by corresponding changes in the allocation quantity management characteristic part to obtain an adjusted allocation quantity management prediction model.

[0035] Preferably, historical resource management record information of the target enterprise is obtained, and historical effective target-reaching effect values ​​whose actual resource management efficiency values ​​are not lower than the predicted efficiency values ​​are extracted from the historical resource management record information, and historical effective resource management feature information corresponding to the historical effective target-reaching effect values ​​is extracted from the historical resource management record information;

[0036] Inputting the historical effective achievement effect value into the adjusted structure management prediction model for testing to obtain the resource combination structure prediction result;

[0037] Input the resource combination structure prediction result and the historical effective target-reaching effect value into the adjusted allocation management prediction model for testing to obtain the resource allocation prediction result;

[0038] If one of the resource allocation prediction results is consistent with the historical effective resource management characteristic information, then the current demand compliance effect value of the target enterprise in the current period is obtained;

[0039] Inputting the current demand achievement effect value into the adjusted structure management prediction model for testing to obtain the current combined structure prediction result;

[0040] The current combination structure prediction result and the current demand achievement effect value are input into the adjusted allocation quantity management prediction model for testing to obtain the current allocation quantity prediction result. According to the current allocation quantity prediction result, the current resource information of each category of the target enterprise is allocated and managed accordingly.

[0041] In a second aspect, an Internet-based enterprise resource coordination management system includes:

[0042] A similar enterprise screening unit is used to obtain characteristic information of a target enterprise, and screen a first enterprise and a second enterprise from a plurality of similar enterprises of the same type according to the characteristic information;

[0043] A structural model building unit is used to obtain the total resource management combination structure of the first enterprise, extract the first combination structure, the second combination structure and the third combination structure from the total resource management combination structure, process the first combination structure, the second combination structure and the third combination structure according to the resource management combination structure development trend to obtain structural optimization trend characteristics, and establish a structural management prediction model according to the structural optimization trend characteristics;

[0044] an allocation quantity model establishment unit, for obtaining the total resource allocation quantity management data information of the second enterprise, extracting the first allocation quantity management and the second allocation quantity management from the total resource allocation quantity management data information, performing a comparative statistical analysis of the resource allocation quantity management development trends of the first allocation quantity management and the second allocation quantity management to obtain allocation quantity optimization trend characteristics, and establishing an allocation quantity management prediction model according to the allocation quantity optimization trend characteristics;

[0045] A model adjustment unit is used to evaluate the environmental correlation impact degree of the first enterprise, the second enterprise and the target enterprise respectively to obtain a first environmental correlation impact degree set, a second environmental correlation impact degree set and a third environmental correlation impact degree set, perform change ratio statistics on the target environmental correlation impact degree set and the first environmental correlation impact degree set to change and adjust the structure management prediction model to obtain an adjusted structure management prediction model, perform change ratio statistics on the target environmental correlation impact degree set and the second environmental correlation impact degree set to change and adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model;

[0046] The current resource management unit is used to obtain the historical effective target enterprise's target enterprise's target effect value. According to the historical effective target effect value, the resource allocation prediction results predicted by the adjusted structure management prediction model and the adjusted allocation management prediction model are verified. If the verification is up to standard, the target enterprise's current demand target effect value in the current period is obtained, and the resource information management plan is predicted through the two adjusted prediction models to output the current allocation prediction results.

[0047] Compared with the prior art, the present invention has the following characteristics and beneficial effects:

[0048] By extracting two enterprises of the same type as the target enterprise from the market environment, namely the first enterprise and the second enterprise, and the resource information management characteristics contained in the first enterprise and the second enterprise are different, namely the first enterprise has the highest effectiveness in the optimization and update of the combination structure over the years, and the second enterprise has the highest effectiveness in the optimization and update of the combination management allocation over the years, through the analysis of the resource management characteristics of these two enterprises over the years, the resource information management plan of the target enterprise is optimized, that is, a structural management prediction model is established through the analysis of the characteristic information of the first enterprise, and an allocation management prediction model is established through the analysis of the characteristic information of the second enterprise. In order to improve the reliability of these two prediction models in predicting the resource information management plan of the target enterprise Reliability, and taking into account the correlation and influence of environmental factors on various categories of resource information, it is necessary to adjust some characteristic information in the two prediction models according to the change value of the correlation and influence degree between the environmental characteristic information of the target enterprise and various categories of resource information, so as to realize the scientific and real-time research on the sustainable development factor information, verify and process the two prediction models, enhance the correlation between various influencing factors, improve the efficiency of the entire information processing work, and avoid the traditional technology of only conducting a single analysis of the resource management record information of the target enterprise in its own historical period, resulting in large errors in the analysis results, and deviating from the track of market changes, resulting in waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 It is a flowchart of a method for coordinating and managing enterprise resources based on the Internet, which is mainly embodied in this embodiment.

[0050] Figure 2 This is a structural block diagram of an Internet-based enterprise resource coordination management system mainly embodied in this embodiment. DETAILED DESCRIPTION

[0051] The present invention is further described in detail below in conjunction with the following examples.

[0052] Reference Figure 1 , a method and system for coordinating and managing enterprise resources based on the Internet, the method comprising the following steps:

[0053] S1. Obtain characteristic information of the target enterprise, and select a first enterprise and a second enterprise from a plurality of similar enterprises of the same type based on the characteristic information.

[0054] S2. Obtain the total resource management combination structure of the first enterprise, extract the first combination structure, the second combination structure and the third combination structure from the total resource management combination structure, process the first combination structure, the second combination structure and the third combination structure according to the development trend of the resource management combination structure to obtain the structural optimization trend characteristics, and establish a structural management prediction model according to the structural optimization trend characteristics.

[0055] S3. Obtain the total resource allocation management data information of the second enterprise, extract the first allocation management and the second allocation management from the total resource allocation management data information, compare and statistically analyze the resource allocation management development trends of the first allocation management and the second allocation management to obtain the allocation optimization trend characteristics, and establish an allocation management prediction model based on the allocation optimization trend characteristics.

[0056] S4. Evaluate the environmental correlation impact levels of the first enterprise, the second enterprise and the target enterprise respectively to obtain the first environmental correlation impact level set, the second environmental correlation impact level set and the third environmental correlation impact level set, perform statistical change ratios on the target environmental correlation impact level set and the first environmental correlation impact level set to make changes and adjustments to the structure management prediction model to obtain an adjusted structure management prediction model, perform statistical change ratios on the target environmental correlation impact level set and the second environmental correlation impact level set to make changes and adjustments to the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model.

[0057] S5. Obtain the historical effective compliance effect value of the target enterprise, and verify the resource allocation quantity prediction results predicted by the adjusted structure management prediction model and the adjusted allocation quantity management prediction model based on the historical effective compliance effect value. If the verification is satisfactory, obtain the current demand compliance effect value of the target enterprise in the current period, and use the two adjusted prediction models to predict the resource information management plan and output the current allocation quantity prediction result.

[0058] Specifically, two enterprises of the same type as the target enterprise are extracted from the market environment, namely the first enterprise and the second enterprise, and the resource information management characteristics contained in the first enterprise and the second enterprise are different, namely the first enterprise has the highest effectiveness in the optimization and update of the combination structure over the years, and the second enterprise has the highest effectiveness in the optimization and update of the allocation of the combination management over the years. By analyzing the resource management characteristics of these two enterprises over the years, the resource information management plan of the target enterprise is optimized, that is, a structural management prediction model is established through the analysis of the characteristic information of the first enterprise, and an allocation management prediction model is established through the analysis of the characteristic information of the second enterprise. In order to improve the prediction of the resource information management plan of the target enterprise by these two prediction models, In order to ensure the reliability of the prediction models and take into account the correlation and influence of environmental factors on various types of resource information, it is necessary to adjust some of the characteristic information in the two prediction models according to the change in the correlation and influence between the environmental characteristic information of the target enterprise and various types of resource information, thereby realizing scientific and real-time research on sustainable development factor information and verifying the two prediction models, thereby enhancing the correlation between various influencing factors and improving the efficiency of the entire information processing work. It avoids the traditional technology of only conducting a single analysis of the resource management record information of the target enterprise in its own historical period, resulting in large errors in the analysis results, and deviating from the track of market changes, resulting in waste of resources.

[0059] The specific step S1 includes the following sub-steps:

[0060] Obtain the characteristic information of the target enterprise, and collect multiple similar enterprises of the same type based on the characteristic information.

[0061] The optimization efficiency of the combined management structure of resource information of each enterprise in the same category over the years is statistically analyzed to obtain a set of structural statistical results.

[0062] The optimization efficiency of the combination management allocation quantity of resource information of each enterprise in the same type over the years is statistically analyzed to obtain an allocation quantity statistical result set.

[0063] From similar enterprises, extract the first enterprise with the highest efficiency value in the structural statistical result set.

[0064] From the same type of enterprises, extract the second enterprise with the highest efficiency value in the statistical result set of the allocated quantity.

[0065] Specifically, the characteristic information here refers to the target enterprise's development direction attributes, integrity (including vision, strategic goals, business strategy and functional strategy), long-term, basic (such as resource integration, market positioning, competitive advantage, etc.) and strategic (including selecting suitable business areas and products, forming core competitiveness, and winning in competition through differentiation) and other characteristics. Similar enterprises refer to the same type of enterprises with the same characteristic information or extremely high similarity. The structural statistical result set (for example, one of the similar enterprises had a combination structure of AB in resource management three months ago, and the actual resource management effect value of this combination structure was 70%. Here A and B are two types of resources. In the resource management two months ago, a combination structure was ABC, and the actual resource management effect value of this combination structure was 70%. The management effect value is 75%, then the optimization efficiency of this type of combination management structure (ABC) is 5%, and so on, the same steps are performed on other types of combination management structures), allocation quantity statistical result set (for example, one of the same enterprises had a combination structure in resource management three months ago, in which the allocation of Class A resources in AB was 20%, and the allocation of Class B resources was 30%, and the actual resource management effect value achieved by this type of allocation quantity management was 60%; two months ago, the allocation of Class A resources in AB was 20%, and the allocation of Class B resources was 40%, and the actual resource management effect value achieved by this type of allocation quantity management was 70%, then the optimization efficiency of this type of allocation quantity management (A20%-B40%) is 10%, and so on, the same steps are performed on other types of allocation quantity management information).

[0066] The specific step S2 includes the following sub-steps:

[0067] The resource management total combination structure of the first enterprise is obtained, three different resource management combination structures are extracted from the resource management total combination structure, and the first combination structure, the second combination structure and the third combination structure are output.

[0068] The target effect values ​​of the first combination structure, the second combination structure and the third combination structure are obtained respectively, and the target effect value of the first structure, the target effect value of the second structure and the target effect value of the third structure are output, wherein the target effect value refers to the efficiency value achieved by the resource information after the management of the first combination structure.

[0069] The first difference structure between the first combination structure and the second combination structure is extracted, and the first type difference effect value one is obtained by calculating the difference between the standard effect value of the first structure and the standard effect value of the second structure.

[0070] The first difference structure and the first type of difference effect value are combined into a set of first structure development trend characteristics.

[0071] The second difference structure between the first combination structure and the third combination structure is extracted, and the first type difference effect value two is obtained by calculating the difference between the first structure standard effect value and the third structure standard effect value.

[0072] The second difference structure and the first type of difference effect value combine to form the development trend characteristics of the second structure.

[0073] The most effective structural development trend feature is selected from the first structural development trend feature and the second structural development trend feature, and the structural optimization trend feature is output.

[0074] According to the structural optimization trend characteristics, a structural management prediction model is established to optimize the combined management structure of resource information.

[0075] Specifically, such as the total combination structure of resource management (such as including AB, ABC, ABD, ABE, ABCD, BCD), the first combination structure (such as AB), the second combination structure (such as ABC) and the third combination structure (such as ABD). It should be noted that the ABCDE resource categories involved in this article refer to: financial resources, physical resources, technical resources, brand resources, and human resources, that is, the second combination structure and the third combination structure both contain the first combination structure, and both have one more category resource information than the first combination structure. The number of category resource information in the second combination structure and the third combination structure is the same, and there is one difference category resource information between the second combination structure and the third combination structure, the first structure reaching the standard effect value, the second structure reaching the standard effect value and the third structure reaching the standard effect value (all are the same as the explanation of the above-mentioned structure statistical result set and the allocation quantity statistical result set, no further explanation is given here, if they are 65%, 70%, and 80% respectively), the first difference Structure (the difference in the combination structure between AB and ABC is C), the first type of difference effect value one (such as the difference between 65% and 70% is 5%), the second difference structure (the difference in the combination structure between AB and ABD is D), the first type of difference effect value two (such as the difference between 70% and 80% is 10%), structural optimization trend characteristics (such as the structural optimization trend is an ABD type combination structure, which can increase the effect value by 10%, and so on. The same steps are performed on the remaining other combination structures to obtain several structural optimization trend characteristics), structural management prediction model (that is, based on the obtained several structural optimization trend characteristics to form a structural optimization feature matching prediction table, for example, similar to the management model based on resource orchestration theory in the prior art: through the three processes of resource structuring, capability and leverage, enterprises can more effectively identify and utilize resources and discover new entrepreneurial opportunities. Recombine resources in innovative ways to discover new business opportunities).

[0076] The specific step S3 includes the following sub-steps:

[0077] The total resource allocation management data information of the second enterprise is obtained, three different resource allocation management data information are extracted from the total resource allocation management data information, and the first allocation management and the second allocation management are output.

[0078] The target effect values ​​of the first allocation management and the second allocation management are obtained respectively, and the target effect value of the first allocation and the target effect value of the second allocation are output. The target effect value refers to the efficiency value achieved by the resource information after the first allocation management.

[0079] The difference between the same category of resource information with different allocation amounts in the first allocation amount management and the second allocation amount management is calculated to obtain the differential allocation amount, and the first allocation amount reaching standard effect value and the second allocation amount reaching standard effect value are calculated to obtain the second category differential effect value.

[0080] The difference allocation amount and the second type difference effect value are combined into the allocation amount optimization trend characteristics.

[0081] According to the optimization trend characteristics of allocation quantity, an allocation quantity management prediction model is established to optimize the allocation quantity management of resource information.

[0082] Specifically, such as the total resource allocation management data information (such as the management allocation of each type of resources in AB and AB, and the management allocation data of each type of resources in several combination structures of ABC and ABD, taking AB as an example: in the first two months, the management allocation of A resources in the AB combination structure was 20%, and the management allocation of B resources was 30%, and in the first month, the management allocation of A resources in the AB combination structure was 20%, and the management allocation of B resources was 50%), one is the allocation amount reaching the target effect value (such as the management allocation of A resources in the AB combination structure in the first two months was 20%, and the management allocation of B resources was 30%, and the actual resource management effect value of this type of resource management allocation is 70%) and the other is the allocation amount reaching the target effect value (in the first month, the management allocation of AB combination structure was AB combination structure). The resource management allocation of A in the structure is 20%, and the resource management allocation of B is 40%. The actual resource management effect value achieved by this type of resource management allocation is 85%), difference allocation (B resources: 20%), the second type of difference effect value (the difference between 70% and 85% is 15%), allocation management prediction model (that is, based on a number of allocation optimization trend characteristics to form a resource management allocation optimization feature matching prediction table, such as the dynamic programming resource allocation model in the prior art: by taking the process of allocating resources to one or several users as a stage, and using the reverse relationship of dynamic programming to solve the optimal resource allocation plan. The resource management allocation here involves managing part of the A resource in the AB combination structure and part of it in other combination structures).

[0083] The specific step S4 includes the following sub-steps:

[0084] The environmental impact characteristic information of the first enterprise and various value indicators of various categories of resource information in the first enterprise are obtained, and according to the various value indicators, the correlation impact degree between the environmental impact characteristic information and the various categories of resource information is evaluated to obtain a first environmental correlation impact degree set.

[0085] According to the first environment-related impact degree set, a second environment-related impact degree set corresponding to the second enterprise and a target environment-related impact degree set corresponding to the target enterprise are evaluated.

[0086] The change difference ratio between the target environment association impact degree set and the first environment association impact degree set is calculated to obtain the association change range set one.

[0087] The change difference ratio between the target environment association impact degree set and the second environment association impact degree set is calculated to obtain the association change range set 2.

[0088] According to the associated change amplitude set one, the structural management prediction model is adjusted by making corresponding structural combination characteristic partial changes to obtain the adjusted structural management prediction model.

[0089] According to the associated change amplitude set 2, the allocation quantity management prediction model is adjusted accordingly based on the allocation quantity management characteristic part changes to obtain the adjusted allocation quantity management prediction model.

[0090] Specifically, such as environmental impact characteristic information (such as population growth changes, economic distribution changes, industry development direction changes and other characteristic information), various value indicators (the value assessment of various types of resources of an enterprise is carried out through three major methods: cost method, market method and income method. For example, the value indicator of Class A resources is 70% (expressed as a percentage here), the value indicator of Class B resources is 75%, the value indicator of Class C resources is 70%, and the value indicator of Class D resources is 75%), the first environmental correlation impact degree set (taking Class A resources as an example, the correlation impact degree between population growth changes, economic distribution changes, industry development direction changes and Class A resource value indicators is evaluated respectively, for example, using Existing technology: The analytic hierarchy process (AHP) of the comprehensive evaluation method, by establishing a hierarchical model, conducts a hierarchical analysis of the relationship between population growth and the value of enterprise resources, calculates the importance weight of each factor to the overall goal, and obtains a comprehensive evaluation result. If they are 10%, 15%, and 15% respectively, the comprehensive result is about 13%, that is, the first environmental correlation impact degree between Class A resources and environmental impact characteristic information is 25%), the second environmental correlation impact degree set and the target environmental correlation impact degree set (the explanation is the same as the explanation of the first environmental correlation impact degree set, and no further explanation is given here. If the environmental correlation impact degrees of each Class A resource are 15% and 20% respectively) , the correlation change range set 1 (7%), the correlation change range set 2 (5%), the adjusted structural management prediction model (such as the corresponding position structure fine-tuning of the changes in the correlation influence degree between each category of resources and environmental impact characteristic information in each type of combination structure in the formed structural optimization feature matching prediction table, such as the compliance effect value of ABC is 70%, and the correlation influence degree between A and the environmental impact characteristic information in ABC changes by 7%, the correlation influence degree between B and C and the environmental impact characteristic information remains unchanged, the compliance effect value of ABD is also 70%, and the correlation influence degree between D and the environmental impact characteristic information changes by 5%. If the various types of combination structures are initially The priority matching prediction analysis order of the structure is that ABC is only located before ABD. Then according to the associated change range data information, the subsequent priority matching prediction analysis is carried out before ABD changes to ABC), the allocation management prediction model (the same as the explanation of the adjusted structure management prediction model, such as the compliance effect value of ABC is 70%, and the degree of association between A and the environmental impact characteristic information in ABC changes by 7%, and the degree of association between B and C and the environmental impact characteristic information remains unchanged. If the Class A resource management allocation in ABC is 20% at the beginning, then according to the associated change range data information, the Class A resource management allocation is changed to 27% at this time).

[0091] The specific step S5 includes the following sub-steps:

[0092] Obtain the historical resource management record information of the target enterprise, extract the historical effective target-reaching effect value whose actual resource management efficiency value is not lower than the predicted efficiency value from the historical resource management record information, and extract the historical effective resource management feature information corresponding to the historical effective target-reaching effect value from the historical resource management record information.

[0093] The historical effective achievement effect values ​​are input into the adjusted structural management forecasting model for testing to obtain the resource portfolio structure forecast results.

[0094] The resource combination structure prediction results and historical effective target achievement effect values ​​are input into the adjusted allocation management prediction model for testing to obtain the resource allocation prediction results.

[0095] If there is a result in the resource allocation prediction result that is consistent with the historical effective resource management characteristic information, the current demand achievement effect value of the target enterprise in the current period is obtained.

[0096] The current demand achievement effect value is input into the adjusted structural management prediction model for testing to obtain the current combined structure prediction result.

[0097] The current combination structure prediction results and the current demand achievement effect values ​​are input into the adjusted allocation quantity management prediction model for testing to obtain the current allocation quantity prediction results. According to the current allocation quantity prediction results, the current resource information of each category of the target enterprise is allocated and managed accordingly.

[0098] Specifically, such as historical resource management record information (such as AB, ABC, ABD, ABE, ABCD, BCD), historical effective compliance effect value (such as ABC's actual resource management efficiency value is 60%, and the predicted efficiency value is 65%, which is not in compliance. If AB's actual resource management efficiency value is 70%, and the predicted efficiency value is 65%, then change AB's actual resource management efficiency value to 70% as the historical effective compliance effect value), historical effective resource management feature information (that is, AB combination structure and resource management allocation A: 15%, B: 30%), resource combination structure prediction results (such as changing 70% of the historical effective compliance effect value Input into the adjusted structure management forecast model for matching forecast analysis to obtain multiple combination structure results (such as: AB, ABC, ABD), resource allocation forecast results (that is, 70% of the historical effective target effect value and three combination structure results: AB, ABC, ABD are input into the adjusted allocation management forecast model for matching forecast analysis to obtain the A-class resource management allocation forecast results in AB: 15%, B: 30%, ABC: 15%, B: 20%, C: 15%, ABD: 10%, B: 30%, C: 20%). , if there is one result in the resource allocation prediction result that is consistent with the historical effective resource management characteristic information (that is, the prediction result of the A-type resource management allocation in AB is 15%, and the result of B: 30% is consistent, then it means that the verification of the above two adjusted prediction models has passed, and the subsequent prediction of resource information management schemes can be carried out), the current demand compliance effect value (if it is 80%), the current combination structure prediction result (the processing steps are the same as the above resource combination structure prediction result, and the explanation is also the same, if it is the three combination structures of ABE, ABCD, and BCD), the current allocation prediction result (the 80% historical effective compliance effect value and the three combination structure structures are combined into one). If ABE, ABCD, and BCD are all input into the adjusted allocation management forecast model for matching forecast analysis and the results are A: 30%-B: 15%-E: 15%, A: 10%-B: 15%-C: 15%-D: 10%, B: 10%-C: 15%-D: 20%, then B: 10%-C: 15%-D: 20% is selected with the least resource management allocation, because it means that there are more remaining available resources, which is convenient for the subsequent prediction of new combination structures to optimize resource management, thereby improving resource utilization and cost). According to the current allocation forecast results, the current resource information of each category of the target enterprise is allocated and managed accordingly.

[0099] An enterprise resource coordination management system based on the Internet, by applying the above-mentioned enterprise resource coordination management method based on the Internet, includes a similar enterprise screening unit, a structure model building unit, an allocation model building unit, a model adjustment unit and a current resource management unit, referring to Figure 2 , obtain the characteristic information of the target enterprise through the similar enterprise screening unit, and screen the first enterprise and the second enterprise from multiple similar enterprises of the same type according to the characteristic information; the structure model establishment unit obtains the total resource management combination structure of the first enterprise, extracts the first combination structure, the second combination structure and the third combination structure from the total resource management combination structure, processes the resource management combination structure development trend of the first combination structure, the second combination structure and the third combination structure to obtain the structural optimization trend characteristics, and establishes the structural management prediction model according to the structural optimization trend characteristics; the allocation quantity model establishment unit obtains the total resource allocation quantity management data information of the second enterprise, extracts the first allocation quantity management and the second allocation quantity management from the total resource allocation quantity management data information, compares and statistics the resource allocation quantity management development trend of the first allocation quantity management and the second allocation quantity management to obtain the allocation quantity optimization trend characteristics, and establishes the allocation quantity management prediction model according to the allocation quantity optimization trend characteristics; the model adjustment unit adjusts the first enterprise and the second enterprise The target enterprise is evaluated for the degree of environmental correlation impact respectively to obtain a first set of environmental correlation impact, a second set of environmental correlation impact and a third set of environmental correlation impact; the target environmental correlation impact set and the first set of environmental correlation impact are statistically analyzed for change ratios to adjust the structure management prediction model to obtain an adjusted structure management prediction model; the target environmental correlation impact set and the second set of environmental correlation impact are statistically analyzed for change ratios to adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model; the current resource management unit obtains the historical effective compliance effect value of the target enterprise, and verifies the resource allocation quantity prediction results predicted by the adjusted structure management prediction model and the adjusted allocation quantity management prediction model according to the historical effective compliance effect value; if the verification is satisfactory, the current demand compliance effect value of the target enterprise in the current period is obtained, and the resource information management plan is predicted through the two adjusted prediction models to output the current allocation quantity prediction result.

[0100] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An enterprise resource coordination management method based on the Internet, characterized in that: The following steps are involved: Acquire characteristic information of the target enterprise, and select a first enterprise and a second enterprise from a plurality of similar enterprises of the same type according to the characteristic information; Obtaining the total resource management combination structure of the first enterprise, extracting a first combination structure, a second combination structure, and a third combination structure from the total resource management combination structure, processing the first combination structure, the second combination structure, and the third combination structure according to the resource management combination structure development trend to obtain structure optimization trend characteristics, and establishing a structure management prediction model according to the structure optimization trend characteristics; Obtaining the total resource allocation management data information of the second enterprise, extracting the first allocation management and the second allocation management from the total resource allocation management data information, performing a comparative statistical analysis of the resource allocation management development trends of the first allocation management and the second allocation management to obtain allocation optimization trend characteristics, and establishing an allocation management prediction model based on the allocation optimization trend characteristics; The first enterprise, the second enterprise and the target enterprise are respectively evaluated for the degree of environmental relevance to obtain a first environmental relevance degree set, a second environmental relevance degree set and a third environmental relevance degree set, and the target environmental relevance degree set and the first environmental relevance degree set are statistically varied in proportion to adjust the structure management prediction model to obtain an adjusted structure management prediction model, and the target environmental relevance degree set and the second environmental relevance degree set are statistically varied in proportion to adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model; Obtain the historical effective compliance effect value of the target enterprise, and verify the resource allocation quantity prediction results predicted by the adjusted structure management prediction model and the adjusted allocation quantity management prediction model based on the historical effective compliance effect value. If the verification is satisfactory, obtain the current demand compliance effect value of the target enterprise in the current period, and use the two adjusted prediction models to predict the resource information management plan and output the current allocation quantity prediction result.

2. The method for coordinating and managing enterprise resources based on the Internet according to claim 1, characterized in that: The steps of obtaining the characteristic information of the target enterprise and selecting the first enterprise and the second enterprise from a plurality of similar enterprises of the same type according to the characteristic information are specifically as follows: Obtaining characteristic information of the target enterprise, and collecting multiple similar enterprises of the same type based on the characteristic information; Statistically analyzing the optimization efficiency of the combined management structure of resource information of each enterprise in the same category over the years to obtain a structure statistical result set; The optimization efficiency of the allocation quantity of the combination management of the resource information of each enterprise in the same type of enterprises in previous years is statistically analyzed to obtain a statistical result set of the allocation quantity; Extract the first enterprise with the highest efficiency value in the structure statistical result set from the same type of enterprises; From the same type of enterprises, extract the second enterprise with the highest efficiency value in the statistical result set of the allocated quantity.

3. The method for coordinating and managing enterprise resources based on the Internet according to claim 2, characterized in that: The steps of obtaining the resource management total combination structure of the first enterprise, extracting the first combination structure, the second combination structure and the third combination structure from the resource management total combination structure, processing the first combination structure, the second combination structure and the third combination structure according to the resource management combination structure development trend to obtain the structural optimization trend characteristics, and establishing the structural management prediction model according to the structural optimization trend characteristics are specifically as follows: Obtaining a resource management total combination structure of the first enterprise, extracting three different resource management combination structures from the resource management total combination structure, and outputting a first combination structure, a second combination structure, and a third combination structure; Respectively obtain the target effect values ​​of the first combination structure, the second combination structure and the third combination structure, and output the target effect value of the first structure, the target effect value of the second structure and the target effect value of the third structure, wherein the target effect value refers to the efficiency value achieved by the resource information after the management of the first combination structure; Extracting a first difference structure between the first combination structure and the second combination structure, performing a difference calculation between the first structure's standard-reaching effect value and the second structure's standard-reaching effect value to obtain a first-category difference effect value one; The first difference structure and the first type of difference effect value are combined into a first structure development trend feature; Extracting the second difference structure between the first combination structure and the third combination structure, performing difference calculation on the standard-reaching effect value of the first structure and the standard-reaching effect value of the third structure to obtain the first-category difference effect value 2; The second difference structure and the first type difference effect value are combined to form the second structure development trend characteristics; Selecting the most effective structural development trend feature from the first structural development trend feature and the second structural development trend feature, and outputting a structural optimization trend feature; According to the structural optimization trend characteristics, a structural management prediction model for optimizing the combined management structure of resource information is established.

4. The method for coordinating and managing enterprise resources based on the Internet according to claim 2, characterized in that: The steps of obtaining the total resource allocation management data information of the second enterprise, extracting the first allocation management and the second allocation management from the total resource allocation management data information, comparing the first allocation management and the second allocation management with respect to the resource allocation management development trends to obtain allocation optimization trend characteristics, and establishing an allocation management prediction model according to the allocation optimization trend characteristics are specifically as follows: Obtaining total resource allocation management data information of the second enterprise, extracting three different resource allocation management data information from the total resource allocation management data information, and outputting a first allocation management and a second allocation management; Respectively obtain the target effect values ​​of the first allocation amount management and the second allocation amount management, and output the target effect value of the first allocation amount and the target effect value of the second allocation amount, wherein the target effect value refers to the efficiency value achieved by the resource information after the first allocation amount management is applied; The difference between the same category of resource information with different allocation amounts in the first allocation amount management and the second allocation amount management is calculated to obtain the difference allocation amount, and the first allocation amount compliance effect value and the second allocation amount compliance effect value are calculated to obtain the second category difference effect value; The difference allocation amount and the second type of difference effect value are combined into a distribution amount optimization trend feature; According to the allocation quantity optimization trend characteristics, an allocation quantity management prediction model for optimizing allocation quantity management of resource information is established.

5. The method for coordinating and managing enterprise resources based on the Internet according to claim 4, characterized in that: The steps of evaluating the environmental correlation impact degree of the first enterprise, the second enterprise and the target enterprise respectively to obtain a first environmental correlation impact degree set, a second environmental correlation impact degree set and a third environmental correlation impact degree set, performing change ratio statistics on the target environmental correlation impact degree set and the first environmental correlation impact degree set to change and adjust the structure management prediction model to obtain an adjusted structure management prediction model, performing change ratio statistics on the target environmental correlation impact degree set and the second environmental correlation impact degree set to change and adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model, are specifically as follows: Acquire the environmental impact characteristic information of the first enterprise and various value indicators of various types of resource information in the first enterprise, and evaluate the correlation impact degree between the environmental impact characteristic information and the various types of resource information according to the various value indicators to obtain a first environmental correlation impact degree set; According to the first environment-related impact degree set, a second environment-related impact degree set corresponding to the second enterprise and a target environment-related impact degree set corresponding to the target enterprise are evaluated; Calculating the change difference ratio between the target environment association impact degree set and the first environment association impact degree set to obtain an association change range set 1; Calculate the change difference ratio between the target environment association impact degree set and the second environment association impact degree set to obtain the second association change range set; According to the associated change amplitude set 1, the structure management prediction model is adjusted by corresponding structural combination characteristic part changes to obtain an adjusted structure management prediction model; According to the second set of associated change amplitudes, the allocation quantity management prediction model is adjusted by corresponding changes in the allocation quantity management characteristic part to obtain an adjusted allocation quantity management prediction model.

6. The method for coordinating and managing enterprise resources based on the Internet according to claim 5, characterized in that: The steps of obtaining the historical effective target-reaching effect value of the target enterprise, verifying the resource allocation prediction results predicted by the adjusted structure management prediction model and the adjusted allocation management prediction model according to the historical effective target-reaching effect value, and obtaining the current demand target-reaching effect value of the target enterprise in the current period, and predicting the resource information management plan through the two adjusted prediction models, and outputting the current allocation prediction result are as follows: Acquire historical resource management record information of the target enterprise, extract historical effective target-reaching effect values ​​whose actual resource management efficiency values ​​are not lower than the predicted efficiency values ​​from the historical resource management record information, and extract historical effective resource management feature information corresponding to the historical effective target-reaching effect values ​​from the historical resource management record information; Inputting the historical effective achievement effect value into the adjusted structure management prediction model for testing to obtain the resource combination structure prediction result; Input the resource combination structure prediction result and the historical effective target-reaching effect value into the adjusted allocation management prediction model for testing to obtain the resource allocation prediction result; If one of the resource allocation prediction results is consistent with the historical effective resource management characteristic information, then the current demand compliance effect value of the target enterprise in the current period is obtained; Inputting the current demand achievement effect value into the adjusted structure management prediction model for testing to obtain the current combined structure prediction result; The current combination structure prediction result and the current demand achievement effect value are input into the adjusted allocation quantity management prediction model for testing to obtain the current allocation quantity prediction result. According to the current allocation quantity prediction result, the current resource information of each category of the target enterprise is allocated and managed accordingly.

7. An Internet-based enterprise resource coordination and management system, characterized in that: The system is used to implement an Internet-based enterprise resource coordination management method as described in any one of claims 1 to 6, comprising: A similar enterprise screening unit is used to obtain characteristic information of a target enterprise, and screen a first enterprise and a second enterprise from a plurality of similar enterprises of the same type according to the characteristic information; A structural model building unit is used to obtain the total resource management combination structure of the first enterprise, extract the first combination structure, the second combination structure and the third combination structure from the total resource management combination structure, process the first combination structure, the second combination structure and the third combination structure according to the resource management combination structure development trend to obtain structural optimization trend characteristics, and establish a structural management prediction model according to the structural optimization trend characteristics; an allocation quantity model establishment unit, for obtaining the total resource allocation quantity management data information of the second enterprise, extracting the first allocation quantity management and the second allocation quantity management from the total resource allocation quantity management data information, performing a comparative statistical analysis of the resource allocation quantity management development trends of the first allocation quantity management and the second allocation quantity management to obtain allocation quantity optimization trend characteristics, and establishing an allocation quantity management prediction model according to the allocation quantity optimization trend characteristics; A model adjustment unit is used to evaluate the environmental correlation impact degree of the first enterprise, the second enterprise and the target enterprise respectively to obtain a first environmental correlation impact degree set, a second environmental correlation impact degree set and a third environmental correlation impact degree set, perform change ratio statistics on the target environmental correlation impact degree set and the first environmental correlation impact degree set to change and adjust the structure management prediction model to obtain an adjusted structure management prediction model, perform change ratio statistics on the target environmental correlation impact degree set and the second environmental correlation impact degree set to change and adjust the allocation quantity management prediction model to obtain an adjusted allocation quantity management prediction model; The current resource management unit is used to obtain the historical effective target enterprise's target enterprise's target effect value. According to the historical effective target effect value, the resource allocation prediction results predicted by the adjusted structure management prediction model and the adjusted allocation management prediction model are verified. If the verification is up to standard, the target enterprise's current demand target effect value in the current period is obtained, and the resource information management plan is predicted through the two adjusted prediction models to output the current allocation prediction results.