Method for dividing power supply units of urban power distribution network
By calculating the electrical matching degree of plot properties and generating the maximum spanning tree, the plot is merged to form the urban distribution network power supply unit, the problem of rough planning scale and low efficiency of the existing urban distribution network power supply unit division method is solved, and the problem of the existing urban distribution network power supply unit division method is realized. Higher planning accuracy and economicality.
Patent Information
- Application Number
- CN202411278432.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-12-06
AI Technical Summary
The existing urban distribution network power supply unit division method has the problem of rough planning scale, low efficiency, and difficulty in obtaining a better division plan, and lacks quantitative considerations for geographical factors and development status.
By obtaining information such as the land use nature, land area, development timing and plot center coordinates, calculate the electrical matching degree of the plot attributes, generate the maximum spanning tree, and merge the plot according to the principle of the minimum offset rate of the feeder power supply capacity to form Urban distribution network power supply unit.
It improves the accuracy and economicality of urban distribution network planning, reduces the difficulty of planning, improves the utilization rate of power supply lines and equipment, eliminates the subjectivity of planning, and ensures scientificity.
Smart Images

Figure CN119090232A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of distribution network planning, and in particular to a method for dividing power supply units of an urban distribution network. Background Art
[0002] The differentiated and refined planning of the distribution network can effectively improve the economy of the distribution network on the basis of ensuring the reliability of power supply. To this end, the Technical Guidelines for Distribution Network Planning and Design issued by the State Grid Corporation of China in 2020 clearly stipulate that grid planning should be carried out based on power supply grids (2-4 interconnected substations) and power supply units (1-4 groups of feeder power supply ranges) as basic units. Among them, the division of power supply units is mainly carried out on the basis of completing the division of power supply grids and substation planning, combined with standard wiring modes. Through the reasonable division of power supply units, the number of substation outgoing lines can be effectively reduced and the line / interval utilization efficiency can be improved. Taking into account the difference in unit length cost of trunk and branch lines, the construction cost of the grid can also be further reduced.
[0003] At present, the division of power supply units in distribution networks mainly includes two categories: qualitative division based on experience and quantitative division based on quantified individual attributes. The qualitative division of power supply units is generally based on existing boundaries (administrative, geographical, etc.) and then adjusted in combination with load values; the quantitative division method of power supply units mainly considers factors such as similar load size or density between units and the shortest interconnection line between units. However, the qualitative division of power supply units in urban distribution networks does not reflect the connotation of refined planning and cannot guide subsequent planning. Most of the quantitative division methods of power supply units in urban distribution networks only consider load size matching or similar load density, and lack quantification of attributes such as geographical elements and development status.
[0004] In summary, the existing methods for dividing power supply units in urban distribution networks are difficult to divide in practice, the planning scale is relatively rough, and it is easy to come up with a "one-size-fits-all" planning scheme, which has low division efficiency and is difficult to obtain a relatively optimal division scheme. Summary of the invention
[0005] In order to solve the problem that the current division of power supply units in urban distribution networks relies too much on general technical principles and the experience of planners, the purpose of the present invention is to provide a method for dividing power supply units in urban distribution networks, which improves the accuracy of urban distribution network planning, reduces the difficulty of urban distribution network planning, improves the utilization rate of power supply lines, i.e., power equipment, and improves the economy and scientificity of urban distribution network planning.
[0006] To achieve the above object, the present invention adopts the following technical solution: a method for dividing power supply units of a city distribution network, the method comprising the following steps in sequence:
[0007] (1) Obtain the land use nature, land area, development sequence and central coordinates of the plots in the planned power supply area, and then combine the prospective saturated annual load density of the plots, the power supply source of the plots, the industry power load characteristic curve of the region on a typical day, and the mountains, rivers or roads between the plots to calculate the adjacent electrical matching degree C of the plots taking into account the plot attributes. ij ;
[0008] (2) Considering the land parcel as a node in the planned power supply area, the adjacent electrical matching degree C of the land parcel taking into account the land parcel attributes is calculated. ij is regarded as the weight of the edge formed by the two nodes i and j, and the maximum spanning tree in the power supply area to be planned is generated;
[0009] (3) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, the plots covered by the maximum spanning tree are merged in sequence according to the principle of minimizing the feeder power supply capacity deviation rate until an urban distribution network power supply unit is formed.
[0010] The step (1) specifically comprises the following steps:
[0011] (1a) According to the requirements of urban control planning, the land use of urban plots is divided into eight categories: residential land, industrial land, commercial service facilities land, logistics and warehousing land, road and transportation facilities land, public facilities land, green land and square land. The land use nature is represented by Ψ. Through statistical analysis, the typical daily electricity load curves of the eight land use natures in the area are obtained. Calculate the typical daily electricity load P of plot i in the prospective saturation year i , which is expressed as follows:
[0012]
[0013] Among them, P i S P represents the maximum power load of a typical day in a prospective saturated year for plot i; i k represents the load size of plot i in the typical day time period k in the prospective saturation year, ρ i Indicates the prospective saturated annual load density of the plot; S i Indicates the land area of the plot;
[0014] (1b) Assume that there are n plots in the planned power supply area. According to the border relationship between the plots, the plot adjacency matrix A is formed: n×n , the plot adjacency matrix A n×n Element A ij It represents the adjacency relationship between plots i and j, as follows:
[0015]
[0016] (1c) Based on the typical daily electricity load P of the prospective saturated year of plot i i , calculate the horizontal matching degree of the power load between plots i and j
[0017]
[0018] In the formula, It represents the load size of plot j in the typical day time period k in the prospective saturation year;
[0019] Similarly, the vertical matching degree of the power load between plots i and j is calculated
[0020]
[0021] Finally, the power load matching degree between plot i and plot j is calculated.
[0022]
[0023] (1d) The plots in the planned power supply area are divided into three categories according to the degree of development: built-up area, development area and new construction area, which are represented by numbers 1, 2 and 3 respectively. The development time sequence of plot i and plot j is defined as T i ={1,2,3}, T j ={1,2,3}, calculate the matching degree of land development between land parcel i and land parcel j
[0024]
[0025] (1e) Obtain the upper power supply substation numbers of plot i and plot j in the planned power supply area, which are TS i and TS j , calculate the matching degree of the upper power supply between plots i and j
[0026]
[0027] (1f) According to the center coordinate G of plot i i =[G i,x ,G i,y ] and the center coordinates G of plot j j =[G j,x ,G j,y ], calculate G i and G j The physical distance D ij :
[0028]
[0029] In the formula, G i,x and G i,y is the center coordinate G of plot i i The two-dimensional coordinate components of G j,x and G j,y is the center coordinate G of plot j j The two-dimensional coordinate components of ;
[0030] (1g) According to the mountains, rivers, railways, expressways and roads of different levels between the plots in the planned power supply area, the different levels of roads include national roads, provincial roads, county roads and rural roads, set the obstacle coefficient H between plots i and j. ij , calculate the electrical matching degree C of the plot adjacency taking into account the plot attributes ij :
[0031]
[0032] Among them, ω P The power load matching degree of the plot The weight coefficient of T Matching degree of land development The weight coefficient of S The matching degree of the upper power supply of the plot The weight coefficient of .
[0033] The step (2) specifically comprises the following steps:
[0034] (2a) Considering a plot as a node in the planned power supply area, the n plots in the planned power supply area constitute a node set Nd = {1, ..., i, ..., j, ..., n}, where i and j are both plot numbers. At the same time, the electrical matching degree C of the adjacent plots is ij Considered as the weight of the edge formed by two nodes i and j, the connection relationship between the plots in the planned power supply area is represented by the set of weighted edges Br:
[0035] Br={(i,j,C ij )}
[0036] Where: (i,j,C ij ) is an element of the set Br;
[0037] (2b) Sort the edges in set Br from large to small according to their weight values, add the edges in set Br from large to small weight values to the maximum spanning tree, and put the nodes at both ends of the edge into set V. If the nodes at both ends of the edge already belong to set V, discard the edge; if the nodes at both ends of the edge do not belong to set V at the same time, add the edge to the maximum spanning tree, and add the nodes at both ends of the edge to set V; when n-1 edges are added to the maximum spanning tree, the maximum spanning tree T of the power supply area to be planned is obtained;
[0038] (2c) Traverse all edges and determine the edge (i, j, C ij ) weight C ij Is it greater than the critical value ε: If C ij <ε, then the maximum spanning tree T is disconnected between nodes i and j, so that the maximum spanning tree T is split into two trees Ta and Tb; if C ij >ε, the fission is terminated and the process goes to step (3);
[0039] (2d) Similarly, consider Ta and Tb as a new maximum spanning tree and continue to split Ta and Tb until the maximum spanning tree can no longer split. At this time, if the splitting is m trees, they are T 1 ,T 2 ,…,T tr ,…T m , obviously m≤n holds, T tr The subscript tr represents the tree number, tr = 1, 2,…, m.
[0040] The step (3) specifically comprises the following steps:
[0041] (3a) From the first tree T of the maximum spanning tree in the power supply area to be planned 1 Start the analysis. At this time, tr=1 holds. From the first tree T 1 Starting from any terminal node of the tree, the longest path starting from the current node is found through the depth-first search algorithm; after traversing all terminal nodes, the first tree T is found. 1 The longest path, the nodes passed by the longest path are regarded as the trunk line, the first tree T 1 The remaining edges are regarded as branch lines; tr represents the tree number, tr = 1, 2, ..., m;
[0042] (3b) Define the node combined load as the cumulative load value of all node plots downstream of a node in a typical day of the prospective saturation year; from the first tree T 1 Starting from any terminal node of 1 All nodes form branch nodes to combine loads;
[0043] (3c) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, in order to ensure that the feeder power supply capacity deviation rate is minimized, according to different power supply modes of the power grid, the different power supply modes of the power grid include single-ring network mode and double-ring network mode, taking node x as an example, the node capacity deviation rate α is defined x for:
[0044]
[0045] Among them, P LS Standard transmission capacity of feeders supplying electricity to cities; The maximum load of the node combined load in a typical day in the prospective saturation year;
[0046] (3d) After all nodes in the branch are traversed, the node capacity offset rate is less than the minimum capacity offset rate α min The corresponding node set α of the branch is found, and the node y corresponding to the smallest capacity offset rate is found from the node set α, and the node y and its downstream nodes are divided into a power supply unit; if all nodes in the branch are traversed, the capacity offset rate of all nodes is greater than α min , then the loads of all nodes of the branch are accumulated to the nodes of the branch on the trunk path;
[0047] (3e) The division of the power supply units in the trunk path also follows the division principle of step (3d), and the capacity offset rate of each node in the trunk path is calculated respectively, and the capacity offset rate greater than the minimum capacity offset rate α is set. min The nodes are divided into a power supply unit;
[0048] Then, let tr=tr+1;
[0049] (3f) Perform the operations from step (3a) to step (3e) on each maximum spanning tree in the planned power supply area in turn until tr>m, and obtain the final power supply unit division result, which is then merged to form the urban distribution network power supply unit.
[0050] It can be seen from the above technical scheme that the beneficial effects of the present invention are: first, the present invention is based on the complementarity of the power load characteristics of the plots and the degree of attribute matching between the plots, starting from the basic unit of planning, and refining the granularity of planning, thereby improving the accuracy of urban distribution network planning; second, the present invention divides the area to be planned into several parts with the help of the maximum spanning tree and its splitting method, thereby reducing the difficulty of urban distribution network planning; third, the present invention proposes a planning method for minimizing the capacity offset rate between the node combined load and the standard capacity of the power supply feeder, thereby improving the utilization rate of the power supply line, i.e., the power equipment, and improving the economy of urban distribution network planning; fourth, the present invention eliminates the subjectivity of planning through multi-dimensional quantification of planning factors, thereby ensuring the scientific nature of urban distribution network planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a flow chart of the method of the present invention;
[0052] Figure 2 It is a schematic diagram of the maximum spanning tree of the power supply area to be planned based on the electrical matching degree of the adjacent plots;
[0053] Figure 3 Flowchart divided for the power supply unit. DETAILED DESCRIPTION
[0054] like Figure 1 As shown, a method for dividing power supply units of a city distribution network comprises the following steps in order:
[0055] (1) Obtain the land use nature, land area, development sequence and central coordinates of the plots in the planned power supply area, and then combine the prospective saturated annual load density of the plots, the power supply source of the plots, the industry power load characteristic curve of the region on a typical day, and the mountains, rivers or roads between the plots to calculate the adjacent electrical matching degree C of the plots taking into account the plot attributes. ij ;
[0056] (2) Considering the land parcel as a node in the planned power supply area, the adjacent electrical matching degree C of the land parcel taking into account the land parcel attributes is calculated. ij is regarded as the weight of the edge formed by the two nodes i and j, and the maximum spanning tree in the power supply area to be planned is generated;
[0057] (3) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, the plots covered by the maximum spanning tree are merged in sequence according to the principle of minimizing the feeder power supply capacity deviation rate until an urban distribution network power supply unit is formed.
[0058] The step (1) specifically comprises the following steps:
[0059] (1a) According to the requirements of urban control planning, the land use of urban plots is divided into eight categories: residential land, industrial land, commercial service facilities land, logistics and warehousing land, road and transportation facilities land, public facilities land, green land and square land. The land use nature is represented by Ψ. Through statistical analysis, the typical daily electricity load curves of the eight land use natures in the area are obtained. Calculate the typical daily electricity load P of plot i in the prospective saturation year i , which is expressed as follows:
[0060]
[0061] Among them, P i S P represents the maximum power load of a typical day in a prospective saturated year for plot i; i k represents the load size of plot i in the typical day time period k in the prospective saturation year, ρ i Indicates the prospective saturated annual load density of the plot; S i Indicates the land area of the plot;
[0062] (1b) Assume that there are n plots in the planned power supply area. According to the border relationship between the plots, the plot adjacency matrix A is formed: n×n , the plot adjacency matrix A n×n Element A ij It represents the adjacency relationship between plots i and j, as follows:
[0063]
[0064] (1c) Based on the typical daily electricity load P of the prospective saturated year of plot i i , calculate the horizontal matching degree of the power load between plots i and j
[0065]
[0066] In the formula, It represents the load size of plot j in the typical day time period k in the prospective saturation year;
[0067] Similarly, the vertical matching degree of the power load between plots i and j is calculated
[0068]
[0069] Finally, the power load matching degree between plot i and plot j is calculated.
[0070]
[0071] (1d) The plots in the planned power supply area are divided into three categories according to the degree of development: built-up area, development area and new construction area, which are represented by numbers 1, 2 and 3 respectively. The development time sequence of plot i and plot j is defined as T i ={1,2,3}, T j ={1,2,3}, calculate the matching degree of land development between land parcel i and land parcel j
[0072]
[0073] (1e) Obtain the upper power supply substation numbers of plot i and plot j in the planned power supply area, which are TS i and TS j , calculate the matching degree of the upper power supply between plots i and j
[0074]
[0075] (1f) According to the center coordinate G of plot i i =[G i,x ,G i,y ] and the center coordinates G of plot j j =[G j,x ,G j,y ], calculate G i and G j The physical distance D ij :
[0076]
[0077] In the formula, G i,x and G i,y is the center coordinate G of plot i i The two-dimensional coordinate components of G j,x and G j,y is the center coordinate G of plot j j The two-dimensional coordinate components of ;
[0078] (1g) According to the mountains, rivers, railways, expressways and roads of different levels between the plots in the planned power supply area, the different levels of roads include national roads, provincial roads, county roads and rural roads, set the obstacle coefficient H between plots i and j. ij , calculate the electrical matching degree C of the plot adjacency taking into account the plot attributes ij :
[0079]
[0080] Among them, ω P The power load matching degree of the plot The weight coefficient of T Matching degree of land development The weight coefficient of S The matching degree of the upper power supply of the plot The weight coefficient of .
[0081] The step (2) specifically comprises the following steps:
[0082] (2a) Considering a plot as a node in the planned power supply area, the n plots in the planned power supply area constitute a node set Nd = {1, ..., i, ..., j, ..., n}, where i and j are both plot numbers. At the same time, the electrical matching degree C of the adjacent plots is ij Considered as the weight of the edge formed by two nodes i and j, the connection relationship between the plots in the planned power supply area is represented by the set of weighted edges Br:
[0083] Br={(i,j,C ij )}
[0084] Where: (i,j,C ij ) is an element of the set Br;
[0085] (2b) Sort the edges in set Br from large to small according to their weight values, add the edges in set Br from large to small weight values to the maximum spanning tree, and put the nodes at both ends of the edge into set V. If the nodes at both ends of the edge already belong to set V, discard the edge; if the nodes at both ends of the edge do not belong to set V at the same time, add the edge to the maximum spanning tree, and add the nodes at both ends of the edge to set V; when n-1 edges are added to the maximum spanning tree, the maximum spanning tree T of the power supply area to be planned is obtained;
[0086] (2c) Traverse all edges and determine the edge (i, j, C ij ) weight C ij Is it greater than the critical value ε: If C ij <ε, then the maximum spanning tree T is disconnected between nodes i and j, so that the maximum spanning tree T is split into two trees Ta and Tb; if C ij >ε, the fission is terminated and the process goes to step (3);
[0087] (2d) Similarly, consider Ta and Tb as a new maximum spanning tree and continue to split Ta and Tb until the maximum spanning tree can no longer split. At this time, if the splitting is m trees, they are T 1 ,T 2 ,…,T tr ,…T m , obviously m≤n holds, Ttr The subscript tr represents the tree number, tr = 1, 2,…, m.
[0088] like Figure 3 As shown, the step (3) specifically includes the following steps:
[0089] (3a) From the first tree T of the maximum spanning tree in the power supply area to be planned 1 Start the analysis. At this time, tr=1 holds. From the first tree T 1 Starting from any terminal node of the tree, the longest path starting from the current node is found through the depth-first search algorithm; after traversing all terminal nodes, the first tree T is found. 1 The longest path, the nodes passed by the longest path are regarded as the trunk line, the first tree T 1 The remaining edges are regarded as branch lines; tr represents the tree number, tr = 1, 2, ..., m;
[0090] (3b) Define the node combined load as the cumulative load value of all node plots downstream of a node in a typical day of the prospective saturation year; from the first tree T 1 Starting from any terminal node of 1 All nodes form branch nodes to combine loads;
[0091] (3c) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, in order to ensure that the feeder power supply capacity deviation rate is minimized, according to different power supply modes of the power grid, the different power supply modes of the power grid include single-ring network mode and double-ring network mode, taking node x as an example, the node capacity deviation rate α is defined x for:
[0092]
[0093] Among them, P LS Standard transmission capacity of feeders supplying electricity to cities; The maximum load of the node combined load in a typical day in the prospective saturation year;
[0094] (3d) After all nodes in the branch are traversed, the node capacity offset rate is less than the minimum capacity offset rate α min The corresponding node set α of the branch is found, and the node y corresponding to the smallest capacity offset rate is found from the node set α, and the node y and its downstream nodes are divided into a power supply unit; if all nodes in the branch are traversed, the capacity offset rate of all nodes is greater than α min , then the loads of all nodes of the branch are accumulated to the nodes of the branch on the trunk path;
[0095] (3e) The division of the power supply units in the trunk path also follows the division principle of step (3d), and the capacity offset rate of each node in the trunk path is calculated respectively, and the capacity offset rate greater than the minimum capacity offset rate α is set. min The nodes are divided into a power supply unit;
[0096] Then, let tr=tr+1;
[0097] (3f) Perform the operations from step (3a) to step (3e) on each maximum spanning tree in the planned power supply area in turn until tr>m, and obtain the final power supply unit division result, which is then merged to form the urban distribution network power supply unit.
[0098] like Figure 2 As shown, there are 38 plots in the planning area, so the maximum spanning tree should consist of 37 branches. Figure 2 The dotted line in the figure represents the boundary of the plots. For example, the dotted line between the two plots D14 and D20 indicates that there are two plots D14 and D20 in this area. There are also solid lines for the boundary of the plots. The solid lines represent the boundary of natural roads, mountains and rivers. For example, the boundary of the plots between D04 and D05 and D11. Through calculation, it is found that D21 and D27 are restricted by road obstacles and development degree, resulting in the adjacent electrical matching degree C between the two plots. 21,27 <ε, therefore, the branch needs to be disconnected. Figure 2 Two dot-dash lines are used to describe the boundary of the crack. Figure 2 The thick solid line connecting two plots is the main line, and the thin solid line is the branch line. For example, the line between D02 and D13 is the main line, and the line between D02 and D03 is the branch line. The combined load of node D10 is the load on the plot, and the combined load of D10 is P 10 , and the combined load of node D03 is P 3 +P 10 , the combined load of D02 is P 2 +P 3 +P 10 .
[0099] In summary, the present invention is based on the complementary characteristics of power loads of plots and the degree of attribute matching between plots. Starting from the basic unit of planning, the granularity of planning is refined, and the accuracy of urban distribution network planning is improved; the present invention divides the area to be planned into several parts with the help of the maximum spanning tree and its splitting method, which reduces the difficulty of urban distribution network planning; the present invention proposes a planning method for minimizing the capacity offset rate between the node combined load and the standard capacity of the power supply feeder, which improves the utilization rate of the power supply line, that is, the power equipment, and improves the economy of urban distribution network planning; the present invention eliminates the subjectivity of planning through multi-dimensional quantification of planning factors and ensures the scientific nature of urban distribution network planning. Based on the idea of complementary characteristics of power loads of plots, the present invention significantly improves the utilization rate of distribution network lines and equipment, and improves the economy of planning on the basis of ensuring power supply reliability; at the same time, the present invention can effectively overcome the dependence of urban distribution network planning on personnel, eliminate the randomness and subjectivity of planning, reduce the workload of planners, and improve the level of refined planning of urban distribution networks, with good social and economic benefits.
Claims
1. A method for dividing power supply units of a city distribution network, characterized in that: The method comprises the following steps in the following order: (1) Obtain the land use nature, land area, development sequence and central coordinates of the plots in the planned power supply area, and then combine the prospective saturated annual load density of the plots, the power supply source of the plots, the industry power load characteristic curve of the region on a typical day, and the mountains, rivers or roads between the plots to calculate the adjacent electrical matching degree C of the plots taking into account the plot attributes. ij ; (2) Considering the land parcel as a node in the planned power supply area, the adjacent electrical matching degree C of the land parcel taking into account the land parcel attributes is calculated. ij is regarded as the weight of the edge formed by the two nodes i and j, and the maximum spanning tree in the power supply area to be planned is generated; (3) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, the plots covered by the maximum spanning tree are merged in sequence according to the principle of minimizing the feeder power supply capacity deviation rate until an urban distribution network power supply unit is formed.
2. The method for dividing power supply units of a city distribution network according to claim 1, characterized in that: The step (1) specifically comprises the following steps: (1a) According to the requirements of urban control planning, the land use of urban plots is divided into eight categories: residential land, industrial land, commercial service facilities land, logistics and warehousing land, road and transportation facilities land, public facilities land, green land and square land. The land use nature is represented by Ψ. Through statistical analysis, the typical daily electricity load curves of the eight land use natures in the area are obtained. Calculate the typical daily electricity load P of plot i in the prospective saturation year i , which is expressed as follows: Among them, P i S P represents the maximum power load of a typical day in a prospective saturated year for plot i; i k represents the load size of plot i in the typical day time period k in the prospective saturation year, ρ i Indicates the prospective saturated annual load density of the plot; S i Indicates the land area of the plot; (1b) Assume that there are n plots in the planned power supply area. According to the border relationship between the plots, the plot adjacency matrix A is formed: n×n , the plot adjacency matrix A n×n Element A ij It represents the adjacency relationship between plots i and j, as follows: (1c) Based on the typical daily electricity load P of the prospective saturated year of plot i i , calculate the horizontal matching degree of the power load between plots i and j In the formula, It represents the load size of plot j in the typical day time period k in the prospective saturation year; Similarly, the vertical matching degree of the power load between plots i and j is calculated Finally, the power load matching degree between plot i and plot j is calculated. (1d) The plots in the planned power supply area are divided into three categories according to the degree of development: built-up area, development area and new construction area, which are represented by numbers 1, 2 and 3 respectively. The development time sequence of plot i and plot j is defined as T i ={1,2,3}, T j ={1,2,3}, calculate the matching degree of land development between land parcel i and land parcel j (1e) Obtain the upper power supply substation numbers of plot i and plot j in the planned power supply area, which are TS i and TS j , calculate the matching degree of the upper power supply between plots i and j (1f) According to the center coordinate G of plot i i =[G i,x ,G i,y ] and the center coordinates G of plot j j =[G j,x ,G j,y ], calculate G i and G j The physical distance D ij : In the formula, G i,x and G i,y is the center coordinate G of plot i i The two-dimensional coordinate components of G j,x and G j,y is the center coordinate G of plot j j The two-dimensional coordinate components of ; (1g) According to the mountains, rivers, railways, expressways and roads of different levels between the plots in the planned power supply area, the different levels of roads include national roads, provincial roads, county roads and rural roads, set the obstacle coefficient H between plots i and j. ij , calculate the electrical matching degree C of the plot adjacency taking into account the plot attributes ij : Among them, ω P The power load matching degree of the plot The weight coefficient of T Matching degree of land development The weight coefficient of S The matching degree of the upper power supply of the plot The weight coefficient of .
3. The method for dividing power supply units of a city distribution network according to claim 1, characterized in that: The step (2) specifically comprises the following steps: (2a) Considering a plot as a node in the planned power supply area, the n plots in the planned power supply area constitute a node set Nd = {1, ..., i, ..., j, ..., n}, where i and j are both plot numbers. At the same time, the electrical matching degree C of the adjacent plots is ij Considered as the weight of the edge formed by two nodes i and j, the connection relationship between the plots in the planned power supply area is represented by the set of weighted edges Br: Br={(i,j,Cij)} Where: (i,j,C ij ) is an element of the set Br; (2b) Sort the edges in set Br from large to small according to their weight values, add the edges in set Br from large to small weight values to the maximum spanning tree, and put the nodes at both ends of the edge into set V. If the nodes at both ends of the edge already belong to set V, discard the edge; if the nodes at both ends of the edge do not belong to set V at the same time, add the edge to the maximum spanning tree, and add the nodes at both ends of the edge to set V; when n-1 edges are added to the maximum spanning tree, the maximum spanning tree T of the power supply area to be planned is obtained; (2c) Traverse all edges and determine the edge (i, j, C ij ) weight C ij Is it greater than the critical value ε: If C ij <ε, then the maximum spanning tree T is disconnected between nodes i and j, so that the maximum spanning tree T is split into two trees Ta and Tb; if C ij >ε, the fission is terminated and the process goes to step (3); (2d) Similarly, consider Ta and Tb as a new maximum spanning tree and continue to split Ta and Tb until the maximum spanning tree can no longer split. At this time, if the splitting is m trees, they are T1, T2, …, T tr ,…T m , obviously m≤n holds, T tr The subscript tr represents the tree number, tr = 1, 2,…, m.
4. The method for dividing power supply units of a city distribution network according to claim 1, characterized in that: The step (3) specifically comprises the following steps: (3a) Start the analysis from the first tree T1 of the maximum spanning tree in the planned power supply area. At this time, tr=1 holds. Starting from any end node of the first tree T1, find the longest path starting from the current node through the depth-first search algorithm. After traversing all the end nodes, the longest path of the first tree T1 is found. The nodes passed by the longest path are regarded as the trunk lines, and the remaining edges of the first tree T1 are regarded as branch lines. tr represents the tree number, tr=1,2,…,m. (3b) Define the node combined load as the cumulative load value of all node plots downstream of a node in a typical day of the prospective saturation year; starting from any end node of the first tree T1, traverse all nodes located in the first tree T1 to form the branch node combined load; (3c) According to the standard capacity of the urban power supply feeder and the requirements of the target grid, in order to ensure that the feeder power supply capacity deviation rate is minimized, according to different power supply modes of the power grid, the different power supply modes of the power grid include single-ring network mode and double-ring network mode, taking node x as an example, the node capacity deviation rate α is defined x for: Among them, P LS Standard transmission capacity of feeders supplying electricity to cities; The maximum load of the node combined load in a typical day in the prospective saturation year; (3d) After all nodes in the branch are traversed, the node capacity offset rate is less than the minimum capacity offset rate α min The corresponding node set α of the branch is found, and the node y corresponding to the smallest capacity offset rate is found from the node set α, and the node y and its downstream nodes are divided into a power supply unit; if all nodes in the branch are traversed, the capacity offset rate of all nodes is greater than α min , then the loads of all nodes of the branch are accumulated to the nodes of the branch on the trunk path; (3e) The division of the power supply units in the trunk path also follows the division principle of step (3d), and the capacity offset rate of each node in the trunk path is calculated respectively, and the capacity offset rate greater than the minimum capacity offset rate α is set. min The nodes are divided into a power supply unit; Then, let tr=tr+1; (3f) Perform the operations from step (3a) to step (3e) on each maximum spanning tree in the planned power supply area in turn until tr>m, and obtain the final power supply unit division result, which is then merged to form the urban distribution network power supply unit.