Motor time-sharing sharing method and system for compressed air energy storage system

By using the motor time-sharing method in the compressed air energy storage system, a motor unit is used to combine the air compression energy storage subsystem and the expansion electronic system, which solves the problems of large number of equipment and large area, and achieves efficient utilization and Cost reduction.

CN119093435AActive Publication Date: 2024-12-06CHINA ENERGY LONGYUAN ENVIRONMENTAL PROTECTION CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411300632.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-06
Estimated Expiration
2044-09-18

AI Technical Summary

Technical Problem

The compressed air energy storage system has problems such as large number of equipment, large area of ​​land and large pipeline engineering, which leads to high energy storage costs, especially when the energy storage scale increases, cost problems are gradually becoming serious.

Method used

Using the motor time-sharing method, use a motor unit to combine the air compressed energy storage subsystem and the compressed air expansion and generation electronic system to switch the energy storage and power generation modes according to the power grid peak shaving command, and use the same motor unit to perform air compression and expansion. , reduce the number of system motors and equipment space.

Benefits of technology

Reduce the number of system motors under the same energy storage scale, reduce equipment space, improve overall economy, significantly reduce energy storage costs, and achieve intelligent control and efficient utilization of motor equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093435A_ABST
    Figure CN119093435A_ABST
Patent Text Reader

Abstract

The invention provides a motor time-sharing and sharing method and system for a compressed air energy storage system, and belongs to the field of energy storage. The compressed air energy storage system comprises an air compression energy storage subsystem used for compressed air energy storage and a compressed air expansion power generation subsystem used for generating power through compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share one motor set. The method comprises the following steps: matching and executing a corresponding peak regulation scheme based on a power grid peak regulation instruction: when the power grid peak regulation instruction is an energy storage instruction, the peak regulation scheme is a scheme for controlling a motor set and an air compression energy storage subsystem to execute compressed air energy storage; and when the power grid peak regulation instruction is a power generation instruction, the peak regulation scheme is a scheme for controlling a motor set and a compressed air expansion power generation subsystem to execute power generation by using compressed air. The purposes of reducing the number of system motors, reducing the equipment space and improving the overall economical efficiency of the compressed air energy storage system are achieved on the premise of the same energy storage scale.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy storage, and in particular to a method for time-sharing motor use in a compressed air energy storage system, a system for time-sharing motor use in a compressed air energy storage system, a machine-readable storage medium and an electronic device. Background Art

[0002] In recent years, the scale of the new energy industry has grown rapidly and is the main energy source for the increase in installed capacity. The installed capacity will reach 52.6% by the end of 2023. The high proportion and large-scale access of wind and solar energy in a short period of time has brought challenges to the safe and stable operation of the power system, and the power grid has higher requirements for the duration and response rate of peak and frequency regulation.

[0003] Electricity is a type of energy that is used immediately after it is generated. Energy storage technology can make up for this shortcoming. It can maintain a balance between the power generation side and the power consumption side by releasing energy during peak power periods and storing energy during low load periods, thus ensuring the safe and economical operation of the power grid when clean energy is connected to the grid on a large scale in the future. The application scenarios of energy storage cover all aspects of the power system, including the power generation side, the grid side, and the power consumption side. Among them, energy storage on the power generation side is mainly used for power peak regulation, auxiliary dynamic operation, system frequency regulation, and renewable energy connection to the grid. Energy storage on the grid side is mainly used for peak regulation, frequency regulation, relieving grid congestion, and delaying the expansion and upgrading of transmission and distribution. Energy storage on the user side mainly relies on distributed new energy to achieve self-generation and self-use of electricity, reduce user electricity costs, and improve power supply reliability.

[0004] Compressed air energy storage is considered to be one of the most promising large-scale energy storage technologies, with the advantages of large capacity, long energy storage cycle, small investment, and environmental protection. During the low electricity consumption period, the electric energy drives the compressor to convert the electric energy into air pressure energy, and the high-pressure air is temporarily stored; during the peak electricity consumption period, the air pressure energy is converted into mechanical energy or electrical energy, and the high-pressure air drives the turbine expander to work. With the rapid advancement of technology, the efficiency of compressed air energy storage power stations has increased to 75%, slightly lower than that of pumped storage power stations; the cost per kilowatt-hour is about 0.436 yuan / (kW・h), which is much lower than lithium iron phosphate energy storage. However, the current compressed air energy storage system has energy storage cost problems such as a large number of equipment, a large footprint, and a large amount of pipeline engineering. In particular, with the increase in demand for energy storage scale and the increase in compression and expansion stages, the energy storage cost problem has become increasingly serious. Summary of the invention

[0005] The purpose of the embodiments of the present invention is to provide a method and system for time-sharing use of motors in a compressed air energy storage system, so as to at least solve the problems of the compressed air energy storage system having a large number of equipment, a large floor space, and a large amount of pipeline engineering.

[0006] In order to achieve the above-mentioned object, the first aspect of the present invention provides a method for time-sharing use of motors for a compressed air energy storage system, wherein the compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The method includes: Based on the grid peak load instructions, the corresponding peak load load solutions are matched and executed, including: When the grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is to control the generator set and the air compression energy storage subsystem to execute the compressed air energy storage scheme; When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme is to control the motor group and the compressed air expansion power generation subsystem to execute the scheme of using compressed air to generate electricity.

[0007] Optionally, the above-mentioned motor group includes a first-level charge-and-discharge integrated motor and a second-level charge-and-discharge integrated motor, the first-level charge-and-discharge integrated motor is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the second-level charge-and-discharge integrated motor is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the first-level charge-and-discharge integrated motor and the second-level charge-and-discharge integrated motor are simultaneously connected to an electric energy station, and the electric energy station is used to supply power to the first-level charge-and-discharge integrated motor and the second-level charge-and-discharge integrated motor.

[0008] Optionally, the air compression energy storage subsystem includes a first magnetic clutch, a second magnetic clutch, and a first-stage air compressor, a second-stage air compressor, and an air storage device connected in sequence, wherein the air inlet end of the first-stage air compressor is connected to the first magnetic clutch, the first magnetic clutch is connected to the first-stage charging-discharging integrated motor, the air inlet end of the second-stage air compressor is connected to the second magnetic clutch, and the second magnetic clutch is connected to the second-stage charging-discharging integrated motor; The above-mentioned scheme for controlling the motor group and the air compression energy storage subsystem to perform compressed air energy storage includes: The first magnetic clutch and the second magnetic clutch are controlled to close, and the rotor of the first-stage charging and discharging integrated motor and the rotor of the second-stage charging and discharging integrated motor are controlled to rotate to drive the air to pass through the first-stage air compressor and the second-stage air compressor in sequence for air compression, and the air storage device is controlled to store the compressed air.

[0009] Optionally, the matching and executing of a corresponding peak-shaving scheme based on a power grid peak-shaving instruction may further include: When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme also includes an air compression energy storage subsystem control scheme; wherein, The control scheme of the air compression energy storage subsystem includes: Control the first-stage air compressor to enter standby mode; Based on the grid load fluctuation data and the pressure state data of the gas storage device, the secondary charging and discharging integrated motor operation plan and the secondary air compressor operation plan are matched and executed to control the secondary charging and discharging integrated motor and the secondary air compressor to operate respectively.

[0010] Optionally, the above-mentioned matching and execution of the secondary charging and discharging integrated motor operation scheme and the secondary air compressor operation scheme based on the grid load fluctuation data and the pressure state data of the gas storage device include: When it is determined that the value of the to-be-cut peak electricity reaches the first preset to-be-cut peak electricity threshold and the pressure state of the gas storage device is in a full-load state, the secondary charging and discharging integrated motor operation scheme is a scheme for controlling the secondary charging and discharging integrated motor to enter a standby state, and the secondary air compressor operation scheme is a scheme for controlling the secondary air compressor to enter a standby state; When it is determined that the value of the to-be-cut peak electricity is less than the second preset to-be-cut peak electricity threshold and the pressure state of the gas storage device is not in a full-load state, the secondary charging-discharging integrated motor operation scheme is a scheme for controlling the rotor of the secondary charging-discharging integrated motor to rotate, and the secondary air compressor operation scheme is a scheme for controlling the secondary air compressor to operate at a preset low load; Among them, the value of the peak power to be slashed is determined based on the grid load fluctuation data.

[0011] Optionally, the compressed air expansion and power generation subsystem includes a third magnetic clutch, a fourth magnetic clutch, and a first-stage turbine expander and a second-stage turbine expander connected in sequence, the first-stage turbine expander is connected to the fourth magnetic clutch, the fourth magnetic clutch is connected to the second-stage charging and discharging integrated motor, the second-stage turbine expander is connected to the third magnetic clutch, and the third magnetic clutch is connected to the first-stage charging and discharging integrated motor; The above-mentioned control motor group and compressed air expansion power generation subsystem execute the scheme of using compressed air to generate electricity, including: The third magnetic clutch and the fourth magnetic clutch are controlled to close, and the compressed air in the air storage device is controlled to enter the first-stage turbine expander and the second-stage turbine expander in sequence to expand and do work, so as to drive the first-stage charging and discharging integrated motor and the second-stage charging and discharging integrated motor to generate electricity.

[0012] Optionally, the compressed air energy storage system further includes a heat collection and utilization subsystem, which includes a first-stage compressor heat exchanger, a second-stage compressor heat exchanger, a first-stage expander heat exchanger, a second-stage expander heat exchanger, a heat storage tank and a cold storage tank. The air outlet end of the first-stage compressor heat exchanger and the air outlet end of the second-stage compressor heat exchanger are respectively connected to the air inlet end of the heat storage tank, the air inlet end of the first-stage expander heat exchanger and the air inlet end of the second-stage expander heat exchanger are respectively connected to the air outlet end of the heat storage tank, the air inlet end of the first-stage compressor heat exchanger and the air inlet end of the second-stage compressor heat exchanger are respectively connected to the air outlet end of the cold storage tank, and the air outlet end of the first-stage expander heat exchanger and the air outlet end of the second-stage expander heat exchanger are respectively connected to the air inlet end of the cold storage tank.

[0013] A second aspect of the present invention provides a system for time-sharing motor use in a compressed air energy storage system, wherein the compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The system for time-sharing motor use in compressed air energy storage system includes: The peak load plan execution module is used to match and execute the corresponding peak load plan based on the grid peak load instruction, including: When the grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is to control the generator group and the air compression energy storage subsystem to execute the compressed air energy storage scheme; When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme is to control the motor group and the compressed air expansion power generation subsystem to execute the scheme of using compressed air to generate electricity.

[0014] In a third aspect of the present invention, a machine-readable storage medium is provided, on which instructions are stored, and when the instructions are executed by a processor, the processor is configured to execute the above-mentioned method for time-sharing use of motors in a compressed air energy storage system.

[0015] In a fourth aspect of the present invention, an electronic device is provided, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the method for time-sharing use of motors in a compressed air energy storage system is implemented.

[0016] Through the above technical scheme, a method and system for the time-sharing use of motors for a compressed air energy storage system is provided, which uses a motor group to share the air compression energy storage subsystem and the compressed air expansion power generation subsystem. When the received power grid peak-shaving instruction is an energy storage instruction, the motor group is controlled to drive the air compression energy storage subsystem to store compressed air energy. When the received power grid peak-shaving instruction is a power generation instruction, the compressed air is expanded and works through the compressed air expansion power generation subsystem to drive the motor group to generate electricity. The method and system for the time-sharing use of motors for a compressed air energy storage system is based on compressed air energy storage technology, and the motor of the air compression energy storage subsystem in the prior art and the generator of the compressed air expansion power generation subsystem in the prior art are shared as a motor group, so that in the energy storage working state (that is, the power grid peak-shaving instruction is the energy storage instruction), the driving motor group drives the air compression energy storage subsystem to perform compressed air energy storage; in the energy release state (that is, the power grid peak-shaving instruction is the power generation instruction), the motor group switches to the generator mode, and the compressed air passes through the compressed air expansion power generation subsystem to do work, thereby driving the motor group to generate electricity. The method and system for time-sharing motor use in a compressed air energy storage system can reduce the number of system motors, reduce equipment space, and improve the overall economy of the compressed air energy storage system under the premise of the same energy storage scale. This realizes the intelligent control of the switching of the working state of the motor group, realizes the efficient use of motor equipment, and significantly reduces the energy storage cost.

[0017] Other features and advantages of the embodiments of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings: Figure 1 It is a flow chart of a method for time-sharing use of motors in a compressed air energy storage system provided by one embodiment of the present invention; Figure 2 It is a structural schematic diagram of a compressed air energy storage system provided in one embodiment of the present invention.

[0019] Description of Reference Numerals 1-first-stage air compressor, 2-second-stage air compressor, 3-first-stage turbine expander, 4-second-stage turbine expander, 5-first-stage charging and discharging integrated motor, 6-second-stage charging and discharging integrated motor, 7-air storage device, 8-first-stage compressor heat exchanger, 9-second-stage compressor heat exchanger, 10-first-stage expander heat exchanger, 11-second-stage expander heat exchanger, 12-heat storage tank, 13-cold storage tank, 14-first magnetic clutch, 15-second magnetic clutch, 16-third magnetic clutch, 17-fourth magnetic clutch. DETAILED DESCRIPTION

[0020] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.

[0021] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0022] In the present invention, unless otherwise specified, directional words such as "up, down, top, bottom" are usually used with reference to the directions shown in the drawings or are used to describe the relative positional relationships of components in the vertical, perpendicular or gravity direction.

[0023] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0024] Figure 1 FIG. 1 is a flow chart of a method for time-sharing motor use in a compressed air energy storage system provided by an embodiment of the present invention. Figure 1 As shown, an embodiment of the present invention provides a method for time-sharing use of motors for a compressed air energy storage system, wherein the compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The method includes: Based on the grid peak load instructions, the corresponding peak load load solutions are matched and executed, including: When the grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is to control the generator set and the air compression energy storage subsystem to execute the compressed air energy storage scheme; When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme is to control the motor group and the compressed air expansion power generation subsystem to execute the scheme of using compressed air to generate electricity.

[0025] The grid peak load regulation command is issued by the grid dispatching and control system to the compressed air energy storage system based on the peak load regulation demand signal of the regional grid (the peak load regulation demand signal can be determined by manually judging the grid status or by the real-time monitoring of the grid status). The grid dispatching and control system issues energy storage commands when the regional grid load is low, and issues power generation commands when the regional grid power consumption is peak.

[0026] Specifically, the method uses a motor group for the air compression energy storage subsystem and the compressed air expansion power generation subsystem. When the received grid peak-shaving instruction is an energy storage instruction, the motor group is controlled to drive the air compression energy storage subsystem to store compressed air energy. When the received grid peak-shaving instruction is a power generation instruction, the compressed air is expanded and works through the compressed air expansion power generation subsystem to drive the motor group to generate electricity. Based on the compressed air energy storage technology, the method uses the motor of the air compression energy storage subsystem in the prior art and the generator of the compressed air expansion power generation subsystem in the prior art as a motor group, so that in the energy storage working state (that is, the grid peak-shaving instruction is the energy storage instruction), the driving motor group drives the air compression energy storage subsystem to perform compressed air energy storage; in the energy release state (that is, the grid peak-shaving instruction is the power generation instruction), the motor group switches to the generator mode, and the compressed air passes through the compressed air expansion power generation subsystem to do work, thereby driving the motor group to generate electricity. This method can reduce the number of system motors, reduce equipment space, and improve the overall economy of the compressed air energy storage system under the premise of the same energy storage scale. This enables intelligent control of the switching of the working states of the motor groups, realizes efficient use of motor equipment, and significantly reduces the cost of energy storage.

[0027] Please refer to Figure 2 , Figure 2 It is a structural schematic diagram of a compressed air energy storage system provided by an embodiment of the present invention. In some embodiments of this embodiment, the above-mentioned motor group includes a primary charging and discharging integrated motor 5 and a secondary charging and discharging integrated motor 6, the primary charging and discharging integrated motor 5 is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the secondary charging and discharging integrated motor 6 is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the primary charging and discharging integrated motor 5 and the secondary charging and discharging integrated motor 6 are simultaneously connected to the electric energy station, and the electric energy station is used to supply power to the primary charging and discharging integrated motor 5 and the secondary charging and discharging integrated motor 6.

[0028] Specifically, the motor (i.e., motor group) used by the air compression energy storage subsystem and the compressed air expansion power generation subsystem includes a first-level integrated charge-discharge motor 5 and a second-level integrated charge-discharge motor 6. The compressed air energy storage system is controlled to switch between the energy storage mode and the energy release mode according to the peak load demand signal of the regional power grid. The working mode of the motor group switches between the motor and the generator as the compressed air energy storage system switches its mode. This ensures that the compressed air energy storage system switches efficiently and safely between the energy storage state and the energy release state.

[0029] Among them, the electric energy station includes a thermal power plant or a new energy station. When the power grid peak load regulation instruction is an energy storage instruction, the excess electric energy generated by the thermal power plant or the new energy station can drive the first-level integrated charge-discharge motor 5 and the second-level integrated charge-discharge motor 6 to drive the air compression energy storage subsystem to store compressed air energy.

[0030] In some implementations of the present embodiment, the above-mentioned air compression energy storage subsystem includes a first magnetic clutch 14, a second magnetic clutch 15, and a first-stage air compressor 1, a second-stage air compressor 2 and an air storage device 7 connected in sequence, the air intake end of the first-stage air compressor 1 is connected to the first magnetic clutch 14, the first magnetic clutch 14 is connected to the first-stage charging and discharging integrated motor 5, the air intake end of the second-stage air compressor 2 is connected to the second magnetic clutch 15, and the second magnetic clutch 15 is connected to the second-stage charging and discharging integrated motor 6; the content of the above-mentioned control motor group and air compression energy storage subsystem to perform compressed air energy storage includes: controlling the first magnetic clutch 14 and the second magnetic clutch 15 to close, controlling the rotor of the first-stage charging and discharging integrated motor 5 and the rotor of the second-stage charging and discharging integrated motor 6 to rotate, so as to drive the air to pass through the first-stage air compressor 1 and the second-stage air compressor 2 in sequence for air compression, and controlling the air storage device 7 to store the compressed air.

[0031] Specifically, when the regional power grid is in a low load period, the air compression energy storage subsystem receives the energy storage instruction to start the energy storage mode. In the energy storage mode, the first magnetic clutch 14 is closed, the second magnetic clutch 15 is closed, the first-level charging and discharging integrated motor 5 and the second-level charging and discharging integrated motor 6 are in the motor mode, and the excess electric energy generated by the thermal power plant or the new energy station drives the first-level charging and discharging integrated motor 5 and the second-level charging and discharging integrated motor 6. The rotor of the first-level charging and discharging integrated motor 5 and the rotor of the second-level charging and discharging integrated motor 6 drive the air to pass through the first-level air compressor 1 and the second-level air compressor 2 in turn for compression, and the air pressure increases in turn, and the final compressed air is stored in the air storage device 7. Thereby, the purpose of using the motor group to drive the air compression energy storage subsystem to compress air energy is achieved.

[0032] In some implementations of the present embodiment, the above-mentioned matching and execution of the corresponding peak-shaving scheme based on the grid peak-shaving instruction also includes: when the grid peak-shaving instruction is a power generation instruction, the peak-shaving scheme also includes an air compression energy storage subsystem control scheme; wherein the content of the air compression energy storage subsystem control scheme includes: controlling the first-stage air compressor 1 to enter the standby state; based on the grid load fluctuation data and the pressure state data of the air storage device 7, matching and executing the second-stage charging and discharging integrated motor 6 operation plan and the second-stage air compressor 2 operation plan, so as to control the second-stage charging and discharging integrated motor 6 and the second-stage air compressor 2 to operate respectively.

[0033] Specifically, when the regional power grid is at a peak power consumption period (i.e., load peak period), the primary air compressor 1 is in a completely standby state. The secondary charging and discharging integrated motor 6 and the secondary air compressor 2 can be adjusted according to the power grid load fluctuation data and the pressure state of the gas storage device 7.

[0034] In some implementations of the present embodiment, the above-mentioned matching and execution of the secondary charging and discharging integrated motor 6 operation plan and the secondary air compressor 2 operation plan based on the grid load fluctuation data and the pressure state data of the gas storage device 7 include: when it is determined that the value of the peak power to be shaving reaches the first preset peak power threshold to be shaving and the pressure state of the gas storage device 7 is in a full load state, the secondary charging and discharging integrated motor 6 operation plan is a plan for controlling the secondary charging and discharging integrated motor 6 to enter a standby state, and the secondary air compressor 2 operation plan is a plan for controlling the secondary air compressor 2 to enter a standby state; when it is determined that the value of the peak power to be shaving is less than the second preset peak power threshold to be shaving and the pressure state of the gas storage device 7 is not in a full load state, the secondary charging and discharging integrated motor 6 operation plan is a plan for controlling the rotor of the secondary charging and discharging integrated motor 6 to rotate, and the secondary air compressor 2 operation plan is a plan for controlling the secondary air compressor 2 to operate according to a preset low load; wherein, the value of the peak power to be shaving is determined based on the grid load fluctuation data.

[0035] Specifically, if a large amount of peak power is required to be slashed (i.e., the value of the peak power to be slashed reaches the first preset peak power threshold to be slashed) and the pressure of the air storage device 7 is fully loaded, the secondary charging and discharging integrated motor 6 and the secondary air compressor 2 directly enter the standby state; if a small amount of peak power is required to be slashed (i.e., the value of the peak power to be slashed is less than the second preset peak power threshold to be slashed) and the pressure of the air storage device 7 is insufficient, the secondary charging and discharging integrated motor 6 can drive the secondary air compressor 2 to operate at a low load.

[0036] In some implementations of the present embodiment, the compressed air expansion and power generation subsystem includes a third magnetic clutch 16, a fourth magnetic clutch 17, and a first-stage turbine expander 3 and a second-stage turbine expander 4 connected in sequence, the first-stage turbine expander 3 is connected to the fourth magnetic clutch 17, the fourth magnetic clutch 17 is connected to the second-stage charging and discharging integrated motor 6, the second-stage turbine expander 4 is connected to the third magnetic clutch 16, and the third magnetic clutch 16 is connected to the first-stage charging and discharging integrated motor 5; the content of controlling the motor group and the compressed air expansion and power generation subsystem to execute the scheme of using compressed air to generate electricity includes: controlling the third magnetic clutch 16 and the fourth magnetic clutch 17 to close, and controlling the compressed air in the air storage device 7 to enter the first-stage turbine expander 3 and the second-stage turbine expander 4 in sequence for expansion and work, so as to drive the first-stage charging and discharging integrated motor 5 and the second-stage charging and discharging integrated motor 6 to generate electricity.

[0037] Specifically, when the regional power grid is at a peak load period, the compressed air expansion power generation subsystem receives the power generation command issued by the regional power grid and starts the power generation mode. In the power generation mode, the third magnetic clutch 16 and the fourth magnetic clutch 17 are controlled to close, the first-stage charging and discharging integrated motor 5 and the second-stage charging and discharging integrated motor 6 are in the motor mode, and the high-pressure compressed air in the air storage device 7 enters the first-stage turbine expander 3 and the second-stage turbine expander 4 in turn to drive the first-stage charging and discharging integrated motor 5 and the second-stage charging and discharging integrated motor 6 to generate electricity. Thereby, the purpose of compressed air doing work through the first-stage turbine expander 3 and the second-stage turbine expander 4, driving the first-stage charging and discharging integrated motor 5 and the second-stage charging and discharging integrated motor 6 to generate electricity is achieved.

[0038] In some implementations of this embodiment, when the regional power grid is in a low load period, the first-stage turbine expander 3 and the second-stage turbine expander 4 are in a standby state, and the high-pressure gas (i.e., compressed air) in the gas storage device 7 is in a state of only entering but not exiting.

[0039] In some implementations of the present embodiment, the compressed air energy storage system further includes a heat collection and utilization subsystem, which includes a first-stage compressor heat exchanger 8, a second-stage compressor heat exchanger 9, a first-stage expander heat exchanger 10, a second-stage expander heat exchanger 11, a heat storage tank 12 and a cold storage tank 13. The air outlet end of the first-stage compressor heat exchanger 8 and the air outlet end of the second-stage compressor heat exchanger 9 are respectively connected to the air inlet end of the heat storage tank 12, the air inlet end of the first-stage expander heat exchanger 10 and the air inlet end of the second-stage expander heat exchanger 11 are respectively connected to the air outlet end of the heat storage tank 12, the air inlet end of the first-stage compressor heat exchanger 8 and the air inlet end of the second-stage compressor heat exchanger 9 are respectively connected to the air outlet end of the cold storage tank 13, and the air outlet end of the first-stage expander heat exchanger 10 and the air outlet end of the second-stage expander heat exchanger 11 are respectively connected to the air inlet end of the cold storage tank 13.

[0040] The embodiment of the present invention further provides a system for time-sharing use of motors in a compressed air energy storage system, wherein the compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The system for time-sharing motor use in compressed air energy storage system includes: The peak load plan execution module is used to match and execute the corresponding peak load plan based on the grid peak load instruction, including: When the grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is to control the generator group and the air compression energy storage subsystem to execute the compressed air energy storage scheme; When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme is to control the motor group and the compressed air expansion power generation subsystem to execute the scheme of using compressed air to generate electricity.

[0041] Specifically, the motor time-sharing system for the compressed air energy storage system uses the air compression energy storage subsystem and the compressed air expansion power generation subsystem in one motor group. When the received grid peak-shaving instruction is an energy storage instruction, the motor group is controlled to drive the air compression energy storage subsystem to store compressed air energy. When the received grid peak-shaving instruction is a power generation instruction, the compressed air is expanded and works through the compressed air expansion power generation subsystem to drive the motor group to generate electricity. The motor time-sharing system for the compressed air energy storage system is based on compressed air energy storage technology, and uses the motor of the air compression energy storage subsystem in the prior art and the generator of the compressed air expansion power generation subsystem in the prior art into one motor group, so that in the energy storage working state (that is, the grid peak-shaving instruction is the energy storage instruction), the driving motor group drives the air compression energy storage subsystem to perform compressed air energy storage; in the energy release state (that is, the grid peak-shaving instruction is the power generation instruction), the motor group switches to the generator mode, and the compressed air passes through the compressed air expansion power generation subsystem to do work, thereby driving the motor group to generate electricity. The motor time-sharing system for compressed air energy storage system can reduce the number of system motors, reduce equipment space, and improve the overall economy of compressed air energy storage system under the premise of the same energy storage scale. It can realize the intelligent control of the switching of the working state of the motor group, realize the efficient use of motor equipment, and significantly reduce the energy storage cost.

[0042] The optional implementation modes of the embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the embodiments of the present invention are not limited to the specific details in the above implementation modes. Within the technical concept of the embodiments of the present invention, various simple modifications can be made to the technical scheme of the embodiments of the present invention, and these simple modifications all belong to the protection scope of the embodiments of the present invention.

[0043] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. To avoid unnecessary repetition, the embodiments of the present invention will not further describe various possible combinations.

[0044] Those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions to enable a single-chip microcomputer, a chip or a processor to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0045] In addition, various implementation modes of the embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the embodiments of the present invention, they should also be regarded as the contents disclosed by the embodiments of the present invention.

Claims

1. A method for time-sharing use of motors in a compressed air energy storage system, characterized in that: The compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The method comprises: Based on the grid peak load instructions, the corresponding peak load load solutions are matched and executed, including: When the power grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is a scheme for controlling the motor group and the air compression energy storage subsystem to perform compressed air energy storage; When the grid peak-shaving instruction is a power generation instruction, the peak-shaving scheme is to control the motor group and the compressed air expansion power generation subsystem to execute a scheme of using compressed air to generate electricity.

2. The method for time-sharing use of motors for a compressed air energy storage system according to claim 1, characterized in that: The motor group includes a primary charging and discharging integrated motor and a secondary charging and discharging integrated motor, the primary charging and discharging integrated motor is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the secondary charging and discharging integrated motor is respectively connected to the air compression energy storage subsystem and the compressed air expansion power generation subsystem, the primary charging and discharging integrated motor and the secondary charging and discharging integrated motor are simultaneously connected to an electric energy station, and the electric energy station is used to supply power to the primary charging and discharging integrated motor and the secondary charging and discharging integrated motor.

3. The method for time-sharing use of motors for a compressed air energy storage system according to claim 2, characterized in that: The air compression energy storage subsystem includes a first magnetic clutch, a second magnetic clutch, and a first-stage air compressor, a second-stage air compressor, and an air storage device connected in sequence, wherein the air inlet end of the first-stage air compressor is connected to the first magnetic clutch, the first magnetic clutch is connected to the first-stage charging-discharging integrated motor, the air inlet end of the second-stage air compressor is connected to the second magnetic clutch, and the second magnetic clutch is connected to the second-stage charging-discharging integrated motor; The contents of the scheme for controlling the motor group and the air compression energy storage subsystem to perform compressed air energy storage include: The first magnetic clutch and the second magnetic clutch are controlled to close, and the rotor of the first-stage charging-discharging integrated motor and the rotor of the second-stage charging-discharging integrated motor are controlled to rotate to drive the air to pass through the first-stage air compressor and the second-stage air compressor in sequence for air compression, and the air storage device is controlled to store the compressed air.

4. The method for time-sharing use of motors for a compressed air energy storage system according to claim 3, characterized in that: The matching and executing of the corresponding peak load regulation scheme based on the power grid peak load regulation instruction also includes: When the grid peak load regulation instruction is a power generation instruction, the peak load regulation scheme also includes an air compression energy storage subsystem control scheme; wherein, The contents of the air compression energy storage subsystem control scheme include: Control the first-stage air compressor to enter standby mode; Based on the grid load fluctuation data and the pressure state data of the gas storage device, the secondary charging and discharging integrated motor operation plan and the secondary air compressor operation plan are matched and executed to control the secondary charging and discharging integrated motor and the secondary air compressor to operate respectively.

5. The method for time-sharing use of motors for a compressed air energy storage system according to claim 4, characterized in that: The matching and execution of the two-stage charging and discharging integrated motor operation scheme and the two-stage air compressor operation scheme based on the grid load fluctuation data and the pressure state data of the gas storage device include: When it is determined that the value of the to-be-cut peak electricity reaches the first preset to-be-cut peak electricity threshold and the pressure state of the gas storage device is in a full-load state, the two-stage charging-discharging integrated motor operation scheme is a scheme for controlling the two-stage charging-discharging integrated motor to enter a standby state, and the two-stage air compressor operation scheme is a scheme for controlling the two-stage air compressor to enter a standby state; When it is determined that the value of the to-be-cut peak electricity is less than the second preset to-be-cut peak electricity threshold and the pressure state of the gas storage device is not in a full-load state, the secondary charging-discharging integrated motor operation scheme is a scheme for controlling the rotor of the secondary charging-discharging integrated motor to rotate, and the secondary air compressor operation scheme is a scheme for controlling the secondary air compressor to operate at a preset low load; The value of the peak power to be slashed is determined based on power grid load fluctuation data.

6. The method for time-sharing use of motors for a compressed air energy storage system according to claim 2, characterized in that: The compressed air expansion and power generation subsystem includes a third magnetic clutch, a fourth magnetic clutch, and a first-stage turbine expander and a second-stage turbine expander connected in sequence, wherein the first-stage turbine expander is connected to the fourth magnetic clutch, the fourth magnetic clutch is connected to the second-stage charging and discharging integrated motor, the second-stage turbine expander is connected to the third magnetic clutch, and the third magnetic clutch is connected to the first-stage charging and discharging integrated motor; The contents of the control motor group and the compressed air expansion power generation subsystem to execute the scheme of using compressed air to generate electricity include: The third magnetic clutch and the fourth magnetic clutch are controlled to close, and the compressed air in the air storage device is controlled to enter the first-stage turbine expander and the second-stage turbine expander in sequence to expand and perform work, so as to drive the first-stage charging and discharging integrated motor and the second-stage charging and discharging integrated motor to generate electricity.

7. The method for time-sharing use of motors for a compressed air energy storage system according to claim 1, characterized in that: The compressed air energy storage system also includes a heat collection and utilization subsystem, which includes a first-level compressor heat exchanger, a second-level compressor heat exchanger, a first-level expander heat exchanger, a second-level expander heat exchanger, a heat storage tank and a cold storage tank. The air outlet end of the first-level compressor heat exchanger and the air outlet end of the second-level compressor heat exchanger are respectively connected to the air inlet end of the heat storage tank, the air inlet end of the first-level expander heat exchanger and the air inlet end of the second-level expander heat exchanger are respectively connected to the air outlet end of the heat storage tank, the air inlet end of the first-level compressor heat exchanger and the air inlet end of the second-level compressor heat exchanger are respectively connected to the air outlet end of the cold storage tank, and the air outlet end of the first-level expander heat exchanger and the air outlet end of the second-level expander heat exchanger are respectively connected to the air inlet end of the cold storage tank.

8. A system for time-sharing motor use in a compressed air energy storage system, characterized in that: The compressed air energy storage system comprises an air compression energy storage subsystem and a compressed air expansion power generation subsystem, wherein the air compression energy storage subsystem is used for compressed air energy storage, and the compressed air expansion power generation subsystem is used for generating electricity using compressed air, and the air compression energy storage subsystem and the compressed air expansion power generation subsystem share a motor group; The system for time-sharing use of motors in a compressed air energy storage system comprises: The peak load plan execution module is used to match and execute the corresponding peak load plan based on the grid peak load instruction, including: When the power grid peak load regulation instruction is an energy storage instruction, the peak load regulation scheme is a scheme for controlling the motor group and the air compression energy storage subsystem to perform compressed air energy storage; When the grid peak-shaving instruction is a power generation instruction, the peak-shaving scheme is to control the motor group and the compressed air expansion power generation subsystem to execute a scheme of using compressed air to generate electricity.

9. A machine-readable storage medium having instructions stored thereon, characterized in that: When the instruction is executed by a processor, the processor is configured to execute the method for time-sharing use of motors in a compressed air energy storage system as described in any one of claims 1 to 7.

10. An electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the method for time-sharing use of motors in a compressed air energy storage system as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Compressed air energy storage system coupled and integrated with deep cooling air separation device

    CN112901459A

  • Direct connection heat pump system based on compressed air energy storage

    CN115263441A

  • Compressed air energy storage coupling flywheel system and phase modulation mode design method

    CN117096906A

  • Gas-air combined cycle compressed air energy storage peak shaving power station and operation method thereof

    CN117703589A

  • Compressed air energy storage system applying coupling operation of motor generator

    CN118622663A