Convergence division method of distributed photovoltaic power station
Through precise data processing and optimization algorithms, the convergence division scheme of distributed photovoltaic power stations is designed, which solves the problems of unreasonable layout and high cost in the existing technology, and achieves efficient and stable power station operation.
Patent Information
- Application Number
- CN202411059151.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-12-06
AI Technical Summary
The prior art is difficult to accurately predict the optimal photovoltaic string location and connection path during the confluence division process in distributed photovoltaic power stations, resulting in unreasonable layout, reducing power generation efficiency and increasing cable and bridge costs, and failing to fully consider roof structure and obstacles. difference.
Through precise data collection and processing, the principle of convergence division is determined, the complex division algorithm is designed, the optimal solution is calculated in combination with the optimization algorithm, and detailed design documents and construction drawings are output through simulation simulation and actual test verification schemes.
It improves the power generation efficiency and operating stability of the power station, reduces the cost of cables and bridges, and ensures the rationality and maintainability of the power station.
Smart Images

Figure CN119093469A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of distributed photovoltaic power stations, and specifically to a method for dividing the flow of distributed photovoltaic power stations. Background Art
[0002] In the design of distributed photovoltaic power stations, the confluence division is a crucial step. Its core goal is to ensure that the current and voltage characteristics of the photovoltaic strings are accurately matched with the input requirements of the inverter. Considering that the output characteristics of photovoltaic modules will be dynamically affected by various natural factors such as light intensity and temperature, the confluence division process requires careful analysis and comprehensive consideration of these factors to ensure that the photovoltaic strings can efficiently and stably transmit electricity to the inverter. In addition, since photovoltaic strings are often distributed in different areas in the power station, the confluence division must also take into account the layout and direction of the photovoltaic strings. Through reasonable planning, the current transmission path is made shortest and the loss is minimized, thereby improving the overall power generation efficiency of the power station, reducing operating costs, and ensuring the stable operation of the power station, providing convenience for subsequent maintenance and overhaul.
[0003] In the design of distributed photovoltaic power stations, the traditional convergence division method mainly relies on the rich experience and professional knowledge of engineers and designers. However, in the face of the complex distribution of obstacles on distributed roofs, such as buildings, ventilation ducts, chimneys, skylights, etc., this method often seems to be inadequate. The structure of distributed roofs is complex, the obstacles are numerous and the layout is irregular, making the layout and connection of photovoltaic strings extremely complicated. When dealing with such complexity and differences, the convergence division based on manual experience is often difficult to accurately predict the optimal position and connection path of each photovoltaic string, which may lead to unreasonable layout, such as strings that are too dense or isolated, which not only reduces the power generation efficiency of the power station, but also increases the use of cables and bridges, thereby increasing costs. In addition, the manual experience method also has limitations when dealing with differences in the structure, material and inclination of different roofs. These differences may not be fully considered, resulting in unreasonable design and inefficiency. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a method for confluence division of a distributed photovoltaic power station, which can achieve effective connection between photovoltaic strings and inverters through precise calculation and optimization algorithms, reduce string isolation, reduce the cost of cables and bridges, and improve the power generation efficiency of the power station.
[0005] To achieve the above objectives, this application provides the following technical solutions:
[0006] The present application provides a method for dividing the flow of a distributed photovoltaic power station, including the following steps:
[0007] S100, data collection and processing: collect relevant data of distributed photovoltaic power stations, including the location, power, current and voltage characteristics, roof structure, and obstacle distribution information of photovoltaic strings, and pre-process these data, including data cleaning, outlier processing, and coordinate conversion, to ensure the accuracy and consistency of the data;
[0008] S200, Determine the principles of bus division: Determine the principles of bus division according to the actual situation and design requirements of the power station. The principles include but are not limited to: ensuring that the current and voltage characteristics of the photovoltaic strings accurately match the input requirements of the inverter; considering the layout and direction of the photovoltaic strings to make the current transmission path shortest and the loss smallest; avoiding the strings being too dense or isolated;
[0009] S300, refined confluence division algorithm: Design a refined confluence division algorithm, comprehensively consider the output characteristics of the photovoltaic strings, roof structure, and obstacle distribution factors, and calculate the optimal confluence division scheme through the optimization algorithm;
[0010] S400, Scheme verification and optimization: Verify the scheme obtained by the refined confluence partitioning algorithm to ensure that the scheme meets all principles and requirements;
[0011] S500, output and application: Output the verified refined confluence division scheme as a design document or construction drawing to guide the actual construction of distributed photovoltaic power stations.
[0012] The specific steps in step S100 include:
[0013] S101. Collect PV string data: record the specific location of each PV string, including longitude and latitude or coordinates relative to a reference point, and collect the rated power, actual operating power, current and voltage key electrical characteristic data of each string;
[0014] S102. Obtaining roof structure information: Learn the shape, size and material information of the roof in detail, and record any special structures or design features on the roof;
[0015] S103. Investigate the distribution of obstacles: Identify and record all fixed or movable obstacles on the roof, determine the location, size and height of these obstacles, and the shadows or shading they may cause to the PV strings;
[0016] S104, data cleaning: remove duplicate records, identify and delete obviously erroneous or unreasonable data points;
[0017] S105, outlier processing: using statistical methods to identify and process outliers, and performing interpolation, average value replacement or deletion operations on the identified outliers;
[0018] S106, coordinate conversion: if the collected position data is not in a unified coordinate system, convert it to the same coordinate system;
[0019] S107, Data consistency check: Compare data collected from different sources or at different time points to ensure consistency and coherence between the data. For inconsistent data, further verification of the original data or correction is required;
[0020] S108, data arrangement and storage: the cleaned and pre-processed data are arranged into a standard format for data storage.
[0021] The specific operation steps in step S200 include:
[0022] S201. Matching PV strings with inverter requirements: Based on the collected PV string current and voltage characteristics, ensure that these characteristics accurately match the input requirements of the inverter. The maximum number of series modules designed for the PV array should ensure that the array output voltage does not exceed the maximum allowable input voltage of the PV inverter at the maximum open circuit voltage, and the array output current does not exceed the maximum input current of the inverter.
[0023] S202, optimizing the current transmission path: considering the layout and direction of the photovoltaic strings, and making the current transmission path as short as possible by dividing the current;
[0024] S203. Avoid too dense or isolated strings: When dividing the confluence, avoid too dense connection of PV strings to the same combiner box or inverter to prevent overload or hot spots. At the same time, avoid string isolation and ensure that each confluence area has enough PV strings connected to improve the overall efficiency and stability of the system.
[0025] S204. Consider the scalability and maintainability of the power station: When determining the principles of confluence division, the future expansion needs of the power station should be taken into account to ensure that the current division plan can facilitate future expansion. At the same time, the maintainability of the power station should also be considered to make the confluence division plan convenient for daily operation and maintenance and troubleshooting.
[0026] When determining the convergence division principle in step S200, relevant design specifications and standards should be followed, including photovoltaic power station design specifications and inverter access standards. When determining the convergence division principle, the economic efficiency and technical feasibility of the power station should be comprehensively considered.
[0027] The specific operation steps in step S300 include:
[0028] S301, initializing algorithm parameters: setting initial parameters of the algorithm according to the actual situation and design requirements of the power station;
[0029] S302, establishing a mathematical model: establishing a mathematical model of flow division according to the output characteristics of the photovoltaic strings, the roof structure and the obstacle distribution information, wherein the model includes constraints of flow division;
[0030] S303, encoding and decoding: encoding the confluence partitioning scheme into a format that can be processed by the algorithm, and decoding is to convert the encoding result output by the algorithm back to the actual confluence partitioning scheme;
[0031] S304, fitness function design: design a fitness function to evaluate the pros and cons of each confluence division scheme;
[0032] S305, optimization algorithm iteration: iteratively optimize the confluence partitioning scheme. In each iteration, the pros and cons of the current scheme are evaluated according to the fitness function, and a new scheme is generated through selection, crossover, and mutation operations. The iterative process is repeated until the termination condition is met, such as reaching the maximum number of iterations and the fitness function value converges;
[0033] S306, result analysis and selection: Analyze and compare multiple confluence division schemes output by the optimization algorithm, and select the best scheme as the final result.
[0034] The specific steps in step S400 include:
[0035] S401, simulation verification: using photovoltaic power station simulation software, import the solution obtained by the refined confluence division algorithm into the simulation environment, simulate the operation of the power station under different lighting conditions and temperature environmental factors in the simulation environment, and observe and record various performance indicators, such as system efficiency, power generation, and cable loss;
[0036] S402, performance index analysis: Analyze the performance index in the simulation results, compare with the expected goals and design principles, and check whether the solution meets all principles and requirements;
[0037] S403, fine-tuning and optimizing the solution: if it is found that the solution does not meet the principles or has poor performance, it is necessary to fine-tune or optimize the solution, repeat steps S100 and S200, and perform simulation verification and performance analysis on the fine-tuned solution again until all principles and requirements are met;
[0038] S404. If conditions permit, conduct actual environmental testing on the fine-tuned scheme, install and operate the adjusted confluence division scheme at the power station site, observe and record the performance indicators under actual operation, compare the actual test results with the simulation results, and evaluate the feasibility and effectiveness of the scheme.
[0039] During the scheme verification and optimization process, risk assessment is carried out to identify possible risks and problems. According to the identified risks and problems, corresponding response measures and plans are formulated to ensure the stable operation and safety of the power station. The data, analysis results and conclusions in the verification and optimization process are compiled into a document or report. The document should include a detailed description of the scheme, verification process, performance indicator analysis, fine-tuning and optimization records, risk assessment and response measures, etc. The verified and optimized scheme is submitted to relevant departments or experts for review, and the scheme is further modified and improved according to the review opinions. After passing the review, the scheme is approved as the final confluence division scheme.
[0040] The specific steps in step S500 include:
[0041] S501, collating verification results: Summarizing all data and results of solution verification and optimization in step S400 to ensure that all changes and fine-tuning have been fully considered and incorporated into the final solution;
[0042] S502. Prepare design documents: Prepare detailed design documents to describe the specific contents of the refined confluence division scheme, including the layout of PV strings, the location of the combiner box, and the configuration of the inverter. The document shall include a detailed description of the scheme, design basis, performance indicator analysis, risk assessment, and countermeasures;
[0043] S503, drawing construction drawings: drawing detailed construction drawings according to the scheme in the design document;
[0044] S504, Review and Modification: Submit the design documents and construction drawings to relevant departments or experts for review, and make necessary modifications and improvements to the documents and drawings based on the review opinions to ensure that they meet the design requirements and construction standards;
[0045] S505, Output and Delivery: Output the final design documents and construction drawings as electronic and paper files, and deliver them to the construction team and related personnel. Before delivery, ensure the completeness and accuracy of all documents and drawings to avoid omissions or errors.
[0046] Compared with the prior art, the beneficial effects of the present invention are as follows: through the data collection and processing of step S100, the accuracy and consistency of the power station related data are ensured, laying a solid foundation for subsequent analysis. Then, step S200 clarifies the principles of convergence division, which comprehensively consider the matching of photovoltaic strings and inverters, the optimization of current transmission paths and the rationality of string layout, providing clear guidance for subsequent algorithm design and program formulation. Subsequently, the refined convergence division algorithm proposed in step S300, by comprehensively considering the output characteristics of photovoltaic strings, roof structure, obstacle distribution and other factors, efficiently calculates the optimal convergence division. In step S400, the obtained scheme is scientifically verified and optimized. Through simulation and actual environment testing, the performance of the scheme is comprehensively evaluated, and fine-tuning or optimization is carried out according to the evaluation results, thereby further improving the power generation efficiency and operation stability of the power station. Finally, step S500 outputs the verified scheme as practical design documents and construction drawings, providing detailed guidance for the actual construction of the power station and ensuring the smooth progress of the construction. The entire method process is rigorous and scientific, which effectively solves the key problems in the convergence division of distributed photovoltaic power stations, significantly improves the overall performance of the power station, and has important practical application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 The present invention is a flowchart of a method for dividing a distributed photovoltaic power station according to an embodiment of the present invention. DETAILED DESCRIPTION
[0049] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0050] The terms "comprises," "comprising," or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.
[0051] The terms "first", "second", etc. are only used to distinguish one entity or operation from another entity or operation, and should not be understood as indicating or implying relative importance, nor should they be understood as requiring or implying any such actual relationship or order between these entities or operations.
[0052] like Figure 1 , combined with Figure 1 As shown, a method for dividing the flow of a distributed photovoltaic power station of the present invention comprises the following steps:
[0053] S100, data collection and processing: collect relevant data of distributed photovoltaic power stations, including the location, power, current and voltage characteristics, roof structure, obstacle distribution and other information of photovoltaic strings, and then pre-process these data, including data cleaning, outlier processing, coordinate conversion, etc., to ensure the accuracy and consistency of the data;
[0054] The specific steps in step S100 include:
[0055] S101. Collect PV string data: record the specific location of each PV string, which may include longitude and latitude or coordinates relative to a reference point, and collect key electrical characteristic data such as rated power, actual operating power, current and voltage of each string;
[0056] S102. Obtaining roof structure information: Learn in detail about the shape, size, and material of the roof, and record any special structures or design features that may exist on the roof;
[0057] S103. Investigate the distribution of obstacles: Identify and record all fixed or movable obstacles on the roof, such as ventilation equipment, skylights, other building protrusions, etc., determine the location, size and height of these obstacles, and the shadows or shading they may cause to the PV strings;
[0058] S104, data cleaning: remove duplicate recorded data, identify and delete obviously erroneous or unreasonable data points, such as values that exceed the reasonable range of PV string electrical parameters;
[0059] S105. Outlier processing: Use statistical methods such as standard deviation and quartiles to identify and process outliers. For identified outliers, operations such as interpolation, mean value replacement or deletion can be performed. The specific method depends on the nature of the data and the purpose of analysis.
[0060] S106, coordinate conversion: if the collected location data is not in a unified coordinate system, it needs to be converted to the same coordinate system to facilitate subsequent analysis and processing. As needed, it may involve conversion from latitude and longitude coordinates to plane coordinates, or conversion between different projection coordinate systems;
[0061] S107, Data consistency check: Compare data collected from different sources or at different time points to ensure consistency and coherence between the data. For inconsistent data, further verification of the original data or correction using appropriate methods is required;
[0062] S108, data organization and storage: organize the cleaned and pre-processed data into a standard format, and select a suitable database or data storage solution for subsequent data analysis and mining.
[0063] Through steps S101 and S102, the system collected key electrical characteristic data and roof structure information of the photovoltaic strings, which are the basis for the subsequent convergence division algorithm. Next, step S103 investigated the obstacles on the roof, providing the algorithm with important information to avoid shadows and occlusions. Subsequently, steps S104 to S106 cleaned the data, processed outliers, and converted coordinates to ensure the accuracy and uniformity of the data. Finally, steps S107 and S108 checked the consistency of the data and organized and stored them, providing reliable data support for subsequent data analysis and mining. The entire process forms a closed-loop data processing system to ensure the accuracy and availability of the data.
[0064] Here are some possible correction methods:
[0065] Verify original data: First, re-examine the original data collection process to confirm whether there are any recording errors or input errors. If possible, re-obtain the data directly from the source.
[0066] Data correction: For known errors or obvious deviations, the data should be corrected directly. For example, if the power data of a photovoltaic string is mistakenly recorded as a negative number, it should be corrected to the correct positive value.
[0067] Use the mean or median: If a data point is significantly outliers from the other data points and there is no clear reason for the error, you can use the mean or median of the same set of data to replace the outlier. This method assumes that most of the data is accurate and the outlier may be caused by random error or measurement error.
[0068] Interpolation: If missing or inconsistent data is caused by uneven sampling intervals or no data collection at certain time points, interpolation can be used to estimate the missing data points. Interpolation methods include linear interpolation, polynomial interpolation, spline interpolation, and many other methods. The specific method to choose depends on the characteristics of the data and the analysis requirements.
[0069] Regression analysis: If there is a clear correlation between the data, regression analysis can be used to model the relationship between the data and predict or correct inconsistent data points based on the model.
[0070] Data fusion: If the data comes from multiple different data sources and there are inconsistencies between these data sources, data fusion technology can be used to integrate the information from multiple data sources to obtain more accurate and comprehensive data.
[0071] Time series analysis: For time series data, time series analysis methods can be used to identify factors such as trends and seasonal changes in the data, and to correct inconsistent data accordingly.
[0072] Regarding the data collection method, it can be further clarified what kind of sensors or equipment are used to collect the electrical characteristics data of the photovoltaic strings, and how to ensure the real-time and accuracy of data collection. Secondly, for the obstacle survey part, it can be supplemented with how to combine remote sensing technology or modern tools such as drones for more efficient and accurate obstacle identification and positioning. In addition, in the data cleaning and preprocessing stage, it can be further explored to use more advanced algorithms or technologies to improve the efficiency and accuracy of data processing. Finally, in terms of data collation and storage, it can be discussed how to combine cloud computing or big data technology to achieve more efficient and secure data storage and management.
[0073] S200, Determine the principles of bus division: Determine the principles of bus division according to the actual situation and design requirements of the power station. These principles include but are not limited to: ensuring that the current and voltage characteristics of the photovoltaic strings accurately match the input requirements of the inverter; considering the layout and direction of the photovoltaic strings to make the current transmission path shortest and the loss smallest; avoiding overly dense or isolated strings, etc.
[0074] The specific operation steps in step S200 include:
[0075] S201. Matching PV strings with inverter requirements: Based on the collected PV string current and voltage characteristics, such as the output voltage and output current under the maximum number of series-connected modules, ensure that these characteristics accurately match the input requirements of the inverter. The maximum number of series-connected modules designed for the PV array should ensure that the array output voltage does not exceed the maximum allowable input voltage of the PV inverter at the maximum open-circuit voltage. Similarly, the array output current should not be greater than the maximum input current of the inverter.
[0076] S202, optimize the current transmission path: consider the layout and direction of the photovoltaic strings, and make the current transmission path as short as possible through reasonable confluence division, thereby reducing cable loss and cost. Use information such as roof structure and obstacle distribution to avoid cables detouring between obstacles or crossing unnecessary long distances;
[0077] S203. Avoid too dense or isolated strings: When dividing the confluence, pay attention to avoid too dense connection of PV strings to the same combiner box or inverter to prevent overload or hot spots. At the same time, avoid string isolation and ensure that each confluence area has enough PV strings connected to improve the overall efficiency and stability of the system;
[0078] S204. Consider the scalability and maintainability of the power station: When determining the principles of confluence division, the future expansion needs of the power station should be taken into account to ensure that the current division plan can facilitate future expansion. At the same time, the maintainability of the power station should also be considered to make the confluence division plan convenient for daily operation and maintenance and troubleshooting.
[0079] Through step S201, it is ensured that the current and voltage characteristics of the photovoltaic strings are accurately matched with the input requirements of the inverter, which is the basis for ensuring the stable operation of the photovoltaic power station. Next, step S202 focuses on the optimization of the current transmission path, and reduces cable losses and costs through reasonable convergence division, while using the roof structure and obstacle distribution information to avoid unnecessary detours. Step S203 focuses on avoiding the problem of too dense or isolated strings to ensure the load balance and stability of the system. Finally, step S204 takes into account the scalability and maintainability of the power station, which facilitates the future development and daily operation and maintenance of the power station. These steps together constitute the core content of the determination of the convergence division principle, and provide clear guidance for the subsequent refined convergence division algorithm.
[0080] In step S201, the specific standards and methods for matching PV strings with inverters can be further clarified, including how to select appropriate PV strings based on the specifications and performance requirements of the inverter. Secondly, in step S202, the use of advanced path planning algorithms or technologies to optimize the current transmission path can be explored to further improve the efficiency and reliability of the system. In addition, in step S203, it can be studied how to reasonably set the access density and layout of the strings in combination with the actual situation and operation strategy of the power station to achieve more efficient energy conversion and transmission. Finally, in step S204, the impact of environmental factors, equipment aging and other factors on the scalability and maintainability of the power station can be further considered, and corresponding response strategies can be formulated.
[0081] In step S200, when determining the bus division principle, relevant design specifications and standards should be followed, such as photovoltaic power station design specifications, inverter access standards, etc. These specifications and standards will provide clear guidance and requirements for bus division to ensure the safety and reliability of the power station. When determining the bus division principle, the economic and technical feasibility of the power station should be comprehensively considered. By optimizing the bus division scheme, the use of cables and bridges can be reduced, thereby reducing costs. At the same time, it is also necessary to ensure that the adopted technical solution is feasible and reliable.
[0082] The importance of following relevant design specifications and standards is emphasized. These specifications and standards, such as photovoltaic power station design specifications and inverter access standards, provide clear guidance and requirements for busbar division to ensure the safety, reliability and compliance with industry standards of the power station. At the same time, when determining the busbar division principles, not only the economic efficiency of the power station is considered, and the cost is reduced by optimizing the busbar division scheme to reduce the use of cables and bridges, but also the technical feasibility is taken into account to ensure that the adopted technical solutions are feasible and reliable in actual operation. This comprehensive consideration method helps to achieve a balance between the economic benefits and technical performance of the power station.
[0083] Although the importance of following design specifications and standards has been emphasized, in actual operations, it is necessary to further clarify the specific content of these specifications and standards and how they are applied to the determination of the convergence division principles. In addition, with regard to the consideration of economic and technical feasibility, it is possible to further explore how to develop more detailed and quantitative evaluation indicators and methods based on the specific conditions and needs of the power station. For example, it is possible to consider introducing tools such as cost-benefit analysis and technical risk assessment to more accurately evaluate the economic and technical feasibility of different convergence division schemes. In addition, factors such as the long-term operation and maintenance costs of the power station and the impact of environmental factors can also be considered to develop a more comprehensive and sustainable convergence division scheme.
[0084] S300, refined confluence division algorithm: Based on the above principles, a refined confluence division algorithm is designed. This algorithm comprehensively considers factors such as the output characteristics of the photovoltaic strings, the roof structure, and the distribution of obstacles, and calculates the optimal confluence division scheme through optimization algorithms such as genetic algorithms and neural network algorithms.
[0085] The specific operation steps in step S300 include:
[0086] S301, initializing algorithm parameters: according to the actual situation and design requirements of the power station, setting the initial parameters of the algorithm, such as the population size, number of iterations, crossover rate and mutation rate of the genetic algorithm; or the number of layers, number of nodes, learning rate, etc. of the neural network algorithm;
[0087] S302, establish a mathematical model: according to the output characteristics of the photovoltaic strings such as current, voltage, power, etc., the roof structure such as shape, size, orientation, etc., and the obstacle distribution, a mathematical model of the current division is established. The model should include the constraints of the current division, such as the input requirements of the inverter, the cable length and loss limit, the distance limit between the strings, etc.;
[0088] S303, encoding and decoding: When an evolutionary algorithm such as a genetic algorithm is used, the confluence partitioning scheme needs to be encoded into a format that the algorithm can process, such as binary encoding, real number encoding, etc., and decoding is to convert the encoding result output by the algorithm back to the actual confluence partitioning scheme;
[0089] S304, fitness function design: Design a fitness function to evaluate the pros and cons of each confluence division scheme. The fitness function should comprehensively consider multiple factors, such as cable loss, system efficiency, balance between strings, etc. Different weights can be assigned to these factors according to the actual situation and design requirements of the power station;
[0090] S305, optimization algorithm iteration: use optimization algorithms such as genetic algorithms, neural network algorithms, etc. to iteratively optimize the confluence partitioning scheme. In each iteration, the pros and cons of the current scheme are evaluated according to the fitness function, and new schemes are generated through operations such as selection, crossover, and mutation. The iterative process is repeated until the termination conditions are met, such as reaching the maximum number of iterations, the fitness function value converges, etc.;
[0091] S306, result analysis and selection: Analyze and compare multiple confluence partitioning schemes output by the optimization algorithm, and select the best scheme as the final result. The scheme can be evaluated based on indicators such as fitness function value, cable length and loss, and system efficiency;
[0092] Initialize the algorithm parameters in step S301 to ensure that the algorithm can effectively search according to the actual situation and design requirements of the power station. Then, in step S302, a mathematical model based on information such as photovoltaic string output characteristics, roof structure and obstacle distribution is established. The model contains the constraints of the confluence division and provides a clear search range for the algorithm. In step S303, the algorithm converts the confluence division scheme into a format that the algorithm can process through encoding and decoding operations, realizing the discretization of the search space. Subsequently, in step S304, a fitness function is designed to evaluate the pros and cons of each confluence division scheme, taking into account multiple factors such as cable loss and system efficiency. In step S305, the optimization algorithm continuously generates new confluence division schemes through an iterative process, and evaluates their pros and cons according to the fitness function, gradually approaching the optimal solution. Finally, in step S306, multiple schemes output by the optimization algorithm are analyzed and compared, and the optimal scheme is selected as the final result. The entire process realizes the refined search and optimization of the confluence division scheme through the combination of mathematical models and optimization algorithms.
[0093] In step S301, initializing algorithm parameters is a key step in the confluence partitioning method, and it has a close relationship with the subsequent steps. The following is a detailed description of this relationship:
[0094] Relationship with step S302 (building a mathematical model)
[0095] Basic settings: Initializing the algorithm parameters provides the necessary algorithm foundation for establishing the mathematical model. Many parameters in the mathematical model (such as the input requirements of the inverter, the threshold of cable loss, etc.) may need to be matched with the algorithm parameters (such as the number of iterations, population size, etc.) to ensure the rationality and effectiveness of the model.
[0096] Constraints: Although the constraints in the model are mainly determined by the actual situation and design requirements of the power plant, the setting of algorithm parameters may indirectly affect the implementation of these constraints. For example, if the algorithm sets a shorter number of iterations, some constraints in the model may need to be adjusted accordingly to ensure that a solution that satisfies the conditions is found within a limited number of iterations.
[0097] Relationship with step S303 (encoding and decoding) Encoding method: The setting of algorithm parameters may affect the selection of encoding method. For example, for a genetic algorithm, if the population size is small, a more compact encoding method may be used to reduce the amount of calculation.
[0098] Decoding difficulty: The setting of algorithm parameters may also affect the difficulty and complexity of decoding. For example, if the crossover rate and mutation rate are high, the generated encoding results may be more diverse, thereby increasing the difficulty of decoding.
[0099] Relationship with step S304 (fitness function design) Evaluation criteria: The setting of algorithm parameters may indirectly affect the design of the fitness function. For example, if the algorithm focuses on convergence speed, then the fitness function may need to emphasize the closeness between the current solution and the optimal solution, so as to guide the algorithm to approach the optimal solution more quickly.
[0100] Weight distribution: In the fitness function, the weight distribution of different factors may also be affected by the algorithm parameters. For example, if the algorithm sets a longer number of iterations, the weights of each factor can be adjusted more carefully to seek a more balanced and optimized solution.
[0101] Relationship with step S305 (optimization algorithm iteration) Iteration process: The setting of algorithm parameters directly determines the iteration process of the optimization algorithm. For example, parameters such as population size, number of iterations, crossover rate and mutation rate jointly determine the exploration ability and convergence speed of the genetic algorithm in the search space.
[0102] Termination condition: The setting of algorithm parameters also determines the termination condition of the iterative process. For example, the maximum number of iterations is a common termination condition, which is directly set by the algorithm parameters.
[0103] Relationship with step S306 (result analysis and selection) Solution quality: The setting of algorithm parameters will directly affect the quality of the final generated confluence division solution. Reasonable algorithm parameter settings can generate more excellent and practical solutions.
[0104] Evaluation indicators: During the result analysis and selection phase, the selection and weighting of evaluation indicators may also be affected by the algorithm parameter settings. For example, if the algorithm focuses on reducing cable loss, then the cable loss indicator may be given more attention when evaluating the solution.
[0105] In step S304, the fitness function is a key tool for evaluating the pros and cons of each bus partitioning scheme. Due to the complexity of the bus partitioning problem, the fitness function usually takes into account multiple factors, such as cable loss, system efficiency, and balance between strings. However, since the relative importance of these factors and the specific calculation methods may vary from power station to power station, it is difficult to give a universal and specific function formula.
[0106] In summary, the algorithm parameter initialization in step S301 is an important step in the confluence partitioning method, and it has a close relationship and mutual influence with the subsequent steps. Reasonable algorithm parameter setting plays a vital role in improving the efficiency and effect of the entire method.
[0107] Based on the contents of steps S301 to S306, the following is an example of using a genetic algorithm (GA) to perform flow division of a distributed photovoltaic power station, including a specific algorithm model design.
[0108] S300 refined confluence partitioning algorithm example (using genetic algorithm)
[0109] S301 Initialize algorithm parameters
[0110] Population Size: N = 100
[0111] Max Generations: G = 200
[0112] Crossover Rate: P c = 0.7
[0113] Mutation Rate: P m = 0.02
[0114] S302 Establishing mathematical model
[0115] Assume that a photovoltaic power station has M photovoltaic strings, which need to be divided into K bus areas. Each string is described by parameters such as current I i, voltage V i and power P i. The roof structure and obstacle distribution are given by spatial coordinates and shape information. The goal of the mathematical model is to minimize cable losses and meet the input requirements of the inverter, while considering the limitations of cable length and distance between strings.
[0116] The mathematical model can be formalized as:
[0117] [\text{minimize}\sum_{k=1}^{K}\sum_{i\in\text{Cluster}_k}\text{CableLoss}(i,\text{Cluster}_k)]
[0118] [\text{subject to}\left{\begin{array}{l}
[0119] \sum_{i\in\text{Cluster}_k}P_i\leq\text{MaxInverterInput}_k\
[0120] \text{CableLength}(\text{Cluster}_k)\leq\text{MaxLength}_k\
[0121] \text{DistanceBetweenStrings}(\text{Cluster}_k)\geq\text{MinDistance}
[0122] \end{array}\right.]
[0123] CableLoss(i,Cluster k) represents the cable loss from cluster i to its own confluence area k, MaxInverterInput k
[0124] is the maximum input power of inverter k, CableLength(Cluster k) and DistanceBetweenStrings(Cluster k) represent the total cable length of cluster k and the minimum distance limit between strings, respectively.
[0125] S303 encoding and decoding
[0126] Encoding: Integer encoding is used. Each chromosome is an array of length M. Each element in the array is an integer, which represents the number of the confluence area to which the corresponding group string belongs (from 1 to K). Decoding: The integer encoding is directly converted into a confluence partitioning scheme, that is, the group strings are assigned to different confluence areas according to the integers in the chromosome.
[0127] S304 fitness function design
[0128] The fitness function comprehensively considers cable loss, system efficiency and balance between strings:
[0129] [\text{Fitness}=\frac{1}{\text{TotalCableLoss}+\alpha\cdot\text{StandardDevia tionOfPower}(\text{Clusters})+\beta\cdot\text{InefficiencyFactor}}]
[0130] Among them, TotalCableLoss is the sum of the cable losses in all the confluence areas, StandardDeviationOfPower(Clusters) is the standard deviation of the power in each confluence area (a measure of balance), InefficiencyFactor is the system efficiency loss estimated based on factors such as the inverter's non-full load rate, and α and β are weight coefficients.
[0131] S305 optimization algorithm iteration
[0132] Selection: Roulette wheel selection method is used to select individuals to enter the next generation based on their fitness values.
[0133] Crossover: Use single-point crossover or multi-point crossover, and perform according to the probability of P c.
[0134] Mutation: Randomly select a bit in the chromosome to change (such as changing the number of the confluence region to which it belongs) with a probability of P m.
[0135] The iterative process is repeated, and each iteration evaluates the fitness of the current population and generates a new population through selection, crossover and mutation until the maximum number of iterations G is reached or the fitness function value converges.
[0136] S306 Result Analysis and Selection
[0137] Analyze the fitness values of each individual in the final generation population, and select the individual with the highest fitness as the optimal confluence division scheme. Further detailed evaluation can be performed based on indicators such as cable length, loss, and system efficiency to ensure the rationality and superiority of the scheme.
[0138] Through the above method, the problem of confluence division of distributed photovoltaic power stations can be efficiently solved, and the power generation efficiency and operation stability of the power station can be improved.
[0139] When initializing the algorithm parameters, we can further explore how to automatically adjust and optimize the algorithm parameters according to the specific situation and design requirements of the power station to improve the algorithm's search efficiency and the quality of the solution. Secondly, when establishing the mathematical model, we can consider introducing more influencing factors and constraints, such as environmental factors, equipment aging, etc., to more comprehensively reflect the actual situation of the power station. In addition, in the design of the fitness function, we can further explore how to assign more reasonable weights to different factors according to the operation strategy and goals of the power station to better meet the actual needs of the power station. Finally, in the result analysis and selection stage, we can introduce more evaluation indicators and methods, such as fuzzy comprehensive evaluation, multi-objective optimization, etc., to more comprehensively evaluate the advantages and disadvantages of different confluence division schemes, and select the optimal scheme that better meets the actual situation and needs of the power station.
[0140] The selected convergence division scheme is compared and verified with the actual situation of the power station to ensure the feasibility and effectiveness of the scheme. If it is found that the scheme has problems or does not meet the design requirements, the mathematical model can be readjusted by returning to step S200. The final convergence division scheme should also be output as a specific construction drawing or design document for use in the design and construction of the power station. The scheme should include detailed convergence path, cable specifications and lengths, inverter configuration and other information.
[0141] After selecting the confluence division scheme, the scheme is first compared and verified to ensure its feasibility and effectiveness in the actual power station construction. This step ensures the connection between theoretical design and actual operation, and timely discovers and corrects potential problems through feedback from actual conditions. If there are problems with the scheme or it does not meet the design requirements, you can return to step S200, readjust the mathematical model based on the feedback information, and perform optimization calculations again until a satisfactory solution is obtained. Finally, the verified confluence division scheme is output as a specific construction drawing or design document. These documents detail key information such as the confluence path, cable specifications and length, inverter configuration, etc., providing direct guidance for the design and construction of the power station.
[0142] During the comparison and verification phase of the scheme, specific verification methods and standards can be clarified, such as using simulation, on-site measurement and other means to ensure the accuracy and reliability of the verification results. Secondly, when adjusting the mathematical model, more advanced optimization algorithms and strategies can be introduced to improve the efficiency and quality of scheme adjustment. In addition, when outputting construction drawings or design documents, the standardization and completeness of the documents can be emphasized to ensure that the documents contain all necessary information and comply with industry standards and specifications. Finally, it is also possible to consider increasing communication and collaboration with the power plant design and construction team after the scheme is output to ensure that the design scheme can be smoothly transformed into an actual project.
[0143] S400, Scheme verification and optimization: Verify the scheme obtained by the refined confluence division algorithm to ensure that the scheme meets all principles and requirements. If necessary, fine-tune or optimize the scheme to further improve the power generation efficiency and operation stability of the power station;
[0144] The specific steps in step S400 include:
[0145] S401, simulation verification: using photovoltaic power station simulation software, import the solution obtained by the refined confluence division algorithm into the simulation environment, simulate the operation of the power station under different lighting conditions, temperature and other environmental factors in the simulation environment, observe and record various performance indicators, such as system efficiency, power generation, cable loss, etc.;
[0146] S402, performance index analysis: Analyze the performance indexes in the simulation results, compare them with the expected goals and design principles, and check whether the scheme meets all principles and requirements, such as the matching of PV strings and inverters, optimization of current transmission paths, and avoiding overly dense or isolated strings.
[0147] S403, fine-tuning and optimizing the scheme: If it is found that the scheme does not meet the principles or has poor performance, it is necessary to fine-tune or optimize the scheme. According to the bottlenecks and problems in the simulation results, the distribution of PV strings, the layout of the combiner box or the configuration of the inverter are adjusted in a targeted manner. Steps S100 and S200 are repeated to perform simulation verification and performance analysis on the fine-tuned scheme again until all principles and requirements are met;
[0148] S404. If conditions permit, conduct actual environmental testing on the fine-tuned scheme, install and operate the adjusted confluence division scheme at the power station site, observe and record the performance indicators under actual operation, compare the actual test results with the simulation results, and evaluate the feasibility and effectiveness of the scheme.
[0149] Through step S401, the photovoltaic power station simulation software is used to place the confluence division scheme in a virtual environment for testing, simulate the operation of the power station under different environmental conditions, and record key performance indicators. Subsequently, step S402 conducts an in-depth analysis of the simulation results, compares the expected goals and design principles, and checks whether the scheme meets all requirements. If the scheme does not meet the principles or has poor performance, enter step S403, fine-tune or optimize the scheme according to the bottlenecks and problems in the simulation results, and repeat the simulation verification and performance analysis until the scheme meets all requirements. Finally, in step S404, if conditions permit, the fine-tuned scheme is tested in an actual environment, and the feasibility and effectiveness of the scheme are further evaluated by comparing the actual operation results with the simulation results. The whole process combines simulation with practice to ensure the stability and reliability of the confluence division scheme in practical applications.
[0150] In the simulation verification stage, the accuracy and comprehensiveness of the simulation environment can be emphasized, including the simulation accuracy of environmental factors such as lighting conditions and temperature, and the simulation range of the power station operation. Secondly, in the performance indicator analysis stage, all performance indicators that need to be analyzed can be clearly listed, and the importance and impact of these indicators on the operation of the power station can be explained. In addition, in the fine-tuning and optimization stage of the solution, the specific methods and technical means of fine-tuning or optimization can be described in detail, such as adjusting the distribution of photovoltaic strings, the layout of the junction box, or the configuration of the inverter, and explaining how these adjustments improve the performance of the solution. Finally, in the actual environment testing stage, the safety and controllability of the test process can be emphasized, and it can be explained how to ensure that the test process will not cause damage to the power station or affect normal operation.
[0151] During the scheme verification and optimization process, risk assessment is carried out to identify possible risks and problems. According to the identified risks and problems, corresponding response measures and plans are formulated to ensure the stable operation and safety of the power station. The data, analysis results and conclusions in the verification and optimization process are compiled into documents or reports. The documents should include a detailed description of the scheme, verification process, performance indicator analysis, fine-tuning and optimization records, risk assessment and response measures, etc. The verified and optimized scheme is submitted to relevant departments or experts for review. The scheme is further modified and improved according to the review opinions. After passing the review, the scheme is approved as the final confluence division scheme.
[0152] By identifying possible risks and problems, a comprehensive risk assessment is conducted on the refined confluence division scheme to ensure the stable operation and safety of the power station. According to the identified risks and problems, corresponding countermeasures and plans are formulated to prevent the occurrence of potential problems or mitigate their impact. At the same time, the data, analysis results and conclusions in the verification and optimization process are compiled into documents or reports in detail, including a detailed description of the scheme, verification process, performance indicator analysis, fine-tuning and optimization records, and risk assessment and countermeasures. These documents not only record the entire verification and optimization process of the scheme, but also provide a basis for the review and modification of subsequent schemes. Finally, the verified and optimized scheme is submitted to the relevant departments or experts for review, and the scheme is further modified and improved according to the review opinions to ensure the scientificity and feasibility of the scheme. After the review is passed, the scheme will be approved as the final confluence division scheme to provide guidance for the construction and operation of the power station.
[0153] During the risk assessment phase, the risk assessment methods and tools, as well as the risk level classification standards, can be clarified to ensure the accuracy and reliability of risk assessment. Secondly, in terms of document writing, the standardization and completeness of the documents can be emphasized, including the format, content, charts and other requirements of the documents, so as to facilitate the reading and archiving of the documents. In addition, during the submission and review of the plan, the review procedures and requirements, as well as the feedback on the review results and the handling methods of modification suggestions can be explained in detail to ensure the fairness and effectiveness of the review process. Finally, after the plan is approved, the implementation steps and precautions of the plan can be further described to ensure that the plan can be smoothly transformed into an actual project and achieve the expected results.
[0154] S500, output and application: Output the verified refined confluence division scheme as a design document or construction drawing to guide the actual construction of distributed photovoltaic power stations.
[0155] The specific steps in step S500 include:
[0156] S501, collating verification results: Summarizing all data and results of solution verification and optimization in step S400 to ensure that all changes and fine-tuning have been fully considered and incorporated into the final solution;
[0157] S502. Prepare design documents: Prepare detailed design documents to describe the specific contents of the refined confluence division scheme, including the layout of PV strings, the location of the combiner box, the configuration of the inverter, etc. The document should include a detailed description of the scheme, design basis, performance index analysis, risk assessment and response measures, etc. The format of the document should be standardized and unified to facilitate reading and understanding by relevant personnel;
[0158] S503. Draw construction drawings: Draw detailed construction drawings according to the scheme in the design document, including the arrangement diagram of photovoltaic modules, cable path diagram, equipment layout diagram, etc. The drawings should clearly and accurately reflect the details of the scheme, including the model, quantity, installation location of the modules, the specification, length, connection method of the cables, etc. The drawings should comply with relevant standards and specifications to ensure safety and reliability during the construction process;
[0159] S504, Review and Modification: Submit the design documents and construction drawings to relevant departments or experts for review, and make necessary modifications and improvements to the documents and drawings based on the review opinions to ensure that they meet the design requirements and construction standards;
[0160] S505, Output and Delivery: Output the final design documents and construction drawings as electronic and paper files, and deliver them to the construction team and related personnel. Before delivery, ensure the completeness and accuracy of all documents and drawings to avoid omissions or errors.
[0161] Through step S501, all data and results of scheme verification and optimization are summarized and sorted to ensure that all changes and fine-tuning are fully considered and incorporated into the final scheme. Then, step S502 requires the preparation of detailed design documents, which describe the various contents of the scheme in detail, including the layout of PV strings, the location of the combiner box, the configuration of the inverter, etc., and provide key information such as performance indicator analysis, risk assessment and countermeasures. Subsequently, step S503 draws detailed construction drawings based on the design documents. The drawings should clearly and accurately reflect the details of the scheme to ensure safety and reliability during the construction process. In step S504, the design documents and construction drawings are submitted to relevant departments or experts for review, and are modified and improved according to the review opinions to ensure that the documents and drawings meet the design requirements and construction standards. Finally, step S505 outputs the final design documents and construction drawings as electronic and paper files, and delivers them to the construction team and relevant personnel to ensure completeness and accuracy before delivery.
[0162] When collating the verification results, you can emphasize the check of the accuracy and completeness of the data to ensure that all key data are accurately recorded and included in the final plan. Secondly, when writing design documents, you can emphasize the readability and ease of use of the documents, and use clear and concise language and diagrams to describe them, so that relevant personnel can quickly understand and use them. In addition, when drawing construction drawings, computer-aided design software and technology can be introduced to improve the accuracy and efficiency of drawings. In the review and modification stage, the review process and standards can be clarified to ensure the fairness and effectiveness of the review. Finally, before output and delivery, confidentiality requirements for documents and drawings can be added to ensure that sensitive information is not leaked.
[0163] In step S500, technical support and training should also be set up to provide the construction team with necessary technical support and training to ensure that they can understand and correctly implement the requirements in the design documents and construction drawings. During the construction process, necessary assistance and answers to questions are provided to ensure the smooth progress of the construction process. During the actual construction process, the implementation of the plan is tracked to ensure that the construction team constructs in accordance with the design documents and construction drawings, feedback during the construction process is collected, and necessary adjustments and improvements are made to the plan to further improve the construction quality and efficiency of the power station.
[0164] In step S500, in addition to completing the output and delivery of design documents and construction drawings, the importance of technical support and training is also emphasized. In order to ensure that the construction team can fully understand and correctly implement the requirements in the design documents and construction drawings, necessary technical support and training need to be provided. This link aims to improve the professional skills of the construction team and their understanding of the refined confluence division scheme, thereby ensuring the smooth progress of the construction process. During the construction process, the technical support team will provide necessary assistance and answer questions to ensure that the construction team can solve problems in a timely manner when they encounter them. At the same time, by tracking the implementation of the plan and collecting feedback during the construction process, necessary adjustments and improvements can be made to the plan to further improve the construction quality and efficiency of the power station.
[0165] It can also clarify the specific content and form of technical support and training, such as providing training courses, on-site guidance, technical manuals, etc., to ensure that the construction team can fully master the required skills. Secondly, the professionalism and experience of the technical support team can be emphasized. They should have rich experience in power plant construction and a deep technical background to ensure that they can provide high-quality technical support. In addition, when tracking the implementation of the plan, an effective communication mechanism can be established to ensure smooth information between the construction team and the technical support team so that problems can be discovered and adjusted in a timely manner. Finally, when collecting feedback during the construction process, feedback channels and feedback processing mechanisms can be established to ensure that feedback can be responded to and processed in a timely manner to further improve the plan and improve the quality of power plant construction.
[0166] This method of confluence division of distributed photovoltaic power stations first starts with data collection and processing. In step S100, various types of data closely related to distributed photovoltaic power stations are collected, which involve key information such as the location, power, current and voltage characteristics of photovoltaic strings, as well as roof structure, obstacle distribution, etc. Subsequently, these data are preprocessed, including data cleaning, outlier processing, coordinate transformation, etc., to ensure that the data used in subsequent analysis has a high degree of accuracy and consistency. Entering step S200, the principles of confluence division are determined according to the actual situation and design requirements of the power station. These principles are intended to ensure the precise matching of photovoltaic strings and inverters, optimize the current transmission path to reduce losses, and avoid situations that are not conducive to the operation of power stations, such as overly dense or isolated strings. Then, in step S300, based on the determined confluence division principles, a refined confluence division algorithm is designed. This algorithm will comprehensively consider multiple factors such as the output characteristics of photovoltaic strings, roof structure, obstacle distribution, etc., and use optimization algorithms such as genetic algorithms and neural network algorithms to calculate the optimal confluence division scheme. In step S400, the solution obtained by the refined confluence partitioning algorithm is strictly verified to ensure that it meets all principles and requirements. If the verification result does not meet expectations, the solution will be fine-tuned or optimized until the solution reaches the predetermined performance standard to ensure that the power generation efficiency and operation stability of the power station are improved. Finally, in step S500, the verified and optimized refined confluence partitioning solution is output as a design document or construction drawing. These documents and drawings will serve as guidance documents for the actual construction of distributed photovoltaic power stations to ensure that every link in the power station construction process strictly follows the optimal confluence partitioning solution.
[0167] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for dividing the flow of distributed photovoltaic power stations. It is characterized in that The following steps are involved: S100, data collection and processing: collect relevant data of distributed photovoltaic power stations, including the location, power, current and voltage characteristics, roof structure, and obstacle distribution information of photovoltaic strings, and pre-process these data, including data cleaning, outlier processing, and coordinate conversion, to ensure the accuracy and consistency of the data; S200, Determine the principles of bus division: Determine the principles of bus division according to the actual situation and design requirements of the power station. The principles include but are not limited to: ensuring that the current and voltage characteristics of the photovoltaic strings accurately match the input requirements of the inverter; considering the layout and direction of the photovoltaic strings to make the current transmission path shortest and the loss smallest; avoiding the strings being too dense or isolated; S300, refined confluence division algorithm: Design a refined confluence division algorithm, comprehensively consider the output characteristics of the photovoltaic strings, roof structure, and obstacle distribution factors, and calculate the optimal confluence division scheme through the optimization algorithm; S400, Scheme verification and optimization: Verify the scheme obtained by the refined confluence partitioning algorithm to ensure that the scheme meets all principles and requirements; S500, output and application: Output the verified refined confluence division scheme as a design document or construction drawing to guide the actual construction of distributed photovoltaic power stations.
2. A method for dividing the flow of a distributed photovoltaic power station according to claim 1, It is characterized in that The specific steps in step S100 include: S101. Collect PV string data: record the specific location of each PV string, including longitude and latitude or coordinates relative to a reference point, and collect the rated power, actual operating power, current and voltage key electrical characteristic data of each string; S102. Obtaining roof structure information: Learn the shape, size and material information of the roof in detail, and record any special structures or design features on the roof; S103. Investigate the distribution of obstacles: Identify and record all fixed or movable obstacles on the roof, determine the location, size and height of these obstacles, and the shadows or shading they may cause to the PV strings; S104, data cleaning: remove duplicate records, identify and delete obviously erroneous or unreasonable data points; S105, outlier processing: using statistical methods to identify and process outliers, and performing interpolation, average value replacement or deletion operations on the identified outliers; S106, coordinate conversion: if the collected position data is not in a unified coordinate system, convert it to the same coordinate system; S107, Data consistency check: Compare data collected from different sources or at different time points to ensure consistency and coherence between the data. For inconsistent data, further verification of the original data or correction is required; S108, data arrangement and storage: the cleaned and pre-processed data are arranged into a standard format for data storage.
3. A method for dividing the flow of a distributed photovoltaic power station according to claim 1, It is characterized in that The specific operation steps in step S200 include: S201. Matching PV strings with inverter requirements: Based on the collected PV string current and voltage characteristics, ensure that these characteristics accurately match the input requirements of the inverter. The maximum number of series modules designed for the PV array should ensure that the array output voltage does not exceed the maximum allowable input voltage of the PV inverter at the maximum open circuit voltage, and the array output current does not exceed the maximum input current of the inverter. S202, optimizing the current transmission path: considering the layout and direction of the photovoltaic strings, and making the current transmission path as short as possible by dividing the current; S203. Avoid too dense or isolated strings: When dividing the confluence, avoid too dense connection of PV strings to the same combiner box or inverter to prevent overload or hot spots. At the same time, avoid string isolation and ensure that each confluence area has enough PV strings connected to improve the overall efficiency and stability of the system. S204. Consider the scalability and maintainability of the power station: When determining the principles of confluence division, the future expansion needs of the power station should be taken into account to ensure that the current division plan can facilitate future expansion. At the same time, the maintainability of the power station should also be considered to make the confluence division plan convenient for daily operation and maintenance and troubleshooting.
4. A method for dividing the flow of a distributed photovoltaic power station according to claim 3, It is characterized in that When determining the convergence division principle in step S200, relevant design specifications and standards should be followed, including photovoltaic power station design specifications and inverter access standards. When determining the convergence division principle, the economic efficiency and technical feasibility of the power station should be comprehensively considered.
5. The method for dividing the flow of a distributed photovoltaic power station according to claim 1, It is characterized in that The specific operation steps in step S300 include: S301, initializing algorithm parameters: setting initial parameters of the algorithm according to the actual situation and design requirements of the power station; S302, establishing a mathematical model: establishing a mathematical model of flow division according to the output characteristics of the photovoltaic strings, the roof structure and the obstacle distribution information, wherein the model includes constraints of flow division; S303, encoding and decoding: encoding the confluence partitioning scheme into a format that can be processed by the algorithm, and decoding is to convert the encoding result output by the algorithm back to the actual confluence partitioning scheme; S304, fitness function design: design a fitness function to evaluate the pros and cons of each confluence division scheme; S305, optimization algorithm iteration: iteratively optimize the confluence partitioning scheme. In each iteration, the pros and cons of the current scheme are evaluated according to the fitness function, and a new scheme is generated through selection, crossover, and mutation operations. The iterative process is repeated until the termination condition is met, such as reaching the maximum number of iterations and the fitness function value converges; S306, result analysis and selection: Analyze and compare multiple confluence division schemes output by the optimization algorithm, and select the best scheme as the final result.
6. A method for dividing the flow of a distributed photovoltaic power station according to claim 1, It is characterized in that The specific steps in step S400 include: S401, simulation verification: using photovoltaic power station simulation software, import the solution obtained by the refined confluence division algorithm into the simulation environment, simulate the operation of the power station under different lighting conditions and temperature environmental factors in the simulation environment, and observe and record various performance indicators, such as system efficiency, power generation, and cable loss; S402, performance index analysis: Analyze the performance index in the simulation results, compare with the expected goals and design principles, and check whether the solution meets all principles and requirements; S403, fine-tuning and optimizing the solution: if it is found that the solution does not meet the principles or has poor performance, it is necessary to fine-tune or optimize the solution, repeat steps S100 and S200, and perform simulation verification and performance analysis on the fine-tuned solution again until all principles and requirements are met; S404. If conditions permit, conduct actual environmental testing on the fine-tuned scheme, install and operate the adjusted confluence division scheme at the power station site, observe and record the performance indicators under actual operation, compare the actual test results with the simulation results, and evaluate the feasibility and effectiveness of the scheme.
7. A method for dividing the flow of a distributed photovoltaic power station according to claim 1, It is characterized in that During the scheme verification and optimization process, risk assessment is carried out to identify possible risks and problems. According to the identified risks and problems, corresponding response measures and plans are formulated to ensure the stable operation and safety of the power station. The data, analysis results and conclusions in the verification and optimization process are compiled into a document or report. The document should include a detailed description of the scheme, verification process, performance indicator analysis, fine-tuning and optimization records, risk assessment and response measures, etc. The verified and optimized scheme is submitted to relevant departments or experts for review, and the scheme is further modified and improved according to the review opinions. After passing the review, the scheme is approved as the final confluence division scheme.
8. A method for dividing the flow of a distributed photovoltaic power station according to claim 7, It is characterized in that The specific steps in step S500 include: S501, collating verification results: Summarizing all data and results of solution verification and optimization in step S400 to ensure that all changes and fine-tuning have been fully considered and incorporated into the final solution; S502. Prepare design documents: Prepare detailed design documents to describe the specific contents of the refined confluence division scheme, including the layout of PV strings, the location of the combiner box, and the configuration of the inverter. The document shall include a detailed description of the scheme, design basis, performance indicator analysis, risk assessment, and countermeasures; S503, drawing construction drawings: drawing detailed construction drawings according to the scheme in the design document; S504, Review and Modification: Submit the design documents and construction drawings to relevant departments or experts for review, and make necessary modifications and improvements to the documents and drawings based on the review opinions to ensure that they meet the design requirements and construction standards; S505, Output and Delivery: Output the final design documents and construction drawings as electronic and paper files, and deliver them to the construction team and related personnel. Before delivery, ensure the completeness and accuracy of all documents and drawings to avoid omissions or errors.
Citation Information
Cited By
Simulation experiment design method and system based on DeepSeek large model
CN121031357A
Photovoltaic field area low-voltage AC / DC cable laying optimization design method
CN121413269A