Tablet computer intelligent management system and method based on 5G transmission

Through an intelligent management system based on 5G transmission, random forest and decision tree algorithms are used to identify the failure points of tablet computers and optimize resource configuration, the problems of slow response and performance degradation in the existing technology are solved, and rapid response and continuous optimization are achieved, improving User experience and device stability.

CN119095088AActive Publication Date: 2024-12-06SHENZHEN INCAR TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411385501.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-06
Estimated Expiration
2044-09-30

AI Technical Summary

Technical Problem

The existing tablet intelligent management system is slow to respond when the device fails and fails to effectively utilize the advantages of high-speed data transmission, resulting in delays and performance degradation of the equipment at critical moments, affecting user experience and device stability.

Method used

Adopt an intelligent management system based on 5G transmission, and collects data transmission rate and network delay information through the data acquisition and screening module. The intelligent fault analysis module uses a random forest algorithm to identify fault points. The response and configuration module uses a decision tree algorithm to determine the response strategy and maintain it. Evaluation and optimization modules record maintenance activities and realize real-time fault identification and resource optimization.

Benefits of technology

It significantly shortens fault diagnosis time, reduces equipment downtime, improves user experience, extends equipment service life, and ensures service sustainability and equipment stability through continuous maintenance performance evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119095088A_ABST
    Figure CN119095088A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tablet personal computers, in particular to a tablet personal computer intelligent management system and method based on 5G transmission, and the system comprises a data collection and screening module, an intelligent fault analysis module, a response and configuration module and a maintenance evaluation and optimization module. And collecting data transmission rate and network delay information uploaded by the tablet computer. According to the method, normal and abnormal behavior modes of the equipment can be effectively identified and classified by using the random forest and decision tree algorithm, accurate positioning of key fault points is realized, the fault diagnosis time is shortened, potential problems can be predicted and quickly responded, the downtime of the equipment is remarkably shortened, and the fault diagnosis efficiency is improved. The automatic response strategy reduces the operation burden of the user, the service life of the equipment is prolonged through continuous performance optimization, the overall user experience is improved, and the system ensures the service continuity and the equipment stability through continuous maintenance efficiency evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tablet computers, and in particular to a tablet computer intelligent management system and method based on 5G transmission. Background Art

[0002] Tablet computers emphasize portability, touch interface, and efficient wireless communication capabilities. The devices are usually equipped with large screens, thin and light designs, and integrate a variety of sensors such as accelerometers, gyroscopes, and GPS, making them adaptable to various interactions and environments. Tablet computers support a wide range of applications, from office automation to entertainment, from education to remote control, and can also achieve high-speed data transmission through wireless technologies such as Wi-Fi, Bluetooth, and 4G / 5G.

[0003] Among them, the tablet computer intelligent management system aims to improve the efficiency and intelligence level of device management. By integrating multiple management tools and applications, users can better monitor and control the various functions and resources of the tablet computer. Its uses include application management, data security protection, device performance monitoring, and automatic updates. It usually uses data analysis and machine learning technology to predict device problems and optimize performance to provide a personalized user experience.

[0004] Existing systems react only after a failure occurs, rather than managing preventively. This causes users to experience equipment freezes at critical moments, affecting work continuity and productivity. Existing technologies fail to effectively utilize the advantages of high-speed data transmission, and delays occur when processing complex data sets, limiting their ability to quickly adjust resource allocation in emergency situations. The lack of real-time optimization and predictive maintenance also makes equipment prone to performance degradation in long-term operation, increasing the risk of equipment failure and use. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings existing in the prior art and propose a tablet computer intelligent management system and method based on 5G transmission.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: a tablet computer intelligent management system based on 5G transmission, the system comprising:

[0007] The data collection and screening module performs parameter collection based on the 5G network, collects data transmission rate and network delay information uploaded by the tablet, summarizes battery power and application crash logs, screens key information in the data set, and generates a preliminary diagnostic data set;

[0008] The intelligent fault analysis module integrates the associated time series data based on the preliminary diagnosis data set, classifies the data using a random forest algorithm, distinguishes normal and abnormal behavior patterns, identifies key fault points of the tablet computer, and obtains fault identification indicators;

[0009] The response and configuration module uses a decision tree algorithm to analyze the urgency of the fault based on the fault identification index, determines the response process, and configures resource allocation of the tablet computer, including automatically restarting the application or adjusting performance allocation, and generates response strategy details;

[0010] The maintenance evaluation and optimization module records the effects of maintenance activities based on the response strategy details, sends the records to the maintenance database through the 5G network, evaluates the success rate and efficiency of the maintenance activities, and generates maintenance performance records.

[0011] The present invention is improved in that the steps of collecting the data transmission rate and network delay information are specifically as follows:

[0012] Based on the 5G network, the data transmission rate and network delay of the tablet are collected, and the formula is used:

[0013]

[0014] and

[0015] ND t =L t

[0016] Get the data transmission rate DTR per second t and network latency t , where S t Represents the amount of data uploaded in the tth second, T t Represents upload S t Time required, L t Represents network delay time;

[0017] The data transmission rate and network delay are integrated and the data is smoothly integrated using the formula:

[0018]

[0019] and

[0020]

[0021] Get the smoothed data transmission rate and network latency Among them, w i Represents the weight of the ith second, DTR i and ND i represents the data transmission rate and network delay at the tth second, and n is the time window size.

[0022] The present invention is improved in that the step of screening the key information is specifically as follows:

[0023] Summarize the battery power data and application crash logs, calculate the average battery power and the frequency of application crashes, using the formula:

[0024]

[0025] and

[0026]

[0027] Get the average battery power E avg and application crash frequency F crash , where E i represents the i-th battery charge reading, N is the total number of readings, T is the observation time interval, C total is the total number of crashes during the observation period;

[0028] Based on the average battery power value and the application crash frequency, data cleaning is performed to remove invalid or erroneous data, and key information in the data set is screened to obtain a preliminary diagnosis data set.

[0029] The present invention is improved in that the step of classifying the data is specifically as follows:

[0030] Based on the preliminary diagnostic data set, time series data, battery power and network latency information are collected and organized, using the formula:

[0031]

[0032] Get the standardized feature matrix Xd norm , where Xd represents the original data point, mean(Xd) is the mean of the data, and std(Xd) is the standard deviation of the data;

[0033] Based on the standardized feature matrix, the random forest algorithm is used to classify the data and optimize the accuracy of the classification results. The formula is:

[0034]

[0035] Get the classification result YX, where N d is the number of decision trees, Xt i is the classification function of the i-th tree, Xd norm is the normalized feature matrix.

[0036] The present invention is improved in that the step of obtaining the fault identification index is specifically as follows:

[0037] The generated abnormal category data is analyzed, including extracting key features and patterns, and calculating the contribution rate and relevance of each feature, using the formula:

[0038]

[0039] Get the feature set IScore associated with abnormal behavior, where F i Represents a single feature, Gain(F i ) represents the feature F i The contribution to improving model performance when building a decision tree, TGain is the total contribution of the feature, N s is the total number of features;

[0040] Based on the feature set associated with the abnormal behavior, a threshold is set to distinguish between normal and abnormal states, using the formula:

[0041] Threshold=μ index +k s ·σ index

[0042] Get the fault identification index, where μ index is the historical average of the selected fault indicator, σ index is the historical standard deviation, k s It is a coefficient used to adjust the threshold sensitivity, and Threshold is the threshold used to distinguish between normal and abnormal states.

[0043] The present invention is improved in that the steps of analyzing the urgency of the fault are specifically as follows:

[0044] Based on the fault identification index, the decision tree model is initialized to distinguish different types of faults and calculate the urgency score of each type using the formula:

[0045] U initial =a c ·F frequency +b c ·F impact

[0046] Get a preliminary emergency score U initial , where F frequency and F impact Represent the frequency and impact of failures, respectively. c and b c is the parameter influence weight;

[0047] Based on the preliminary urgency score, combined with the fault history data and potential development trends, the formula is used:

[0048] U final =U initial +c f ·H history +d f ·P potential

[0049] Get the urgency score U of the fault final , where H history and P potential Represent historical failure data and potential impact, c f and d f is the corresponding adjustment coefficient, U initial It is the preliminary emergency score.

[0050] The present invention is improved in that the step of obtaining the response strategy details is specifically as follows:

[0051] According to the current total resources and emergency failures, the matching degree of resource demand is evaluated using the formula:

[0052]

[0053] Get the resource matching result R match , where C r Represents the current amount of CPU resources, M r Represents the current amount of memory resources, D r Represents the CPU demand during a failure, N r represents the memory requirement at the time of failure, α g and β g is the adjustment factor, which is used to adjust resource requirements according to the current load;

[0054] Based on the resource matching result, the resource adjustment configuration is determined using the judgment formula:

[0055]

[0056] Get the response strategy detailsAdjust Type , where R match is the resource matching result, γ o , δ o and o is the adjustment factor.

[0057] The present invention is improved in that the steps of obtaining the maintenance performance record are specifically as follows:

[0058] Based on the response strategy details, the maintenance activity effects are recorded using the formula:

[0059]

[0060] Get the maintenance effectiveness score RJ, where lc i is the completion degree of activity i, le i is the effect score of activity i, lv i is the weight of activity i, ln is the total number of maintenance activities;

[0061] Based on the maintenance efficiency score, the data is sent to the maintenance database via the 5G network, and the rate and integrity of data transmission are verified to obtain a record of successful data reception;

[0062] Based on the data successfully received records, calculate and analyze the success rate of maintenance activities, using the formula:

[0063]

[0064] The success rate and efficiency SR of the maintenance activity are obtained, where Nl s is the number of successful maintenance activities, Nl t is the total maintenance activity quantity.

[0065] The tablet computer intelligent management method based on 5G transmission is executed based on the above-mentioned tablet computer intelligent management system based on 5G transmission, and includes the following steps:

[0066] S1: Based on the 5G network, it receives the data transmission rate and network delay information of the tablet computer, summarizes the battery power and application crash logs, and filters the key information in the status data to generate a preliminary diagnostic data set;

[0067] S2: Based on the preliminary diagnostic data set, integrate the associated time series data, identify normal and abnormal behavior patterns, locate the key failure points of the tablet computer, and use the failure modes of indicator classification differences to obtain fault identification indicators;

[0068] S3: Analyze the urgency and impact scope of the fault according to the fault identification index, configure a response process for high-risk fault points, perform delayed processing for low-risk faults, configure resource allocation for the tablet computer, and generate response strategy details;

[0069] S4: Based on the response strategy details, record the effect of response execution, upload the data of maintenance activities to the maintenance database through the 5G network, extract key performance data, and generate maintenance effectiveness records;

[0070] S5: Using the maintenance effectiveness record, evaluate the effectiveness of maintenance activities, analyze the success rate and efficiency of various tablet computer maintenance activities, identify potential areas for optimization, and generate identification optimization results.

[0071] Compared with the prior art, the advantages and positive effects of the present invention are:

[0072] In the present invention, by utilizing random forest and decision tree algorithms, normal and abnormal behavior patterns of equipment can be effectively identified and classified, and critical fault points can be accurately located, which not only shortens the time for fault diagnosis, but also predicts potential problems and responds quickly, significantly reducing equipment downtime. The automated response strategy reduces the user's operating burden, and through continuous performance optimization, extends the service life of the equipment and improves the overall user experience. The system ensures service continuity and equipment stability through continuous maintenance performance evaluation and self-optimization. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Figure 1 The module diagram of the tablet computer intelligent management system based on 5G transmission is proposed for the present invention;

[0074] Figure 2 It is a flow chart for collecting data transmission rate and network delay information in the present invention;

[0075] Figure 3 It is a flow chart for screening key information in the present invention;

[0076] Figure 4 This is a flow chart of classifying data in the present invention;

[0077] Figure 5 A flowchart for obtaining fault identification indicators in the present invention;

[0078] Figure 6 This is a flow chart for analyzing the urgency of a fault in the present invention;

[0079] Figure 7 A flowchart for obtaining the response strategy details in the present invention;

[0080] Figure 8 The figure is a flowchart for obtaining the maintenance performance record in the present invention. DETAILED DESCRIPTION

[0081] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0082] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0083] Example

[0084] See also Figure 1 The present invention provides a technical solution: a tablet computer intelligent management system based on 5G transmission includes:

[0085] The data collection and screening module performs parameter collection based on the 5G network, collects data transmission rate and network delay information uploaded by the tablet, summarizes battery power and application crash logs, screens key information in the data set, and generates a preliminary diagnostic data set;

[0086] Based on the preliminary diagnosis data set, the intelligent fault analysis module integrates the associated time series data, uses the random forest algorithm to classify the data, distinguishes normal and abnormal behavior patterns, identifies the key fault points of the tablet computer, and obtains the fault identification index;

[0087] The response and configuration module uses a decision tree algorithm to analyze the urgency of the fault based on the fault identification index, determine the response process, and configure the resource allocation of the tablet computer, including automatically restarting the application or adjusting the performance allocation, and generating response strategy details;

[0088] The maintenance evaluation and optimization module records the effectiveness of maintenance activities based on the response strategy details, sends the records to the maintenance database through the 5G network, evaluates the success rate and efficiency of maintenance activities, and generates maintenance effectiveness records.

[0089] The preliminary diagnostic data set includes data transmission efficiency, network stability indicators, battery status logs, and application stability analysis logs. Fault identification indicators include abnormal behavior types, key fault locations, and abnormality levels. Response strategy details include emergency response levels, resource reallocation plans, and performance optimization plans. Maintenance effectiveness records include maintenance operation success rates, maintenance efficiency evaluation results, and communication efficiency records.

[0090] See also Figure 2 ,The specific steps for collecting data transmission rate and network delay information are:

[0091] Based on the 5G network, the data transmission rate and network delay of the tablet are collected, and the formula is used:

[0092]

[0093] and

[0094] ND t =L t

[0095] Get the data transmission rate DTR per second t and network latency t , where S t Represents the amount of data uploaded in the tth second, T t Represents upload S t Time required, L t Represents network delay time;

[0096] Integrate the data transmission rate and network delay, and smooth the integrated data using the formula:

[0097]

[0098] and

[0099]

[0100] Get the smoothed data transmission rate and network latency Among them, w i Represents the weight of the ith second, DTR i and ND i represents the data transmission rate and network delay at the tth second, and n is the time window size.

[0101] In one measurement, the tablet uploaded 2048 bytes of data in 1 second, with an upload time of 0.8 seconds and a measured network latency of 35 milliseconds.

[0102] Calculation of data transfer rate:

[0103]

[0104] Network delay record:

[0105] ND t =35ms

[0106] 2560bytes / s means the amount of data uploaded per second;

[0107] 35ms is the network delay time at the time of measurement.

[0108] Calculate the weighted average of the past three seconds, using the aforementioned weights and data transfer rate, and collect DTRs of 2500, 2600, and 2700 bytes / s, with weights of 0.2, 0.3, and 0.5, respectively.

[0109] Calculation of weighted average data transfer rate:

[0110]

[0111] Calculate the weighted average network latency, and the collected NDs are 33ms, 36ms, and 35ms respectively:

[0112]

[0113] 2630 bytes / s represents the weighted average data transfer rate over the past three seconds;

[0114] 34.9ms represents the weighted average network latency over the past three seconds.

[0115] See also Figure 3 , the specific steps for screening key information are:

[0116] Summarize battery power data and application crash logs to calculate the average battery power and the frequency of application crashes using the formula:

[0117]

[0118] and

[0119]

[0120] Get the average battery power E avg and application crash frequency F crash , where E i represents the i-th battery charge reading, N is the total number of readings, T is the observation time interval, C total is the total number of crashes during the observation period;

[0121] Based on the average battery power and application crash frequency, data cleaning is performed to remove invalid or erroneous data, and key information in the data set is filtered to obtain a preliminary diagnostic data set.

[0122] There are 5 power measurements in one day, and the values ​​are: 80%, 70%, 75%, 65% and 85%;

[0123] The steps to calculate the average power are as follows:

[0124] Sum the power percentage:

[0125] 80+70+75+65+85=375%

[0126] Calculate the average:

[0127]

[0128] The resulting 75% is the average battery charge for the day.

[0129] T is 1 day;

[0130] If the application crashes 10 times in one day and the number of days is 1, then:

[0131] Calculate frequency:

[0132]

[0133] The results obtained indicate that the application crashes 10 times per day.

[0134] Two data points were monitored, the battery readings were 105% and 95%, and the crash log integrity was incomplete and complete respectively, and the judgment threshold was set to 100%;

[0135] For the first data point, 105% is greater than 100%, so the first data point is invalid due to the out-of-range value and incomplete log;

[0136] For the second data point, 95% is less than 100%, so the second data point is valid because it meets all the criteria.

[0137] See also Figure 4 , the specific steps for classifying data are:

[0138] Based on the preliminary diagnostic data set, time series data, battery power and network latency information are collected and organized, using the formula:

[0139]

[0140] Get the standardized feature matrix Xd norm , where Xd represents the original data point, mean(Xd) is the mean of the data, and std(Xd) is the standard deviation of the data;

[0141] Based on the standardized feature matrix, the random forest algorithm is used to classify the data and optimize the accuracy of the classification results. The formula is:

[0142]

[0143] Get the classification result YX, where N d is the number of decision trees, Xt i is the classification function of the i-th tree, Xd norm is the normalized feature matrix.

[0144] The battery charge data at 5 measurement points in one day are [80%, 85%, 75%, 70%, 65%];

[0145] mean(Xd) is calculated as

[0146] std(Xd) is calculated as

[0147] Calculate the difference between each data point and the mean [5%, 10%, 0%, -5%, -10%];

[0148] Calculate the variance:

[0149]

[0150] Calculate the standard deviation:

[0151]

[0152] The standardized data is more suitable for processing.

[0153] Normalize each data point and wait.

[0154] Let N d is 100, and the classification result of each tree for the same data point is 1 (abnormal) or 0 (normal);

[0155] Assume that among 100 trees, 60 trees classify a data point as an anomaly, then the classification result of the point is:

[0156]

[0157] Indicates that the data point tends to be classified as an anomaly.

[0158] See also Figure 5 , the specific steps for obtaining fault identification indicators are:

[0159] The generated abnormal category data is analyzed, including extracting key features and patterns, and calculating the contribution rate and relevance of each feature, using the formula:

[0160]

[0161] Get the feature set IScore associated with abnormal behavior, where F i Represents a single feature, Gain(F i ) represents the feature F i The contribution to improving model performance when building a decision tree, TGain is the total contribution of the feature, N sis the total number of features;

[0162] Based on the feature set associated with abnormal behavior, a threshold is set to distinguish between normal and abnormal states using the formula:

[0163] Threshold=μ index +k s ·σ index

[0164] Get the fault identification index, where μ index is the historical average of the selected fault indicator, σ index is the historical standard deviation, k s It is a coefficient used to adjust the threshold sensitivity, and Threshold is the threshold used to distinguish between normal and abnormal states.

[0165] There are three features F1, F2, and F3, whose contribution to the improvement in random forest is 30, 20, and 10 respectively.

[0166] Calculate the total contribution: TGain = 30 + 20 + 10 = 60

[0167]

[0168] The scores show that F1 is the most important feature and contributes the most to the improvement of the model, while F3 contributes the least.

[0169] Assume that the historical average value of the fault index μ index is 0.2, standard deviation σ index is 0.05, k s is 3;

[0170] Calculate the threshold:

[0171] Threshold=0.2+3×0.05=0.35;

[0172] The threshold is used for fault detection. When the real-time monitored fault index exceeds 0.35, the system triggers an alarm, indicating that the abnormal behavior exceeds three standard deviations of the historical range, and there is a high probability that the system status is abnormal.

[0173] See also Figure 6 , the specific steps for analyzing the urgency of the fault are:

[0174] Based on the fault identification index, the decision tree model is initialized to distinguish different types of faults and calculate the urgency score of each type using the formula:

[0175] U initial =a c ·F frequency +b c ·Fimpact

[0176] Get a preliminary emergency score U initial , where F frequency and F impact Represent the frequency and impact of failures, respectively. c and b c is the parameter influence weight;

[0177] Based on the preliminary urgency score, combined with the fault history data and potential development trends, the formula is used:

[0178] U final =U initial +c f ·H history +d f ·P potential

[0179] Get the urgency score U of the fault final , where H history and P potential Represent historical failure data and potential impact, c f and d f is the corresponding adjustment coefficient, U initial It is the preliminary emergency score.

[0180] Detected F frequency 0.3 times / hour, F impact The evaluation is 0.7;

[0181] Let weight a c = 0.6 and b c =0.4;

[0182] Calculate the preliminary urgency score:

[0183] U initial =0.6·0.3+0.4·0.7=0.18+0.28=0.46

[0184] A score of 0.46 indicates that the fault has a medium urgency, and this score will be used for further evaluation in subsequent analysis.

[0185] Collect H history = 0.2 and P potential =0.5;

[0186] Let weight c f = 0.5 and d f =0.5.

[0187] Refine the urgency score of the fault:

[0188] U final=0.46+0.5·0.2+0.5.0.5=0.46+0.1+0.25=0.81

[0189] The calculated value of 0.81 indicates that this fault has a high urgency and needs to be handled with priority.

[0190] See also Figure 7 , the specific steps for obtaining the response policy details are:

[0191] According to the current total resources and emergency failures, the matching degree of resource demand is evaluated using the formula:

[0192]

[0193] Get the resource matching result R match , where C r Represents the current amount of CPU resources, M r Represents the current amount of memory resources, D r Represents the CPU demand during a failure, N r represents the memory requirement at the time of failure, α g and β g is the adjustment factor, which is used to adjust resource requirements according to the current load;

[0194] Based on the resource matching results, determine the resource adjustment configuration and use the judgment formula:

[0195]

[0196] Get the response strategy detailsAdjust Type , where R match is the resource matching result, γ o , δ o and o It is an adjustment factor used to determine the strategy and intensity of resource adjustment.

[0197] The current tablet has a 4-core CPU (C r =4) and 8GB RAM (M r =8);

[0198] Fault handling requires a 2-core CPU (D r =2) and 4GB RAM (N r =4);

[0199] Assume adjustment coefficient α g =1.2 and β g =0.8;

[0200] Computing resource matching:

[0201]

[0202] The result value of 261.54% indicates that the current resources far exceed the fault handling requirements, indicating that the resources are over-allocated. o =0.5,δ o =1 and ζ o =0.2; Based on the above results, 261.54 should be greater than 120, so:

[0203] ζ o ·R match =0.2×261.54=52.31

[0204] 52.31% indicated that resource allocation needs to be reduced to approximately half to improve system efficiency;

[0205] When it is less than 80%, the resource classification amount needs to be increased, and when it is between 80%-120%, it remains unchanged.

[0206] See also Figure 8 , the specific steps for obtaining maintenance performance records are:

[0207] Based on the response strategy details, the maintenance activity effects are recorded using the formula:

[0208]

[0209] Get the maintenance effectiveness score RJ, where lc i is the completion degree of activity i, le i is the effect score of activity i, lv i is the weight of activity i, ln is the total number of maintenance activities;

[0210] Based on the maintenance efficiency score, the data is sent to the maintenance database through the 5G network, and the speed and integrity of data transmission are verified to obtain a record of successful data reception;

[0211] Based on the data successfully received records, calculate and analyze the success rate of maintenance activities using the formula:

[0212]

[0213] The success rate and efficiency SR of the maintenance activity are obtained, where Nl s is the number of successful maintenance activities, Nl t is the total maintenance activity quantity.

[0214] Assume there are three maintenance activities:

[0215] Activity 1: completion degree is 1, effect score is 8, and weight is 0.3;

[0216] Activity 2: completion degree is 0.8, effect score is 7, and weight is 0.4;

[0217] Activity 3: The completion degree is 0.9, the effect score is 9, and the weight is 0.3.

[0218] Calculation process:

[0219] RJ=(1×8×0.3)+(0.8×7×0.4)+(0.9×9×0.3)

[0220] RJ=2.4+2.24+2.43

[0221] RJ=7.07

[0222] The maintenance effectiveness score obtained was 7.07, which represents a comprehensive assessment of the quality and effectiveness of the overall activity completed.

[0223] A total of 20 maintenance activities were monitored, of which 18 were successful.

[0224] Calculation process:

[0225]

[0226] SR=0.9×100%

[0227] SR=90%

[0228] The maintenance activity success rate obtained was 90%, indicating that most maintenance activities met the expected success criteria.

[0229] The tablet computer intelligent management method based on 5G transmission includes the following steps:

[0230] S1: Based on the 5G network, it receives the data transmission rate and network delay information of the tablet computer, summarizes the battery power and application crash logs, and filters the key information in the status data to generate a preliminary diagnostic data set;

[0231] S2: Based on the preliminary diagnosis data set, the associated time series data is integrated to identify normal and abnormal behavior patterns, locate the key failure points of the tablet computer, and use the failure modes of indicator classification differences to obtain fault identification indicators;

[0232] S3: Analyze the urgency and impact of the fault based on the fault identification indicators, configure the response process for high-risk fault points, perform delayed processing for low-risk faults, configure the resource allocation of the tablet computer, and generate response strategy details;

[0233] S4: Based on the response strategy details, record the effect of response execution, upload the data of maintenance activities to the maintenance database through the 5G network, extract key performance data, and generate maintenance effectiveness records;

[0234] S5: Use maintenance effectiveness records to evaluate the effectiveness of maintenance activities, analyze the success rate and efficiency of various tablet maintenance activities, identify potential areas for optimization, and generate identified optimization results.

[0235] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. The tablet computer intelligent management system based on 5G transmission is characterized by: The system comprises: The data collection and screening module performs parameter collection based on the 5G network, collects data transmission rate and network delay information uploaded by the tablet, summarizes battery power and application crash logs, screens key information in the data set, and generates a preliminary diagnostic data set; The intelligent fault analysis module integrates the associated time series data based on the preliminary diagnosis data set, classifies the data using a random forest algorithm, distinguishes normal and abnormal behavior patterns, identifies key fault points of the tablet computer, and obtains fault identification indicators; The response and configuration module uses a decision tree algorithm to analyze the urgency of the fault based on the fault identification index, determines the response process, and configures resource allocation of the tablet computer, including automatically restarting the application or adjusting performance allocation, and generates response strategy details; The maintenance evaluation and optimization module records the effects of maintenance activities based on the response strategy details, sends the records to the maintenance database through the 5G network, evaluates the success rate and efficiency of the maintenance activities, and generates maintenance performance records.

2. According to claim 1, the tablet computer intelligent management system based on 5G transmission is characterized in that: The steps for collecting the data transmission rate and network delay information are specifically as follows: Based on the 5G network, the data transmission rate and network delay of the tablet are collected, and the formula is used: and ND t =L t Get the data transmission rate DTR per second t and network latency t , where S t Represents the amount of data uploaded in the tth second, T t Represents upload S t Time required, L t Represents network delay time; The data transmission rate and network delay are integrated and the data is smoothly integrated using the formula: and Get the smoothed data transmission rate and network latency Among them, w i Represents the weight of the ith second, DTR i and ND i represents the data transmission rate and network delay at the tth second, and n is the time window size.

3. According to claim 1, the tablet computer intelligent management system based on 5G transmission is characterized in that: The steps for screening the key information are specifically as follows: Summarize the battery power data and application crash logs, calculate the average battery power and the frequency of application crashes, using the formula: and Get the average battery power E avg and application crash frequency F crash , where E i represents the i-th battery charge reading, N is the total number of readings, T is the observation time interval, C total is the total number of crashes during the observation period; Based on the average battery power value and the application crash frequency, data cleaning is performed to remove invalid or erroneous data, and key information in the data set is screened to obtain a preliminary diagnosis data set.

4. According to claim 1, the tablet computer intelligent management system based on 5G transmission is characterized in that: The steps of classifying the data are specifically as follows: Based on the preliminary diagnostic data set, time series data, battery power and network latency information are collected and organized, using the formula: Get the standardized feature matrix Xd norm , where Xd represents the original data point, mean(Xd) is the mean of the data, and std(Xd) is the standard deviation of the data; Based on the standardized feature matrix, the random forest algorithm is used to classify the data and optimize the accuracy of the classification results. The formula is: Get the classification result YX, where N d is the number of decision trees, Xt i is the classification function of the i-th tree, Xd norm is the normalized feature matrix.

5. The tablet computer intelligent management system based on 5G transmission according to claim 1 is characterized in that: The steps for obtaining the fault identification index are specifically as follows: The generated abnormal category data is analyzed, including extracting key features and patterns, and calculating the contribution rate and relevance of each feature, using the formula: Get the feature set IScore associated with abnormal behavior, where F i Represents a single feature, Gain(F i ) represents the feature F i The contribution to improving model performance when building a decision tree, TGain is the total contribution of the feature, N s is the total number of features; Based on the feature set associated with the abnormal behavior, a threshold is set to distinguish between normal and abnormal states, using the formula: Threshold=μ index +k s ·σ index Get the fault identification index, where μ index is the historical average value of the selected fault indicator, σ index is the historical standard deviation, k s It is a coefficient used to adjust the threshold sensitivity, and Threshold is the threshold used to distinguish between normal and abnormal states.

6. The tablet computer intelligent management system based on 5G transmission according to claim 1 is characterized in that: The steps for analyzing the urgency of the fault are specifically as follows: Based on the fault identification index, the decision tree model is initialized to distinguish different types of faults and calculate the urgency score of each type using the formula: U initial =a c ·F frequency +b c ·F impact Get a preliminary emergency score U initial , where F frequency and F impact Represent the frequency and impact of failures, respectively. c and b c is the parameter influence weight; Based on the preliminary urgency score, combined with the fault history data and potential development trends, the formula is used: U final =U initial +c f ·H history +d f ·P potential Get the urgency score U of the fault final , where H history and P potential Represent historical failure data and potential impact, c f and d f is the corresponding adjustment coefficient, U initial It is the preliminary emergency score.

7. The tablet computer intelligent management system based on 5G transmission according to claim 1 is characterized in that: The steps for obtaining the response strategy details are as follows: According to the current total resources and emergency failures, the matching degree of resource demand is evaluated using the formula: Get the resource matching result R match , where C r Represents the current amount of CPU resources, M r Represents the current amount of memory resources, D r Represents the CPU demand during a failure, N r represents the memory requirement at the time of failure, α g and β g is the adjustment factor, which is used to adjust resource requirements according to the current load; Based on the resource matching result, the resource adjustment configuration is determined using the judgment formula: Get the response strategy detailsAdjust Type , where R match is the resource matching result, γ o , δ o and o is the adjustment factor.

8. The tablet computer intelligent management system based on 5G transmission according to claim 1 is characterized in that: The steps for obtaining the maintenance performance record are specifically as follows: Based on the response strategy details, the maintenance activity effects are recorded using the formula: Get the maintenance effectiveness score RJ, where lc i is the completion degree of activity i, le i is the effect score of activity i, lv i is the weight of activity i, ln is the total number of maintenance activities; Based on the maintenance efficiency score, the data is sent to the maintenance database via the 5G network, and the rate and integrity of data transmission are verified to obtain a record of successful data reception; Based on the data successfully received records, calculate and analyze the success rate of maintenance activities, using the formula: The success rate and efficiency SR of the maintenance activity are obtained, where Nl s is the number of successful maintenance activities, Nl t is the total maintenance activity quantity.

9. A tablet computer intelligent management method based on 5G transmission, characterized in that: The tablet computer intelligent management system based on 5G transmission according to any one of claims 1 to 8 is implemented, comprising the following steps: Based on the 5G network, the data transmission rate and network delay information of the tablet computer are received, the battery power and application crash logs are summarized, and the key information in the status data is filtered to generate a preliminary diagnostic data set; Based on the preliminary diagnostic data set, the associated time series data is integrated to identify normal and abnormal behavior patterns, locate the key failure points of the tablet computer, and obtain the failure identification indicators by using the failure modes of the indicator classification differences; According to the fault identification index, analyze the urgency and impact scope of the fault, configure the response process for high-risk fault points, perform delayed processing for low-risk faults, configure resource allocation for the tablet computer, and generate response strategy details; Based on the response strategy details, record the effect of response execution, upload the data of maintenance activities to the maintenance database through the 5G network, extract key performance data, and generate maintenance effectiveness records; The maintenance effectiveness records are used to evaluate the effects of maintenance activities, analyze the success rates and efficiencies of various tablet computer maintenance activities, identify potential areas for optimization, and generate identification optimization results.

Citation Information

Patent Citations

  • Wind turbine generator remote fault diagnosis method and system based on cloud platform

    CN117930815A

  • Wireless communication network fault prediction method and system

    CN118075791A

  • Micro-grid equipment state intelligent diagnosis and alarm notification system

    CN118249504A

  • Fault processing system, fault processing method and related equipment

    CN118312339A

  • Remote control distributed energy station intelligent operation and maintenance management system and method

    CN118348878A