Operation error monitoring method and system based on direct current charging pile

The charging data of DC charging piles is obtained and corrected through the central control platform, and the abnormal charge deduction and power error problems of DC charging piles are solved, ensuring the expected status of the charging equipment, and improving the efficiency and life of the equipment.

CN119099418APending Publication Date: 2024-12-10江西驴充充物联网科技有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411581679.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

Existing DC charging piles may cause abnormal charge deductions and errors between output power and input power when charging, resulting in the charging device being unable to achieve the expected charging state.

Method used

The charging power of the charging pile, the unit charging price and the real-time power of the charging device are obtained through the central control platform, the remaining charging amount is calculated and corrected, and the charging amount is adjusted according to the power compensation amount to ensure that the charging device can reach the expected energy state.

Benefits of technology

It effectively avoids abnormal charge deductions, eliminates abnormal operation of DC charging piles, and improves the efficiency of charging equipment and the service life of DC charging piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119099418A_ABST
    Figure CN119099418A_ABST
Patent Text Reader

Abstract

The invention discloses an operation error monitoring method and system based on a direct current charging pile, and relates to the technical field of charging piles, and the method comprises the steps: carrying out the data reading of an order platform, and obtaining the charging power, the charging unit price, the total charging amount, the charged time, the type of charging equipment, and the first residual energy of the charging equipment of the charging pile; according to the method, the charging real-time power of the charging equipment is obtained by calculating the residual energy when the charging equipment is not charged and the residual energy after the charging equipment is charged for a period of time, then the charging real-time power of the charging equipment and the charging power of the charging pile are calculated, the power compensation amount is determined, and the charging residual amount is compensated according to the power compensation amount. According to the method, the energy of the charging equipment can reach the corresponding state through the fixed charging amount, in addition, the charging real-time power of the charging equipment and the charging power of the charging pile are analyzed, the abnormal problem of the direct-current charging pile can be eliminated, normal use of the direct-current charging pile can be guaranteed, and the service life of the direct-current charging pile is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of charging piles, and in particular to an operation error monitoring method and system based on a direct current charging pile. Background Art

[0002] A charging pile refers to a charging device that provides charging services for electric vehicles.

[0003] Charging piles are mainly divided into floor-standing charging piles and wall-mounted charging piles, which mainly adopt the charging methods of time-based, electricity-metered, and amount-based. Charging piles can be fixed on the ground or on the wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations, and can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected to the AC power grid, and the output end is equipped with a charging plug for charging electric vehicles. Charging piles are mainly public charging piles, which generally provide two charging methods: conventional charging and fast charging. People can use a specific charging card to swipe the card on the human-computer interaction interface provided by the charging pile to perform corresponding charging methods, charging time, and cost data printing. The charging pile display can display data such as charging amount, cost, and charging time.

[0004] When charging a charging device, an existing DC charging pile will transmit real-time data to an ordering platform. When the ordering platform fails, abnormal deductions may occur, resulting in the fixed charging amount not allowing the charging device to reach the corresponding charging state. In addition, when a DC charging pile operates abnormally, a large error may occur between the output power of the DC charging pile and the input power of the charging device. Summary of the invention

[0005] In order to solve the above technical problems, a method and system for monitoring operation errors based on a DC charging pile are provided. The technical solution solves the problem that the existing DC charging pile proposed in the above background technology transmits real-time data to the order platform when charging the charging device. When the order platform fails, abnormal deductions may occur, resulting in the fixed charging amount not making the charging device reach the corresponding charging state. In addition, when the DC charging pile operates abnormally, a large error may occur between the output power of the DC charging pile and the input power of the charging device.

[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is: A method for monitoring operation errors of a DC charging pile, comprising: Based on the central control platform, the order platform is read to obtain the charging power, charging unit price, total charging amount, charging time, charging equipment type and the first remaining energy of the charging equipment; Calculate and process the remaining amount of charging according to the charging power, charging unit price, charging time and total charging amount of the charging pile; Based on the central control platform, analyze the type of charging equipment and obtain the real-time charging power; Based on the charging power of the charging pile and the real-time charging power, the remaining amount of charging is corrected to obtain the corrected remaining amount of charging; The charging completion time is obtained by analyzing and processing the corrected remaining charging amount, real-time charging power and charging unit price.

[0007] Preferably, the specific calculation formula for obtaining the remaining amount of charging is:

[0008] In the formula, The remaining amount for charging; is the total amount of charging; Charging power for charging pile; Is the charging time; The unit price for charging.

[0009] Preferably, the analyzing the charging device type based on the central control platform to obtain the real-time charging power specifically includes the following steps: Based on the type of charging equipment, information is retrieved from the database system to obtain the communication protocol corresponding to the charging equipment; Based on the communication protocol corresponding to the charging equipment, the central control platform establishes a communication connection with the charging equipment; Based on the central control platform, a data transmission instruction is sent to the charging device to obtain the second residual energy of the charging device; Calculate and process the first remaining energy of the charging device and the second remaining energy of the charging device to obtain charged energy information; Calculate and process the charged energy information and the charging time to obtain the real-time charging power; The specific calculation formula for obtaining the real-time charging power is:

[0010] In the formula, Real-time power for charging; It is the second surplus energy source for charging equipment; It is the first surplus energy source for charging equipment; The charging time.

[0011] Preferably, the method of correcting the remaining amount of charging based on the charging power of the charging pile and the real-time charging power, and obtaining the corrected remaining amount of charging specifically comprises the following steps: Based on the central control platform, the charging power of the charging pile and the real-time charging power are calculated and processed to obtain the power offset; Perform judgment processing according to the power offset and the set first threshold to determine the power compensation amount, wherein the power compensation amount includes a first compensation amount and a second power compensation amount; Based on the power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a corrected remaining amount of charging, wherein the corrected remaining amount of charging includes a first corrected remaining amount of charging and a second corrected remaining amount of charging; The specific calculation formula for obtaining the power offset is:

[0012] In the formula, is the power offset; Charging power for charging pile; Real-time power for charging.

[0013] Preferably, the determination of the power compensation amount by judging the power offset and setting the first threshold value specifically comprises the following steps: Making a judgment based on the power offset and a set first threshold; If the power offset is greater than the set first threshold, the output power first compensation amount ; If the power offset is equal to the set first threshold, the output charging power of the charging pile is the same as the real-time charging power, and there is no need to correct the remaining amount of charging; If the power offset is less than the set first threshold, the output power second compensation amount .

[0014] Preferably, the method of correcting the remaining amount of charging based on the power compensation amount and the charging unit price, and obtaining the corrected remaining amount of charging specifically comprises the following steps: If the power compensation amount is the first power compensation amount ; Based on the first power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a first corrected remaining amount of charging; The specific calculation formula for obtaining the first modified charging remaining amount is:

[0015] In the formula, Charge the remaining amount for the first amendment; The remaining amount for charging; is the first power compensation amount; Is the charging time; is the charging unit price; If the power compensation amount is the second power compensation amount ; Based on the second power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a second corrected remaining amount of charging; The specific calculation formula for obtaining the second modified charging remaining amount is:

[0016] In the formula, Charge the remaining amount for the second amendment; The remaining amount for charging; is the second power compensation amount; Is the charging time; The unit price for charging.

[0017] Preferably, the analysis and processing based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the charging completion time specifically includes the following steps: Calculate and process based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time, where the remaining charging time includes a first remaining charging time and a second remaining charging time; The charging completion time is obtained by performing calculation based on the remaining charging time and the charged time. The charging completion time includes a first charging completion time and a second charging completion time.

[0018] Preferably, the calculation and processing based on the modified remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time specifically includes the following steps: If the revised charging remaining amount is the first revised charging remaining amount; Calculate and process the first remaining charging time according to the first corrected remaining charging amount, the real-time charging power, and the charging unit price; The specific calculation formula for obtaining the remaining time of the first charge is:

[0019] In the formula, The remaining time for the first charge; Charge the remaining amount for the first amendment; Real-time power for charging; is the charging unit price; If the revised charging remaining amount is the second revised charging remaining amount; Calculate and process the remaining amount of the second corrected charging, the real-time charging power, and the charging unit price to obtain the remaining time of the second charging; The specific calculation formula for obtaining the second remaining charging time is:

[0020] In the formula, The remaining time for the second charge; Charge the remaining amount for the second amendment; Real-time power for charging; The unit price for charging.

[0021] Preferably, the calculation and processing based on the remaining charging time and the charged time to obtain the charging completion time specifically includes the following steps: If the remaining charging time is the first remaining charging time; Calculate and process the first charging remaining time and the charging time to obtain the first charging completion time; If the remaining charging time is the second remaining charging time; Calculation is performed based on the second remaining charging time and the charged time to obtain the second charging completion time.

[0022] Furthermore, a DC charging pile-based operation error monitoring system is proposed, which is used to implement the above-mentioned DC charging pile-based operation error monitoring method, including: Central control platform, which is used to control data transmission and information interaction between various modules; An order platform, which is used to display the charging power of the charging pile, the charging unit price, the total charging amount, the charging time, the charging device type and the first remaining energy of the charging device; A database system, the database system is used to store relevant parameters corresponding to charging equipment types; A data calculation module, wherein the data calculation module calculates according to the charging power of the charging pile and the real-time charging power to obtain the power offset, the data calculation module calculates according to the charging power of the charging pile, the charging unit price, the charging time and the total charging amount to obtain the remaining charging amount, and the data calculation module calculates according to the charged energy information and the charging time to obtain the real-time charging power; A comparison and judgment module, wherein the comparison and judgment module makes a judgment based on the power offset and a set first threshold value, determines the power compensation amount, and obtains the first power compensation amount and the second power compensation amount; The correction module corrects the remaining amount of charging according to the power compensation amount and the charging unit price to obtain the corrected remaining amount of charging. The correction module calculates according to the remaining charging time and the charging time to obtain the charging completion time.

[0023] Compared with the prior art, the present invention provides an operation error monitoring method and system based on a DC charging pile, which has the following beneficial effects: The present invention calculates the remaining energy when the charging device is not charged and the remaining energy after charging for a period of time to obtain the real-time charging power of the charging device, then calculates the real-time charging power of the charging device and the charging power of the charging pile, determines the power compensation amount, and compensates the remaining charging amount according to the power compensation amount, thereby ensuring that a fixed charging amount can make the energy of the charging device reach a corresponding state. In addition, by analyzing the real-time charging power of the charging device and the charging power of the charging pile, abnormal problems of the DC charging pile can be eliminated, thereby ensuring that the DC charging pile can be used normally and increasing the service life of the DC charging pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a flow chart of steps S100-S500 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 2 This is a flow chart of steps S301-S305 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 3 This is a flow chart of steps S401-S403 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 4 This is a flow chart of steps S4021-S4024 in a method for monitoring an operation error of a DC charging pile proposed by the present invention; Figure 5 This is a flow chart of steps S4031-S4034 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 6 This is a flow chart of steps S501-S502 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 7 This is a flow chart of steps S5011-S5014 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Figure 8 This is a flow chart of steps S5021-S5024 in a method for monitoring operation errors of a DC charging pile proposed by the present invention; Fig. 9 This is a structural block diagram of an operation error monitoring system based on a DC charging pile proposed by the present invention. DETAILED DESCRIPTION

[0025] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0026] Reference Figure 1 As shown, a method for monitoring operation errors based on a DC charging pile includes: S100, based on the central control platform, read the data of the order platform to obtain the charging power, charging unit price, total charging amount, charging time, charging device type and the first remaining energy of the charging device; S200, calculating and processing according to the charging power of the charging pile, the charging unit price, the charging time and the total charging amount to obtain the remaining charging amount; The specific calculation formula for obtaining the remaining amount of charging is:

[0027] In the formula, The remaining amount for charging; is the total amount of charging; Charging power for charging pile; Is the charging time; is the charging unit price; S300: Analyze the type of charging equipment based on the central control platform to obtain the real-time charging power; S400, based on the charging power of the charging pile and the real-time charging power, correct the remaining amount of charging to obtain a corrected remaining amount of charging; S500, analyzing and processing the corrected remaining amount of charging, the real-time charging power, and the charging unit price to obtain the charging completion time; It will be understood by those skilled in the art that when a user places an order through an order platform to charge a charging device, when the order platform fails, the relevant parameters within the order platform will become abnormal, which may result in the charging amount ordered by the user being unable to replenish the charging device with the electric energy corresponding to the charging amount. In addition, the charging power and the real-time charging power of the charging pile are analyzed. When there is a large error between the charging power and the real-time charging power of the charging pile, it means that there is an abnormality in the DC charging pile. Therefore, a power compensation amount is introduced to compensate for the remaining charging amount to ensure that the user's charging amount can enable the charging device to reach the corresponding energy state.

[0028] Reference Figure 2 As shown, based on the central control platform, analyzing the charging device type and obtaining the real-time charging power specifically include the following steps: S301, based on the type of charging device, perform information retrieval on the database system to obtain the communication protocol corresponding to the charging device; S302: The central control platform establishes a communication connection with the charging device based on the communication protocol corresponding to the charging device; S303, based on the central control platform, sending a data transmission instruction to the charging device to obtain the second residual energy of the charging device; S304, performing calculation and processing according to the first remaining energy of the charging device and the second remaining energy of the charging device to obtain charged energy information; S305, performing calculations based on the charged energy information and the charging time to obtain the real-time charging power; The specific calculation formula for obtaining the real-time charging power is:

[0029] In the formula, Real-time power for charging; It is the second surplus energy source for charging equipment; It is the first surplus energy source for charging equipment; Is the charging time; In this embodiment, when the charging device is charging, the order platform will display the relevant parameters of the charging device, that is, the type of charging device. The central control platform will search for information in the database system according to the type of charging device, and determine the communication protocol corresponding to the charging device. The central control platform will establish a communication connection with the charging device according to the communication protocol corresponding to the charging device, read the energy information that has been replenished by the charging device, and then calculate based on the remaining energy information of the charging device when not charging and the charging time, and determine the real-time charging power, so that the subsequent combined analysis with the charging power of the charging pile will be more accurate.

[0030] Reference Figure 3 As shown, based on the charging power of the charging pile and the real-time charging power, the remaining amount of charging is corrected, and obtaining the corrected remaining amount of charging specifically includes the following steps: S401. Based on the central control platform, the charging power and the real-time charging power of the charging pile are calculated and processed to obtain a power offset; S402, performing judgment processing according to the power offset and the set first threshold to determine the power compensation amount, where the power compensation amount includes a first compensation amount and a second power compensation amount; S403, based on the power compensation amount and the charging unit price, correct the remaining amount of charging to obtain a corrected remaining amount of charging, wherein the corrected remaining amount of charging includes a first corrected remaining amount of charging and a second corrected remaining amount of charging; The specific calculation formula for obtaining the power offset is:

[0031] In the formula, is the power offset; Charging power for charging pile; Real-time power for charging; In this embodiment, when an abnormality occurs in the DC charging pile, the difference between the output power of the charging pile and the input power of the charging device will be abnormal. Therefore, in order to enable the charging device to reach the corresponding state with the total charging amount of the user, a power compensation amount is introduced here to correct the remaining charging amount, thereby ensuring that the total charging amount of the user obtains the corresponding power resources.

[0032] Reference Figure 4 As shown, judging and processing are performed according to the power offset and setting the first threshold, and determining the power compensation amount specifically includes the following steps: S4021, making a judgment according to the power offset and a set first threshold; S4022: If the power offset is greater than the set first threshold, output the first power compensation amount. ; S4023: If the power offset is equal to the set first threshold, the output charging pile charging power is the same as the real-time charging power, and there is no need to correct the remaining amount of charging; S4024: If the power offset is less than the set first threshold, the second power compensation amount is output ; In this embodiment, the first power compensation amount is a positive value, because there is a difference between the output power of the DC charging pile and the input power of the charging device, and the input power of the DC charging pile is greater than the input power of the charging device, that is, the charging power of the charging pile is greater than the real-time charging power, and the second power compensation amount is a negative value, that is, the real-time power of the charging pile is less than the real-time charging power, but this phenomenon is impossible to occur in real life, that is, the order platform has an abnormality. In this case, the energy charged for the total charging amount is too much, so the remaining charging amount is corrected by the second power compensation amount.

[0033] Reference Figure 5 As shown, based on the power compensation amount and the charging unit price, the remaining amount of charging is corrected, and obtaining the corrected remaining amount of charging specifically includes the following steps: S4031, if the power compensation amount is the first power compensation amount ; S4032: based on the first power compensation amount and the charging unit price, correct the remaining amount of charging to obtain a first corrected remaining amount of charging; The specific calculation formula for obtaining the first modified charging remaining amount is:

[0034] In the formula, Charge the remaining amount for the first amendment; The remaining amount for charging; is the first power compensation amount; Is the charging time; is the charging unit price; S4033: If the power compensation amount is the second power compensation amount ; S4034. Based on the second power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a second corrected remaining amount of charging; The specific calculation formula for obtaining the second modified charging remaining amount is:

[0035] In the formula, Charge the remaining amount for the second amendment; The remaining amount for charging; is the second power compensation amount; Is the charging time; The unit price for charging.

[0036] Reference Figure 6 As shown, according to the correction of the remaining amount of charging, the real-time charging power and the charging unit price, the analysis and processing to obtain the charging completion time specifically includes the following steps: S501, performing calculation based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time, where the remaining charging time includes a first remaining charging time and a second remaining charging time; S502, calculating and processing according to the remaining charging time and the charged time to obtain the charging completion time, where the charging completion time includes a first charging completion time and a second charging completion time; In this embodiment, when the revised charging remaining amount is the first revised charging remaining amount or the second revised charging remaining amount, the charging completion time will also be different. When the revised charging amount is the first revised charging remaining amount, it means that there is an abnormality in the DC charging pile, and the total charging amount cannot obtain the corresponding power resources. Therefore, the charging time needs to be extended so that the total charging amount can obtain the corresponding power resources. When the revised charging amount is the second revised charging remaining amount, it means that there is an abnormality in the display of the order platform. The display parameters of the order platform are corrected to ensure that the user can get the correct charging completion time. It is worth noting that the first charging completion time is greater than the second charging completion time.

[0037] Reference Figure 7 As shown, the calculation and processing based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time specifically includes the following steps: S5011, if the revised charging remaining amount is the first revised charging remaining amount; S5012. Calculate and process according to the first corrected remaining charging amount, the real-time charging power, and the charging unit price to obtain a first remaining charging time; The specific calculation formula for obtaining the remaining time of the first charge is:

[0038] In the formula, The remaining time for the first charge; Charge the remaining amount for the first amendment; Real-time power for charging; is the charging unit price; S5013, if the revised charging remaining amount is the second revised charging remaining amount; S5014. Calculate and process according to the second corrected remaining charging amount, the real-time charging power, and the charging unit price to obtain a second remaining charging time. The specific calculation formula for obtaining the second remaining charging time is:

[0039] In the formula, The remaining time for the second charge; Charge the remaining amount for the second amendment; Real-time power for charging; The unit price for charging.

[0040] Reference Figure 8 As shown, the calculation and processing are performed based on the remaining charging time and the charged time, and the charging completion time is obtained, which specifically includes the following steps: S5021: If the remaining charging time is the first remaining charging time; S5022: Calculate and process the first charging remaining time and the charging time to obtain the first charging completion time; S5023: If the remaining charging time is the second remaining charging time; S5024: Calculate and process according to the second remaining charging time and the charged time to obtain the second charging completion time.

[0041] Reference Fig. 9 As shown, a running error monitoring system based on a DC charging pile is used to implement the above-mentioned running error monitoring method based on a DC charging pile, including: Central control platform, which is used to control data transmission and information interaction between various modules; An order platform, which is used to display the charging power of the charging pile, the charging unit price, the total charging amount, the charging time, the charging device type and the first remaining energy of the charging device; A database system, the database system is used to store relevant parameters corresponding to charging equipment types; A data calculation module, wherein the data calculation module calculates according to the charging power of the charging pile and the real-time charging power to obtain the power offset, the data calculation module calculates according to the charging power of the charging pile, the charging unit price, the charging time and the total charging amount to obtain the remaining charging amount, and the data calculation module calculates according to the charged energy information and the charging time to obtain the real-time charging power; A comparison and judgment module, wherein the comparison and judgment module makes a judgment based on the power offset and a set first threshold value, determines the power compensation amount, and obtains the first power compensation amount and the second power compensation amount; The correction module corrects the remaining amount of charging according to the power compensation amount and the charging unit price to obtain the corrected remaining amount of charging. The correction module calculates according to the remaining charging time and the charging time to obtain the charging completion time.

[0042] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for monitoring operation errors based on DC charging piles. It is characterized in that include: Based on the central control platform, the order platform is read to obtain the charging power, charging unit price, total charging amount, charging time, charging equipment type and the first remaining energy of the charging equipment; Calculate and process the remaining amount of charging according to the charging power, charging unit price, charging time and total charging amount of the charging pile; Based on the central control platform, analyze the type of charging equipment and obtain the real-time charging power; Based on the charging power of the charging pile and the real-time charging power, the remaining amount of charging is corrected to obtain the corrected remaining amount of charging; The charging completion time is obtained by analyzing and processing the corrected remaining charging amount, real-time charging power and charging unit price.

2. According to claim 1, a method for monitoring operation errors based on a DC charging pile, It is characterized in that The specific calculation formula for obtaining the remaining amount of charging is: In the formula, The remaining amount for charging; is the total amount of charging; Charging power for charging pile; Is the charging time; The unit price for charging.

3. According to claim 1, a method for monitoring operation errors based on a DC charging pile, It is characterized in that The method of analyzing the type of charging equipment based on the central control platform and obtaining the real-time charging power specifically includes the following steps: Based on the type of charging equipment, information is retrieved from the database system to obtain the communication protocol corresponding to the charging equipment; Based on the communication protocol corresponding to the charging equipment, the central control platform establishes a communication connection with the charging equipment; Based on the central control platform, a data transmission instruction is sent to the charging device to obtain the second residual energy of the charging device; Calculate and process the first remaining energy of the charging device and the second remaining energy of the charging device to obtain charged energy information; Calculate and process the charged energy information and the charging time to obtain the real-time charging power; The specific calculation formula for obtaining the real-time charging power is: In the formula, Real-time power for charging; It is the second surplus energy source for charging equipment; It is the first surplus energy source for charging equipment; The charging time.

4. According to claim 1, a method for monitoring operation errors based on a DC charging pile, It is characterized in that The method of correcting the remaining amount of charging based on the charging power of the charging pile and the real-time charging power, and obtaining the corrected remaining amount of charging specifically includes the following steps: Based on the central control platform, the charging power of the charging pile and the real-time charging power are calculated and processed to obtain the power offset; Perform judgment processing according to the power offset and the set first threshold to determine the power compensation amount, wherein the power compensation amount includes a first compensation amount and a second power compensation amount; Based on the power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a corrected remaining amount of charging, wherein the corrected remaining amount of charging includes a first corrected remaining amount of charging and a second corrected remaining amount of charging; The specific calculation formula for obtaining the power offset is: In the formula, is the power offset; Charging power for charging pile; Real-time power for charging.

5. According to claim 4, a method for monitoring operation errors based on a DC charging pile, It is characterized in that The determination of the power compensation amount by judging the power offset and setting the first threshold value specifically comprises the following steps: Making a judgment based on the power offset and a set first threshold; If the power offset is greater than the set first threshold, the output power first compensation amount ; If the power offset is equal to the set first threshold, the output charging power of the charging pile is the same as the real-time charging power, and there is no need to correct the remaining amount of charging; If the power offset is less than the set first threshold, the output power second compensation amount .

6. According to claim 4, a method for monitoring operation errors based on a DC charging pile, It is characterized in that The method of correcting the remaining amount of charging based on the power compensation amount and the charging unit price to obtain the corrected remaining amount of charging specifically includes the following steps: If the power compensation amount is the first power compensation amount ; Based on the first power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a first corrected remaining amount of charging; The specific calculation formula for obtaining the first modified charging remaining amount is: In the formula, Charge the remaining amount for the first amendment; The remaining amount for charging; is the first power compensation amount; Is the charging time; is the charging unit price; If the power compensation amount is the second power compensation amount ; Based on the second power compensation amount and the charging unit price, the remaining amount of charging is corrected to obtain a second corrected remaining amount of charging; The specific calculation formula for obtaining the second modified charging remaining amount is: In the formula, Charge the remaining amount for the second amendment; The remaining amount for charging; is the second power compensation amount; Is the charging time; The unit price for charging.

7. The operation error monitoring method based on a DC charging pile according to claim 1, It is characterized in that The analysis and processing based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the charging completion time specifically includes the following steps: Calculate and process based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time, where the remaining charging time includes a first remaining charging time and a second remaining charging time; The charging completion time is obtained by performing calculation based on the remaining charging time and the charged time. The charging completion time includes a first charging completion time and a second charging completion time.

8. The operation error monitoring method based on a DC charging pile according to claim 7, It is characterized in that The calculation and processing based on the corrected remaining charging amount, the real-time charging power and the charging unit price to obtain the remaining charging time specifically includes the following steps: If the revised charging remaining amount is the first revised charging remaining amount; Calculate and process the first remaining charging time according to the first corrected remaining charging amount, the real-time charging power, and the charging unit price; The specific calculation formula for obtaining the remaining time of the first charge is: In the formula, The remaining time for the first charge; Charge the remaining amount for the first amendment; Real-time power for charging; is the charging unit price; If the revised charging remaining amount is the second revised charging remaining amount; Calculate and process the remaining amount of the second corrected charging, the real-time charging power, and the charging unit price to obtain the remaining time of the second charging; The specific calculation formula for obtaining the second remaining charging time is: In the formula, The remaining time for the second charge; Charge the remaining amount for the second amendment; Real-time power for charging; The unit price for charging.

9. The operation error monitoring method based on a DC charging pile according to claim 7, It is characterized in that The calculation and processing based on the remaining charging time and the charged time to obtain the charging completion time specifically includes the following steps: If the remaining charging time is the first remaining charging time; Calculate and process the first charging remaining time and the charging time to obtain the first charging completion time; If the remaining charging time is the second remaining charging time; Calculation is performed based on the second remaining charging time and the charged time to obtain the second charging completion time.

10. An operation error monitoring system based on a DC charging pile, used to implement an operation error monitoring method based on a DC charging pile as described in any one of claims 1 to 9, It is characterized in that include: Central control platform, which is used to control data transmission and information interaction between various modules; An order platform, which is used to display the charging power of the charging pile, the charging unit price, the total charging amount, the charging time, the charging device type and the first remaining energy of the charging device; A database system, the database system is used to store relevant parameters corresponding to charging equipment types; A data calculation module, wherein the data calculation module calculates according to the charging power of the charging pile and the real-time charging power to obtain the power offset, the data calculation module calculates according to the charging power of the charging pile, the charging unit price, the charging time and the total charging amount to obtain the remaining charging amount, and the data calculation module calculates according to the charged energy information and the charging time to obtain the real-time charging power; A comparison and judgment module, wherein the comparison and judgment module makes a judgment based on the power offset and a set first threshold, determines the power compensation amount, and obtains the first power compensation amount and the second power compensation amount; The correction module corrects the remaining amount of charging according to the power compensation amount and the charging unit price to obtain the corrected remaining amount of charging. The correction module calculates according to the remaining charging time and the charging time to obtain the charging completion time.

Citation Information

Cited By

  • Charging pile charging data compensation method and device, platform and storage medium

    CN121200856A