Vibration force transmission structure for construction of large-diameter steel casing and construction method

By designing vibration sinking, automatic amplitude adjustment and vibration force transmission devices in the construction of steel casing, synchronous soil extraction and vibration sinking of steel casing during the sinking process, solving the low construction efficiency and soil in the existing technology The problem of poor body stability improves construction efficiency and automation.

CN119102218AInactive Publication Date: 2024-12-10CCCC SHEC FIRST HIGHWAY ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411222677.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of existing steel casings, the vibration sinking efficiency is low, and the soil cannot be collected simultaneously. The amplitude adjustment is complex and the cost is high, resulting in construction efficiency and soil stability problems.

Method used

A construction structure including a vibration sinking device, an amplitude automatic adjustment device and a vibration force transmission device are designed. Vibration sinking and synchronous soil extraction are realized through the extrusion contact between the gripper and the steel casing, and vertical sliding grooves and spirals are used. The lifting sheet realizes vibration power transmission and soil lifting, and automatically adjusts the amplitude to meet construction needs.

Benefits of technology

It improves the soil extraction efficiency during the sinking of the steel casing, shortens the construction cycle, reduces labor intensity, reduces soil disturbances, maintains soil stability, and reduces manual operation requirements through automated construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119102218A_ABST
    Figure CN119102218A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of steel casing construction, and particularly relates to a vibration force transmission structure for large-diameter steel casing construction and a construction method.The vibration force transmission structure comprises a steel casing and a gripper, the clamping surface of the gripper is in extrusion contact with the top surface of the steel casing, and a sinking soil taking device is arranged in the steel casing; according to the sinking soil sampling device, the action of synchronously sampling soil while the steel casing sinks is realized. According to the vibration force transmission structure for construction of the large-diameter steel casing and the construction method, by arranging the sinking soil taking device, the vibration sinking device, the automatic amplitude adjusting device and the vibration force transmission device, soil taking is conducted synchronously in the sinking process of the steel casing, the soil taking efficiency is improved, and the construction period is shortened; the automatic amplitude adjusting device can automatically adjust the amplitude according to construction requirements, and the accuracy and flexibility of construction are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel casing construction, and in particular to a vibration force transmission structure and a construction method for large-diameter steel casing construction. Background Art

[0002] At present, most of the steel casings are sunk by top clamping vibrating hammers. The casing is hoisted by lifting equipment and vibrating hammers are used to apply vibration force to the steel casing to make it sink. After a period of vibration sinking, the sinking operation needs to be stopped and soil excavation operation is carried out. After the soil excavation is completed, the vibrating sinking operation is carried out again. This method leads to low construction efficiency and inability to synchronize the sinking and soil excavation operations. In addition, the amplitude adjustment design during the vibration operation is complex and the investment cost is high. Therefore, a vibration force transmission structure and construction method for large-diameter steel casing construction are needed. Summary of the invention

[0003] Based on the existing technical problems, the present invention proposes a vibration force transmission structure and a construction method for large-diameter steel casing construction.

[0004] The present invention proposes a vibration force transmission structure for large-diameter steel casing construction, which includes a steel casing and a gripper. The clamping surface of the gripper is in extrusion contact with the top surface of the steel casing. A sinking and soil-taking device is provided inside the steel casing. The sinking and soil-taking device enables the steel casing to synchronously take soil while sinking.

[0005] A vibration sinking device, an amplitude automatic adjustment device and a vibration force transmission device are respectively arranged on the top of the gripper, and the vibration sinking device realizes the action of providing vibration driving force during the sinking of the steel casing.

[0006] The automatic amplitude adjustment device realizes the action of automatic amplitude adjustment of the vibration sinking device.

[0007] The vibration force transmission device realizes the action of driving the sinking soil-taking device to take soil by suction by the vibration force of the vibration sinking device.

[0008] Preferably, the sinking soil-taking device includes a vertical sliding groove opened on the inner wall of the steel casing, and the four vertical sliding grooves are distributed in a circular array inside the steel casing. A vertical sliding block is slidably inserted into the inner wall of the vertical sliding groove, and a vertical soil-taking pipe is fixedly installed on the surface of the vertical sliding block. A feed port is opened at the bottom end of the vertical soil-taking pipe.

[0009] The top end of the vertical soil sampling pipe is rotatably connected to a soil sampling shaft via a bearing, the bottom end of the soil sampling shaft penetrates and extends into the interior of the vertical soil sampling pipe, and a spiral lifting piece is fixedly installed on the arc surface of the soil sampling shaft, the surface of the spiral lifting piece is rotatably connected to the interior of the vertical soil sampling pipe, and a small sprocket is fixedly installed on the top end of the soil sampling shaft, and the surfaces of the four small sprockets are all transmission-connected with chains.

[0010] Preferably, an L-shaped driving tube is fixedly installed on the top side surface of the vertical soil sampling tube, a discharge tube is fixedly installed on the top of one end of the L-shaped driving tube, the top of the discharge tube is installed with the feed end of the soft discharge tube, a connecting rod is fixedly installed on the one side surface of the discharge tube, a lifting drive motor is fixedly installed on one end of the connecting rod, and the output end of the lifting drive motor is fixedly installed relative to the top of the vertical soil sampling tube through a coupling.

[0011] Preferably, the vibrating sinking device includes a vibrating frame installed on the top of the gripper, guide sleeves are fixedly installed on the top of both ends of the vibrating frame, guide columns are slidably inserted into the inner walls of the guide sleeves, base plates are fixedly installed on the bottoms of every two guide columns, a vibration spring is also fixedly installed on the top of the base plate, the vibration spring is movably socketed on the surface of the guide column, the top of the vibration spring is fixedly installed on the inner wall of the top end of the vibrating frame, arc-shaped protective covers are fixedly installed on the tops of the four guide columns, and the top hanging ears of the arc-shaped protective covers are connected to the hooks of the lifting equipment.

[0012] Preferably, a vibration drive motor is also fixedly installed on the top of the vibration frame, and the output shaft of the vibration drive motor is fixedly installed with a power drive shaft through a coupling, and a first pulley is fixedly installed on the arc surface of one end of the power drive shaft, and the inner sides of the vibration frame are rotatably connected with rotating shafts relative to the inner walls through bearings, and the four rotating shafts are grouped in pairs, and the two groups of rotating shafts are arranged in parallel up and down.

[0013] Preferably, a top vibration cam and a top driving gear are respectively installed on the arc surfaces of two rotating shafts in a top group, the gear teeth and tooth grooves of the two top driving gears are meshed, the four top vibration cams are arranged crosswise, and a second pulley is also fixedly installed at one end of one of the rotating shafts, and the groove of the second pulley and the groove of the first pulley are both transmission-connected with the first belt.

[0014] Preferably, a bottom vibration cam and a bottom driving gear are respectively installed on the arc surfaces of a group of two rotating shafts at the bottom end, the gear teeth and tooth grooves of the two bottom driving gears are meshed, the four bottom vibration cams are arranged crosswise, and a third pulley is also fixedly installed at one end of one of the rotating shafts, and the groove of the third pulley and the groove of the second pulley are both transmission-connected with a second belt.

[0015] Preferably, the automatic amplitude adjustment device includes an L-shaped connecting seat installed on the surface of one side of the vibration frame, the surface of the L-shaped connecting seat is rotatably connected to the arc surface of one of the rotating shafts at the bottom through a bearing, and a one-way bearing is also installed at one end of the rotating shaft, and an adjustment gear is fixedly installed on the outer arc surface of the one-way bearing.

[0016] An adjusting motor is also fixedly mounted on one side surface of the L-shaped connecting seat, and an adjusting shaft is fixedly mounted on the output shaft of the adjusting motor via a coupling. A driving gear is fixedly mounted on one end of the adjusting shaft, and the gear teeth of the driving gear mesh with the tooth grooves of the adjusting gear.

[0017] Preferably, the vibration force transmission device includes a vertical power rod installed at the bottom end of the base plate, a driving ring is fixedly installed at the bottom end of the vertical power rod, a telescopic driving shaft is slidably inserted at the top of the other end of the L-shaped driving tube, the bottom end of the telescopic driving shaft penetrates and extends into the interior of the L-shaped driving tube, and a driving piston is fixedly installed at the bottom end of the telescopic driving shaft, the surface of the driving piston is slidably inserted with the inner wall of the L-shaped driving tube through a sealing ring, and the tops of the four telescopic driving shafts are fixedly installed with the bottom of the driving ring.

[0018] A limiting sealing ring is fixedly installed on the inner bottom side wall of the top end of the discharge pipe, a sealing gasket is fixedly installed on the top end of the limiting sealing ring, a compression spring is fixedly installed on the inner top side wall of the top end of the discharge pipe, a sealing ball is fixedly installed on one end of the compression spring, and the surface of the sealing ball is in compression contact with the surface of the sealing gasket.

[0019] The present invention proposes a construction method for a vibration force transmission structure for large-diameter steel casing construction. In step 1, during the sinking operation of the steel casing, the hook of the lifting equipment is connected to the hanging ear on the top of the arc-shaped protective cover to drive the device to lift, and then the gripper is used to clamp the steel casing. During the sinking, the vibration sinking device works to control the vibration drive motor to work, driving the power drive shaft to rotate, thereby controlling the rotation of the first pulley at one end, and the first belt connected to the surface transmission cooperates to drive the corresponding rotating shaft at the bottom to rotate. The rotation of the rotating shaft controls the top vibration cam and the top driving gear on the surface to work, and the two top driving gears mesh and work to synchronously control the synchronous rotation of the two rotating shafts at the top, driving the top vibration cam on the surface to rotate and generate vibration force. At the same time, the second pulley rotates and cooperates with the second belt to control the rotation of another corresponding rotating shaft at the bottom, thereby controlling the rotation of the bottom vibration cam at the bottom to generate vibration force, and the vibration force at the top and the vibration force at the bottom are combined to cooperate with the vibration steel casing sinking operation.

[0020] Step 2. When the vibration amplitude needs to be adjusted according to the sinking state, the vibration drive motor stops working, and its multiple rotating shafts stop rotating. Because a one-way bearing is installed inside the adjusting gear, while the rotating shaft rotates to generate vibration force, one end of the rotating shaft idles with the adjusting gear through the one-way bearing. When the adjusting gear is stationary, the rotating shaft rotates. When adjusting the amplitude, the adjusting motor drives the adjusting shaft to rotate, thereby driving the active gear to rotate. Under engagement, the adjusting gear is controlled to reverse, and then under the unidirectional action of the one-way bearing, the adjusting gear and the rotating shaft are locked to form a whole, controlling the reverse of the rotating shaft, driving the rotating shaft to rotate, and controlling the angle of the bottom vibration cam on the surface to adjust. After the adjustment, the adjusting motor stops working, and the vibration drive motor works in the air to control the rotation of the top vibration cam and the bottom vibration cam inside the vibration frame to generate adjusted vibration force to drive the steel casing to sink.

[0021] Step 3: When the steel casing is sinking, the lifting drive motor on the top is controlled to drive the soil-taking shaft to rotate, and the small sprocket is controlled to rotate. The four soil-taking shafts are controlled to move synchronously under the chain transmission, thereby driving the spiral lifting piece to rotate, and performing a spiral lifting operation on the mixed soil generated during the sinking of the steel casing.

[0022] Step 4. During the spiral lifting operation, the lifted soil is controlled to enter the interior of the L-shaped driving tube, and the vibration force transmission device is used to operate. The vibration frame vibrates while driving the bottom plate to apply vibration force to the bottom driving ring, thereby controlling the four telescopic driving shafts to reciprocate in the vertical direction, driving the bottom driving piston to reciprocate, and the sealing ball arranged on the top of the discharge pipe squeezes the sealing gasket and the spirally lifted soil and water inside the vertical soil taking pipe to form a closed control, thereby controlling the suction and thrust inside the L-shaped driving tube. The suction force extracts the lifted soil inside the vertical soil taking pipe, and the thrust pushes the top sealing ball to leave the sealing gasket so that the extracted soil can be discharged; until the steel casing finishes sinking, the vertical sliding block is pulled out through the vertical sliding groove for removal, leaving the steel casing.

[0023] The beneficial effects of the present invention are:

[0024] By arranging a sinking and earth-taking device, a vibrating sinking device, an automatic amplitude adjustment device and a vibration force transmission device, it is achieved that the steel casing can be simultaneously earth-taken during the sinking process, thereby improving the earth-taking efficiency and shortening the construction period; the automatic amplitude adjustment device can automatically adjust the amplitude according to construction requirements, thereby improving the accuracy and flexibility of construction; the vibration force transmission device transmits the vibration force of the vibrating sinking device to the sinking and earth-taking device, thereby realizing the vibration-force-driven earth-taking action and improving the earth-taking efficiency; the design of these devices realizes the automated construction during the sinking process of the steel casing, reduces the need for manual operation, and reduces labor intensity; through the simultaneous vibration and earth-taking, the disturbance of the surrounding soil by the single earth-taking operation is reduced, thereby maintaining the stability of the soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of a vibration force transmission structure used in the construction of large-diameter steel casing;

[0026] Figure 2 It is a three-dimensional exploded view of a sinking earth-taking device used for a vibration force transmission structure in the construction of a large-diameter steel casing;

[0027] Figure 3 A three-dimensional diagram of a vibration force transmission device used in the vibration force transmission structure of large-diameter steel casing construction;

[0028] Figure 4 A three-dimensional diagram of a vibration sinking device used in the vibration force transmission structure of large-diameter steel casing construction;

[0029] Figure 5 A three-dimensional diagram of an automatic amplitude adjustment device for a vibration force transmission structure used in large-diameter steel casing construction;

[0030] Figure 6 It is a three-dimensional exploded view of a vibration force transmission device used in the vibration force transmission structure of large-diameter steel casing construction.

[0031] In the figure: 1, steel casing; 2, gripper; 3, sinking and soil taking device; 31, vertical sliding groove; 32, vertical sliding block; 33, vertical soil taking pipe; 34, feeding port; 35, soil taking shaft; 36, spiral lifting piece; 37, small sprocket; 38, chain; 39, L-shaped driving pipe; 310, discharge pipe; 311, connecting rod; 312, lifting drive motor; 4, vibration sinking device; 41, vibration frame; 42, guide sleeve; 43, guide column; 44, bottom plate; 45, vibration spring; 46, arc-shaped protective cover; 47, vibration drive motor; 48, power drive shaft; 49, first pulley; 410, rotating shaft; 411. Top vibration cam; 412. Top driving gear; 413. Second pulley; 414. First belt; 415. Bottom vibration cam; 416. Bottom driving gear; 417. Third pulley; 418. Second belt; 5. Automatic amplitude adjustment device; 51. L-shaped connecting seat; 52. One-way bearing; 53. Adjusting gear; 54. Adjusting motor; 55. Adjusting shaft; 56. Driving gear; 6. Vibration force transmission device; 61. Vertical power rod; 62. Driving ring; 63. Telescopic driving shaft; 64. Driving piston; 65. Limit sealing ring; 66. Sealing pad; 67. Compression spring; 68. Sealing ball. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0033] Embodiment 1

[0034] Reference Figure 1-Figure 6 A vibration force transmission structure for large-diameter steel casing construction includes a steel casing 1 and a gripper 2, wherein the clamping surface of the gripper 2 is in extrusion contact with the top surface of the steel casing 1, and a sinking soil taking device 3 is arranged inside the steel casing 1.

[0035] In order to realize the action of synchronously taking soil while the steel casing 1 is sinking, a sinking and taking soil device 3 is provided, including a vertical sliding groove 31 opened on the inner wall of the steel casing 1. The four vertical sliding grooves 31 are distributed in a circular array inside the steel casing 1. A vertical sliding block 32 is slidably inserted into the inner wall of the vertical sliding groove 31. A vertical soil taking pipe 33 is fixedly installed on the surface of the vertical sliding block 32. A feed port 34 is opened at the bottom end of the vertical soil taking pipe 33.

[0036] Specifically implemented in this way, four vertical sliding grooves 31 are distributed in a circular array inside the steel casing 1, ensuring that the soil taking action is carried out evenly at the bottom of the entire steel casing 1, which helps the steel casing 1 to sink evenly and avoid tilting or deviation.

[0037] The top of the vertical soil sampling pipe 33 is rotatably connected to a soil sampling shaft 35 through a bearing, the bottom end of the soil sampling shaft 35 passes through and extends into the interior of the vertical soil sampling pipe 33, and a spiral lifting piece 36 is fixedly installed on the arc surface of the soil sampling shaft 35, the surface of the spiral lifting piece 36 is rotatably connected to the interior of the vertical soil sampling pipe 33, and a small sprocket 37 is fixedly installed on the top of the soil sampling shaft 35, and the surfaces of the four small sprockets 37 are all transmission-connected to chains 38.

[0038] Specifically implemented in this way, the design of the spiral lifting plate 36 can effectively lift the soil from the feed port 34 to the top of the vertical soil taking pipe 33, and transport the soil out through rotational motion, thereby improving the soil taking efficiency; the chain 38 is connected to the four small sprockets 37, so that multiple soil taking shafts 35 can work simultaneously, realizing continuous soil taking operations and speeding up the entire construction progress.

[0039] An L-shaped driving tube 39 is fixedly installed on the surface of one side of the top of the vertical soil taking tube 33, and a discharge tube 310 is fixedly installed on the top of one end of the L-shaped driving tube 39. The top of the discharge tube 310 is installed with the feed end of the soft discharge tube. A connecting rod 311 is fixedly installed on the surface of one side of the discharge tube 310, and a lifting drive motor 312 is fixedly installed on one end of the connecting rod 311. The output end of the lifting drive motor 312 is fixedly installed relative to the top of the vertical soil taking tube 33 through a coupling.

[0040] Specifically implemented in this way, the design of the L-shaped drive pipe 39 and the discharge pipe 310 allows the soil to be automatically discharged from the vertical soil taking pipe 33, and the soil is transported to the designated position through the soft discharge pipe, thereby improving the degree of construction automation; the use of the lifting drive motor 312 can realize continuous and efficient soil discharge without manual intervention, which significantly improves the construction efficiency; realizes automatic soil discharge, improves construction efficiency, reduces labor, improves safety, and facilitates operation and maintenance.

[0041] The top of the gripper 2 is respectively provided with a vibration sinking device 4, an amplitude automatic adjustment device 5 and a vibration force transmission device 6. In order to realize the action of providing a vibration driving force during the sinking of the steel casing 1, a vibration sinking device 4 is provided, including a vibration frame 41 installed on the top of the gripper 2. Guide sleeves 42 are fixedly installed on the tops of both ends of the vibration frame 41. Guide columns 43 are slidably inserted into the inner wall of the guide sleeves 42. A bottom plate 44 is fixedly installed on the bottom of every two guide columns 43. A vibration spring 45 is also fixedly installed on the top of the bottom plate 44. The vibration spring 45 is movably socketed with the surface of the guide column 43. The top of the vibration spring 45 is fixedly installed on the inner wall of the top of the vibration frame 41. The tops of the four guide columns 43 are fixedly installed with arc-shaped protective covers 46, and the top hanging ears of the arc-shaped protective covers 46 are connected to the hooks of the lifting equipment.

[0042] Specifically implemented in this way, the design of the vibration frame 41 and the vibration spring 45 can provide continuous vibration power for the sinking of the steel casing 1, help overcome soil resistance, and accelerate the sinking speed; because guide sleeves 42 and guide columns 43 are installed at both ends of the vibration frame 41, and vibration springs 45 are installed on the bottom plate 44, this symmetrical design ensures that the vibration effect on the steel casing 1 is evenly distributed, which helps the steel casing 1 to sink smoothly.

[0043] A vibration drive motor 47 is also fixedly installed on the top of the vibration frame 41, and a power drive shaft 48 is fixedly installed on the output shaft of the vibration drive motor 47 through a coupling. A first pulley 49 is fixedly installed on the arc surface of one end of the power drive shaft 48. The inner sides of the vibration frame 41 are rotatably connected to the inner walls via bearings with rotating shafts 410. The four rotating shafts 410 are grouped in pairs, and the two groups of rotating shafts 410 are arranged in parallel up and down.

[0044] Specifically, through the design of the power drive shaft 48 and the first pulley 49, the vibration can be evenly transmitted to the two sets of rotating shafts 410, ensuring that the vibration around the steel casing 1 is uniform, which helps the steel casing 1 to sink smoothly; through the upper and lower parallel arrangement of the two sets of rotating shafts 410, the stability of the entire vibrating sinking device 4 can be enhanced and the shaking during the vibration process can be reduced.

[0045] A top vibration cam 411 and a top driving gear 412 are respectively installed on the arc surface of a group of two rotating shafts 410 at the top, and the gear teeth and tooth grooves of the two top driving gears 412 are meshed. The four top vibration cams 411 are arranged crosswise and respectively, and a second pulley 413 is also fixedly installed at one end of one of the rotating shafts 410, and the groove of the second pulley 413 and the groove of the first pulley 49 are both transmission-connected with the first belt 414.

[0046] Specifically, the gear teeth and tooth grooves of the two top driving gears 412 are meshed, ensuring the synchronous rotation of the two rotating shafts 410, thereby providing a uniform vibration effect; the four top vibration cams 411 are cross-arranged to produce a complex vibration mode, which helps to break the adhesion and friction of the soil and improve the sinking efficiency; the cross-arranged vibration cams and the synchronously rotating gear design ensure the uniform distribution of vibration force and help prevent the steel casing 1 from deflecting during the sinking process.

[0047] A bottom vibration cam 415 and a bottom driving gear 416 are respectively installed on the arc surface of a group of two rotating shafts 410 at the bottom, and the gear teeth and tooth grooves of the two bottom driving gears 416 are meshed. The four bottom vibration cams 415 are arranged crosswise, and a third pulley 417 is also fixedly installed at one end of one of the rotating shafts 410. The groove of the third pulley 417 and the groove of the second pulley 413 are both transmission-connected with a second belt 418.

[0048] Specifically implemented in this way, the top and bottom vibration cams work together to form a two-way vibration, which can more effectively break the adhesion and friction of the soil and improve the efficiency of the sinking of the steel casing 1; the coordinated use of the bottom vibration cam 415 and the top vibration cam 411 can enhance the effect of the vibration transmitted from the vibration frame 41 to the steel casing 1, making the sinking process smoother; through the two-stage belt transmission system, the first belt 414 and the second belt 418, the power of the vibration drive motor 47 can be more efficiently transmitted to the top and bottom rotating shafts 410.

[0049] In order to realize the action of automatic amplitude adjustment of the vibrating sinking device 4, an amplitude automatic adjustment device 5 is provided, which includes an L-shaped connecting seat 51 installed on the surface of one side of the vibration frame 41. The surface of the L-shaped connecting seat 51 is rotatably connected to the arc surface of a rotating shaft 410 at the bottom through a bearing, and a one-way bearing 52 is also installed at one end of the rotating shaft 410. An adjusting gear 53 is fixedly installed on the outer arc surface of the one-way bearing 52.

[0050] Specifically, by adjusting the coordination between the gear 53 and the one-way bearing 52, the amplitude of the vibration sinking device 4 can be automatically adjusted to adapt to different construction requirements and environmental conditions; the automatic adjustment of the amplitude can quickly adapt to different soil conditions without stopping work for manual adjustment, thereby improving construction efficiency; by automatically adjusting the amplitude, the stability of the vibration sinking process can be maintained to avoid unstable sinking caused by excessive or small amplitude.

[0051] An adjusting motor 54 is also fixedly mounted on one side surface of the L-shaped connecting seat 51 , and an adjusting shaft 55 is fixedly mounted on the output shaft of the adjusting motor 54 via a coupling. A driving gear 56 is fixedly mounted on one end of the adjusting shaft 55 , and the gear teeth of the driving gear 56 mesh with the tooth grooves of the adjusting gear 53 .

[0052] Specifically implemented in this way, the use of the adjusting motor 54 realizes the automation of amplitude adjustment, which can be operated remotely or through a control system, thereby improving the level of automation in construction; by accurately controlling the rotation of the driving gear 56 by the adjusting motor 54, thereby driving the adjusting gear 53, accurate adjustment of the amplitude can be achieved; automatic and accurate amplitude adjustment helps the steel casing 1 to sink quickly and stably, thereby improving construction efficiency.

[0053] In order to realize the action of the vibration force of the vibrating sinking device 4 driving the suction force of the sinking soil-taking device 3 to take soil, a vibration force transmission device 6 is set, which includes a vertical power rod 61 installed at the bottom end of the base plate 44, and a driving ring 62 is fixedly installed at the bottom end of the vertical power rod 61. A telescopic driving shaft 63 is slidably inserted at the top of the other end of the L-shaped driving tube 39. The bottom end of the telescopic driving shaft 63 penetrates and extends into the interior of the L-shaped driving tube 39, and a driving piston 64 is fixedly installed at the bottom end of the telescopic driving shaft 63. The surface of the driving piston 64 is slidably inserted with the inner wall of the L-shaped driving tube 39 through a sealing ring, and the tops of the four telescopic driving shafts 63 are fixedly installed with the bottom of the driving ring 62.

[0054] Specifically, the vibration force of the vibration sinking device 4 is converted into soil-extracting power through the vibration force transmission device 6, so that the vibration and soil-extracting can be carried out simultaneously, and the construction efficiency is improved; under the action of the vibration force, the driving piston 64 forms suction through the sliding connection between the sealing ring and the inner wall of the L-shaped driving tube 39, and cooperates with the spiral lifting piece 36 to more efficiently lift and transport the soil; the cooperation between the spiral lifting piece 36 and the driving piston 64 can realize the continuous lifting and transportation of the soil, avoiding the influence of the sinking efficiency due to the accumulation of soil.

[0055] A limiting sealing ring 65 is fixedly installed on the inner bottom side wall of the top end of the discharge pipe 310, a sealing gasket 66 is fixedly installed on the top end of the limiting sealing ring 65, a compression spring 67 is fixedly installed on the inner top side wall of the top end of the discharge pipe 310, a sealing ball 68 is fixedly installed on one end of the compression spring 67, and the surface of the sealing ball 68 is in extrusion contact with the surface of the sealing gasket 66.

[0056] Specifically implemented in this way, the compression spring 67 can maintain the continuous pressure of the sealing ball 68 on the sealing gasket 66, and maintain a good sealing effect even in the case of vibration or movement; through the cooperation of the compression spring 67 and the sealing ball 68, the internal space of the L-shaped drive tube 39 is sealed, ensuring the closed operation during the soil taking and discharge process, reducing the flying of soil and water loss; under the action of thrust, the sealing ball 68 leaves the sealing gasket 66, so that the soil can be discharged, while avoiding the backfilling of the soil into the discharge pipe 310, maintaining the continuity of the soil taking process; the compression spring 67 controls the sealing ball 68 to squeeze the sealing gasket 66 to seal, and cooperates with the spiral lifting plate 36 to achieve efficient soil discharge and speed up the construction progress.

[0057] By arranging the sinking soil-taking device 3, the vibrating sinking device 4, the automatic amplitude adjustment device 5 and the vibration force transmission device 6, the steel casing 1 can synchronously take soil during the sinking process, thereby improving the soil-taking efficiency and shortening the construction period; the automatic amplitude adjustment device 5 can automatically adjust the amplitude according to the construction requirements, thereby improving the accuracy and flexibility of the construction; the vibration force transmission device 6 transmits the vibration force of the vibrating sinking device 4 to the sinking soil-taking device 3, thereby realizing the vibration-force-driven soil-taking action and improving the soil-taking efficiency; the design of these devices realizes the automated construction during the sinking process of the steel casing 1, reduces the need for manual operation, and reduces labor intensity; through the synchronous vibration and soil taking, the disturbance of the surrounding soil by the single soil taking operation is reduced, thereby maintaining the stability of the soil.

[0058] Embodiment 2

[0059] Reference Figure 1-Figure 6 , a construction method for a vibration force transmission structure for large-diameter steel casing construction, step 1, during the sinking operation of the steel casing 1, the hook of the lifting equipment is connected to the hanging ear on the top of the arc-shaped protective cover 46 to drive the device to lift, and then the gripper 2 is used to clamp the steel casing 1. During the sinking, the vibration sinking device 4 works to control the vibration drive motor 47 to work, drive the power drive shaft 48 to rotate, thereby controlling the first pulley 49 at one end to rotate, and the first belt 414 connected to the surface transmission cooperates to drive the corresponding rotating shaft 410 at the bottom to rotate, and the rotating shaft The rotational motion of 410 controls the top vibration cam 411 and the top driving gear 412 on the surface to work, and the two top driving gears 412 mesh and work to synchronously control the two rotating shafts 410 on the top to rotate synchronously, driving the top vibration cam 411 on the surface to rotate and generate vibration force. At the same time, the second pulley 413 rotates and cooperates with the second belt 418 to control the rotational motion of the other corresponding rotating shaft 410 at the bottom, thereby controlling the rotational motion of the bottom vibration cam 415 to generate vibration force. The vibration force at the top and the vibration force at the bottom are combined to cooperate with the vibration steel casing 1 to sink.

[0060] Step 2: When the vibration amplitude needs to be adjusted according to the state of sinking, the vibration drive motor 47 stops working, so that the multiple rotating shafts 410 stop rotating. Because the adjusting gear 53 is internally installed with a one-way bearing 52, while the rotating shaft 410 rotates to generate vibration force, one end of the rotating shaft 410 performs idling motion with the adjusting gear 53 through the one-way bearing 52. When the adjusting gear 53 is stationary, the rotating shaft 410 rotates. When adjusting the amplitude, the adjusting motor 54 drives the adjusting shaft 55 to rotate, thereby driving the driving gear 56. Rotate, control the adjusting gear 53 to reverse under meshing, and then under the unidirectional action of the one-way bearing 52, the adjusting gear 53 and the rotating shaft 410 are locked to form a whole, control the rotating shaft 410 to reverse, drive the rotating shaft 410 to rotate, and control the angle of the bottom vibration cam 415 on the surface to adjust, and after the adjustment, the adjusting motor 54 stops working, and the vibration driving motor 47 works in the air, controlling the top vibration cam 411 and the bottom vibration cam 415 inside the vibration frame 41 to rotate, and generate the adjusted vibration force to drive the steel casing 1 to sink.

[0061] Step 3. When the steel casing 1 is sinking, the lifting drive motor 312 at the top is controlled to drive the soil-taking shaft 35 to rotate, and the small sprocket 37 is controlled to rotate. The four soil-taking shafts 35 are controlled to move synchronously under the transmission of the chain 38, thereby driving the spiral lifting piece 36 to rotate, and performing a spiral lifting operation on the mixed soil generated during the sinking of the steel casing 1.

[0062] Step 4, during the spiral lifting operation, the lifted soil is controlled to enter the interior of the L-shaped driving tube 39, and the vibration force transmission device 6 is used to operate. The vibration frame 41 vibrates while driving the bottom plate 44 to apply vibration force to the bottom driving ring 62, thereby controlling the four telescopic driving shafts 63 to reciprocate in the vertical direction, driving the bottom driving piston 64 to reciprocate, and the sealing ball 68 arranged on the top of the discharge pipe 310 squeezes the sealing pad 66 and the vertical soil extraction pipe 33 The spirally lifted soil and water are blocked to form a closed control, thereby controlling the L-shaped driving tube 39 to generate suction and thrust. The suction force extracts the soil lifted inside the vertical soil extraction pipe 33, and the thrust pushes the top sealing ball 68 to leave the sealing pad 66 so that the extracted soil is discharged; until the steel casing 1 sinks completely, the vertical sliding block 32 is pulled out through the vertical sliding groove 31 for removal, leaving the steel casing 1.

[0063] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A vibration force transmission structure for large diameter steel casing construction, comprising a steel casing (1) and a gripper (2), characterized in that: The clamping surface of the gripper (2) is in compression contact with the top surface of the steel casing (1), and a sinking and soil-taking device (3) is provided inside the steel casing (1). The sinking and soil-taking device (3) enables the steel casing (1) to synchronously take soil while sinking. The top of the gripper (2) is provided with a vibration sinking device (4), an amplitude automatic adjustment device (5) and a vibration force transmission device (6), respectively, and the vibration sinking device (4) realizes the action of providing a vibration driving force when the steel casing (1) sinks; The automatic amplitude adjustment device (5) realizes the action of automatically adjusting the amplitude of the vibration sinking device (4); The vibration force transmission device (6) realizes the action of the vibration force of the vibration sinking device (4) driving the suction force of the sinking soil taking device (3) to take soil.

2. A vibration force transmission structure for large diameter steel casing construction according to claim 1, characterized in that: The sinking soil taking device (3) comprises a vertical sliding groove (31) provided on the inner wall of the steel casing (1), wherein four vertical sliding grooves (31) are distributed in a circular array inside the steel casing (1), a vertical sliding block (32) is slidably inserted into the inner wall of the vertical sliding groove (31), a vertical soil taking pipe (33) is fixedly installed on the surface of the vertical sliding block (32), and a feed port (34) is provided at the bottom end of the vertical soil taking pipe (33); The top end of the vertical soil sampling pipe (33) is rotatably connected to a soil sampling shaft (35) via a bearing, the bottom end of the soil sampling shaft (35) penetrates and extends into the interior of the vertical soil sampling pipe (33), and a spiral lifting piece (36) is fixedly installed on the arc surface of the soil sampling shaft (35), the surface of the spiral lifting piece (36) is rotatably connected to the interior of the vertical soil sampling pipe (33), and a small sprocket (37) is fixedly installed on the top end of the soil sampling shaft (35), and the surfaces of the four small sprockets (37) are all transmission-connected to chains (38).

3. A vibration force transmission structure for large diameter steel casing construction according to claim 2, characterized in that: An L-shaped driving tube (39) is fixedly mounted on one side surface of the top end of the vertical soil taking tube (33); a discharge tube (310) is fixedly mounted on the top of one end of the L-shaped driving tube (39); the top end of the discharge tube (310) is mounted on the feed end of the flexible discharge tube; a connecting rod (311) is fixedly mounted on one side surface of the discharge tube (310); a lifting driving motor (312) is fixedly mounted on one end of the connecting rod (311); the output end of the lifting driving motor (312) is fixedly mounted relative to the top end of the vertical soil taking tube (33) via a coupling.

4. A vibration force transmission structure for large diameter steel casing construction according to claim 3, characterized in that: The vibrating sinking device (4) comprises a vibrating frame (41) mounted on the top of the gripper (2), guide sleeves (42) are fixedly mounted on the tops of both ends of the vibrating frame (41), guide pillars (43) are slidably inserted into the inner walls of the guide sleeves (42), bottoms of every two guide pillars (43) are fixedly mounted with a base plate (44), the top of the base plate (44) is also fixedly mounted with a vibrating spring (45), the vibrating spring (45) is movably sleeved on the surface of the guide pillars (43), the top of the vibrating spring (45) is fixedly mounted on the inner wall of the top end of the vibrating frame (41), the tops of the four guide pillars (43) are fixedly mounted with arc-shaped protective covers (46), and the top hanging ears of the arc-shaped protective covers (46) are connected to the hooks of the lifting equipment.

5. A vibration force transmission structure for large diameter steel casing construction according to claim 4, characterized in that: A vibration drive motor (47) is also fixedly mounted on the top of the vibration frame (41); a power drive shaft (48) is fixedly mounted on the output shaft of the vibration drive motor (47) via a coupling; a first pulley (49) is fixedly mounted on the arc surface of one end of the power drive shaft (48); rotating shafts (410) are rotatably connected to the inner walls of both sides of the vibration frame (41) via bearings; four rotating shafts (410) are arranged in groups of two, and two groups of rotating shafts (410) are arranged in parallel up and down.

6. The vibration force transmission structure for large diameter steel casing construction according to claim 5 is characterized in that: A top vibration cam (411) and a top driving gear (412) are respectively installed on the arc surfaces of the top group of two rotating shafts (410), the gear teeth and tooth grooves of the two top driving gears (412) are meshed, the four top vibration cams (411) are arranged crosswise, and a second pulley (413) is fixedly installed on one end of one of the rotating shafts (410), and the groove of the second pulley (413) and the groove of the first pulley (49) are both transmission-connected with a first belt (414).

7. A vibration force transmission structure for large diameter steel casing construction according to claim 6, characterized in that: A bottom vibration cam (415) and a bottom driving gear (416) are respectively installed on the arc surfaces of a group of two rotating shafts (410) at the bottom end, the gear teeth and tooth grooves of the two bottom driving gears (416) are meshed, the four bottom vibration cams (415) are arranged in a cross pattern, and a third pulley (417) is fixedly installed on one end of one of the rotating shafts (410), and the groove of the third pulley (417) and the groove of the second pulley (413) are both transmission-connected with a second belt (418).

8. The vibration force transmission structure for large diameter steel casing construction according to claim 5 is characterized in that: The amplitude automatic adjustment device (5) comprises an L-shaped connection seat (51) mounted on a side surface of the vibration frame (41), the surface of the L-shaped connection seat (51) being rotationally connected to the arc surface of a rotating shaft (410) at the bottom end via a bearing, and a one-way bearing (52) is also mounted on one end of the rotating shaft (410), and an adjustment gear (53) is fixedly mounted on the outer arc surface of the one-way bearing (52); An adjusting motor (54) is also fixedly mounted on one side surface of the L-shaped connecting seat (51); an adjusting shaft (55) is fixedly mounted on the output shaft of the adjusting motor (54) via a coupling; a driving gear (56) is fixedly mounted on one end of the adjusting shaft (55); the gear teeth of the driving gear (56) mesh with the tooth grooves of the adjusting gear (53).

9. The vibration force transmission structure for large diameter steel casing construction according to claim 4, characterized in that: The vibration force transmission device (6) comprises a vertical power rod (61) mounted at the bottom end of the base plate (44), a driving ring (62) being fixedly mounted at the bottom end of the vertical power rod (61), a telescopic driving shaft (63) being slidably inserted at the top of the other end of the L-shaped driving tube (39), the bottom end of the telescopic driving shaft (63) being penetrated and extended into the interior of the L-shaped driving tube (39), and a driving piston (64) being fixedly mounted at the bottom end of the telescopic driving shaft (63), the surface of the driving piston (64) being slidably inserted with the inner wall of the L-shaped driving tube (39) via a sealing ring, and the tops of the four telescopic driving shafts (63) being fixedly mounted with the bottom of the driving ring (62); A limiting sealing ring (65) is fixedly installed on the inner bottom side wall of the top end of the discharge pipe (310), a sealing gasket (66) is fixedly installed on the top end of the limiting sealing ring (65), a compression spring (67) is fixedly installed on the inner top side wall of the top end of the discharge pipe (310), a sealing ball (68) is fixedly installed on one end of the compression spring (67), and the surface of the sealing ball (68) is in compression contact with the surface of the sealing gasket (66).

10. A construction method for a vibration force transmission structure for a large diameter steel casing according to any one of claims 1 to 9, characterized in that: Step 1: During the sinking operation of the steel casing (1), the hook of the lifting device is connected to the hanging ear on the top of the arc-shaped protective cover (46) to drive the device to lift, and then the gripper (2) is used to clamp the steel casing (1). During the sinking, the vibration sinking device (4) works to control the vibration drive motor (47) to work, drive the power drive shaft (48) to rotate, thereby controlling the rotation of the first pulley (49) at one end, and the first belt (414) connected to the surface transmission cooperates to drive the corresponding rotation shaft (410) at the bottom to rotate, and the rotation of the rotation shaft (410) controls the surface The top vibration cam (411) and the top driving gear (412) work, and the two top driving gears (412) mesh and work to synchronously control the two rotating shafts (410) at the top to rotate synchronously, thereby driving the top vibration cam (411) on the surface to rotate and generate vibration force. At the same time, the second pulley (413) rotates and cooperates with the second belt (418) to control the rotation of the other corresponding rotating shaft (410) at the bottom, thereby controlling the rotation of the bottom vibration cam (415) at the bottom to generate vibration force. The vibration force at the top and the vibration force at the bottom are combined to cooperate with the vibration steel casing (1) to sink. Step 2: When the vibration amplitude needs to be adjusted according to the state of sinking, the vibration driving motor (47) stops working, so that the multiple rotating shafts (410) stop rotating. Since the adjusting gear (53) is internally installed with a one-way bearing (52), when the rotating shaft (410) rotates to generate vibration force, one end of the rotating shaft (410) performs idling motion with the adjusting gear (53) through the one-way bearing (52). When the adjusting gear (53) is stationary, the rotating shaft (410) rotates. When adjusting the amplitude, the adjusting motor (54) drives the adjusting shaft (55) to rotate, thereby driving the driving gear (56). The adjusting gear (53) is controlled to rotate in reverse under meshing, and then the adjusting gear (53) is locked with the rotating shaft (410) to form a whole under the unidirectional action of the one-way bearing (52), and the rotating shaft (410) is controlled to rotate in reverse, driving the rotating shaft (410) to rotate, and adjusting the angle of the bottom vibration cam (415) on the surface. After the adjustment is completed, the adjusting motor (54) stops working, and the vibration driving motor (47) in the air works to control the top vibration cam (411) and the bottom vibration cam (415) inside the vibration frame (41) to rotate, thereby generating an adjusted vibration force to drive the steel casing (1) to sink; Step 3: When the steel casing (1) is sinking, the lifting drive motor (312) at the top is controlled to work to drive the soil taking shaft (35) to rotate, and the small sprocket (37) is controlled to rotate. The four soil taking shafts (35) are synchronously controlled to move synchronously under the transmission of the chain (38), thereby driving the spiral lifting piece (36) to rotate, and performing a spiral lifting operation on the mixed soil generated during the sinking of the steel casing (1); Step 4: During the spiral lifting operation, the lifted soil is controlled to enter the interior of the L-shaped driving tube (39), and the vibration force transmission device (6) is operated to drive the bottom plate (44) to apply vibration force to the bottom driving ring (62) through the vibration of the vibration frame (41), thereby controlling the four telescopic driving shafts (63) to reciprocate in the vertical direction, driving the bottom driving piston (64) to reciprocate, and the sealing ball (68) provided at the top of the discharge tube (310) squeezes the sealing pad (66 ) and the vertical soil taking pipe (33) to block the soil and water lifted by the spiral, forming a closed control, thereby controlling the suction and thrust inside the L-shaped driving pipe (39), the suction extracts the soil lifted inside the vertical soil taking pipe (33), and the thrust pushes the sealing ball (68) at the top to leave the sealing pad (66) so that the extracted soil can be discharged; until the steel casing (1) sinks completely, the vertical sliding block (32) is pulled out through the vertical sliding groove (31) for removal, leaving the steel casing (1).