Bidirectional construction drilling, bolting, grouting, net spraying and frame integrated trolley

By designing a two-way construction drilling, anchoring, injection, net spraying rack integrated trolley, integrating the functions of drilling, anchoring, injection, net and spraying, the problems of low construction efficiency and poor quality of the existing drilling and explosion methods are solved, and efficient and stable Tunnel construction.

CN119102704APending Publication Date: 2024-12-10CHINA GEZHOUBA GRP THREE GORGES CONSTR ENG CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411250287.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

During the construction process of the existing drilling and blasting method, there are frequent equipment replacement, complicated processes, low efficiency, high labor intensity and poor construction quality.

Method used

Design a two-way construction drilling anchor injection net spraying rack integrated trolley, including chassis, electrical system, hydraulic system, base and working arm system. The working arm system includes grouting wet spraying arm, arch frame mounting arm, and main rock drilling arm , anchor rod mounting arms and auxiliary rock drilling arms, through these arm frames, the functions of drilling, anchor, injection, mesh and spraying are integrated, and the degree of mechanization is improved.

Benefits of technology

It greatly improves the efficiency and quality of tunnel construction, reduces labor costs, reduces drilling time, and ensures the stability and efficient operation of the trolley in complex environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119102704A_ABST
    Figure CN119102704A_ABST
Patent Text Reader

Abstract

A bidirectional construction drilling-bolting-grouting net spraying frame integrated trolley comprises a chassis, and an electrical system, a hydraulic system, a base, a working arm system and a wet spraying material receiving and supplying system are installed on the chassis. The working arm system comprises a grouting wet spraying arm, an arch frame mounting arm, a main rock drilling arm, an anchor rod mounting arm and an auxiliary rock drilling arm, the grouting wet spraying arm, the arch frame mounting arm, the main rock drilling arm and the auxiliary rock drilling arm are mounted on one side of the chassis, and the anchor rod mounting arm is mounted on the other side of the chassis. According to the bidirectional construction drilling, bolting, grouting, net spraying and frame integrated trolley, the construction efficiency and quality of an existing tunnel can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a trolley, in particular to a two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley. Background Art

[0002] Drilling and blasting is a commonly used method for underground engineering excavation. It forms underground space through drilling, charging, blasting, slagging and other processes. For underground chambers of different shapes and sizes, the drilling and blasting method can be adapted by adjusting the drilling and blasting parameters.

[0003] However, the drilling and blasting method requires a series of processes such as drilling, charging, blasting, and slag removal, and each process takes a certain amount of time, so the overall construction progress is relatively slow. In addition, the construction mostly relies on manual operation and the degree of automation is low, which not only increases the construction cost, but also seriously reduces the construction efficiency. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a bidirectional construction drilling, anchoring, grouting, mesh and spraying frame integrated trolley, aiming to solve the technical problems of frequent replacement of equipment and personnel, complicated procedures, low efficiency, high labor intensity and poor construction quality in the existing tunnel construction process.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: A two-way construction drilling, anchoring, grouting, mesh and spraying frame integrated trolley comprises a chassis, on which are installed an electrical system, a hydraulic system, a base, a working arm system and a wet spraying material receiving and feeding system; the working arm system comprises a grouting wet spraying arm, an arch frame mounting arm, a main rock drilling arm, an anchor rod mounting arm and an auxiliary rock drilling arm, wherein the grouting wet spraying arm, the arch frame mounting arm, the main rock drilling arm and the auxiliary rock drilling arm are mounted on one side of the chassis, and the anchor rod mounting arm is mounted on the other side of the chassis.

[0006] The grouting wet spraying arm includes a second arm frame, one end of which is equipped with a sliding spraying mechanism, the sliding spraying mechanism is connected to the wet spraying material feeding system through a feeding pipeline, the other end of the second arm frame is slidably matched with one end of the first arm frame and is driven to be extended and retracted by a telescopic cylinder, the other end of the first arm frame is hinged to the first support seat and is driven to be lifted or lowered by the first pitch cylinder; the first support seat is fixed on the first turntable, and the first turntable is rotatably connected to the base and is driven to rotate by a motor.

[0007] The arch mounting arm includes a fourth arm, one end of which is equipped with an arch mounting manipulator, the other end of the fourth arm slidingly cooperates with one end of the third arm and is driven to extend and retract through a second telescopic cylinder; the other end of the third arm is hinged to the second support seat and is driven to be lifted or lowered through a second pitch cylinder; the second support seat is fixed on the second turntable, and the second turntable is rotatably connected to the base and driven to rotate by a motor.

[0008] The main rock drilling arm includes a third turntable, which is rotatably mounted on the base and driven to rotate by a motor; a third support seat is fixed to the upper end of the third turntable; a fifth arm is hinged on the third support seat, and the fifth arm is driven to swing up and down by a third pitch cylinder; a sixth arm is slidably arranged on the top of the fifth arm, and the sixth arm is driven to move left and right by a third telescopic cylinder; the main drilling rig system is installed on the sixth arm.

[0009] The anchor mounting arm includes a first swivel seat, which can be rotatably mounted on the base and driven to rotate by a motor; a fourth support seat is fixed on the swivel seat, an eighth arm is hinged on the fourth support seat, and the eighth arm is driven to be lifted or lowered by a fourth pitch cylinder; a fourth telescopic cylinder is installed on the top of the eighth arm, and the fourth telescopic cylinder drives the seventh arm to be telescoped; a second swivel seat is installed on the other end of the seventh arm, and the second swivel seat drives the anchor-injection integrated system to rotate.

[0010] The structure of the auxiliary rock drilling arm is the same as that of the main rock drilling arm and is respectively located on both sides of the chassis.

[0011] The wet spraying material receiving and feeding system comprises a feeding box, which is connected with a receiving hopper, and the material in the feeding box is driven into the sliding spraying mechanism through a wet spraying pressurizing system.

[0012] The present invention provides a two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley, which has the following technical effects: 1) By arranging the grouting wet spraying arm, arch mounting arm, main rock drilling arm, anchor bolt mounting arm and auxiliary rock drilling arm on the trolley, it is ensured that the trolley can perform operations such as drilling and anchoring on surrounding rocks at any position in a complex tunnel environment. The high degree of mechanization greatly improves the efficiency of tunnel construction and realizes the integrated functions of drilling, anchoring, injection, meshing and spraying on one device. The work efficiency is high and the construction quality is greatly improved. It also has the advantages of good economic benefits and greatly saving labor costs.

[0013] 2) The main drilling arm and the auxiliary drilling arm are set at the same time. The double drilling arms can perform drilling operations at the same time under the control of the intelligent system, reducing drilling time and improving work efficiency.

[0014] 3) By arranging the grouting wet spray arm and the arch mounting arm in the middle, the main rock drilling arm and the auxiliary rock drilling arm on both sides, and the anchor mounting arm at the other end, the advantages of this position arrangement are: the main / auxiliary rock drilling arms are arranged on both sides to meet the requirements of the peripheral holes of the extra-large section and carry out drilling operations at the same time without interfering with each other, thereby improving the drilling efficiency; the grouting wet spray arm and the arch mounting arm are arranged in the middle, on the one hand, which facilitates the process succession, and on the other hand, the excessive weight of the arch frame prevents excessive eccentric torque during the lifting process, thereby improving the stability of the trolley. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a three-dimensional structural diagram of the present invention.

[0016] Figure 2 It is a rear view of the present invention.

[0017] Figure 3 It is a structural diagram of the grouting wet spray arm in the present invention.

[0018] Figure 4 It is a structural diagram of the arch mounting arm in the present invention.

[0019] Figure 5 It is a structural diagram of the main rock drilling arm in the present invention.

[0020] Figure 6 It is a top view of the anchor rod installation arm in the present invention.

[0021] Figure 7 It is a structural diagram of the auxiliary rock drilling arm in the present invention.

[0022] Figure 8 It is a structural schematic diagram of the wet spraying material supply system in the present invention. DETAILED DESCRIPTION

[0023] like Figure 1-2 As shown, an anchor drilling, injection and mesh spraying integrated trolley for tunnels includes a chassis 100, an electrical system 200, a hydraulic system 300, a base 400, a working arm system 500, a wet spraying material receiving and feeding system 600 and an intelligent control system 700.

[0024] The chassis 100 adopts an articulated four-wheel drive to realize the forward and backward movement of the device.

[0025] The electrical system 200 , the hydraulic system 300 and the base 400 are fixedly installed at appropriate positions on the chassis 100 by means of bolts. The electrical system 200 and the hydraulic system 300 are used to provide kinetic energy, and the base 400 is used to install the working arm system 500 .

[0026] like Figure 2 As shown, the working arm system 500 includes a grouting wet spraying arm 510, an arch mounting arm 520, a main rock drilling arm 530, an anchor mounting arm 540, and an auxiliary rock drilling arm 550. The working arm system 500 integrates the functions of drilling, anchoring, injection, netting, and spraying, greatly improving efficiency.

[0027] The wet spraying material receiving and feeding system 600 is installed at the end of the equipment to perform wet spraying feeding.

[0028] The intelligent control system 700 is integrated on the control panel of the operation room and can monitor and record the construction process in real time.

[0029] like Figure 3As shown, specifically, the grouting wet spraying arm 510 includes a first arm frame 511, a second arm frame 512, a first pitch cylinder 513, a first telescopic cylinder 514, and a wet spraying functional module.

[0030] The second arm 512 is slidably matched with one end of the first arm 511 and driven to slide by the telescopic cylinder 514, so that the second arm 512 is extended or retracted relative to the first arm 511. The other end of the first arm 511 is hinged to the first support seat and is driven by the first pitch cylinder 513 to be raised or lowered. The first support seat is fixed on the first turntable, and the first turntable is rotatably connected to the base 400 and driven to rotate by the motor, so that the grouting wet spray arm 510 can swing left and right.

[0031] The wet spraying function module includes a feed pipeline and a sliding spraying mechanism. The feed pipeline is integrated in the first arm 511 and the second arm 512, and is connected to the wet spraying material receiving and feeding system 600 through a pipeline to form a feed system.

[0032] The sliding spraying mechanism is installed at the end of the second boom 512. The sliding spraying mechanism can be driven by a motor to rotate 360 ​​degrees relative to the second boom 512, thereby meeting the requirements of large-scale cave excavation and spraying construction.

[0033] The sliding shotcrete mechanism is a widely used mechanical component on the spray-mixing trolley. It is generally not made into a separate product and does not have a specific model. The designs of mainstream equipment manufacturers are similar, so no special explanation is given here.

[0034] Preferably, a first platform 515 is fixedly installed on one side of the second boom 512, and the first platform 515 is used by workers to perform fine operations such as spraying concrete.

[0035] like Figure 4 As shown, the arch mounting arm 520 includes a third arm 521 , a fourth arm 522 , a slider 523 , a second telescopic cylinder 524 , a second pitch cylinder 525 , a second support seat 526 , a second turntable 527 and an arch mounting manipulator 528 .

[0036] The fourth boom 522 is slidably matched with one end of the third boom 521 and driven to slide by the second telescopic cylinder 524, so that the fourth boom 522 is extended or retracted relative to the third boom 521. The other end of the third boom 521 is hinged to the second support seat 526 and is driven by the second pitch cylinder 525 to be raised or lowered. The second support seat 526 is fixed on the second rotating disk 527, and the second rotating disk 527 is rotatably connected to the base 400 and driven to rotate by the motor.

[0037] The arch mounting manipulator 528 is mounted at the end of the fourth arm 522 , and can swing up and down and left and right through the second telescopic cylinder 524 , the second pitch cylinder 525 and the second turntable 527 .

[0038] Since the arch structure is arc-shaped, the arch installation robot 528 is adapted to the arch structure, so the arch installation arm 520 can be directly used to lift and move.

[0039] The arch installation robot 528 is a widely used mechanical component on the arch trolley. It is usually not made into a separate product and does not have a specific model. The designs of mainstream equipment manufacturers are similar, so no special explanation is given here.

[0040] like Figure 5 As shown, the main drilling arm 530 includes a fifth arm 531 , a sixth arm 532 , a slide block 534 , a third pitch cylinder 535 , a third support seat 536 , a third turntable 537 , a third telescopic cylinder 533 and a main drilling rig system 538 .

[0041] The third rotating disk 537 is rotatably mounted on the base 400 and driven to rotate by the motor. A third support seat 536 is fixed to the upper end of the third rotating disk 537. A fifth arm 531 is hingedly connected to the third support seat 536, and the fifth arm 531 is driven to swing up and down by the third pitch cylinder 535. A sixth arm 532 is slidably arranged on the top of the fifth arm 531, and the sixth arm 532 is driven to move left and right by the third telescopic cylinder 533.

[0042] The main drilling rig system 538 can rotate 360 ​​degrees, which can meet the needs of 15m-level extra-large section and full-section drilling construction; the main drilling rig system 538 includes hydraulic system pipelines and drill rod propulsion beams. When drilling, an intelligent control system is used to control the hydraulic system to propel the drill rod propulsion beam for drilling.

[0043] like Figure 6 As shown, the anchor rod installation arm 540 includes a seventh arm 541, an eighth arm 542, a fourth telescopic cylinder 543, a fourth pitch cylinder 544, a fourth slider 545, a fourth support seat 546, a first swivel seat 547, and an anchor-injection integrated system 548.

[0044] The first swivel seat 547 is rotatably mounted on the base 400 and driven to rotate by a motor. A fourth support seat 546 is fixed to the first swivel seat 547, and an eighth boom 542 is hinged to the fourth support seat 546. The eighth boom 542 is driven to be raised or lowered by a fourth pitch cylinder 544. A fourth telescopic cylinder 543 is installed at the top of the eighth boom 542, and the fourth telescopic cylinder 543 drives the seventh boom 541 to telescope relative to the eighth boom 542.

[0045] A second swivel seat is installed at the other end of the seventh arm 541, and the second swivel seat drives the anchoring and grouting integrated system 548 to rotate. In this way, the anchoring and grouting integrated system 548 can rotate 360 ​​degrees, ensuring that the trolley can use the system to anchor surrounding rocks at any position in a complex tunnel environment, and the mechanization degree is high, which greatly improves the efficiency of anchor support in the tunnel.

[0046] The integrated anchoring and grouting system 548 includes an anchor rod warehouse, an anchor rod pushing device, an anchor rod locking and grouting device, a grouting system, and a working platform.

[0047] The anchor-injection integrated system 548 is a widely used mechanical component on the anchor trolley. It is usually not made into a separate product and does not have a specific model. The designs of mainstream equipment manufacturers are similar, so no special explanation is given here.

[0048] like Figure 7 As shown, the auxiliary rock drilling arm 550 comprises a ninth arm frame 551, a tenth arm frame 552, a fifth telescopic oil cylinder 553, a slide block 554, a fifth pitch oil cylinder 555, a support seat 556, a third swivel seat 557 and an auxiliary drilling system 558. The structure of the auxiliary rock drilling arm 550 is basically the same as that of the main rock drilling arm 530.

[0049] The auxiliary drilling system 558 can rotate 360 ​​degrees and can meet the needs of 15m-level extra-large section full-section drilling construction; the auxiliary drilling system 558 includes hydraulic system pipelines and drill rod propulsion beams. When drilling, an intelligent control system is used to control the hydraulic system to propel the drill rod propulsion beam for drilling.

[0050] like Figure 8 As shown, the wet spraying receiving and feeding system 600 includes an admixture storage box 602 and a feeding box 604. The admixture storage box 602 stores the agent, and the agent is added to the feeding box 604. The concrete enters the feeding box 604 through the receiving hopper 601. After the agent and the concrete are evenly mixed, they are transported to the sliding spraying mechanism under the action of the wet spraying pressurization system 603 for wet spraying feeding.

[0051] The intelligent control system 700 is composed of high-performance computer hardware and intelligent software modules, which can realize refined control and monitoring of the trolley hardware.

Claims

1. A two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley, characterized by: The invention comprises a chassis (100), on which an electrical system (200), a hydraulic system (300), a base (400), a working arm system (500) and a wet spraying material receiving and feeding system (600) are installed; the working arm system (500) comprises a grouting wet spraying arm (510), an arch mounting arm (520), a main rock drilling arm (530), an anchor mounting arm (540) and an auxiliary rock drilling arm (550), wherein the grouting wet spraying arm (510), the arch mounting arm (520), the main rock drilling arm (530) and the auxiliary rock drilling arm (550) are installed on one side of the chassis (100), and the anchor mounting arm (540) is installed on the other side of the chassis (100).

2. A two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley according to claim 1, characterized in that: The grouting wet spraying arm (510) comprises a second arm frame (512), one end of which is provided with a sliding spraying mechanism, which is connected to the wet spraying material receiving and feeding system (600) via a feeding pipeline, the other end of the second arm frame (512) is slidably matched with one end of the first arm frame (511) and is driven to be extended and retracted via a telescopic cylinder (514), the other end of the first arm frame (511) is hinged to the first support seat and is driven to be lifted or lowered via a first pitch cylinder (513); the first support seat is fixed on a first turntable, which is rotatably connected to the base (400) and is driven to rotate via a motor.

3. The two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley according to claim 1, characterized in that: The arch mounting arm (520) comprises a fourth arm (522), one end of the fourth arm (522) being mounted with an arch mounting manipulator (528), the other end of the fourth arm (522) being slidably matched with one end of the third arm (521) and driven to be telescopic by a second telescopic oil cylinder (524); the other end of the third arm (521) being hinged to a second support seat (526) and driven to be lifted or lowered by a second pitch oil cylinder (525); the second support seat (526) being fixed on a second rotating disk (527), and the second rotating disk (527) being rotatably connected to the base (400) and driven to rotate by a motor.

4. The two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley according to claim 1, characterized in that: The main rock drilling arm (530) comprises a third rotating disk (537), which is rotatably mounted on the base (400) and driven to rotate by a motor; a third supporting seat (536) is fixed to the upper end of the third rotating disk (537); a fifth boom (531) is hingedly connected to the third supporting seat (536), and the fifth boom (531) is driven to swing up and down by a third pitch cylinder (535); a sixth boom (532) is slidably arranged at the top end of the fifth boom (531), and the sixth boom (532) is driven to move left and right by a third telescopic cylinder (533); and a main drilling rig system (538) is installed on the sixth boom (532).

5. The two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley according to claim 1, characterized in that: The anchor rod mounting arm (540) comprises a first swivel seat (547), which is rotatably mounted on the base (400) and driven to rotate by a motor; a fourth support seat (546) is fixed on the swivel seat (547), an eighth boom (542) is hinged on the fourth support seat (546), and the eighth boom (542) is driven to be raised or lowered by a fourth pitch cylinder (544); a fourth telescopic cylinder (543) is mounted on the top of the eighth boom (542), and the fourth telescopic cylinder (543) drives the seventh boom (541) to be telescopic; a second swivel seat is mounted on the other end of the seventh boom (541), and the second swivel seat drives the anchor-injection integrated system (548) to rotate.

6. The two-way construction drilling, anchoring, grouting, mesh and spraying frame integrated trolley according to claim 1, characterized in that: The structure of the auxiliary rock drilling arm (550) is the same as that of the main rock drilling arm (530) and is respectively located on both sides of the chassis (100).

7. The two-way construction drilling, anchoring, grouting, netting and spraying frame integrated trolley according to claim 1, characterized in that: The wet spraying material receiving and feeding system (600) comprises a feeding box (604), the feeding box (604) is connected to the receiving hopper (601), and the material in the feeding box (604) is driven into the sliding spraying mechanism through the wet spraying pressurizing system (603).

Citation Information

Cited By

  • Drilling, grouting and anchoring integrated construction equipment and construction method

    CN121273380A