Power equipment fault monitoring device and method
By using wire management monitoring components and data acquisition connectors in power equipment fault monitoring devices, the problems of confusion in wire wiring and unintuitive data display in power equipment fault monitoring are solved, and detailed real-time collection and monitoring of power equipment data are realized, and timely discovery is achieved. Exception reduces the operation and maintenance workload.
Patent Information
- Application Number
- CN202411501152.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2024-12-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power equipment fault monitoring devices have confusion and unintuitive problems in wiring and data display, which makes it difficult for staff to quickly understand the monitoring results.
A power equipment fault monitoring device is designed, using wire management monitoring components, and constraining wires through the guide rod and restraining rib strips. The wire runs through the guide hole, and combines the data acquisition joint and display screen to realize the neat arrangement of the wires and real-time data acquisition and data acquisition. exhibit.
It effectively avoids messy wires, realizes detailed real-time collection and monitoring of power equipment data, timely discovers abnormal situations, and visually displays data through the display screen, reducing the on-site inspection workload of operation and maintenance personnel.
Smart Images

Figure CN119104824A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power equipment fault monitoring, and more specifically, to a power equipment fault monitoring device and method. Background Art
[0002] Power equipment is divided into two categories: power generation equipment and power supply equipment. In order to avoid power equipment failure and ensure its normal operation, the operating status of the power equipment is usually monitored. During the monitoring process, a signal monitoring device is usually used to monitor the fault signal of the power equipment.
[0003] Among them, the patent with publication number CN118425669A discloses a power equipment fault monitoring device and method, which belongs to the field of power equipment monitoring technology, including a connection frame, a fixed column is fixedly connected to the center of the rear side of the connection frame, two connection columns are fixedly connected to the end of the outer edge of the fixed column close to the connection frame, and the end of the connection column away from the fixed column is fixedly connected to an electric telescopic rod; When this structure is in use, through the mutual cooperation between the connecting frame, L-shaped tube, fixed column, cross plate and other structures, it can be realized that after the monitoring device body is placed inside the storage frame, the line of the monitoring device body can be placed inside the adjacent L-shaped tube, and the power cord can be inserted into the power supply body. However, this structure is not easy to wire quickly when in use, which may cause confusion when different power equipment are monitored at the same time, and it is not easy for the staff to intuitively understand the monitoring results. Summary of the invention
[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a device and method for monitoring faults of electric power equipment, aiming to solve the problems raised in the above-mentioned background technology.
[0005] The present invention provides the following technical solution: an electric power equipment fault monitoring device, comprising a base, a top side of the base is provided with a wire management monitoring component; The cable management monitoring assembly includes a support plate arranged on one side of the top of the base, a processor is arranged in the middle of the support plate, and a plurality of guide rods are distributed on the outer side of the support plate; A plurality of drainage holes are formed through the surface of the support plate, and each drainage hole is located on one side of the bottom of a corresponding drainage rod. Constraint ribs are provided on one side of the surface of the plurality of drainage rods, and the cross-sectional shape of each constraint rib is arc-shaped. A data acquisition connector is provided on the top of the constraint rib, and the data acquisition connector is clamped with the drainage rod.
[0006] It can be seen that in the above technical solution, one end of the wire passes through the drainage hole, and the wire is constrained by the constraining ribs to avoid the wire from being messy. At the same time, the wire installed on the power equipment is connected to the data acquisition connector. The real-time data collection provides detailed information support for the operation of the power system. After the data acquisition connector collects data from different power equipment, the processor processes the data based on the real-time collected data, promptly discovers abnormal equipment conditions and issues early warnings. Optionally, in a possible implementation, an extension cover is fixedly provided on the top of each of the plurality of guide rods, a protective cone cover is plugged into one end of the extension cover, the vertical cross-section of the protective cone cover is conical, a connecting disk is provided at one end of the protective cone cover away from the extension cover, the connecting disk is embedded in the protective cone cover and is threadedly connected to the protective cone cover, a plurality of limiting slots are penetrated through the connecting disk, and a display screen is clamped in each of the limiting slots, and the plurality of display screens are respectively located on the top of the corresponding data acquisition connectors, a radiator is provided in the middle of the connecting disk, and a guide tube is rotatably connected to the radiator. The guide tube is provided with a plurality of card plates fixedly disposed on the outside of the guide tube, a plurality of second positioning holes are formed through the radiator, a plurality of first positioning holes are formed on the connection plate, and the bottom of each card plate extends into the first positioning hole and the second positioning hole respectively and is plugged into the first positioning hole and the second positioning hole, a support ring is sleeved on the outside of the connection plate, a plurality of remote controllers are clamped on the support ring, and a plurality of remote controllers are sleeved with identifications, a support vertical rod is threadedly connected to the top of the base, one end of the support vertical rod extends to one side of the support plate and is detachably connected to the support plate by bolts; It can be seen that in the above technical solution, when the data acquisition connector and the processor collect and monitor the data status of the power equipment, the corresponding data acquisition connector data transmission status is displayed through each display screen, which is easy for the staff to understand intuitively. After the setting of the radiator and the card board, the card board is plugged together with the corresponding second positioning hole and the first positioning hole, so that the radiator and the guide tube can be fixed in the middle of the connecting plate, which is convenient for the device to quickly dissipate heat during operation.
[0007] A method for monitoring faults of electric equipment, using the above-mentioned device for monitoring faults of electric equipment, comprises the following steps: Step 1: The staff installs the device at the designated location. When monitoring power equipment such as transformers, switch cabinets or cable lines, the device is installed on the power equipment through an external wire. One end of the wire passes through the drainage hole and is constrained by the constraining ribs to prevent the wire from becoming messy. At the same time, the wire installed on the power equipment is connected to the data acquisition connector to monitor parameters such as the winding temperature and current load of the power equipment. The real-time data collection provides detailed information support for the operation of the power system. Step 2: After collecting data from different power equipment through the data collection connector, the processor processes the data based on the real-time collected data, promptly discovers abnormal conditions of the equipment and issues early warnings. For example, when a related electrical quantity is detected to be out of limit, the related relay will output an alarm signal, thereby promptly notifying the operation and maintenance personnel to handle the problem; Step 3: When the data acquisition connector and the processor collect and monitor the data of the power equipment, the corresponding data acquisition connector data transmission status is displayed on each display screen, which is easy for the staff to understand intuitively; Step 4: After the heat sink and the card board are set, the card board is plugged into the corresponding second positioning hole and the first positioning hole, so that the heat sink and the guide tube can be fixed in the middle of the connecting plate, which is convenient for the device to quickly dissipate heat during operation.
[0008] Technical effects and advantages of the present invention: 1. The present invention allows one end of the wire to pass through the drainage hole and constrain the wire through the constraining ribs to avoid the wire from being messy. At the same time, the wire installed on the power equipment is connected to the data acquisition connector to monitor and collect data of the power equipment, providing detailed information support for the operation of the power system; 2. After the data acquisition connector is used to collect data from different power equipment, the processor processes the data based on the real-time collected data, making it easy for the device to detect abnormal conditions of the equipment in time and issue an early warning, which is convenient for the staff to handle; 3. When the data acquisition connector and the processor of the present invention collect and monitor the data of the power equipment, the corresponding data acquisition connector data transmission status is displayed on each display screen, which is easy for the staff to understand intuitively; To sum up, through the corresponding coordinated use of various structures, the wires are constrained by the constraint ribs to avoid the wires from becoming messy. At the same time, the wires installed on the power equipment are connected to the data acquisition connector to monitor and collect data from the power equipment. After data is collected from different power equipment through the data acquisition connector, the processor processes the data based on the real-time collected data, which makes it easy for the device to detect equipment abnormalities in time and issue early warnings. The data transmission status of the corresponding data acquisition connector is displayed on each display screen, which is easy for the staff to understand intuitively, thereby reducing the on-site inspection workload of the operation and maintenance personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the present disclosure, the following briefly introduces the drawings required for use in some embodiments. Obviously, the drawings described below are only drawings of some embodiments of the present disclosure. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings. In addition, the drawings described below can be regarded as schematic diagrams, and are not intended to limit the actual size of the product involved in the embodiments of the present disclosure, the actual process of the method, the actual timing of the signal, etc.
[0010] Figure 1 It is the front view of the overall structure of the present invention.
[0011] Figure 2 It is a side view of the overall structure of the present invention.
[0012] Figure 3 It is a top view of the cable management monitoring assembly of the present invention.
[0013] Figure 4 It is a stereoscopic diagram of the support plate, the guide rod, the restraining ribs and the data acquisition joint of the present invention.
[0014] Figure 5 It is a three-dimensional diagram of the support ring, remote controller, logo and heat sink of the present invention.
[0015] Figure 6 It is a stereoscopic diagram of the protective cone cover, connecting plate, clamping plate, guide pipe and radiator of the present invention.
[0016] The accompanying drawings are marked as follows: 1. base; 2. support plate; 3. processor; 4. guide rod; 5. guide hole; 6. constraint rib; 7. data acquisition connector; 8. extension cover; 9. protective cone cover; 10. connection plate; 11. limit slot; 12. display screen; 13. heat sink; 14. guide tube; 15. card plate; 16. first positioning hole; 17. support ring; 18. remote controller; 19. logo; 20. second positioning hole; 21. support vertical rod. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] As attached Figure 1-6The power equipment fault monitoring device and method shown in the figure, through the wire management monitoring component set on the base 1, the wires are constrained by the constraining ribs 6 to avoid the wires from being messy, and the wires installed on the power equipment are connected to the data acquisition connector 7 to monitor and collect the data of the power equipment. After the data acquisition connector 7 collects data from different power equipment, the processor 3 processes the data based on the real-time collected data, which makes it easy for the device to detect abnormal conditions of the equipment in time and issue an early warning. The data transmission status of the corresponding data acquisition connector 7 is displayed through each display screen 12, which is easy for the staff to understand intuitively, reducing the on-site inspection workload of the operation and maintenance personnel. The specific structure of the component is set as follows; The cable management monitoring assembly includes a support plate 2 arranged on one side of the top of the base 1, a processor 3 is arranged in the middle of the support plate 2, and a plurality of guide rods 4 are distributed on the outer side of the support plate 2; A plurality of drainage holes 5 are provided through the surface of the support plate 2, and each drainage hole 5 is located at one side of the bottom of the corresponding drainage rod 4. Constraint ribs 6 are provided on one side of the surface of the plurality of drainage rods 4, and the cross-sectional shape of each constraint rib 6 is arc-shaped. A data acquisition connector 7 is provided on the top of the constraint rib 6, and the data acquisition connector 7 is clamped with the drainage rod 4.
[0019] Optionally, in a possible embodiment, the top ends of the plurality of drainage rods 4 are fixedly provided with an extension cover 8, one end of the extension cover 8 is plugged with a protective cone cover 9, the vertical cross-section of the protective cone cover 9 is conical, and the end of the protective cone cover 9 away from the extension cover 8 is provided with a connecting disk 10, the connecting disk 10 is embedded in the protective cone cover 9 and is threadedly connected to the protective cone cover 9, a plurality of limiting card slots 11 are penetrated through the connecting disk 10, and a display screen 12 is clamped in each limiting card slot 11, and the plurality of display screens 12 are respectively located at the top of the corresponding data acquisition connector 7, a radiator 13 is provided in the middle of the connecting disk 10, and a guide pipe 14 is rotatably connected to the radiator 13, and the guide pipe 1 4 is fixedly provided with a plurality of card plates 15 on the outside, a plurality of second positioning holes 20 are formed through the heat sink 13, a plurality of first positioning holes 16 are formed on the connection plate 10, and the bottom of each card plate 15 extends into the first positioning hole 16 and the second positioning hole 20 respectively and plugs into the first positioning hole 16 and the second positioning hole 20, a support ring 17 is sleeved on the outside of the connection plate 10, a plurality of remote controllers 18 are clamped on the support ring 17, and a plurality of remote controllers 18 are sleeved with a mark 19, a support vertical rod 21 is threadedly connected to the top of the base 1, one end of the support vertical rod 21 extends to one side of the support plate 2 and is detachably connected to the support plate 2 by bolts; A method for monitoring faults of electric equipment, using the above-mentioned device for monitoring faults of electric equipment, comprises the following steps: Step 1: The staff installs the device at the designated location. When monitoring power equipment such as transformers, switch cabinets or cable lines, the device is installed on the power equipment through an external wire. One end of the wire passes through the drainage hole 5, and the wire is constrained by the constraint rib 6 to prevent the wire from being messy. At the same time, the wire installed on the power equipment is connected to the data acquisition connector 7 to monitor the parameters such as the winding temperature and current load of the power equipment. The real-time data collection provides detailed information support for the operation of the power system. Step 2: After the data acquisition connector 7 acquires data from different power equipment, the processor 3 processes the data based on the real-time acquired data, promptly discovers abnormal conditions of the equipment and issues an early warning. For example, when a certain associated electrical quantity is detected to be out of limit, the associated relay will output an alarm signal, thereby promptly notifying the operation and maintenance personnel to handle the problem. Step 3: When the data acquisition connector 7 and the processor 3 collect and monitor the data of the power equipment, the corresponding data acquisition connector 7 data transmission status is displayed through each display screen 12, which is easy for the staff to understand intuitively; Step four, after the heat sink 13 and the card plate 15 are set, the card plate 15 is plugged into the corresponding second positioning hole 20 and the first positioning hole 16, so that the heat sink 13 and the guide tube 14 can be fixed in the middle of the connecting plate 10, which is convenient for the device to quickly dissipate heat during operation.
[0020] According to the above structure, when in use, the staff installs the device at a designated location. When monitoring power equipment such as transformers, switch cabinets or cable lines, the device is installed on the power equipment through an external wire. One end of the wire passes through the drainage hole 5, and the wire is constrained by the constraint rib 6 to avoid the wire from being messy. At the same time, the wire installed on the power equipment is connected to the data acquisition connector 7 to monitor parameters such as the winding temperature and current load of the power equipment, and the real-time data collection provides detailed information support for the operation of the power system. After the data acquisition connector 7 acquires data from different power equipment, the processor 3 processes the data based on the real-time acquired data, promptly discovers abnormal conditions of the equipment and issues an early warning. For example, when a certain associated electrical quantity is detected to be beyond the limit, the associated relay will output an alarm signal, thereby promptly notifying the operation and maintenance personnel to handle the problem. When the data acquisition connector 7 and the processor 3 collect and monitor the data of the power equipment, the corresponding data transmission status of the data acquisition connector 7 is displayed through each display screen 12, which is easy for the staff to understand intuitively. After the setting of the radiator 13 and the card board 15, the card board 15 is plugged together with the corresponding second positioning hole 20 and the first positioning hole 16, so that the radiator 13 and the guide tube 14 can be fixed in the middle of the connecting disk 10, which is convenient for the device to quickly dissipate heat during operation.
[0021] Different from the prior art, the present application discloses a fault monitoring device and method for power equipment, in which the wires are constrained by constraint ribs 6 to prevent the wires from becoming messy. At the same time, the wires installed on the power equipment are connected to the data acquisition connector 7 for monitoring and collecting data of the power equipment. After data is collected from different power equipment through the data acquisition connector 7, the processor 3 processes the data based on the real-time collected data, which makes it easy for the device to detect equipment abnormalities in time and issue early warnings. The data transmission status of the corresponding data acquisition connector 7 is displayed on each display screen 12, which is easy for the staff to understand intuitively, thereby reducing the on-site inspection workload of the operation and maintenance personnel.
[0022] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A power equipment fault monitoring device, comprising a base (1), characterized in that: A wire management monitoring component is provided on one side of the top of the base (1); The cable management monitoring assembly comprises a support plate (2) arranged on one side of the top of the base (1), a processor (3) is arranged in the middle of the support plate (2), and a plurality of guide rods (4) are distributed on the outer side of the support plate (2); A plurality of drainage holes (5) are formed through the surface of the support plate (2), and each drainage hole (5) is located at one side of the bottom of a corresponding drainage rod (4). Constraint ribs (6) are provided on one side of the surface of the plurality of drainage rods (4), and the cross-sectional shape of each of the constraint ribs (6) is arc-shaped. A data acquisition connector (7) is provided at the top of the constraint rib (6), and the data acquisition connector (7) is snap-connected to the drainage rod (4).
2. The power equipment fault monitoring device according to claim 1, characterized in that: An extension cover (8) is fixedly provided at the top end of each of the plurality of drainage rods (4), and a protective cone cover (9) is inserted at one end of the extension cover (8).
3. The power equipment fault monitoring device according to claim 2, characterized in that: The vertical cross-section of the protective cone cover (9) is conical, and a connecting plate (10) is provided at one end of the protective cone cover (9) away from the extension cover (8). The connecting plate (10) is embedded in the protective cone cover (9) and is threadedly connected to the protective cone cover (9).
4. The power equipment fault monitoring device according to claim 1, characterized in that: The connection disk (10) is provided with a plurality of limit slots (11) extending therethrough, and a display screen (12) is clamped in each of the limit slots (11), and the plurality of display screens (12) are respectively located on the top of corresponding data acquisition connectors (7).
5. The power equipment fault monitoring device according to claim 3, characterized in that: A heat sink (13) is provided in the middle of the connection plate (10), a flow guide tube (14) is rotatably connected to the heat sink (13), and a plurality of clamping plates (15) are fixedly provided on the outer side of the flow guide tube (14).
6. The power equipment fault monitoring device according to claim 5, characterized in that: The heat sink (13) is provided with a plurality of second positioning holes (20), the connection plate (10) is provided with a plurality of first positioning holes (16), and the bottom of each of the clamping plates (15) extends into the first positioning hole (16) and the second positioning hole (20) respectively and is plugged into the first positioning hole (16) and the second positioning hole (20).
7. The power equipment fault monitoring device according to claim 1, characterized in that: A support ring (17) is sleeved on the outer side of the connection disk (10), a plurality of remote controllers (18) are clamped on the support ring (17), and a plurality of remote controllers (18) are sleeved on each of the plurality of remote controllers (18).
8. The power equipment fault monitoring device according to claim 1, characterized in that: A support vertical rod (21) is threadedly connected to the top of the base (1); one end of the support vertical rod (21) extends to one side of the support plate (2) and is detachably connected to the support plate (2) via bolts.
9. A method for monitoring faults of electric equipment, using the device for monitoring faults of electric equipment according to any one of claims 1 to 8, characterized in that: The following steps are included: Step 1: Install an external wire on the power equipment, one end of the wire passes through the drainage hole (5), the wire is constrained by the constraining rib (6) and connected to the data acquisition connector (7), and the power system operation information is collected; Step 2: The processor (3) processes the data collected in real time by the data collection connector (7) to promptly detect abnormal conditions of the equipment and issue an early warning; Step three, when the data acquisition connector (7) and the processor (3) collect and monitor the data status of the power equipment, the corresponding data acquisition connector (7) data transmission status is displayed through each display screen (12); Step 4: After the heat sink (13) and the card plate (15) are arranged, the card plate (15) is plugged into the corresponding second positioning hole (20) and the first positioning hole (16), so that the heat sink (13) and the guide tube (14) are fixed in the middle of the connecting plate (10).
Citation Information
Patent Citations
Power equipment fault monitoring device and method
CN118425669A
