Ship position data management and analysis method and system

By constructing a ship position data management database and analyzing the ship position data, the problem of low efficiency in ship position adjustment data management during ship construction is solved, and the whole process management is achieved, which improves construction efficiency and saves labor costs.

CN119130703APending Publication Date: 2024-12-13JIANGNAN SHIPYARD (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411200009.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-13

AI Technical Summary

Technical Problem

During the ship construction process, the data management of ship position adjustment mainly relies on paper records, resulting in low efficiency, high error rate, inconsistent evaluation basis, and lack of digital and informatization means for full-process management, affecting construction efficiency and cost.

Method used

By constructing a basic database for ship position data management, enter and analyze the standard values ​​and measured values ​​of ship position data, calculate the deviation values, and judge whether the ship position deviation is qualified, so as to achieve the entire process management from measurement, collection, processing to analysis.

Benefits of technology

It improves ship construction efficiency, saves labor costs, realizes standard definition, actual measurement entry and analysis management of ship position data, and improves the management efficiency of the floating state docking process of the ring section.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119130703A_ABST
    Figure CN119130703A_ABST
Patent Text Reader

Abstract

The invention discloses a ship position data management and analysis method and system. The ship position data management and analysis method comprises the following steps: sorting all basic data involved in a ship position data management service, and constructing a basic database for ship position data management; inputting ship position data standard values of the operation object in the operation stage, wherein the ship position data standard values comprise a center line minimum deviation standard value, a center line maximum deviation standard value, front and back minimum deviation standard values and front and back maximum deviation standard values; and inputting a target spot measurement value and a front and back deviation measurement value of the operation object in the operation stage. A bow deviation value and a stern deviation value are calculated based on the target measurement value. And judging whether the center line deviation and the front-back deviation are qualified or not based on the ship position data standard value, the bow deviation value, the stern deviation value and the front-back deviation measurement value. Furthermore, standard definition, actual measurement input and analysis management of ship position data in the ring section floating state docking process can be realized, the ship building efficiency is further improved, and the labor cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to a method and system for managing and analyzing ship position data. Background Art

[0002] There are many links involved in the floating docking process of ship segments, and ship position adjustment is one of the key process links. In the actual data management process of ship position adjustment, the main method used is paper records and calculations by construction personnel. This method has low efficiency, high error rate and inconsistent judgment basis. Therefore, it is urgent to use digital information technology to realize the whole process management of ship position data from measurement, collection, processing to analysis, so as to further improve the efficiency of ship construction and save labor costs. Summary of the invention

[0003] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a method and system for ship position data management and analysis, so as to achieve the whole process management of ship position data from measurement, collection, processing to analysis, and improve the efficiency of ship construction.

[0004] In order to achieve the above-mentioned object and other related objects, the present invention provides a method for managing and analyzing ship position data, comprising:

[0005] Sort out all basic data involved in the ship position data management business and build a basic database for ship position data management; the basic database includes: ship position operation area data, ship position operation object data, ship position operation stage data, and segment ship position target measurement schematic diagram;

[0006] Enter the standard values ​​of the ship position data of the operation object during the operation phase. The standard values ​​of the ship position data include the standard value of the minimum deviation of the center line, the standard value of the maximum deviation of the center line, the standard value of the minimum deviation of the front and rear, and the standard value of the maximum deviation of the front and rear;

[0007] Enter the target point measurement value and the front and rear deviation measurement value of the operation object during the operation stage;

[0008] Calculate the bow deviation value and the stern deviation value based on the target point measurement value;

[0009] Based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value, it is judged whether the centerline deviation and fore-aft deviation are qualified.

[0010] Optionally, the step of sorting out all basic data involved in the ship position data management business and building a basic database for ship position data management includes:

[0011] Sort out the engineering number data related to the ship position data management business during the ring segment docking process, and record the name, number and sequence number of all engineering numbers in the basic database;

[0012] Sort out the operation area data related to the ship position data management business, and record the names and serial numbers of all operation areas in the basic database;

[0013] Sort out the operation object data related to the ship position data management business, and record the names and serial numbers of all operation objects in the basic database;

[0014] Sort out the operation phase data related to the ship position data management business, and record the name, serial number and sequence number of all operation phases in the basic database;

[0015] Sort out the operation instruction drawings related to the ship position data management business, upload and record all the operation instruction drawings in the basic database in image format.

[0016] Optionally, the step of entering the standard value of the position data of the operation object in the operation phase includes:

[0017] Read the project number, operation area, operation object, and operation stage data stored in the basic database, and maintain the standard value of the operation object in the operation stage.

[0018] Optionally, the standard values ​​include a centerline minimum deviation standard value, a centerline maximum deviation standard value, a front-to-back minimum deviation standard value, and a front-to-back maximum deviation standard value.

[0019] Optionally, the step of entering the measurement value of the operation object in the operation stage includes:

[0020] Read the project number, operation area, operation object, and operation stage data stored in the basic database;

[0021] The target measurement values ​​and front and rear deviation measurement values ​​of the maintenance operation object during the operation stage. The target measurement values ​​include target measurement value A, target measurement value B, target measurement value C, and target measurement value D.

[0022] Optionally, the step of calculating the bow deviation value, the stern deviation value, the centerline deviation value and the fore-aft deviation value based on the target point measurement value includes:

[0023] The bow deviation value is the difference between the target point measurement value A and the target point measurement value B;

[0024] The stern deviation value is the difference between the target point measurement value C and the target point measurement value D.

[0025] Optionally, the step of judging whether the centerline deviation and the fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value includes:

[0026] When the bow deviation value is between the minimum centerline deviation standard value and the maximum centerline deviation standard value, and the stern deviation value is also between the minimum centerline deviation standard value and the maximum centerline deviation standard value, the centerline deviation of the operation object is judged to be qualified.

[0027] Optionally, the step of judging whether the centerline deviation and the fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value includes:

[0028] When the front-to-back deviation measurement value is between the front-to-back minimum deviation standard value and the front-to-back maximum deviation standard value, the front-to-back deviation is judged to be qualified.

[0029] According to one aspect of the present invention, a ship position data management and analysis system is also included, and the ship position data management and analysis system includes:

[0030] Basic data management module is used to maintain and manage the basic information required for ship position data management, mainly including information such as engineering, operation area, operation stage, operation object, layout diagram, etc.

[0031] The standard value data management module is used to input the standard value data of the operation object during the operation stage;

[0032] The measurement data management module is used to input the target point measurement data of the operation object during the operation phase, as well as the front and back deviation measurement values;

[0033] The ship position data analysis module is used for calculating the deviation value of the bow of the ship, calculating the deviation value of the stern of the ship, judging the qualified deviation of the centerline of the ship, and judging the qualified deviation of the fore and aft of the ship.

[0034] Compared with the prior art, the method and system for managing and analyzing ship position data of the present invention have at least the following beneficial effects:

[0035] The ship position data management and analysis method of the present invention comprises constructing a basic database and maintaining standard value data of the operation object in the operation stage. The actual target point measurement value of the operation object in the operation stage and the actual measurement value of the front and rear deviation are input. By calculating the bow deviation value and the tail deviation value, the qualified judgment of the centerline deviation and the front and rear deviation of the ship position is performed. Furthermore, the present invention can realize the standard definition, actual measurement input and analysis management of the ship position data during the ring segment floating docking process, thereby further improving the ship construction efficiency and saving labor costs.

[0036] The ship position data management and analysis system in the present invention is applied to the above-mentioned ship position data management and analysis system, and also has the above-mentioned technical effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a flow chart of a method for managing and analyzing ship position data in an embodiment of the present invention;

[0038] Figure 2 Schematic diagram of the structure of the ship position data management and analysis system in an embodiment of the present invention. DETAILED DESCRIPTION

[0039] The following specific embodiments illustrate the embodiments of the present invention, and those familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0040] It should be noted that the diagrams provided in the embodiments of the present invention are only used to illustrate the basic concept of the present invention in a schematic manner. Although the diagrams only show the components related to the present invention rather than being drawn according to the number, shape and size of the components in actual implementation, the form, quantity and proportion of each component can be changed at will during actual implementation, and the layout of the components may also be more complex. The structures, proportions, sizes, etc. illustrated in the drawings of the specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions that can be implemented in this application, so they have no technical substantive significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by the present invention.

[0041] This embodiment provides a method for managing and analyzing ship position data. Figure 1 , the vessel position data management and analysis method includes:

[0042] S1: Sort out all basic data involved in the ship position data management business and build a basic database for ship position data management; the basic database includes: ship position operation area data, ship position operation object data, ship position operation stage data, and segment ship position target measurement schematic diagram;

[0043] Specifically, the steps of sorting out all basic data involved in the ship position data management business and building a basic database for ship position data management include:

[0044] S11: sort out the engineering number data related to the ship position data management business during the ring segment docking process, and record the names, numbers and serial numbers of all engineering numbers in the basic database, as shown in Table 1 below.

[0045] Table 1

[0046] Serial number Project No. Project Name

[0047] S12: Sort out the operation area data related to the ship position data management business, and record the names and serial numbers of all operation areas in the basic database, as shown in Table 2 below.

[0048] Table 2

[0049] Serial number Working area

[0050] S13: sort out the operation object data related to the ship position data management business, and record the names and serial numbers of all operation objects in the basic database, as shown in Table 3 below.

[0051] Table 3

[0052] Serial number Job Object

[0053] S14: Sort out the operation phase data related to the ship position data management business, and record the names, serial numbers, and sequence numbers of all operation phases in the basic database, as shown in Table 4 below.

[0054] Table 4

[0055] Serial number Operation stage

[0056] S15: Sort out the operation instruction drawings related to the ship position data management business, upload and record all the operation instruction drawings in the basic database in the form of pictures.

[0057] S2: Enter the standard values ​​of the ship position data of the operation object during the operation phase. The standard values ​​of the ship position data include the standard value of the minimum deviation of the center line, the standard value of the maximum deviation of the center line, the standard value of the minimum deviation of the front and rear, and the standard value of the maximum deviation of the front and rear;

[0058] Specifically, when entering the standard value of the ship position data of the operation object in the operation phase, first read the project number, operation area, operation object, and operation phase data stored in the basic database, and then enter the standard value of the maintenance operation object in the operation phase. Among them, the standard value includes the standard value of the minimum deviation of the center line, the standard value of the maximum deviation of the center line, the standard value of the minimum deviation of the front and rear, and the standard value of the maximum deviation of the front and rear.

[0059] For example: set the project number to H9999; the operation area to 1# dock; the operation object to the middle section, and set the standard values ​​at different operation stages, as shown in Table 5 below.

[0060] Table 5

[0061]

[0062] S3: Enter the target point measurement value and the front and rear deviation measurement value of the operation object during the operation stage;

[0063] Specifically, when entering the standard value of the ship position data of the operation object in the operation phase, read the project number, operation area, operation object, and operation phase data stored in the basic database, and then enter and maintain the target measurement value and front and rear deviation measurement value of the operation object in the operation phase. The target measurement value includes target measurement value A, target measurement value B, target measurement value C, and target measurement value D. The front and rear deviation measurement value includes the front and rear deviation measurement value E.

[0064] For example: set the project number to H9999; the operation area to 1# dock; the operation object to the middle section, and enter the actual measured values ​​of the targets in different operation stages, as shown in Table 6 below.

[0065] Table 6

[0066]

[0067]

[0068] S4: Calculate the bow deviation value and the stern deviation value based on the target point measurement value;

[0069] Specifically, after entering the target point measurement value, the specific data of the target point measurement value is obtained, and then the bow deviation value and the stern deviation value are calculated according to the measurement data of the target point measurement value. When calculating the bow deviation value of the operation object, the calculation rule of the bow deviation value is: bow deviation value = target point measurement value A target point measurement value B.

[0070] For example: based on the entered project number H9999, the operation area is 1# dock, and the operation object is the actual measured value of the target in the middle section, the bow deviation value is calculated separately, as shown in Table 7 below.

[0071] Table 7

[0072]

[0073] When calculating the stern deviation value of the operation object, the stern deviation value calculation rule is: tail deviation value = target point measurement value C target point measurement value D.

[0074] For example: based on the entered project number H9999, the operation area is 1# dock, and the operation object is the actual measured value of the target in the middle section, the tail deviation value is calculated separately, as shown in Table 8 below.

[0075] Table 8

[0076]

[0077] S5: Determine whether the centerline deviation and fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value.

[0078] Obtain the standard value of the ship position data entered in step S2, the measured value of the fore-aft deviation in step S3, and the bow deviation value and stern deviation value calculated in step S4. Determine whether the centerline deviation and fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value, and the measured value of the fore-aft deviation.

[0079] Specifically, when judging whether the centerline deviation before and after the work object is qualified, the qualified judgment rule is:

[0080] The minimum deviation standard value of the center line ≤ the deviation value of the head ≤ the maximum deviation standard value of the center line

[0081] And the minimum deviation standard value of the center line ≤ the tail deviation value ≤ the maximum deviation standard value of the center line.

[0082] For example: Based on the entered project number H9999, the operation area is 1# dock, the operation object is the measured value of the target point in the middle section, and the calculated bow deviation value and stern deviation value, determine whether the centerline deviation of the ship position at different operation stages is qualified, as shown in Table 9 below.

[0083] Table 9

[0084]

[0085] When judging whether the front and rear deviations of the work object are qualified, the qualified judgment rules are:

[0086] The minimum standard value of the front-to-back deviation ≤ the actual measured value of the front-to-back deviation ≤ the maximum standard value of the front-to-back deviation.

[0087] For example: Based on the entered project number H9999, the operation area is 1# dock, the operation object is the target point measured value and the actual value of the front and rear deviations in the middle section, determine whether the centerline deviation of the ship position at different operation stages is qualified, as shown in Table 10 below.

[0088] Table 10

[0089]

[0090] This embodiment also provides a ship position data management and analysis system, which is applied to the above-mentioned ship position data management and analysis method. Figure 2As shown, the ship position data management and analysis system includes a basic data management module, a standard value data management module, a measurement value data management module and a ship position data analysis module. The basic data management module is used to realize the maintenance and management of the basic information required for the ship position data management, mainly including information such as engineering, operation area, operation stage, operation object, layout diagram, etc. The standard value data management module is used to realize the entry of standard value data of the operation object in the operation stage. The measurement value data management module is used to realize the entry of target point measurement value data of the operation object in the operation stage, as well as the front and rear deviation measurement values. The ship position data analysis module is used to realize the calculation of the ship position bow deviation value, the calculation of the ship position stern deviation value, the qualified judgment of the ship position centerline deviation, and the qualified judgment of the front and rear deviation of the ship position.

[0091] In summary, the ship position data management and analysis method of the present invention includes constructing a basic database, maintaining the standard value data of the operation object in the operation stage; performing actual target point measurement values ​​of the operation object in the operation stage, and entering the actual measurement values ​​of the front and rear deviations. By calculating the bow deviation value and the tail deviation value, the qualified judgment of the centerline deviation and the front and rear deviation of the ship position is performed. Furthermore, the present invention can realize the standard definition, actual measurement entry and analysis management of the ship position data during the ring segment floating docking process, thereby further improving the efficiency of ship construction and saving labor costs.

[0092] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A method for managing and analyzing ship position data, characterized in that: include: Sort out all basic data involved in the ship position data management business and build a basic database for ship position data management; The basic database includes: ship position operation area data, ship position operation object data, ship position operation stage data, and a schematic diagram of loop segment ship position target point measurement; Enter the standard values ​​of the ship position data of the operation object during the operation phase, wherein the standard values ​​of the ship position data include the standard value of the minimum deviation of the center line, the standard value of the maximum deviation of the center line, the standard value of the minimum deviation of the front and rear, and the standard value of the maximum deviation of the front and rear; Enter the target point measurement value and the front and rear deviation measurement value of the operation object during the operation stage; Calculate the bow deviation value and the stern deviation value based on the target point measurement value; Based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value, it is judged whether the centerline deviation and fore-aft deviation are qualified.

2. The method for managing and analyzing ship position data according to claim 1, characterized in that: The steps of sorting out all the basic data involved in the ship position data management business and building the basic database for ship position data management include: Sort out the engineering number data related to the ship position data management business during the ring segment docking process, and record the name, number and sequence number of all engineering numbers in the basic database; Sort out the operation area data related to the ship position data management business, and record the names and serial numbers of all operation areas in the basic database; Sort out the operation object data related to the ship position data management business, and record the names and serial numbers of all operation objects in the basic database; Sort out the operation phase data related to the ship position data management business, and record the name, serial number and sequence number of all operation phases in the basic database; Sort out the operation instruction drawings related to the ship position data management business, upload and record all the operation instruction drawings in the basic database in image format.

3. The method for managing and analyzing ship position data according to claim 1, characterized in that: The step of inputting the standard value of the ship position data of the operation object during the operation phase includes: Read the project number, operation area, operation object, and operation stage data stored in the basic database, and maintain the standard value of the operation object in the operation stage.

4. The method for managing and analyzing ship position data according to claim 3, characterized in that: The standard values ​​include a centerline minimum deviation standard value, a centerline maximum deviation standard value, a front-to-back minimum deviation standard value, and a front-to-back maximum deviation standard value.

5. The method for managing and analyzing ship position data according to claim 1, characterized in that: The step of entering the measured value of the operation object during the operation phase includes: Read the project number, operation area, operation object, and operation stage data stored in the basic database; The target point measurement values ​​and the front and rear deviation measurement values ​​of the maintenance operation object during the operation stage, wherein the target point measurement values ​​include target point measurement value A, target point measurement value B, target point measurement value C, and target point measurement value D.

6. The method for managing and analyzing ship position data according to claim 5, characterized in that: The step of calculating the bow deviation value, the stern deviation value, the centerline deviation value and the fore-aft deviation value based on the target point measurement value includes: The bow deviation value is the difference between the target point measurement value A and the target point measurement value B; The stern deviation value is the difference between the target point measurement value C and the target point measurement value D.

7. The method for managing and analyzing ship position data according to claim 1, characterized in that: The step of judging whether the centerline deviation and the fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value includes: When the bow deviation value is between the minimum centerline deviation standard value and the maximum centerline deviation standard value, and the stern deviation value is also between the minimum centerline deviation standard value and the maximum centerline deviation standard value, the centerline deviation of the operation object is judged to be qualified.

8. The method for managing and analyzing ship position data according to claim 1, characterized in that: The step of judging whether the centerline deviation and the fore-aft deviation are qualified based on the standard value of the ship position data, the bow deviation value, the stern deviation value and the fore-aft deviation measurement value includes: When the front-to-back deviation measurement value is between the front-to-back minimum deviation standard value and the front-to-back maximum deviation standard value, the front-to-back deviation is judged to be qualified.

9. A ship position data management and analysis system, characterized in that: The ship position data management and analysis system comprises: Basic data management module, used for the maintenance and management of basic information required for ship position data management, mainly including information such as engineering, operation area, operation stage, operation object, layout diagram, etc.; The standard value data management module is used to input the standard value data of the operation object during the operation stage; The measurement data management module is used to input the target point measurement data of the operation object during the operation phase, as well as the front and back deviation measurement values; The ship position data analysis module is used for calculating the deviation value of the bow of the ship, calculating the deviation value of the stern of the ship, judging the qualified deviation of the centerline of the ship, and judging the qualified deviation of the fore and aft of the ship.