Tower crane wall-attaching mounting and dismounting planning method

By determining the allowable points of the tower crane attached wall and adjusting the status of the wall attached wall, the problem of insufficient stability of the tower crane attached wall installation and demolition plan is solved, and the stability and safety improvement during the construction process is achieved. It is suitable for different types of tower cranes and construction. on site.

CN119130734APending Publication Date: 2024-12-13SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411275795.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-13

AI Technical Summary

Technical Problem

The tower crane wall installation and demolition plan has insufficient stability, resulting in high safety risks during construction and relying on the experience of technical personnel, which has subjectivity and uncertainty.

Method used

By determining the set of allowed wall points on the tower crane, determine the points of the new wall according to the minimum height value of the new wall and the set of allowed wall points, and traverse the connection status of the existing walls, adjust or add attachments according to the minimum height value of the new wall height and the set of allowed wall points, and traverse the connection status of the existing walls, adjust or add attachments To ensure that the spacing requirements for attachment walls are met, the formula is used to calculate the height and point of the new attachment walls, and comprehensively consider the spacing and cantilever height of the attachment walls.

Benefits of technology

Ensure the stability of tower cranes during construction, reduce safety risks, improve construction efficiency, have strong versatility and operability, and are suitable for different types of tower cranes and construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119130734A_ABST
    Figure CN119130734A_ABST
Patent Text Reader

Abstract

The invention provides a tower crane wall-attaching mounting and dismounting planning method. The tower crane wall-attaching mounting and dismounting planning method comprises the steps that S1, a set of permitted wall-attaching points on a tower crane is determined; s2, determining a point location of a new attached wall; s3, adjusting the existing attached wall; s4, determining point locations capable of being added with attached walls, and adding an attached wall at each point location capable of being added with the attached walls; s5, the connection state of each existing attached wall is traversed in sequence, whether the distance requirement with the newly-added attached wall is met or not is checked in each step of traversing, and if yes, a final result is output; otherwise, the condition is fed back to the technician, and the technician compiles an overrun scheme and reports the tower crane manufacturer to approve. According to the wall-attached mounting and dismounting planning method for the tower crane, factors such as the wall-attached distance and the height of the cantilever of the tower crane are comprehensively considered instead of relying on experience of technicians, the stability of the tower crane in the construction process can be ensured, the safety risk is reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering construction, and in particular to a tower crane wall-attached installation and disassembly planning method. Background Art

[0002] Tower crane is an important vertical transportation equipment, and its stability is directly related to construction safety. During operation, the tower crane needs to be connected to the building through a wall attachment device to enhance its stability. However, as the building rises, the location and number of the tower crane's wall attachments also need to be adjusted accordingly.

[0003] At present, the planning of tower crane wall installation and disassembly plans mainly relies on the experience of technical personnel, which involves certain subjectivity and uncertainty, and may lead to insufficient stability of the tower crane during construction, or even safety accidents.

[0004] With regard to the problem of insufficient tower crane stability in the prior art tower crane wall installation and removal scheme, those skilled in the art have been looking for solutions. Summary of the invention

[0005] The purpose of the present invention is to provide a tower crane wall installation and disassembly planning method, which can ensure the stability of the tower crane during the construction process, reduce safety risks and improve construction efficiency.

[0006] In order to solve the above technical problems, the present invention provides a tower crane wall installation and disassembly planning method, the tower crane wall installation and disassembly planning method comprises the following steps:

[0007] S1: Determine the set of allowed wall attachment points on the tower crane;

[0008] S2: Determine the location of the new wall according to the minimum height of the new wall and the set of allowed wall attachment points;

[0009] S3: First, check whether the second-to-last existing attached wall meets the requirements of the wall spacing. If so, there is no need to adjust the existing attached wall, and the current result is directly output; otherwise, the connection status of each existing attached wall is traversed in turn, and each step of the traversal is checked to see whether the requirements of the wall spacing are met. If so, the final result is output, otherwise, S4 is executed; wherein the connection status includes: a tightened state and a loosened state;

[0010] S4: Determine the points where an attached wall can be added, and add an attached wall at each point where an attached wall can be added;

[0011] S5: Traverse the connection status of each existing attached wall in turn, and verify whether the spacing requirements with the newly added attached wall are met at each step. If yes, the output is the final result; otherwise, the situation is fed back to the technicians, who will prepare an over-limit plan and report it to the tower crane manufacturer for approval.

[0012] Optionally, in the tower crane wall installation and removal planning method, S1 includes the following sub-steps:

[0013] S11: Take the intersection of the building's wall-attachable range and the tower crane's wall-attachable range;

[0014] S12: The set obtained by discretizing the intersection with a step size of 0.1 meters is the set of allowed wall attachment points.

[0015] Optionally, in the tower crane wall installation and disassembly planning method, S2 includes the following sub-steps:

[0016] S21: Calculate the minimum height of the new wall according to the cantilever height specified in the tower crane manual and the current height of the tower crane;

[0017] S22: Determine the location of the new wall based on the following formula:

[0018] P0=min({x|x∈C and x>Pmin});

[0019] Among them, P0 is the point of the new wall attachment, C is the set of allowed wall attachment points, and Pmin is the minimum height of the new wall attachment.

[0020] Optionally, in the tower crane wall installation and removal planning method, in S21, the minimum height of the new wall is calculated based on the following formula:

[0021] Pmin = Ht - Hx;

[0022] Among them, Pmin is the minimum height of the newly attached wall; Ht is the current height of the tower crane; Hx is the cantilever height.

[0023] Optionally, in the tower crane wall attachment installation and removal planning method, in S4, the points where additional wall attachments can be added are determined based on the following formula:

[0024] {Pnew}={x|x∈C and x <P0};

[0025] Among them, Pnew is the point added to the wall; C is the set of allowed wall attachment points; P0 is the new wall attachment point.

[0026] In the tower crane wall attachment installation and disassembly planning method provided by the present invention, the tower crane wall attachment installation and disassembly planning method includes: S1: determining a set of allowed wall attachment points on the tower crane; S2: determining the point position of the new wall attachment according to the minimum height of the new wall attachment and the set of allowed wall attachment points; S3: first verifying whether the second-to-last existing wall attachment meets the wall attachment spacing requirement, if so, there is no need to adjust the existing wall attachment, and directly output the current result; otherwise, traversing the connection status of each existing wall attachment in turn, and verifying whether the wall attachment spacing is met at each step of the traversal Requirements, if met, then the output is the final result, otherwise, S4 is executed; wherein, the connection state includes: tightening state and loosening state; S4: determine the points where the attachment wall can be added, and add an attachment wall at each point where the attachment wall can be added; S5: traverse the connection state of each existing attachment wall in turn, and verify at each step whether the spacing requirement with the newly added attachment wall is met, if satisfied, then the output is the final result; otherwise, the situation is fed back to the technicians, and the technicians prepare an over-limit plan and report it to the tower crane manufacturer for approval. The tower crane attachment wall installation and disassembly planning method of the present invention comprehensively considers factors such as the attachment wall spacing and the tower crane cantilever height, rather than relying on the experience of technicians, and can ensure the stability of the tower crane during construction, reduce safety risks, and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0028] Figure 1 It is a flow chart of a tower crane wall installation and disassembly planning method according to one embodiment of the present invention;

[0029] Figure 2 It is a principle block diagram of a tower crane wall-attached installation and disassembly planning method in one embodiment of the present invention;

[0030] Figure 3 It is a schematic diagram of the range of walls that buildings and tower cranes can be attached to in one embodiment of the present invention;

[0031] Figure 4 It is a schematic diagram of an example of adjusting the attached wall and adding the attached wall in one embodiment of the present invention. DETAILED DESCRIPTION

[0032] The following is a further detailed description of a tower crane wall installation and disassembly planning method proposed by the present invention in combination with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the accompanying drawings are in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0033] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0034] In the description of the invention, it is necessary to understand that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0036] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to the specific circumstances.

[0037] Please refer to Figures 1 to 4 The tower crane wall installation and disassembly planning method comprises the following steps:

[0038] First, execute step S1 to determine a set of allowed wall attachment points on the tower crane;

[0039] Specifically, S1 includes the following steps:

[0040] S11: Take the intersection of the building's wall-attachable range and the tower crane's wall-attachable range;

[0041] S12: The set obtained by discretizing the intersection with a step size of 0.1 meters is the set of allowed wall attachment points.

[0042] Example 1: Please refer to Figure 3 , Figure 3In the figure, the building can be attached to the wall range {M} and the tower crane can be attached to the wall range {B}. The intersection of the two segments M and the two segments B is 25~25.6 and 26~26.2, and the set of allowed wall attachment points C = {25,25.1,25.2,25.3,25.4,25.5,25.6,26,62.1,26.2} is obtained.

[0043] Next, executing step S2, determining the point of the new wall attachment according to the minimum height of the new wall attachment and the set of allowed wall attachment points;

[0044] Specifically, S2 includes the following steps:

[0045] S21: Calculate the minimum height Pmin of the new wall according to the cantilever height specified in the tower crane instruction manual and the current height of the tower crane; wherein, in S21, the minimum height Pmin of the new wall is calculated based on the following formula:

[0046] Pmin=Ht-Hx; Pmin is the minimum height of the newly attached wall; Ht is the current height of the tower crane; Hx is the cantilever height.

[0047] S22: Determine the point P0 of the new wall based on the following formula:

[0048] P0=min({x|x∈C and x>Pmin}); where P0 is the new wall attachment point, C is the set of allowed wall attachment points, and Pmin is the minimum height of the new wall attachment. In other words, the process of determining the new wall attachment point P0 is: select the smallest point that meets the minimum height value from the set of allowed wall attachment points as the new wall attachment point P0; if there is no point that meets the requirements in the set of allowed wall attachment points, then select the smallest point in the set of allowed wall attachment points that is greater than the minimum height value Pmin of the new wall attachment as the new wall attachment point.

[0049] Example 2: The current height of the tower crane is 91 meters, and the cantilever height specified in the manual is 33.6 meters, then Pmin = 57.4m, but this height is not in C, so the smallest point greater than Pmin, that is, 57.8m, is selected as the new wall attachment position.

[0050] Next, step S3 is executed, (adjusting the existing attached wall) firstly verifies whether the second to last existing attached wall meets the requirements of the attached wall spacing. If so, there is no need to adjust the existing attached wall, and the current result is directly output; otherwise, the connection state of each existing attached wall is traversed in turn, and each step of traversal verifies whether the requirements of the attached wall spacing are met. If so, the final result is output, otherwise, S4 is executed; wherein the connection state includes: a tightened state and a loosened state;

[0051] Example 3: Please refer to Figure 4 , Figure 4Except for the newly added attachment wall, there are already 2 attachment walls for the tower crane, located at P1 = 46.4m and P2 = 25.6m respectively. Among them, the spacing requirements are not met between P1 and P0, so try to loosen it. Traverse the four states of the two existing attachment walls, namely <tight|tight>, <tight|loose>, <loose|tight>, <loose|loose>. After checking, it is found that the state of <loose|tight> meets the requirements, that is, P1 is loosened and P2 remains. This plan is the final plan.

[0052] Next, execute step S4 (try to add attachment walls), determine the points where attachment walls can be added, and add an attachment wall at each point where an attachment wall can be added; specifically, the points where attachment walls can be added can be determined based on the following formula:

[0053] {Pnew} = {x|x ∈ C and x < P0}; where Pnew is the point where the attachment wall is added; C is the set of allowable attachment wall points; P0 is the point of the new attachment wall.

[0054] Embodiment 4: The points where attachment walls can be added are {57.7, 57.6, 57.5,...}. Traverse these points and add an attachment wall ( Figure 4 ), and traverse the four states of the two existing attachment walls as above. If the check is satisfied, it is the final plan.

[0055] Next, execute step S5, traverse the connection states of each existing attachment wall in turn, and check whether the spacing requirements are met with the newly added attachment wall at each step of traversal. If satisfied, output it as the final result; otherwise, feedback this situation to the technical personnel, and the technical personnel will prepare an over-limit plan and submit it to the tower crane manufacturer for approval.

[0056] It should be noted that for the foregoing method embodiments, for the sake of simple description, they are all expressed as a series of action combinations. However, those skilled in the art should know that the present application is not limited by the described action sequence, because according to the present application, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily essential to the present application.

[0057] The present invention has the following advantages:

[0058] 1) The tower crane attachment wall installation and removal planning method comprehensively considers factors such as attachment wall spacing and tower crane cantilever height, rather than relying on the experience of technical personnel, which can ensure the stability of the tower crane during construction, reduce safety risks, and improve construction efficiency;

[0059] 2) The tower crane attachment wall installation and removal planning method has strong versatility and operability, and is applicable to different types of tower cranes and construction sites.

[0060] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A tower crane wall installation and disassembly planning method, characterized in that: The following steps are involved: S1: Determine the set of allowed wall attachment points on the tower crane; S2: Determine the location of the new wall according to the minimum height of the new wall and the set of allowed wall attachment points; S3: First calculate whether the second-to-last existing attached wall meets the requirements for the attached wall spacing. If so, there is no need to adjust the existing attached wall, and the current result is directly output; Otherwise, the connection state of each existing wall is traversed in turn, and each step of the traversal verifies whether the wall spacing requirement is met. If it is met, the final result is output, otherwise, S4 is executed; wherein the connection state includes: a tightened state and a loosened state; S4: Determine the points where an attached wall can be added, and add an attached wall at each point where an attached wall can be added; S5: Traverse the connection status of each existing attached wall in turn, and verify whether the spacing requirements with the newly added attached wall are met at each step. If yes, the output is the final result; otherwise, the situation is fed back to the technicians, who will prepare an over-limit plan and report it to the tower crane manufacturer for approval.

2. The manufacturing method of the tower crane wall installation and disassembly planning method according to claim 1 is characterized in that: S1 includes the following sub-steps: S11: Take the intersection of the building's wall-attachable range and the tower crane's wall-attachable range; S12: The set obtained by discretizing the intersection with a step size of 0.1 meters is the set of allowed wall attachment points.

3. The manufacturing method of the tower crane wall installation and disassembly planning method according to claim 1 is characterized in that: S2 includes the following sub-steps: S21: Calculate the minimum height of the new wall according to the cantilever height specified in the tower crane manual and the current height of the tower crane; S22: Determine the location of the new wall based on the following formula: P0=min({x|x∈C and x>Pmin}); Among them, P0 is the point of the new wall attachment, C is the set of allowed wall attachment points, and Pmin is the minimum height of the new wall attachment.

4. The manufacturing method of the tower crane wall installation and disassembly planning method as claimed in claim 3 is characterized in that: In S21, the minimum height of the new attached wall is calculated based on the following formula: Pmin = Ht - Hx; Among them, Pmin is the minimum height of the newly attached wall; Ht is the current height of the tower crane; Hx is the cantilever height.

5. The manufacturing method of the tower crane wall installation and disassembly planning method according to claim 1 is characterized in that: In S4, the points where the wall attachment can be added are determined based on the following formula: {Pnew}={x|x∈C and x <P0}; Among them, Pnew is the point added to the wall; C is the set of allowed wall attachment points; P0 is the new wall attachment point.