Mobile hydraulic filling retaining wall for mines and its use method
By adopting mobile hydraulic filling retaining wall technology in mining and using flexible filling walls and hydraulic support structures, the problems of low disassembly and assembly efficiency, low material recycling rate and low safety and stability in existing filling retaining wall technologies are solved, and the filling effect is achieved with high efficiency, safety and low cost.
Patent Information
- Application Number
- CN202411649261.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-11-19
AI Technical Summary
The existing filling retaining wall technology has problems such as low disassembly and assembly efficiency, low material recycling rate and low safety and stability, making it difficult to meet the demand for high efficiency, safety and low cost in mining.
The mine mobile hydraulic filling retaining wall is adopted, including a frame and a shovel fixed in the tunnel, and the flexible filling wall is filled with filling bodies. It can quickly install and remove by filling hydraulic folding brackets and movable support structures, and improve safety and stability through hydraulic support.
The construction efficiency of the filling retaining wall and the recycling rate of materials are improved, safety and stability are enhanced, and the effect of controlling the shape and preventing side bulges is achieved.
Smart Images

Figure CN119145908B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of paste filling, and in particular to a mine mobile hydraulic filling retaining wall and a use method thereof. Background Art
[0002] In the mining industry, mines need to be filled after mining. As a mining method with high safety, environmental protection and low loss and depletion rate, the filling method has been increasingly used. After mining by the filling method, the remaining goaf needs to be filled in time to avoid the fall of surrounding rock, so as to ensure that the ore can be mined safely and efficiently under the protection of the filling body.
[0003] The backfill mining method has high requirements for the stability, safety and efficiency of the backfill retaining wall. The purpose of the backfill retaining wall is to prevent the paste filling slurry from leaking out during backfilling. At the same time, it also needs to withstand the lateral static pressure and dynamic pressure applied before the paste filling slurry solidifies. At present, the commonly used backfill retaining walls at home and abroad mainly include concrete retaining walls, brick retaining walls, log retaining walls, steel structure retaining walls and sandbag retaining walls. For example, the utility model patent with authorization announcement number CN208416605U discloses a high-concentration tailings cemented and filled reinforced concrete retaining wall. The main body of the retaining wall is a reinforced concrete structure. The retaining wall main body is connected to the inner wall of the mining tunnel by groove casting on all sides. The two ends of the through steel bars in the retaining wall main body are embedded in the inner wall of the mining tunnel, so that the retaining wall main body and the inner wall of the mining tunnel are firmly connected. However, its main body is a traditional concrete retaining wall, which has the problems of large masonry work volume, high cost, and long maintenance time. Brick retaining walls also have the problems of complicated construction procedures, high labor intensity of workers, one-time investment of materials, and inability to be recycled and reused. Secondly, they have poor bending resistance and are prone to local displacement, deformation, cracking, and even collapse. The construction quality of wooden retaining walls, steel structure retaining walls, and sandbag retaining walls is difficult to guarantee, and the professional requirements for construction personnel are high. The strength and anti-seepage performance of the retaining walls are poor.
[0004] With the expansion of production scale, the improvement of production efficiency and the strictness of production safety, the construction efficiency and safety requirements of filling retaining walls are becoming higher and higher. At the same time, the requirements for reducing the cost of filling retaining walls and the repeated recycling of filling retaining walls are also becoming higher and higher. The existing filling retaining wall technology has low disassembly and assembly efficiency, low material recycling rate and low safety and stability. Therefore, mechanized and efficient filling retaining wall production has become an important part of the on-site application of paste filling mining method. The research and development of new mechanized filling combination walls is also of great significance to the development of mine filling technology. Summary of the invention
[0005] The purpose of the present invention is to provide a mobile hydraulic filling retaining wall for mines and a method of using the same, which solves the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the present invention specifically provides the following technical solutions:
[0007] A mine mobile hydraulic filling retaining wall comprises a frame fixed in a tunnel and a scraper located in the tunnel, the frame is provided with a flexible filling wall, the flexible filling wall is filled with a filling body, and the filling body overflows into the tunnel on one side of the flexible filling wall and fills the tunnel, the other side of the flexible filling wall is detachably connected to a movable support structure, the side of the movable support structure away from the flexible filling wall is connected to a filling hydraulic folding bracket, the side of the filling hydraulic folding bracket away from the movable support structure is detachably connected to an upper fixing rod and a lower fixing rod, and the upper fixing rod and the lower fixing rod are both connected to the scraper;
[0008] Among them, the filling hydraulic folding support can be bent and fixed in the tunnel through hydraulic support, and the movable support structure is pressed by the shovel loader. The movable support structure can adjust the support angle and is used to support the flexible filling wall. The flexible filling wall is used to close the tunnel to limit the leakage of the filling body.
[0009] As a preferred solution of the present invention, the filling hydraulic folding bracket includes a support plate, one side of the support plate is provided with an upper fixed slot and a lower fixed slot, and the upper fixed slot is used to fix the end of the upper fixed rod by a pin, and the lower fixed slot is used to fix the end of the lower fixed rod by a pin, the top of the support plate is rotatably connected to a folding plate, and one side of the folding plate is rotatably connected to a plurality of hydraulic telescopic rods rotatably connected to the support plate.
[0010] As a preferred solution of the present invention, the support plate is rotatably connected with a push screw, the push screw is threadedly connected with a sliding seat slidably connected to the support plate, the sliding seat is rotatably connected with a support rod, and the support rod and the sliding seat are detachably connected, the end of the support rod is rotatably connected with a slide plate slidably connected to the folding plate, and a plurality of spikes are arranged on the side of the slide plate facing away from the support plate.
[0011] As a preferred solution of the present invention, the support plate is connected with a plurality of support screws for contacting the ground via inclined threads, each of the support screws is provided with a rotating handle, and the plurality of support screws are inclined downward in a direction away from the movable support structure.
[0012] As a preferred solution of the present invention, the movable support structure includes multiple hydraulic mechanisms connected to the support plate, and the multiple hydraulic mechanisms are commonly connected to a hydraulic plate. A multiple hydraulic telescopic frame is arranged on the side of the hydraulic plate away from the hydraulic mechanism, and the multiple hydraulic telescopic frame is detachably connected to the flexible filling wall.
[0013] As a preferred embodiment of the present invention, the flexible filling wall includes water bags, which include an upper water bag, a middle water bag and a lower water bag which are arranged on one side of the frame from top to bottom, and the upper water bag is open, and the middle water bag and the lower water bag are both closed. A transparent plastic sheet is laid on the other side of the frame, and the transparent plastic sheet is wrapped around the upper water bag, the middle water bag and the lower water bag. A steel mesh is laid on the side of the transparent plastic sheet away from the frame, and the steel mesh is used to be detachably connected to multiple hydraulic telescopic frames. The middle water bag and the lower water bag are connected to filling pipes through filling pipe joints, and multiple filling pipes and multiple return air pipes are fixedly arranged in the tunnel through fixed chains.
[0014] The present invention also provides a method for using a mine mobile hydraulic filling retaining wall, comprising the steps of:
[0015] S100, use a scraper to transport the accessory materials to the construction site, then the scraper erects the filling hydraulic folding support through the upper fixing rod and the lower fixing rod, and fixes it to the top plate and the bottom plate of the tunnel;
[0016] S200, multiple filling pipes and multiple air return pipes are set up, and the upper water bag, the middle water bag and the lower water bag are installed on the frame in sequence, the middle water bag and the lower water bag are connected to the corresponding filling pipes, and the remaining filling pipes are passed through the upper water bag and fixed, and the position where the filling pipe passes through the upper water bag is sealed;
[0017] S300, laying a transparent plastic sheet and a steel mesh on the frame in sequence, wherein the transparent plastic sheet is wrapped around the upper water bag, the middle water bag and the lower water bag and is in contact with the inner wall of the tunnel;
[0018] S400, adjusting the hydraulic plate through the hydraulic mechanism until the hydraulic telescopic frame abuts against the steel mesh, and adjusting the length and angle of the hydraulic telescopic frame to abut against the inner wall of the tunnel perimeter, and after completion, fixing the hydraulic telescopic frame on the steel mesh;
[0019] S500, after removing the upper fixing rod and the lower fixing rod, the scraper is driven away to a distant place, and then the filling body is poured into the upper water bag, the middle water bag and the lower water bag in batches through the filling pipe until the filling body overflows and fills the tunnel;
[0020] S600, after the filling body solidifies, drive the scraper to the filling hydraulic folding support, reinstall the upper and lower fixed rods to the support plate, then retract the hydraulic telescopic rod and hydraulic telescopic frame, and remove the hydraulic telescopic frame from the steel mesh, then retract the hydraulic plate and remove the steel mesh, and the scraper transports all the materials to the next site.
[0021] As a preferred solution of the present invention, in step S500, the specific steps of filling the filling body with the filling tube are:
[0022] S501, first filling, after the lower water bag is filled, continue filling until the height of the filling body in the tunnel reaches the height of the lower water bag;
[0023] S502, filling for the second time, after the middle water bag is filled, continue filling until the height of the filling body in the tunnel reaches the height of the middle water bag;
[0024] S503, the tunnel area away from the frame is filled for the third time until the corresponding air return pipe discharges slurry, and the remaining area is filled for the fourth time until another air return pipe discharges slurry, and then the filling body is stopped.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] In the present invention, the scraper can quickly move and transport related materials, and the movable support structure, the filling hydraulic folding bracket and part of the flexible filling wall can be dismantled for recycling, with a high reuse rate, and can be quickly installed and dismantled, thereby improving construction efficiency. Secondly, the movable support structure and the filling hydraulic folding bracket are both hydraulically supported and fixed, which improves safety and stability, and the flexible filling wall is used to buffer and block the filling body, thereby achieving controllable shape, being able to fit with the inner wall of the tunnel, and preventing side bulging. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0029] Figure 2 It is a partial structural schematic diagram of the present invention;
[0030] Figure 3 It is a partial structural schematic diagram of the filling hydraulic folding support of the present invention;
[0031] Figure 4 It is a partial structural schematic diagram of the movable support structure of the present invention;
[0032] Figure 5 for Figure 2 A schematic diagram of the structure enlargement of part A shown in FIG.
[0033] Figure 6 It is a schematic diagram of the connection between the movable support structure and the steel mesh of the present invention;
[0034] Figure 7 It is a schematic diagram of the connection relationship of the flexible filling wall of the present invention.
[0035] The numbers in the figure represent the following:
[0036] 1. Scraper; 2. Upper fixed rod; 3. Lower fixed rod; 4. Filling hydraulic folding bracket; 5. Movable supporting structure; 6. Flexible filling wall; 7. Filling body;
[0037] 401, support plate; 402, upper fixed slot; 403, lower fixed slot; 404, folding plate; 405, hydraulic telescopic rod; 406, push screw; 407, slide seat; 408, support rod; 409, slide plate; 410, spur; 411, support screw; 412, rotating handle; 501, hydraulic mechanism; 502, hydraulic plate; 503, hydraulic telescopic frame; 601, water bag; 602, transparent plastic cloth; 603, steel mesh; 604, upper water bag; 605, middle water bag; 606, lower water bag; 608, filling pipe; 609, return air pipe. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] like Figures 1 to 7 As shown, the present invention provides a mobile hydraulic filling retaining wall for a mine, comprising a frame fixed in a tunnel and a shovel loader 1 located in the tunnel, a flexible filling wall 6 is arranged on the frame, the flexible filling wall 6 is filled with a filling body 7, and the filling body 7 overflows into the tunnel on one side of the flexible filling wall 6 and fills the tunnel, the other side of the flexible filling wall 6 is detachably connected to a movable supporting structure 5, a side of the movable supporting structure 5 facing away from the flexible filling wall 6 is connected to a filling hydraulic folding bracket 4, a side of the filling hydraulic folding bracket 4 facing away from the movable supporting structure 5 is detachably connected to an upper fixed rod 2 and a lower fixed rod 3, and the upper fixed rod 2 and the lower fixed rod 3 are both connected to the shovel loader 1.
[0040] Among them, the filling hydraulic folding support 4 can be bent and fixed in the tunnel through hydraulic support, and the movable support structure 5 is pressed by the shovel loader 1. The movable support structure 5 can adjust the support angle and is used to support the flexible filling wall 6. The flexible filling wall 6 is used to close the tunnel to limit the leakage of the filling body 7.
[0041] When the technical solution of the present invention is implemented, the shovel loader 1 can transport the flexible filling wall 6, the movable support structure 5 and the filling hydraulic folding support 4 to the construction site (the tunnel in the mining area) in the mining area access road, and then the shovel loader 1 erects the filling hydraulic folding support 4 through the upper fixing rod 2 and the lower fixing rod 3, so that the filling hydraulic folding support 4 is pressed against the top and bottom of the tunnel, fixes the frame, and installs the flexible filling wall 6 on the frame, and then connects and fixes the movable support structure 5 with the flexible filling wall 6, so that the flexible filling wall 6 can be supported by the filling hydraulic folding support 4 and the movable support structure 5, and finally fills the filling body 7 into the flexible filling wall 6, so that the flexible filling wall 6 expands to fit tightly with the inner wall of the tunnel, avoiding leakage of the filling body 7, and realizing the closure and isolation of the space on one side of the flexible filling wall 6 away from the movable support structure 5, so as to achieve effective filling, and secondly, the flexible filling wall 6 can expand after filling, so that the flexible filling wall 6 has a buffering effect and has higher stability during the construction process.
[0042] The filling hydraulic folding bracket 4 and the movable supporting structure 5 both support the flexible filling wall 6 through hydraulic pressure, thereby ensuring the stability of the flexible filling wall 6 during the construction process.
[0043] While waiting for the filling body 7 to solidify, the upper fixing rod 2 and the lower fixing rod 3 can be removed from the filling hydraulic folding support 4, and the scraper 1 can be driven away from the site to perform other construction, so that the scraper 1 has a higher utilization rate.
[0044] After the filling body 7 solidifies, the filling hydraulic folding bracket 4 and the movable supporting structure 5 can be removed, thereby improving the recycling rate of the materials, and can be installed and moved by the scraper 1, thereby making the construction more efficient.
[0045] The filling hydraulic folding bracket 4 includes a support plate 401, one side of the support plate 401 is provided with an upper fixed slot 402 and a lower fixed slot 403, and the upper fixed slot 402 is used to fix the end of the upper fixed rod 2 by a pin, and the lower fixed slot 403 is used to fix the end of the lower fixed rod 3 by a pin, and the top of the support plate 401 is rotatably connected to a folding plate 404, and one side of the folding plate 404 is rotatably connected to a plurality of hydraulic telescopic rods 405 rotatably connected to the support plate 401.
[0046] The upper fixing rod 2 and the lower fixing rod 3 are respectively fixed in the upper fixing slot 402 and the lower fixing slot 403 by means of latches, so that the scraper 1 can move the support plate 401 through the upper fixing rod 2 and the lower fixing rod 3, and stand up the support plate 401, and then drive the folding plate 404 to rotate to abut against the top of the tunnel through the hydraulic telescopic rod 405, thereby fixing the entire filling hydraulic folding support 4 in the tunnel.
[0047] A push screw 406 is rotatably connected to the support plate 401, and a slide seat 407 slidably connected to the support plate 401 is threadedly connected to the push screw 406. A support rod 408 is rotatably connected to the slide seat 407, and the support rod 408 and the slide seat 407 are detachably connected. The end of the support rod 408 is rotatably connected to a slide plate 409 slidably connected to the folding plate 404, and a plurality of spikes 410 are provided on the side of the slide plate 409 facing away from the support plate 401.
[0048] Taking into account that the filling hydraulic folding support 4 will be disconnected from the upper fixing rod 2 and the lower fixing rod 3 for a period of time, the slide 407 is driven to slide upward along the support plate 401 by rotating the advancement screw 406, thereby pushing the support rod 408 to drive the slide plate 409 to move on the folding plate 404 until the spike 410 extends out of the folding plate 404 and abuts against the top of the alley. By abutting the spike 410 against the top of the alley, the resistance between the folding plate 404 and the alley is increased, thereby improving the stability of the filling hydraulic folding support 4 during use.
[0049] When the hydraulic foldable support 4 is folded, the support rod 408 and the slide seat 407 can be directly disassembled to improve the convenience of use and avoid the support rod 408 interfering with the rotation of the folding plate 404.
[0050] The support plate 401 is connected with a plurality of support screws 411 for contacting the ground via inclined threads. Each support screw 411 is provided with a rotating handle 412 , and the plurality of support screws 411 are inclined downward in a direction away from the movable support structure 5 .
[0051] Taking into account that the filling hydraulic folding bracket 4 will be disconnected from the upper fixed rod 2 and the lower fixed rod 3 for a period of time, the supporting screw 411 is driven to rotate by turning the rotating handle 412, so that the bottom of the supporting screw 411 gradually tilts downward until it is against the ground, thereby supporting the support plate 401, further improving the stability of the filling hydraulic folding bracket 4 during use.
[0052] The movable support structure 5 includes multiple hydraulic mechanisms 501 connected to the support plate 401, and the multiple hydraulic mechanisms 501 are commonly connected to a hydraulic plate 502. A plurality of hydraulic telescopic skeletons 503 are arranged on the side of the hydraulic plate 502 away from the hydraulic mechanism 501, and the plurality of hydraulic telescopic skeletons 503 are used for detachable connection with the flexible filling wall 6.
[0053] After the filling hydraulic folding support 4 and the flexible filling wall 6 are installed, the position of the hydraulic plate 502 is adjusted through the hydraulic mechanism 501 until the multiple hydraulic telescopic skeletons 503 are against the flexible filling wall 6, and then the lengths and angles of the multiple hydraulic telescopic skeletons 503 are adjusted so that the multiple hydraulic telescopic skeletons 503 are against the inner wall of the tunnel, and the hydraulic telescopic skeletons 503 are fixed on the flexible filling wall 6 to support the flexible filling wall 6. The hydraulic telescopic skeletons 503 can be fixed on the flexible filling wall 6 by wire, etc.
[0054] The flexible filling wall 6 includes a water bag 601, which includes an upper water bag 604, a middle water bag 605 and a lower water bag 606, which are arranged on one side of the frame from top to bottom, and the upper water bag 604 is open, and the middle water bag 605 and the lower water bag 606 are both closed. A transparent plastic sheet 602 is laid on the other side of the frame, and the transparent plastic sheet 602 is wrapped around the upper water bag 604, the middle water bag 605 and the lower water bag 606. A steel mesh 603 is laid on the side of the transparent plastic sheet 602 away from the frame, and the steel mesh 603 is detachably connected to multiple hydraulic telescopic skeletons 503. The middle water bag 605 and the lower water bag 606 are connected to a filling pipe 608 through a filling pipe joint, and multiple filling pipes 608 and multiple return air pipes 609 are fixed in the tunnel through fixed chains.
[0055] The flexible filling wall 6 is filled with the filling body 7 through the upper water bag 604, the middle water bag 605 and the lower water bag 606. The filling body 7 is the slurry used for existing filling. The filling body 7 is poured into the upper water bag 604, the middle water bag 605 and the lower water bag 606 through multiple filling pipes 608 until they overflow from multiple return air pipes 609.
[0056] The transparent plastic sheet 602 and the steel mesh 603 are used to seal the gap between the inner wall of the tunnel and the upper water bag 604, the middle water bag 605, and the lower water bag 606, so that after the upper water bag 604, the middle water bag 605, and the lower water bag 606 are filled with the filling body 7 and expanded, the transparent plastic sheet 602 can fit tightly on the inner wall of the tunnel and fix the positions of the transparent plastic sheet 602, the upper water bag 604, the middle water bag 605, and the lower water bag 606.
[0057] The present invention also provides a method for using a mobile hydraulic filling retaining wall in a mine, comprising the steps of:
[0058] S100, using a scraper 1 to transport the accessory materials to the construction site, and then the scraper 1 erects the filling hydraulic folding support 4 through the upper fixing rod 2 and the lower fixing rod 3, and fixes it to the top plate and the bottom plate of the tunnel.
[0059] S200, set up multiple filling tubes 608 and multiple air return tubes 609, and install the upper water bag 604, the middle water bag 605 and the lower water bag 606 on the frame in sequence, the middle water bag 605 and the lower water bag 606 are connected to the corresponding filling tubes 608, and the remaining filling tubes 608 are passed through the upper water bag 604 and fixed, and the position where the filling tube 608 passes through the upper water bag 604 is sealed.
[0060] S300, laying transparent plastic sheet 602 and steel mesh 603 on the frame in sequence, wherein the transparent plastic sheet 602 is wrapped around the upper water bag 604, the middle water bag 605 and the lower water bag 606 and fits with the inner wall of the tunnel.
[0061] S400, adjust the hydraulic plate 502 through the hydraulic mechanism 501 until the hydraulic telescopic frame 503 is against the steel mesh 603, and adjust the length and angle of the hydraulic telescopic frame 503 to be against the inner wall of the tunnel. After completion, fix the hydraulic telescopic frame 503 on the steel mesh 603.
[0062] S500, after removing the upper fixing rod 2 and the lower fixing rod 3, the scraper 1 is driven away to a distant place, and then the filling body 7 is poured into the upper water bag 604, the middle water bag 605 and the lower water bag 606 in batches through the filling pipe 608 until it overflows and fills the tunnel.
[0063] S600, after the filling body 7 solidifies, drive the scraper 1 to the filling hydraulic folding support 4, reinstall the upper fixed rod 2 and the lower fixed rod 3 to the support plate 401, then retract the hydraulic telescopic rod 405 and the hydraulic telescopic skeleton 503, and remove the hydraulic telescopic skeleton 503 from the steel mesh 603, then retract the hydraulic plate 502 and remove the steel mesh 603, and the scraper 1 transports all materials to the next site.
[0064] In step S500, the specific steps of filling the filling tube 608 with the filling body 7 are as follows:
[0065] S501, first filling, after the lower water bag 606 is filled, continue filling until the height of the filling body 7 in the tunnel reaches the height of the lower water bag 606;
[0066] S502, the second filling, after the middle water bag 605 is filled, the filling is continued until the height of the filling body 7 in the tunnel reaches the height of the middle water bag 605;
[0067] S503, filling the tunnel area away from the frame for the third time until the corresponding return air pipe 609 discharges slurry, and filling the remaining area for the fourth time until another return air pipe 609 discharges slurry, and then stopping the pouring of the filling body 7.
[0068] According to the attached Figure 2As shown, a is the area covered by the first filling, b is the area covered by the second filling, c is the area covered by the third filling, and d is the area covered by the fourth filling.
[0069] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.
Claims
1. A mobile hydraulic filling retaining wall for a mine, comprising a frame fixed in a tunnel and a scraper (1) located in the tunnel, characterized in that: A flexible filling wall (6) is arranged on the frame, and a filling body (7) is filled in the flexible filling wall (6), and the filling body (7) overflows into the tunnel on one side of the flexible filling wall (6) and fills the tunnel completely; the other side of the flexible filling wall (6) is detachably connected to a movable support structure (5); a side of the movable support structure (5) facing away from the flexible filling wall (6) is connected to a filling hydraulic folding bracket (4); a side of the filling hydraulic folding bracket (4) facing away from the movable support structure (5) is detachably connected to an upper fixing rod (2) and a lower fixing rod (3); and the upper fixing rod (2) and the lower fixing rod (3) are both connected to the scraper (1); The filling hydraulic foldable support (4) can be bent and fixed in the tunnel through hydraulic support, and the movable support structure (5) is pressed by the scraper (1). The movable support structure (5) can adjust the support angle and is used to support the flexible filling wall (6). The flexible filling wall (6) is used to close the tunnel to limit the leakage of the filling body (7); The filling hydraulic folding bracket (4) comprises a support plate (401), one side of the support plate (401) is provided with an upper fixing slot (402) and a lower fixing slot (403), the upper fixing slot (402) is used to fix the end of the upper fixing rod (2) by means of a latch, the lower fixing slot (403) is used to fix the end of the lower fixing rod (3) by means of a latch, the top of the support plate (401) is rotatably connected to a folding plate (404), and one side of the folding plate (404) is rotatably connected to a plurality of hydraulic telescopic rods (405) rotatably connected to the support plate (401); The movable support structure (5) comprises a plurality of hydraulic mechanisms (501) connected to the support plate (401), the plurality of hydraulic mechanisms (501) being commonly connected to a hydraulic plate (502), a plurality of hydraulic telescopic frames (503) being arranged on a side of the hydraulic plate (502) away from the hydraulic mechanisms (501), and the plurality of hydraulic telescopic frames (503) being detachably connected to the flexible filling wall (6).
2. The mine movable hydraulic filling retaining wall according to claim 1 is characterized in that: The support plate (401) is rotatably connected to a propulsion screw (406), a slide seat (407) slidably connected to the support plate (401) is threadedly connected to the propulsion screw (406), a support rod (408) is rotatably connected to the slide seat (407), the support rod (408) and the slide seat (407) are detachably connected, the end of the support rod (408) is rotatably connected to a slide plate (409) slidably connected to the folding plate (404), and a plurality of spikes (410) are provided on a side of the slide plate (409) facing away from the support plate (401).
3. The mine movable hydraulic filling retaining wall according to claim 1 is characterized in that: The support plate (401) is connected with a plurality of support screws (411) for contacting the ground via inclined threads, each of the support screws (411) is provided with a rotating handle (412), and the plurality of support screws (411) are inclined downward in a direction away from the movable support structure (5).
4. The mine movable hydraulic filling retaining wall according to claim 1 is characterized in that: The flexible filling wall (6) comprises a water bag (601), wherein the water bag (601) comprises an upper water bag (604), a middle water bag (605) and a lower water bag (606) which are arranged in sequence from top to bottom on one side of the frame, wherein the upper water bag (604) is open, and the middle water bag (605) and the lower water bag (606) are both closed. A transparent plastic sheet (602) is laid on the other side of the frame, and the transparent plastic sheet (602) covers the upper water bag (604), the middle water bag (605) and the lower water bag (606). In addition to the water bag (605) and the lower water bag (606), a steel mesh (603) is laid on the side of the transparent plastic sheet (602) away from the frame, and the steel mesh (603) is used to be detachably connected to multiple hydraulic telescopic skeletons (503). The middle water bag (605) and the lower water bag (606) are both connected to a filling pipe (608) via a filling pipe joint. Multiple filling pipes (608) and multiple air return pipes (609) are fixedly arranged in the tunnel via a fixing chain.
5. The method for using the mobile hydraulic filling retaining wall in a mine according to any one of claims 1 to 4 is characterized in that: Includes steps: S100, using a scraper (1) to transport the accessory materials to the construction site, and then the scraper (1) erects the filling hydraulic folding support (4) through the upper fixing rod (2) and the lower fixing rod (3), and fixes it to the top plate and the bottom plate of the tunnel; S200, multiple filling tubes (608) and multiple air return tubes (609) are set up, and the upper water bag (604), the middle water bag (605) and the lower water bag (606) are installed on the frame in sequence, the middle water bag (605) and the lower water bag (606) are connected to the corresponding filling tubes (608), and the remaining filling tubes (608) are passed through the upper water bag (604) and then fixed, and the position where the filling tube (608) passes through the upper water bag (604) is sealed; S300, laying a transparent plastic sheet (602) and a steel mesh (603) on the frame in sequence, wherein the transparent plastic sheet (602) is wrapped around the upper water bag (604), the middle water bag (605) and the lower water bag (606) and is in contact with the inner wall of the tunnel; S400, adjusting the hydraulic plate (502) through the hydraulic mechanism (501) until the hydraulic telescopic frame (503) abuts against the steel mesh (603), and adjusting the length and angle of the hydraulic telescopic frame (503) to abut against the inner wall of the tunnel periphery, and after completion, fixing the hydraulic telescopic frame (503) on the steel mesh (603); S500, after removing the upper fixing rod (2) and the lower fixing rod (3), the scraper (1) is driven away to a distant place, and then the filling body (7) is poured into the upper water bag (604), the middle water bag (605) and the lower water bag (606) in batches through the filling pipe (608) until the filling body (7) overflows and fills the tunnel; S600, after the filling body (7) solidifies, the scraper (1) is driven to the filling hydraulic folding support (4), and the upper fixing rod (2) and the lower fixing rod (3) are reinstalled on the support plate (401), and then the hydraulic telescopic rod (405) and the hydraulic telescopic frame (503) are retracted, and the hydraulic telescopic frame (503) is removed from the steel mesh (603), and then the hydraulic plate (502) is retracted and the steel mesh (603) is removed, and the scraper (1) transports all the materials to the next site.
6. The method for using a mobile hydraulic filling retaining wall in a mine according to claim 5, characterized in that: In step S500, the specific steps of pouring the filling body (7) into the filling tube (608) are: S501, first filling, after the lower water bag (606) is filled, continue filling until the height of the filling body (7) in the tunnel reaches the height of the lower water bag (606); S502, filling for the second time, after the middle water bag (605) is filled, continue filling until the height of the filling body (7) in the tunnel reaches the height of the middle water bag (605); S503, the tunnel area away from the frame is filled for the third time until the corresponding air return pipe (609) discharges slurry, and the remaining area is filled for the fourth time until another air return pipe (609) discharges slurry, and then the filling body (7) is stopped.
Citation Information
Patent Citations
High concentration tailings consolidated fill reinforced concrete barricade
CN208416605U
Hydraulic filling retaining wall device and using method
CN109488369A
Underground recyclable flexible filling retaining wall and construction method thereof
CN113882896A