A water environment management device for a river basin
The silt is formed into a hollow backfill body through the basin water environment management equipment, which solves the problem of disturbed suspension during silt backfill at the bottom of the river basin, and realizes pollutant isolation, silt adsorption and sediment fixation, improving water quality and riverbed stability.
Patent Information
- Application Number
- CN202411679299.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2044-11-22
AI Technical Summary
In the prior art, the in-situ backfill method of silt at the bottom of the river basin has a problem of disturbing suspension, which causes the backfill to be unable to effectively block the release of pollutants at the bottom of the river, and it is easy to cause the rise and accelerated release of pollutants inside the silt at the bottom of the river.
A water environment management equipment in the basin is used to mold the dehydrated and harmless sludge to obtain a hollow cylindrical body. After the hollow cylindrical body is sintered, a hollow backfill body with a certain weight is obtained. The hollow backfill body is filled with a hollow backfill body. After entering the river bottom, it can reduce the probability of disturbance and suspension, and act as a container to absorb the floating silt. The hollow backfill body after sinking can also fix the subsequent sedimentation of silt to reduce the floating of silt.
The hollow backfill body is able to stabilize the isolation of pollutants at the bottom of the river, reduce the spread of pollutants, and at the same time adsorb floating silt and fixed silt, improve water quality, improve riverbed stability, and maintain the balance of the aquatic ecosystem in the river.
Smart Images

Figure CN119189406B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of solid waste treatment, and in particular to a watershed water environment treatment device. Background Art
[0002] In order to solve the problem of water pollution in river basins, existing technologies usually use river dredging, in-situ covering, ecological management and other technologies for pollution control. Among them, river dredging is to clear the silt, sand and other sediments in the riverbed to maintain the normal flow capacity of the river, and at the same time improve the water quality and ecological environment. The cleaned silt is a solid waste and needs to be properly handled. If it is discharged directly into the environment, it may pollute the soil, water source and air, and then affect the ecosystem and human health.
[0003] In the prior art, the cleaned sludge can be used as other substrates after dehydration, drying and harmless treatment, such as sintering to form bricks. Of course, it can also be used as backfill to the riverbed to isolate pollutants at the riverbed and reduce the spread of pollutants. However, the in-situ sludge backfill method is only suitable for bottom mud with a small degree of disturbance and low degree of pollution. Once the riverbed is greatly disturbed, the backfill mud will be suspended and cannot effectively prevent the release of pollutants at the riverbed. In addition, the backfill is generally added to the river water body by hydraulic jetting, surface dumping of mechanical equipment, etc. The impact and extrusion of the inputs can easily disturb the sludge at the bottom of the river, causing the pollutants inside the sludge at the bottom of the river to float and release faster. Summary of the invention
[0004] In view of the limitations of the in-situ backfilling method of silt at the bottom of a river basin in the prior art, the present invention proposes a water environment management device for the river basin, in which the silt that has been dehydrated, dried and harmlessly treated is molded to obtain a hollow cylindrical body, and the hollow cylindrical body is sintered to obtain a hollow backfill body with a certain weight. After the hollow backfill body is filled into the river bottom, the probability of disturbed suspension of the backfill body can be reduced. At the same time, the hollow backfill body can serve as a container to absorb the floating silt during backfilling. The hollow backfill body that has sunk to the bottom can also fix the sediment that subsequently settles on the river bottom to reduce the floating of the sediment.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A water environment treatment device for a river basin includes a base and a support frame, an extrusion head for sludge extrusion is arranged on the support frame, a conveyor belt for conveying a sludge model is arranged on the base, the sludge model includes an upper model and a lower model, the upper model and the lower model are combined to form a hollow cylindrical body with an end face seal, and a hollow hole is arranged on the side wall of the upper model. A plurality of feeding plates for installing a sludge forming mold are arranged on the conveyor belt, and the sludge forming mold includes a first mold for forming the upper model and a second mold for forming the lower model.
[0007] The above-mentioned first mold includes a first upper template, an intermediate template and a first lower template which are combined in sequence from top to bottom, a plurality of first mold holes are arranged on the first upper template, an insert rod matching the position and number of the first mold holes is arranged on the upper part of the first lower template, a plurality of evenly distributed insert blocks are arranged on the cylindrical side of the insert rod, the insert rod passes through the intermediate template and is inserted into the interior of the first mold hole, and a first mold cavity for extruding the upper model is formed between the first mold hole, the insert rod and the intermediate template; the second mold includes a second upper template located at the upper part and a second lower template located at the lower part, the second upper template is provided with a plurality of second mold holes, a sealing column matching the position and number of the second mold holes is arranged on the upper part of the second lower template, the sealing column passes through the second upper template and extends to the bottom of the second mold hole, the second mold hole and the sealing column are combined to form a second mold cavity for extruding the lower model; the position distribution of the second mold holes corresponds to the position distribution of the first mold holes.
[0008] The first mold and the second mold are arranged at intervals along the conveying path of the conveyor belt. The extrusion head extrude the lower mold through the second mold after the first mold extrude the upper mold. The support frame is provided with a model combination mechanism behind the extrusion head. The model combination mechanism is used to combine the upper model obtained by the first mold and the lower model obtained by the second mold to obtain a sludge model.
[0009] Preferably, the model assembly mechanism includes a first clamping assembly for clamping the middle template and a second clamping assembly for clamping the first upper template. When the first mold passes through the model assembly mechanism, the model assembly mechanism performs a first action: the first clamping assembly moves the middle template upward in the vertical direction to achieve separation between the middle template and the first lower template. After the insertion rod on the first lower template completely leaves the upper template, the second clamping assembly fixes and clamps the first upper template. The first clamping assembly moves the middle template downward in the vertical direction to achieve separation of the middle template from the first upper template and combination of the middle template with the first lower template. The upper model stays inside the first mold hole of the first upper template. When the second mold passes through the model assembly mechanism, the model assembly mechanism performs a second action: the second clamping assembly covers the first upper template on the second mold, the upper model is pushed out from the first mold hole of the first upper template, and the upper model is combined with the lower model in the second mold to obtain a sludge model.
[0010] Preferably, the support frame is also provided with a second slide for realizing the movement of the model assembly mechanism, and the first end and the second end of the second slide are respectively located above the conveyor belt. The model assembly mechanism moves along the second slide to transfer the first upper template at the first end of the second slide to the second end of the second slide, and installs the first upper template on the first mold which is not equipped with the first upper template.
[0011] Preferably, the model assembly mechanism also includes a workbench, a second sealing cover and a movable plate located inside the second sealing cover, the second sealing cover is fixedly connected to the workbench, a sealing groove matching the second sealing cover is provided on the first upper template, the movable plate is connected to the workbench through a fifth working cylinder, and a plurality of limit columns are provided on the lower surface of the movable plate, and the limit columns correspond to the position and number of the first mold holes on the first upper template.
[0012] Preferably, the support frame is provided with a first clamp and a second clamp for clamping the second upper template, the first clamp is used for unloading the second upper template, and the second clamp is used for loading the second upper template.
[0013] Preferably, a glue coating part is also provided between the extrusion head and the model assembly mechanism on the conveying path of the conveyor belt, and the glue coating part is used to perform glue coating treatment on the lower model inside the second mold hole, and the glue coating treatment is used to coat an adhesive substance on the upper surface of the lower model, and the adhesive substance is used to bond the lower model and the upper model.
[0014] Preferably, the first clamp includes two groups of symmetrically arranged third clamping members, the third clamping members include a third clamping plate and a seventh working cylinder, the third clamping plate is fixedly connected to one end of the seventh working cylinder, the other end of the seventh working cylinder is respectively fixedly connected to the connecting body, and the seventh working cylinder is horizontally arranged.
[0015] Preferably, the first clamping assembly includes two groups of symmetrically arranged first clamping members, the first clamping members include a first clamping plate, a first working cylinder and a second working cylinder, the first clamping plate is fixedly connected to one end of the second working cylinder, the other end of the second working cylinder is fixedly connected to one end of the first working cylinder, the other end of the first working cylinder is fixedly connected to the workbench, and the axis of the first working cylinder is arranged perpendicular to the axis of the second working cylinder.
[0016] Preferably, the second clamping assembly includes two groups of symmetrically arranged second clamping members, the second clamping members include a second clamping plate, a third working cylinder and a fourth working cylinder, the second clamping plate is fixedly connected to one end of the fourth working cylinder, the other end of the fourth working cylinder is fixedly connected to one end of the third working cylinder, the other end of the third working cylinder is fixedly connected to the workbench, and the axis of the third working cylinder is arranged perpendicular to the axis of the fourth working cylinder.
[0017] The beneficial effects of the present invention are:
[0018] 1. The water environment management equipment in this basin is used to make silt into a silt model. The silt model is a hollow cylindrical body. After sintering, the hollow cylindrical body can be used as a hollow backfill body for in-situ backfilling in the river channel. The heavy hollow backfill body can stably isolate pollutants on the riverbed and reduce the spread of pollutants. At the same time, the hollow backfill body can be used as a container to absorb the floating silt during backfilling. The hollow backfill body after sinking to the bottom can also fix the subsequent sediment settled on the riverbed, reduce the floating of sediment, and then reduce the increase of water turbidity, improve water quality and the stability of the riverbed, and maintain the balance of the river aquatic ecosystem.
[0019] 2. The water environment treatment equipment in this basin is provided with a first mold, a second mold and a model combination mechanism. The upper model is obtained by the first mold, the lower mold is obtained by the second mold, the upper model is demoulded by the model combination mechanism, and the upper model is combined with the lower mold to obtain a sludge model, thereby realizing automatic and continuous processing of the sludge model with high production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is the overall structural diagram of the water environment management equipment in this basin;
[0021] Figure 2 This is a schematic diagram of the structure of the front of the water environment management equipment in this basin;
[0022] Figure 3 This is a schematic diagram of the structure of the conveyor belt of the water environment treatment equipment in this basin, looking down;
[0023] Figure 4 This is a structural diagram of the extrusion head of the water environment treatment equipment in this basin (corresponding to the first mold);
[0024] Figure 5 This is a structural diagram of the extrusion head of the water environment treatment equipment in this basin (corresponding to the second mold);
[0025] Figure 6 This is a structural schematic diagram of the first mold (excluding the first upper mold plate) in the water environment treatment equipment of this basin;
[0026] Figure 7 This is a schematic diagram of the structure of the first mold in the water environment treatment equipment of this basin from a bird's-eye view;
[0027] Figure 8 This is a schematic diagram of the structure of the second mold in the water environment treatment equipment of this basin from a bird's-eye view;
[0028] Fig. 9 This is a schematic diagram of the structure of the sludge model obtained by the water environment management equipment in this basin;
[0029] Fig.10 This is a schematic diagram of the structure of the model combination mechanism in the water environment management equipment of this basin;
[0030] Fig.11 It is a structural schematic diagram of the model assembly mechanism corresponding to the first mold;
[0031] Fig.12 It is a structural schematic diagram of the model assembly mechanism clamping the first upper template and the middle template;
[0032] Fig.13 The schematic diagram of the structure when the middle template is put back into the model assembly mechanism;
[0033] Fig.14 It is a structural schematic diagram of the model combination mechanism corresponding to the second mold;
[0034] Fig.15 It is a structural schematic diagram of a model assembly mechanism placing a first upper mold plate on a second mold;
[0035] Fig.16 It is a structural schematic diagram of the model assembly mechanism used for demoulding the upper model;
[0036] Fig.17 It is a structural schematic diagram of the model assembly mechanism when the upper model is demoulded and the unloaded first upper template is clamped.
[0037] In the figure: 1, base; 2, support frame; 3, conveyor belt; 4, first mold; 5, second mold; 6, extruder; 7, glue coating part; 8, model assembly mechanism; 9, first clamp; 10, second clamp; 11, first slide; 12, extrusion tube; 13, second slide; 14, third slide; 15, support table; 16, loading position; 17, material stacking position; 18, upper mold; 19, lower mold; 20, cutting knife; 21, tenth working cylinder;
[0038] 31. Support seat; 32. Adjustment cylinder; 33. Feeding plate; 34. Transmission wheel; 41. First upper template; 42. Intermediate template; 43. First lower template; 51. Second upper template; 52. Second lower template; 61. Discharging plate; 62. Discharging hole; 63. First sealing cover; 64. Connecting hole; 65. First negative pressure pipe; 81. First clamping plate; 82. Second clamping plate; 83. Second sealing cover; 84. Fifth working cylinder; 85. Active Moving plate; 86, limiting column; 87, working table; 91, third clamping plate; 92, seventh working cylinder; 93, connecting body; 94, third bending rod; 111, first sliding block; 112, eighth working cylinder; 121, screw rod; 122, feed pipe; 123, extrusion motor; 124, discharge pipe; 131, second sliding block; 132, sixth working cylinder; 141, third sliding block; 142, ninth working cylinder; 181, hollow hole;
[0039] 411, first die hole; 431, insert rod; 432, insert block; 511, second die hole; 521, sealing column; 811, first working cylinder; 812, first bending rod; 813, second working cylinder; 821, third working cylinder; 822, second bending rod; 823, fourth working cylinder;
[0040] 301, second mold assembly station; 302, model assembly station; 303, first mold assembly station; 304, blanking station. DETAILED DESCRIPTION
[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0042] Reference Figure 1-2 , a basin water environment treatment device, comprising a base 1 and a support frame 2, wherein the support frame 2 is located above the base 1. A conveyor belt 3 for conveying a sludge model is arranged on the base 1, and an extrusion head 6 for sludge extrusion, a glue coating member 7 for glue coating, a model assembly mechanism 8 for assembling the sludge model, a first clamp 9 and a second clamp 10 for clamping the mold are arranged on the support frame 2, and the extrusion head 6, the glue coating member 7, the model assembly mechanism 8, the first clamp 9 and the second clamp 10 are arranged in sequence on the conveying path of the conveyor belt 3.
[0043] refer to Fig. 9 The above-mentioned sludge model includes an upper model 18 and a lower model 19. The upper model 18 is a cylinder with a single end face sealed. The side wall of the upper model 18 is provided with a hollow hole 181. The lower model 19 is a plate body used to seal the other end face of the upper model 18. The upper model 18 and the lower model 19 are combined to form a hollow sludge model. The sludge model is a hollow cylindrical body with two end faces sealed.
[0044] refer to Figure 1 and Figure 3 The conveyor belt 3 is a closed belt body, and two conveyor wheels 34 and a first motor for driving the conveyor wheels 34 to rotate are arranged on the base 1. The two conveyor wheels 34 are used to support the conveyor belt 3, and the first motor realizes the conveyance of the conveyor belt 3 by rotating the conveyor wheels 34. In this embodiment, the conveying path of the conveyor belt 3 is arranged horizontally, and the axis of the conveyor wheel 34 is arranged vertically.
[0045] refer to Figure 2 and Figure 3, a plurality of support seats 31 are arranged on the conveyor belt 3, and the support seats 31 are evenly arranged on the conveying path of the conveyor belt 3. A support platform 15 is arranged on the base 1, and a plurality of support seats 31 are located on the support platform 15, and the support platform 15 supports the support seats 31, and the support seats 31 are slidably connected with the support platform 15. A feeding plate 33 is arranged on the support seat 31, and an adjustment cylinder 32 is arranged between the feeding plate 33 and the support seat 31, and the adjustment cylinder 32 is arranged vertically, and the adjustment cylinder 32 is used to move the feeding plate 33 in the vertical direction. A fixture for installing a sludge forming mold is arranged on the feeding plate 33, and the sludge forming mold includes a first mold 4 and a second mold 5, wherein the first mold 4 is used for molding the upper mold 18, and the second mold 5 is used for molding the lower mold 19, and the first mold 4 and the second mold 5 are arranged at intervals along the conveying path of the conveyor belt 3.
[0046] refer to Figure 4 , Figure 6 and Figure 7 The first mold 4 includes a first upper mold plate 41, a middle mold plate 42 and a first lower mold plate 43 which are sequentially assembled from top to bottom. The first upper mold plate 41, the middle mold plate 42 and the first lower mold plate 43 are movably overlapped to form a stack. A plurality of first mold holes 411 are arranged on the first upper mold plate 41. The upper part of the first lower mold plate 43 is provided with an insertion rod 431 whose position and number match the first mold hole 411. The insertion rod 431 penetrates the middle mold plate 42 and is inserted into the first mold hole 411. The insertion rod 431 is coaxially arranged with the first mold hole 411. A plurality of uniformly distributed insertion blocks 432 are fixedly arranged on the cylindrical side of the insertion rod 431. One side of the insertion block 432 is fixedly connected to the insertion rod 431, and the other side of the insertion block 432 extends to the hole wall of the first mold hole 411 and contacts the hole wall of the first mold hole 411. A first mold cavity for extruding the upper mold 18 is formed between the first mold hole 411 , the insertion rod 431 and the middle mold plate 42 , and the insertion rod 431 is used to form a hollow hole 181 on the side wall of the upper mold 18 .
[0047] For further reference, Figure 5 and Figure 8 The second mold 5 includes a second upper mold plate 51 located at the upper part and a second lower mold plate 52 located at the lower part, and the second upper mold plate 51 and the second lower mold plate 52 are movably overlapped to form a stack. The second upper mold plate 51 is provided with a plurality of second mold holes 511, and the upper part of the second lower mold plate 52 is provided with sealing columns 521 whose positions and numbers match the second mold holes 511, and the radial area of the sealing columns 521 is smaller than the radial area of the second mold holes 511. The sealing columns 521 penetrate the second upper mold plate 51 and extend to the bottom of the second mold holes 511, and the second mold holes 511 and the sealing columns 521 are combined to form a second mold cavity for extruding the lower mold 19.
[0048] The position distribution of the second mold hole 511 of the above-mentioned second mold 5 corresponds to the position distribution of the first mold hole 411 of the first mold 4, and the radial cross-section of the first mold hole 411 has the same shape as the radial cross-section of the second mold hole 511, so that the upper model 18 obtained by the first mold 4 and the lower model 19 obtained by the second mold 5 can be matched and combined.
[0049] refer to Figure 2 The support frame 2 is provided with an extrusion tube 12 and an extrusion motor 123. A screw rod 121 is provided inside the extrusion tube 12. The output shaft of the extrusion motor 123 is connected to one end of the screw rod 121. The extrusion motor 123 is used to drive the screw rod 121 to rotate to form the extrusion of the material inside the extrusion tube 12. A discharge pipe 124 is provided at one end of the extrusion tube 12. The discharge pipe 124 is connected to the feed end of the extrusion head 6. A feed pipe 122 is provided at the other end of the extrusion tube 12. The sludge after dehydration and harmless treatment enters the extrusion tube 12 from the feed pipe 122, and is fed through the screw rod 121 to be extruded from the discharge pipe 124 into the interior of the extrusion head 6.
[0050] Furthermore, a discharge plate 61 is provided at the lower part of the extrusion head 6, and a plurality of discharge holes 62 are provided on the discharge plate 61, and the position distribution of the discharge holes 62 corresponds to the position distribution of the second die holes 511 of the second die 5 and the position distribution of the first die holes 411 of the first die 4. The radial cross-sectional shapes of the discharge holes 62, the first die holes 411 and the second die holes 511 are the same.
[0051] refer to Figure 4 When the first mold 4 passes through the extrusion head 6, the corresponding adjustment cylinder 32 pushes the first mold 4 to move upward, so that the first upper mold plate 41 of the first mold 4 is attached to the discharge plate 61 of the extrusion head 6, and the first mold hole 411 of the first upper mold plate 41 is connected with the discharge hole 62 of the discharge plate 61. The sludge inside the extrusion head 6 can enter the first mold hole 411 of the first upper mold plate 41 from the discharge hole 62, and then fill the entire first mold cavity of the first mold 4 to obtain the upper model 18.
[0052] Similarly, reference Figure 5 When the second mold 5 passes through the extrusion head 6, the corresponding adjustment cylinder 32 pushes the second mold 5 to move upward, so that the second upper mold plate 51 of the second mold 5 is attached to the discharge plate 61 of the extrusion head 6, and the second mold hole 511 of the second upper mold plate 51 is connected with the discharge hole 62 of the discharge plate 61. The sludge inside the extrusion head 6 can enter the second mold hole 511 of the second upper mold plate 51 from the discharge hole 62, and then fill the entire second mold cavity of the second mold 5 to obtain the lower model 19.
[0053] refer to Figure 2A cutting knife 20 is provided below the extrusion head 6. The cutting knife 20 moves between the extrusion head 6 and the first mold 4 and between the extrusion head 6 and the second mold 5 to cut the sludge extruded from the extrusion head 6 to obtain a single upper mold 18 or a lower mold 19. The cutting knife 20 is connected to the support frame 2 through the tenth working cylinder 21. The tenth working cylinder 21 is horizontally arranged. The tenth working cylinder 21 is used to drive the cutting knife 20 to move in the horizontal direction to realize the cutting action of the cutting knife 20.
[0054] Furthermore, a first sealing cover 63 is provided above the extrusion head 6, a connecting hole 64 is provided at the top of the extrusion head 6, and the interior of the first sealing cover 63 is connected to the first negative pressure pipe 65 and the top space of the extrusion head 6. When the extrusion head 6 is not extruding, the first sealing cover 63 can form a negative pressure at the top of the extrusion head 6 to prevent the sludge from leaking out of the discharge hole 62 of the discharge plate 61.
[0055] A model assembly mechanism 8 is provided behind the extrusion head 6. Fig.10 The model assembly mechanism 8 includes a first clamping assembly, a second clamping assembly, a second sealing cover 83, a movable plate 85 and a workbench 87, and the first clamping assembly, the second clamping assembly, the second sealing cover 83 and the movable plate 85 are all installed on the workbench 87.
[0056] The above-mentioned first clamping assembly includes two groups of first clamping members, and the two groups of first clamping members are symmetrically arranged about the workbench 87. The first clamping member includes a first clamping plate 81, a first working cylinder 811, a first bending rod 812 and a second working cylinder 813. The first clamping plate 81 is fixedly connected to one end of the second working cylinder 813, the other end of the second working cylinder 813 is fixedly connected to one end of the first bending rod 812, the other end of the first bending rod 812 is fixedly connected to one end of the first working cylinder 811, and the other end of the first working cylinder 811 is fixedly connected to the workbench 87. The first bending rod 812 is an L-shaped rod body, and the first bending rod 812 is used to connect the first working cylinder 811 and the second working cylinder 813. The first working cylinder 811 is arranged horizontally, and the second working cylinder 813 is arranged vertically. The two first working cylinders 811 cooperate to form the clamping function between the first clamping plates 81, and the two second working cylinders 813 cooperate to form the movement of the first clamping plate 81 in the vertical direction.
[0057] The above-mentioned second clamping assembly includes two groups of second clamping members, and the two groups of second clamping members are symmetrically arranged about the workbench 87. The second clamping member includes a second clamping plate 82, a third working cylinder 821, a second bending rod 822 and a fourth working cylinder 823. The second clamping plate 82 is fixedly connected to one end of the fourth working cylinder 823, the other end of the fourth working cylinder 823 is fixedly connected to one end of the second bending rod 822, the other end of the second bending rod 822 is fixedly connected to one end of the third working cylinder 821, and the other end of the third working cylinder 821 is fixedly connected to the workbench 87. The second bending rod 822 is an L-shaped rod body, and the second bending rod 822 is used to connect the third working cylinder 821 and the fourth working cylinder 823. The third working cylinder 821 is horizontally arranged, and the fourth working cylinder 823 is vertically arranged. The two third working cylinders 821 cooperate to form the clamping function between the second clamping plates 82, and the two second working cylinders 813 cooperate to form the movement of the second clamping plate 82 in the vertical direction.
[0058] The two first clamping plates 81 of the first clamping assembly are used to clamp the middle template 42, and the two second clamping plates 82 of the second clamping assembly are used to clamp the first upper template 41. The second sealing cover 83 is located between the two second clamping plates 82, and the second sealing cover 83 is fixedly connected to the workbench 87. The top surface of the first upper template 41 is provided with a sealing groove matching the second sealing cover 83. Fig.12 When the second clamping assembly clamps the first upper template 41, the sealing groove on the top surface of the first upper template 41 can be combined with the second sealing cover 83 by moving the first upper template 41, thereby forming a seal for the upper space of the first mold hole 411 on the first upper template 41. The second sealing cover 83 is connected to a second negative pressure tube, and a negative pressure environment can be formed inside the second negative pressure tube, so that negative pressure is formed in the upper space of the first mold hole 411 on the first upper template 41, so as to prevent the upper mold 18 from falling from the first mold hole 411.
[0059] The movable plate 85 is connected to the workbench 87 through the fifth working cylinder 84. The fifth working cylinder 84 is vertically arranged and penetrates the second sealing cover 83. The movable plate 85 is located inside the second sealing cover 83. A plurality of limiting columns 86 are arranged on the lower surface of the movable plate 85. The limiting columns 86 correspond to the positions of the first die holes 411 on the first upper die plate 41. Fig.16When the upper model 18 is demoulded, the fifth working cylinder 84 adjusts the position of the limiting column 86, and the limiting column 86 moves downward to press against the upper model 18 from the upper part of the upper model 18, and the model assembly mechanism 8 moves upward as a whole, and the second clamping assembly moves upward with the first upper template 41, and the limiting column 86 enters the first die hole 411 to limit the upper model 18, and the upper model 18 and the first upper template 41 move relative to each other, so as to separate the upper model 18 and complete the demoulding of the upper model 18. The axial length of the limiting column 86 is greater than the axial length of the first die hole 411, so as to ensure that the upper model 18 can be completely removed from the first die hole 411.
[0060] The above-mentioned model combination mechanism 8 is used to clamp the first upper template 41 and the middle template 42, and realize the separation and combination between the first upper template 41 and the middle template 42 and the separation and combination between the middle template 42 and the first lower template 43 by moving the first upper template 41 and the middle template 42 in the vertical direction.
[0061] refer to Fig.11 and Fig.12 When the first mold 4 passes through the model assembly mechanism 8, the first clamping assembly clamps the intermediate mold 42 and moves the intermediate mold 42 upward until the sealing groove on the top surface of the first upper mold 41 is combined with the second sealing cover 83, the intermediate mold 42 is separated from the first lower mold 43, the insertion rod 431 of the first lower mold 43 leaves the first mold hole 411 of the first upper mold 41, the upper mold 18 is separated from the insertion rod 431, and the upper mold 18 stays above the intermediate mold 42. Then, refer to Fig.13 , the second clamping assembly clamps the first upper template 41, and the first clamping assembly moves the middle template 42 downward, so that the first upper template 41 is separated from the middle template 42, and the middle template 42 is combined with the first lower template 43. At this time, the upper mold 18 stays inside the first mold hole 411 of the first upper template 41, and the second negative pressure tube forms a negative pressure environment inside the second sealing cover 83 to prevent the upper mold 18 from falling from the first mold hole 411. After the middle template 42 is combined with the first lower template 43, the first mold 4 leaves the model assembly mechanism 8. At this time, the first mold 4 is not equipped with the first upper template 41.
[0062] refer to Fig.14 and Fig.15 When the second mold 5 passes through the model assembly mechanism 8, the second clamping assembly of the model assembly mechanism 8 moves the first upper mold plate 41 downward so that the first upper mold plate 41 covers the second mold 5. At this time, the first mold hole 411 on the first upper mold plate 41 is connected with the second mold hole 511 on the second mold 5. The upper mold 18 inside the first mold hole 411 is combined with the lower mold 19 inside the second mold hole 511 to obtain a sludge model. Then, refer to Fig.16 and Fig.17, adjust the positions of the movable plate 85 and the limiting column 86, and demold the upper model 18 on the first upper template 41, so that the upper model 18 remains on the second mold 5, and the first upper template 41 is clamped in the model assembly mechanism 8.
[0063] In this embodiment, reference Figure 1 and Figure 2 On the conveying path of the conveyor belt 3, a glue coating member 7 is also provided between the extruder head 6 and the model assembly mechanism 8. The glue coating member 7 is used to coat the lower model 19 inside the second die hole 511 with glue, that is, to coat the upper surface of the lower model 19 with an adhesive material, and the adhesive material is used to bond the lower model 19 and the upper model 18. Specifically, the glue coating member 7 includes a glue coating box, and a plurality of glue coating nozzles are provided at the lower part of the glue coating box, and the position arrangement of the glue coating nozzles is the same as the position arrangement of the second die hole 511 on the second mold 5. A fluid adhesive material is provided inside the glue coating box, and the glue coating box is equipped with a pressure pipe, and the pressure pipe is connected to a high-pressure pump to form a glue extrusion pressure inside the glue coating box, so that the adhesive material is extruded from the glue coating nozzle. The adhesive material in this embodiment is a ceramic slurry with adhesiveness, and the ceramic slurry can assist in bonding the lower model 19 and the upper model 18, and can be sintered at high temperature together with the lower model 19 and the upper model 18. The glue coating nozzle of the glue coating member 7 is used to apply glue to the lower model 19 inside the second mold hole 511 , and the adhesive material is located on the upper surface of the lower model 19 and is used to bond the lower model 19 and the upper model 18 .
[0064] refer to Figure 3 In this embodiment, the conveyor belt 3 is provided with a second mold assembly station 301, a model assembly station 302, a first mold assembly station 303 and a blanking station 304. The second mold assembly station 301 is used to combine the second upper mold plate 51 and the second lower mold plate 52 in the second mold 5; the model assembly station 302 is used to combine the upper mold 18 and the lower mold 19; the first mold assembly station 303 is used to combine the first upper mold plate 41 and the middle mold plate 42 in the first mold 4; the blanking station 304 is used to separate the second upper mold plate 51 and the second lower mold plate 52 in the second mold 5 to realize the blanking of the sludge model.
[0065] refer to Figure 2 and Figure 3The above-mentioned model assembly mechanism 8 is located on the model assembly station 302, and a second slide 13 for realizing the movement of the model assembly mechanism 8 is provided on the support frame 2, and the first end and the second end of the second slide 13 are respectively located above the conveyor belt 3. The first end of the second slide 13 is located at the model assembly station 302, and the second end of the second slide 13 is located at the first mold assembly station 303. The second slide 13 connects the model assembly station 302 and the first mold assembly station 303. A second sliding block 131 matching the second slide 13 is provided on the second slide 13, and the second sliding block 131 is slidably connected to the second slide 13. A second driving cylinder for driving the second sliding block 131 to move is also provided on the support frame 2. The second sliding block 131 is connected to the working table 87 of the model assembly mechanism 8 through a sixth working cylinder 132, and the sixth working cylinder 132 is used to adjust the position of the model assembly mechanism 8 in the vertical direction.
[0066] When the upper model 18 escapes from the first mold hole 411, the second driving cylinder drives the second sliding block 131 to move, so that the model assembly mechanism 8 and the first upper template 41 thereon move from the model assembly station 302 to the first mold assembly station 303, and the first upper template 41 is placed on the first mold 4 on the first mold assembly station 303 through the second clamping assembly. At this position, the middle template 42 on the first mold 4 is combined with the first upper template 41 to obtain a complete first mold 4.
[0067] refer to Figure 2 and Figure 3 The support frame 2 is provided with a third slideway 14 at the material unloading station 304. The first end of the third slideway 14 is located at the material unloading station 304, and the second end of the third slideway 14 extends to the material stacking position 17. The material stacking position 17 is used to place the second upper template 51 carrying the sludge model. The third slideway 14 is provided with a third sliding block 141 matching the third slideway 14. The third sliding block 141 is slidably connected to the third slideway 14. The support frame 2 is also provided with a third driving cylinder for driving the third sliding block 141 to move. The third sliding block 141 is provided with a first clamp 9, and the first clamp 9 is used to clamp the second upper template 51 to realize the unloading of the second upper template 51.
[0068] For further reference, Figure 2 and Figure 3The support frame 2 is provided with a first slideway 11 at the second mold assembly station 301. The first end of the first slideway 11 is located at the second mold assembly station 301. The second end of the first slideway 11 extends to the loading position 16 of the second upper mold plate 51. The loading position 16 is provided with a plurality of unloaded second upper mold plates 51. The first slideway 11 is provided with a first sliding block 111 matching the first slideway 11. The first sliding block 111 is slidably connected with the first slideway 11. The support frame 2 is also provided with a first driving cylinder for driving the first sliding block 111 to move. The first sliding block 111 is provided with a second clamp 10. The second clamp 10 is used to clamp the second upper mold plate 51. The second clamp 10 clamps the second upper mold plate 51 at the loading position 16 of the second upper mold plate 51, and then sends the second upper mold plate 51 to the top of the second mold 5 located at the second mold assembly station 301, completes the combination of the second upper mold plate 51 and the second lower mold plate 52, obtains a complete second mold 5, and realizes the loading of the second upper mold plate 51.
[0069] Furthermore, the second clamp 10 has the same structure as the first clamp 9. Figure 2 The first clamp 9 includes two third clamping members and a connecting body 93, and the two third clamping members are symmetrically arranged about the connecting body 93. The third clamping member includes a third clamping plate 91 and a seventh working cylinder 92, and the third clamping plate 91 is fixedly connected to one end of a third bending rod 94, and the other end of the third bending rod 94 is fixedly connected to the seventh working cylinder 92, and the other end of the seventh working cylinder 92 is connected to the connecting body 93. The third bending rod 94 is an L-shaped rod body, and the third bending rod 94 is used to connect the seventh working cylinder 92 and the third clamping plate 91. The seventh working cylinder 92 is horizontally arranged, and the two seventh working cylinders 92 cooperate to form a clamping function between the third clamping plates 91.
[0070] The connecting body 93 corresponding to the first clamp 9 is connected to the third sliding block 141 through the ninth working cylinder 142, and the ninth working cylinder 142 is used to adjust the vertical position of the first clamp 9; the connecting body 93 corresponding to the second clamp 10 is connected to the first sliding block 111 through the eighth working cylinder 112, and the eighth working cylinder 112 is used to adjust the vertical position of the second clamp 10.
[0071] The working process of the water environment treatment equipment in this embodiment includes the following steps:
[0072] Step 1: Install the first mold 4 and the second mold 5 on the upper feeding plate 33 of the conveyor belt 3, refer to Figure 3 , keep the first mold 4 and the second mold 5 arranged at intervals along the conveying path of the conveyor belt 3, and the clamp on the feeding plate 33 fixes and clamps the first lower mold plate 43 of the first mold 4 and the second lower mold plate 52 of the second mold 5;
[0073] The dehydrated and harmless sludge enters the extrusion tube 12 from the feed tube 122, and is fed by the screw rod 121 and extruded from the discharge tube 124 into the extrusion head 6;
[0074] Step 2: The conveyor belt 3 moves with the first mold 4 and the second mold 5, and the first mold 4 and the second mold 5 pass through the extrusion head 6 in sequence;
[0075] refer to Figure 4 When the first die 4 passes through the extrusion head 6, the corresponding adjustment cylinder 32 pushes the first die 4 to move upward, so that the first upper die plate 41 of the first die 4 is attached to the discharge plate 61 of the extrusion head 6, and the first die hole 411 of the first upper die plate 41 is connected with the discharge hole 62 of the discharge plate 61. The sludge inside the extrusion head 6 can enter the first die hole 411 of the first upper die plate 41 from the discharge hole 62, and then fill the entire first die cavity of the first die 4, and the cutting knife 20 cuts off the sludge extruded from the extrusion head 6 to obtain the upper mold 18;
[0076] refer to Figure 5 When the second die 5 passes through the extrusion head 6, the corresponding adjustment cylinder 32 pushes the second die 5 to move upward, so that the second upper die plate 51 of the second die 5 is attached to the discharge plate 61 of the extrusion head 6, and the second die hole 511 of the second upper die plate 51 is connected with the discharge hole 62 of the discharge plate 61. The sludge inside the extrusion head 6 can enter the second die hole 511 of the second upper die plate 51 from the discharge hole 62, and then fill the entire second die cavity of the second die 5. The cutting knife 20 cuts off the sludge extruded from the extrusion head 6 to obtain the lower mold 19;
[0077] Step 3: The conveyor belt 3 moves with the first mold 4 and the second mold 5, the first mold 4 passes through the model assembly mechanism 8, and the second mold 5 passes through the glue coating part 7;
[0078] refer to Fig.11 , Fig.12 and Fig.13, when the first mold 4 passes through the model combination mechanism 8, the first clamping plate 81 of the first clamping assembly clamps the intermediate template 42 and moves the intermediate template 42 upward until the sealing groove on the top surface of the first upper template 41 is combined with the second sealing cover 83. At this time, the first lower template 43 is fixedly clamped on the feeding plate 33, the intermediate template 42 and the first lower template 43 are separated, the insertion rod 431 of the first lower template 43 leaves the first mold hole 411 of the first upper template 41, and the upper model 18 stays above the intermediate template 42, and the upper model 18 is separated from the insertion rod 431; then, the second clamping plate 82 of the second clamping assembly clamps the first upper template 41, and the first clamping assembly moves the intermediate template 42 downward, so that the first upper template 41 is separated from the intermediate template 42, and the intermediate template 42 is combined with the first lower template 43. At this time, the upper model 18 stays inside the first mold hole 411 of the first upper template 41, and the second negative pressure tube forms a negative pressure environment inside the second sealing cover 83 to prevent the upper model 18 from falling from the first mold hole 411;
[0079] When the second mold 5 passes through the glue coating member 7, the glue coating member 7 performs glue coating on the lower mold 19 inside the second mold hole 511, and applies the adhesive substance to the upper surface of the lower mold 19, and the adhesive substance is used to connect the lower mold 19 and the upper mold 18;
[0080] Step 4: The conveyor belt 3 moves with the first mold 4 and the second mold 5, and the first mold 4 leaves the model assembly mechanism 8. At this time, the first mold 4 is not equipped with the first upper mold plate 41; the second mold 5 passes through the model assembly mechanism 8;
[0081] refer to Fig.14 and Fig.15 When the second mold 5 passes through the model assembly mechanism 8, the second clamping assembly of the model assembly mechanism 8 moves the first upper mold plate 41 downward so that the first upper mold plate 41 covers the second mold 5. At this time, the first mold hole 411 on the first upper mold plate 41 is connected with the second mold hole 511 on the second mold 5, and the upper mold 18 inside the first mold hole 411 is combined with the lower mold 19 inside the second mold hole 511 to obtain a sludge model;
[0082] refer to Fig.16 and Fig.17The fifth working cylinder 84 adjusts the position of the limiting column 86, and the limiting column 86 moves downward to press against the upper model 18 from the upper part of the upper model 18. The sixth working cylinder 132 moves the entire model assembly mechanism 8 upward, and the second clamping assembly and the first upper template 41 move upward with the model assembly mechanism 8. The limiting column 86 enters the first die hole 411 to limit the upper model 18, and the upper model 18 and the first upper template 41 move relative to each other, so as to separate the upper model 18 from the first upper template 41, and complete the demoulding of the upper model 18. The sludge model formed by the combination of the upper model 18 and the lower model 19 remains on the second upper template 51 of the second mold 5;
[0083] Step 5: The conveyor belt 3 moves with the first mold 4 and the second mold 5, and the second mold 5 comes to the unloading station 304. The first clamp 9 clamps the second upper mold plate 51 on the second mold 5, so that the second lower mold plate 52 of the second mold 5 is separated from the second upper mold plate 51. The first clamp 9 moves along the third slide 14, and brings the second upper mold plate 51 from the unloading station 304 to the material stacking position 17, completing the unloading of the sludge model;
[0084] Step 6: The conveyor belt 3 moves with the first mold 4 and the second mold 5, and the first mold 4 comes to the first mold assembly station 303. At the same time, the model assembly mechanism 8 and the first upper mold plate 41 thereon come from the model assembly station 302 to the first mold assembly station 303. The second clamping assembly of the model assembly mechanism 8 places the first upper mold plate 41 on the first mold 4 on the first mold assembly station 303, and the middle mold plate 42 on the first mold 4 is combined with the first upper mold plate 41 at this position to obtain a complete first mold 4.
[0085] Step 7: The conveyor belt 3 moves with the first mold 4 and the second mold 5, and the second mold 5 comes to the second mold assembly station 301. At the same time, the second clamp 10 clamps the unloaded second upper mold 51 at the loading position 16 of the second upper mold 51, and then sends the second upper mold 51 to the top of the second mold 5 at the second mold assembly station 301, completing the combination of the second upper mold 51 and the second lower mold 52, and obtaining a complete second mold 5;
[0086] Step 8: The complete first mold 4 and the complete second mold 5 continue to be conveyed by the conveyor belt 3, and steps 2 to 7 are repeated to continuously process and combine the upper model 18 and the lower model 19 to achieve automatic and continuous processing of the sludge model.
[0087] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water environment treatment device for a river basin, comprising a base and a support frame, wherein the support frame is provided with an extrusion head for sludge extrusion, and the base is provided with a conveyor belt for conveying sludge models, characterized in that: The sludge model comprises an upper model and a lower model, the upper model and the lower model are combined to form a hollow cylindrical body with sealed end faces, and the side wall of the upper model is provided with hollow holes; The conveyor belt is provided with a plurality of feeding plates for mounting the sludge forming mold, and the sludge forming mold comprises a first mold for forming an upper mold and a second mold for forming a lower mold; The first mold comprises a first upper mold plate, a middle mold plate and a first lower mold plate which are sequentially combined from top to bottom, a plurality of first mold holes are arranged on the first upper mold plate, an insert rod matching the position and quantity of the first mold holes is arranged on the upper portion of the first lower mold plate, a plurality of insert blocks evenly distributed are arranged on the cylindrical side of the insert rod, the insert rod passes through the middle mold plate and is inserted into the first mold hole, and a first mold cavity for extruding the upper model is formed between the first mold hole, the insert rod and the middle mold plate; the second mold comprises a second upper mold plate located at the upper portion and a second lower mold plate located at the lower portion, a plurality of second mold holes are arranged on the second upper mold plate, a sealing column matching the position and quantity of the second mold holes is arranged on the upper portion of the second lower mold plate, the sealing column passes through the second upper mold plate and extends to the bottom of the second mold hole, and the second mold hole and the sealing column are combined to form a second mold cavity for extruding the lower model; the position distribution of the second mold holes corresponds to the position distribution of the first mold holes; The first mold and the second mold are arranged at intervals along the conveying path of the conveyor belt. The extrusion head extrude the lower mold through the second mold after the first mold extrude the upper mold. The support frame is provided with a model combination mechanism behind the extrusion head. The model combination mechanism is used to combine the upper model obtained by the first mold and the lower model obtained by the second mold to obtain a sludge model.
2. The watershed water environment management equipment according to claim 1 is characterized in that: The model assembly mechanism comprises a first clamping assembly for clamping the middle template and a second clamping assembly for clamping the first upper template; When the first mold passes through the model assembly mechanism, the model assembly mechanism performs a first action: the first clamping assembly moves the middle template upward in the vertical direction to separate the middle template from the first lower template, and after the insertion rod on the first lower template completely leaves the upper mold, the second clamping assembly fixes and clamps the first upper mold, and the first clamping assembly moves the middle template downward in the vertical direction to separate the middle template from the first upper mold and combine the middle template with the first lower mold, and the upper mold stays inside the first mold hole of the first upper mold; When the second mold passes through the model combination mechanism, the model combination mechanism performs a second action: the second clamping assembly covers the first upper mold plate on the second mold, the upper model is pushed out from the first mold hole of the first upper mold plate, and the upper model is combined with the lower model in the second mold to obtain a mud model.
3. The watershed water environment management equipment according to claim 2 is characterized in that: The support frame is also provided with a second slide for realizing the movement of the model assembly mechanism, the first end and the second end of the second slide are respectively located above the conveyor belt, and the model assembly mechanism moves along the second slide to transfer the first upper template at the first end of the second slide to the second end of the second slide, and installs the first upper template on the first mold which is not equipped with the first upper template.
4. The watershed water environment treatment equipment according to claim 3 is characterized in that: The model assembly mechanism also includes a workbench, a second sealing cover and a movable plate located inside the second sealing cover, the second sealing cover is fixedly connected to the workbench, a sealing groove matching the second sealing cover is provided on the first upper template, the movable plate is connected to the workbench through a fifth working cylinder, and a plurality of limit columns are provided on the lower surface of the movable plate, and the limit columns correspond to the position and quantity of the first mold holes on the first upper template.
5. The watershed water environment treatment equipment according to claim 4 is characterized in that: The support frame is provided with a first clamp and a second clamp for clamping the second upper template, the first clamp is used for unloading the second upper template, and the second clamp is used for loading the second upper template.
6. The watershed water environment treatment equipment according to claim 5 is characterized in that: On the conveying path of the conveyor belt, a glue coating part is also arranged between the extrusion head and the model assembly mechanism, and the glue coating part is used to perform glue coating on the lower model inside the second mold hole. The glue coating process is used to coat an adhesive substance on the upper surface of the lower model, and the adhesive substance is used to bond the lower model and the upper model.
7. The watershed water environment treatment equipment according to claim 5 is characterized in that: The first clamp includes two groups of symmetrically arranged third clamping members, and the third clamping members include a third clamping plate and a seventh working cylinder. The third clamping plate is fixedly connected to one end of the seventh working cylinder, and the other end of the seventh working cylinder is respectively fixedly connected to the connecting body. The seventh working cylinder is horizontally arranged.
8. The watershed water environment treatment equipment according to any one of claims 2 to 7, characterized in that: The first clamping assembly includes two groups of symmetrically arranged first clamping members, the first clamping members include a first clamping plate, a first working cylinder and a second working cylinder, the first clamping plate is fixedly connected to one end of the second working cylinder, the other end of the second working cylinder is fixedly connected to one end of the first working cylinder, the other end of the first working cylinder is fixedly connected to the workbench, and the axis of the first working cylinder is arranged perpendicular to the axis of the second working cylinder.
9. The watershed water environment management equipment according to any one of claims 2 to 7, characterized in that: The second clamping assembly includes two groups of symmetrically arranged second clamping members, the second clamping members include a second clamping plate, a third working cylinder and a fourth working cylinder, the second clamping plate is fixedly connected to one end of the fourth working cylinder, the other end of the fourth working cylinder is fixedly connected to one end of the third working cylinder, the other end of the third working cylinder is fixedly connected to the workbench, and the axis of the third working cylinder is arranged perpendicular to the axis of the fourth working cylinder.
Citation Information
Patent Citations
Die for making porous bricks by using mud and method for forming porous bricks by using die
CN102555040A
Sewer sludge curing and shaping mould
CN109020121A