Construction method of high embankment
By adopting a combined structure of step surface, reinforcement strip, pull rod and protective net on the high embankment, combined with the water storage cavity and drive components, the problem of landslide risk of high embankment in earthquake areas is solved, and structural stability and rainwater utilization rate are improved. , reducing the risk of landslides and soil erosion.
Patent Information
- Application Number
- CN202411394687.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2025-01-03
AI Technical Summary
In areas with frequent earthquakes, the slopes of high embankments are susceptible to loosening and landslides caused by seismic waves, and existing protective measures are difficult to effectively reduce the risk of landslides.
A combined structure of step surface, reinforcement strip and tie rod is adopted, combined with the setting of protective net and connectors, a discontinuous slope and reinforcement structure is formed, which improves the stability and protection effect of the foundation layer, and improves the water storage cavity and drive components. Rainwater utilization rate.
Effectively reduce the possibility of high embankment landslides and soil erosion, improve structural strength and protective effect, improve rainwater utilization, and enhance the protection of slopes and the convenience of vegetation watering.
Smart Images

Figure CN119243557A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of foundation construction, and in particular to a construction method of a high embankment. Background Art
[0002] In highway engineering, embankment refers to the fill roadbed that is higher than the original ground. Its function is to support the roadbed and road surface, and connect with the road cutting to form a complete line. High embankment is an embankment that reaches a certain standard in height, usually an embankment with a height greater than 20m. High embankments are more common in mountainous and hilly areas with complex terrain. Their construction plays an important role in raising the line elevation, improving the line shape, and meeting driving safety.
[0003] In the prior art, in order to reduce the possibility of landslides and collapses on high embankments, the slopes on both sides of the high embankments are protected and reinforced by means of plant protection, stone masonry, shotcrete, etc. However, in areas of my country where earthquakes occur frequently, seismic waves will generate strong vibrations on the ground during propagation, which can loosen, break and displace the soil and rock on the slopes, especially when seismic waves pass through soft soil or rock layers, which is more likely to cause landslides. Summary of the invention
[0004] In order to reduce the possibility of landslides on high embankments, the present application provides a construction method for high embankments.
[0005] The construction method of the high embankment provided in this application adopts the following technical solution: The construction method of a high embankment includes the following steps: S1, cleaning and excavation: cleaning the construction ground and removing obstacles on the construction ground; S2, filling of the foundation layer: selecting soil, stone and other materials that meet the requirements, filling on the construction ground to form a foundation layer, laying reinforcing strips on both sides of the width direction of the surface of the foundation layer in sequence, the two ends of the reinforcing strips extending along the length direction of the foundation layer, a tie rod is provided between the two reinforcing strips, and the two reinforcing strips are connected as a whole by the tie rod; filling multiple layers in sequence from bottom to top, forming slopes on both sides of each foundation layer, the width of each foundation layer decreases in sequence from bottom to top, and a step surface is formed between two vertically adjacent slopes; S3, protection of the slope surface: laying protective nets on the slope surfaces on both sides of each foundation layer in sequence, the protective nets are provided with connecting parts, and the protective nets are fixed to the slope surface through the connecting parts; S4, laying of the pavement layer: laying the pavement layer on the surface of the highest foundation layer.
[0006] By adopting the above-mentioned technical scheme, through the arrangement of step surfaces, reinforcing strips and tie rods, on the one hand, the width of each base layer decreases from bottom to top to form a plurality of step surfaces, and the step surfaces form a plurality of discontinuous slope surfaces on both sides of the high embankment to reduce the possibility of large-scale landslides on the high embankment; on the other hand, reinforcing strips are arranged on both sides of the width direction of each base layer, and the reinforcing strips on both sides of the width direction of the base layer are connected to each other as a whole by tie rods to reduce the possibility of landslides in a single base layer to improve the structural strength of the base layer; on the other hand, a protective net is arranged on the slope to protect the slope of the base layer to improve the structural stability of the slope and reduce the possibility of soil erosion caused by rain erosion on the slope.
[0007] Optionally, before laying the reinforcement strips in step S2, the base layer is compacted, and according to the planning and design, a first embedding groove is opened on both sides of the width direction of the base layer surface, and the two ends of the first embedding groove are extended along the length direction of the base layer. The two reinforcement strips are arranged corresponding to the two embedding grooves, and each reinforcement strip is embedded in the corresponding embedding groove; a second embedding groove is opened on the surface of the base layer, and the two ends of the second embedding groove are respectively connected to the two first embedding grooves, the tension rod is embedded in the first embedding groove, and the two ends of the tension rod are respectively connected to the two reinforcement strips.
[0008] By adopting the above-mentioned technical scheme, through the setting of the first embedding groove and the second embedding groove, the base layer is compacted before the reinforcement strip is laid to improve the structural density of the base layer. The first embedding groove is used for embedding the reinforcement strip, thereby increasing the contact area between the reinforcement strip and the base layer, thereby improving the connection stability between the reinforcement strip and the base layer. The combination of the pull rod and the two reinforcement strips can reinforce both sides of the base layer and reduce the possibility of landslides and collapses in the base layer.
[0009] Optionally, each of the reinforcement strips is partially exposed on its corresponding step surface, and the reinforcement strips are respectively provided with connecting rods and hanging rings, and the connecting rods and hanging rings are respectively arranged on two opposite side walls of the reinforcement strip, one end of the connecting rod is connected to the reinforcement strip, and the other end extends to the outer edge of the step surface, and a hanging groove is provided on the peripheral wall of the end of the connecting rod away from the reinforcement strip; one side of the protective net is hung on the hanging groove of the connecting rod, and the other side is hung on the hanging ring of the vertically adjacent reinforcement strip.
[0010] By adopting the above-mentioned technical scheme, through the setting of connecting rods and hanging rings, when the protective net is laid on the slope of the base layer, one side of the protective net is hung on the hanging groove of the connecting rod, and the other side is hung on the hanging ring of the vertically adjacent reinforcement strip. On the one hand, the hanging groove of the connecting rod and the hanging ring of the vertically adjacent reinforcement strip can play a role in preliminarily fixing the protective net, so that the subsequent protective net is connected to the slope through the connecting piece, thereby improving the convenience of installing the protective net; on the other hand, the two sides of the protective net are respectively hung on the hanging groove and the hanging ring of the vertically adjacent reinforcement strip, so that the protective net can be kept in the unfolded state as much as possible, thereby improving the protective effect on the slope; the two vertically adjacent reinforcement strips are connected together by the protective net, and the combination of the protective net and the two vertically adjacent reinforcement strips can improve the protective effect on the base layer and reduce the possibility of landslides in the base layer.
[0011] Optionally, the connecting member includes a connecting strip and an anchor rod, the connecting strip is used to fit the surface of the protective net away from the slope, the top wall of the reinforcing strip is provided with a snap-in block, one end of the connecting strip is provided with a snap-in groove for matching and snapping with the snap-in block, and the other end of the connecting strip is provided with a plug-in groove for plugging in vertically adjacent connecting rods; the anchor rod is sequentially passed through the connecting strip and the protective net and plugged into the slope, and the length direction of the anchor rod is not parallel to the length direction of the connecting rod.
[0012] By adopting the above-mentioned technical scheme, through the setting of connecting strips and anchor rods, after the protective net is installed, the connecting strip is attached to the surface of the protective net, and the clamping block of the reinforcement strip is clamped in the clamping groove, and the vertically adjacent connecting rods are inserted in the insertion groove to preliminarily fix the connecting strip, and then the anchor rods are successively passed through the connecting strip and the protective net and inserted into the slope surface, so as to fix the protective net to achieve the protective effect of the slope surface; one end of the connecting strip is connected to the clamping block of the reinforcement strip, and the other end is connected to the connecting rod of the vertically adjacent reinforcement strip, so that the two vertically adjacent reinforcement strips are connected as a whole to improve the protective effect of the overall structure, thereby reducing the possibility of landslides in high embankments.
[0013] Optionally, a connecting hole is provided on the side wall of the reinforcement bar away from the hanging ring, one end of the connecting rod is inserted into the connecting hole, an anti-slip block is provided on the peripheral wall of one end of the connecting rod close to the reinforcement bar, and an avoidance groove is provided on the peripheral wall of the connecting hole for the anti-slip block to pass through, and the connecting rod is detachably mounted on the reinforcement bar through the anti-slip block.
[0014] By adopting the above-mentioned technical scheme, through the setting of the connecting hole and the anti-dropping block, when installing the connecting rod, one end of the connecting rod is aligned with the connecting hole and the anti-dropping block is aligned with the avoidance groove, and then the connecting rod is pushed, and the connecting rod is inserted into the connecting hole, and then the connecting rod is rotated to form a misalignment between the anti-dropping block of the connecting rod and the avoidance groove, so that the connecting rod is installed on the reinforcing bar, thereby improving the installation convenience between the connecting rod and the reinforcing bar.
[0015] Optionally, a water storage cavity is defined in the reinforcing strip, and a plurality of water collection holes connected to the water storage cavity are defined on the top wall of the reinforcing strip; a flow channel is defined in the connecting rod, and the flow channel passes through the end surface of the connecting rod close to the reinforcing strip to be connected to the water storage cavity, and a plurality of water outlet holes connected to the flow channel are defined on the peripheral wall of the connecting rod; a pushing strip is slidably installed in the water storage cavity, and the pushing strip is provided with a driving assembly, and the driving assembly is used to drive the pushing strip to rise and fall so as to push rainwater in the water storage cavity into the flow channel of the connecting rod.
[0016] By adopting the above-mentioned technical scheme, through the setting of the water storage chamber and the pushing bar, for areas with less precipitation, the water storage chamber can be used to collect and store rainwater. When the vegetation growing on the slope or step surface needs to be watered, the pushing bar is driven to rise and fall by the driving component. The pushing bar can push the rainwater collected in the water storage chamber into the flow channel of the connecting rod, and then discharge it to the step surface of the base layer through the water outlet for absorption by the vegetation, thereby improving the utilization rate of rainwater.
[0017] Optionally, the driving assembly includes a driving screw and a driving handwheel, the driving screw being rotatably installed in the water storage chamber, the driving screw being passed through a pushing bar and being threadedly connected to the pushing bar, one end of the driving screw passing through the water storage chamber and being connected to a rotating head; the driving handwheel has a rotating groove for matching and inserting a rotating head, when the rotating head is matched and inserted in the rotating groove, the driving handwheel and the driving screw are circumferentially linked, and the driving handwheel and the driving screw are detachably connected via the rotating head.
[0018] By adopting the above-mentioned technical scheme, through the setting of the driving screw and the driving handwheel, the driving handwheel and the driving screw are connected through the rotating head. When the vegetation growing on the slope needs to be watered, the rotating groove of the driving handwheel is aligned with the rotating head of the driving screw and pushed, so that the rotating head of the driving screw is inserted into the rotating groove of the driving handwheel, and then the driving handwheel is driven to rotate, which can drive the driving screw to rotate, and then can drive the pushing bar to rise and fall, so that the rainwater collected in the water storage chamber can be used to water the vegetation.
[0019] Optionally, the driving assembly includes a rotating disk, a return spring, a first connecting rod, a second connecting rod and a driving member, the rotating disk is rotatably installed on the inner wall of the water storage chamber, the return spring is installed between the push bar and the inner wall of the water storage chamber, and the return spring normally causes the push bar to move to the bottom of the water storage chamber; one end of the first connecting rod is hinged to the rotating disk, and the other end is hinged to the push bar, one end of the second connecting rod is hinged to the rotating disk, and the other end is connected to the driving member, the driving member is used to pull the second connecting rod up and down to drive the rotating disk to rotate, when the second connecting rod descends, the rotating disk rotates and the push bar is lifted to push rainwater in the water storage chamber into the flow channel of the connecting rod.
[0020] By adopting the above-mentioned technical solution, through the arrangement of the rotating disk, the return spring, the first connecting rod, the second connecting rod and the driving member, when it is necessary to water the vegetation, the second connecting rod is driven down by the driving member, the second connecting rod drives the rotating disk to rotate, the rotating disk pulls the first connecting rod, thereby forcing the push bar to rise, so as to push the rainwater in the water storage chamber to the flow channel of the connecting rod for watering; when the push bar is lifted, the return spring is deformed and elastic force exists, and the elastic force enables the push bar to be reset, so that the water storage chamber can regain the ability to collect rainwater.
[0021] Optionally, the driving member includes a pedal and a third connecting rod, the pedal is arranged on the top of the reinforcement bar, one end of the third connecting rod is connected to the pedal, and the other end is slidably passed through the reinforcement bar and extends into the water storage chamber, and the pedal is slidably installed on the reinforcement bar through the third connecting rod; the end of the second connecting rod away from the rotating disk is hinged to the third connecting rod.
[0022] By adopting the above-mentioned technical solution, through the setting of the pedal and the third connecting rod, when watering the vegetation, the pedal is stepped on to force the pedal to sink, and the pedal pushes the second connecting rod through the third connecting rod to drive the rotating disk to rotate, and then the pushing bar can be driven to rise and fall under the action of the first connecting rod, thereby greatly improving the operational convenience of taking out rainwater from the water storage chamber.
[0023] Optionally, in step S2, a plurality of reinforcing strips are arranged at intervals along the length direction of the base layer, a butt joint is provided between two adjacent reinforcing strips along the length direction of the base layer, and two adjacent reinforcing strips along the length direction of the base layer are connected into a whole through the butt joint.
[0024] By adopting the above technical solution and setting the butt joint, the butt joint connects two adjacent reinforcing strips along the length direction of the base layer into a whole, so as to improve the structural stability of the base layer and reduce the possibility of landslides in the high embankment.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through the arrangement of step surfaces, reinforcement strips and tie rods, on the one hand, the width of each foundation layer decreases from bottom to top to form multiple step surfaces, which form multiple discontinuous slopes on both sides of the high embankment to reduce the possibility of large-scale landslides on the high embankment; on the other hand, reinforcement strips are arranged on both sides of the width direction of each foundation layer, and the reinforcement strips on both sides of the width direction of the foundation layer are connected to each other as a whole through tie rods to reduce the possibility of landslides in a single foundation layer and improve the structural strength of the foundation layer; on the other hand, a protective net is arranged on the slope surface to protect the slope surface of the foundation layer, so as to improve the structural stability of the slope surface and reduce the possibility of soil erosion caused by rain erosion on the slope surface; 2. Through the setting of connecting rods and hanging rings, when the protective net is laid on the slope of the base layer, one side of the protective net is hung on the hanging groove of the connecting rod, and the other side is hung on the hanging ring of the vertically adjacent reinforcing strip. On the one hand, the hanging groove of the connecting rod and the hanging ring of the vertically adjacent reinforcing strip can play a role in preliminarily fixing the protective net, so that the subsequent protective net is connected to the slope through the connecting piece, thereby improving the convenience of installing the protective net; on the other hand, the two sides of the protective net are respectively hung on the hanging groove and the hanging ring of the vertically adjacent reinforcing strip, so that the protective net can be kept in an unfolded state as much as possible, thereby improving the protective effect on the slope; the two vertically adjacent reinforcing strips are connected together by the protective net, and the combination of the protective net and the two vertically adjacent reinforcing strips can improve the protective effect on the base layer and reduce the possibility of landslides in the base layer; 3. Through the arrangement of the rotating disk, the return spring, the first connecting rod, the second connecting rod and the driving member, when the vegetation needs to be watered, the second connecting rod is driven down by the driving member, the second connecting rod drives the rotating disk to rotate, the rotating disk pulls the first connecting rod, thereby forcing the push bar to rise, so as to push the rainwater in the water storage chamber to the flow channel of the connecting rod for watering; when the push bar is lifted, the return spring is deformed and elastic force exists, and the elastic force enables the push bar to be reset, so that the water storage chamber can regain the ability to collect rainwater. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a schematic diagram of the overall structure of Example 1; Figure 2 is a partial cross-sectional view of the tie rod embodied in Embodiment 1; Figure 3 is a partial cross-sectional view of the hanging ring of embodiment 1; Figure 4 is a partial cross-sectional view of the hanging groove of embodiment 1; Figure 5 yes Figure 1 The enlarged view of point A in the middle; Figure 6 is a schematic diagram of the structure of the docking strip according to Embodiment 1; Figure 7 is a partial cross-sectional view of a drive assembly according to Embodiment 2; Figure 8 It is a partial cross-sectional view of the drive assembly of Example 3.
[0027] Explanation of reference numerals: 1. foundation layer; 11. slope surface; 12. step surface; 13. first embedded groove; 14. second embedded groove; 15. third embedded groove; 16. fourth embedded groove; 2. reinforcement strip; 21. connecting rod; 211. hanging groove; 212. anti-drop block; 213. flow channel; 214. water outlet; 215. blocking block; 22. hanging ring; 221. inlet and outlet; 23. clamping block; 24. connecting hole; 241. avoidance groove; 25. water storage chamber; 251. water collection hole; 252. installation groove; 26. push strip; 27. first connecting block; 271. first connecting groove; 28 , second connecting block; 281, second connecting groove; 3, tension rod; 31, first plug-in block; 4, protective net; 5, connecting piece; 51, connecting strip; 511, snap-in groove; 512, plug-in groove; 513, through hole; 514, protrusion; 52, anchor rod; 521, tightening block; 6, pavement layer; 7, driving assembly; 71, driving screw; 711, rotating head; 72, driving hand wheel; 721, rotating groove; 73, rotating disk; 74, reset spring; 75, first connecting rod; 76, second connecting rod; 77, pedal; 78, third connecting rod; 8, docking strip; 81, second plug-in block. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-8 This application is described in further detail.
[0029] Embodiment 1: The embodiment of the present application discloses a construction method of a high embankment.
[0030] Reference Figure 1 , Figure 2 , the construction method of the high embankment comprises the following steps: S1. Cleaning and excavation: Clean the construction ground and remove obstacles on the construction ground.
[0031] S2. Filling of foundation layer 1: a. Select soil, stone and other materials that meet the requirements, fill them on the construction ground according to the planning and design, form a foundation layer 1 of a certain length, and compact it using compaction equipment.
[0032] b. First embedding grooves 13 are respectively provided on both sides of the surface of the base layer 1 in the width direction, and both ends of the first embedding groove 13 are extended along the length direction of the base layer 1; c. A second embedding groove 14 is opened on the surface of the base layer 1, and both ends of the second embedding groove 14 are extended along the width direction of the base layer 1, and both ends of the second embedding groove 14 are respectively connected to the two first embedding grooves 13. The number of the second embedding grooves 14 between the two first embedding grooves 13 can be one or more. In this embodiment, the number of the second embedding grooves 14 between the two first embedding grooves 13 is set to be multiple, and they are spaced apart along the length direction of the base layer 1.
[0033] d. Lay a reinforcing strip 2 in each first embedding groove 13 in turn, and the shape of the reinforcing strip 2 is adapted to the shape of the first embedding groove 13; lay a tie rod 3 in each second embedding groove 14, and the two ends of the tie rod 3 are respectively connected to two reinforcing strips 2, and the two reinforcing strips 2 are connected as a whole through the tie rod 3.
[0034] Repeat steps a, b, c, and d from bottom to top to fill multiple layers of foundation layers 1 in sequence, forming inclined slopes 11 on both sides of each foundation layer 1, and the width of each foundation layer 1 decreases from bottom to top, forming a step surface 12 between two vertically adjacent slopes 11.
[0035] S3. Protection of the slope 11: protective nets 4 are laid in sequence on the slopes 11 on both sides of each base layer 1. The protective nets 4 are provided with connecting members 5. The protective nets 4 are fixed to the slopes 11 through the connecting members 5 to protect the slopes 11 of the base layer 1 and reduce the possibility of landslides on the slopes 11 of the base layer 1.
[0036] S4. Laying of pavement layer 6: pavement layer 6 is laid on the surface of the highest base layer 1. The pavement layer 6 may be an asphalt pavement for people or vehicles to pass through.
[0037] Reference Figure 2 , Figure 3 In this embodiment, a first connecting block 27 is fixedly installed on the side wall of each reinforcement bar 2 close to the tension rod 3, and a first connecting groove 271 is opened on the top wall of the first connecting block 27; the tension rod 3 is a plurality of sections of steel bars that are welded and connected at the ends to form the tension rod 3, and a first plug-in block 31 is fixedly installed on both ends of the tension rod 3, and the first plug-in block 31 is used to be inserted into the first connecting groove 271 of the first connecting block 27, and the tension rod 3 is connected to the first connecting block 27 of the reinforcement bar 2 through the first plug-in block 31; it should be noted that after the first plug-in block 31 is inserted into the first connecting groove 271 of the first connecting block 27, it is necessary to weld the first plug-in block 31 and the first connecting block 27 so that the first plug-in block 31 and the first connecting block 27 are combined to form a whole.
[0038] Reference Figure 3 , Figure 4, the reinforcement strips 2 are partially exposed on the surface of the base layer 1, that is, exposed on the corresponding step surfaces 12, and each reinforcement strip 2 is respectively connected with a connecting rod 21 and a hanging ring 22, and the connecting rod 21 and the hanging ring 22 are respectively arranged on the two opposite side walls of the reinforcement strip 2; in this embodiment, one end of the connecting rod 21 is fixedly connected to the side wall of the reinforcement strip 2 by welding, and the other end extends to the outer edge of the step surface 12, and a hanging groove 211 is provided on the peripheral wall of the end of the connecting rod 21 away from the reinforcement strip 2; it should be noted that the step surface 12 is provided with a third embedding groove 15, and the third embedding groove 15 is used for embedding the connecting rod 21, so that the connecting rod 21 sinks into the third embedding groove 15, so that the step surface 12 can be kept as flat as possible.
[0039] Reference Figure 3 , Figure 4 The hanging ring 22 is fixedly connected to the side wall of the reinforcing strip 2 away from the connecting rod 21 by welding. An inlet and outlet 221 is provided between the hanging ring 22 and the inner wall of the reinforcing strip 2. The inlet and outlet 221 is used for allowing the edge of the protective net 4 to enter the hanging ring 22. One side of the protective net 4 is hung on the hanging groove 211 of the connecting rod 21, and the other side is hung on the hanging ring 22 of the vertically adjacent reinforcing strip 2. In this embodiment, the number of connecting rods 21 and the number of hanging rings 22 are both provided in plurality, and are arranged at intervals along the length direction of the reinforcing strip 2.
[0040] Reference Figure 3 , Figure 4 , Figure 5 In this embodiment, the connecting member 5 includes a connecting strip 51 and an anchor rod 52. The connecting strip 51 is used to fit on the surface of the protective net 4 away from the slope 11. The side wall of the connecting strip 51 is provided with a penetration hole 513 for the anchor rod 52 to penetrate. The anchor rod 52 is sequentially penetrated through the penetration hole 513 of the connecting strip 51 and the mesh gap of the protective net 4 and inserted into the slope 11. A tightening block 521 is integrally formed at one end of the anchor rod 52 away from the slope 11. The tightening block 521 is used to make the connecting strip 51 press against the protective net 4. It should be noted that in this embodiment, a plurality of connecting strips 51 are provided, and the plurality of connecting strips 51 are spaced apart along the length direction of the base layer 1. A plurality of anchor rods 52 are provided in each connecting strip 51, and the plurality of anchor rods 52 are spaced apart along the length direction of the connecting strip 51.
[0041] Reference Figure 3 , Figure 4 , Figure 5A clamping block 23 is fixedly installed on the top wall of the reinforcing strip 2, and the shape of the clamping block 23 is "T-shaped". A clamping groove 511 is provided at one end of the connecting strip 51, and the shape of the clamping groove 511 is adapted to the shape of the clamping block 23, so as to be matched and clamped with the clamping block 23; a plug-in groove 512 is provided on the side wall of the connecting strip 51 at one end away from the clamping groove 511, and the plug-in groove 512 is used for plugging in the vertically adjacent connecting rod 21; a protrusion 514 is fixedly installed on the side wall of the connecting strip 51 at one end away from the clamping groove 511, and when the vertically adjacent connecting rod 21 is inserted in the plug-in groove 512, the protrusion 514 blocks the notch of the hanging groove 211 of the connecting rod 21, thereby reducing the possibility of the protective net 4 escaping from the hanging groove 211.
[0042] It is particularly noteworthy that, in the present embodiment, the movement direction of the engaging block 23 sliding into the engaging groove 511 is consistent with the movement direction of the connecting rod 21 inserted into the plug-in groove 512 (i.e., both are in horizontal directions), and the length direction of the anchor rod 52 is perpendicular to the slope 11 (i.e., the length direction of the connecting rod 21 is not parallel to the length direction of the anchor rod 52).
[0043] Reference Figure 1 , Figure 6 In this embodiment, in step S2, a plurality of reinforcing strips 2 are arranged at intervals along the length direction of the base layer 1, and the end surfaces of two adjacent reinforcing strips 2 along the length direction of the base layer 1 that are close to each other are fixedly installed with second connecting blocks 28, and a docking piece is arranged between two adjacent second connecting blocks 28, and two adjacent reinforcing strips 2 along the length direction of the base layer 1 are connected into a whole through the docking piece.
[0044] Reference Figure 1 , Figure 6 A second connecting groove 281 is provided on the top wall of each second connecting block 28, and the docking piece includes a docking strip 8, which is in a "V-shape". Second plug-in blocks 81 are fixedly installed at both ends of the docking strip 8, and the second plug-in blocks 81 are used to be inserted into the second connecting groove 281 of the second connecting block 28. Two adjacent reinforcing strips 2 along the length direction of the base layer 1 are connected by the docking strip 8; a fourth embedding groove 16 is provided on the step surface 12, and the shape of the fourth embedding groove 16 is adapted to the shape of the docking strip 8 so that the docking strip 8 can be matched and embedded.
[0045] The implementation principle of Example 1 of the present application is as follows: through the arrangement of the reinforcing strips 2, the tension rods 3 and the protective net 4, on the one hand, the protective net 4 is fixed to the slope 11 by the anchor rods 52 of the connecting strips 51, which plays a first fixing effect on the protective net 4; on the other hand, one side of the protective net 4 is hung on the hanging groove 211 of the connecting rod 21, and the other side is hung on the hanging ring 22 of the vertically adjacent reinforcing strips 2. The reinforcing strips 2 on both sides of the base layer 1 form a whole through the tension rods 3, thereby being connected in series to the protective net 4 on the slopes 11 on both sides of the base layer 1, which plays a second fixing effect on the protective net 4, thereby improving the protective effect of the protective net 4 on the slopes 11 on both sides of the base layer 1. The protective net 4 on the slopes 11 on both sides of the base layer 1 wraps the base layer 1, greatly reducing the possibility of landslides in high embankments.
[0046] Embodiment 2: The embodiment of the present application discloses a construction method of a high embankment.
[0047] Reference Figure 7 The difference between the construction method of the high embankment disclosed in the embodiment of the present application and that in embodiment 1 is that: In this embodiment, a water storage chamber 25 is opened in the reinforcing strip 2, and a plurality of water collection holes 251 connected to the water storage chamber 25 are opened on the top wall of the reinforcing strip 2; a connecting hole 24 is opened on the side wall of the reinforcing strip 2 away from the hanging ring 22, and the connecting hole 24 is connected to the water storage chamber 25. The number of the connecting holes 24 is arranged corresponding to the number of the connecting rods 21, and the end of the connecting rod 21 away from the hanging groove 211 is inserted into the corresponding connecting hole 24.
[0048] An anti-slip block 212 is fixedly installed on the peripheral wall of one end of the connecting rod 21 close to the reinforcing strip 2, and an avoidance groove 241 is opened on the peripheral wall of the connecting hole 24 for the anti-slip block 212 to pass through, and the avoidance groove 241 is located at the top of the connecting hole 24, and the connecting rod 21 is detachably installed on the reinforcing strip 2 through the anti-slip block 212; a blocking block 215 is fixed on the peripheral wall of the connecting rod 21, and when the anti-slip block 212 of the connecting rod 21 enters the water storage chamber 25, the blocking block 215 blocks the connecting hole 24 and the avoidance groove 241; when installing the connecting rod 21, the connecting rod 21 is inserted into the connecting hole 24, and when the anti-slip block 212 enters the water storage chamber 25, the connecting rod 21 is rotated to rotate the anti-slip block 212 of the connecting rod 21 downward, thereby clamping the connecting rod 21 at the connecting hole 24 of the reinforcing strip 2, thereby improving the convenience of disassembly and assembly of the connecting rod 21.
[0049] Reference Figure 7A flow channel 213 is provided in the connecting rod 21, and the flow channel 213 passes through the end surface of the connecting rod 21 close to the reinforcing strip 2 to be connected to the water storage chamber 25. A plurality of water outlet holes 214 are provided on the peripheral wall of the connecting rod 21, and all the water outlet holes 214 are arranged at intervals along the length direction of the connecting rod 21, and each water outlet hole 214 is connected to the flow channel 213; a pushing bar 26 is slidably installed in the water storage chamber 25, and the pushing bar 26 is provided with a driving component 7, and the driving component 7 is used to drive the pushing bar 26 to rise and fall so as to push the rainwater in the water storage chamber 25 into the flow channel 213 of the connecting rod 21.
[0050] Reference Figure 7 In this embodiment, the driving assembly 7 includes a driving screw rod 71 and a driving hand wheel 72. The driving screw rod 71 is vertically arranged and rotatably installed in the water storage chamber 25. The driving screw rod 71 is penetrated by the pushing bar 26 and is threadedly connected with the pushing bar 26. One end of the driving screw rod 71 passes through the water storage chamber 25 and is connected with a rotating head 711. The cross-sectional shape of the rotating head 711 is polygonal; the driving hand wheel 72 has a rotating groove 721 for the rotating head 711 to be matched and inserted. When the rotating head 711 is matched and inserted in the rotating groove 721, the driving hand wheel 72 and the driving screw rod 71 are circumferentially linked (that is, the driving hand wheel 72 can drive the driving screw rod 71 to rotate), and the driving hand wheel 72 and the driving screw rod 71 are detachably connected through the rotating head 711.
[0051] The implementation principle of Example 2 of the present application is as follows: for areas with low precipitation, a reinforcing strip 2 with a water storage chamber 25 is selected. The water storage chamber 25 can be used to collect and store rainwater. When the vegetation growing on the slope 11 or the step surface 12 needs to be watered, the driving screw 71 is driven to rotate by the driving hand wheel 72 to drive the pushing strip 26 to rise and fall. The pushing strip 26 can push the rainwater collected in the water storage chamber 25 into the flow channel 213 of the connecting rod 21, and then discharge it to the step surface 12 of the base layer 1 through the water outlet 214 for absorption by vegetation, thereby improving the utilization rate of rainwater.
[0052] Embodiment 3: The embodiment of the present application discloses a construction method of a high embankment.
[0053] Reference Figure 8 The difference between the construction method of the high embankment disclosed in the embodiment of the present application and that in embodiment 2 is that: In this embodiment, an installation groove 252 is opened on the inner wall of the water storage chamber 25, and the driving assembly 7 includes a rotating disk 73, a return spring 74, a first connecting rod 75, a second connecting rod 76 and a driving member. The rotating disk 73 is rotatably installed on the inner wall of the installation groove 252, and the return spring 74 is installed between the push bar 26 and the inner wall of the water storage chamber 25. One end of the return spring 74 is fixedly connected to the top wall of the water storage chamber 25, and the other end is fixedly connected to the push bar 26. The return spring 74 normally moves the push bar 26 to the bottom of the water storage chamber 25.
[0054] Reference Figure 8 The driving member includes a pedal 77 and a third connecting rod 78. The pedal 77 is located at the top of the reinforcing strip 2. The third connecting rod 78 is vertically arranged. One end of the third connecting rod 78 is connected to the pedal 77, and the other end is slidably penetrated through the reinforcing strip 2 and extends into the water storage chamber 25. The pedal 77 is slidably installed on the reinforcing strip 2 through the third connecting rod 78; the first connecting rod 75 and the second connecting rod 76 are both in the shape of long strips. One end of the first connecting rod 75 is hinged to the rotating disk 73, and the other end is hinged to the pushing strip 26. One end of the second connecting rod 76 is hinged to the rotating disk 73, and the other end is hinged to the third connecting rod 78. When the second connecting rod 76 descends, the rotating disk 73 rotates and the pushing strip 26 is lifted to push the rainwater in the water storage chamber 25 into the flow channel 213 of the connecting rod 21.
[0055] The implementation principle of Example 3 of the present application is as follows: when the vegetation needs to be watered, the pedal 77 is stepped on to force the pedal 77 to sink, and the pedal 77 pushes the second connecting rod 76 through the third connecting rod 78 to drive the rotating disk 73 to rotate, and then the push bar 26 can be driven to lift under the action of the first connecting rod 75, thereby greatly improving the convenience of operation for taking out rainwater from the water storage chamber 25; after the push bar 26 is lifted, the reset spring 74 is deformed and has elastic force. When people lift their feet, the elastic force enables the push bar 26 to reset, so that the water storage chamber 25 can regain the ability to collect rainwater, thereby greatly improving the convenience of operation of the overall structure.
[0056] The above are preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for constructing a high embankment, characterized in that: The following steps are involved: S1. Cleaning and excavation: clean the construction ground and remove obstacles on the construction ground; S2. filling of the foundation layer (1): select soil, stone and other materials that meet the requirements, fill the construction ground to form a foundation layer (1), and lay reinforcing strips (2) on both sides of the width direction of the surface of the foundation layer (1). The two ends of the reinforcing strips (2) extend along the length direction of the foundation layer (1). A tie rod (3) is provided between the two reinforcing strips (2). The two reinforcing strips (2) are connected to form a whole through the tie rod (3); multiple layers are filled in sequence from bottom to top, and each layer Slope surfaces (11) are formed on both sides of the base layer (1), the width of each base layer (1) decreases from bottom to top, and a step surface (12) is formed between two vertically adjacent slope surfaces (11); S3, protection of the slope surface (11): protective nets (4) are successively laid on the slope surfaces (11) on both sides of each base layer (1), the protective nets (4) are provided with connecting parts (5), and the protective nets (4) are fixed to the slope surface (11) through the connecting parts (5); S4, laying of the pavement layer (6): the pavement layer (6) is laid on the surface of the highest base layer (1).
2. The method for constructing a high embankment according to claim 1, characterized in that: Before laying the reinforcing strips (2) in step S2, the base layer (1) is compacted, and according to the planning and design, first embedding grooves (13) are opened on both sides of the width direction of the surface of the base layer (1), and the two ends of the first embedding grooves (13) are extended along the length direction of the base layer (1). The two reinforcing strips (2) are arranged corresponding to the two embedding grooves, and each of the reinforcing strips (2) is embedded in the corresponding embedding groove; a second embedding groove (14) is opened on the surface of the base layer (1), and the two ends of the second embedding groove (14) are respectively connected to the two first embedding grooves (13), and the tie rod (3) is embedded in the first embedding groove (13), and the two ends of the tie rod (3) are respectively connected to the two reinforcing strips (2).
3. The method for constructing a high embankment according to claim 2, characterized in that: Each of the reinforcing strips (2) is partially exposed on the corresponding step surface (12), and the reinforcing strips (2) are respectively provided with a connecting rod (21) and a hanging ring (22), and the connecting rod (21) and the hanging ring (22) are respectively arranged on two opposite side walls of the reinforcing strip (2), one end of the connecting rod (21) is connected to the reinforcing strip (2), and the other end extends to the outer edge of the step surface (12), and a hanging groove (211) is provided on the peripheral wall of the end of the connecting rod (21) away from the reinforcing strip (2); one side of the protective net (4) is hung on the hanging groove (211) of the connecting rod (21), and the other side is hung on the hanging ring (22) of the vertically adjacent reinforcing strip (2).
4. The method for constructing a high embankment according to claim 3, characterized in that: The connecting member (5) comprises a connecting strip (51) and an anchor rod (52), wherein the connecting strip (51) is used to fit on the surface of the protective net (4) away from the slope surface (11), the top wall of the reinforcing strip (2) is provided with a clamping block (23), one end of the connecting strip (51) is provided with a clamping groove (511) for the clamping block (23) to match and clamp, and the other end of the connecting strip (51) is provided with a plugging groove (512), and the plugging groove (512) is used for plugging in vertically adjacent connecting rods (21); the anchor rod (52) is sequentially inserted into the connecting strip (51) and the protective net (4) and plugged into the slope surface (11), and the length direction of the anchor rod (52) is not parallel to the length direction of the connecting rod (21).
5. The method for constructing a high embankment according to claim 3, characterized in that: A connecting hole (24) is provided on the side wall of the reinforcing strip (2) away from the hanging ring (22); one end of the connecting rod (21) is inserted into the connecting hole (24); an anti-slip block (212) is provided on the peripheral wall of one end of the connecting rod (21) close to the reinforcing strip (2); an avoidance groove (241) is provided on the peripheral wall of the connecting hole (24) for the anti-slip block (212) to pass through; the connecting rod (21) is detachably mounted on the reinforcing strip (2) via the anti-slip block (212).
6. The method for constructing a high embankment according to claim 5, characterized in that: A water storage chamber (25) is provided in the reinforcing strip (2), and a plurality of water collecting holes (251) connected to the water storage chamber (25) are provided on the top wall of the reinforcing strip (2); a flow channel (213) is provided in the connecting rod (21), and the flow channel (213) passes through the end surface of the connecting rod (21) close to the reinforcing strip (2) to be connected to the water storage chamber (25), and a plurality of water outlet holes (214) connected to the flow channel (213) are provided on the peripheral wall of the connecting rod (21); a pushing strip (26) is slidably installed in the water storage chamber (25), and the pushing strip (26) is provided with a driving assembly (7), and the driving assembly (7) is used to drive the pushing strip (26) to rise and fall so as to push rainwater in the water storage chamber (25) into the flow channel (213) of the connecting rod (21).
7. The method for constructing a high embankment according to claim 6, characterized in that: The driving assembly (7) comprises a driving screw (71) and a driving hand wheel (72); the driving screw (71) is rotatably mounted in the water storage chamber (25); the driving screw (71) is inserted through the push bar (26) and is threadedly connected to the push bar (26); one end of the driving screw (71) passes through the water storage chamber (25) and is connected to a rotating head (711); the driving hand wheel (72) has a rotating groove (721) for the rotating head (711) to be matched and inserted; when the rotating head (711) is matched and inserted into the rotating groove (721), the driving hand wheel (72) and the driving screw (71) are circumferentially linked; the driving hand wheel (72) and the driving screw (71) are detachably connected via the rotating head (711).
8. The method for constructing a high embankment according to claim 6, characterized in that: The driving assembly (7) comprises a rotating disk (73), a return spring (74), a first connecting rod (75), a second connecting rod (76) and a driving member. The rotating disk (73) is rotatably mounted on the inner wall of the water storage chamber (25). The return spring (74) is mounted between the pushing bar (26) and the inner wall of the water storage chamber (25). The return spring (74) normally moves the pushing bar (26) to the bottom of the water storage chamber (25). One end of the first connecting rod (75) is hinged. The second connecting rod (76) is connected to the rotating disk (73) and has the other end hinged to the pushing bar (26). One end of the second connecting rod (76) is hinged to the rotating disk (73) and the other end is connected to the driving member. The driving member is used to pull the second connecting rod (76) up and down to drive the rotating disk (73) to rotate. When the second connecting rod (76) descends, the rotating disk (73) rotates and the pushing bar (26) rises to push the rainwater in the water storage chamber (25) into the flow channel (213) of the connecting rod (21).
9. The method for constructing a high embankment according to claim 8, characterized in that: The driving member comprises a pedal (77) and a third connecting rod (78); the pedal (77) is arranged at the top of the reinforcing strip (2); one end of the third connecting rod (78) is connected to the pedal (77), and the other end is slidably arranged in the reinforcing strip (2) and extends into the water storage chamber (25); the pedal (77) is slidably installed on the reinforcing strip (2) through the third connecting rod (78); one end of the second connecting rod (76) away from the rotating disk (73) is hinged to the third connecting rod (78).
10. The method for constructing a high embankment according to claim 1, characterized in that: In step S2, a plurality of reinforcing strips (2) are arranged at intervals along the length direction of the base layer (1), and a butt joint is provided between two adjacent reinforcing strips (2) along the length direction of the base layer (1), and the two adjacent reinforcing strips (2) along the length direction of the base layer (1) are connected into a whole through the butt joint.