A bearing ring forging processing system

Through the bearing ring forging processing system combining air-cooling and water-cooling technology, the problem of poor cooling effect of air-cooling devices in the prior art is solved, efficient cooling and cooling is achieved, nozzle blockage is avoided, and production efficiency is improved.

CN119259907BActive Publication Date: 2025-02-28LUOYANG HENGJIA HEAVY IND EQUIPMENT CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411818486.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-02-28
Estimated Expiration
2044-12-11

AI Technical Summary

Technical Problem

In the existing bearing ring forging and processing systems, the air-cooling device has poor cooling effect and a long cooling time, which cannot meet the high-efficiency production needs. The spray cooling method can easily lead to blockage of the nozzle.

Method used

Design a bearing ring forging processing system, combining air-cooling and water-cooling technology, adopts air-cooling components, vortex tubes and water pumps and other structures to achieve air-cooling cooling through air-cooling components, and achieve water-cooling cooling through vortex tubes and water pumps. At the same time, cleaning rings and condensing plates are designed to ensure the recycling of coolant and heat recovery.

Benefits of technology

It improves the cooling effect of bearing rings, shortens cooling time, meets high-efficiency production needs, avoids nozzle clogging, and improves raw material utilization and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of bearing ring forging, and specifically to a bearing ring forging processing system, including a cooling box, movable slots are provided on both sides of the cooling box, a conveying mechanism is provided inside the cooling box, and both ends of the conveying mechanism extend to the outside of the cooling box through the movable slots; an air cooling component is provided inside the cooling box at the upper side of the conveying mechanism, and grille air inlets are provided on the front and rear sides of the cooling box at the lower side of the conveying mechanism, and the grille air inlets are formed by a number of hollow heat dissipating fins distributed at equal distances and fixed on the cooling box. The air cooling component of the present application cooperates with structures such as a vortex tube and a water pump to realize the combination of air cooling and water cooling, cools the bearing ring on the conveying mechanism, improves the cooling effect of the bearing ring, and improves the effect of subsequent production and processing of the bearing ring, and the air cooling further cools the liquid in the water cooling to ensure the recycling of the water cooling liquid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bearing ring forging, in particular to a bearing ring forging processing system. Background Art

[0002] The bearing includes a ring, a rolling element, and a cage. Most of the bearing rings are made of high-carbon chromium bearing steels such as GCr15, G8Cr15, GCr15SiMn, GCr15SiMo, GCr18Mo, and 100Cr6. In the existing forging process of the bearing rings, the surface of the bearing rings is rough due to the low processing accuracy of the ordinary ring rolling machine, and the decarburized layer of the bearing rings is thickened due to the impure gas atmosphere in the annealing furnace, which increases the subsequent cutting allowance and causes steel waste;

[0003] The utility model with announcement number CN209969481U specifically discloses a bearing ring forging processing system, which relates to the technical field of bearing ring forging processing. It includes a heating furnace, a punching machine, a CNC ring rolling machine, an air cooler, and a double-layer roller bottom nitrogen protection annealing furnace. The heating furnace is used to heat the material segment of high carbon chromium bearing steel. The punching machine is used to roughen, extrude, and punch the heated material segment in sequence to obtain the axially punched material segment. The CNC ring rolling machine is used to roll the axially punched material segment to obtain the ring. The air cooler is used to air cool the ring. The double-layer roller bottom nitrogen protection annealing furnace is used to spheroidize anneal the air-cooled ring. This application can reduce the surface roughness of the bearing ring and eliminate the decarburization layer after spheroidizing annealing, thereby reducing the cutting allowance, saving steel, and improving the utilization rate of raw materials.

[0004] In the bearing ring forging processing system, cooling of the bearing ring is a key link in the process steps. The air cooling device in the prior art has a poor cooling effect on the bearing ring and a long cooling time, which cannot meet the high-efficiency production requirements. In the prior art, the bearing ring is cooled by spraying cooling water on the bearing ring in a high-temperature state. However, in actual use, the cooling water will vaporize when it encounters the bearing ring in a high-temperature state. The vaporized high-temperature steam rises and contacts with the cooling water nozzle for a long time, which will cause scale to adhere to the surface of the nozzle, and the nozzle will be easily blocked if used for a long time.

[0005] Therefore, a bearing ring forging processing system is proposed. Summary of the invention

[0006] The object of the present invention is to provide a bearing ring forging system to solve the problems raised in the above background technology.

[0007] To achieve the above object, the present invention provides the following technical solution: a bearing ring forging processing system, comprising a cooling box, movable notches are provided on both sides of the cooling box, a conveying mechanism is provided inside the cooling box, and both ends of the conveying mechanism extend to the outside of the cooling box through the movable notches;

[0008] An air cooling component is arranged inside the cooling box at the upper side of the conveying mechanism, and grille air inlets are arranged on the front and rear sides of the cooling box at the lower side of the conveying mechanism. The grille air inlets are formed by several equally distributed hollow heat dissipating fins fixed on the cooling box.

[0009] Preferably, the conveying mechanism includes ear plates symmetrically fixed at the movable slots, a conveying roller is rotatably connected between the two ear plates, a conveying belt is sleeved on the outside of the conveying roller, the conveying belt is made of mesh alloy metal, a driving motor is fixed on the outside of the ear plate, and the output shaft of the driving motor is connected to one end of the conveying roller.

[0010] Preferably, the air cooling component includes a dual-axis motor, and the upper end output shaft of the dual-axis motor is sleeved and fixed with a sleeve, the outside of the sleeve is annularly fixed with fan blades at equal distances, the upper end surface of the cooling box is provided with a mounting groove, the fan blades are located in the mounting groove, and a protective net is fixed inside the mounting groove at the upper side of the fan blades, the outside of the dual-axis motor is fixed with a mounting plate, and the other end of the mounting plate is fixed to the inner wall of the cooling box.

[0011] Preferably, the lower output shaft of the dual-axis motor is rotatably connected to a condensation plate, and an electromagnet is embedded between the condensation plate and the lower output shaft of the dual-axis motor. The electromagnet is fixed to the condensation plate, and the lower output shaft of the dual-axis motor is made of a magnetic metal material.

[0012] Preferably, a vortex tube is provided on the lower side of the condensation plate, and injection holes are provided at equal distances on the lower end surface of the vortex tube.

[0013] Preferably, a cleaning ring is sleeved on the outside of the vortex tube, and a slider is fixed to the upper end of the cleaning ring. A sliding groove is opened on the lower side of the condensation plate at a position corresponding to the slider, and the top of the slider is located inside the sliding groove and is slidably connected to the sliding groove.

[0014] Preferably, the condensation plate is made of heat-conducting metal copper material, and a water tank with a vortex structure is opened inside the condensation plate, and the two ends of the water tank are respectively connected to the water inlet hole and the drainage hole, and the water inlet hole and the drainage hole are connected to the external water supply equipment.

[0015] Preferably, the bottom of the cooling box is a water storage chamber, in which a guide platform with an isosceles trapezoidal structure is fixed, a straw is fixed on the upper side of the guide platform at a position corresponding to the heat dissipation fins, and the other end of the straw is connected to the inside of the heat dissipation fins.

[0016] Preferably, a water pump is fixed on the rear side of the cooling box at the upper side of the grille air inlet hole, and the water inlet end and the water discharge end of the water pump are respectively fixedly connected with water pipes, the water inlet end water pipe is connected to the top of the cooling fin, and the water discharge end water pipe is connected to the vortex tube.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. The air cooling component of the present application cooperates with structures such as a vortex tube and a water pump to realize the combination of air cooling and water cooling, cools the bearing rings on the conveying mechanism, improves the cooling effect of the bearing rings, and improves the effect of subsequent production and processing of the bearing rings. The air cooling further cools the liquid in the water cooling to ensure the recycling of the water cooling liquid.

[0019] 2. The present application designs a cleaning ring and a condensation plate structure, which can, on the one hand, scrape and clean the adherent scale or other impurities on the surface of the vortex tube to avoid clogging the vortex tube injection hole; on the other hand, the design of the condensation plate allows the coolant to contact the vapor rising from the high-temperature bearing ring for condensation, thereby reducing the consumption of coolant and further recovering the heat through the internal water tank. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 It is the overall structural view of the present invention;

[0022] Figure 2 It is a cross-sectional view of the overall structure of the present invention;

[0023] Figure 3 It is a structural view of the air cooling assembly of the present invention;

[0024] Figure 4 A bottom view of the air cooling assembly of the present invention;

[0025] Figure 5 It is a structural view of the cooling box and the water pump of the present invention.

[0026] Description of reference numerals:

[0027] 1. Cooling box; 11. Movable notch; 12. Guide platform; 13. Mounting slot; 14. Protective net; 2. Conveying mechanism; 21. Driving motor; 22. Ear plate; 23. Conveyor belt; 24. Conveying roller; 3. Air cooling assembly; 31. Dual-axis motor; 32. Mounting plate; 33. Sleeve; 34. Fan blade; 35. Condensation plate; 36. Slide; 37. Cleaning ring; 38. Slider; 4. Vortex tube; 5. Grille air inlet; 51. Suction pipe; 6. Water pump; 61. Water pipe. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] See also Figures 1 to 5 , the present invention provides a technical solution:

[0030] A bearing ring forging processing system comprises a cooling box 1, wherein movable notches 11 are formed through both sides of the cooling box 1, a conveying mechanism 2 is arranged inside the cooling box 1, and both ends of the conveying mechanism 2 extend to the outside of the cooling box 1 through the movable notches 11;

[0031] An air cooling assembly 3 is provided inside the cooling box 1 at the upper side of the conveying mechanism 2, and grille air inlet holes 5 are provided on the front and rear sides of the cooling box 1 at the lower side of the conveying mechanism 2. The grille air inlet holes 5 are formed by several equally distributed hollow heat dissipating fins fixed on the cooling box 1.

[0032] The conveying mechanism 2 includes ear plates 22 symmetrically fixed at the movable slot 11, and a conveying roller 24 is rotatably connected between the two ear plates 22. A conveying belt 23 is sleeved on the outside of the conveying roller 24, and the conveying belt 23 is made of mesh alloy metal. A driving motor 21 is fixed on the outside of the ear plate 22, and the output shaft of the driving motor 21 is connected to one end of the conveying roller 24.

[0033] Specifically, the air cooling component 3 includes a dual-axis motor 31, and the upper output shaft of the dual-axis motor 31 is sleeved and fixed with a sleeve 33, and the outside of the sleeve 33 is equidistantly annularly fixed with fan blades 34, the upper end surface of the cooling box 1 is provided with a mounting groove 13, the fan blades 34 are located in the mounting groove 13, and a protective net 14 is fixed inside the mounting groove 13 at the upper side of the fan blades 34, the outside of the dual-axis motor 31 is fixed with a mounting plate 32, and the other end of the mounting plate 32 is fixed to the inner wall of the cooling box 1, the lower output shaft of the dual-axis motor 31 is rotatably connected with a condensation plate 35, and an electromagnet is embedded between the condensation plate 35 and the lower output shaft of the dual-axis motor 31, and the electromagnet is fixed to the condensation plate 35, the lower output shaft of the dual-axis motor 31 is made of magnetic metal material, a vortex tube 4 is provided on the lower side of the condensation plate 35, and injection holes are equidistantly provided on the lower end surface of the vortex tube 4.

[0034] By adopting the above technical solution, when working, add a proper amount of coolant to the water storage chamber at the bottom of the cooling box 1, and then use a tool to place the bearing ring to be cooled on the surface of the conveyor belt 23 at the right end of the cooling box 1, and then control the drive motor 21 and the dual-axis motor 31 to run. The drive motor 21 drives the conveyor belt 23 to move to the left by driving the conveyor roller 24, and then carries the bearing ring to be cooled through the inside of the cooling box 1. At this time, the dual-axis motor 31 rotates to suck the air on the lower side, and the external air enters the cooling box 1 through the grille air inlet 5, and blows the bearing ring transported on the surface of the conveyor belt 23 through the mesh conveyor belt 23 to achieve air cooling.

[0035] Specifically, a cleaning ring 37 is sleeved on the outside of the vortex tube 4, and a slider 38 is fixed to the upper end of the cleaning ring 37. A slide groove 36 is opened on the lower side of the condensation plate 35 at a position corresponding to the slider 38, and the top of the slider 38 is located inside the slide groove 36 and is slidably connected to the slide groove 36.

[0036] By adopting the above technical solution, when the dual-axis motor 31 controls the operation of the fan blades 34, the electromagnet between the lower output shaft and the condensation plate 35 is powered off, so it will not drive the condensation plate 35 to rotate. When a large amount of impurities or scale adheres to the surface of the vortex tube 4 and needs to be cleaned, the electromagnet is controlled to be conductive, and the dual-axis motor 31 rotates slowly, driving the slider 38 and the cleaning ring 37 to move along the surface of the vortex tube 4, and the slider 38 moves inside the slide groove 36 to clean the impurities on the surface of the vortex tube 4.

[0037] Specifically, the condensation plate 35 is made of heat-conducting metal copper, and a water tank with a vortex structure is opened inside the condensation plate 35. The two ends of the water tank are respectively connected to a water inlet hole and a drainage hole, and the water inlet hole and the drainage hole are connected to an external water supply device.

[0038] By adopting the above technical solution, the design of the condensation plate 35 allows the coolant to contact the steam rising from the high-temperature bearing ring to condense, thereby reducing the consumption of the coolant and further recovering the heat through the internal water tank.

[0039] Specifically, the bottom of the cooling box 1 is a water storage chamber, and a guide platform 12 with an isosceles trapezoidal structure is fixed in the water storage chamber. A suction pipe 51 is fixed on the upper side of the guide platform 12 at a position corresponding to the cooling fins, and the other end of the suction pipe 51 is connected to the inside of the cooling fins. A water pump 6 is fixed on the rear side of the cooling box 1 at a position above the grille air inlet hole 5. The water inlet end and the drainage end of the water pump 6 are respectively fixedly connected with water pipes 61. The water inlet end water pipe 61 is connected to the top of the cooling fin, and the drainage end water pipe 61 is connected to the vortex tube 4.

[0040] By adopting the above technical solution, the water pump 6 on the rear side of the cooling box 1 sucks the coolant in the water storage chamber through the water pipe 61 and transports it to the vortex tube 4, and finally sprays it downward on the surface of the bearing ring passing through the injection hole under the vortex tube 4 to achieve water cooling. The cooled coolant is filtered by the mesh conveyor belt 23 and finally flows back and falls into the water storage chamber.

[0041] Working principle: When working, add a proper amount of coolant to the water storage chamber at the bottom of the cooling box 1, and then use a tool to place the bearing ring to be cooled on the surface of the conveyor belt 23 at the right end of the cooling box 1, and then control the drive motor 21 and the double-axis motor 31 to run. The drive motor 21 drives the conveyor belt 23 to move to the left by driving the conveyor roller 24, and then carries the bearing ring to be cooled through the inside of the cooling box 1. At this time, the double-axis motor 31 rotates to suck the air on the lower side, and the external air enters the cooling box 1 through the grille air inlet 5, and passes through the mesh conveyor belt 2 The bearing ring transported on the surface of the conveyor belt 23 is blown to realize air cooling. During the air cooling, the water pump 6 at the rear side of the cooling box 1 sucks the coolant in the water storage chamber through the water pipe 61 and transports it to the vortex tube 4. Finally, the coolant is sprayed downward on the surface of the bearing ring passing through the lower injection hole of the vortex tube 4 to realize water cooling. The cooled coolant is filtered by the mesh conveyor belt 23 and finally flows back to the water storage chamber. During the falling process of the coolant, it can also be blown by the wind generated by the fan blades 34 driven by the dual-axis motor 31 to realize the cooling of the coolant.

[0042] The purpose of designing the guide platform 12 in the water storage chamber is that although the coolant is filtered by the mesh conveyor belt 23, fine metal dust can still easily fall through the conveyor belt 23. Therefore, the coolant is diverted by the guide platform 12 to precipitate on both sides of the guide platform 12. The user handles the precipitate regularly. The suction pipe 51 on the guide platform 12 is used to absorb water from the water storage chamber.

[0043] When the dual-axis motor 31 is controlling the operation of the fan blades 34, the electromagnet between the lower output shaft and the condensation plate 35 is powered off, so the condensation plate 35 will not be driven to rotate. When a large amount of impurities or scale adheres to the surface of the vortex tube 4 and needs to be cleaned, the electromagnet is controlled to be conductive, and the dual-axis motor 31 rotates slowly, driving the slider 38 and the cleaning ring 37 to move along the surface of the vortex tube 4. The slider 38 moves inside the slide groove 36 to clean the impurities on the surface of the vortex tube 4.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A bearing ring forging system, comprising a cooling box (1), characterized in that: Both sides of the cooling box (1) are provided with movable slots (11), a conveying mechanism (2) is provided inside the cooling box (1), and both ends of the conveying mechanism (2) extend to the outside of the cooling box (1) through the movable slots (11); An air cooling assembly (3) is arranged inside the cooling box (1) at an upper position of the conveying mechanism (2), and grille air inlet holes (5) are arranged at the front and rear sides of the cooling box (1) at a lower position of the conveying mechanism (2), wherein the grille air inlet holes (5) are formed by a plurality of hollow heat dissipation fins distributed at equal distances and fixed on the cooling box (1); The air cooling component (3) comprises a dual-axis motor (31), and the output shaft at the upper end of the dual-axis motor (31) is sleeved and fixed with a sleeve (33), and the outer part of the sleeve (33) is equidistantly annularly fixed with fan blades (34), and the upper end surface of the cooling box (1) is provided with a mounting groove (13), and the fan blades (34) are located in the mounting groove (13), and a protective net (14) is fixed inside the mounting groove (13) at a position above the fan blades (34), and a mounting plate (32) is fixed to the outer part of the dual-axis motor (31), and the other end of the mounting plate (32) is fixed to the inner wall of the cooling box (1); The output shaft at the lower end of the dual-axis motor (31) is rotatably connected to a condensation plate (35), and an electromagnet is embedded and connected between the condensation plate (35) and the output shaft at the lower end of the dual-axis motor (31), and the electromagnet is fixed to the condensation plate (35). The output shaft at the lower end of the dual-axis motor (31) is made of a magnetic metal material. A vortex tube (4) is provided on the lower side of the condensation plate (35), and injection holes are provided on the lower end surface of the vortex tube (4) at equal distances. A cleaning ring (37) is sleeved on the outside of the vortex tube (4), and a slider (38) is fixed to the upper end of the cleaning ring (37). A slide groove (36) is provided on the lower side of the condensation plate (35) at a position corresponding to the slider (38), and the top of the slider (38) is located inside the slide groove (36) and is slidably connected to the slide groove (36).

2. A bearing ring forging system according to claim 1, characterized in that: The conveying mechanism (2) comprises ear plates (22) symmetrically fixed at the movable notch (11), a conveying roller (24) is rotatably connected between the two ear plates (22), a conveying belt (23) is sleeved on the outside of the conveying roller (24), and the conveying belt (23) is made of a mesh alloy metal. A driving motor (21) is fixed on the outside of the ear plate (22), and the output shaft of the driving motor (21) is connected to one end of the conveying roller (24).

3. A bearing ring forging system according to claim 2, characterized in that: The condensation plate (35) is made of a heat-conducting metal copper material, and a water tank with a vortex structure is provided inside the condensation plate (35), and the two ends of the water tank are respectively connected to a water inlet hole and a drainage hole, and the water inlet hole and the drainage hole are connected to an external water source supply device.

4. A bearing ring forging system according to claim 3, characterized in that: The bottom of the cooling box (1) is a water storage chamber, in which a guide platform (12) with an isosceles trapezoidal structure is fixed, and a suction pipe (51) is fixed on the upper side of the guide platform (12) at a position corresponding to the heat dissipation fins, and the other end of the suction pipe (51) is connected to the inside of the heat dissipation fins.

5. A bearing ring forging system according to claim 4, characterized in that: A water pump (6) is fixedly provided on the rear side of the cooling box (1) at a position above the grille air inlet hole (5); a water pipe (61) is fixedly connected to the water inlet end and the water outlet end of the water pump (6); the water inlet end water pipe (61) is connected to the top of the heat dissipation fin, and the water outlet end water pipe (61) is connected to the vortex tube (4).

Citation Information

Patent Citations

  • Bearing ring forging system

    CN209969481U

  • Bearing ring forging cooling device with protection mechanism

    CN215657657U

  • Cooling device for bearing ring forging

    CN218744684U