Villa elevator steel structure modularization rapid installation device
Through a modular rapid installation device, the pre-processed main support, cross support and built-in U-shaped joints are used to solve the problems of high welding strength and deformation in steel structure elevator installation, and a fast and accurate installation process is achieved, reducing costs and Avoid welding deformation.
Patent Information
- Application Number
- CN202411592192.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2025-01-10
AI Technical Summary
During the installation of existing steel structure elevators, due to the need for on-site welding, the welding strength is high but the technical requirements are high, and the welding deformation and the size is difficult to accurately control.
Modular quick installation devices, including main braces, cross braces and built-in U-shaped joints, are pre-processed threads and welding by factory pre-processing, and are quickly assembled on site using electric torque wrench and infrared instruments to avoid the welding process.
Modular assembly is realized, installation speed and accuracy is improved, welding deformation is avoided, cost-saving, and assembly is possible without a crane.
Smart Images

Figure CN119284686A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of elevator installation. Background Art
[0002] The existing steel structures are troublesome to install on site because they are all loose parts. All profiles need to be welded on site, and most of them are vertical welding. The welding strength is high and requires high skills of the welding workers. The original surface paint is burned during the welding process, and it is easy to deform during welding. All dimensions are not easy to control accurately during welding. Summary of the invention
[0003] In view of the above problems, the present invention provides a modular quick installation device for a villa elevator steel structure, comprising a main support (1), a cross support (2), and characterized in that it also comprises: a built-in joint (4).
[0004] The built-in joint (4) is made of U-shaped steel; the main support (1) and the cross support (2) are provided with through holes; the built-in joint (4) is also provided with a through hole; the upper and lower main supports are connected by the built-in joint and bolts; and the built-in joint is also connected to the cross support by bolts;
[0005] Furthermore, a connecting plate (3) is provided between the cross brace (2) and the bolts used to fix the built-in joint.
[0006] Furthermore, the connecting plate (3) is provided with two L-shaped grooves for fixing the bolts, and the two grooves are arranged in parallel.
[0007] Furthermore, a reinforcing plate (5) is provided above the connecting plate (3); a through hole for fixing bolts is provided on the reinforcing plate (5).
[0008] The connecting holes between the main support (1) and the cross support (2) are drilled in the factory and then tapped with an extrusion tap. The connecting holes at both ends of the main support (1) are directly drilled on the main support (1). The cross support (2) and the connecting plate (3) components are welded in the factory and shipped. The built-in joint (4) is cut by laser.
[0009] During on-site assembly, first place one main support (1) on each side flat on the ground. Three cross supports (2) are required on each side. After the three sets are installed in place, tighten them with an electric torque wrench. This structure requires two sets of assembly.
[0010] After assembling the two groups of standing up, use the cross brace (2) components, bolt and connect with the reinforcing plate (5) to tighten, so that the four main supports (1) of the entire frame at the bottom section are erected. Because it is an overall square structure, it can stand up. After using an infrared level to check the horizontality and verticality, weld it firmly with the embedded parts on site. Then put the built-in joint (4) into the connection hole of the upper main support (1), and fix it with the main support (1). Insert the upper main support into the built-in joint (4) and fix it with bolts. Repeat the above steps to install the other three in place and tighten them in turn;
[0011] Screw the bolts into the threaded holes of the main cross brace (1), install the mounting cross brace (2) assembly in place and tighten it. This completes the second section assembly. You can assemble it in the same way as required.
[0012] The present invention has the advantages of modular assembly, high dimensional accuracy, fast installation speed, beautiful appearance, no welding deformation, cost saving, and can be assembled without a crane. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 is the main view.
[0014] Figure 2 This is a view of the built-in connector.
[0015] Figure 3 Assemble the views for the cross braces.
[0016] Figure 4 This is the assembly diagram of the cross brace and connecting plate.
[0017] Figure 5 This is the assembly drawing of the built-in connector parts.
[0018] Figure 6 For connecting plate.
[0019] Figure 7 For reinforcement plate. DETAILED DESCRIPTION
[0020] The connecting holes between the main support (1) and the cross support (2) are drilled in the factory and then tapped with an extrusion tap. The connecting holes at both ends of the main support (1) are directly drilled on the main support (1). The cross support (2) and the connecting plate (3) components are welded in the factory and shipped. The built-in joint (4) is cut by laser.
[0021] During on-site assembly, first place one main support (1) on each side flat on the ground. Three cross supports (2) are required on each side. After the three sets are installed in place, tighten them with an electric torque wrench. This structure requires two sets of assembly.
[0022] After assembling the two groups of standing up, use the cross brace (2) components, bolt and connect with the reinforcing plate (5) to tighten, so that the four main supports (1) of the entire frame at the bottom section are erected. Because it is an overall square structure, it can stand up. After using an infrared level to check the horizontality and verticality, weld it firmly with the embedded parts on site. Then put the built-in joint (4) into the connection hole of the upper main support (1), and fix it with the main support (1). Insert the upper main support into the built-in joint (4) and fix it with bolts. Repeat the above steps to install the other three in place and tighten them in turn;
[0023] Screw the bolts into the threaded holes of the main cross brace (1), install the mounting cross brace (2) assembly in place and tighten it. This completes the second section assembly. You can assemble it in the same way as required.
[0024] The connecting holes of the main support (1) and the cross support (2) are processed in the factory by using a radial drilling machine. The profile thickness is stretched on the parts with a hot melt drill bit to increase the depth of the thread to achieve the fastening strength. After drilling, the hole diameter is 10.5mm, and then the M12X1.75 thread is tapped with an extrusion tap. The connecting holes at both ends of the main support (1) are directly drilled with a twist drill on the 100mm width side and the 50mm side of the main support (1). The hole spacing is 60mm from the end face and the hole spacing is 120mm. There are 6 holes in total. The cross support (2) and the connecting plate (3) components are welded in the factory and shipped. The built-in joint (4) is cut by laser, and the hole spacing is 120mm. After processing and bending, 12 M12X1.75 national standard nuts are welded on each piece. The connecting plate (3) and the reinforcing plate (5) are stamped by a mold. After the above parts are processed, the surface is processed according to customer requirements and then put into the finished product warehouse.
[0025] During on-site assembly, firstly, place one main support (1) on each side flat on the ground, then screw the M12X30 hexagonal bolt (GB / T1228-1991), Φ12 spring washer (GB / T 7244-1987) and reinforcing plate (5) into the threaded holes of the main support (1), leaving a 10mm gap so that the cross support (2) assembly can be quickly installed through the small gap. Thus, three cross support (2) assemblies are required on one side. After the three sets are installed, they are tightened with an electric torque wrench. This structure requires two sets of assembly. After assembling the two groups of standing cross braces (2), M12X30 hexagonal bolts (GB / T 1228-1991), Φ12 spring washers (GB / T7244-1987) and reinforcing plates (5) are connected and tightened. In this way, the four main supports (1) of the entire frame at the bottom section are erected. Because it is an overall square structure, it can stand up stably. After using an infrared level to check the horizontality and verticality, weld it firmly with the embedded parts on site (reserved in advance by the customer). Then put the built-in joint (4) into the joint hole of the upper main support (1), and connect it with the main support (1) with M12X30 national standard hexagonal bolts (GB / T 1228-1991), Φ12 spring washers (GB / T Insert the upper main support into the built-in joint (4) and fix it with M12X30 national standard hexagonal bolts (GB / T 1228-1991), Φ12 spring washers (GB / T 7244-1987), and Φ12 flat washers (GB / T 95-2002) 6 each. Repeat the above steps to install and tighten the other three in turn. Then repeat the steps in the last section, screw the M12X30 hexagonal bolt (GB / T 1228-1991), Φ12 spring washer (GB / T 7244-1987) and reinforcing plate (5) into the threaded holes of the main support (1), leaving a 10mm gap so that the cross support (2) assembly can be quickly installed through the small gap. Install the cross support (2) assembly in place and tighten it. The second section is now assembled. You can assemble it in the same way as required.
[0026] The specific options are as follows but are not limited to the following options.
[0027] 1: Main support (100X50X4 rectangular tube material QB235) 2: Horizontal support (100X50X4 rectangular tube material QB235)
[0028] 3: Connecting plate (5mm plate material QB235) 4: Built-in connector (4.5mm plate material QB235)
[0029] 5: Reinforcement plate (4.5mm, material QB235) 6: M12X30 hexagonal head bolt (GB / T1228-1991)
[0030] 7: Φ12 spring washer (GB / T 7244-1987) 8: Φ12 flat washer (GB / T 95-2002)
[0031] 9: M12 nut (GB6170-86) 10: Wide reinforcement plate (10mm plate material QB235)
[0032] 11: Narrow reinforcement plate (10mm plate material QB235)
[0033] Figure 1 Shown is the main view
[0034] Figure 2 The figure shows the built-in joint view. First, put the built-in joint (4) into the inner joint of the main support (1) at the upper end of the lower section, and fix it to the main support (1) with 6 M12X30 national standard hexagonal head bolts (GB / T 1228-1991), Φ12 spring washers (GB / T 7244-1987), and Φ12 flat washers (GB / T 95-2002). Insert the upper main support into the built-in joint (4) and fix it with 6 M12X30 national standard hexagonal head bolts (GB / T 1228-1991), Φ12 spring washers (GB / T 7244-1987), and Φ12 flat washers (GB / T 95-2002). The built-in joint is assembled.
[0035] Figure 3 The figure shows the assembly view of the cross brace. Screw the M12X30 hexagonal bolt (GB / T 1228-1991), Φ12 spring washer (GB / T 7244-1987) and reinforcing plate (5) into the threaded hole of the main brace (1) respectively, leaving a 10mm gap so that the cross brace (2) assembly can be quickly installed through the small gap. In this way, three cross brace (2) assemblies are required on one side. After the three groups are installed, they are tightened with an electric torque wrench. This requires two sets of assembly. After assembling the two groups, stand them up and connect the cross brace (2) assembly, M12X30 hexagonal bolt (GB / T 1228-1991), Φ12 spring washer (GB / T 7244-1987) and reinforcing plate (5) respectively to tighten them.
[0036] Figure 4 The figure shows the assembly and welding of the cross braces (2) and (3).
[0037] Figure 5 The figure shows the assembly diagram of the parts of the built-in connector (4). During welding, the holes are positioned according to the positions of the holes, and the folded built-in connector (4) and the M12 nut (9) (GB6170-86) are welded in sequence by a welding robot.
[0038] The connecting holes of the main support (1) and the cross support (2) are processed in the factory by using a radial drilling machine. The profile thickness is stretched on the parts with a hot melt drill bit to increase the depth of the thread to achieve the fastening strength. After drilling, the hole diameter is 10.5mm, and then the M12X1.75 thread is tapped with an extrusion tap. The connecting holes at both ends of the main support (1) are directly drilled with a twist drill on both sides of the main support. The hole spacing is 60mm from the end face and the hole spacing is 120mm. There are 6 holes in total. The cross support (2) and the connecting plate (3) components are welded in the factory and shipped. The built-in joint (4) is bent, and then 12 M12X1.75 national standard nuts are welded on each piece. The connecting plate (3) and the reinforcing plate (5) are common parts. The above parts are processed and put into the finished product warehouse.
[0039] During on-site assembly, the main support (1) and the cross support (2) are placed flat on the ground, and then the M12X30 hexagonal bolts (GB / T1228-1991), Φ12 spring washers (GB / T 7244-1987) and the reinforcing plate (5) are screwed into the threaded holes of the main support (1) respectively, leaving a 10mm gap, so that the cross support (2) welding assembly can be quickly installed in place through the small gap. After it is in place, it is tightened with an electric torque wrench, and the infrared level is used to check the horizontality and verticality, and then it is welded firmly with the embedded parts on site (reserved in advance by the customer). Then, the built-in joint (4) is placed in the inner joint of the upper main support (1), and the main support (1) is fixed with the M12X30 national standard hexagonal bolts (GB / T 1228-1991), Φ12 spring washers (GB / T Insert the upper main support into the built-in joint (4) and fix it with M12X30 national standard hexagonal head bolts (GB / T 1228-1991), Φ12 spring washers (GB / T 7244-1987), and Φ12 flat washers (GB / T 95-2002) 6 each.
Claims
1. A modular quick installation device for a villa elevator steel structure, comprising a main support (1) and a cross support (2), characterized in that Also includes: Built-in connector (4); The built-in joint (4) is made of U-shaped steel; the main support (1) and the cross support (2) are provided with through holes; the built-in joint (4) is also provided with a through hole; the upper and lower main supports are connected through the built-in joint and bolts; and the built-in joint is also connected to the cross support through bolts.
2. A modular quick installation device for villa elevator steel structure according to claim 1, characterized in that; A connecting plate (3) is also provided between the cross brace (2) and the bolts used to fix the built-in joint.
3. A modular quick installation device for villa elevator steel structure according to claim 2, characterized in that: The connecting plate (3) is provided with two L-shaped grooves for fixing bolts, and the two grooves are arranged in parallel.
4. A modular quick installation device for steel structure of villa elevator according to claim 2, characterized in that: A reinforcing plate (5) is also provided above the connecting plate (3); a through hole for fixing bolts is provided on the reinforcing plate (5).
5. A method for applying the device as claimed in claim 1, characterized in that: The connecting holes between the main support (1) and the cross support (2) are drilled in the factory and then tapped with an extrusion tap. The connecting holes at both ends of the main support (1) are directly drilled on the main support (1). The cross support (2) and the connecting plate (3) components are welded in the factory and shipped. The built-in joint (4) is cut by laser. During on-site assembly, first place one main support (1) on each side flat on the ground. Three cross supports (2) are required on each side. After the three sets are installed in place, tighten them with an electric torque wrench. This structure requires two sets of assembly. After assembling the two groups of standing up, use the cross brace (2) components, bolt and connect with the reinforcing plate (5) to tighten, so that the four main supports (1) of the entire frame at the bottom section are erected. Because it is an overall square structure, it can stand up. After using an infrared level to check the horizontality and verticality, weld it firmly with the embedded parts on site. Then put the built-in joint (4) into the connection hole of the upper main support (1), and fix it with the main support (1). Insert the upper main support into the built-in joint (4) and fix it with bolts. Repeat the above steps to install the other three in place and tighten them in turn; Screw the bolts into the threaded holes of the main cross brace (1), install the mounting cross brace (2) assembly in place and tighten it. This completes the second section assembly. You can assemble it in the same way as required.